1 Water/Wastewater Capital Improvement Plan FY 2017 Georgetown Utility Systems Advisory Board June 10, 2016
2 Capital Improvement Plan Program funding sources: Operating Revenue (utility rates) Impact Fees Capital Improvement Plan addresses need for superior water, wastewater, irrigation service, and electric. Determined by many factors Customer base growth Service improvement Rehabilitation of aging infrastructure State and federal requirements Competitive advantage Contractual obligations
3 Water Services - Georgetown Water Mains - $6,274,000 Leander Interconnect - $575,000 Approximately 2,000 LF of 12 line. Potential interconnect with Leander water system Potentially provide up to 6 million gallons per day Provide redundancy Western District West Loop - $2,119,000 Along SH 29 (Wolf Ranch to DB Wood) Replace existing 8/12 lines with 24 Redundancy to Wolf Ranch Development and Pastor Pump Station Assist with distribution of Round Rock water CR $3,000,000 Approximately 7 miles (Daniels Mountain tank site to SH 29) Continuation of Western District line replacement under design and partially funded FY 16 Maintenance and rehabilitation (multiple breaks, poor bedding, substandard material) Street Rehab - $330,000 W. 11 th Street (Main-Rock) Western District Line Upgrades - $250,000 As needed to meet TCEQ requirements
4 Water Services - Georgetown Water Treatment - $6,100,000 Lake Treatment Plant Maintenance - $600,000 Estimated to need approximately 2 million gallons per/year Lake intake maintenance Increase intake capacity to almost 38 million gallons Additional treatment will be required Estimated at $12 million (FY 18/19) South Lake Treatment Plant - $1MM Site Selection (2017) Permits (2018) Design ( ) New treatment facility ( ) 5-10 year development plan Approximately 12 million gallons initially Approximately $35 million total
5 Water Services - Georgetown Water Treatment Domel Pump Station - $4,500,000 Add filtration to Domel Pump Station rehabilitation project (funded in FY 16). Potential risk of losing 3 million gallons per day if certain contaminants are found.
6 Water Services - Georgetown Water Storage -$6,030,000 Sun City Elevated Storage Tank - $3,050,000 Replace existing 400,000 gallon elevated tank Construct new 1.5 million gallon elevated tank Required to meet growing demands Sequoia Ground Storage Tank - $2,500, million gallon tank on existing site Ground tank instead of elevated in Georgetown Village Increased treated water storage to help Lake Plant peak Very competitive tank pricing currently available Tank Rehabilitation - $480,000 Repair and rehabilitate existing metal tanks Typically required every years Airport Road Reuse tank (2017) Daniels Mountain small tank (2018) Daniels Mountain large tank (2019)
7
8 Wastewater Services Wastewater Improvements - $13,636,000 Edwards Aquifer Recharge Zone (EARZ) $1,500,000 Continuation of existing program Identification and replacement of damaged sewer lines and manholes Street Projects - $136,000 W. 11 th Street (Rock Main) Berry Creek Interceptor - $12,000,000 Initial phase of construction planned for late 2016 (Sun City to Airport Road) Airport Road to Pecan Branch Wastewater Treatment Plant Proposed funding for potential Public-Private Partnership with Homestead Development Provide permanent wastewater capacity to expanded Sun City, Shell Road, and Hwy 195 Corridor Ultimately take Sun City Lift Station offline
9 Wastewater Services Lift stations - $4,532,000 Park Lift Station and Force Main - $3,982,000 Existing San Gabriel Wastewater Treatment Plant Lift Station Required repairs of existing station and capacity expansion for development Lift Station Upgrades - $550,000 TCEQ/SSO plan requirements Redundant power Electrical/control system upgrades Lift stations to be prioritized based on field conditions Irrigation System No improvements proposed
10 Wastewater Services Plant Upgrades - $10,155,000 Pecan Branch Wastewater Treatment Plant Expansion - $7,948, /1.8 million gallons per day to 3.0/3.6 million gallons per day TCEQ mandate to initiate construction based on actual plan flows Design previously initiated 18 month construction schedule (additional $3,600,000 FY 18) Ultimate terminus for Berry Creek Interceptor (Sun City, Shell Road, Hwy 195, Berry Creek areas) San Gabriel Wastewater Treatment Plant Belt Press - $2,207,000 Sludge dewatering currently manual, inefficient, limited capacity, and weather dependent Belt press will mechanically & chemically dewater sludge Free up drying bed space onsite
11
DeSoto County is not a water service provider and does not operate any
Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationFISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More informationSECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.
More informationMaricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001
Maricopa Association of Governments Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS August 2001 3033 NORTH 44TH STREET, SUITE 101 PHOENIX, ARIZONA 85018 (602) 263-9500 FAX (602) 265-1422 Technical
More informationCity of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP
City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer
More informationGOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
More informationName: Date: P.O. Box 2449, San Antonio, Texas 78298 (210) 233-3683. Number of Taps
PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;
More informationVista Ridge Water Transmission & Purchase Agreement
Vista Ridge Water Transmission & Purchase Agreement Doug Evanson Senior Vice President/Chief Financial Officer Rates Advisory Committee Concentric Sources of Supply Canyon Lake Trinity Aquifer CRWA Lake
More informationAPPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT
REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT This Agreement ("the Agreement ) is entered into this day of, 2011, between the Town of Amherst Sanitary Sewer District 1 (hereinafter SSD 1 ) and Town
More informationCity of Cape Coral, Florida FY 2015-2017 Proposed Operating Budgets
FUNDED CAPITAL IMPROVEMENT PROGRAM FY 2015-2020 SUMMARY OF REQUIRED REVENUES FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TOTAL All Hazards $ 100,000 $ - $ - $ - $ - $ - $ 100,000 Capital Facility Expansion
More informationBEAUMONT S PIONEERING CFD
BEAUMONT S PIONEERING CFD Prepared for Beaumont City Council Prepared By Development Services Department Comprehensive Infrastructure Development What is Beaumont s CFD? The CFD is part of Beaumont s Comprehensive
More informationBased on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
More informationCalifornia Wastewater
Abridged Edition L A Y P E R S O N S G U I D E T O California Wastewater Prepared by the Water Education Foundation Contents The Layperson s Guide to California Wastewater is prepared and distributed by
More informationPlan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
More informationClean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP)
Clean Water State Revolving Fund (CWSRF) Requirements and Guidance for a Fiscal Sustainability Plan (FSP) Maine CWSRF Fiscal Sustainability Plan Requirements Starting October 1, 2014, a Fiscal Sustainability
More informationAPPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR
APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601
More informationSanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
More informationRepairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to
More informationM I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program
M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program
More informationWilliam E. Dunn Water Reclamation Facility. Facility Overview & Information
William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa
More informationBay Park Sewage Treatment Plant Super Storm Sandy Recovery
County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park
More informationCity of Gardner Electric, Water and Wastewater Utilities. Request for Information (RFI) 1. Purpose of Request
City of Gardner Electric, Water and Wastewater Utilities Request for Information (RFI) 1. Purpose of Request The City of Gardner ( City ), faces challenges related to maintaining its basic infrastructure,
More informationAquatera 2015/16 Business Plan Highlights
Who We Are Aquatera 2015/16 Business Plan Highlights Aquatera is a full-service utility corporation the provider of choice for governments, businesses, and communities. Our business is to provide high-quality
More informationUnauthorized Discharges and Sanitary Sewer Overflows
TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental
More informationFacing The Challenges In Houston s Water System: Past, Present, and Future
Facing The Challenges In Houston s Water System: Past, Present, and Future Jun Chang, P.E. D.WRE Deputy Director Department of Public Works and Engineering Presented to HCEC February 17, 2012 Past Regulatory
More informationPreserve the Tax-Exempt Status of Municipal Bonds
The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.
More informationNEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
More informationTown of New Castle Utility Department Introduction
Town of New Castle Utility Department Introduction Town of New Castle Utility Department Mission Statement Our commitment is to ensure that our customers receive high quality water and wastewater treatment
More informationRESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY
CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:
More information2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationPROJECT NAME BACKGROUND STATUS
Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure
More informationSFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco
SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco Emilio Cruz AGM, Infrastructure Agenda + San Francisco s Sewer System + San Francisco
More informationSanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention
Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation
More informationTestimony. Shaun LaLonde Agency Hearing Staff Eduardo Hernandez Applicant Witness
ISSUE #4 Is it feasible to connect the proposed Sewer District #27 to Sewer District #23 via a pump station and associated components, taking into account design, location, impacts (such as noise, odors,
More informationTexas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems
Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values
More informationecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
More informationCapital Improvement Plan Utilities-Wastewater
Capital Improvement Plan Utilities FY14 Existing Inventory The Utilities Division of the Public Works currently serves an estimated 24,890 residential and nonresidential wastewater customers. Average daily
More informationINTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT
INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT The Adapting to Rising Tides (ART) project evaluated the current condition of shoreline and community assets, and the
More informationREQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
More informationTown of Yorktown Comprehensive Plan 8. INFRASTRUCTURE
Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE 8. Infrastructure 8.1 VISION STATEMENT Infrastructure is a basic building block of the community essential for the health, safety, and welfare of residents.
