1 INVITATION TO BID Northern Moraine Wastewater Reclamation District Addendum #1 Issued Five Lift Station Renewal Project BID OPENING: October 6, 2015 at 1:00 pm * All pages of Addendum #1 must be submitted with the bid. * -1-

2 Addendum Item 1. Revise scope of Hale 1 Work to delete replacement of valves, per below. (pg. 15 of Invitation to Bid) Piping and valves in check valve vault were replaced in 2014 and are to be reused. Hale 1, 3440 Hale Lane, Island Lake Rehabilitate steel wet well, modify pumping equipment and convert to a front rail system, replace piping, replace valves and controls and add fall protection grates Addendum Item 2 Section 1.0 Hale 1 Lift Station Add to end of item 1.11, Bidders may place a 6 concrete fillet in bottom of wet well to prevent water intrusion and facilitate liner installation if necessary Provide and install a liner system, such as Spectra Shield or equal, to restore structural integrity and protect against future corrosion. Provide surface preparation via cleaning, sandblasting etc., per liner manufactures requirements. Bidders may place a 6 concrete fillet in bottom of wet well to prevent water intrusion and facilitate liner installation if necessary. Addendum Item Revise to read: replace existing cathodic protection system as shown on Hale 1 Drawing #3 (page 44 or bid package), with two (2) 17 pound Magnesium anode bags connected to wet well. Addendum Item Provide by-pass pumping as required and assure that sewer service is not disrupted within the service area. Hale #1 has 3 incoming lines, only one of which can be blocked at the upstream manhole the other two lines have services on them between the upstream manhole and the lift station. Approximate daily flows into Hale 1 are listed below: Hale 1 daily flow 77,000 gallons /day North MH #B8NE34 gpd West MH #B8NE24 gpd South MH #B8NE37 gpd Pump Controls Addendum Item Include an APPLETON ADR1034RS 100 AMP 3W 4P RECEPTACLE that MATES W/ ACP1034CD pin connector to allow for the connection of a portable generator. Provide and install a manual transfer switch for selection of normal (Com Ed) or standby power. In the event that the generator option is selected, the manual transfer switch will be deducted in favor of the ATS to be provided with the generator. NMWRD 5 Lift Station Renewal 2015 Addendum #1-2-

3 Addendum Item 6 Revised Station Monitor 1.39 Provide a new integrated Isco Model 4501 Pump Station Monitor. Provide a new integrated Grundfos Model CU 362 Station Controller (PN ), CU 362 Battery Backup (PN ), IO 351 for CU 362 (PN ) along with a Grundfos pressure transducer with cable, (PN ) and Grundfos level switch with cable (PN ) Addendum Item 7 Existing control panel concrete pad may be reused for new control panel. Section 2.0 Hale 2 Lift Station Addendum Item Provide by-pass pumping as required and assure that sewer service is not disrupted within the service area. Hale 2 has 2 incoming lines, neither of which can be blocked at the upstream manhole due to service lines connections between that manhole and the lift station. Approximate daily flows are listed below. Hale 2 daily flow 59,000 gallons/day North MH #B8SE36 gpd South MH #B8SE40 gpd See attached clips of NMWRD Sewer Atlas, attached for sewer configuration Addendum Item Include an APPLETON ADR1034RS 100 AMP 3W 4P RECEPTACLE that MATES W/ ACP1034CD pin connector to allow for the connection of a portable generator with a manual transfer switch. Include a manual transfer switch for selection of Com Ed or standby power. Add: In space provided for future ATS switch Addendum Item 10 Revised Station Monitor 2.38 Provide a new integrated Isco Model 4501 Pump Station Monitor. Provide a new integrated Groundfos Model CU 362 Station Controller (PN ), CU 362 Battery Backup (PN ), IO 351 for CU 362 (PN ) along with a Grundfos pressure transducer with cable, (PN ) and Grundfos level switch with cable (PN ) Addendum Item 11 Existing control panel concrete pad may be reused for new control panel. Addendum Item 12 The District will trim and/or remove trees from the Hale 2 Station to facilitate renovation work. NMWRD 5 Lift Station Renewal 2015 Addendum #1-3-

4 Section 3.0 Waterford Lift Station Addendum Item 13 Location: Waterford and Newport Drive, Island Lake, IL 3.19 Provide by-pass pumping as required and assure that sewer service is not disrupted within the service area. Waterford has 3 incoming lines, two of which can be blocked at the upstream manhole, with one line having service connections between the upstream manhole and the lift station. Approximate daily flows are listed below. Waterford daily flow 169,000 gallons/day North MH #C8NW32 gpd West MH #C8NW45 gpd East MH #C8NW37 gpd Section 4.0 Waters Edge Lift Station Addendum Item Provide by-pass pumping as required and assure that sewer service is not disrupted within the service area. Section 5.0 Burr Oak Lift Station Addendum Item Provide by-pass pumping as required and assure that sewer service is not disrupted within the service area. Addendum Item 16 Contract Period Substantial completion of the work must be achieved within two hundred and forty calendar days and with final completion of the work within two hundred and eighty calendar days after the date of the Notice to Proceed. * All pages of Addendum #1 must be submitted with the bid. * NMWRD 5 Lift Station Renewal 2015 Addendum #1-4-

