MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING

Size: px
Start display at page:

Download "MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING"

Transcription

1 MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING PREPARED BY WARDELL ARMSTRONG (RJWA) LTD Suite 8, Suffolk House, College Road, Croydon, CR0 1EP Tel: Ref: 42332/rjw/August 2015 (Final)

2 CONTENTS 1.0 INTRODUCTION 2.0 GENERAL CONDITIONS 3.0 NOISE AND VIBRATION 4.0 DUST AND AIR POLLUTION 5.0 CONSIDERATION OF SITE OPERATIONS AND ACCESS 6.0 CONTRACTOR S RESPONSIBILITES 7.0 MONITORING REQUIREMENTS

3 Prepared by: Robert Witt Signed: Dated 24 th August 2015 Reviewed by: Richard Butler Signed: Dated: 24 th August 2015 For and on behalf of Wardell Armstrong (RJWA)

4 1.0 INTRODUCTION This document has been prepared to accompany the submission of a planning application at Mayflower House, Plymouth. At this stage no contractor has been appointed and no detailed discussions have been held with any contractors. All contractors tendering for the Contract will be required to develop a detailed Construction Management Plan (CMP), based upon this document, any specific requirements of the Planning Approval and the contractor s specific method of working developed for the project. For this reason the project specific Construction Management Plan cannot be prepared until after the contract has been let to the successful contractor. Notwithstanding, the scheme under consideration for Mayflower House, Armada Way is recognised as being significant and will impact on the adjacent and surrounding areas during construction. This preliminary document has been prepared to set out the framework for the project specific CMP GENERAL CONDITIONS As part of the project specific CMP the contractor will be required to consider and include the following general points within the document: The protection of the public and adjacent and surrounding buildings affected by the works The contractor s methodology with regards to publicity will require to be set out specifically for the project The proposed hours of work will need to be clearly set out in the document (the working hours are likely to be subject to any condition on planning and the contractor will need to take cognisance of this) 3.0 NOISE AND VIBRATION As stated above it is recognised the proposed development is likely to have an impact on local business and residents during construction. The specific CMP will detail how the effective regimes to control noise and vibration are to be provided but this must include the following: Noisy plant and machinery will be sited at places of least disruption to noise sensitive buildings All vehicles and mechanical plant shall be fitted with effective exhaust silencers, which will be regularly maintained Machines for intermittent use will be either closed or throttled down when not in use Compressors will be fitted with properly designed acoustic covers The use of concrete breaking equipment using impact tools is to be avoided

5 All tools to be used are to be defined and are to be selected, where practicable, to give the least noise and vibration possible. In addition all plant and tools will be maintained in good working order Good communication with neighbours with regards to noisy operations will be maintained at all times Monitoring of noise during loading and unloading operations will be put in place Piling is likely to be required as part of the construction process to support the building loads safely into the supporting strata. The piling selected at the design stage will take into account the proximity of the adjacent buildings and structures and the need to impact on the surrounding area as least as possible. The contractor s CMP will detail these specific requirements and control mechanisms. In addition, should surface contamination be an issue then the methodology of controlling this during piling operations will be detailed as part of the CMP. 4.0 DUST AND AIR POLLUTION As part of the development the existing building is to be demolished in a careful and controlled manner. The Specification prepared will set out the various requirements for the contractor to include within his work. As part of the tender return the contractor will be required to provide a Method Statement, which will be required to detail the steps to deal with the following in specific terms: Dust and Air Pollution Asbestos Crushing Machines Monitoring of air quality Underground Drainage to remain post demolition Each of the above aspects will be dealt with as part of the Method Statement required and will also form part of the project specific CMP as required for planning. In developing the Method Statement and the project specific CMP, the contractor will be required to liaise with all statutory parties including the Health and Safety Executive, the Environment Agency and Plymouth City Council. 5.0 CONSIDERATION OF SITE OPERATIONS AND ACCESS The site operations and access will require careful consideration, especially as the access to Mayflower House is reasonably limited. The whole of the western boundary to the site is flanked by Armada Way and the whole of the eastern boundary abuts the public car park, currently managed and operated by Plymouth City Council. The use of the car park for construction purposes with regards to storage, deliveries and messing facilities is the preferred method as it provides an easier route to the site, can be more readily protected and would cause less disruption and damage to Armada Way.

