1 I35W Bridge A Transportation Agency s Emergency Response Dan Dorgan State Bridge Engineer Minnesota Department of Transportation February 15, 2010

2 I-35W Bridge Bridge Background Bridge Collapse August 1, 2007 August 2, 2007 Emergency Response Rescue Operations Traffic Management Investigation Begins Media Coverage Responding to Public and Media Recovery of Victims and Bridge Removal Mn/DOT Actions Following August 2007 NTSB Investigation Minnesota Legislature: Victims Fund and Transportation Funding Impact on Employees Observations - Lessons Learned

3 I-35W Bridge Downtown Minneapolis University of Minnesota

4 I-35W Bridge Bridge Background Bridge Completed in Feet Long 3 span continuous truss Main span approach spans ADT 141,000 Sufficiency Rating 50.0 Annually Inspected Mn/DOT 20 year plan called for Replacement/Renovation July 1967

5

6 Two Previous Studies of the Bridge 2001 University of Minnesota Fatigue Evaluation of the Deck Truss of Bridge Fatigue Evaluation and Redundancy Analysis Multi Girder Approach Spans Had Required Retrofits for Cracks at Diaphragm Connection

7 Previous Bridge Modifications 1977 Concrete overlay 1998 Railing repair, drainage system, minor deck repair 1999 Painting Portion of Truss Spans 1999 Anti Icing System 2001 Curb & Slab repair Average yearly Mn/DOT Maintenance Hours 500

8 Contract Maintenance Work at Time of Collapse Contract to replace concrete overlay, and repair joints. Work completed: North bound two inside lanes South bound two outside lanes Scheduled completion date was September 30, 2007 Contractor employees and Mn/DOT inspectors on bridge at collapse

9 August 1, 2007 The Collapse Collapse occurs at 6:05 p.m. Wednesday, August 1, 2007 Over 100 vehicles on the bridge at the time 13 fatalities 140 injuries

10 North End I 35W Bridge South End

11 North End

12 Main Span

13 Pier 6 South End Main Span

14 South Spans

15 Emergency Response 6:05 p.m. Numerous calls to 911 Motorists on bridge, construction workers, citizens in area assist injured Emergency personnel from Twin Cities and Western Wisconsin respond 6:10 p.m. District Emergency Operations Center activated Mn/DOT s Regional Transportation Management Center (RTMC) Immediate traffic control for ramp and freeway closures provided by FIRST units, maintenance units, and contractors in the vicinity

16

17

18

19

20 Response the First 12 Hours Unified command center set up on collapse site. Mpls. Fire Department in charge of rescue operation Hennepin County Sheriff in charge of recovery Rescue operations well coordinated by emergency responders. August 1, 2007

21 First 12 Hours (continued) 6:20 p.m. Maintenance started converting I- 35W temporary traffic control measures to longer term traffic control standards with barriers and signs 20 changeable message signs activated 800 megahertz communication system was critical for responders

22 First 12 Hours (continued) 7:00 p.m. Over 150 employees activated, most just returned without a call 10:00 p.m. Governor and Mayor provide an update to public. Number of victims unknown. Rescue Operations Ended, Recovery Begins 11:00 p.m. Detour maps for a.m. rush posted on Mn/DOT Web site Overnight Expanded signing and barricades of closed I-35W Converted T.H. 280 to a freeway

23 I-35W Detour Map

24 Key Decisions Early August 2 nd Division of Tasks Dedicate a team to bridge replacement Identify individuals that would address questions on the collapsed bridge Retain a forensic expert for the collapse investigation Previous planning for a bridge emergency replacement addressed typical interchange bridges, not a major river crossing.