More informationFY 2015-16 Springs Funding Projects
FY 2015-16 Springs Funding Projects Spring Homosassa Springs Project Name and Description Garcia Point Septic Project: Through the connection of 88 residential septic systems to Citrus County s central
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationChapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan
Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan 8.1 Introduction The purpose of this chapter is to document the variety of treatment-related
More informationTEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer
TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.
More informationHow To Improve Water Quality In East Pacificon
WATER STORIES EAST PROVIDENCE, RI We are proud to partner with East Providence on this very important project. Together we developed an innovative, sustainable solution that promotes public, economic
More informationAltoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
More informationPUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING
PUBLIC SEWER SERVICE, CAPACITY MANAGEMENT & MUNICIPAL PLANNING Our shared role in protecting local water resources 1 Goals for this presentation: Water Environment Protection? Clean Water What is it worth?
More informationSTEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
More informationProject Rankings. Fiscal Year 2015 2019 Capital Improvement Plan
Fiscal Year 2015 2019 Capital Improvement Plan Project Rankings 99 CIP Ranking Worksheet 101 104 Final Ranking Scores The following matrix shows all of the projects within the five-year period that were
More informationChapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
More informationTexas State University Utility Analysis. Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA
Texas State University Utility Analysis Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA Texas State University - San Marcos The rising STAR
More informationMINUTES OF REGULAR MEETING NORTHAMPTON MUNICIPAL UTILITY DISTRICT HARRIS COUNTY, TEXAS. January 20, 2014
MINUTES OF REGULAR MEETING NORTHAMPTON MUNICIPAL UTILITY DISTRICT HARRIS COUNTY, TEXAS January 20, 2014 THE STATE OF TEXAS COUNTY OF HARRIS The Board of Directors (the Board ) of Northampton Municipal
More informationPurpose and Approach. Introduction
City of Ann Arbor Sanitary Sewer Wet Weather Evaluation Project Best Practices Sub- Group of the Citizens Advisory Committee Examples of Wet Weather Improvements from Other Communities December 5, 2013
More informationCity of Charlottetown Wastewater Treatment Expansion & Upgrading
City of Charlottetown Wastewater Treatment Expansion & Upgrading Background As Canada s smallest provincial capital, the City of the Charlottetown has a population of approximately 34,000 residents and
More informationAllegany County Combined Sewer Overflows - Long Term Control Plan
Allegany County Combined Sewer Overflows - Long Term Control Plan On December 14, 2001 the Maryland Department of the Environment (MDE) filed a Consent Decree and Judgment (Consolidated Case No. 01-C-00-18342-L)
More informationProcess and Energy Audits at Water and Wastewater Facilities. Thomas Devine, CAP, CEM, LEED AP April 25 2012
Process and Energy Audits at Water and Wastewater Facilities Thomas Devine, CAP, CEM, LEED AP April 25 2012 Presentation Outline Types of Audits Benchmarking Submetering Data Collection/Information Gathering
More informationWater and Wastewater Challenges for San Antonio 2013
Water and Wastewater Challenges for San Antonio 2013 Kelley Neumann, P. E. Senior Vice President / Strategic Resources September 11, 2013 San Antonio Women s Chamber of Commerce Water Operations Growth
More informationAfter the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.
