1 Wembley Stadium Event Day Traffic Management Report March 2013 Prepared for: The Wembley Contractor Under the LoHAC Contract Version 2 Prepared by: Paul Richards Traffic Manager Transportation Service Unit Brent House High Road, Wembley, Middlesex, HA9 6BZ 1 P a g e

2 CONTENTS 1. Introduction 4 2. Staff Structure 6 3. Wembley Event Day Control Room 7 4. Order of operation 8 Event Day Signage Great Central Way Scheme South Way Scheme 13 South Way Drop off/pick Up Drawing Method Statement South Way scheme CCTV Event Day Road Closures Stadium Event List Event Timing Sheet 22 Scheme Drawings Drawing of Wembley Stadium Parking Protection Area 23 Event Day Flap Sign Locations 24 CCTV location Drawing 27 Tow Away Zone Sign Locations 28 Equipment Packing List Master 29 Great Central Way Tidal Flow Drawing Inbound 31 Great Central Way Tidal Flow Drawing Outbound 33 Road Closures Banned Turns 35 South Way Two Way Scheme 36 Conference Centre Drawing 38 Triangle Drawing 39 2 P a g e

3 Station Grove Scheme 40 Gate 5 Lane Drop Scheme 42 London Road Scheme 43 Engineers Way Closure Scheme 44 TFL - N.C.R Lane Drops 45 3 P a g e

4 Introduction 1.1 Wembley National Stadium was opened in 2007 and has a capacity of 90,000. It is the sole venue of the England national football team, and hosts the latter stages of top level domestic club cup competitions. 1.2 Upon average the stadium hosts around thirty events each year. Outside of football, the stadium also hosts major rugby league games, such as the Challenge Cup and International Rugby League. The stadium is also an annual regular season venue for the American National Football League's International Series. In addition sport the stadium also hosts a variety of large music concerts. 1.3 This document has been written to provide staff working on Wembley Events an overview on various traffic schemes required on a typical event day. Staffs are encouraged to have a good understanding of the schemes so that they are aware of the type of activity they are required to undertake and what the Council expects of them on an event day. Throughout this document the term traffic refers to both pedestrian and vehicle activity. 1.4 The Stadium Event Team worked in partnership with the Metropolitan Police for the Event Day Traffic Management Plan. The new 90,000 seat Stadium caters for a maximum of 2,900 car equivalent spaces including 250 disabled parking spaces, depending on the number of planned coaches for an event, and will sell combined event and car parking tickets to help minimise local congestion. The two official car parks are the multi-storey and Eastern Surfaced Car Park. Wembley National Stadium Limited (WNSL) has entered into a contractual agreement with Carey s to provide VIPs and staff parking. The Carey site is located in South Way opposite Fourth Way. 1.5 The Eastern Car Park is accessed via the Stadium Access Corridor, which, on event days, will have three lanes (up to the Fourth Way junction), with two lanes in-bound and one lane out. Post event the centre lane will reverse to allow two lanes of traffic to progress out-bound with one lane in. 1.6 Access and egress route to the Multi Storey car park is via Royal Route off Wembley Hill Road. South Way passes close to the Stadium and carries a potential security risk. On event days, that stretch of South Way will be closed for through traffic because of security concern. 1.7 The on-going redevelopment of the area around the stadium will see the demolishment of the Multi Storey car park in Quintain the land owners are contractility bound to provide 2900 car parking spaces to the stadium. 4 P a g e

5 Therefore, they propose to provide parking on the Yellow car park which is located to the north of Engineers Way opposite Wembley Arena. 1.8 No matter how the Traffic Management is shaped, the following operations will need to be carried out to ensure smooth and safe traffic flows and pedestrian flows from stations. 1.9 Staffing for events is coordinated by Janet Kear (Events Officer), with the exception of the Highways crew. The contractor is responsible for allocating staff for events throughout the year Two staff members from the Transportation Service Unit are allocated to man the control room and five others are allocated to man the Land Rover Land Rover personnel are responsible for implementing the roads closures at Fulton Road, Engineers Way, Conference Centre Roundabout, South Way and London Road Highways crews are responsible for undertaking the equipment drop-off prior to the event and implementing the schemes on Great Central Way, South Way (if required) and the closure of the Triangle at Harrow Road/Wembley Hill Road ** Please Note** - Drawings and Equipment Lists are currently being updated. Please use these as an estimated guide only Wembley Stadium Ltd produces a calendar of all proposed events each month. Confirmed events are shown in bold (see page 21). 5 P a g e

6 London Borough of Brent Transportation Structure Paul Chandler Head of Transportation Vacant Contracts Manager Paul Richards Traffic Manager Janet Kear Traffic Events Officer Paul Mcdonagh Network Engineer Wembley Event Staff 6 P a g e

7 Wembley Event Day Control Room 3.1 The Event Day Control Room is located on Level 4 on the south-side of the stadium and is partitioned between WNSL and Police. WNSL are responsible for coordinating and monitoring activity within the stadium and Police are responsible for activity outside the stadium. 3.2 The control room is also manned by British Transport Police, London Fire Brigade, London Ambulance and London Borough of Brent. 3.3 Police are responsible for the policing of public order issues both inside and outside the stadium. They are also responsible for facilitating Team Coaches in and out of the venue and assist in keeping routes clear of obstructions. 3.4 The Council have two staff members from Transportation operating within the control room who oversee council operations in respect to road closures and traffic management. They have access to a number of Brent CCTV cameras along with a variety of stadium cameras enabling them to monitor traffic/pedestrian flows on local roads and on the stadium site. 3.5 Control Room Staff communicates with crews via VHF radio issued on the day or permanently fitted to the vehicles. 7 P a g e

