Advanced Design and Technologies for In-situ Reprovisioning of Sha Tin Water Treatment Works South Works

Size: px
Start display at page:

Download "Advanced Design and Technologies for In-situ Reprovisioning of Sha Tin Water Treatment Works South Works"

Transcription

1 Advanced Design and Technologies for In-situ Reprovisioning of Sha Tin Water Treatment Works South Works Abstract: The Sha Tin Water Treatment Works is the largest water treatment plant in the Hong Kong Special Administrative Region, People s Republic of China. The South Works, using conventional water treatment process, was commissioned in 1964 while the subsequent expansions in 1973, 1976 and 1983 formed the North Works. The 48 years old plant and equipment in the South Works are approaching the end of their service life and require major renovation and replacement. The challenge is to complete the in-situ reprovisioning of the South Works and major common facilities for both the South Works and North Works within a site, which is already fully utilised, whilst maintaining the continuous operation, maintenance and security of the North Works. The key to success is to replace the conventional low-rate sedimentation process with high-rate robust process to free up the much-needed space. High rate lamella sedimentation basins, followed by ozonation and deep bed biological filtration, and UV disinfection at the downstream are proposed for the in-situ reprovisioning of the South Works. The paper presents the design approach and evaluation methodology of the water treatment processes and the formulation of the subsequent Master Layout Plan for the new South Works. Keywords: In-situ Reprovisioning, Water Treatment Works, High Rate Lamella Sedimentation, Deep Bed Biological Filtration, UV Disinfection 1

2 Introduction The Sha Tin Water Treatment Works (STWTW) is the largest water treatment plant of the Hong Kong Special Administrative Region (HKSAR) Government, People s Republic of China. It was commissioned in 1964 with an initial treatment capacity of 364,000 m³/day, which formed the current South Works. Three subsequent expansions in 1973, 1976 and 1983 formed the North Works, bringing the total nominal treatment capacity to 1,227,000 m³/day. The 48 years old plant and equipment in the South Works are approaching the end of their service life and require major renovation and replacement. The challenge is to complete the in-situ reprovisioning of the South Works with increased capacity from 364,000m 3 /day to 550,000m 3 /day, including major common facilities for both the South Works and North Works within the site, which is already fully utilised. It is also necessary to maintain continuous operation, maintenance and security of the North Works during the South Works reprovisioning. Water Supply Sources Currently STWTW receives water from 5 different sources: Dongjiang water is the main source, supplying water 11 months in a year. Plover Cove Reservoir (main storage of Dongjiang water) during Dongjiang shutdown. Shing Mun Reservoirs (yield from local catchment) by gravity. High Island Reservoir (yield from local catchment) with nominal supply only, and cosupply with Plover Cove Reservoir during Dongjiang shutdown. Direct catchment yields with high turbidity during rainy seasons. Figure 1 Water Sources for STWTW 2

3 These five water sources are different in character. Whilst the current Dongjiang water is excellent in quality, there have been prolonged periods in the past with high ammonia and manganese that require special attention. For the reservoir water, it is generally low in turbidity. High Island Reservoir is excellent in quality. Organics in the Plover Cove Reservoir tend to be high due to eutrophication, with occasional taste and odour problems due to algal bloom or slightly high MIB level in reservoir. Volume of catchwater yield during downpour can be very high and sufficient for normal demand without supplement from other sources. The challenge is the high turbidity from the runoff, jumping from the annual average between NTU to the average maximum between NTU during wet seasons (six months yearly), and a historical high of 400 NTU. Conventional Water Treatment Process With the constant changes of water sources during the day and throughout the year, the treatment process must be robust to meet the challenges from a continuous fluctuation in raw water quality. The treatment plant uses the conventional two-stage treatment process which is a typical design of the It comprises: addition of lime for ph adjustment and alum for coagulation and flocculation; clarification to settle out the large particles as sludge for further treatment and disposal; chlorine to remove manganese and ammonia that may be present in the water; rapid gravity filtration to remove finely divided particles in clarified water; and disinfection with chlorine, corrosion control by ph adjustment with hydrated lime and fluoridation for dental protection. Figure 2 Conventional Treatment Process Adopted in STWTW 3

4 A few key features of the earlier design include: Hydrated lime and alum addition at the inlet work is by dripping over a channel, followed by hydraulic mixing. This is an energy efficient design as no external energy input is required. The circular sludge blanket/reactor type clarifier is robust and capable of accommodating a wide turbidity range. However, shock loading from sudden changes in flow and quality must be avoided. The rapid gravity filter design uses dual media comprising fine sand and anthracite with a total thickness from 0.6m to 0.8m with supporting gravel layers (for filters constructed in different years). Treated water quality from this design serves the public well, and is generally able to meet the latest World Health Organisation (WHO) Guidelines for Drinking-water Quality. The Need for Reprovisioning STWTW used to supply treated water to approximately 40% of the population in Hong Kong in the 1980s and 1990s. With de-centralization of the population, more treatment plants were built in the 1990s. Commissioning of these treatment plants also serve to reduce reliance on production from STWTW and to improve reliability in security of water supply. Today, it still serves about 30% (two million people) of the population. With over 48 years of service, the aging plant and equipment are approaching the end of their service life. Increasing fault occurrences and unavailability of the spare parts caused significant maintenance problems. Furthermore, the treated water quality requirements have been raised progressively over the last 48 years with anticipated higher requirements in the future. Being an international city with high standards of living, the Water Supplies Department (WSD) of the HKSAR reviewed the international treatment plant design criteria in more advanced developed countries like US and the UK in formulating the appropriate design specifications for the reprovisioned STWTW. In addition to the compliance of treated water quality with the latest WHO s Guidelines for Drinking-water Quality, additional parameters have been incorporated in the design specification to supplement the WHO Guidelines in safeguarding drinking water quality. The key additional parameters include reduction of cryptosporidium and giardia (C&G) and virus by 4 log (ie, 99.99% reduction), as well as the treatment capability to cope with high iron, as well as removal of ammoniacal nitrogen (3.0 mg/l) and soluble manganese (1.5 mg/l) in raw water to take account of historical occurrence of these parameters. 4