5 NMWRD 5 Lift Station Renewal 2015 Addendum #1-5- Hale 1

6 NMWRD 5 Lift Station Renewal 2015 Addendum #1-6- Hale 2

7 NMWRD 5 Lift Station Renewal 2015 Addendum #1-7- Waterford Lift

8 NMWRD 5 Lift Station Renewal 2015 Addendum #1-8- Waters Edge

9 NMWRD 5 Lift Station Renewal 2015 Addendum #1-9- Burr Oak Lift

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

Request for Proposal # 2016-054

Request for Proposal # 2016-054 Request for Proposal # 2016-054 GIS Editing & Updating Services Due Date: July 7, 2016 Time: 2:00PM Receipt Location: Government Center, 500 N. Main Street, 7 th Floor, Room #709, Monroe, NC 28112 Procurement

More information

PROJECT NAME BACKGROUND STATUS

PROJECT NAME BACKGROUND STATUS Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe products for the infrastructure rehabilitation and

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

ADDENDUM #1 Bid # 14021

ADDENDUM #1 Bid # 14021 DATE: February 20, 2014 TO: ALL PLAN HOLDERS FROM: Jay Hummel, Project Engineer SUBJECT: Addendum #1 to Sewer Lake Line Replacement at Meydenbauer Bay The enclosed changes and/or additions are hereby made

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program

More information

Appendix S Pump Station Evaluation

Appendix S Pump Station Evaluation Appendix S Pump Station Evaluation Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange

More information

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions Sewer Backup Protection Grant Program Guidelines, materials and frequently asked questions SEWER BACKUP PROTECTION GRANT PROGRAM GUIDELINES I. WHAT IS IT? The Village of Oak Park Sewer Backup Protection

More information

VOYAGER 570G. 744A Sprayer Control

VOYAGER 570G. 744A Sprayer Control VOYAGER 570G 744A Sprayer Control U S E R M A N U A L U S E R M A N U A L Table of Contents CHAPTER 1 - INTRODUCTION...1 SYSTEM CONFIGURATIONS...1 KIT CONTENTS...3 CONTROL HOUSING ASSEMBLY...5 CHAPTER

More information

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

A Century of Progress with Pride

A Century of Progress with Pride The City of Berwyn Engineering Department A Century of Progress with Pride November 12, 2014 Re: Waiting List Application I am interested in the following programs and would like to be added to the waiting

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS

MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS MUNICIPAL WASTEWATER PUMP STATION DESIGN PROBLEMS AND SOLUTIONS Presented at: WEFTEC 2006 Dallas, TX October 24, 2006 New England Water Environment Association Meeting Westford, MA September 12, 2006 Virginia

More information

GLS 3700 6712. Sampler Selection Guide

GLS 3700 6712. Sampler Selection Guide Glacier 5800 6712FR Avalanche GLS 3700 6712 Sampler Selection Guide Advanced Automated Sampler Products From Teledyne Isco With more than four decades of industry leadership, Teledyne Isco continues to

More information

THERE S NO USE CRYING OVER SPILLED SEWAGE: USING STANDBY LIFT STATION PUMPS TO PREVENT SSOS BEFORE THEY HAPPEN

THERE S NO USE CRYING OVER SPILLED SEWAGE: USING STANDBY LIFT STATION PUMPS TO PREVENT SSOS BEFORE THEY HAPPEN THERE S NO USE CRYING OVER SPILLED SEWAGE: USING STANDBY LIFT STATION PUMPS TO PREVENT SSOS BEFORE THEY HAPPEN ABSTRACT Michael J. Delzingaro Godwin Pumps of America, Inc. One Floodgate Road Bridgeport,

More information

Zebra RW 420 Mobile Battery Eliminator Kits

Zebra RW 420 Mobile Battery Eliminator Kits Zebra Technologies Corporation 475 Half Day Road, Suite 500 Lincolnshire, IL 60069 USA Zebra RW 420 Mobile Battery Eliminator Kits Installation Instructions September, 2010 RW 420 Mobile Battery Eliminator

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application

More information

SANITARY SEWER OVERFLOW EVALUATION REPORT

SANITARY SEWER OVERFLOW EVALUATION REPORT SANITARY SEWER OVERFLOW EVALUATION REPORT MAY 2012 SEPT 2013 Draft for Review: November 13, 2013 Prepared by: James C. Hailey & Company City of Gallatin, Sumner County, TN Sanitary Sewer Collection Evaluation

