1 HEAL Active Transportation Bicycle and Pedestrian Facility Design Discussion September 9, 2014

2 Major Design Considerations Rural and urban Areas Sidewalk location considerations Crosswalk locations and safety Bicycle accommodation on roadways Parking issues Speeding and traffic calming Sidewalk typical section design Intersections One-way streets

3 Basic Design Parameters Sidewalks 5 wide with 2% cross slope (at driveways also) Layout route to minimize crosswalks Crosswalks at intersections are usually safer than midblock crosswalks Minimize crosswalk length Separate sidewalks from roadways as much as possible Bicycle Accommodation Roadway lanes are typically 11 Shoulders/Bicycle lanes should be 4 wide (5 where curb is present)

4 Basic Design Parameters

5 Basic Design Parameters

6 Basic Design Parameters

7 Broadway, Pembroke - Preconstruction Conditions Densely populated residential area Existing sidewalks in poor condition Broadway is wide open road with no curbing Two-way streets add to traffic congestion at school Major drainage problems Water system and gas system improvements Pedestrian safety at the school needed attention

8 Broadway, Pembroke - Preconstruction Conditions

9 Broadway, Pembroke - Preconstruction Conditions

10 Broadway, Pembroke - Preconstruction Conditions

11 Broadway, Pembroke Design Goals Rebuild sidewalks to comply with ADA Add curbing project wide to define roadway areas Create a one-way circulation pattern (Maple and Pine) Include angle parking on east side of roadway Improve pedestrian safety at the school by minimizing vehicle/pedestrain conflicts at front entrance

12 Broadway, Pembroke Post Construction Conditions

13 Broadway, Pembroke Post Construction Conditions

14 Broadway, Pembroke Post Construction Conditions

15 Broadway, Pembroke Post Construction Conditions

16 Broadway, Pembroke Post Construction Conditions

17 Broadway, Pembroke Village School

18 Broadway, Pembroke Village School

19 Broadway, Pembroke Village School

20 Broadway, Pembroke Summary Mailbox locations important to consider Creating a one-way circulation pattern drastically improved pedestrian safety at the school Back in angle parking was accepted by area residents with no complaints Village School improvements further improved safety for students being dropped off and walkers Street trees would have helped narrow scale of roadway Bicycle advocacy may have helped refine design

21 Newbury Harbor Pedestrian Project Preconstruction Conditions Small rural community center No sidewalks heavy pedestrian activity in summer Unsafe pedestrian areas at Town dock/beach parking area Intersection wide open allowing fast turns by cars and trucks Wide open roadway shoulders and poor access control leading to speeding Standard street lighting

22 Newbury Harbor Project - Preconstruction Conditions

23 Newbury Harbor Project - Preconstruction Conditions

24 Newbury Harbor Project - Preconstruction Conditions

25 Newbury Harbor Project - Preconstruction Conditions

26 Newbury Harbor Project - Preconstruction Conditions

27 Newbury Harbor Project Preconstruction Conditions

28 Newbury Harbor Project - Preconstruction Conditions

29 Newbury Harbor Project - Preconstruction Conditions

30 Newbury Harbor Project - Design Considerations Provide new sidewalks between municipal complex/library/town beach Create a safe pedestrian route at parking lot near the beach/docks including pedestrian bridge Create safe crosswalk locations Redesign the intersection to slow traffic down Provide improved bicycle accommodation Traffic calming to reduce speeding Shift roadway about 4 feet to accommodate sidewalks New street lighting and landscaping

31 Newbury Harbor Project Post Construction Conditions

32 Newbury Harbor Project - Post Construction

33 Newbury Harbor Project - Post Construction

34 Newbury Harbor Project - Post Construction

35 Newbury Harbor Project - Post Construction Conditions

36 Newbury Harbor Project - Post Construction

37 Newbury Harbor Project - Post Construction

38 Newbury Harbor Project - Post Construction

39 Newbury Harbor Project - Post Construction

40 Newbury Harbor Project - Summary Identify destinations/pedestrian routes early Parking spaces at Town Beach were sacrificed to improve pedestrian safety and create sitting areas Create enjoyable spaces in large pedestrian areas (not all concrete) that people will use Curbing, trees and ornamental lights (locations) are critical to visual character of roadway Create a balance between large vehicles and traffic calming at the intersection