5 In addition to the above treated water quality standards, WSD also required that in the new process design, the use of chlorine should be reduced as far as practicable to minimise the hazards associated with chlorine delivery and storage and halogenated disinfection byproducts. Traditionally, chlorine is used for oxidation of manganese and removal of ammonia, as well as final disinfection. Alternative treatment has to be used. Due to the above changes, the logical and practical solution is to reconstruct the plant to meet the current standards. Constraints in the Reprovisioning An investigation study was conducted in 2003, with the requirements that the treatment plant output be maintained at 900,000m 3 per day during the reprovisioning plant, and only two clarifiers could be taken out of service at any one time. New common facilities including chemical building, administration building, laboratory, power supply and pumping stations had to be reprovisioned as well. The first step taken was a review of the site utilization. Figure 3 shows the layout of the existing treatment plant, and the approximate area occupied by the clarifiers and filters. With the main treatment area occupying an area of approximately 80,000m 2, the clarifiers and filters take up respectively 46% and 20% of the site. A review of the existing treatment processes shows that the effective surface loading rate (SLR) of the clarifiers is about 2-2.5m/hr, whereas the SLR of the filters is about 9m/hr. A logical solution is to use high rate processes to reduce the footprint and free up more areas for other facilities for the reprovisioning of South Works with upgraded capacity from 364,000m 3 /day to 550,000m 3 /day. 5

6 Figure 3 Site Utilization Plan Whilst modern clarification and filtration processes are capable of offering higher SLR, the severe constraints mean that only relatively fast processes like Actiflo for clarification or low pressure membrane could be used. Apart from the operation and maintenance issues with these processes, the final layout of the treatment plant is considered unsatisfactory due to the small areas available for concurrent demolition and reconstruction. As a result of the findings from this study, WSD has carried out the following advance works to provide more area available for concurrent demolition and reconstruction: Obtained consent from the district council and residents association to remove part of the hill on the west of the site to construct a new chemical building. There are two main advantages: freeing up space early for reconstruction and offering a more central location for chemical dosing for the new treatment plant; Made modifications to the South Works filters to allow about half of the South Works filters to be demolished on commencement of construction; and Re-configured the water supply network and reduced reliance of supply from STWTW. These advance works allow other process alternatives to be considered. 6

7 Process Considerations Comparing the conventional treatment process used at STWTW and the new treated water quality standards including the reduction in chlorine usage, the following observations are made: The hydraulic mixing facility does not provide sufficient mixing energy needed for the modern design. Hence a new flash mixing and flocculation facility has to be provided. Whilst the use of potassium permanganate for manganese oxidation is practised elsewhere, it requires very precise control which is not easy to achieve in practice for WTW receiving raw water with rapid quality fluctuation. Hence, it is not the preferred solution in Hong Kong. The alternative is to use ozone (pre-ozone). Experience of this process in Ngau Tam Mei WTW, another advanced treatment plant in Hong Kong, is very favourable. The use of ozone at this stage of the treatment has the added benefit of reducing taste and odour problems and breaking down organics in the raw water to facilitate better process performance downstream. The alternative for ammonia removal is to use biological filter, with exhausted granular activated carbon as media. This process is to be preceded by intermediate ozonation which will oxidize the organics in the raw water as food source for the biological process in the biological activated carbon (BAC), and replenish dissolved oxygen to the water. Use high rate clarification technology such as high rate lamella sedimentation and dissolved air flotation to substantially reduce the footprint. Disinfection using chlorine remains the most practical solution. All other alternatives will involve the use of alternative form of chlorine products either as hypochlorite solution or chloramines (a chemical product of chlorine and ammonia). They require more space for its installation and storage, lead to more traffic, noise and emission impact for frequent deliveries, and require more energy and E&M plant for its production with the disadvantage of being less effective in disinfection. C&G and virus, which cannot be completely removed by conventional filters, can be reduced / inactivated by a number of alternatives, such as intermediate ozonation, ultraviolet (UV) radiation and low pressure membrane filtration. Each with different capital cost, operating cost, land requirement and point of application. Taking into account the above considerations, six treatment process options that can satisfy the process needs have been selected. All six options invariably require the use of ozone for manganese oxidation and biologically activated filter for ammonia removal for the reasons given above. These six treatment process options are: 7

8 Descriptions of Process Options Option 1A Option 1B Option 2 Option 3 Option 4A Option 4B Clarification Ozone BAC - UV High rate lamella sedimentation, followed by intermediate ozonation, single stage deep bed biological filtration (BAC) combining the biological ammonia removal function and particle filtration in one single filter, and UV disinfection downstream of the BAC Clarification Ozone BAC - Granular Media Filtration - UV This option is similar to Option 1A, but with two stages of filtration, ie, different filters for biological filtration and particle filtration Clarification Ozone BAC - Low Pressure Membrane Filtration This option is similar to Option 1B, but uses low pressure membrane filtration to perform the function of particle filtration and C&G removal Low Pressure Membrane Filtration Ozone - BAC Low pressure membrane filtration to replace clarification, particle filtration and C&G removal, followed by ozonation and subsequent biological filtration for ammonia removal Clarification Ozone - BAC This is the same as Option 1A, except that instead of using UV downstream of the BAC for C&G inactivation, the intermediate ozone system is designed to carry out this function Clarification - Ozone - BAC - Granular Media Filtration This is the same as Option 1B, except that instead of using UV downstream of the BAC for C&G inactivation, the intermediate ozone system is designed to carry out this function The designed SLR of the high rate lamella sedimentation process is 10m/hr, which is about 5 times faster than the current sludge blanket/reactor type clarifier. The SLR of the filters (either biological filter or particle filter) is also increased from 9m/hr to 16m/hr by using a deep bed (2.1m vs about 0.9m in conventional filters) coarse monomedia (GAC with effective size 1.1mm for biofilter and anthracite with effective size 0.95mm for particle filter, against fine sand with effective size 0.65mm and anthracite with effective size 1.4mm for conventional filter). These high rate processes allow some existing areas to be freed up for provision of other new facilities such as pre-ozone, intermediate ozone and biofilters needed for the new process. Essentially, the difference between Options 1 and 4 is in the use of UV against ozone for C&G inactivation, and the difference between Options A and B is the use of one-stage or two-stage filters. To assist the evaluation process, a decision model was constructed. Taking into account the treatment requirements, technical as well as operational needs, the selection criteria in the model included: treatment effectiveness, constructability, public acceptance/aesthetics, operational issues, sustainability and impacts on distribution system as shown in Appendix 1. 8