More information

FOXAIR 60/50 ALL MODELS

FOXAIR 60/50 ALL MODELS FOXAIR 60/50 ALL MODELS OPERATION AND SERVICE MANUAL UNIT WEIGHT - ALL MODELS APPROX. 300 POUNDS FOXTRONICS, INC. 38 L x 28 W x 24 H Love Field-Dallas TX MADE IN THE USA 3448 West Mockingbird Lane Dallas,

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

WWTP RETROFIT. Smith & Loveless Inc. www.smithandloveless.com. Also in this issue: Do You Have Emergency Backup? Aging Clarifiers Retrofit to Like New

WWTP RETROFIT. Smith & Loveless Inc. www.smithandloveless.com. Also in this issue: Do You Have Emergency Backup? Aging Clarifiers Retrofit to Like New Winter 2010 Issue #04-06-759 Rehabilitate your aging infrastructure quickly and increase your treatment capacity. Also in this issue: Do You Have Emergency Backup? Aging Clarifiers Retrofit to Like New

More information

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2 The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2 S Odor and Corrosion in Sanitary Sewer Systems Aileen Gibson Chris Knapp Steve Leykauf Wastewater Treatment History In

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013 Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information

CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION

CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION 42-INCH SANITARY SEWER REHABILITATION WHAT WE WILL DISCUSS TODAY: Project Justification & Evolution (high level/not a chemistry

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

SECTION 01 78 29 AS-BUILT DOCUMENTATION

SECTION 01 78 29 AS-BUILT DOCUMENTATION SECTION 01 78 29 AS-BUILT DOCUMENTATION PART 1: GENERAL 1.01 AS-BUILTS Where identified as a product of the Work, provide as-built drawings adhering to the criteria provided here and in the special conditions.

More information

City of Newton Wastewater Treatment System Performance Annual Report for 2014 February 26, 2015

City of Newton Wastewater Treatment System Performance Annual Report for 2014 February 26, 2015 I. General Information City of Newton Wastewater Treatment System Performance Annual Report for 2014 February 26, 2015 Facility Name: Contact Person: Applicable Permits: City of Newton Sanitary Sewer Collection

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.

More information

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

--------------------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------------------- Request for Bid Front Street & Mud Island Interceptor Rehab Addendum # 1 to RFB No. 179821.71.0404 January 19, 2016 The following information encompasses Addendum # 1 for the above referenced RFB. Bidders

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

EDD-600 FLOW TOTALIZER RATE INDICATOR OPERATION MANUAL. P.O. Box 12128 Odessa, Texas 79768 USA. E-mail rkw@eddevices.com.

EDD-600 FLOW TOTALIZER RATE INDICATOR OPERATION MANUAL. P.O. Box 12128 Odessa, Texas 79768 USA. E-mail rkw@eddevices.com. OPERATION MANUAL EDD-600 FLOW TOTALIZER RATE INDICATOR Phone 432-366-8699 Fax 432-366-1106 P.O. Box 12128 Odessa, Texas 79768 USA E-mail rkw@eddevices.com Website www.eddevices.com 3 EDD-600 Digital Battery

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019. Project Description

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019. Project Description PUBLIC NOTICE Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, 2019 Project Description Project Name: Hunnewell Fish Hatchery Production Pond Renovation (Phases 2 and 3) Location: Hunnewell Fish

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

Frequently Asked Questions Generators

Frequently Asked Questions Generators Frequently Asked Questions Generators Fuel Related How much fuel do the generators use during normal operation? At exercise? The generator fuel consumption is given in each of the product knowledge books

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

Making Your Home Ready For Solar Water Heating

Making Your Home Ready For Solar Water Heating Making Your Home Ready For Solar Water Heating During construction or a major renovation, making a home ready to use solar energy can be easy and inexpensive. When the time comes to install your solar

More information

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING

PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

City of Springfield, Illinois Office of Public Works Sewer Division. 2012 Sewer Overflow Report

City of Springfield, Illinois Office of Public Works Sewer Division. 2012 Sewer Overflow Report City of Springfield, Illinois Office of Public Works Sewer Division 2012 Sewer Overflow Report April 24, 2013 1 Table of Contents 1. PURPOSE... 3 APPENDIX A. City of Springfield 2012 SSO Report... 4 2

More information

REMOVAL AND INSTALLATION

REMOVAL AND INSTALLATION 303-01C-1 REMOVAL AND INSTALLATION Engine Body On Special Tool(s) Adapter For 303-D043 303-D043-02 or equivalent Special Tool(s) 303-01C-1 Turbocharger Lifting Bracket 303-1266 Wrench, Fan Clutch Nut 303-214