6 Currently vehicular access to the building is through the car park and it is considered reasonable that access for small vehicles visiting site can be maintained through this current route. It is noted however, following pre-application discussions with Plymouth City Council that their Parking team would not be willing to offer this. Therefore, the Council would prefer the compound to be located on Armada Way. Unless an agreement can be reached with Plymouth City Council on providing storage and messing facilities in the car park on the eastern boundary of the site, in principle deliveries to site and demolition materials away from the site will need to be carried out through Armada Way. It is accepted this will require a significant degree of protection to the adjacent areas and a temporary closure of part of Armada Way to facilitate the operations and provide storage and messing facilities for the contractor. The exact area of Armada Way required for the contractor s storage and messing facilities and the exact delivery route will be subject to agreement between Plymouth City Council and the Contractor. To this end, the applicant is undertaking early discussions with the Estates team at Plymouth City Council to agree an arrangement to use Armada Way for construction purposes. In preparing the CMP, the contractor will be required to include the following with regards to Site Operations and Access: Travel plans for deliveries taking into account the appropriate road network. The details of this will be set out in the CMP and agreed with Plymouth City Council Possible out of hours deliveries to reduce the impact on traffic Prevent traffic congestion, ensure vehicle movements are such as to minimise air pollution and noise, provide specific location points on site for deliveries, locations of hoists, cranes and location of noise sensitive areas and adjacent properties The provision of appropriate marshals and banksmen In addition to this the contractor will be required to include the following information as part of the project specific CMP: Ensure that collection and delivery will take place in such a manner not to impact unduly on main roads and other routes Assess the onsite turning space allocation The size of any loading bays and set out the strategy with regards to off road queuing facilities Conduct a risk assessment of the loading points Audit the local traffic management regulations and consider the likely impacts for freight to and from the site The project specific CMP will also need to deal with the contractor s procurement procedures. In particular the contractor will need to confirm a number of critical factors concerning procurement and the proposed supply chain, which will include the following:

7 Awareness of vehicle activities Demonstrate a commitment to safer, more efficient and more environmentally friendly subcontractors Operational efficiency Consideration to off peak delivery times Set up delivery plans and the monitoring of the same 6.0 CONTRACTOR S RESPONSIBILITES In order the contractor is able to demonstrate an understanding of the responsibilities with regards to the project and operations, there will be a requirement to set out the procedures with regards to the following aspects as part of the Contractor s Responsibilities. All of the following shall be in agreement with Plymouth City Council. Staff Travel Plan Supply Chain Management Contracts Delivery and Servicing Plans In addition the contractor is to make reference and include any requirements from the following organisations in preparing the above: Fleet Operators Recognition Scheme Local Low Emission Zone Any specific requirements set out by The Local Highways Authority 7.0 MONITORING REQUIREMENTS As part of the project specific CMP the contractor will be required to set out the monitoring regime and steps considered suitable to ensure the CMP is being adhered to in all aspects. The monitoring regime will be fully defined and will include but not necessarily be limited to the following; Data collection to enable regular periodic reporting Delivery tracking and recording system should be initiated and maintained Data from the monitoring process matched against transport assessment Reporting to the local authority at agreed regular intervals Any matters of concern to be raised with adjacent and/or adjoining owners

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

19-27 Young Street Development Kensington

19-27 Young Street Development Kensington 19-27 Young Street Development Kensington Construction Management Plan Resident Update Draft 2nd October 2013 υ Introduction An initial construction management meeting took place on Tuesday 10 th September

More information

Approval Services Unit

Approval Services Unit Approval Services Construction Management Plan Pro-Forma Commercial Properties Please complete the enclosed form and return to:- By Mail: Approval Services Unit City of Perth Council House 27 St Georges

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

Construction Management Plan Template

Construction Management Plan Template Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

Construction Logistics Plan Guidance

Construction Logistics Plan Guidance Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents

More information

North Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules.

North Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules. Camden Road Construction Liaison Meeting Tuesday 12 th May 2015, 5pm - 7pm The Irish Centre, Camden Square Attendees: Local representatives (LR) Anne Holt (AH) Polly Holt (PH) Gill Scott (GS) James Demos

More information

Construction Management Statement. Introduction. Contents

Construction Management Statement. Introduction. Contents Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Demolition & Construction Management Plan

Demolition & Construction Management Plan Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview

More information

Construction Logistics Handbook LOGISTICS

Construction Logistics Handbook LOGISTICS Construction Logistics Handbook LOGISTICS August 2015 Contents Section 1 Introduction Section 2 Site Access Section 3 Supply Chain Management Tools Section 4 Standards and Tools Section 5 Site Specific

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

Howard Primary School Construction Management Plan

Howard Primary School Construction Management Plan 2.1 Introduction Howard Primary School Construction Management Plan The Howard Primary school project covers the construction of a new three storey block next to a live school and includes alterations

More information

Considerate Constructors Scheme Site Manager s Guide

Considerate Constructors Scheme Site Manager s Guide J5478 Site manager guide aw_layout 1 04/10/2013 09:03 Page 1 Considerate Constructors Scheme Site Manager s Guide Started in 1997, the Considerate Constructors Scheme was set up by the UK construction

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

London Underground Environment Strategy

London Underground Environment Strategy London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment

More information

Pollution Control Construction Site

Pollution Control Construction Site Cardiff Council Pollution Control Construction Site Handbook Services - Environment Pollution Control Division City Page Hall 3 - Part One Introducti Cardiff CF10 3ND February 2013 www.cardiff.gov.uk/pollution/

More information

Appendix 8 Providing Pre-construction information and check list (Regulations 10)

Appendix 8 Providing Pre-construction information and check list (Regulations 10) Appendix 8 Providing Pre-construction information and check list (Regulations 10) Project specific health and safety information STFC will have procedures in place to ensure that there is timely release

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

Environmental Management System

Environmental Management System Environmental Management System Heron Island Research Station (HIRS) Environmental Noise Program 1. Scope The Environmental Noise Program is limited to the following noise sources: Machinery owned by the

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Application for Planning Permission for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990

Application for Planning Permission for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 Application for Planning Permission for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full name

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

Health, Security, Safety and Environment (HSE)

Health, Security, Safety and Environment (HSE) Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our

More information

Health and safety policy

Health and safety policy 1. General statement of intent The Company recognises and accepts its responsibilities as an employer to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

University Arms Hotel, Cambridge

University Arms Hotel, Cambridge Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN

More information

Demolition Works Measures for Public Safety

Demolition Works Measures for Public Safety Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note

More information

CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE

CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE CONTROL OF POLLUTION ACT 1974, SECTION 61 PRIOR CONSENT APPLICATION CONSTRUCTION AND DEMOLITION SITE NOISE I/WE HEREBY MAKE APPLICATION to the London Borough of Merton Council for Prior Consent under Section

More information

Residential Development Travel Plan

Residential Development Travel Plan Residential Development Travel Plan A Template for Developers Name of Development (Address) Name of Developer (Contact Details) Date of Travel Plan For office use: Planning reference.. /.. /.. Residential

More information

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions. Householder Application for Planning Permission for Works or Extension to a Dwelling and for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF

More information

Guide to the Preparation of a Traffic Management Plan

Guide to the Preparation of a Traffic Management Plan Guide to the Preparation of a Traffic Management 1. INTRODUCTION... 4 2. PREPARATION OF TRAFFIC MANAGEMENT PLANS... 5 2.1. LEASEHOLDER SITE... 5 2.1.1. Site Operations... 6 2.1.2. Statutory Requirements...