25 August 2, 2008 Mn/DOT Engineers assess stability of wreckage for recovery personnel Mn/DOT retains Wiss Janney Elstner and TranSystems/Lichtenstein for forensic investigation Federal Agencies Arrive at Command Site FEMA, FBI, Coast Guard, OSHA, OIG, FTA, NTSB, Rick Capka and National FHWA staff NTSB Leads Investigation Team Law Enforcement and NTSB Update Victims Families Mn/DOT Engineering Team is organized for rapid replacement Command Site

26 Media Coverage August 2nd Governor Conducts interviews throughout morning 2:00 pm Press Conference Governor announces Emergency Statewide Bridge Inspections beginning with underdeck trusses Forensic Investigation Team Wiss Janney Elstner Transystems Independent Review of Mn/DOT Inspection Program FHWA Participates Mn/DOT provides bridge background and responds to questions National and International News Organizations present National Transportation Safety Board Begins Updates

27

28

29

30

31

32

33

34

35 Responding to Public and Media Requests Held Daily 2:00 pm Press Conference Became only means to respond to volume of requests Format was Statement, Update on specific issue, Open to questions Length was held to a reasonable time 30 to 45 minutes When it ended, held questions till next day Approach to Press Conferences Share the information we possess Be factual and calm Avoid speculation. Ok to admit you don t know. It is Ok to stop and think before answering. Use non-engineering terms when possible Provide information that informs the public Keep accusatory questions in perspective lives have been lost 8/3/07 Press Conference

36 Responding to Public and Media Requests (Continued) Mn/DOT goal was to be transparent Document requests were voluminous Website posting of plans, inspection reports, bridge studies Dedicated I-35W Website included all documents Later needed to remove inspectors names after calls were made to their homes.

37 Responding to Public and Media Requests (Continued) Mn/DOT priority was local media requests Within days, some began their own investigations and speculation. Correcting factual errors consumed time Document Management System established to gather and store all bridge information Spectators and Media on Adjacent 10 th Avenue Bridge

38 National Response Aug. 2 Secretary Peters and FHWA Administrator Capka on site Aug. 4 - President Bush pledges to cut red tape that could delay recovery Several site visits by Secretary Peters and President Bush, and continuing presence by Rick Capka

39 Within days, Congress authorizes $250 million in Emergency Relief money to replace bridge and restore highway facilities to predisaster conditions Total Federal Emergency Relief $373.5M

40 Recovery of Victims Access to site controlled by police and fending 24/7 Aug. 6 Careful bridge demolition began to aid recovery, and NTSB investigation Navy Divers from Norfolk, VA assist in recovery NTSB Investigation Team Supervises Removal All steel members marked and indexed Members removed by torch underwater cuts could take 1-4 hours Extensive coordination required with divers, sheriff, investigators and contractor Site protocol followed during recovery of victims Navy Dive Team

41 Navy Divers Perspective

42 Assigned bridge engineers to assist NTSB not previously involved in bridge Aug. 20 Navy Divers recover 13th victim, site turned over to Mn/DOT Sept. 6 - Navigation channel opened to commercial traffic Sept. 27 Final steel removed from river Removing Wreckage from Navigation Channel

43 Structural Steel Laid Out On River Flats

44

45

46 September 2007 November 2008 Anticipate and Act Identify what we should do Resulting from the investigation or internal process reviews Don t wait Take action Take opportunities to communicate what you are doing Encouraged and reassured our staff Keep them focused Understand rebuilding credibility is a journey

47 Minnesota Actions Following August 1, 2007 Bridge Inspection Aug. 2 - Governor directs MnDOT to inspect all bridges on the trunk highway system in priority order Inspection continued of all MnDOT bridges, with priority to fracture critical bridges and those rated structurally deficient By December 21, MnDOT bridges inspected 840 Local Bridges Supplemented MnDOT inspection teams with PB Americas, Michael Baker, HDR, Volkert, and STV

48 Minnesota Actions (Continued) Peer Review of Major Bridge Designs April 2008 Spans over 250 feet Unique bridge types Independent design review by a separate design firm Design Criteria and Assumptions Review of Design Constructability Review

49 Bridge Inspection Minnesota Actions (Continued) Governor Directs Mn/DOT to conduct an independent Stem to Stern review of bridge inspection program Mn/DOT retains PB Americas to conduct 301 bridges inspected and used in Condition Rating Comparison Findings June 2008 Condition ratings for 282/301 bridges within 1 NBI rating MnDOT Program Consistent with other States and complies with NBIS Better documentation to track- inspection findings to follow up maintenance actions Clarify responsibilities between routine and fracture critical inspection teams