8 Order of Operation Pre-event 4.1 The night prior to the event, Highways Operational Staff commence flapping approximately 500 Event Day signs around the borough (see page 11 fig 1 & 2) for the two different types of signage. These advise motorists/residents of the event and form part of the Parking Protection Scheme (PPS). This operation is undertaken on behalf of the Parking Team and is not part of the LoHAC contract. There are two routes for flapping of signage Blue and Green (see pages 24 & 25). Once all signage has been flapped the operative then signs the confirmation sheet (see page 26). This is required in the event of a complaint should a parking ticket be issued on the day. 4.2 On event day the Highways Crew call sign Highways 1(H1), will commence the drop-off of equipment at designated locations to assist with road closures pre and post event. (See page 29 for master equipment list and locations). 4.3 The Control Room will open approximately 5 hours prior to kick-off and will monitor council operations and coordinate with police and other services as required. 4.4 Prior to the Event Day, Wembley Stadium will notify Transport for London whether there is a need for the North Circular Road lane drops. If required lane drops are implemented by TfL s own contractor. (See page 45 for scheme drawing). 4.5 The Land Rover Crew call sign Brent 1 (B1) will commence their operation by dropping the pedestrian bollards on White Horse Bridge using a special key. This will assist Chiltern Rail in managing queues post event. 4.6 B1 will then implement the closure of South Way between First Way and Wembley Hill Road as this section becomes very busy with pedestrian traffic pre and post event. (See page 29 loading list for equipment required). 4.7 H1 on the authority of the Control Room will then commence the Tidal Flow scheme on Great Central Way for inbound traffic (See page 34 and 35). The Tidal-Flow Scheme has proven to be very successful in maximising traffic flows pre and post-match. On arrival the scheme will provide 2 lanes inbound and 1 lane outbound. (See page 29 for equipment required). 4.8 B1 at the appointed time will place the No Parking cones on Wembley Hill Road to deter parking. This will ensure that we have maximum carriageway capacity on dispersal. 8 P a g e

9 4.9 B1 using the cones/signs previously dropped off by H1 will implement the closure of Fulton Road (see page 45) to allow unrestricted pedestrian flow along Olympic Way. This closure is removed at kick-off when pedestrian flows have reduced. (See page 29 for the equipment required) At the designated time B1 will proceed to Wembley Central and implement the closure of London Road to assist with managing crowd flows onto the platforms of Wembley Central Station. The council are not responsible for crowd management. This operation is undertaken by London Underground stewards. (See page 29 for equipment required) In the past it was necessary to implement the Station Grove Scheme to assist with queuing arrangements at Wembley Central Station. This closure was implemented by the B1 crew. (See page 40). Although this scheme has not been implemented for the last two seasons, there is a possibility that it may be required again for a future event. Post- Event 4.12 At kick-off H1 will commence the switch of the tidal flow system in preparation for dispersing traffic. (See pages 14 and 15).To assist with maximising traffic flow the London Streets Traffic Coordination Centre (LSTCC) will increase the Green phase of traffic signals at Hannah Close and Drury Way/Great Central Way junctions At half-time, Highways 2 (H2) will commence preparation of the triangle scheme ready for its closure. (See page 39. Post event pedestrian flow from the stadium back to Wembley Central is so heavy that pedestrians walk on the carriageway. This has resulted in the council having to close Wembley Hill Road between the Triangle and Empire Way. (See page 29 for equipment list) H2 commence dropping cones along the length of Wembley Hill Road over the hill in an attempt provide two lanes for outbound traffic. (See page 29 for equipment list) B1 will be responsible for implementing the scheme at the green opposite York House. Traffic on Empire Way will be diverted over the hill on Wembley Hill Road and traffic exiting the Red Car Park will be diverted right on Wembley Hill Road and will merge with the diverted traffic at Empire Way. Once the pedestrian foot fall is reduced the scheme at the Triangle is removed and traffic exiting the Red Car Park will be permitted to turn left towards the Triangle. (See page 29 for equipment list). 9 P a g e

10 4.16 Transport for London (Tfl) contractors on occasions implement a lane drop on the North Circular Road to assist exiting traffic from Drury Way and Great Central Way onto the A406 North Circular Road. (See Page 45) H1 will implement the lane drop in First Way at the junction with South Way. The lane drop forces traffic from lane 1 of 2 into lane 2 of 2 allowing a dedicated exit lane from the Green Car Park. (See Page 41) Just prior to the end of the match B1 again closes Fulton Road in preparation for pedestrian flow back to Wembley Park Station. Police position resources at the location to contain supporters on Olympic Way. Due to police presence the closure is left with Police. B1 then proceeds to Engineers Way. (See page 44) B1 closes Engineers Way from Empire Way to First Way. No vehicular traffic is permitted to travel between Rutherford Way and Empire Way. The closure at the junction of First Way prohibits traffic flow westbound. However, traffic exiting Rutherford Way is permitted to travel eastbound towards First Way. (See pages 44 & 45) Once the car parks have emptied, closures are removed and the environmental pickup of equipment is undertaken by H1 & H2. H1 will follow the traffic along Great Central Way and remove the tidal flow scheme. Once the pickup of equipment is complete the Control Room will close. 10 P a g e

11 Event Day Signage Fig1 Fig 2 11 P a g e

12 Great Central Way Tidal Flow 5.0 On event days, Great Central Way from the traffic light junction at Drury Way to the junction of Fourth Way operates as a tidal flow system. (See pages 31-34). 5.1 The central cross hatched area which is marked with a red surface provides an additional inbound lane for arrivals or outbound lane for dispersal. Cones placed along one edge of the cross hatchings enable the area to be used as an additional lane to provide two inbound and one outbound lane. 5.2 At half time cones are moved across onto the other edge of the cross hatched area to provide two outbound lanes and one inbound for dispersals. 5.3 This facility become part of the 2012 Olympic Route Network and enabled the provision of a dedicated lane for the Olympic Family. 12 P a g e

13 6. Highway Operation South Way 2-Way Scheme 6.1 Prior to the 2012 Olympics, Wembley National Stadium contracted Steer, Davies, Gleave (SDG) Transport Consultancy to detail the traffic management and operations plan for South Way to the East of the stadium. 6.2 There is a possibility that the scheme may be required on selected future events. Therefore, it is appropriate that it should be included in this report. 6.3 The plans attached to this document were prepared by SDG in order to implement a 2-way traffic flow on South Way between the junction of Fourth Way and the junction of First Way during the post-match period. The intended purpose is to provide an expeditious and direct access route to Great Central Way from the Green car park. 6.4 The current route from the Green car park is via First Way, Fifth Way and Fourth Way via the one-way system. This route becomes congested as vehicles exiting pirate car park sites exit onto the network. General Scheme 6.5 South Way between the Junctions with Fourth Way and First Way will operate in both eastbound directions. A combination of cones and water filled barriers will be placed along the white line in the centre of the carriageway to separate east and westbound flows. 6.6 The tidal flow system on Great Central Way will operate as per normal throughout the implementation of this scheme. 6.7 Traffic travelling eastbound on South Way will merge with traffic on Fourth Way just east of the junction. Junctions between Fourth Way and South Way 6.8 Vehicle exiting the Carey s site opposite Carey Way will be permitted to turn right onto South Way. This junction must be controlled by a traffic marshal employed by City & Suburban Parking (CSP). 6.9 Eastbound traffic on South Way will be controlled by a Community Safety Accreditation Officer (CSAS) traffic marshal who will be located at the junction on the northern footway Westbound traffic on South Way will be controlled by a CSAS marshal located at the junction on the southern footway The CSAS marshals will alternate priority of traffic exiting the Carey s site and that on South Way until such time as the car park has been emptied. 13 P a g e