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

Home Office, Home Occupation and Home Business

Home Office, Home Occupation and Home Business , Home Occupation and Home Business Introduction This fact sheet provides summary information on requirements for, Home Occupation and Home Business proposals. It is not a definitive document but provides

More information

Considerate Constructors Scheme Site Manager s Guide

Considerate Constructors Scheme Site Manager s Guide Considerate Constructors Scheme Site Manager s Guide Started in 1997, the Considerate Constructors Scheme was set up by the UK construction industry to improve its image. The Scheme is a non-profit-making,

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Construction Logistics Plan Guidance

Construction Logistics Plan Guidance Construction Logistics Plan Guidance For developers MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 4 Section 3 Why complete a

More information

PLANNING POLICY 3.3.5

PLANNING POLICY 3.3.5 PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family

More information

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works

More information

Emergency Management and Business Continuity Policy

Emergency Management and Business Continuity Policy www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

Construction Site Set Up Requirements

Construction Site Set Up Requirements Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment

More information

Department of Markets and Consumer Protection. Code of Practice for Deconstruction and Construction Sites. Seventh Edition May 2013

Department of Markets and Consumer Protection. Code of Practice for Deconstruction and Construction Sites. Seventh Edition May 2013 Department of Markets and Consumer Protection Code of Practice for Deconstruction and Construction Sites Seventh Edition May 2013 Department of Markets and Consumer Protection City of London PO Box 270

More information

CONSTRUCTION SITE TRANSPORT THE NEXT BIG THING

CONSTRUCTION SITE TRANSPORT THE NEXT BIG THING CONSTRUCTION SITE TRANSPORT THE NEXT BIG THING Why transport is important What you can do about it April 2003 Transport accounts for 10-20% of construction costs. CBI estimate the annual cost of road congestion

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019

Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019 Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019 KE Architects P/L 49 Galvin Street MAROUBRA NSW 2035 D211/14 RP (PDS) ENVIRONMENTAL

More information

SPECIFICATION NET LINE 1 - Wilkinson Street Diamond Crossing (WSDC) re-ballast

SPECIFICATION NET LINE 1 - Wilkinson Street Diamond Crossing (WSDC) re-ballast General Requirements: The existing fixed diamond crossing at the Armstrong Way / Wilkinson Street junction (NG7 7NW) has become contaminated with material from roadway run-off and requires re-ballasting

More information

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN JULY 2015 Standard Elements of a Construction Management Plan (CMP) This guidance tool was developed through partnership between the Department of Planning

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

CONSTRUCTION MANAGEMENT PLAN

CONSTRUCTION MANAGEMENT PLAN CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May 2010 1 P a g e Mansell have been appointed

More information

RISK ASSESSMENT EXPLANATORY NOTES FOR OUTDOOR EVENTS

RISK ASSESSMENT EXPLANATORY NOTES FOR OUTDOOR EVENTS RISK ASSESSMENT EXPLANATORY NOTES FOR OUTDOOR EVENTS 1. For every event a responsible person should carry out a suitable and sufficient risk assessment of safety covering all aspects of the event applicable

More information

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020 HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 05-00 STRATEGIC ROAD NETWORK 4,00 miles of motorways and major A roads A billion tonnes of freight transported each year 4 million people drive on the

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Q. Why have we set up an energy centre and heat network in Bunhill?

Q. Why have we set up an energy centre and heat network in Bunhill? FAQs: Bunhill energy centre and heat network Q. Why have we set up an energy centre and heat network in Bunhill? A. We set up a heat network in the Bunhill ward to provide cheaper, greener, locallyproduced

More information

Project Environmental Plan for the CCURV PSDH

Project Environmental Plan for the CCURV PSDH CCURV PSDH Page 1 of 21 Project Environmental Plan for the CCURV PSDH Controlled Copy No LSE PEP - 38 Employer: Project Office Address: John Laing Partnership Highbury Grove HEADING PAGE N o Title, Contents

More information

MLD: Domestic Maritime Transport Project

MLD: Domestic Maritime Transport Project Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication

More information

A guide to appointing an architect

A guide to appointing an architect A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the

More information

The Construction (Design and Management) Regulations 2007

The Construction (Design and Management) Regulations 2007 STATUTORY INSTRUMENTS 2007 No. 320 HEALTH AND SAFETY The Construction (Design and Management) Regulations 2007 Made - - - - - 7th February 2007 Laid before Parliament 15th February 2007 Coming into force

More information

Guide Document for Development of WHS Management Plans

Guide Document for Development of WHS Management Plans DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS

More information

Traffic Management Plan - Depot Procedure

Traffic Management Plan - Depot Procedure Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope

More information

RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module.

RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module. Services for professional procurement. Be better informed, make better decisions. RISQS Audit Protocol: Network Rail On-Track Plant Operations Scheme (POS) module. Contents Contents... 2 Preface... 3 Issue

More information

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26 Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain

More information

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. A Construction Management Plan (CMP) shall be submitted for all projects in Pitkin

More information

WHS CONTRACTOR MANAGEMENT PROCEDURE

WHS CONTRACTOR MANAGEMENT PROCEDURE 1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and

More information

Newsletter: Construction Information, No. 1 28 June 2010

Newsletter: Construction Information, No. 1 28 June 2010 1 ( 6 ) Newsletter: Construction Information, No. 1 28 June 2010 Premiere for the newsletter about construction and disruption In connection with the start of the construction of the New Karolinska Solna

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

2007 No. 00 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2007

2007 No. 00 HEALTH AND SAFETY. The Construction (Design and Management) Regulations 2007 2 N D DRAFT STATUTORY INSTRUMENTS 2007 No. 00 HEALTH AND SAFETY The Construction (Design and Management) Regulations 2007 Made - - - - Day Month 2007 Laid before Parliament Day Month 2007 Coming into force

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

Environmental Policy. JRI Orthopaedics Limited

Environmental Policy. JRI Orthopaedics Limited JRI Orthopaedics Limited October 2014 Contents Clause 1. Policy Statement 1 2. Who is covered by the policy? 2 3. Organisation and Responsibilities 2 4. Training and Communication 3 5. Suppliers and Customers

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

DIRECTORATE OF ESTATES & FACILITIES

DIRECTORATE OF ESTATES & FACILITIES DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM PM4 Client Representative (University Project Manager) for Capital Projects Scope of Services Document Originated: April 2006 By:

More information

TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE

TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE RWE Innogy UK TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE The Planning Act 2008 requires developers to undertake pre-application consultation before submitting an application for a Development

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

HEALTH, SAFETY AND WELFARE POLICY HSM010

HEALTH, SAFETY AND WELFARE POLICY HSM010 HEALTH, SAFETY AND WELFARE POLICY HSM010 REVIEWED AND REVISED 1 SEPTEMBER 2011 Reviews and Revisions Action Date Reason Initial Policy 12 July 1999 Various revisions 1999 to 2006 Personnel and legislation

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.

APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS. Document No: 16-02-12A Issue Date: 09 December 2014 APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS (An approved Traffic Management

More information

REPORT FOR: Traffic and Road Safety Advisory Panel

REPORT FOR: Traffic and Road Safety Advisory Panel REPORT FOR: Traffic and Road Safety Advisory Panel Date of Meeting: 3 October 2012 Subject: INFORMATION REPORT - NETWORK MANAGEMENT DUTY 2011/12 Responsible Officer: John Edwards - Interim Corporate Director,

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

WHS Contractor Management Procedure

WHS Contractor Management Procedure Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety

More information

Construction insurance. Product overview

Construction insurance. Product overview Construction insurance Product overview Global construction output is forecast to increase from 5.2tn in 2014 to 9.3tn in 2025.* In the UK, the sector contributes almost 90bn to the UK economy and employs

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units

SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT Excessive noise from the operation of machines and external mechanical plant can disturb neighbours, disrupt sleep, interfere with

More information

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy. UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract

More information

Environmental Code of Development Practice. Issued by Planning Services and the Environmental Protection Team

Environmental Code of Development Practice. Issued by Planning Services and the Environmental Protection Team Environmental Code of Development Practice Issued by Planning Services and the Environmental Protection Team Table of contents 1.0 Introduction 4 2.0 General Principles 5 2.1 Hours of work 5 2.2 Publicity

More information