9 The weighting for each factors and the technical scores for the six options were agreed at a workshop with all stakeholders. Results of the technical evaluation are shown in Appendix 2. After the technical evaluation from the decision model, the technical scores and the estimated whole life cost for a 20 year period were compared. As there is no cost data for similar plants in Hong Kong, and that the design is only at conceptual level, typical unit costs from North America were used where appropriate. As the main purpose of this evaluation is to compare the relative order between options, absolute values are not necessary. The evaluation results are shown in Table 1 below. Primary Factor Total Benefits (as Measured by the Decision Model) Estimated 20 year Life Cycle Cost Benefit-to- Cost Ratio (with cost measured in Billion HK$) 1A: Preozone- Clarification- Ozone-BAC- UV 1B: Preozone- Clarification- Ozone-Two- Stage Filtration-UV 2: Preozone- Clarification- Ozone-BAC- Membranes Option Number 3: Preozone- Membranes- Ozone-BAC 4A: Preozone- Clarification- Ozone-BAC 4B: Preozone- Clarification- Ozone-Two- Stage Filtration HK$2,599M HK$3,050M HK$3,490M HK$3,381M HK$2,562M HK$3,049M Table 1 Preliminary Benefit-to-Cost ratio for all Process Alternatives Given that the cost estimate is only at conceptual level, the ranking is viewed as groups rather than absolute ranking. On this basis, the preliminary modelling indicates that Options 4A and 1A are the leading options, followed by Options 4B and 1B. The last two Options 2 and 3 are both membrane related. The following observations can be drawn from the above analysis: In terms of effectiveness in achieving the treatment goals and other objectives, all options are satisfactory without significant difference in scoring; The main difference between groups, apart from physical land intake, is in capital and O&M costs; The most favoured options are those with single stage filtration (Options 1A and 4A). Apart from savings in capital cost for one less set of filters, the lesser head loss means that long term pumping cost of treated water away from the treatment plant is also lower. 9

10 Options 1B and 4B scored generally better than Options 1A and 4A from a treatment effectiveness standpoint, but scored lower overall due to other issues such higher capital and O&M costs, larger footprint, and operational complexity. It is also noted that the model showed a comparatively small difference between Options 1A and 4A, and between Options 1B and 4B. These pairs of options differ only in the type of primary disinfection used, with those options using ozone scoring slightly higher than those using UV. However, the differences are small, and can be considered to be the same in practical terms. The most unfavourable options are those using membrane filtration because of the higher capital and O&M costs. Taking into account the increasingly more stringent treated water quality standards by WHO and other authorities such as United States Environmental Protection Agency (USEPA), and potential deterioration of raw water quality in future, the following factors were considered in the final decision process with an aim to further reduce potential risks on public health by multiple barriers: A two-stage filtration process will provide an additional barrier for particle removal; and UV downstream of filters will provide an additional barrier for disinfection. From functional needs, the selected treatment process is therefore Option 1B: Clarification Ozone BAC - Granular Media Filtration - UV Because the whole treatment plant is to be reprovisioned in stages, it is inevitable that the treatment process for the new South Works will be different from the existing North Works. This include the provision of a separate pre-ozonation, coagulation and flocculation facility to the new South Works, whilst the North Works will only be provided with a new inchannel static mixer for alum and lime dosing. Programme Constraints and Final Site Layout Although the four clarifiers and half of the filters in the South Works can be demolished on commencement of the construction works, other key programme constraints must also be considered. These include: Current access to the North Works is via the South Works. An uninterrupted access for fire services and chlorine and other chemical delivery must be provided to maintain normal operation of the North Works during reprovisioning. Therefore an additional section of road must first be constructed at the north-east corner of the site to form a ring road from the site entrance via the sludge treatment area to the North Works filter area; 10

11 A new chemical building must be re-provided before the existing chemical building at the south-most part of the site can be decommissioned. That means the hill west of the site must first be removed for construction of a new chemical building; The state-of-the-art administration building cum laboratory including visitor facilities will occupy the area of the existing filter backwash facility at the eastern part of the site, which currently handles the washwater from both the South and North Works filters. This area can only be vacated after a new washwater handling facility (i.e. residual management facility) is provided in the South Works; and last but not the least, The remaining half of the South Works filters, which is currently used to provide the shortfall in filtration capacity from the North Works, can only be demolished when the water supply from STWTW could be reduced to 550,000m 3 /day provided that Tai Po Water Treatment Works Stage 2 is tentatively commissioned in early The final site layout plan is shown in Figure 4, and the state-of-the-art administration building cum laboratory is shown in Figure 5. Conclusion The reprovisioned South Works of STWTW will provide treated water meeting the latest treated water quality standards. Innovation includes the introduction of high rate lamella sedimentation, deep bed monomedia biofiltration and UV disinfection. The administration building cum laboratory including visitor facilities blend in well with the environment, embroidering sustaining design features aiming at least a gold standard for green building design according to the Hong Kong Building Environmental Assessment Method (BEAM). The congested site together with the constraint to maintain uninterrupted operation of the North Works albeit at a reduced capacity poses significant challenge to the design team. The solution adopted takes account of all physical, operational, and other constraints, and has been subject to a comprehensive evaluation of planning, engineering, environmental, cost and maintenance considerations. The selected multi-barrier design is considered to be the most feasible and practicable. The proposed layout also offers the most efficient and balanced land use arrangements. 11

12 Figure 4 Layout Plan of Reprovisioned South Works Figure 5 State-of-the-art Administration Building cum Laboratory 12

13 Appendix 1 - Criteria for the Decision Model Level 1 Criteria Treatment Effectiveness Constructability Issues Public Acceptance/ Aesthetics Operational Issues Level 1 Weight 30% 10% Level 2 Criteria Level 2 Weight Level 3 Criteria Level 3 Weight Effectiveness for Taste & Odour 10% Control None 3.0% Effectiveness for Organics 10% Removal None 3.0% Enhanced Primary Disinfection 20% None 6.0% Effectiveness for Ammonia 20% Removal None 6.0% Effectiveness for Manganese 20% and Iron Removal None 6.0% Effectiveness for Particulate 20% Removal None 6.0% Overall Footprint 35% None 3.5% Integration with existing North Works and future reprovisioned 15% None 1.5% North Works Impacts to Operation and Access to the North Works 15% None 1.5% during Reprovisioning Construction Schedule 35% None 3.5% Net Impact on Total Score 10% None 10.0% 30% Sustainability 10% Impacts Distribution System on 10% Health and Safety 5% None 1.5% Operator Friendliness 20% None 6.0% Reliability 20% None 6.0% Familiarity to WSD 20% None 6.0% Proven Track Record 20% None 6.0% Reliance on Proprietary Systems 15% and/or Equipment None 4.5% Waste Generation 30% Liquid Waste 40% 1.2% Solid Waste 60% 1.8% Carbon Footprint 70% None 7.0% Potential Bacterial Regrowth 50% None 5.0% Disinfection By-Product 50% Formation Potential None 5.0% TOTAL 100% 13