41 Central Square, Bristol Preconstruction Conditions Downtown, densely populated, commercial area Many missing sidewalk connections Unsafe crosswalks Poor bicycle accommodation on roadways Vehicle speeding and traffic calming Wide open intersection with poorly defined lanes One-way operation change on North Main Street New lighting and landscaping

42 Central Square, Bristol - Preconstruction Conditions

43 Central Square, Bristol - Preconstruction Conditions

44 Central Square, Bristol - Preconstruction Conditions

45 Central Square, Bristol - Preconstruction Conditions

46 Central Square, Bristol - Preconstruction Conditions

47 Central Square, Bristol - Preconstruction Conditions

48 Central Square, Bristol - Design Objectives Improve crosswalk safety Add missing sidewalk connections Provide bicycle accommodation on roadways Minimize loss in parking spaces and locate new parking spaces where possible Create a visually constrained corridor with street trees and other streetscape elements for traffic calming Intersection improvements for pedestrian/vehicle safety One-way operation change on North Main Street for safety Create a Town Common area

49 Central Square, Bristol - Post Construction Conditions

50 Central Square, Bristol - Post Construction Conditions

51 Central Square, Bristol - Post Construction Conditions

52 Central Square, Bristol - Post Construction Conditions

53 Central Square, Bristol - Post Construction Conditions

54 Central Square, Bristol - Post Construction Conditions

55 Central Square, Bristol - Post Construction Conditions

56 Central Square, Bristol - Post Construction Conditions

57 Central Square, Bristol - Post Construction Conditions

58 Central Square, Bristol - Post Construction Conditions

59 Central Square, Bristol - Post Construction Conditions Improved visibility When leaving the parking space, motorists are able to see oncoming traffic. Decreased number of collisions Motorists no longer have to back out blindly from their parking space.s Improved safety For children. Car doors open in a manner that directs children to the back of the vehicle, ushering them towards the sidewalk rather than the street. For cyclists. As vehicles exit their parking stall, they are able to see cyclists in the roadway. Improved loading and unloading Trunks are adjacent to the sidewalk and open car doors offer protection from the street, allowing loading and unloading to occur outside of the traveled roadway.

60 Central Square, Bristol - Summary Back-in angle parking public acceptability can be challenging Flush island design (curb with stamped concrete) changed to stamped asphalt during construction Care must be taken when placing trees in commercial areas Locate new parking spaces where possible (back-in angle) Wide sidewalks encourage outdoor dining If a Town common is created it will be used Beautiful Streetscapes encourage investments

61 Conclusion Opportunities to allocate underused sections of roadways are everywhere Balance between large vehicles, bicycles and pedestrians a challenge Cannot tell people enough about what the impacts will be during construction Use back in angle parking wherever possible Beautiful streetscapes encourage investments Pedestrian and bicycle advocates must get involved during the design/public meeting process

Bicycle Facility Design Guidelines

Bicycle Facility Design Guidelines Bicycle Facility Design Guidelines, New Hampshire Prepared for: Bicycle and Pedestrian Advisory Committee Prepared By: ORW Landscape Architects and Planners Introduction September, 2008 These guidelines

More information

DIVISION 5 SITE ACCESS/DRIVEWAYS

DIVISION 5 SITE ACCESS/DRIVEWAYS DIVISION 5 SITE ACCESS/DRIVEWAYS This section pertains to the site access roads and driveways of private properties, accessing the street system of the City of Lynden. Access points are low volume intersections

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Traffic Calming Solutions for Athens-Clarke County

Traffic Calming Solutions for Athens-Clarke County Traffic Calming Solutions for Athens-Clarke County Implementing the Neighborhood Traffic Management Program for safer streets in your neighborhood SUPPORT BikeAthens TRANSPORTATION CHOICES.com The Athens-Clarke

More information

COMPLETE STREETS ROAD DESIGN AUDITS FOR BICYCLES AND PEDESTRIANS

COMPLETE STREETS ROAD DESIGN AUDITS FOR BICYCLES AND PEDESTRIANS COMPLETE STREETS ROAD DESIGN AUDITS FOR BICYCLES AND PEDESTRIANS By Ed Barsotti, Executive Director Stephen Hunt, Project Assistant Christopher Trigg, Project Assistant League of Illinois Bicyclists 2550