50 Minnesota Actions (Continued) Process Reviews of Internal Procedures Completed as a follow-up to PB study and Legislative Auditor Study Internal QC/QA Design Procedures are under review Inspection Consolidated documentation of QA/QC procedures for Routine and Fracture Critical Inspections Increased use of UT to assess corrosion Maintenance Revised procedures to document maintenance follow up to inspection findings

51 Gusset Plate Reviews and Inspections January 15, 2008 NTSB urges truss and gusset plate load ratings for bridges citing design error in I-35W Bridge. Mn/DOT developed a checking process for gusset plates in October-November 2007 No software or rating methods existed for checking truss gusset plates, few examples in references Mn/DOT began the analysis of several bridges in Fall 2007

52 January 15, 2008 Press Conference Mn/DOT conducted news conference following NTSB Press Conference on January 15 Informed the public we had already begun the design review of gusset plates on our truss bridges Committed to completing the process by July of 2008 Shared the purpose was to determine if original designs were correct Noted we had no reason to suspect a similar error this was precautionary

53 Truss Bridge Gusset Plate Checks Performed by Mn/DOT in 2008 Rivets/bolts in shear and bearing Buckling at ends of diagonals Flexure at sections cut along length and height of gusset plate Tension at ends of all tension members Block shear at ends of all tension members Gusset Plate free edge unsupported length to thickness ratio

54 Gusset Plate Rating Results By July 1, 2008: 25 trusses load rated to verify original design was correct By August 1, 2008: 25 bridge field inspections of gussets completed No design deficiencies similar to I-35W found Wabasha Bridge

55 Results of Reviews Typical Areas of Loss Gusset Plates Below: Deck Joints Drain Pipes Section Loss Areas: Interior Face Along Chord (Red) Interior Face Along Edges of Diagonals (Green) Interior Face Along Edges of Verticals (Blue) Exterior Face Along Top of Lateral Brace Gusset Plate Extensive use of ultrasonic devices to measure plate thickness Blatnik Bridge

56 Documentation of Losses Visual ( 1/8 ) & NDT ( 1/8 ) Quantify Depths Quantify Areas Identify Locations Include Contours

57 Results of Reviews St. Cloud Bridge closed and replacement accelerated Blatnik Bridge in Duluth gusset stiffened to restore full safety factor Winona Bridge reinforced gusset due to corrosion All necessary repairs were completed by July 2008 Blatnik Bridge

58 Press Conferences Held in Each City Impacted Local press conference on the day we restricted or closed a bridge. Commissioner, State Bridge Engineer, District Engineer, and Elected Officials Participated. Commissioner emphasized safety was our number one priority. Described what our inspectors had discovered. Why we needed to act. Stated we were acting conservatively out of an abundance of caution. Committed to repairing as soon as possible. Promised to update them on progress.

59 DESOTO BRIDGE St. Cloud Closed March 20, 2008-Replacement Accelerated

60 BLATNIK BRIDGE - Duluth Restricted May 6, Lane Each Direction Repairs Completed July 2008 Overlay weight and Previous Corrosion had reduced Safety Factors at 29 Locations $1.1 Million Repair Job

61 WINONA BRIDGE Closed Temporarily June 3, 2008 Repairs Completed July 2008

62 WINONA BRIDGE $108,000 total cost Corrosion had reduced Safety Factors at 15 locations

63 Minnesota Actions Revised Bridge Construction Load Specifications in response to FHWA August 8, 2007 Advisory April 2008 Unless otherwise allowed in plans, limits construction to loadings similar to design liveload. Construction materials limited to 65,000 lb per 1000 SF. Individual Stockpiles limited to 25,000 lb per 100 SF. Vehicles, materials, equipment limited to 200,000 lbs per span. Alternate loadings require submittal by contractor s engineer and approval of Mn/DOT Project Engineer.

64 Legislative/Congressional Hearings and Investigations Congressional Hearing September 2007 Several Minnesota Legislative Hearings Regarding Transportation Issues and the I35W Bridge Investigative Report to Joint Committee to Investigate the I35W Bridge Collapse May 2008 Office of the Legislative Auditor, State of Minnesota Evaluation Report: State Highways and Bridges February 2008

65 National Transportation Safety Board Investigation NTSB led the investigation with a team of professionals including metallurgists, engineers, and experienced investigators Investigation Docket has been posted on the NTSB website at: under Highway Accidents. Process was very disciplined progressing through fact finding, analysis, conclusions and recommendations. NTSB parties and contributors to the investigation included the FHWA, Wiss Janney, Elstner and Transystems, Mn/DOT, Jacobs Engineering, and PCI.

