1 Nuclear Regulatory Framework: India R. Bhattacharya Secretary, Atomic Energy Regulatory Board (AERB) & Director, Information &Technical Services Division, AERB & Director, Industrial Plants Safety Division, AERB Mumbai, India

2 Outline Indian Nuclear Power Programme History of Nuclear Regulation in India Legal Framework Organisational Framework Regulated Installations/Activities Functions Attributes About NSRA Summary 2

3 Three Stage Indian Nuclear Power Programme

4 Agencies Involved Atomic Energy Commission (AEC): Apex body which is responsible for implementation of Government s Policy in all matters concerning Atomic Energy, among its other mandates Department of Atomic Energy (DAE): Mandated to promote the nuclear energy and applications of radiation. Nuclear Power Corporation of India Limited (NPCIL): PHWRs, BWRs and PWRs Bharatiya Nabhikiya Vidyut Nigam (BHAVINI): FBRs 4

5 Evolution of Nuclear Safety Regulation..1/2 Mid fifties: Self regulation (APSARA : 1956) Radioactive material and sources of radiation should be handled in Atomic Energy Establishment, in a manner, which not only ensures that no harm can come to workers in the Establishment or anyone else, but also in an exemplary manner so as to set a standard which other organization in the country may be asked to emulate. - H.J. Bhabha; Directive issued 27 Feb,

6 Evolution of Nuclear Safety Regulation..2/2 Sixties: Safety monitoring and surveillance by designated groups in Bhabha Atomic Research Centre (Health Physics Division; Directorate of Radiation Protection) 1972: DAE Safety Review Committee RAPS-1 Commissioning All DAE Units 1983: Atomic Energy Regulatory Board 6

7 Atomic Energy Regulatory Board Established by Government of India by exercising the powers conferred by Section 27 of the Atomic Energy Act 1962 through a gazette notification. Steps initiated to enhance it legal status through enactment of law. 7

8 Scope To carry out regulatory and safety functions under the Atomic Energy Act. radiation safety in nuclear and radiation facilities industrial safety in DAE units The present scope of AERB s functioning and the organizational structure has evolved over the years since its inception. Presently, an ISO: 9001:2008 certified organisation 8

9 AERB MISSION The mission of AERB is to ensure that the use of ionizing radiation and nuclear energy in India does not cause unacceptable impact on the health of workers, members of the public, and the environment. 9

10 Legal Framework

11 Rules under Atomic Energy Act, 1962 Atomic Energy (Radiation Protection) Rules, 2004 Atomic Energy (Working of Mines, Minerals and Handling of Prescribed Substance) Rules, 1984 Atomic Energy (Safe Disposal of Radioactive Wastes) Rules, 1987 Atomic Energy (Factories) Rules, 1996 Atomic Energy (Control of Irradiation of Food) Rules, 1996 Chairman AERB designated as Competent Authority to enforce these rules 11

12 Other Statutes that empower AERB Environmental Protection Act, 1986 Air (Prevention and Control of Pollution) Act, 1981 Hazardous Wastes (Management and Handling) Rules, 1989 Manufacture, Storage and Import of Hazardous Chemical Rules (1989) 12

13 Organisational Framework

14 14

15 Composition of AERB The Board Chairman, AERB Chairman, SARCOP (ex-officio Member) 4 outside Experts as Members Secretary The Secretariat Seven Technical Divisions One Safety Research Institute Two regional centres Staff Strength - >250 (Scientific & Technical) Technical Support Bhabha Atomic Research Centre (BARC), Indira Gandhi Centre for Atomic Research (IGCAR), Academic Institutions 15

16 AERB s Board Organizational Structure AERB s Secretariat Atomic Energy Commission Board of AERB Chairman, AERB Vice Chairman, AERB (Chairman, SARCOP) Advisory Committees SARCOP SARCAR Chairman, AERB Chairman, SARCOP (ex-officio member) 4 members from outside DAE Secretary Technical Divisions Operating Plants Safety Division (OPSD) Nuclear Projects Safety Division (NPSD) Industrial Plants Safety Division (IPSD) Nuclear Safety Analysis Division (NSAD) Siting and Structural Engineering Division (S&SED) Radiological Safety Division (RSD) Information & Technical Services Division (ITSD) Safety Research Institute, Kalpakkam 9 16

17 Regulated Installations/Activities

18 Facilities Regulated by AERB NPP vs Radiation facilities NPPs Average radioactivity inventory of several billions of curies. Irradiators several hundred kci Gamma chamber many kci Industrial radiography Few hundred Ci X-rays Atomic Energy Regulatory Board, INDIA

19 Nuclear & Radiation Installations under AERB s Purview Atomic Minerals Directorate for Exploration and Research (AMD) Uranium Corporation of India Limited (UCIL) Nuclear Fuel Complex (NFC) Indian Rare Earths Limited (IREL) Heavy Water Plants (HWP) Nuclear Medicine Centres (Diagnostic and Therapy) ~170 Industrial Radiography Installations ~ 600 Radio Therapy Installations ~ 300 Institutions using Nucleonic Gauges ~1700 Diagnostic X-Ray Machines ~ 50,000 Gamma Radiation Processing Facilities ~ 15 Indira Gandhi Centre for Atomic Research (IGCAR) Raja Ramanna Centre for Advanced Technology (RRCAT) Variable Energy Cyclotron Centre (VECC) Fuel Cycle Facilities Radiation Facilities R & D Institutes 19

20 N u c l e a r P o w e r P l a n t s Operating NPPs: 20 ( 2 BWRs, 18 PHWRs) Research Reactors: 2 ( FBTR & KAMINI) NP Projects : 7 ( 2 VVERs, 4 PHWRs, 1 PFBR) 20

21 NPPs in operation in India NPPS Capacity Total Output BWRs 2 x 160 TAPS-1&2 320 MWe PHWRs 1 x 100 RAPS MWe 1 x 200 RAPS MWe 14 x 220 (MAPS-1&2, NAPS-1&2, KAPS 1&2, Kaiga- 1,2,3&4, RAPS 3,4,5&6) 3080 Mwe 2 x 540 TAPS-3&4 1080Mwe Total 20 Units 4780 MWe 21