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

6: LANE POSITIONS, TURNING, & PASSING

6: LANE POSITIONS, TURNING, & PASSING 6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against

More information

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings

HIGHWAY DESIGN REPORT. Appendix 4. Proposed Design Principles for City Passings HIGHWAY DESIGN REPORT Appendix 4 Proposed Design Principles for City Passings June 2000 Contents Page 1 Introduction 2 1.1 Purpose 2 1.2 Definition of city passing 2 1.3 Safety Problems 2 1.4 Planning

More information

Easton 13 th Street Corridor

Easton 13 th Street Corridor green infrastructure Easton 13 th Street Corridor Sustainable Communities Grant community connections 12 th Avenue, Portland, OR Karl Stirner Arts Trail, Easton, PA safer corridors beautification 3 rd

More information

Bicycle Facility Design

Bicycle Facility Design Bicycle Facility Design by Richard C. Moeur, P.E., L.C.I. April 2004 edition What is a "Bicycle Facility"? Bicycle Facility: Improvements and provisions to accommodate or encourage bicycling Any roadway

More information

Traffic Calming Techniques

Traffic Calming Techniques Traffic Calming Techniques Cape Cod Commission June 2011 June 2011 By request from the Town of Truro, the Cape Cod Commission has prepared this summary of Traffic Calming Techniques. Traffic Calming is

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Making Concepts Concrete

Making Concepts Concrete COMPLETE STREETS/COMPETING PRIORITIES Making Concepts Concrete UCLA DOWNTOWN LOS ANGELES FORUM / MAY 14, 2015 Francie Stefan, Transportation & Strategic Planning Manager City of Santa Monica Santa Monica

More information

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter.

CHAPTER 7 DRIVEWAYS. The following definitions must be used in conjunction with the criteria described in this Chapter. CHAPTER 7 DRIVEWAYS 7.0 INTRODUCTION It is in the public interest to regulate the location, design, construction, maintenance and drainage of access driveways, local roads and other property within State

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

TRAFFIC RULES QUESTIONS

TRAFFIC RULES QUESTIONS TRAFFIC RULES QUESTIONS Answer 1. In Ontario, a driver will be given 7 demerit points if he/she is convicted of: A. Following too close B. Failing to stop for a stopped school bus with its red alternating

More information

The overwhelming majority of pedestrian routes cross a mixture of land types [13, 139].

The overwhelming majority of pedestrian routes cross a mixture of land types [13, 139]. 5 Approaches to providing for pedestrians Adopt the best approach for each place Who gets considered first? road user hierarchy Getting it right on private land too Consider solutions in this order Concepts

More information

chapter 3 basic driving skills

chapter 3 basic driving skills chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow

More information

NE 75TH STREET REDESIGN

NE 75TH STREET REDESIGN The Seattle Department of Transportation NE 75TH STREET REDESIGN Before and After Study: 15th Ave NE to 35th Ave NE NE 75TH STREET REDESIGN 1 CONTENTS 3 Project Overview 4 Study Background 5 Early Improvements

More information

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool.

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9 Office: 519-829-8801 Cell: 519-362-5664 Email: info@guelphdrivingschool.com Dear Student, We would like to take this opportunity to thank you for choosing

More information

Hennepin County 2040 Bicycle Transportation

Hennepin County 2040 Bicycle Transportation Hennepin County 2040 Bicycle Transportation Appendix C - Bikeway Design Toolkit The Hennepin County Toolkit serves a dual function of providing definitions and reference guidance to local cities, agencies

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

Cycling and The Highway Traffic Act. Ontario Cycling Association Club Presidents Day Sasha Gollish, P.Eng., M.Eng., LEEDap

Cycling and The Highway Traffic Act. Ontario Cycling Association Club Presidents Day Sasha Gollish, P.Eng., M.Eng., LEEDap Cycling and The Highway Traffic Act Ontario Cycling Association Club Presidents Day Sasha Gollish, P.Eng., M.Eng., LEEDap Vehicles Users Safety Roads Federal Provincial Municipal Cycling and the Law Safest

More information

Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation

Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation The Montgomery Metropolitan Planning Organization (MPO) receives a direct annual allocation

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

IV. LIGHTING. General Lighting Principles

IV. LIGHTING. General Lighting Principles IV. LIGHTING Introduction General Lighting Principles Driveways Parking Lots, Outdoor Sales & Service Areas Pedestrian Spaces Building Facades & Landscape Lighting Gas Station, Convenience Stores & Drive-Through

More information

17.0 Lighting. Figure A Illumination Level Standards Table. Lights in the plaza s canopy allows this area to be used at night.