14 6.12 Vehicles will not be permitted to turn right from Fourth Way into South Way once the scheme has been implemented. The placement of cones in accordance with the scheme drawing will prevent this manoeuvre. Emergency Service, L.B Brent and the LoHAC contractor vehicles will be permitted to make the manoeuvre. Cone must be replaced once the vehicle has passed through the closure point Only Emergency vehicles will be permitted to turn left or right into Carey Way. There will be a CSAC marshal at this location to assist will emergency vehicle access Drawing on page 36 shows the arrangement at the Fourth Way/South Way junction. Junction between First way and South Way 6.15 Traffic will not be permitted to turn right into Second Way from South Way, other than emergency vehicles. There will be a CSAS traffic marshal at the location to enforce this measure Vehicles exiting the car parks located at the Popin Building and VDC site will not be permitted to turn right into South Way All vehicles travelling west towards Gate 5 must turn right into First Way and follow the one-way system. No U-turning will be permitted at this junction. This will be physically prevented with the use of water filled barriers and conning Traffic exiting the car park at Gate 5 will be directed into the temporary eastbound lane on South Way The section of South Way, towards Wembley Hill Road will be closed to traffic except emergency vehicles, consistent to normal event day operations Figure 40 shows the arrangement at the First Way/South Way junction. Pedestrian Crossing Management 6.21 The management of pedestrian crossing is coordinated by the management of vehicles exiting at Gate P a g e

15 South Way Drop Off/Pick Up During events Second Way is used for Drop Off/Pick Up pre and post event. Signs and cones are placed on the carriageway on South Way opposite the junction of Second Way indicating the drop off/pick Up area. 15 P a g e

16 7. LB BRENT SOUTH WAY TWO WAY TRAFFIC SCHEME 26/02/2012 METHOD STATEMENT 7.1 As am additional preparatory step for this event at 08h00 the Highways Operations traffic management equipment drop-off tem (TM team) and Highways 3 (H3) will pre drop, lay out and tape together a lone of 100 x 750 high traffic cones approximately 1.5m from the back of the southern footpath on South Way along the Popin Centre front of building parking area leaving gaps for pedestrian access. 7.2 H1 (Highways 1 Great Central Way Crew) will take responsibility for the removal of the scheme post dispersal. 7.3 The H1 crew will start work at Pyramid House at 11h30 (2 hours prior to the inbound tidal flow implementation) and immediately commence transportation of 130 pre-loaded WFB s (Water Filled barriers) to the northern pavement opposite the Popin Centre on South Way. 7.4 The H1 crew and H3 will then drop and lay out the WFB s in row of chains of 4 WFB s linked together at the back of the Northern footpath of South Way from Adam s Bridge to the j/w South Way and First Way. The team will also lay out a temporary taper of cones to the rear of the truck as they work near the bend to deflect traffic into the left lane. 7.5 Once the truck has been emptied H1b will return to Pyramid House, load the remaining WFB s and return to site and continue the drop off. 7.6 When the operatives reach j/w First Way they will drop 40 WFB s 15x2m traffic rails and 16 WFB posts in the last two (west) parking bays of the Popin front parking area for later use and then return to Pyramid House and stand by until they receive the instruction to deploy the inbound tidal flow. 7.7 Once the inbound tidal flow has been deployed (with flashing yellow beacon lights) H1a, b and c and H3 will then return to Pyramid House, load the additional signage required for implementing the South way two way scheme as well as the cones for use at Fourth Way (for the Fourth way lane merge build out, Great Central Way inbound chicane build out opposite Carey s and the Carey way closure) and then proceed to pre-drop the signage and cones at designated points along South way for use later in the day. 7.8 H3 (the morning Highways Co-ordinator), who would usually sign off just before the H2 crew are deployed, will stay on to assist in deploying the scheme in the role of team supervisor continuing to use the call sign of H3 16 P a g e

17 and will team up with H2d (the fourth H2 operative) in order to take over the responsibility of the tidal flow switch over using a Chapter 8 compliant Highways Van. 7.9 The afternoon Highways coordinator will take the afternoon H3 responsibility as per usual when he/she signs on but will use the call sign Highways 4 (H4) and will continue to oversee the activities of all Highways Operations operatives as per usual for the remainder of the event. H4 will assist in the deployment of the triangle closure as usual but will also provide hands on cover for H2d s role during triangle implementation At about 16h00, or when inbound traffic has been deemed by Brent Traffic Control to be light enough, the H1 crew will begin to deploy the new two way scheme starting at South way j/w Fourth Way ensuring dropped off signs are positioned accordingly, relevant permanent signage is blocked out and cones are dropped and positioned as required. At the same time H3, H2d and two operatives from Brent 1 will commence switch over of the tidal flow starting at Drury Way As the H1 crew start to deploy the two way scheme they will begin by hanging four specially designed lane merge In Turn signs made from Corex from the four use Both Lanes flap type signs permanently located in Fourth Way The H1 crew will then lay out cones and signs along Fourth way near the approach to South Way creating a taper which will both merge the two lanes of traffic on Fourth Way into one lane. The crew will however leave the right turn from Fourth Way into South Way open Once the lane merge scheme is completed, the H1 crew will proceed to the Carey s entrance in Great Central Way, use the entrance to safely turn their truck around and commence setting out a line of cones down the centre of South Way. In order to prevent operatives from traffic approaching from the rear H1 crew will build a temporary coned taper near the Eastern end of the traffic island at Fourth Way which will push inbound traffic into the left lane of South Way until the tidal flow switch is fully implemented Just after the junction the H1 will build a second and third coned taper forming a corridor from Fourth Way into the far side inbound lane of South Way enabling right turning traffic from Fourth to join inbound traffic The H1 crew will also create a coned build out on the inbound approach to the Carey s car park exit forming a chicane to slow inbound traffic and they will close the right turn into Carey Way with cones The H1 crew will then continue to deploy cones and signage along the length of South Way until they reach the first stack of WFB s after the bridge. 17 P a g e