22 NPPs under Construction/Commissioning Kundankulam 1 & 2 (1000 MW, VVER) Unit 1 under commissioning Unit 2 nearing completion Prototype Fast Breeder Reactor (500 MW, PFBR) in advanced state of construction at Kalpakkam Kakrapar 3 & 4 & Rajasthan 7 & 8 (700 MW, PHWR) Construction started 22

23 NPPs Under Planning Government accorded in principle approval for setting up 20 new NPPs (10 PHWR-700 MW and 10 LWRs of 1000 MW or above) Siting evaluation in progress Kudankulam (Tamil Nadu) : 4 x 1000 MW, VVER Jaitapur (Maharashtra) : 6 x 1650 MW, EPR New sites identified for PHWRs 700 MW Kumharia, Haryana :4 Units Bargi, Madhya Pradesh :2 Units -LWRs 1000 MW & above Chhayamithi Virdi, Gujrat West coast Kovvada, Andhra Pradesh East coast Haripur, West Bengal East coast 23

24 Kudankulam Atomic Power Project (Units -1,2) VVER, 2X1000 MW Unit-1 is undergoing Commissioning. Construction of Unit -2 is nearly complete. 24

25 Prototype Fast Breeder Reactor (500 MW, PFBR) Kalpakkam Erection of Safety Vessel Primary pipe with Grid Plate Roof Slab: Fabrication Erection of Main Vessel Secondary Sodium Pump Steam Generator Primary Sodium Pump Prototype Fast Breeder Reactor (500 MW) is in advanced stage of construction 25

26 Kakrapar Atomic Power Project (Units -3,4) PHWR, 2X700 MW Clearance for first pour of concrete issued by AERB in November 2010 and construction is in progress. 26

27 Rajasthan Atomic Power Project (Units -7,8) PHWR, 2X700 MW Clearance for first pour of concrete issued in July 2011, construction in progress. 27

28 Functions of AERB

29 A. Regulating Safety AERB regulates the safety of nuclear /radiation facilities in India by : specifying the requirements to be met through a system of codes and guides (~140 documents) granting consent or license for setting up the facility or running it, after ensuring that it complies with the requirements set out in codes and guides. While the prime responsibility for ensuring safety of a NPP is that of licensee, AERB ensures that the licensee is performing its responsibilities adequately. 29

30 1. Development of Safety Documents...1/4 Approval by Chairman AERB Apex Committee Approval by Chairman AERB Apex Committee Technical & Copy Editing SDDP Working Group 30

31 Types of Documents...2/4 Safety Codes Safety Standards (provide requirements of Regulatory Body) Safety Guides Safety Manuals (provide methodology of fulfilling the requirements given in the Codes/Standards) February 29, 2012 AERB-ASN Meeting 31

32 Safety Documents Issued...3/4 Category of documents No. of safety documents issued Governmental Organization 11 NPPs - Siting 12 NPPs - Operation 21 NPPs - Quality Assurance 10 NPPs - Design 21 Radiation Protection 01 Emergency preparedness 05 Civil & Structural Engineering 12 Radioactive Waste Management 11 Fuel cycle Facilities 05 Radiation Facilities 25 Industrial and Fire Safety 06 Safety Glossary 01 Grand Total

33 Safety Codes related to NPPs...4/4 Safety Code on Regulation of Nuclear and Radiation Facilities, SC/G: 2000 Safety Code on Design of PHWR based NPPs, SC/D Rev.1: 2009 Safety Code on Nuclear Power Plant Operation, SC/O Rev.1: 2008 Safety Code on Quality Assurance in NPPs, SC/QA Rev.1, 2009 Safety Code on Siting, SC/S, Revision in progress 33

34 2. Issue of Consents Licence High hazard facilities/activities Authorisation Registration Graded Approach Approval Low hazard facilities/activities Exemption- from regulatory control 34

35 3. Safety Review...1/3 Governing Document Regulation of Nuclear and Radiation Facilities (AERB-SC-G) Major Consenting Stages Siting Construction (typically up-to three stages) Commissioning (several stages culminating in full power operation) Regular operation Decommissioning 35

36 Consent for Siting AERB Siting requirements Effect of site on plant Effect of plant on site Exclusion zone, Low population & emergency planning area MoEF Requirements Consent from State PCB Air and Water EIA/EMP study Public hearing Seismic considerations Site to be clear of all rejection criteria AERB issues siting consent subject to the clearance from MOEF 36

37 Consent for Construction Consent for construction issued either in single stage or in 3 sub-stages (Option for Utility) Site Excavation First Pour of Concrete Erection of Major Equipment Review Elements PSAR QA Programme Design Basis Reports & supporting documents Operating Experience Feedback from similar plants Nuclear Security Aspects Industrial & Fire Safety 37

38 Licence for Operation Results of Construction and Commissioning Final Safety Analysis Report (FSAR) reflecting as built design Performance of Plant systems during sustained operation at rated power Status and Measures to resolve any outstanding issues Licence for Regular Operation issued for a maximum period of five years. 38

39 Regulation of Operating NPPs 1/5 Safety Monitoring and Review Operational feedback Technical specification Staffing & qualification Design configuration control BSD Ageing management Equipment qualification Radiation Safety Industrial Safety Waste management Emergency preparedness Modification Proposals Licensing of Operators and Management Personnel 39

40 Regulation of Operating NPPs 2/5 AERB issues authorization for operation of NPPs for a period of maximum five years. The renewal of authorization is issued by AERB based on safety reviews as specified under. limited safety review of Application for Renewal of Authorization (ARA) submitted in the prescribed format prior to completion of five years of operation and Comprehensive review of Report on Periodic Safety Review (PSR) submitted prior to completion of ten years of operation. AERB safety guide AERB/SG/O-12 on Renewal of Authorization for operation of NPPs covers these aspects Special Reviews Following major events / developments 40

41 Regulation of Operating NPPs 3/5 PSR Periodic Safety Review (PSR), once in 10 years Thorough safety assessment of plant against current safety standards and practices. Any shortfalls or non-compliance is analyzed and upgrades are carried out, if necessary This ensures constant safety up-gradation of plants at par with current safety standards. Through this process of PSR, the strengths and shortcomings of the NPP against the requirements of current standards are identified. 41