14 Appendix 2 Technical Evaluation Results from the Decision Model 14

Facility Classification Standards

Facility Classification Standards Facility Classification Standards Approval Date: April 3, 2009 Effective Date: April 3, 2009 Approved By: Nancy Vanstone, Deputy Minister Version Control: Replaces Facility Classification Standards dated

More information

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES 8-1. General. Upgrading of wastewater treatment plants may be required to handle increased hydraulic and organic loadings to meet existing effluent quality

More information

COMPANY PROFILE & CAPABILITY STATEMENT

COMPANY PROFILE & CAPABILITY STATEMENT COMPANY PROFILE & CAPABILITY STATEMENT November 2014 Contents 1. Introduction... 1 1.1. Corporate Summary... 2 2. Extent of Capabilities... 3 2.1. General... 3 2.2. Water Treatment... 3 2.3. Municipal

More information

Cyanotoxin Removal in Drinking. Recreational Waters. Judy Westrick April 14, 2011 2011 Northeast Regional Cyanobacteria Workshop

Cyanotoxin Removal in Drinking. Recreational Waters. Judy Westrick April 14, 2011 2011 Northeast Regional Cyanobacteria Workshop Cyanotoxin Removal in Drinking Water Treatment Process and Recreational Waters Judy Westrick April 14, 2011 2011 Northeast Regional Cyanobacteria Workshop NEIWPCC Overview Water Treatment Source and Recreational

More information

Water Water Treatment Plant Tour

Water Water Treatment Plant Tour Water Water Treatment Plant Tour Don Rankin, Superintendent Topeka, KS 66606 785-368-3111 Tel 785-368-3825 FAX For a complete list of contacts with phone numbers, FAX numbers and email addresses, click

More information

Iron and Manganese BACTERIA AND IRON AND MANGANESE

Iron and Manganese BACTERIA AND IRON AND MANGANESE Iron and Manganese Iron and manganese control is the most common type of municipal water treatment in Minnesota. Iron and manganese occur naturally in groundwater. Neither element causes adverse heath

More information

AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2007 SCORING GUIDELINES Question 1 Read the Fremont Examiner article below and answer the questions that follow. (a) Identify ONE component of the sewage that is targeted for removal

More information

Water Treatment. Session Objectives

Water Treatment. Session Objectives Water Treatment Session Objectives To demonstrate the need for treatment of surface waters and some groundwaters for drinking purposes. To introduce the concept of the multiple barrier principle and to

More information

CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS APPLICATION INSTRUCTIONS

CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS APPLICATION INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION STATE BOARD FOR CERTIFICATION OF WATER AND WASTEWATER SYSTEMS OPERATORS CERTIFICATION TO OPERATE WATER AND WASTEWATER TREATMENT SYSTEMS

More information

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM OTCO Water Workshop March, 2011 Frank Woyma Plant Manager Nick Pizzi Vice-President EE&T ENVIRONMENTAL ENGINEERING & TECHNOLOGY, INC. Objectives Review the

More information

WATER TREATMENT IN AUCKLAND

WATER TREATMENT IN AUCKLAND WATER TREATMENT IN AUCKLAND Auckland's water (like water throughout New Zealand) is a combination of water from dams and water from underground springs. Depending on the source of the water, it has different

More information

Wastewater Nutrient Removal

Wastewater Nutrient Removal Wastewater Nutrient Removal An overview of phosphorus and nitrogen removal strategies Presented by: William E. Brown, P.E. Peter C. Atherton, P.E. Why are nutrients an issue in the environment? Stimulates

More information

Chemistry at Work. How Chemistry is used in the Water Service

Chemistry at Work. How Chemistry is used in the Water Service Chemistry at Work How Chemistry is used in the Water Service WATER TREATMENT Everyday, more than 100 water treatment works in Northern Ireland put approximately 680 million litres of water into the supply

More information

City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects

City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects October 13, 2014 Tulsa, OK City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects Ron Cass Gert-Jan Schers Location West Palm Beach 2 Consent Order - 2008 Source

More information

Residuals Management Somersworth Drinking Water Treatment Facility. Ian Rohrbacher, Treatment Operator IV

Residuals Management Somersworth Drinking Water Treatment Facility. Ian Rohrbacher, Treatment Operator IV Residuals Management Somersworth Drinking Water Treatment Facility A HISTORICAL OVERVIEW OF SURFACE WATER TREATMENT RESIDUALS HANDLING Ian Rohrbacher, Treatment Operator IV Background We are a Grade III

More information

2. AUDIT OBSERVATIONS

2. AUDIT OBSERVATIONS Drinking Water Audit Report Local Authority: Kerry County Council Date of Audit: 16/09/08 Plant Inspected: Dromin Water Treatment Plant Listowel File Reference: DW2008/554 Supply Code (1300PUB1204) Auditors:

More information

WASTEWATER TREATMENT OBJECTIVES

WASTEWATER TREATMENT OBJECTIVES WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater

More information

COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens

COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens Removal of particulate material from wastewater Eco-efficient use of capital Water pollution control through maximum COD/BOD 5 reduction Service

More information

ACTIFLO Process For Wet Weather and Wastewater Treatment

ACTIFLO Process For Wet Weather and Wastewater Treatment ACTIFLO Process For Wet Weather and Wastewater Treatment ACTIFLO Microsand Ballasted Clarification Process ACTIFLO is a high rate, compact process developed by Veolia Solutions & Technologies. The process

More information

Municipal Standard Solutions. Water Treatment WATER TECHNOLOGIES

Municipal Standard Solutions. Water Treatment WATER TECHNOLOGIES Municipal Standard Solutions Water Treatment WATER TECHNOLOGIES Standard Units and Tailor-made Systems Veolia provides the complete range of services required to design, build, maintain and upgrade water