66 NTSB Investigation Results November 13-14, 2008 NTSB Public Hearing Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 Page 152 Probable cause inadequate load capacity due to a design error by Sverdrup & Parcel and Associates, of the gusset plates at the U10 nodes, which failed under a combination of 1) Substantial increases in the weight of the bridge, which resulted from previous bridge modifications, and 2) The traffic and concentrated construction loads on the bridge on the day of collapse.

67 NTSB Investigation Results (Continued) Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 Page 152 Contributing to the design error was the failure of Sverdrup & Parcel s quality control procedures to ensure that the appropriate main truss gusset plate calculations were performed for the I-35W bridge and the inadequate design review by Federal and State transportation officials. Contributing to the accident was the generally accepted practice among Federal and State transportation officials of giving inadequate attention to gusset plates during inspections for conditions of distortion, such as bowing, and of excluding gusset plates in load rating analyses.

68

69 Mn/DOT Communication Following November 13-14, 2008 NTSB Hearing Commissioner responded to media following the hearing expressing thanks to the NTSB. Due to actions already taken, Mn/DOT was able to state action was complete or underway regarding all NTSB recommendations.

70 Minnesota 2008 Transportation Funding 2008 Transportation Bill License Plate Fee and 5 cent Gas Tax Increase $1.8 billion in bonding of which $600M bridges Up to 3.5 cent added gas tax for bond payments By June 2018, replace all bridges rated SD and below 50, and FC bridges, unless reason documented to remain in service Approximately 120 bridges to be replaced or repaired Victims Fund Legislation Existing statutory limits on liability inadequate $37 million in payments completed

71 Bridge Replacements Completed to Date 41 bridge projects are completed or underway. 13 major bridge projects planned over the next 8 years with 6 Mississippi River crossings.

72 Impacts on Employees and Organization Responded well on August 1. They returned without a call. Tremendous strength and perseverance shown. Stress debriefings were valuable tools to share emotions. We watched for signs of employee struggles with mental and physical health. Reassigned to other duties as needed. Communicate with employees as often as possible, rather than the news be their source. Provided reassurance. Important to have Governor and other leaders in forefront to help reassure the public. Media communication handled by Assistant Commissioner and Bridge Engineer to allow employees to focus on their job.

73 Observations and Lessons Learned Existing partnerships/relationships with the FHWA, Minneapolis, and other agencies were key in responding to the tragedy. Dedicating a team solely to rapid replacement was needed. Others dealt with collapse. Establish a Web Site to make information public versus responding to individual data requests. Daily News conferences are manageable, individual interviews are overwhelming.

74 Observations and Lessons Learned (Continued) A redundant traffic management system is invaluable. Understand politics will be part of it. Within tragedy is also the impetus to review processes and improve, be open to the opportunity.

75

Office of Highway Safety. IIC Opening Statement I-35W Bridge Collapse Minneapolis, MN. Mark Bagnard

Office of Highway Safety. IIC Opening Statement I-35W Bridge Collapse Minneapolis, MN. Mark Bagnard Office of Highway Safety IIC Opening Statement I-35W Bridge Collapse Minneapolis, MN Mark Bagnard I-35W Bridge Downtown District Source: Google Earth I-35W Bridge Information Designed by Sverdrup & Parcel

More information

The Infamous Gusset Plates. Roberto Ballarini and Taichiro Okazaki Department of Civil Engineering University of Minnesota.