18 7.17 Once the H1 crew has reached the WFB s they will then proceed to move them into the centre of the road and to lay them out (interlinked but not filled with water) creating a solid barrier wall along the centre line of South Way from the bent just after the bridge to the Gate 5 entrance. When the H1 crew reaches Gate 5 at the junction of First Way they will also build a second WFB wall (added WFB rail tops) across South Way as required closing South Way The H1 crew will then seal off the mouth (or entrance point) to the outbound contra flow lane with traffic cones Once the entrance to the contra flow lane has been sealed the crew will then commence moving the taped cones along the front of the Popin Centre to the roadside edge of the footpath. Once this part of the process is completed the crew will stand by at this location When H3 reaches Fourth Way he/she will the remove the first temporary taper placing flashing beacon lights on every fifth cone. H3 will however still leave the second and third taper / corridor in place until the order is given to implement full closure. H2d will at that point proceed to assist in his / her normal duties at the triangle On confirmation that CSP have completed putting in controls on WNSL property at the gate 5 exit and on instruction from Brent Traffic Control, H3 and the H1 crew will drive the full length of the newly implemented outbound carriageway to ensure it is safe, driveable and TM compliant. H3 will then communicate the all clear / fit for use to Brent Traffic Control who will in turn record this in their log and communicate it to all parties. H1a will however remain behind at South Way j/w First way and join Brent 8 to monitor and if required adjust the TM layout at that location during dispersal The remaining H1 crew and H3 will then proceed to and stand by at Fourth Way When the instruction is given by Brent Traffic Control, H1b, H1c and H3 will close the right turn from Fourth Way into South Way, remove the taper / corridor, ensure the centre line of cones along South Way at that point is made continuous and then stand by at that location to monitor for and rectify TM displacements Once the Eastern end of the outbound contra flow lane is fully deployed and considered fit for use H3 will inform Traffic Control who will in turn instruct Brent 8 to open the Western end of the contra flow by removing the cones when it is deemed appropriate. 18 P a g e

19 7.25 During dispersal H3 will remain in the vicinity in order to patrol the route on foot monitoring for and rectifying breaches and displaced TM After dispersal is complete and instruction is given to open, the H1 crew will remove the tidal flow as per normal and the H2 crew, after having completed the removal of the triangle scheme, will then proceed to remove the South Way Two Way scheme by: a) re-opening Fourth Way and re-instating the taper / corridor b) pushing all WFB s onto the footpath c) picking up all cones and TM d fully opening Fourth Way and e) returning to collect the WFB s. END OF PROCEEDURE 19 P a g e

20 8. CCTV Cameras 8.1 There are approximately 150 CCTV camera located throughout the borough which are predominantly used for community safety and enforcement of moving traffic offences. 8.2 The cameras are permanently recording images and are accessed on nonevent days from Brent s Community Safety Control Room located within Brent House and the Enforcement Control Room located within Pyramid House. 8.3 On Event days cameras can be accessed from the Event Control Room within the stadium. In addition, access can also be gained to Transport for London cameras enabling the event controller to view inbound/outbound traffic on the A406 North Circular Road and the A40 Western Avenue from the borough boundaries to the stadium. 8.4 The CCTV camera location plan on the following page shows the location of cameras that are regularly accessed around the stadium area. These allow the event controller to monitor traffic flows and identify areas of congestion enabling then to alert police who in turn will assign a unit to the location. 9. Event Day Road Closures 9.1 Pre and Post Event certain road closures are required due to the heavy footfall of spectators attending the event. Closures are implemented when required at the direction of the Event Control Room. 9.2 Pre-event Fulton Road is closed 45min before kick-off to facilitate pedestrian flow from Wembley Park Station to the stadium. Vehicular traffic is directed via Engineers Way. The road is reopened at the commencement of the event on the direction of the Control Room mins prior to final whistle, Fulton Road, Engineers Way, London Road and Wembley Hill Road are closed to all vehicular traffic. However, local residents are facilitated through the closure at Wembley Hill Road to attend their home address. 9.3 South Way between Wembley High Road and First Way on the southern side of the stadium is closed 4 hrs before kick-off for the duration of the event and re-opened approximately 2hrs after the event gas ended. 20 P a g e

21 P a g e

22 11. Event Day Provisional Timing Sheet Wednesday EVENT TIMINGS International Football England v Brazil There are two pages to this document Attendance (K) 90 Car Parks Open ALL DAY Start of main arrival period 17:00 Turnstiles Open 18:00 Kick Off 19:30 End of Event 21:15 PPS YES South Way Two Way NO CT Measures NO Extra Time and Penalties NO Sunset 16:59 Lighting YES PROVISIONAL TIMINGS NOTES TM1 Cone & Tape Drop at Popin NO H1 WFB drop at South Way north side and Popin NO TM1 Equipment Drop Out (Finish By) 14:15 MEET BRENT HOUSE 14:15 Control Room Open 15:00 B1 Drop Bollards White Horse Bridge 15:00 B1 Road Closure Advance Warning Signs 15:00 B1 Close South Way 15:30 H1 Inbound Tidal Flow Commences 15:30 B1 Wembley Hill Road Parking Bay Suspension 17:30 B1 Fulton Road Closure Arrivals 17:30 or when necessary TURNSTILES OPEN 18:30 B1 London Road scheme implemented 19:15 KICK OFF 19:30 H1 Tidal Flow Switch to Dispersal 19:30 Earliest H2 / B1 Triangle Preparation commences 20:15 B1 Chiltern Railway signs 20:30 Latest H2 / B1 Triangle Closure implemented 21:00 TfL NCR lane drops last cone NONE H1 First Way Lane Drop - Car Park Exit 21:00 B1 Fulton Road Closure Dispersals 21:00 B1 Engineers Way Closure - Dispersals 21:15 B1 Engineers Way / First Way Closure 21:15 END OF EVENT 21:15 TM1 Env Area pick up 21:45 Starting with Harrow Road areas Car Park Arrangements NOTES Wembley Arena Green Car Park Red Car Park Strictly Come Dancing 1830hrs Doors Yellow Car Park not in use 1930hrs Show start 2200hrs Finish Public Transport Arrangements Wembley Park Wembley Stadium Wembley Central NOTES Queuing & bridge closed Overbridge in use Service Suspensions None Note timings driven by start of main arrival period 22 P a g e