More information

Water Purification Treatment System

Water Purification Treatment System Introductions to Tap Water Purification Treatment System A diagram of water treatment process : Raw water Flash mixer Floccula;on basin Sedimenta;on tank Add PAC Add disinfectant Sludge Surface thickening

More information

How To Water System

How To Water System Mid-Monroe Water System: Soluble Iron and Manganese Removal via Oxidation & Filtration Daniel Rickard, P.E. Engineering Project Manager Pennsylvania-American Water Company Who Is American Water We are

More information

Cambridge Wastewater Treatment Facility

Cambridge Wastewater Treatment Facility Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working

More information

Amiad s AMF² pre-treatment technology ensures efficient and reliable nanofiltration of Scottish Highland loch water

Amiad s AMF² pre-treatment technology ensures efficient and reliable nanofiltration of Scottish Highland loch water technical article Document Ref: 0411001-NFPT-text-RevG Status: Re-issued to Elsevier Science Company: Amiad Filtration Systems Limited Issue Date: 10 February 2006 Copy Deadline: 10 February 2006 Publication:

More information

Table of Contents. Certification

Table of Contents. Certification Certification This report was prepared by CH2M Gore & Storrie Limited, Reid Crowther & Partners, Ltd., Wardrop Engineering Inc., and TetrES Consultants Inc., under the direction of a professional engineer

More information

TREATMENT OPTIONS FOR REMOVAL OF SPECIFIC IMPURITIES FROM WATER. S. Vigneswaran Faculty of Engineering, University of Technology, Sydney, Australia

TREATMENT OPTIONS FOR REMOVAL OF SPECIFIC IMPURITIES FROM WATER. S. Vigneswaran Faculty of Engineering, University of Technology, Sydney, Australia TREATMENT OPTIONS FOR REMOVAL OF SPECIFIC IMPURITIES FROM WATER S. Vigneswaran Faculty of Engineering, University of Technology, Sydney, Australia C. Visvanathan Asian Institute of Technology, Bangkok,

More information

Removing Heavy Metals from Wastewater

Removing Heavy Metals from Wastewater Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 2 Removing Heavy Metals From Wastewater Introduction This manual provides

More information

Protecting your private water supplies. The possible causes of contamination and their remediation to prevent this risk.

Protecting your private water supplies. The possible causes of contamination and their remediation to prevent this risk. Protecting your private water supplies The possible causes of contamination and their remediation to prevent this risk. Contamination from a variety of sources can occur potentially at any point throughout

More information

Task D: Water Quality Management Plan

Task D: Water Quality Management Plan Task D: Water Quality Management Plan Comprehensive Water Master Plan DWSD Contract No. CS-1278 Final Report For Submittal to Detroit Water and Sewerage Department February 2004 (Updated June 2004) IN

More information

Applying Life Cycle Assessment to Drinking Water Treatment

Applying Life Cycle Assessment to Drinking Water Treatment Applying Life Cycle Assessment to Drinking Water Treatment W.Takashima*, S.Takizawa**and M. Fujiwara* *Japan Water Research Center, Minato-ku, Tokyo, 105-0001, Japan (takashima@jwrc-net.or.jp) ** University

More information

EPB 311- Strategies for Dealing with Groundwater Treatment Systems Having High Natural Ammonia

EPB 311- Strategies for Dealing with Groundwater Treatment Systems Having High Natural Ammonia EPB 311- Strategies for Dealing with Groundwater Treatment Systems Having High Natural Ammonia Background The occurrence of ammonia (NH 3 ) in the water source is often associated with pollution due to

More information

8 Chemicals from water treatment and distribution

8 Chemicals from water treatment and distribution 8 Chemicals from water treatment and distribution 8.1 Introduction Chemicals from water treatment and distribution reach drinking-water by the most direct route. They fall into three broad categories:

More information

Appendix 2-1. Sewage Treatment Process Options

Appendix 2-1. Sewage Treatment Process Options Appendix 2-1 Sewage Treatment Process Options Table of Contents Appendix 2-1 Sewage Treatment Process Options 1 Introduction...1 2 Chemically Enhanced Primary Treatment (CEPT) Processes...2 2.1 CEPT with

More information

Total water management. Water and wastewater treatment systems for ships and offshore

Total water management. Water and wastewater treatment systems for ships and offshore Total water management Water and wastewater treatment systems for ships and offshore Water technologies Made in Germany Long Experience RWO Marine Water Technology is one of the leading suppliers for water

More information

Department of Environmental Engineering

Department of Environmental Engineering Department of Environmental Engineering Master of Engineering Program in Environmental Engineering (International Program) M.Eng. (Environmental Engineering) Plan A Option 1: (1) Major courses: minimum

More information

IMPACT OF CHEMICALS ADDITION IN WATER/WASTEWATER TREATMENT ON TDS CONCENTRATION AND SLUDGE GENERATION Jurek Patoczka, PhD, PE Hatch Mott MacDonald 27 Bleeker Str., Millburn, NJ 07041 (973) 912 2541 jurek.patoczka@hatchmott.com

More information

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined

More information

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide Sometimes hot water will have a sour smell, similar to that of an old damp rag. This smell often develops when the thermostat has been lowered to save energy or reduce the potential for scalding. Odor-causing

More information

Phosphorus Removal. Wastewater Treatment

Phosphorus Removal. Wastewater Treatment Phosphorus Removal In Wastewater Treatment by Derek Shires (512) 940-2393 Derek.Shires@ett-inc.com Why do we care? Eutrophication of surface water - Especially reservoirs Maximum agronomic uptake - Limiting

More information

Mission Hill Water Treatment Plant & Kalamalka Lake Pump Station Upgrades

Mission Hill Water Treatment Plant & Kalamalka Lake Pump Station Upgrades Mission Hill Water Treatment Plant Treatment Plant Pilot Testing Regional District of North Okanagan, assisted by Sandwell Engineering Services and four manufacturers conducted pilot scale water treatment

More information

PRETREATMENT PROCESSES FOR POTABLE WATER TREATMENT PLANTS

PRETREATMENT PROCESSES FOR POTABLE WATER TREATMENT PLANTS 7 May 2014 PRETREATMENT PROCESSES FOR POTABLE WATER TREATMENT PLANTS JEFF LINDGREN ENGINEERING MANAGER B&V WATER AGENDA Conventional Pretreatment Focus on Clarification (including Sedimentation) Theory/Goals