The Infamous Gusset Plates. Roberto Ballarini and Taichiro Okazaki Department of Civil Engineering University of Minnesota. The Infamous Gusset Plates by Roberto Ballarini and Taichiro Okazaki Department of Civil Engineering University of Minnesota Prepared for The City, the River, the Bridge, University of Minnesota Press

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

highway Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 National Transportation Safety Board ACCIDENT REPORT

highway Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 National Transportation Safety Board ACCIDENT REPORT Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007 highway National Transportation Safety Board ACCIDENT REPORT NTSB/HAR-08/03 PB2008-916203 NTSB/HAR-08/03 PB2008-916203 Notation 7975C

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

Quality and the Bridge Engineer

Quality and the Bridge Engineer Quality and the Bridge Engineer Shane R. Beabes, P.E. Rio-Antirio Bridge in Greece Joint ASHE / SEI General Meeting September 16, 2014 Introduction Agenda Quality Management System Client Requirements

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES

NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES Portland, Oregon April 23-25, 2013 Larry D. O Donnell, P.E. Sr. Structural Engineer Federal Highway Administration Office of Technical Services

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS

APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS APPENDIX H DESIGN CRITERIA FOR NCHRP 12-79 PROJECT NEW BRIDGE DESIGNS This appendix summarizes the criteria applied for the design of new hypothetical bridges considered in NCHRP 12-79 s Task 7 parametric

More information

Asset Maintenance Bridge Emergency Response

Asset Maintenance Bridge Emergency Response FDOT Districts 1 & 7 Structures and Facilities Office Asset Maintenance Bridge Emergency Response Bridge No. 100300 Gandy Boulevard (US 92) over Tampa Bay, FL Jose Pepe Garcia, P.E., Florida DOT David

More information

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1 Appendix C Change Management Plan Communication Plan QA/QC Plan Transition and Closure Plan C-1 CHANGE MANAGEMENT PLAN Whether the effects of changes are positive or negative, managing change is an important

More information

National Bridge Inspection Standards (NBIS) Metrics

National Bridge Inspection Standards (NBIS) Metrics Table of Contents National Bridge Inspection Standards (NBIS) Metrics NATIONAL BRIDGE INSPECTION STANDARDS (NBIS) METRICS TABLE OF CONTENTS...1 Metric #1: 23 CFR 650.307 Bridge inspection organization...2

More information

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT

More information

Improving Transportation Safety Through Accident Investigation. Vernon S. Ellingstad Office of Research & Engineering

Improving Transportation Safety Through Accident Investigation. Vernon S. Ellingstad Office of Research & Engineering Improving Transportation Safety Through Accident Investigation Vernon S. Ellingstad Office of Research & Engineering Mission The NTSB is an independent federal agency charged to: Determine the probable

More information

Corporate Overview. We will start shortly

Corporate Overview. We will start shortly Corporate Overview We will start shortly Case studies presentation: I-35W Bridge in Minneapolis and Punggol EC26 Building in Singapore Presented by: - Luca Manetti, S&S Manager, SMARTEC SA - Branco Glisic,

More information

Bridge Rehabilitation Alternatives

Bridge Rehabilitation Alternatives Kennedy Bridge Planning Study Technical Memorandum: Bridge Rehabilitation Alternatives MnDOT S.P. No. 6018-02 Prepared for: Minnesota Department of Transportation DRAFT April 28, 2014 Prepared by: Report

More information

To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2

To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2 To Mary Kay O'Connor Process Safety Center Home Page To Program details for Day 1 To Program details for Day 2 Using Incident Investigations as a Program Assessment Tool Michael L. Marshall, PE, CSP U.S.

More information

Draft Transportation Management Plan for Via Verdi Repair Project

Draft Transportation Management Plan for Via Verdi Repair Project for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery

MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN ESF14-Long Term Community Recovery Planning Team Support Agency Coffeyville Public Works Independence Public Works Montgomery County Public Works 1/15/2009

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

Maryland Emergency Operations Plan

Maryland Emergency Operations Plan Maryland Emergency Operations Plan Purpose The purpose of the Maryland Emergency Operations Plan (EOP) is to outline an approach and designate responsibilities intended to minimize the consequences of

More information

BRIDGE INSPECTION HANDBOOK. U.S. Fish and Wildlife Service Division of Engineering

BRIDGE INSPECTION HANDBOOK. U.S. Fish and Wildlife Service Division of Engineering BRIDGE A guide to the proper safety inspection and evaluation of vehicular bridges on USFWS facilities U.S. Fish and Wildlife Service Division of Engineering INSPECTION HANDBOOK USFWS Bridge Inspection

More information

The Nursing Home Inspection Process

The Nursing Home Inspection Process 1 The Nursing Home Inspection Process SUMMARY Both the Minnesota Department of Health (MDH) and the U.S. Department of Health and Human Services share responsibility for ensuring that Minnesota s nursing