After the Flush Published: July 14, 2011 Sewage or wastewater is something we rarely think or talk about. The wastewater from our toilets, showers, washing machines and dishwashers quickly departs our
More informationDRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
More informationBiological wastewater treatment plants of BIOGEST
Biological wastewater treatment plants of BIOGEST by: Thorsten ten Neuerer and Markus Batschauer from: BIOGEST AG, Taunusstein The so-called batch technology represents a particularly interesting and effective
More informationA Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
More informationChapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination
Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by
More informationNumber 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
More informationEWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness
EWEB s Approach to Resiliency Through Master Planning and Emergency Preparedness 2015 PNWS-AWWA Annual Conference Bellevue, WA W a l l y M c C u l l o u g h, P E Presentation Outline EWEB s Water System
More informationStandard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
More informationDrain & Tank Cleaning
Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:
More informationA HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
More informationTerms of Reference. Aqaba Water and Wastewater Utility Asset Valuation
Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for
More informationInnovative I/I Analysis Leads to Sustainably Program
Innovative I/I Analysis Leads to Sustainably Program Heart of the Valley Metropolitan Sewerage District Kaukauna, Wisconsin Mark Surwillo, HOVMSD District Manager Tammy Kuehlmann, PE, Donohue & Associates
More informationSaudi Aramco Project Development
Saudi Aramco Project Development Wastewater Treatment Facilities Jeddah Refinery And Marine Area December 2007 Facilities Planning Dept. OBJECTIVE: Provide an overview of the complexities of developing
More informationCALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION
DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the
More informationSECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS
SECTION 6 EXISTING WASTEWATER MANAGEMENT SYSTEMS This section will describe the Town s existing wastewater management systems. This includes on-site disposal systems and private collection systems. The
More informationTown of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
More informationSan Francisco s Non-potable Water Programs
San Francisco s Non-potable Water Programs Technologies and Innovative Solutions for Harvesting and Non-Potable Use of Rain and Stormwater in Urban Settings April 24-25, 2013 Paula Kehoe Director of Water
More informationWork Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
More informationTechnical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff
Technical Council on Lifeline Earthquake Engineering (TCLEE) by Anshel J. Schiff for GEER Joint Advisory Panel and Working Group Meeting October 7 & 8, 2004 Goals of TCLEE Elevate the state-of-the-art
More informationSanitary Sewers LINK TO THE COMPREHENSIVE PLAN
Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,
More informationBOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS
WATER AND SEWER BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS PROGRAM DESCRIPTION: This program
More informationDescription of the Water Conserv II Facility
Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has
More informationINTRODUCTION AND BACKGROUND
Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,
More informationCity of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
More informationCOMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
More informationCambridge Wastewater Treatment Facility
Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working
More informationRECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS
Contra Costa Environmental Health 2120 Diamond Blvd., Suite 200 Concord, CA 94520 Phone: (925) 692-2500 Fax: (925) 692-2504 www.cchealth.org/eh/ RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE
More informationB.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001
Gregory M. Hall, PE, QSD/QSP Project Engineer Oscar Larson & Associates REGISTRATION: EDUCATION: Civil Engineer #73260, California B.S. in Environmental Engineering, minor in Chemistry, Oregon State University,
More informationEl Paso Water Utilities Public Service Board. Application for Renewal Industrial Wastewater Discharge Permit
El Paso Water Utilities Public Service Board Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted
More informationPUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System
PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,
More informationMEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011
MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City
More informationAmerican Society of Civil Engineers
American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply
More informationAffordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective
Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator
More informationThe Importance of Master Planning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco
The Importance of ning Ibrahim S. Nassar, P.E. Facilities Planning Department Saudi Aramco 12/03/2007 SAWEA WORKSHOP - 2007 1 Words of Wisdom We have met the enemy and he is us Walt Kelly Adventure is
More information3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste
3.6 3.6.1 Existing Conditions - Police, Fire, Ambulance, Water, Sewer, & Solid Waste Police Protection The Clarkstown Police Department provides police protection services to properties within the 40 square
More informationBEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
More informationDirector of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water
DEPARTMENT ORGANIZATIONAL CHART WATER RESOURCES Director of Utilities Secretary Resources Manager Business Services Manager Utilities Engineer Resources Supervisor Distribution Supervisor Utilities Project
More informationOn-site Treatmentt for Domestic Wastewater in Thailand Suwanna. K. Boontanon Mahidol Univ. 2
WEPA International Workshop 2013 Cambodia On-site Treatment for Domestic Wastewater in Thailand Suwanna Kitpati Boontanon Assistant Professor, Faculty of Engineering Mahidol University February 18, 2013
More informationExecutive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
More informationSANITARY SEWER OVERFLOW EVALUATION REPORT
SANITARY SEWER OVERFLOW EVALUATION REPORT MAY 2012 SEPT 2013 Draft for Review: November 13, 2013 Prepared by: James C. Hailey & Company City of Gallatin, Sumner County, TN Sanitary Sewer Collection Evaluation