42 Regulation of Operating NPPs 4/5 Improvements based on PSR Safety Upgrades Emergency power supplies Common cause failures Fire protection Additional measures for handling deviations / abnormal conditions Cooling water, Dedicated air supply to critical valves, Supplementary control room Seismic re-evaluation and consequent strengthening of SSCs, where necessary Reassessment of flood levels consideration of upstream dam failure for in-land sites Reassessment of Tsunami Hazard at coastal sites Installation of additional DGs at higher elevation 42

43 Regulation of Operating NPPs 5/5 Improvements based on PSR Revision of safety analysis State of the art analytical tools Taking account of current configuration Probabilistic safety assessment Systematic Programmes for Ageing Management and Equipment Qualification 43

44 Safety Review...2/3 BOARD (3 rd Tier) SARCOP/SARCAR/ACPSR (2 nd Tier) Unit Safety Committee/ Safety reviews carried out at multitiered levels: Individual engineers and working groups. Safety Committees Advisory Committees AERB Board Design Safety Committee ( 1 st tier) 44

45 Safety Review...3/3 The committees include experts in all the relevant fields, including process design, control and instrumentation, thermal hydraulics, structural analysis, reactor physics, seismology etc. Higher level committees include outside experts from academia, national R&D institutes and government bodies. 45

46 Current Regulatory Review related to NPPs Safety supervision of 20 operating NPPs Construction / commissioning supervision of 7 NPPs Review of 4 different designs (BWR, PHWRs, FBR & PWR) AERB completed review of a Foreign Design NPP (VVER) Also completed pre-licensing review of AHWR Safety reviews in the backdrop of Fukushima accident 46

47 Seismic Capability Findings..(1/2) - Older NPPs reevaluated and strengthening done. Now Additional systems to be qualified. Eg. Fire water system Flood - Adequate Margins above Design Basis Flood Level (DBFL). - Older NPPs reassessed DBFLs are higher Action required to raise some equipment or have alternate equipment at higher elevation. 47

48 Findings..(2/2) Capability to withstand extended SBO/Loss of heat sink Augmentations Severe Accident Management Identified - Implementation aspects being followed up by AERB Exchange of Information with other Countries (Through VVER Reg. Forum, CANDU Regulatory Forum, IAEA, CNS) 48

49 Areas of Review/Strengthening Reconfirm capability to withstand currently defined site specific external events, and assess margins beyond those. Enhance capability to safely withstand extended SBO/extended loss of heat sink through design provisions. Review and strengthen SAM programme especially those for: Containment integrity for severe accident Hydrogen management and containment venting Monitoring of key parameters Emergency management capability in case of adverse environment (Create Emergency response facility capable of withstanding severe external events) Emergency preparedness in public domain (NDMA). 49

50 AERB had conducted special regulatory inspections of all NPPs in the wake of the accidents at the Fukushima NPP, Japan. Inspections were undertaken with the intent of assessing the capability of the plant against natural calamities of severe nature and survival under multiple failures. Inspections involved walk down of the plant areas to see vulnerability of critical plant equipment during severe natural calamities and capability for dealing with extended station blackout conditions. Examination of contingency plan and emergency operating procedure relevant to this aspect was also done

51 4. Regulatory Inspection...1/3 To verify that licensee complies with national safety requirements and the consenting conditions. Inspections include scheduled and reactive inspections, both announced and unannounced. 51

52 Regulatory Inspection...2/3 Inspections performed in accordance with magnitude and nature of associated hazard (graded approach) Monthly for nuclear projects under construction w.r.t industrial safety Half yearly for operating nuclear power plants Quarterly for nuclear power projects Yearly for high hazard radiation facilities 52

53 Regulatory Inspection...3/3 In general, the following areas are covered during a typical regulatory inspection of an operating NPP. Operation, maintenance and Quality Assurance Program. Adherence to the Technical Specifications for operation. Compliance to various regulatory recommendations. Adequacy of licensed staff at NPPs Performance of safety related systems. Radiation safety and ALARA practices. Emergency Preparedness Industrial Safety 53

54 5. Enforcement Several graded enforcement options are available to AERB such as: An order for satisfactory rectification of the deficiency or deviation detected during inspection; Order to applicant/licensee for improvement (incorporation of additional features/calling for additional mockups/analysis) within a reasonable time frame; Orders to curtail or stop activity; Modification, suspension or revocation of license; and Initiate penal action through Central Govt. for offences under the Act. 54

55 B. Safety Analysis & Research Promotion of R&D Carries out safety research studies of regulatory interests Funds safety related research projects in various academic institutions 55

56 C. Human Resource...1/2 Scientific and Technical staff in AERB Present staff strength ~ 250 (Additionally 50 Administrative Staff) Further expansion planned in the 12 th five-year plan. Technical support Bhabha Atomic Research Centre, Mumbai Indira Gandhi Centre for Atomic Research, Kalpakkam Academic Institutions/ Government Organisations Retired Experts Additional expertise available 170 retired experts 200 experts from R&D Organizations and Universities Serve in various Committees 56

57 Human Resource...2/2 Training Orientation course after recruitment Training at NPPs Refresher courses Modes of recruitment Through training schools of BARC, IGCAR, NPCIL and NFC Through open advertisement Through lateral transfers 57

58 D. International Cooperation IAEA CNS Participation in IRS/ INES CSS & Other safety standards committees Technical meetings, CRPs etc. CANDU Sr. Regulators Group VVER Regulators Forum Regulatory Bodies Bilateral arrangements NRC, USA ROSTEKHNADZOR, Russian Federation ASN, France TSOs IRSN France NEA CSNI,CNRA their WGs and TGs, MDEP 58

59 E. Public Information - AERB Website - Annual Reports on website - Newsletter - All regulatory requirements on website - Press Releases - Awareness Programmes - Discussion meets with stakeholders 59

60 F. Other Functions Safety Promotion Activities Awards for Industrial Safety, fire Safety and Green site development Annual Safety and Occupational Health Professionals Meet Workshops, Seminars, Conferences Physical Protection and Security Notification of nuclear accident under Civil Liability for Nuclear Damage Act,

61 Attributes of Regulatory Body

62 Independence AERB is functionally independent of DAE AERB s reporting to AEC (which is high-level policy making body), consists of presentation of Annual Report and Budget proposals. AERB has total autonomy in regulatory decision-making Effective independence can be gauged from the large number of enforcement actions taken by AERB NSRA Bill is aimed at further strengthening of legal status and independence of Regulatory Body. Effective regulation requires technical competence and high standards of professionalism. 62