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

DAMAGE ASSESSMENT ANNEX E

DAMAGE ASSESSMENT ANNEX E DAMAGE ASSESSMENT ANNEX E E1. Purpose, Situation, and Assumptions E1.1 Purpose The purpose of this Damage Assessment Functional Annex is to guide and coordinate agencies and organizations in conducting

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

Bridge Retrofit Laser System

Bridge Retrofit Laser System Highway IDEA Program Bridge Retrofit Laser System Final Report for Highway IDEA Project 153 Prepared by: Paul A. Fuchs Fuchs Consulting, Inc. September 2012 Innovations Deserving Exploratory Analysis (IDEA)

More information

Fact Sheet Fatality Inspections Construction Safety & Health Division Fatal Accident 01/11/12 at the Ambassador Bridge

Fact Sheet Fatality Inspections Construction Safety & Health Division Fatal Accident 01/11/12 at the Ambassador Bridge RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS MICHIGAN OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION MARTHA B.YODER DIRECTOR STEVEN H. HILFINGER DIRECTOR Fact Sheet

More information

ESF 01 - Transportation Annex, 2015

ESF 01 - Transportation Annex, 2015 ESF 01 - Transportation Annex, 2015 Table of contents I. Introduction... 3 A. Purpose... 3 B. Scope of Operations... 3 II. Situation and Assumptions... 3 A. Situation... 3 B. Assumptions... 4 III. Concept

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed. May 7,2015 KSANDER & ASSOCIATES CONSULTING PROFESSIONAL ENGINEERS 130 HUINTER STREET, UNIT 103, PETERBOROUGH, ONTARIO K9H2K8 TELEPHONE (705) 743-9221 FAX 743-0904 Ontario Region Conservation Authority

More information

Disaster Recovery Financial Assistance

Disaster Recovery Financial Assistance Disaster Recovery Financial Assistance Recovering from a disaster is a partnership effort among local, state and federal government agencies in conjunction with private and non-profit organizations. Rebuilding

More information

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction

More information

Truss Bridges of Kentucky

Truss Bridges of Kentucky ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire

More information

STATE OF NEW YORK DEPARTMENT OF HEALTH

STATE OF NEW YORK DEPARTMENT OF HEALTH STATE OF NEW YORK DEPARTMENT OF HEALTH FATALITY ASSESSMENT AND CONTROL EVALUATION Day Laborer at Boat Dock Drowns After Falling Into River Case Report: 08NY021 SUMMARY In April 2008, a male day laborer

More information

Handling, Erection and Bracing of Wood Trusses

Handling, Erection and Bracing of Wood Trusses Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation. Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,

More information

Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges

Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges T. J. Wipf, F. S. Fanous, F. W. Klaiber, A. S. Eapen Evaluation of Appropriate Maintenance, Repair and Rehabilitation Methods for Iowa Bridges April 2003 Sponsored by the Iowa Department of Transportation

More information

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Measuring the Condition of Prestressed Concrete Cylinder Pipe Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

What is Seismic Retrofitting?

What is Seismic Retrofitting? What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes

More information

CRS Report for Congress

CRS Report for Congress Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland

More information

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Texas Depadment of Transpo,tation Bridge Condition Survey Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway: Irving Street Facility Name: Lone Wolf Bridge Structure Number: B00315-031

More information

Risk - Based Inspection Frequencies

Risk - Based Inspection Frequencies Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection

More information

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:

Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address: City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit

More information

BASIC EMERGENCY MANAGEMENT FOR ELECTED OFFICIALS. M a r y l a n d M a y o r s A s s o c i a t i o n. W i n t e r C o n f e r e n c e A n n a p o l i s

BASIC EMERGENCY MANAGEMENT FOR ELECTED OFFICIALS. M a r y l a n d M a y o r s A s s o c i a t i o n. W i n t e r C o n f e r e n c e A n n a p o l i s BASIC EMERGENCY MANAGEMENT FOR ELECTED OFFICIALS M a r y l a n d M a y o r s A s s o c i a t i o n W i n t e r C o n f e r e n c e A n n a p o l i s SPEAKERS Mayor Michael E. Bennett City of Aberdeen Mayor