More information

Case Study: Research Leads To Large-Scale Microfiltration Plants 10/01/1999

Case Study: Research Leads To Large-Scale Microfiltration Plants 10/01/1999 Case Study: Research Leads To Large-Scale Microfiltration Plants 10/01/1999 What are the advantages of low-pressure membrane treatment processes for surface water supplies? How are the requirements of

More information

Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability

Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability Treating water efficiently A global challenge Water and wastewater treatment

More information

Iron and manganese are two similar elements

Iron and manganese are two similar elements L-5451 2-04 Drinking Water Problems: Iron and Manganese Mark L. McFarland, Associate Professor and Extension Soil Fertility Specialist Monty C. Dozier, Assistant Professor and Extension Water Resources

More information

Drinking Water Treatment Systems

Drinking Water Treatment Systems Drinking Water Treatment Systems By Barbara Daniels and Nancy Mesner June, 2005 NR/WQ/2005-24 If your home water comes from a public water supply, it has been tested and meets EPA standards for drinking

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa

TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa TALLINN WATER TREATMENT AND SEWERAGE Tuuli Myllymaa Tallinn is the capital of Estonia. It has approximately 450,000 inhabitants and the town area is about 150 km 2. Tallinn Water Ltd., owned by the City

More information

Steps in the design process. The draft Ultraviolet Disinfection Guidance Manual (USEPA, 2003) recommends the following steps in the design:

Steps in the design process. The draft Ultraviolet Disinfection Guidance Manual (USEPA, 2003) recommends the following steps in the design: DESIGN OF UV DISINFECTION SYSTEMS FOR DRINKING WATER In EPA s economic analyses for the proposed LT2ESWTR, EPA estimated that 500 to 1000 filtration plants will choose UV disinfection as part of their

More information

HUBER Vacuum Rotation Membrane VRM Bioreactor

HUBER Vacuum Rotation Membrane VRM Bioreactor HUBER Vacuum Rotation Membrane VRM Bioreactor VRM The rotating plate membrane for clean water applications. The future-oriented solution designed for the ever increasing requirements in wastewater treatment

More information

Indiana s Newest Filtration Facility; East Chicago

Indiana s Newest Filtration Facility; East Chicago Indiana s Newest Filtration Facility; East Chicago Innovation and Value-Added Benefits Behind East Chicago s Membrane Treatment Facility Eric Horvath, PE and Kara M. Boyles, PhD, PE August 1, 2012 Presentation

More information

GUIDELINE FOR CONSTRUCTION AND APPROVAL OF PUBLIC WATER THE HEALTH HAZARD REGULATIONS

GUIDELINE FOR CONSTRUCTION AND APPROVAL OF PUBLIC WATER THE HEALTH HAZARD REGULATIONS March 2012 GUIDELINE FOR CONSTRUCTION AND APPROVAL OF PUBLIC WATER SYSTEMS REGULATED UNDER THE HEALTH HAZARD REGULATIONS September 2011 Table of Contents Preamble.. 2 Section 1 Submission Requirements...

More information

A chlorine free swimming pool that s free of odours and taste, soft and gentle on the skin. www.waterco.com

A chlorine free swimming pool that s free of odours and taste, soft and gentle on the skin. www.waterco.com A chlorine free swimming pool that s free of odours and taste, soft and gentle on the skin www.waterco.com How does it work? Hydroxypure sanitisation is based on the Advance Oxidation Process. (AOP), which

More information

Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination

Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination Life Cycle Assessment of Three Water Scenarios: Importation, Reclamation, and Desalination Erin Lyons, Peng Zhang, Troy Benn, Miles Costanza, Ke Li, John Crittenden Department of Civil and Environmental

More information

GUIDELINES FOR LEACHATE CONTROL

GUIDELINES FOR LEACHATE CONTROL GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and

More information

How do you treat water based on water quality from different water sources?

How do you treat water based on water quality from different water sources? How do you treat water based on water quality from different water sources? Why? Authors: Wendy Lane and Kim Sciarrone Seattle Public Schools; Seattle, WA Water from different sources will contain different

More information

THE NWF WATER PURIFICATION PROCESS FRESH WATER IN A NATURAL WAY. Esko Meloni Ferroplan Oy

THE NWF WATER PURIFICATION PROCESS FRESH WATER IN A NATURAL WAY. Esko Meloni Ferroplan Oy THE NWF WATER PURIFICATION PROCESS FRESH WATER IN A NATURAL WAY Esko Meloni Ferroplan Oy 1 The NWF Water Purification Process: list of contents 1. NWF biological purification of groundwater Iron and manganese

More information

Innovation and Progress in Water Treatment Technology

Innovation and Progress in Water Treatment Technology Innovation and Progress in Water Treatment Technology Degree of separation of ultrafiltration Summary of the various processes The water will be pressed through the between the raw water side and the filtrate

More information

Ion Exchange Softening

Ion Exchange Softening Ion Exchange Softening Ion-exchange is used extensively in small water systems and individual homes. Ion-exchange resin, (zeolite) exchanges one ion from the water being treated for another ion that is

More information

Complete. Water Solutions. for Rural India

Complete. Water Solutions. for Rural India Complete Water Solutions for Rural India More precious than gold. That s what safe drinking water is to India s rural population. Arsenic, iron, fluoride, nitrate, brackishness and pathogens in ground

More information

Nova Scotia Treatment Standards for Municipal Drinking Water Systems

Nova Scotia Treatment Standards for Municipal Drinking Water Systems Nova Scotia Treatment Standards for Municipal Drinking Water Systems Approval Date: March 12, 2012 Effective Date: March 12, 2012 Approved By: S. J. Snook, Deputy Minister Version Control: Replaces: Treatment

More information

Town of New Castle Utility Department Introduction

Town of New Castle Utility Department Introduction Town of New Castle Utility Department Introduction Town of New Castle Utility Department Mission Statement Our commitment is to ensure that our customers receive high quality water and wastewater treatment

More information

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS

SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS This section will describe the Town s existing wastewater management systems. This includes on-site disposal systems and private collection systems. The

More information

Background. 179 million gallons saved for make-up water

Background. 179 million gallons saved for make-up water Essential Expertise for Water, Energy and Air Gallatin Steel Achieves Significant eroi Savings Through the Use of Nalco Innovative Technologies Background Gallatin Steel is a mini-mill that produces steel

More information

POTW PHOSPHORUS REMOVAL PROCESSES

POTW PHOSPHORUS REMOVAL PROCESSES POTW PHOSPHORUS REMOVAL PROCESSES Ohio Lake Erie Phosphorus Task Force - December 20, 2007 ROBERT M. BONNETT, PE Northeast Ohio Regional Sewer District OUTLINE SOURCES AND FORMS IN WASTEWATER TYPICAL POTW

More information

Coagulation and Flocculation

Coagulation and Flocculation Coagulation and Flocculation Groundwater and surface water contain both dissolved and suspended particles. Coagulation and flocculation are used to separate the suspended solids portion from the water.