63 Openness / Public Information - AERB Website - Annual Reports on website - Newsletter - All regulatory requirements on website - Press Releases - Awareness Programmes - Discussion meets with stakeholders o Public Involvement - Ensure all relevant safety concerns are taken on board - Gain public confidence / trust - Need for balance between transparency and protection of sensitive information 63

64 Regulatory Challenges Public acceptance Public involvement in regulatory review Continued support of Technical Support Organizations Development of Technology Independent Criteria Re-assessment of multi unit sites Severe Accident Management Guidelines 64

65 Proposed NSRA..1/3 To substantiate the legal status of AERB, it has been decided to establish an autonomous and independent regulatory authority under the proposed The Nuclear Safety Regulatory Authority of India Bill,

66 AERB NSRA (2/3) S.No. AERB NSRA 1 Set up in 1983 by an executive order under the Atomic Energy Act, Reports / responsible to AEC Statutory status to be established by the Act of Parliament Will not be reporting to AEC. Autonomous in exercise of its powers and function under the Act. Annual Report to be submitted to the Parliament. February 18, 2012 Nuclear Law Association Annual Conference, New Delhi 66

67 AERB NSRA (3/3) S.No. AERB NSRA 3 AEC reviews AERB reports Authority to devise and implement policies. Broad based Council will oversee and review the policies. 4 Appointment of Chairman based on the recommendation of a Search Committee and on approval of the AEC. Members are appointed on recommendation of the Chairman, AERB and with approval of the AEC. Chairperson and members shall be appointed on the recommendation of the Search Committees constituted by the Council. 5. Appellate Authority - AEC Appellate Authority will be constituted by the Council February 18, 2012 Nuclear Law Association Annual Conference, New Delhi 67

68 Summary AERB in existence for over 28 years (set up in 1983) Over the years it has developed world class infrastructure in terms of regulations, technical expertise and sound practices. Technical support from BARC, IGCAR, IITs etc. Improvements are ongoing : especially in regulation of radiation sources Proposal to strengthen legal status of AERB NSRA Will continue to insist and ensure that all nuclear facilities in India (indigenous or imported) will follow the highest safety standards in design and operation. 68

69 Thank you 69

Nuclear Regulation for SMR in India Current Perspectives

Nuclear Regulation for SMR in India Current Perspectives Licensing and Safety Issues for Small and Mediumsized Reactors (SMRs) 29 July 2 August 2013 IAEA Headquarters, Vienna, Austria Nuclear Regulation for SMR in India Current Perspectives Dr. A. Ramakrishna,

More information

Nuclear Power An alternative

Nuclear Power An alternative Nuclear Power An alternative Dr. S.K.Jain Chairman & Managing Director Nuclear Power Corporation of India Limited & Bharatiya Nabhikiya Vidyut Nigam Limited Promotion of scientific environment in India

More information

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2

Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 Operating Performance: Accident Management: Severe Accident Management Programs for Nuclear Reactors REGDOC-2.3.2 September 2013 Accident Management: Severe Accident Regulatory Document REGDOC-2.3.2 Canadian

More information

IAEA Action Plan on Nuclear Safety 1

IAEA Action Plan on Nuclear Safety 1 IAEA Action Plan on Nuclear Safety 1 In June 2011 a Ministerial Conference on Nuclear Safety was convened to direct, under the leading role of the IAEA, the process of learning and acting upon lessons

More information

Draft IAEA Action Plan on Nuclear Safety

Draft IAEA Action Plan on Nuclear Safety Atoms for Peace Board of Governors General Conference GOV/2011/59-GC(55)/14 Date: 5 September 2011 For official use only Item 3(b) of the Board's provisional agenda (GOV/2011/46) Item 14(b) of the Conference's

More information

IAEA Safety Standards for Regulatory Activities

IAEA Safety Standards for Regulatory Activities Safety Standards for Regulatory Activities April 2010 Gustavo Caruso Regulatory Activities Section Division of Nuclear Installation Safety International Atomic Energy Agency Content Safety Standards and

More information

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November

More information

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY LOK SABHA UNSTARRED QUESTION NO : 927 TO BE ANSWERED ON 03.03.2010 THORIUM EXPLORATION

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY LOK SABHA UNSTARRED QUESTION NO : 927 TO BE ANSWERED ON 03.03.2010 THORIUM EXPLORATION 927 DR. MURLI MANOHAR JOSHI: SHRI B.N. PRASAD MAHATO: GOVERNMENT OF INDIA UNSTARRED QUESTION NO : 927 TO BE ED ON 03.03.2010 THORIUM EXPLORATION (f) whether some foreign companies have shown keen interest

More information

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management

More information

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1] Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette

More information

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document. 2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...

More information

Olkiluoto 3 Experience

Olkiluoto 3 Experience Olkiluoto 3 Experience CNRA International Workshop on New Reactor Siting, Licensing and Construction Experience Hosted by the State Office for Nuclear Safety Prague, Czech Republic 15-17 September 2010

More information

RENCEE SAFETY MARIES

RENCEE SAFETY MARIES IAEA MINISTE ERIAL CONFE RENCEE ON NUCLEAR SAFETY Vienna,, 20 24 June 2011 CHAIRPERSONS SUMM MARIES 1 The attached texts are the Chairpersons summaries of the main proposals that emerged from the Working

More information

Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011

Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011 Belgian Stress tests specifications Applicable to all nuclear plants, excluding power reactors 22 June 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the European

More information

Nuclear Safety. Policy 2013-2016

Nuclear Safety. Policy 2013-2016 Nuclear Safety Policy 2013-2016 Nuclear Safety Policy 2013-2016 T he organisational principles and actions defined in the Nuclear Safety Charter and applied within the group have achieved significant improvements

More information

Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2

Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2 Safety Analysis Probabilistic Safety Assessment (PSA) for Nuclear Power Plants REGDOC-2.4.2 May 2014 Probabilistic Safety Assessment (PSA) for Nuclear Power Plants Regulatory Document REGDOC-2.4.2 Canadian

More information

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1)

Licensing Process for New Nuclear Power Plants in Canada. INFO-0756 (Revision 1) Licensing Process for New Nuclear Power Plants in Canada INFO-0756 (Revision 1) May 2008 Licensing Process for New Nuclear Power Plants in Canada Minister of Public Works and Government Services Canada

More information

/All APPLICANTS SHOULD NOTE THAT THE TOUR LENGTH OF A RESIDENT INSPECTOR AT A SINGLE SITE IS LIMITED TO SEVEN (7) YEARS BY COMMISSION POLICY.