23 Wembley Stadium Parking Protection Scheme Area 23 P a g e

24 Flap Sign Routes 24 P a g e

25 25 P a g e

26 26 P a g e

27 CCTV Camera Locations 27 P a g e

28 28 P a g e

29 MASTER LIST - Wembley Events Traffic Management Equipment List with lights 06/03/2012 Page 1 (there are 2 pages to this document) No Waiting Cone Photocell Flashing Lights Blue Keep Right Arrow Trestle Blue Keep Left Arrow Trestle Road Narrows from left Road Closed Trestle Road Ahead Closed Trestle No left Turn Trestle No Right Turn Trestle Right Turm Only Trestle Right turn/one way Left Turn trestles only Trestle Event Day Tow Away Set Down (Cone / Pick Up Mount) Trestle 750mm No Entry Interlocking Crew Location Traffic Cone Trestle Barrier GCW Great Central Way Tidal Flow GCW Great Central Way jw Hannah Close (contingency for banning Rt turn into Hannah Close) GCW First Way (Adjacent to Gate 5) Lane Drop for dispersals GCW South Way o/s Midnight Motors opposite illegal car park exit GCW Carey Way - Slip road (to be dropped off after Tidal Flow Switch) for Police Use GCW Stadium Way next to 'W' (as a contingency) GCW GCW Total TRI Wembley Hill Road, Empire Way to Wembley Park Drive TRI Empire Way Lane Drop o/s Tesco TRI Wembley Hill Road Rbt Closure (outside Tesco) TRI Wembley Hill Road j/w Stadium Way closure TRI Wembley Hill Road Northbound exit onto Rbt (outside Tesco) TRI Wembley Hill Road - Stadium Way to Royal Route TRI Dagmar Ave jw Wembley Hill Rd Service Road TRI Dagmar Ave j/w Wembley Hill Road (Contingency closure) TRI Royal Route j/w Wembley Hill Road TRI South Way j/w Wembley Hill Road TRI Wembley Hill Road South Way to Ecclestone Place incl junction TRI Wembley Triangle - Triangle TRI TRI Total TM2 Engineers Way j/w First Way TM2 Fulton Road j/w Rutherford TM2 Fulton Road j/w Olympic Way (east side of raised crossing) TM2 Fulton Road j/w Olympic Way (West side of raised crossing) TM2 Fulton Road j/w Empire Way (northern footway) TM2 Fulton Road j/w Empire Way (southern footway) TM2 Wembley Park Drive j/w Empire Way TM2 Engineers Way j/w Empire Way TM2 Engineers Way - yellow box end of island nearest to rear of Arena TM2 Engineers Way immediately West of the Pedestrian Flyover adjacent to yellow car park exit TM2 Engineers Way j/w Rutherford Way TM2 South Way j/w First Way TM2 South Way - adjacent to exit from Pop-Inn building TM2 South Way at the entrance to Cemex Ready Mix TM2 South Way at the Entrance to the Ibis Hotel TM2 South Way j/w Wembley Hill Road TM2 Wembley Central Station - London Road j/w High Road TM2 Wembley Central Station - London Road south of stn entrance outside No TM2 Wembley Central Station - London Road j/w Cecil Avenue TM2 Wembley Central Station - Rupert Avenue j/w Lonsdale Avenue TM2 Wembley Central Station - London Road j/w Rupert Avenue TM2 TM2 TOTAL TM1 Great Central Way j/w Hannah Close TM1 Wembley Hill Road Service Road TM1 Environmental Protection Zones (EPZ's) TM! TM1 TOTAL GRAND TOTAL P a g e

30 MASTER LIST - Wembley Events Traffic Management Equipment List with lights 06/03/2012 Page 2 (There are two pages to this document) No Waiting Cone 750mm Traffic Cone Photocell Flashing Lights Blue Keep Right Arrow Trestle Blue Keep Left Arrow Trestle Road Narrows from left Road Closed Trestle Road Ahead Closed Trestle No Entry Trestle No left Turn Trestle No Right Turn Trestle Right Turm Only Trestle Right turn/one way trestles Left Turn only Trestle Interlocking Barrier Event Day Tow Away Set Down (Cone / Pick Up Mount) Trestle Crew Location SCHEMES ONLY OCCASIONALY DEPLOYED TM2 Wembley Central Station - Station Grove j/w Union Road TM2 Wembley Central Station - Union Road j/w Park Road TM2 Wembley Central Station - Copland Road j/w Montrose Crescent TM2 Wembley Central Station - Montrose Crescent j/w Station Grove TM2 STATION GROVE SCHEMES TOTAL P a g e

31 Great Central Way Inbound Drawing Great Central Way Inbound Drawing 31 P a g e

32 32 P a g e

33 Great Central Way Outbound Drawing 33 P a g e

34 Great Central Way Outbound Drawing 34 P a g e

35 Road Closures and Banned Turns 35 P a g e

36 36 P a g e

37 37 P a g e

38 Conference Centre Scheme 38 P a g e

39 Triangle Scheme 39 P a g e

40 Station Road Scheme 40 P a g e

41 Gate 5 Lane Drop 41 P a g e

42 London Road Closure 42 P a g e

43 43 P a g e

44 Engineers Way/Empire Way TM Drawing 44 P a g e

45 North Circular Road Lane Drop 45 P a g e

46 Notes 46 P a g e

SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016

SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016 SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016 Travel Plan Wembley Stadium will be hosting the Sky Bet Championship Play-Off Final on Saturday 28 th May 2016. Kick off will be at 17:00, with this

More information

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.

Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding. Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing

More information

Merton Parking Service CCTV Enforcement Manual

Merton Parking Service CCTV Enforcement Manual Merton Parking Service CCTV Enforcement Manual Version 1.3 April 2013 Introduction Legislation Data protection Health & Safety CCCTV camera equipment Mobile CCTV vehicles CCTV control room CCTV evidence

More information

Penalty points and fixed charge offences

Penalty points and fixed charge offences Appendix : points and fixed charge offences s that carry penalty points Payment Conviction 8 next 8 Speeding E0 Failure by Driver to comply with front seat belt requirements (for self and for passengers

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Version I - July 2012 An executive agency for the

More information

Standard PCN Codes v6.7.3. On-Street

Standard PCN Codes v6.7.3. On-Street Standard PCN Codes v6.7.3 Code General suffix(es) On-Street Description 01 aoyz Parked in a restricted street during prescribed hours Suffixes y & z for disabled badge holders only 02 ao Parked or loading

More information

Standard PCN Codes v6.6.1 On-Street

Standard PCN Codes v6.6.1 On-Street Code General suffix(es) Standard PCN Codes v6.6.1 On-Street Description 01 ajoyz Parked in a restricted street during prescribed hours Higher Suffixes y & z for disabled badge holders only 02 ajo Parked

More information

DRIVING TEST POSSIBLE QUESTIONS & ANSWERS.