More information

National Transportation Safety Board Washington, D.C. 20594

National Transportation Safety Board Washington, D.C. 20594 E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Safety Recommendation Date: August 2, 2002 In reply refer to: P-02-03 Honorable Christie

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

Rehabilitation Report

Rehabilitation Report Rehabilitation Report Old Cedar Avenue Bridge over Long Meadow Lake (Bridge No. 3145) FINAL The City of Bloomington, MN July 2014 SRF No. 8418 Rehabilitation Report Old Cedar Avenue Bridge over Long Meadow

More information

Interstate 95 is closed from I-26 to I-20 in both directions and is detoured. I-95 will be opened when repairs to these 13 bridges are complete.

Interstate 95 is closed from I-26 to I-20 in both directions and is detoured. I-95 will be opened when repairs to these 13 bridges are complete. 2015 Major Flood Report Statew ide Operations (8:00 AM- REPORT) October 11, 2015 Statewide Summary Interstate I-95: The Contractor has made good progress towards the repair of the substructures of 13 Interstate

More information

SUPER OVERSIZE / OVERWEIGHT SINGLE TRIP

SUPER OVERSIZE / OVERWEIGHT SINGLE TRIP CITY OF BAYTOWN City Clerk s Office 2401 Market Street Baytown, Texas 77520 Phone: (281) 420-6504 Fax: (281) 420-5891 Web: www.baytown.org FOR OFFICE USE ONLY Date Received: Date Processed: SUPER OVERSIZE

More information

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW 2005 New York City Bridge Conference September 12-13, 2005 REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW The Novoarbatsky Bridge across the Moskva River had been built in 1957 Plan of the bridge Steel

More information

Overhang Bracket Loading. Deck Issues: Design Perspective

Overhang Bracket Loading. Deck Issues: Design Perspective Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple

More information

VIRGINIA WORKERS COMPENSATION COMMISSION REPORT ON AUDIT FOR THE YEARS ENDED JUNE 30, 2006 AND JUNE 30, 2007

VIRGINIA WORKERS COMPENSATION COMMISSION REPORT ON AUDIT FOR THE YEARS ENDED JUNE 30, 2006 AND JUNE 30, 2007 VIRGINIA WORKERS COMPENSATION COMMISSION REPORT ON AUDIT FOR THE YEARS ENDED JUNE 30, 2006 AND JUNE 30, 2007 AUDIT SUMMARY Our audit of the Virginia Workers Compensation Commission found: proper recording

More information

Flagger Training & Certification

Flagger Training & Certification Flagger Training & Certification Flagger Training & Certification TMI has a staff of qualified professionals whose knowledge and skills are invaluable to our classroom and online training programs. TRAFFIC

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Chapter 14 Project Incidents and Complaints

Chapter 14 Project Incidents and Complaints Chapter 14 Project Incidents and Complaints 1-1401 Reporting Complaints and Damage or Injury Claims Complaints or claims for personal injury or damage to property because of project details or the operations

More information

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October

More information

Triangle Alliance Conference DISASTERS & HISTORIC PRESERVATION. October 23, 2009

Triangle Alliance Conference DISASTERS & HISTORIC PRESERVATION. October 23, 2009 Triangle Alliance Conference DISASTERS & HISTORIC PRESERVATION October 23, 2009 Topic Outline FEMA s Mission Programs: Individual Assistance, Public Assistance, Mitigation, National Preparedness Environmental

More information

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com

More information

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY

More information

City of Columbus, Ohio Department of Public Safety Division of Police February 2006

City of Columbus, Ohio Department of Public Safety Division of Police February 2006 City of Columbus, Ohio Department of Public Safety Division of Police February 2006 Columbus Focus on Safety Photo Red Light Enforcement MISSION STATEMENT A. The Traffic Bureau s primary mission is the

More information

The 2007 Flood Relief Package and Natural Resources Grants

The 2007 Flood Relief Package and Natural Resources Grants 2007 Special Session Fiscal Summary of Disaster Relief Money Matters 07.07 October 2007 Flood Relief...1 I-35W Bridge Disaster Relief...6 Other Statewide Disaster Relief...6 Fiscal Analysis Department