/All APPLICANTS SHOULD NOTE THAT THE TOUR LENGTH OF A RESIDENT INSPECTOR AT A SINGLE SITE IS LIMITED TO SEVEN (7) YEARS BY COMMISSION POLICY. Senior Resident Inspector QUALIFICATIONS REQUIRED: Candidates must have at least one year of experience at the next lower grade level or equivalent by the closing date or no later than 30 calendar days

More information

ANTEP 2015 Needs from China (NNSA)

ANTEP 2015 Needs from China (NNSA) ANTEP 2015 Needs from China (NNSA) 1 Content of training/education that Decommissioning plan and technologies 2 Background of above need 1. Design life of Qinshan NPP is 30 years, and it has been put into

More information

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI

IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI IAEA INTERNATIONAL FACT FINDING EXPERT MISSION OF THE NUCLEAR ACCIDENT FOLLOWING THE GREAT EAST JAPAN EARTHQUAKE AND TSUNAMI Tokyo, Fukushima Dai-ichi NPP, Fukushima Dai-ni NPP and Tokai NPP, Japan 24

More information

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Template for an Industry Training Program Description NEI 06-13A [Revision 0] Nuclear Energy Institute Template for an Industry Training Program Description ACKNOWLEDGEMENTS This

More information

Belgian Stress tests specifications Applicable to power reactors 17 May 2011

Belgian Stress tests specifications Applicable to power reactors 17 May 2011 Belgian Stress tests specifications Applicable to power reactors 17 May 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the European Council of March 24 th and

More information

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM The supplemental inspection program is designed to support the NRC s goals of maintaining

More information

Human Factors in Design and Construction Regulatory Perspective

Human Factors in Design and Construction Regulatory Perspective Further needs in the Area of management systems Safety culture, leadership and preoperational stages of nuclear projects Human Factors in Design and Construction Regulatory Perspective Technical Meeting,

More information

Report. November 2013

Report. November 2013 Report A comparison of U.S. and Japanese regulatory requirements in effect at the time of the Fukushima accident November 2013 Page 1 EXECUTIVE SUMMARY In the Staff Requirements Memo (SRM) to SECY-12-0110

More information

abstract NRC Headquarters United States Nuclear Regulatory Commission

abstract NRC Headquarters United States Nuclear Regulatory Commission abstract The Strategic Plan Fiscal Years 2008-2013 describes the U.S. Nuclear Regulatory Commission s mission and defines the strategic goals and outcomes the agency intends to pursue. NRC Headquarters

More information

Code of Conduct on the Safety and Security of Radioactive Sources

Code of Conduct on the Safety and Security of Radioactive Sources FOREWORD In recent years there has been a growing awareness of the potential for accidents involving radiation sources, some such accidents having had serious, even fatal, consequences. More recently still,

More information

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay

RC-17. Alejandro V. Nader National Regulatory Authority Montevideo - Uruguay RC-17 Radiation Protection in Waste Management and Disposal Implementing the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Alejandro V. Nader

More information

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY LOK SABHA UNSTARRED QUESTION NO : 413 TO BE ANSWERED ON 24/02/2010

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY LOK SABHA UNSTARRED QUESTION NO : 413 TO BE ANSWERED ON 24/02/2010 UNSTARRED QUESTION NO : 413 TO BE ED ON 24/02/2010 PRIVATE SECTOR PARTICIPATION IN NUCLEAR POWER SECTOR 413 SHRI PRADEEP MAJHI: (e) whether the Government has received any fresh requests from the private

More information

Lessons learned from the radiological accident in Mayapuri, New Delhi, India

Lessons learned from the radiological accident in Mayapuri, New Delhi, India Lessons learned from the radiological accident in Mayapuri, New Delhi, India Rajoo Kumar Atomic Energy Regulatory Board Government of India Mumbai, India www.aerb.gov.in 1 Contents About Mayapuri, New

More information

Nuclear Regulatory Organization Changes in Korea

Nuclear Regulatory Organization Changes in Korea Nuclear Regulatory Organization Changes in Korea January 18, 2012 Yong Ho RYU, Ph.D. Korea Institute of Nuclear Safety http://www.kins.re.kr 1 Background Concerns about regulatory independence in Korea

More information

Nuclear Design Practices and the Case of Loviisa 3

Nuclear Design Practices and the Case of Loviisa 3 Nuclear Design Practices and the Case of Loviisa 3 Harri Tuomisto Fortum Power, Finland Third Nuclear Power School, 20-22 October 2010, Gdańsk, Poland 22 October 2010 Harri Tuomisto 1 Objectives The objective

More information

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction

More information

Nuclear Safety Regulation Reform in Japan

Nuclear Safety Regulation Reform in Japan Nuclear Safety Regulation Reform in Japan 18th January 2012 Shuichi KANEKO Cabinet Secretariat Government of JAPAN 1 Contents Background of the Reform Process of the Reform Basic System for Nuclear Safety

More information

FWK Contract - Support for safety and accident analyses

FWK Contract - Support for safety and accident analyses IDM UID SKKZDR VERSION CREATED ON / VERSION / STATUS 19 Feb 2016 / 1.0 / Approved EXTERNAL REFERENCE / VERSION Technical Specifications (In-Cash Procurement) FWK Contract - Support for safety and accident

More information

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION

STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION STATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION TITLE GRADE EEO-4 CODE RADIATION CONTROL SUPERVISOR 38 B 10.538 SERIES CONCEPT Radiation Control Specialists

More information

Indian Diplomacy At Work

Indian Diplomacy At Work Indian Diplomacy At Work NUCLEAR SECURITY IN INDIA NUCLEAR SECURITY IN INDIA Nuclear security is the prevention and detection of, and response to unauthorised removal, sabotage, unauthorised access, illegal