More information

DRAINS The graphical and text database of all underground sewer Infrastructure. Progress over the last few years includes:

DRAINS The graphical and text database of all underground sewer Infrastructure. Progress over the last few years includes: Drainage Information Management Systems Strategy While a formal strategy document is still underway, significant progress has been made on the Information systems that from the lifeblood of Drainage Services:

More information

Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects. Manhattan Community Board 6 Transportation Committee - June 2, 2014

Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects. Manhattan Community Board 6 Transportation Committee - June 2, 2014 Queens Midtown Tunnel Repair, Restoration, Rehabilitation Projects Manhattan Community Board 6 Transportation Committee - June 2, 2014 Opened to traffic in 1940 Two parallel tubes (North & South), each

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued

More information

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014) STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessory Application Publications No. All 24393 ACCORD (DX, LX) SYSTEM 2-AND 4-DOOR Issue Date AUG 2002 PARTS LIST Security System Attachment (LX): P/N 08E55-SDA-100A Unit panel

More information

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011 MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City

More information

SEWER CLEANING WORK ORDER PROCESS. Work Order Process. 1.Work on multipule work orders 2.Data is stored on Mobile Computer

SEWER CLEANING WORK ORDER PROCESS. Work Order Process. 1.Work on multipule work orders 2.Data is stored on Mobile Computer HANSEN MOBILE WORK ORDER WORK FLOW Hansen Procedure will connect with the EAMSDATAEx tables and process the work orders and remove completed work orders from checked out Hansen Hansen Database Supervisor

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

Chapter 2 System Basics

Chapter 2 System Basics Chapter 2 System Basics The Evolution DX2 Controller contains a comprehensive feature set to support virtually any conceivable irrigation system/configuration. In addition to the more traditional irrigation

More information

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessory Application Publications No. ACCORD All 30209 2-AND 4-DOOR SYSTEM (VP, LX, SE) Issue Date AUG 2005 PARTS LIST Security System Attachment: P/N 08E55-SDA-100A Unit panel

More information

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES

4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.0 SEWER LIFT STATION AND FORCE MAIN GUIDELINES 4.01 INTRODUCTION Sewage collection within Western Municipal Water District s (Western s) service area shall be provided by the construction of gravity

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system

More information

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-6-C THROUGH TF-2-35-C

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-6-C THROUGH TF-2-35-C PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-6-C THROUGH TF-2-35-C Pollution Control Systems Inc. (PCS) is pleased to provide the following equipment specifications for your consideration.

More information

Due Time: 2:00 p.m. Power & Telephone Supply Company Commski, LLC

Due Time: 2:00 p.m. Power & Telephone Supply Company Commski, LLC COUNTY OF HENRICO BID TABULATION IFB # 13-9451-7YD Bid #13-9451-7YD UPS Back-UP Systems and Due Date: August 6, 2013 Fiber Optic Cabling Due Time: 2:00 p.m. BIDDERS Power & Telephone Supply Company Commski,

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide HG600/HG800 Hydro-Power Unit Installation and Operation Guide Copyright 04 HydroSpin, All rights reserved. The data contained in this document is proprietary to HydroSpin. It is disclosed to the receiving

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, and equipment required to install precast concrete manholes, sanitary leaching rings, pump station, valve chamber, structures, frames,

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessory Application Publications No. AII 26327 2004 S2000 Issue Date OCT 2004 PARTS LIST Security System: P/N 08E51-S84-100 Attachment Kit: P/N 08E55-S2A-101 2 Remote controls

More information

foundation designed to keep water out of the basement.

foundation designed to keep water out of the basement. Preventing Sewer Backups To safeguard your home against flooding from sewer backups, you should understand your home's basic plumbing and the preventative techniques discussed in this brochure. Basement

More information

Class Environmental Assessment Schedule B Project File Report

Class Environmental Assessment Schedule B Project File Report R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B

More information

BRANDYWINE HUNDRED SEWER REHABILITATION LYNNFIELD WEBSTER FARMS

BRANDYWINE HUNDRED SEWER REHABILITATION LYNNFIELD WEBSTER FARMS BRANDYWINE HUNDRED SEWER REHABILITATION PROGRAM ND13 GREEN ACRES GREEN ACRES LYNNFIELD WEBSTER FARMS OBJECTIVES OF MEETING Review Why in Brandywine Hundred Explain County obligations regarding laterals

More information

Installation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems

Installation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems Installation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems Project: Location: Micro-Comm Project Manager: NOTE: This Installation Guide is intended to be a Typical Installation reference

More information

Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software.

Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software. Request for Statement of Qualifications and Information (RFQI) Public Works Enterprise Asset Management / Work Order Software. RFQI Submittals Due Thursday, April 28, 2016 by 4:00 PM CONTACT: Chris Bethel,

More information