17.0 Lighting. Figure A Illumination Level Standards Table. Lights in the plaza s canopy allows this area to be used at night. 17.0 Lighting 17.1 Intent 17.2 General Lighting Standards 17.3 Backlight, Uplight and Glare Standards 17.4 Design and Fixture Standards 17.5 Circulation Standards: Streets 17.6 Circulation Standards: Pedestrian,

More information

TEST ON Driving Safely Among Bicyclists and Pedestrians

TEST ON Driving Safely Among Bicyclists and Pedestrians TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score

More information

Intersection Geometry. Designing for Pedestrian Safety Intersection Geometry

Intersection Geometry. Designing for Pedestrian Safety Intersection Geometry Intersection Geometry Learning Outcomes At the end of this module, you will be able to: 1. Explain why tight/right angle intersections are best 2. Describe why pedestrians need access to all corners 3.

More information

an edriving company AB 60 Practice Tests

an edriving company AB 60 Practice Tests an edriving company AB 60 Practice Tests Join the conversation facebook.com/ab60informacion Practice Test #1 8. This sign means: 1. You may drive off of the paved roadway to pass another vehicle: A. If

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Appendix F: Bicycle and Pedestrian Facility Design Guide

Appendix F: Bicycle and Pedestrian Facility Design Guide Appendix F: Bicycle and Pedestrian Facility Design Guide 1 Introduction This technical handbook is intended to assist Washington State University and the City of Pullman in the selection and design of

More information

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding. Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of

More information

GUIDELINES - SITE PLAN APPLICATION DRAWINGS

GUIDELINES - SITE PLAN APPLICATION DRAWINGS GUIDELINES - SITE PLAN APPLICATION DRAWINGS GENERAL PLAN REQUIEMENTS All measurements must be in metric Plan scale is to be a standard scale and to suit project requirements. A scale of 1:200 to 1:400.

More information

9.0 Movement Framework

9.0 Movement Framework Figure C-62. Off-road dedicated bicycle lanes and pedestrian path 9.0 Movement Framework Accessibility across campus is largely dependent on the integrated circulation systems that support a variety of

More information

Driver s ED Test Questions and Answers

Driver s ED Test Questions and Answers Driver s ED Test Questions and Answers 1. When you come to a corner with a stop sign, you should first stop: A. Far enough to see cross traffic B. After crossing a crosswalk or limit line C. In back of

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 P age 305 11 Parking 11.1 Introduction Parking is a necessary part of vehicle based transport. It provides for vehicles to be stopped while they are loaded/unloaded and stored while they are not in use

More information

Context Sensitive Design for Urban Transportation in West Philadelphia

Context Sensitive Design for Urban Transportation in West Philadelphia Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of

More information

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS This chapter summarizes traffic signs, signals and road markings that control the flow of traffic, making streets and highways safer for motorists, bicyclists

More information

What s possible? Design Facilities

What s possible? Design Facilities What s possible? Design Facilities Complete Streets for Bicycling Every street should be designed and operated to meet the needs of people riding bikes using the best available designs and best practices.

More information

11 signs, signals and road markings

11 signs, signals and road markings 11 signs, signals and road markings This chapter is a handy reference section that gives examples of the most common signs, signals and road markings that keep traffic organized and flowing smoothly. What

More information

Welcome! Centre Avenue Information Session. Design changes for pedestrian and bicycle improvements along Centre Avenue

Welcome! Centre Avenue Information Session. Design changes for pedestrian and bicycle improvements along Centre Avenue Welcome! Centre Avenue Information Session Design changes for pedestrian and bicycle improvements along Centre Avenue 1 Design Changes for Pedestrian and Bicycle Improvements Project Objectives: To improve

More information

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces.