More information

Nuclear Energy of Ukraine - History

Nuclear Energy of Ukraine - History Nuclear Energy of Ukraine - History 1950-s Uranium Industry was started 1962 Ministry of Energy and Electrification of Ukraine was established(ukraine a Republic of Soviet Union) 1965 Unique Energy System

More information

Introductions: Dr. Stephen P. Schultz

Introductions: Dr. Stephen P. Schultz Introductions: Dr. Stephen P. Schultz Vienna, Austria 1 3 September 2015 Work Experience Current Member Advisory Committee on Reactor Safeguards, U.S. Nuclear Regulatory Commission, 12/2011 Chair, Fukushima

More information

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria

Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities. IAEA Headquarters Vienna, Austria 1 J7-TM-44883 Technical Meeting on the Implications of the Fukushima Daiichi Accident on the Safety of Fuel Cycle Facilities IAEA Headquarters Vienna, Austria 1 5 July 2013 INFORMATION SHEET 1. Background

More information

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate Overview 1. NRC History and Overview NRC Regulations for Seismic Analysis and Design Applied to San Onofre Nuclear Generating Station Christie Hale Megan Williams 2. Regulations for Seismic Hazards 3.

More information

TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT

TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT 0 75 75 150 km Kocaeli (İzmit) BOSBORUS 0 İzmir Konya ANKARA 150 mi İçel (Mersin) REPUPLIC OF CYPRUS Iskenderun Adana SYRIA

More information

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope. Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:

More information

International Safeguards Infrastructure Development

International Safeguards Infrastructure Development PNNL-SA-74182 International Safeguards Infrastructure Development NGSI Lecture Series, 2011 Sarah Frazar 1 Structure! Overview of the Milestones Process and its three phases! National Development of a

More information

Government Degree on the Safety of Nuclear Power Plants 717/2013

Government Degree on the Safety of Nuclear Power Plants 717/2013 Translation from Finnish. Legally binding only in Finnish and Swedish. Ministry of Employment and the Economy, Finland Government Degree on the Safety of Nuclear Power Plants 717/2013 Chapter 1 Scope and

More information

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Building New Generation Nuclear Plants Worldwide : AREVA's Experience Building New Generation Nuclear Plants Worldwide : AREVA's Experience Philippe Guay Senior Vice President, New Builds Offers AREVA 37 th WNA Symposium 12-14 September 2012 LONDON Projects status The value

More information

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600

INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 INTERNATIONAL ATOMIC ENERGY AGENCY WAGRAMERSTRASSE 5, P.O. BOX 100, A-1400 VIENNA, AUSTRIA FACSIMILE: (+43 1) 26007, TELEPHONE: (+43 1) 2600 - CRAFT - The International Project on COMPLIMENTARY SAFETY

More information

TRAINING PROGRAMMES IN RADIATION SAFETY CONDUCTED BY RADIOLOGICAL PHYSICS & ADVISORY DIVISION

TRAINING PROGRAMMES IN RADIATION SAFETY CONDUCTED BY RADIOLOGICAL PHYSICS & ADVISORY DIVISION TRAINING PROGRAMMES IN RADIATION SAFETY CONDUCTED BY RADIOLOGICAL PHYSICS & ADVISORY DIVISION D.P. Bhatia Radiation Dosimetry & Training Section Radiological Physics & Advisory Division Radiological Physics

More information

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) Counterpart: Ministry of Economy 18 to 22 March 2013 Warsaw, Poland CONTENTS 1. EXECUTIVE SUMMARY... 3 2. INTRODUCTION... 5 3. OBJECTIVES

More information

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006 3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006 1. Introduction At the 3 rd review meeting of the Convention on Nuclear Safety, held in

More information

U.S. Nuclear Regulation after Three Mile Island

U.S. Nuclear Regulation after Three Mile Island U.S. Nuclear Regulation after Three Mile Island Mark Holt Specialist in Energy Policy October 23, 2015 Agenda Setting the scene: Before TMI Three Mile Island accident and aftermath ors, 1957-2015 Presidential

More information

Report WENRA Safety Reference Levels for Existing Reactors - UPDATE IN RELATION TO LESSONS LEARNED FROM TEPCO FUKUSHIMA DAI-ICHI ACCIDENT

Report WENRA Safety Reference Levels for Existing Reactors - UPDATE IN RELATION TO LESSONS LEARNED FROM TEPCO FUKUSHIMA DAI-ICHI ACCIDENT Report WENRA Safety Reference Levels for Existing Reactors - UPDATE IN RELATION TO LESSONS LEARNED FROM TEPCO FUKUSHIMA DAI-ICHI ACCIDENT 24 th September 2014 Table of Content WENRA Safety Reference Levels

More information

Elements of the Russian Emergency Preparedness Program

Elements of the Russian Emergency Preparedness Program Elements of the Russian Emergency Preparedness Program Randolph L. Sullivan, NRC National Radiological EP Conference St. Louis, Missouri March 2006 2 3 4 5 6 Volgodonsk NPP 1000 MWe VVER, a PWR Large Staff

More information

GENERAL INFORMATION BROCHURE FOR ACCREDITATION OF MEDICAL IMAGING SERVICES

GENERAL INFORMATION BROCHURE FOR ACCREDITATION OF MEDICAL IMAGING SERVICES GENERAL INFORMATION BROCHURE FOR ACCREDITATION OF MEDICAL IMAGING SERVICES 2010 Page 1 Introduction to Accreditation Program for Medical Imaging Services Definition of Medical Imaging Services (MIS) Medical

More information

Other provisions in force on qualification or training in relation to radiological protection are the following:

Other provisions in force on qualification or training in relation to radiological protection are the following: Instruction IS-12, of 28 th February 2007, of the Nuclear Safety Council, defining the qualification and training requirements of non-licensed staff and non-licensed off-site personnel of nuclear power

More information

Safety Analysis for Nuclear Power Plants

Safety Analysis for Nuclear Power Plants Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs

More information

International Conference on Global Emergency Preparedness and Response

International Conference on Global Emergency Preparedness and Response International Conference on Global Emergency Preparedness and Response Organized by the International Atomic Energy Agency (IAEA) in cooperation with Comprehensive Nuclear-Test-Ban Treaty Organization