More information

CONCEPTUAL REHABILITATION ALTERNATIVE

CONCEPTUAL REHABILITATION ALTERNATIVE Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement

More information

The Analysis of Open Web Steel Joists in Existing Buildings

The Analysis of Open Web Steel Joists in Existing Buildings PDHonline Course S117 (1 PDH) The Analysis of Open Web Steel Joists in Existing Buildings Instructor: D. Matthew Stuart, P.E., S.E., F.ASCE, F.SEI, SECB, MgtEng 2013 PDH Online PDH Center 5272 Meadow Estates

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina Analysis of the Interstate 0 Twin Bridge s Collapse During Hurricane Katrina By Genda Chen, Emitt C. Witt III, David Hoffman, Ronaldo Luna, and Adam Sevi The Interstate 0 Twin Span Bridge over Lake Pontchartrain

More information

*HB0380S03* H.B. 380 3rd Sub. (Cherry) LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM

*HB0380S03* H.B. 380 3rd Sub. (Cherry) LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM LEGISLATIVE GENERAL COUNSEL Approved for Filing: C.J. Dupont 03-09-16 7:25 PM H.B. 380 3rd Sub. (Cherry) Senator Kevin T. Van Tassell proposes the following substitute bill: 1 UTAH COMMUNICATIONS AUTHORITY

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 This page intentionally left blank. PAGE 12 MINNESOTA GO MNDOT TRANSPORTATION

More information

CITY OF TRAIL MEMORANDUM

CITY OF TRAIL MEMORANDUM 0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest

More information

CAPPELEN MEMORIAL BRIDGE REHABILITATION

CAPPELEN MEMORIAL BRIDGE REHABILITATION CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Cypress Creek Sewer Break

Cypress Creek Sewer Break Arlenia H. Cole, Customer Affairs PIO City of Memphis Public Works Office: 901-636-6922- Cell: 901-569-1971 Email: arlenia.cole@memphistn.gov Cell: 901-569-1971 April 1. 2016 Cypress Creek Sewer Break

More information

Preliminary steel concrete composite bridge design charts for Eurocodes

Preliminary steel concrete composite bridge design charts for Eurocodes Preliminary steel concrete composite bridge 90 Rachel Jones Senior Engineer Highways & Transportation Atkins David A Smith Regional Head of Bridge Engineering Highways & Transportation Atkins Abstract

More information

Quality Control and Quality Assurance Guide

Quality Control and Quality Assurance Guide Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...

More information

CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT***

CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE... 1 SECTION 7.1 INTRODUCTION... 2 Subsection 7.1.1 Purpose... 2 Subsection 7.1.2 Scope... 2 Subsection

More information

The Collapse of Building 7 by Arthur Scheuerman December 8, 06

The Collapse of Building 7 by Arthur Scheuerman December 8, 06 The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built

More information

BRIDGING THE GAP BETWEEN EMERGENCY MANAGEMENT AND TRANSPORTATION. Sheena Connolly Open Roads Consulting

BRIDGING THE GAP BETWEEN EMERGENCY MANAGEMENT AND TRANSPORTATION. Sheena Connolly Open Roads Consulting BRIDGING THE GAP BETWEEN EMERGENCY MANAGEMENT AND TRANSPORTATION Sheena Connolly Open Roads Consulting Your Perspective on Transportation 1. What s your perspective on transportation? (e.g. experience,

More information

PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1

PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT. Xiaohua H. Cheng 1 PRELIMINARY SEISMIC CONSIDERATIONS FOR PULASKI SKYWAY REHABILITATION PROJECT Abstract Xiaohua H. Cheng 1 The 3.5 mile (5.63 km) long Pulaski Skyway is located in northern New Jersey, serving as a major

More information

ESF 14. Long-Term Community Recovery

ESF 14. Long-Term Community Recovery 1. Purpose This annex provides an overview of the general process to be followed in recovering from the economic results of a natural disaster or other major emergency that may impact Coos County. It outlines

More information

Asset Management Performance Report (Asset Management Plan Phase 1)

Asset Management Performance Report (Asset Management Plan Phase 1) 2016 Asset Management Performance Report (Asset Management Plan Phase 1) Prepared by the California Department of Transportation In Accordance with Government Code Section 14526.5 Table of Contents Executive

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_ 2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX

More information