Libor DRAFT Plan. Improve existing gravel parking area to create 12 parking spaces. Libor DRAFT Plan Improve existing gravel parking area to create 12 parking spaces. Expand parking area to create 25 additional spaces with 2 van accessible ADA compliant handicapped stalls with asphalt

More information

Urban Roadway Classification

Urban Roadway Classification Urban Roadway Classification Before the Design Begins GERRY FORBES Senior Manager Synectics Transportation Consultants, Inc. 36 Hiscott Street, Second Floor St. Catharines, Ontario, Canada gforbes@stci.net

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

Site Plan Drawing Requirements Site Plan Control

Site Plan Drawing Requirements Site Plan Control Minimum Site Plan requirements (for Pre-application Consultation purposes only) Note: Site Plan must be sufficiently detailed for City staff to review. Required Information: North arrow Dimensioned property

More information

Hamlet of Chappaqua Improvement Project Town Board Technical Presentation

Hamlet of Chappaqua Improvement Project Town Board Technical Presentation Hamlet of Chappaqua Improvement Project Town Board Technical Presentation April 7, 2015 OBTAIN DIRECTION FROM TOWN INFRASTRUCTURE AND STORMWATER MANAGEMENT DESIGN ROADWAY AND TRAFFIC DESIGN OPTIONS STREETSCAPE

More information

Prepared by Active and Safe Routes to School Manitoba A program of Green Action Centre

Prepared by Active and Safe Routes to School Manitoba A program of Green Action Centre Traffic Survey and Neighbourhood Walkabout Questionnaire Prepared by Active and Safe Routes to School Manitoba A program of Green Action Centre Identifying specific transportation and safety issues at

More information

Preparing For Your Road Test. Class 5 (basic and advanced) and Class 4

Preparing For Your Road Test. Class 5 (basic and advanced) and Class 4 Preparing For Your Road Test Class 5 (basic and advanced) and Class 4 Knowing what to expect on your road test will make you better prepared and increase the chance you will be successful the first time.

More information

MANUAL OF POLICIES AND PROCEDURES. This Section provides the basic criteria for review of driveway designs.

MANUAL OF POLICIES AND PROCEDURES. This Section provides the basic criteria for review of driveway designs. MANUAL OF POLICIES AND PROCEDURES NO. Department of Transportation ATTACHMENT C 2/2003 DIST. ORIGINATOR 10 1 of 13 I. Purpose This Section provides the basic criteria for review of driveway designs. The

More information

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL.

CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS. TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL. CENTRAL CORRIDOR LIGHT RAIL TRANSIT PRELIMINARY DESIGN PLANS TRANSPORTATION AND PUBLIC WORKS COMMITTEE of the MINNEAPOLIS CITY COUNCIL June 10, 2008 I. INTRODUCTION The for the Central Corridor LRT project

More information

How To Link Land Use and Transportation Planning

How To Link Land Use and Transportation Planning How To Planning Series Prepared by Strafford Regional Planning Commission. Funded by the NH Office of State Planning and the NH Department of Transportation How To Link Land Use and Transportation Planning

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Site Plan Approval Process & Application Packet

Site Plan Approval Process & Application Packet Site Plan Approval Process & Application Packet Application packet includes the following: Site Plan application form (must be complete) Design Standards checklist Site Plan Drawing Checklist Application

More information

Road Signs Recognition Quiz

Road Signs Recognition Quiz Road Signs Recognition Quiz Place your answer for each of the signs/pavement markings on the answer sheet. Ready to Roll? Here Comes Sign # 1... #1 A No right turn B Right turn only C Warning, no turn

More information

Cycle Track Concepts for Burlington ON: Design Lessons from Apeldoorn NL

Cycle Track Concepts for Burlington ON: Design Lessons from Apeldoorn NL Cycle Track Concepts for Burlington ON: Design Lessons from Apeldoorn NL Norma Moores, P. Eng. IBI Group Paper prepared for presentation at the Rethinking the Geometric Design of Facilities for Vulnerable

More information

Safety Evidence for Bicycling

Safety Evidence for Bicycling Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Stop for Pedestrians Bill is Now Law