More information

AREVA: supply chain network principles and company s vision

AREVA: supply chain network principles and company s vision AREVA: supply chain network principles and company s vision Virginie MOUCQUOT-LAIHO AREVA Finland Communications Director & Vice Country Manager Oulu, Finland 18.09.2012 1 AREVA & nuclear industry The

More information

AP1000 European 18. Human Factors Engineering Design Control Document

AP1000 European 18. Human Factors Engineering Design Control Document 18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,

More information

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT

PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT PROBABILISTIC RISK ASSESSMENT AND RISK MANAGEMENT OF A NUCLEAR POWER PLANT 1 Introduction 3 2 Scope of application 3 3 Development and use of the PRA 4 3.1 General requirements 4 3.2 PRA during the design

More information

List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page

List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page List of Contents Section 10, Nuclear Safety and Radiation Protection Legislation Page Overview 1 The Radiation Protection (Medical Exposures) Directive 11 The Public Information (Radiological Emergency)

More information

UAE Nuclear Power Programme : Status and Update

UAE Nuclear Power Programme : Status and Update UAE Nuclear Power Programme : Status and Update Technical Meeting on Topical Issues in the Development of Nuclear Power Infrastructure Vienna, 3 rd Feb 2015 Hamad Alkaabi Permanent Representative of the

More information

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT

Public SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT 1 (8) SUMMARY OF EU STRESS TEST FOR LOVIISA NUCLEAR POWER PLANT 1 LOVIISA NUCLEAR POWER PLANT Loviisa town is located approximately 90 km eastwards from Helsinki at the coast of Gulf of Finland. Loviisa

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE CONTAINMENT: CHEMICAL PLANTS Document Type: Nuclear Safety Technical Assessment Guide Unique Document ID and Revision No: NS-TAST-GD-021 Revision 2 Date Issued: March 2013 Review Date: March

More information

Decommissioning situation of Nuclear Power Plant in Japan

Decommissioning situation of Nuclear Power Plant in Japan Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40

More information

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference CAPACITY-BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT PROJECT ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS Terms of Reference Background: The

More information

SAFETY EVALUATION OF. INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS)

SAFETY EVALUATION OF. INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS) A3 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS) A3:0 A3 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT MADRAS ATOMIC POWER STATION (MAPS) 1.0

More information

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1

Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 Environmental Protection: Environmental Protection Policies, Programs and Procedures REGDOC-2.9.1 September 2013 Environmental Protection: Policies, Programs and Procedures Regulatory Document REGDOC-2.9.1

More information

Office for Nuclear Regulation

Office for Nuclear Regulation ONR GUIDE LC17 Management Systems Document Type: ONR Nuclear Safety Technical Inspection Guide Unique Document ID and Revision No: NS-INSP-GD-017 Revision 2 Date Issued: November 2012 Review Date: November

More information

How To Decommission A Nuclear Plant

How To Decommission A Nuclear Plant International Atomic Energy Agency Decommissioning of Nuclear Facilities Management of Decommissioning Projects Lawrence E. Boing Manila, Philippines, October 2006 1 Lesson Objectives Understand the management

More information

HLG_p(2013-24)_117 ENSREG_REPORT_2013. Report of the European Nuclear Safety Regulator's Group ENSREG

HLG_p(2013-24)_117 ENSREG_REPORT_2013. Report of the European Nuclear Safety Regulator's Group ENSREG Report of the European Nuclear Safety Regulator's Group ENSREG July 2013 CONTENTS EXECUTIVE SUMMARY... 5 1. INTRODUCTION... 9 1.1. Content of the report... 9 1.2. Nuclear Safety in the EU context... 9

More information

The Role of Nuclear Knowledge Management

The Role of Nuclear Knowledge Management The Role of Nuclear Knowledge Management A. Introduction The Agency has been a focal point for nuclear knowledge and information since its establishment in 1957. Nuclear knowledge management (NKM) came

More information

International Action Plan On The Decommissioning of Nuclear Facilities

International Action Plan On The Decommissioning of Nuclear Facilities International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical

More information

New legislation in the nuclear field in Sweden

New legislation in the nuclear field in Sweden 1 New legislation in the nuclear field in Sweden A presentation at INLA Congress 2012 (Manchester) - 11 October 2012 by Ingvar Persson, Swedish National Council for Nuclear Waste and PP 1 Presentation

More information

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective

Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective Cyber Security and the Canadian Nuclear Industry a Canadian Regulatory Perspective Terry Jamieson Vice-President Technical Support Branch Canadian Nuclear Safety Commission August 11, 2015 www.nuclearsafety.gc.ca

More information

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions

Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions Long Term Operation R&D to Investigate the Technical Basis for Life Extension and License Renewal Decisions John Gaertner Technical Executive Electric Power Research Institute Charlotte, North Carolina,

More information

Manual for Accreditation of Agencies for Quality Assurance of Diagnostic X-ray Equipment

Manual for Accreditation of Agencies for Quality Assurance of Diagnostic X-ray Equipment Manual for Accreditation of Agencies for Quality Assurance of Diagnostic X-ray Equipment Atomic Energy Regulatory Board Mumbai 400 094 1 DEFINITIONS 1. Quality Assurance (QA): Planned and systematic actions

More information

MDEP Generic Common Position No DICWG 02

MDEP Generic Common Position No DICWG 02 MDEP Generic Common Position No DICWG 02 Related to: Digital Instrumentation and Controls Working Group activities COMMON POSITION ON SOFTWARE TOOLS FOR THE DEVELOPMENT OF SOFTWARE FOR SAFETY SYSTEMS 1

More information

Checklist for submission of application form for Registration

Checklist for submission of application form for Registration Checklist for submission of application form for Registration *Incomplete submission may cause delay in processing of the application. Name of the Hospital/Institution: City State Sr.No. Checkpoints Status

More information

Doel 3 & Tihange 2 RPV Flaw Indications. Evaluation by Belgian Safety Authorities. 1. Regulatory Body in Belgium 28/06/2013

Doel 3 & Tihange 2 RPV Flaw Indications. Evaluation by Belgian Safety Authorities. 1. Regulatory Body in Belgium 28/06/2013 Doel 3 & Tihange 2 RPV Flaw Indications Evaluation by Belgian Safety Authorities 28-06-2013 Doel 3 & Tihange 2 RPV Flaw Indications Evaluation by Belgian Safety Authorities 1. Regulatory Body in Belgium