More information

Water safety plans: methodologies for risk assessment and risk management in drinking-water systems JOSÉ MANUEL PEREIRA VIEIRA

Water safety plans: methodologies for risk assessment and risk management in drinking-water systems JOSÉ MANUEL PEREIRA VIEIRA Water safety plans: methodologies for risk assessment and risk management in drinking-water systems JOSÉ MANUEL PEREIRA VIEIRA Department of Civil Engineering, University of Minho, 4704-553, Braga, Portugal

More information

Brewery Wastewater: 2010 Water and Wastewater Conference. 11.02.2011 Page 1

Brewery Wastewater: 2010 Water and Wastewater Conference. 11.02.2011 Page 1 Brewery Wastewater: Solutions for the Problem By Fred M. Scheer 2010 Water and Wastewater Conference Madison, WI 11.02.2011 Page 1 vr74 What We Will Discuss: Biochemical i Oxygen Demand (BOD): Where does

More information

COSTS AND THE CHOICE OF DRINKING WATER TREATMENT TECHNOLOGY IN SMALL AND RURAL SYSTEMS

COSTS AND THE CHOICE OF DRINKING WATER TREATMENT TECHNOLOGY IN SMALL AND RURAL SYSTEMS COSTS AND THE CHOICE OF DRINKING WATER TREATMENT TECHNOLOGY IN SMALL AND RURAL SYSTEMS By: Mohammed H.I. Dore, Arian Khaleghi- Moghadam, Rajiv G. Singh, and Gopal Achari Res'Eau-Waternet_Project 4.2-DORE

More information

TRADITIONAL AND HOUSEHOLD WATER PURIFICATION METHODS OF RURAL COMMUNITIES IN DEVELOPING COUNTRIES

TRADITIONAL AND HOUSEHOLD WATER PURIFICATION METHODS OF RURAL COMMUNITIES IN DEVELOPING COUNTRIES TRADITIONAL AND HOUSEHOLD WATER PURIFICATION METHODS OF RURAL COMMUNITIES IN DEVELOPING COUNTRIES S. Vigneswaran Faculty of Engineering, University of Technology, Sydney, Australia M. Sundaravadivel Graduate

More information

Basics of UV Disinfection

Basics of UV Disinfection Local Section Seminar Basics of UV Disinfection April 17, 2014 Joseph Moore, P.E. DuBois-Cooper Associates, Inc. 1 Presentation Outline Basics of Ultraviolet (UV) Disinfection Components of UV Disinfection

More information

Genesee Advanced Water Treatment Facility

Genesee Advanced Water Treatment Facility Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015 Project Purpose Upgrade critical components of the District's water system Develop a more robust water

More information

5. Alternatives. 5.1 Introduction

5. Alternatives. 5.1 Introduction 5. Alternatives 5.1 Introduction 5.1.1 Chapter 4 of this Statement identifies the need, which will be met by the proposed development, the development itself described in detail in Chapter 3. 5.1.2 This

More information

Biofiltra on: West Hylebos Log Yard

Biofiltra on: West Hylebos Log Yard Biofiltra on: West Hylebos Log Yard An innova ve solu on to a difficult stormwater problem Anita Fichthorn, Water Quality Manager Bill Rehe, Port Biologist Dave Myers, Project Engineer June 27, 2014 Table

More information

DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT

DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT William J. Cretens 1 ABSTRACT The Ottawa River Sediment Remediation Project, performed in Toledo, Ohio in 2010,

More information

Original Waterworks Facility

Original Waterworks Facility Photo 1.1 Original Waterworks Facility Construction began on the original waterworks facility in 1870 and was completed in 1873. It was built at the intersection of Mulberry and Water Street which is now

More information

Royal Caribbean International Advanced Wastewater Purification Systems

Royal Caribbean International Advanced Wastewater Purification Systems Royal Caribbean International Advanced Wastewater Purification Systems Royal Caribbean International is installing advanced wastewater purification (AWP) systems on all of its ships. These technologically

More information

MEMCOR membranes for drinking water applications. Water Technologies

MEMCOR membranes for drinking water applications. Water Technologies MEMCOR membranes for drinking water applications Water Technologies Memcor membranes Why choose membrane filtration? As ever-tightening water regulations continue to challenge the limits of conventional

More information

Water Treatment & Purification Chemicals

Water Treatment & Purification Chemicals Lime-Out Extra Water Treatment Cleaning Chemicals Dissolves tough lime, calcium & rust stains Non-abrasive thick jelly like liquid clings to vertical surfaces Cleans tubs, sinks, shower doors, dishwashers

More information

333-061-0060 Plan Submission and Review Requirements (1) Plan Submission: (a) Construction and installation plans shall be submitted to and approved

333-061-0060 Plan Submission and Review Requirements (1) Plan Submission: (a) Construction and installation plans shall be submitted to and approved 333-061-0060 Plan Submission and Review Requirements (1) Plan Submission: (a) Construction and installation plans shall be submitted to and approved by the Authority before construction begins on new systems

More information

Cyanobacteria, Toxins and Indicators. Field Monitoring Treatment Facility Monitoring Treatment Studies

Cyanobacteria, Toxins and Indicators. Field Monitoring Treatment Facility Monitoring Treatment Studies U.S. Environmental Projection Agency, Office of Research and Development Cyanobacteria, Toxins and Indicators Field Monitoring Treatment Facility Monitoring Treatment Studies Nicholas Dugan, Toby Sanan,