Stop for Pedestrians Bill is Now Law Stop for Pedestrians Bill is Now Law With the passage of Assembly Bill No. 1329, drivers now risk $200 fines, 15-day community-service sentences and four points if they fail to bring their vehicles to

More information

TRANSPORTATION IMPACT ASSESSMENT. Tisbury Farm Market Consolidation State Road Tisbury, Massachusetts. DRI No. 631

TRANSPORTATION IMPACT ASSESSMENT. Tisbury Farm Market Consolidation State Road Tisbury, Massachusetts. DRI No. 631 TRANSPORTATION IMPACT ASSESSMENT DRI No. 631 Tisbury Farm Market Consolidation State Road Tisbury, Massachusetts April 27 2011 prepared for Martha s Vineyard Commission by C3 Consulting Group CONTENTS

More information

Urban Design Interventions Towards a Bike Friendly City

Urban Design Interventions Towards a Bike Friendly City Denne artikel er publiceret i det elektroniske tidsskrift Artikler fra Trafikdage på Aalborg Universitet (Proceedings from the Annual Transport Conference at Aalborg University) ISSN 1603-9696 www.trafikdage.dk/artikelarkiv

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

A Guide to Safe Bicycling in Hawai i

A Guide to Safe Bicycling in Hawai i A Guide to Safe Bicycling in Hawai i Sharing the Road: A Guide to Safe Bicycling in Hawai i What Motorists & Bicyclists Should Know Everyone has the right to be safe on Hawai i s roads. Law of the Splintered

More information

PEDESTRIAN & BICYCLE LEVEL OF SERVICE

PEDESTRIAN & BICYCLE LEVEL OF SERVICE Charlotte Department of Transportation PEDESTRIAN & BICYCLE LEVEL OF SERVICE METHODOLOGY FOR CROSSINGS AT SIGNALIZED INTERSECTIONS Updated February 27 CONTENTS Introduction p 3 Signal Features and Pedestrian

More information

These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page

These rules of the road are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Texas Bicycle Laws These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Bicyclists have the rights and duties of other vehicle

More information

4-PEDESTRIAN & BICYCLE CIRCULATION & STREETSCAPE DESIGN

4-PEDESTRIAN & BICYCLE CIRCULATION & STREETSCAPE DESIGN 4-Pedestrian & bicycle Circulation & Streetscape Design 4-PEDESTRIAN & BICYCLE CIRCULATION & STREETSCAPE DESIGN In recent years, the City has constructed new sidewalks and enhanced existing ones in the

More information

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas McCauley Area Guiding Principles 1 Connect: Chinatown and Little Italy with downtown and surrounding areas 2 Strengthen: Cultural character in Chinatown and Little Italy 3 Develop: Strong East West pedestrian

More information

Processing Information. Curves & Hills

Processing Information. Curves & Hills Mod 5 Processing Information Intersections Curves & Hills Passing DRIVER REQUIREMENTS Processing Information Basic Requirements for Driving VISIBILITY... SPACE... TIME... SPACE... TRACTION TO MANEUVER

More information

Florida Avenue Crossing

Florida Avenue Crossing Florida Avenue Crossing Prepared for: Arapahoe County Open Spaces On behalf of the High Line Canal Working Group 6934 South Lima Street, Suite A Centennial, CO 80112 Prepared by: Felsburg Holt & Ullevig

More information

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT.

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT. Indiana Multimodal Project Indiana County, PA, Project No#5063 Date- January 22, 2015 Cover Page FINAL REPORT Table of Contents Executive Summary Report Summary of Study Indiana University of Pennsylvania

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

Griffith Park Action Plan

Griffith Park Action Plan Griffith Park Action Plan 1 Project Objectives 1. Improve public safety for ALL 2. Improve public access for all while protecting the natural environment and urban wilderness identity 3. Long term health

More information

City of Portsmouth Application for Driveway Permit Contact Information

City of Portsmouth Application for Driveway Permit Contact Information City of Portsmouth Application for Driveway Permit Contact Information Dave Desfosses djdesfosses@cityofportsmouth.com (603) 766-1411 Forms can be completed and mailed to: Dave Desfosses Dept. of Public

More information

North Eastham Village Zoning Strategy

North Eastham Village Zoning Strategy North Eastham Village Zoning Strategy 1. Make selected revisions to the Eastham Zoning Bylaw in terms of use, dimensional and parking standards specifically tailored to North Eastham Village Project Area.