DRIVING TEST POSSIBLE QUESTIONS & ANSWERS. DRIVING TEST POSSIBLE QUESTIONS & ANSWERS. Question 1. What shape and colour is a warning sign? Diamond Shape - Yellow and Black Question 2. When should you not drive? While under the influence of alcohol,

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

Traffic Management During Construction

Traffic Management During Construction Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to

More information

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013 Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013 1 Contents PART 1 PRELIMINARY... 2 1 Short title... 2 2 Authorising local law... 2 3 Object... 2 4 Definitions the dictionary... 2 PART 2 PERMITS...

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

2016 MONACO GRAND PRIX

2016 MONACO GRAND PRIX 2016 MONACO GRAND PRIX From To The FIA Formula One Race Director All Teams, All Officials Document 3 Date 25 May 2016 Time 09:06 Title Event Notes Description Event Notes (Complete Version) Enclosed Event

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Standard PCN Codes v6.5.1 On-Street Code General

Standard PCN Codes v6.5.1 On-Street Code General Standard PCN Codes v6.5.1 On-Street Code General Description Differential Notes suffix(es) level 01 eoyz Parked in a restricted street during prescribed hours Higher Suffixes y & z for bbh only 02 aejo

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

Date: 14.9.05. Classification: Open. Meeting Name: Council Assembly. Item No. 6.1. Adoption of powers to deal with Moving Traffic Offences All

Date: 14.9.05. Classification: Open. Meeting Name: Council Assembly. Item No. 6.1. Adoption of powers to deal with Moving Traffic Offences All Item No. 6.1 Classification: Open Date: 14.9.05 Meeting Name: Council Assembly Report title: Ward(s) or groups affected: From: Adoption of powers to deal with Moving Traffic Offences All Strategic Director

More information

Madras College Site Traffic Management Plan (South Street) August 2015

Madras College Site Traffic Management Plan (South Street) August 2015 Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email

More information

Road Signs Recognition Quiz

Road Signs Recognition Quiz Road Signs Recognition Quiz Place your answer for each of the signs/pavement markings on the answer sheet. Ready to Roll? Here Comes Sign # 1... #1 A No right turn B Right turn only C Warning, no turn

More information

Static & Mobile Security Services Tender

Static & Mobile Security Services Tender Static & Mobile Security Services Tender Updated 17th December 2014 Interviews Companies shortlisted for the security tender will be invited to the Council s Mill Road depot in Cambridge on Monday the

More information

Traffic controllers and speed zones

Traffic controllers and speed zones Section 8 Traffic controllers and speed zones 8.1 Traffic Controllers 8.1.1 General (AS 4.10.2) (a) Equipment Traffic controllers shall wear approved high visibility clothing and shall control traffic

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Advice for Liverpool Football Club supporters, Europa League Final. Liverpool FC v Sevilla FC Wednesday 18 th May 2016

Advice for Liverpool Football Club supporters, Europa League Final. Liverpool FC v Sevilla FC Wednesday 18 th May 2016 Advice for Liverpool Football Club supporters, Europa League Final. Liverpool FC v Sevilla FC Wednesday 18 th May 2016 Turnstiles Open 17:45 - Kick off 20:45 Liverpool Football Club appreciates the dedication

More information

BY-LAW NUMBER 284-94

BY-LAW NUMBER 284-94 BY-LAW NUMBER 284-94 A by-law to consolidate the by-laws that regulate traffic on roads under the jurisdiction of The Corporation of the City of Vaughan, and to repeal By-laws Numbered 281-90, 54-83, 299-86,

More information

MANCHESTER UNITED PLC SAFETY POLICY IN RESPECT OF SPECTATORS

MANCHESTER UNITED PLC SAFETY POLICY IN RESPECT OF SPECTATORS MANCHESTER UNITED PLC SAFETY POLICY IN RESPECT OF SPECTATORS 1 Manchester United PLC and in particular those employed by Manchester United Football Club with specific responsibilities for safety, undertake

More information

YOUR CHILD AND THE SCHOOL BUS

YOUR CHILD AND THE SCHOOL BUS Chelsea Public Schools Pupil Personnel / Special Education 99 Hawthorne Street Chelsea, MA 02150 Phone: 617.466.4465 Fax: 617.889.8328 YOUR CHILD AND THE SCHOOL BUS A Parent Guide for Door to Door Transportation

More information

Staff Car Park Management Policy

Staff Car Park Management Policy Staff Car Park Management Policy Contents 1.0 Staff Car Parking Management Policy 2.0 Permits 2.1. Staff Permits 2.2. Temporary Disabled Permits 2.3. Disabled Blue Badge Holders 2.4. Exceptional Circumstances

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2002 LIST OF DIAGRAMS AND HOW THEY DIFFER FROM THE TSRGD 1994 SCHEDULE 1 - WARNING SIGNS

THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2002 LIST OF DIAGRAMS AND HOW THEY DIFFER FROM THE TSRGD 1994 SCHEDULE 1 - WARNING SIGNS THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2002 LIST OF DIAGRAMS AND HOW THEY DIFFER FROM THE TSRGD 1994 SCHEDULE 1 - WARNING SIGNS General Most supplementary plates can now incorporate a distance

More information

Parking Services Enforcement Protocol. April 2015

Parking Services Enforcement Protocol. April 2015 Parking Services Enforcement Protocol April 2015 1 Parking Services Enforcement Protocol Table of contents 1. Introduction 2. Glossary of terms 3. Legislation 4. Training 5. Parking places 6. Issuing a

More information

REGATTA SAFETY ADVISER

REGATTA SAFETY ADVISER SAFETY PLAN 2015 This Safety Plan has been formulated to meet the Wallingford Regatta Organising Committee's responsibilities, taking account of advice from British Rowing, the Dorney Regatta Centre, the

More information

chapter 3 basic driving skills

chapter 3 basic driving skills chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow

More information

17 Traffic Management Plan

17 Traffic Management Plan 17 Traffic Management Plan Introduction The Traffic Management Plan has prepared for Glastonbury Festival Ltd by the Off Site Manager following a process of consultation and on going dialogue with the

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues

More information

Frequently Asked Questions (FAQs)

Frequently Asked Questions (FAQs) Frequently Asked Questions (FAQs) Why are we charging for parking? Due to the implementation of paid parking within the Parliamentary Triangle, the Department of Parliamentary Services (DPS) is implementing

More information

AGENDA ITEM: 15 PROPOSED ZEBRA CROSSINGS AT VARIOUS LOCATIONS. Executive Director of Development & Environment

AGENDA ITEM: 15 PROPOSED ZEBRA CROSSINGS AT VARIOUS LOCATIONS. Executive Director of Development & Environment Croydon Council REPORT TO: TRAFFIC MANAGEMENT ADVISORY COMMITTEE 21 July 2014 AGENDA ITEM: 15 SUBJECT: LEAD OFFICER: CABINET MEMBER: PROPOSED ZEBRA CROSSINGS AT VARIOUS LOCATIONS Executive Director of

More information

Repton Primary School. Traffic Management Plan

Repton Primary School. Traffic Management Plan Repton Primary School Traffic Management Plan Headteacher: Mrs H Wallis Signature: H Wallis Date: 26 th June 2015 Chair of Governors: Mrs L Eaton Signature: L Eaton Date: 26 th June 2015 8 th June 2015

More information

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD

More information

Non-profit fundraising events: alcohol, safety and event management A HELPFUL PLANNING GUIDE

Non-profit fundraising events: alcohol, safety and event management A HELPFUL PLANNING GUIDE Non-profit fundraising events: alcohol, safety and event management A joint initiative of the Office of Liquor and Gaming Regulation and Queensland Police Service. Great state. Great opportunity. Non-profit

More information

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers INSTRUCTOR S GUIDE Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers WHAT WE DO Operation Lifesaver is a nationwide, non-profit public information and education

More information

Site Traffic Management Plan

Site Traffic Management Plan Pathhead Primary School Cairns Street West Kirkcaldy Fife KY1 2JA Telephone: 01592 583450 Email: pathheadps.enquiries@fife.gov.uk Headteacher Julie M Anderson Site Traffic Management Plan December 2012

More information

Site Traffic Management Plan

Site Traffic Management Plan Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December

More information

HENLEY ROYAL REGATTA 2016

HENLEY ROYAL REGATTA 2016 HENLEY ROYAL REGATTA 2016 TRAFFIC RULES AND TRAINING TIMES For the Committee of Management Regatta Headquarters Henley-on-Thames Secretary Henley Royal Regatta 2 1. TRAFFIC RULES DURINGTRAINING. To Friday

More information

Traffic Management Plan

Traffic Management Plan China Civil Engineering Construction Corporation The Rarotonga Water Ring Mains Upgrade Project (Te Mato Vai) of the Cook Islands Traffic Management Plan Compilation: Chinese Civil Engineering Corporation

More information

Florida Class E Knowledge Exam Road Rules Practice Questions www.gdlinstitute.org

Florida Class E Knowledge Exam Road Rules Practice Questions www.gdlinstitute.org If you purchase the Value Package from GDL Institute, over 100 additional practice questions are included at no additional cost. Use discount code PQ10 and receive 10% off of the package price! 1. If you

More information

STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND. Committee CE-001 Parking Facilities DRAFT. Australian/New Zealand Standard

STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND. Committee CE-001 Parking Facilities DRAFT. Australian/New Zealand Standard Draft For Committee Purposes Only DRAFT FOR SUBMISSION TO ABCB CE/001/09-481A (Supersedes CE/001/05-406) Issued: February 2009 Project No: 5431 STANDARDS AUSTRALIA/STANDARDS NEW ZEALAND Committee CE-001

More information

Parking Regulations. Why?

Parking Regulations. Why? Parking Regulations Why? The aim is to make the Campus a safer place. Despite there being empty parking spaces available for use most days we still have a minority who regularly park inconsiderately and

More information

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London Chapter 13 Route Window C11 Isle of Dogs station ISLE OF DOGS STATION 13 Route Window C11 Isle of Dogs station Introduction 13.1 The Crossrail Line lies completely in tunnel through this section, just

More information

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool.

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9 Office: 519-829-8801 Cell: 519-362-5664 Email: info@guelphdrivingschool.com Dear Student, We would like to take this opportunity to thank you for choosing

More information

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts

Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal

More information

Department of Transport. Cycling Rules

Department of Transport. Cycling Rules Department of Transport Cycling Rules 2 Contents Definition of a bicycle Standard requirements Power-assisted pedal cycles Carrying or towing loads The rider, passenger and helmets Rules affecting cycling

More information

Staying alert A guide to passenger security

Staying alert A guide to passenger security Staying alert A guide to passenger security GO Safely GO Transit is one of the safest transit systems in North America. Still, we have to be prepared for unexpected incidents. Your safety and security

More information

STANDARD OPERATING PROCEDURES. Rapidly establish triage, treatment and transportation of multiple field casualties.

STANDARD OPERATING PROCEDURES. Rapidly establish triage, treatment and transportation of multiple field casualties. EMERGENCY MEDICAL SERVICE SOP #: Category: Mass Casualty Incidents Date: January 1, 2010 I. Purpose: STANDARD OPERATING PROCEDURES Rapidly establish triage, treatment and transportation of multiple field

More information

ACCESS STATEMENT FOR STADIUM TOUR AND MUSEUM, ARSENAL FOOTBALL CLUB

ACCESS STATEMENT FOR STADIUM TOUR AND MUSEUM, ARSENAL FOOTBALL CLUB Introduction Emirates Stadium, is located between Drayton Park and Hornsey Road in the borough of Highbury and Islington, North London and is situated approximately 3.8 miles from Central London. The Emirates

More information

Principles of Traffic Management on sites / road network

Principles of Traffic Management on sites / road network IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This

More information

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:

The partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety: Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,

More information

HÁ LIMITES PARA O CRESCIMENTO DO SETOR IMOBILIÁRIO? Jacques van Zijl Rea Vaya Project Manager

HÁ LIMITES PARA O CRESCIMENTO DO SETOR IMOBILIÁRIO? Jacques van Zijl Rea Vaya Project Manager HÁ LIMITES PARA O CRESCIMENTO Jacques van Zijl Rea Vaya Project Manager Johannesburg South Africa Johannesburg 3.8 million population Biggest City in South and Southern Africa Only City in South Africa