More information

John D. Dyson, Manager Municipal Water Group Infilco Degremont Inc. Richmond, VA

John D. Dyson, Manager Municipal Water Group Infilco Degremont Inc. Richmond, VA High Rate Pulsed Sludge Blanket Clarifier Performance on Rivers and Reservoirs with Widely Different Raw Water Characteristics in Texas and United States John D. Dyson, Manager Municipal Water Group Infilco

More information

Guidelines for Arsenic Removal Treatment for Small Public Drinking Water Systems

Guidelines for Arsenic Removal Treatment for Small Public Drinking Water Systems February 2010 Guidelines for Arsenic Removal Treatment for Small Public Drinking Water Systems Ted Strickland, Governor Lee Fisher, Lt. Governor Chris Korleski, Director Ohio Environmental Protection Agency

More information

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation

Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation Page 1 of 11 Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation This work is copyright. It may be reproduced in whole or in part for study or training purposes

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

WISCONSIN WASTEWATER OPERATORS ASSOCIATION

WISCONSIN WASTEWATER OPERATORS ASSOCIATION Integrity. People. Knowledge. WISCONSIN WASTEWATER OPERATORS ASSOCIATION ANNUAL CONFERENCE GREEN BAY Resources. MEETING LOW LEVEL PHOSPHORUS LIMITS BY CHEMICAL ADDITION WHAT IS PHOSPHORUS Atomic # 15 Electron

More information

DEPARTMENT OF ENVIRONMENTAL REGULATION. Technical Document DETERMINING REPRESENTATIVE GROUND WATER SAMPLES, FILTERED OR UNFILTERED

DEPARTMENT OF ENVIRONMENTAL REGULATION. Technical Document DETERMINING REPRESENTATIVE GROUND WATER SAMPLES, FILTERED OR UNFILTERED DEPARTMENT OF ENVIRONMENTAL REGULATION Technical Document DETERMINING REPRESENTATIVE GROUND WATER SAMPLES, FILTERED OR UNFILTERED JANUARY 1994 BUREAU OF DRINKING WATER AND GROUND WATER RESOURCES 2600 BLAIR

More information

Coagulation and Flocculation in Water and Wastewater Treatment

Coagulation and Flocculation in Water and Wastewater Treatment W, A. R, Coagulation and Flocculation in Water and Wastewater Treatment Second Edition 02,/f John Bratby,» :.'; '5 s " - ' '! ' " ; i '. ', ' j ',... -,..,.,.-* ;, 0 61^/16*36 S "+ "J6 27 48 FAX 0 6151/16

More information

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office

More information

Advanced Water Treatment and Membrane Technology in Japan

Advanced Water Treatment and Membrane Technology in Japan PUB-JWRC Symposium 2012.7.5 Dealing with Source Water Deterioration-Advanced Water Treatment Technology and Management Advanced Water Treatment and Membrane Technology in Japan Masahiro FUJIWARA, Dr.Eng.

More information

City of Charlottetown Wastewater Treatment Expansion & Upgrading

City of Charlottetown Wastewater Treatment Expansion & Upgrading City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and

More information

ADDENDUM TO THE FACT SHEET FOR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT NO. WA-002264-1 June 25, 2010

ADDENDUM TO THE FACT SHEET FOR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT NO. WA-002264-1 June 25, 2010 ADDENDUM TO THE FACT SHEET FOR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT NO. WA-002264-1 June 25, 2010 I. GENERAL INFORMATION Facility: City of Blaine Wastewater Treatment Plants 9235

More information

Biological wastewater treatment plants of BIOGEST

Biological wastewater treatment plants of BIOGEST Biological wastewater treatment plants of BIOGEST by: Thorsten ten Neuerer and Markus Batschauer from: BIOGEST AG, Taunusstein The so-called batch technology represents a particularly interesting and effective

More information

DOMESTIC WASTEWATER SYSTEMS

DOMESTIC WASTEWATER SYSTEMS Environmental PROTECTION Systems DOMESTIC WASTEWATER SYSTEMS Highest quality sewage treatment systems from the name you can trust Hynds Aerated Wastewater Systems Hynds Lifestyle Systems are an elite range

More information

Enhanced Organic Precursor Removals Using Aged Filter Media Page 1. Enhanced Organic Precursor Removals Using Aged Filter Media

Enhanced Organic Precursor Removals Using Aged Filter Media Page 1. Enhanced Organic Precursor Removals Using Aged Filter Media Enhanced Organic Precursor Removals Using Aged Media Page 1 Enhanced Organic Precursor Removals Using Aged Media O b j e c t i v e s The main goals of this project was to evaluate the dissolved organic

More information

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS Published in Water and Waste Digest membrane issue, November 2008 Miroslav Colic; Chief Scientist, Clean Water Technology

More information

Sewage and Wastewater Odor Control Dr. Giancarlo Riva, Ozono Elettronica Internazionale, Muggio, Italy

Sewage and Wastewater Odor Control Dr. Giancarlo Riva, Ozono Elettronica Internazionale, Muggio, Italy Introduction Sewage and Wastewater Odor Control Dr. Giancarlo Riva, Ozono Elettronica Internazionale, Muggio, Italy Sewage and industrial plants located near residential areas can be subject to political

More information

Water Supplies Department Active WSD Capital Works Contracts

Water Supplies Department Active WSD Capital Works Contracts No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South

More information

Occurrence and removal of Giardia and Cryptosporidium at the Goreangab Reclamation Plant

Occurrence and removal of Giardia and Cryptosporidium at the Goreangab Reclamation Plant Occurrence and removal of Giardia and Cryptosporidium at the Goreangab Reclamation Plant J.G. Menge, J. Haarhoff*, E. König, R. Mertens and B. van der Merwe** Department Infrastructure, Water & Technical

More information

Engineers Edge, LLC PDH & Professional Training

Engineers Edge, LLC PDH & Professional Training 510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Advanced

More information

DOW Ultrafiltration. Case History. High Turbidity and Temperature Fluctuation No Obstacle for DOW Ultrafiltration

DOW Ultrafiltration. Case History. High Turbidity and Temperature Fluctuation No Obstacle for DOW Ultrafiltration Case History High Turbidity and Temperature Fluctuation No Obstacle for Site Information Location: HeBei, China Capacity: 12 m 3 /h (5283 gpm) Purpose: Pretreat sea water prior to RO system Time in Operation:

More information