More information

EPA Technical Assistance for Sustainable Communities Building Blocks

EPA Technical Assistance for Sustainable Communities Building Blocks EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,

More information

VAN WHITE BOULEVARD Open House - January 29, 2015

VAN WHITE BOULEVARD Open House - January 29, 2015 PUBLIC REALM IMPROVEMENTS Enhanced Park Programming, Performance Venue Seed Academy / Harvest Enhanced Streetscape Olson Memorial Hwy Trail Lighting Harrison Park Park Community Garden Plaza Wayfinding

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

II. STREET TREE AND LANDSCAPE MATERIAL PERMIT APPLICATION AND APPROVAL PROCESS

II. STREET TREE AND LANDSCAPE MATERIAL PERMIT APPLICATION AND APPROVAL PROCESS PURSUANT TO ORDINANCE NO. 165-95, REGULATING THE PLANTING, MAINTENANCE, OR REMOVAL OF TREES AND LANDSCAPE MATERIAL ON PUBLIC SIDEWALK AREAS AND SUPERCEDING ORDER NO. 170,735 AND NO. 169,946. I. PURPOSE

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

Legislative Department Seattle City Council Memorandum

Legislative Department Seattle City Council Memorandum Legislative Department Seattle City Council Memorandum To: COBE Committee From: Christa Valles, Central Staff Subject: C.B. 117165, Food Vending Legislation Date: May 10, 2011 On May 11, Executive staff

More information

Bicycle Safety Enforcement Action Guidelines

Bicycle Safety Enforcement Action Guidelines Introduction Bicycle Safety Enforcement Action Guidelines People ride bicycles for many different reasons: fitness, recreation, or for transportation. Regardless of the reason for riding, bicyclists young

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Chapter 15. Access Management. 15 Access Management

Chapter 15. Access Management. 15 Access Management Chapter 15 Access Management 15 Access Management Chapter 15 Access Management This chapter discusses access management techniques that have potential application to highways and streets. The chapter

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Wisconsin Department Intelligent Transportation Systems (ITS) CHAPTER 7 CRASH INVESTIGATION SITES

Wisconsin Department Intelligent Transportation Systems (ITS) CHAPTER 7 CRASH INVESTIGATION SITES CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where

More information

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła,  VeloForum, 16 Oct. How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, www.miastadlarowerow.pl VeloForum, 16 Oct. 2010 th What has communism to do with cycling? No free flow

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

Bike Laws: Massachusetts

Bike Laws: Massachusetts Bike Laws: Massachusetts Do you know your rights of the road? Do you know what your responsibilities are when biking in Massachusetts? Here is a summary of Massachusetts bike law that covers equipment,

More information

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department Collingwood Trails Network Management Guidelines 2012 Parks, Recreation & Culture Department 1 SECTION 1: INTRODUCTION IN December 1998 the Town of Collingwood Parks, Recreation and Culture Department

More information

TRANSPORTATION ELEMENT OF THE COMPREHENSIVE PLAN

TRANSPORTATION ELEMENT OF THE COMPREHENSIVE PLAN TRANSPORTATION ELEMENT OF THE COMPREHENSIVE PLAN 2 INTRODUCTION Portland has spent the last several years working with Metro and other agencies, citizens, and community and business groups to develop the

More information

4.3 BICYCLE FACILITY DESIGN ELEMENTS

4.3 BICYCLE FACILITY DESIGN ELEMENTS 4.3 BICYCLE FACILITY DESIGN ELEMENTS Bicycle Parking... 134 Bike Corral... 138 Sharrows... 142 Conventional Bicycle Lanes... 146 Buffered Bicycle Lanes... 150 Protected Bicycle Lanes... 154 Bike Boxes...

More information

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Is Encouraging More Bike Ridership On El Camino Real A Good Idea? Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning

More information

Design Considerations

Design Considerations Chapter 7 Design Considerations INTRODUCTION The design of the built environment is important. It influences the day-to-day experiences of the residents of the Boroughs as they commute, work and spend

More information