More information

How To Improve Safety At A Nuclear Power Plant

How To Improve Safety At A Nuclear Power Plant OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE August 6, 2015 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor

More information

Meeting the Challenges in Industrial Safety Management in Construction Works (Dec-2007)

Meeting the Challenges in Industrial Safety Management in Construction Works (Dec-2007) Meeting the Challenges in Industrial Safety Management in Construction Works (Dec-2007) 1.0 Introduction Dr. S. K. Jain Chairman & Managing Director Nuclear Power Corporation of India Limited Anushaktinagar,

More information

IMPLEMENTATION OF A MANAGEMENT SYSTEM FOR OPERATING ORGANIZATIONS OF RESEARCH REACTORS

IMPLEMENTATION OF A MANAGEMENT SYSTEM FOR OPERATING ORGANIZATIONS OF RESEARCH REACTORS IMPLEMENTATION OF A MANAGEMENT SYSTEM FOR OPERATING ORGANIZATIONS OF RESEARCH REACTORS Eduardo Kibrit 1, Afonso Rodrigues de Aquino 2 and Désirée Moraes Zouain 3 1 Centro Tecnológico da Marinha em São

More information

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND

RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN FINLAND 1. NATIONAL FRAMEWORK FOR MANAGEMENT AND REGULATION OF RADIOACTIVE WASTE AND DECOMMISSIONING 1.1 National framework 1.1.1 Overview of national

More information

ENEC Management System and Quality Assurance Program

ENEC Management System and Quality Assurance Program ENEC Management System and Quality Assurance Program Shami S. Dua Quality Assurance Director IAEA TM on Management System Grading 23-27 January 2012, Vienna, Austria Safety moment ENEC Management System

More information

International Conference on Human Resource Development for Nuclear Power Programmes: Building and Sustaining Capacity

International Conference on Human Resource Development for Nuclear Power Programmes: Building and Sustaining Capacity 1 #169 International Conference on Human Resource Development for Nuclear Power Programmes: Building and Sustaining Capacity Human Resource Management in the Belgian TSO Bel V M. Roobaert 1, B. Bernard

More information

Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015

Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015 Events reported to the Nuclear Safety Regulator in the period of 1 April 2001 to 31 March 2015 Office for Nuclear Regulation page 1 of 27 Executive summary The Office for Nuclear Regulation (ONR) is the

More information

How To Manage Health, Safety, Security And Environment

How To Manage Health, Safety, Security And Environment Health, Safety, Security and Environmental Management System Management Standards and take c&re of yourself, others and the environment Health, Safety, Security and Environment Policy E.ON Climate & Renewables

More information

Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima. Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division

Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima. Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division Science, Values and Stakeholder Dialogue: NEA Experience in Fukushima Dr Ted Lazo Radiation Protection and Radioactive Waste Management Division International Experts Meeting on Radiation Protection after

More information

Status on Spanish Regulations and Industry. actions related to Filtered Containment. Venting Systems (FCVS)

Status on Spanish Regulations and Industry. actions related to Filtered Containment. Venting Systems (FCVS) Status on Spanish Regulations and Industry actions related to Filtered Containment Venting Systems (FCVS) Sara González Systems Engineering Department Consejo de Seguridad Nuclear, Spain Technical Meeting

More information

Licence condition handbook

Licence condition handbook Licence condition handbook January 2016 Office for Nuclear Regulation page 1 of 24 The standard licence conditions attached to nuclear site licences Introduction This booklet has been produced as an aide-memoire

More information

IAEA-TECDOC-1458. Effective corrective actions to enhance operational safety of nuclear installations

IAEA-TECDOC-1458. Effective corrective actions to enhance operational safety of nuclear installations IAEA-TECDOC-1458 Effective corrective actions to enhance operational safety of nuclear installations July 2005 IAEA SAFETY RELATED PUBLICATIONS IAEA SAFETY STANDARDS Under the terms of Article III of its

More information

SAFETY EVALUATION OF. INDIAN NUCLEAR POWER PLANTS PHWRs AT RAJASTHAN ATOMIC POWER STATION (RAPS-2)

SAFETY EVALUATION OF. INDIAN NUCLEAR POWER PLANTS PHWRs AT RAJASTHAN ATOMIC POWER STATION (RAPS-2) A2 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT RAJASTHAN ATOMIC POWER STATION (RAPS-2) A2 SAFETY EVALUATION OF INDIAN NUCLEAR POWER PLANTS PHWRs AT RAJASTHAN ATOMIC POWER STATION (RAPS-2)

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

DOE s Fuel Cycle Technologies Program - An Overview

DOE s Fuel Cycle Technologies Program - An Overview DOE s Fuel Cycle Technologies Program - An Overview William Boyle Director, Used Fuel Disposition R & D (NE-53) Office of Nuclear Energy U.S. Department of Energy ECA Las Vegas, Nevada Agenda Program Mission

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

How To License A Nuclear Plant

How To License A Nuclear Plant Contents Introduction... 1 Two-Step Licensing Process (10 CFR Part 50)... 2 Construction Permit... 2 Operating License... 4 Additional Licensing Processes (10 CFR Part 52)... 4 Early Site Permits... 6

More information

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels

Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels Introduction to Nuclear Fuel Cycle and Advanced Nuclear Fuels Jon Carmack Deputy National Technical Director Fuel Cycle Technology Advanced Fuels Program February 27, 2011 The Evolution of Nuclear Power

More information

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity

Rx Whitepaper. Using an Asset Management Framework to Drive Process Safety Management and Mechanical Integrity Rx Whitepaper Executive Overview Process Safety Management (PSM), driven by the OSHA 1910.119 standard, aims to prevent the unwanted release of hazardous chemicals, especially into locations which could

More information

The ABWR Project at Shimane-3, Japan

The ABWR Project at Shimane-3, Japan CASE STUDIES ON PROJECT AND LOGISTICS MANAGEMENT IN NUCLEAR NEW BUILT The ABWR Project at Shimane-3, Japan Sang-Baik Kim, Jan-Horst Keppler OECD Nuclear Energy Agency, Nuclear Development Division OECD

More information