More information

TRAFFIC MANAGEMENT IN WORKPLACES

TRAFFIC MANAGEMENT IN WORKPLACES TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties

More information

NZ Transport Agency Safer journeys for schools: guidelines for school communities 2

NZ Transport Agency Safer journeys for schools: guidelines for school communities 2 NZ Transport Agency Safer journeys for schools: guidelines for school communities 2 Understanding school road safety 1. The purpose of these guidelines The safety of students travelling to and from school

More information

SCHOOL BUS TRANSPORTATION Frequently Asked Ques ons

SCHOOL BUS TRANSPORTATION Frequently Asked Ques ons SCHOOL BUS TRANSPORTATION Frequently Asked Ques ons Who is eligible for school bus transportation? School bus transportation is provided to students who live within the attendance area of the school in

More information

STANDARD OPERATING PROCEDURE FOR DEALING WITH ANY TERRORIST ATTACK ON SCHOOLS.

STANDARD OPERATING PROCEDURE FOR DEALING WITH ANY TERRORIST ATTACK ON SCHOOLS. STANDARD OPERATING PROCEDURE FOR DEALING WITH ANY TERRORIST ATTACK ON SCHOOLS. 1. Background: Experience gained in handing terrorism in recent years has shown that with a view to gain widespread media

More information

Traffic Volume Counts

Traffic Volume Counts Traffic Volume Counts Prepare 1. Communicate with other staff/departments 2. Review historical data trends 3. Review citizen input 4. Request traffic control Select Location 1. Select the proper location

More information

1 Introduction 6. 2 Current status and future development 6. 3 Glossary 7. 4 Standards and legislation 9

1 Introduction 6. 2 Current status and future development 6. 3 Glossary 7. 4 Standards and legislation 9 Contents 1 Introduction 6 2 Current status and future development 6 3 Glossary 7 4 Standards and legislation 9 4.1 Code of practice for temporary traffic management (COPTTM) 9 4.2 Local road supplement

More information

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS This chapter summarizes traffic signs, signals and road markings that control the flow of traffic, making streets and highways safer for motorists, bicyclists

More information

FULFORD HEATH GOLF CLUB - Ride on Buggy Policy

FULFORD HEATH GOLF CLUB - Ride on Buggy Policy FULFORD HEATH GOLF CLUB - Ride on Buggy Policy 1. Introduction 1.1 Use is regulated by Fulford Heath Golf Club s policy with due regard to section 6 of The Equality Act 2010 1.2 During normal conditions

More information

To Foreign Nationals Who Drive Vehicles in Japan (English Language Version) Chapter 1 Basic Information

To Foreign Nationals Who Drive Vehicles in Japan (English Language Version) Chapter 1 Basic Information 7,1, 2011 License Division Translated by National Police Agency To Foreign Nationals Who Drive Vehicles in Japan (English Language Version) Introduction This booklet is designed to help you understand

More information

Temporary Traffic Management

Temporary Traffic Management Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary

More information

CITY MEETS CENTRE. Be part of the Cardiff Exciting Hotel Development Opportunity

CITY MEETS CENTRE.  Be part of the Cardiff Exciting Hotel Development Opportunity Exciting otel Development Opportunity CITY MEETS CENTRE JR Smart are seeking to secure an internationally branded hotel on part of the site and will consider the sale of part of the site for hotel development

More information

Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990

Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990 Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full

More information

Signs, Pavement Markings, and Work Zones. Signs, Pavement Markings, and Work Zones

Signs, Pavement Markings, and Work Zones. Signs, Pavement Markings, and Work Zones Signs, Pavement 3 Signs, Pavement 77 3 Signs, Pavement This chapter includes information on highway signs that are intended to guide and inform you while you are driving. It includes information on the

More information

Bicycle riding is a great way to get into shape

Bicycle riding is a great way to get into shape Bicycle riding is a great way to get into shape and have fun. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of bicycle

More information

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic...

Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... Overview... Bus Options... Carpooling, Biking or Walking to School... Driving to Campus: The Loop... The Queue: Managing Lincoln Ave Traffic... 2 3 4 5 6 What is the Queue?... 7 How the Queue and Loop

More information

C Grade Licence Examination Written and Oral questions Study Master List

C Grade Licence Examination Written and Oral questions Study Master List C Grade Licence Examination Written and Oral questions Study Master List Prior to Examination: Candidates are encouraged to either view the live copy of the current Manual or obtain all amendments to the

More information

Group TRAFFIC MANAGEMENT SPECIALIST ACCESS WAY SOLUTIONS CREATIVE SOLUTIONS TO COMMON CHALLENGES. Products

Group TRAFFIC MANAGEMENT SPECIALIST ACCESS WAY SOLUTIONS CREATIVE SOLUTIONS TO COMMON CHALLENGES. Products Group Incorporating: Egmont Doors & totaldoors SPECIALIST ACCESS WAY SOLUTIONS TRAFFIC MANAGEMENT CREATIVE SOLUTIONS TO COMMON CHALLENGES 0800 807 753 trafficmanagement@ultigroup.co.nz www.ultigroup.co.nz

More information

WELCOME VISITING SUPPORTERS GUIDE

WELCOME VISITING SUPPORTERS GUIDE WELCOME VISITING SUPPORTERS GUIDE CONTENTS 03 WELCOME TO LEICESTER CITY FOOTBALL CLUB 04 HOW TO FIND US 05 CAR PARKING 06 CYCLE PARKING 07 AT KING POWER STADIUM 08 KING POWER STADIUM MAP 09 SUPPORTERS

More information

Hobsons Bay City Council Special Events Application

Hobsons Bay City Council Special Events Application Special Events Application EVENT NAME:-------------------------------------------------------- EVENT DATE:--------------------------------------------------------- EVENT MANAGER:--------------------------------------------------

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

SYDNEY ACCESSIBILITY INFORMATION SHEET

SYDNEY ACCESSIBILITY INFORMATION SHEET SYDNEY ACCESSIBILITY INFORMATION SHEET Upon presentation of a Companion Card at a Moshtix outlet, ticket purchasers are entitled to an additional ticket for their respective carer. The Companion Card must

More information

Greater Wellington Regional Parks Health and Safety Plan

Greater Wellington Regional Parks Health and Safety Plan Greater Wellington Regional Parks Health and Safety Plan Health and Safety template Health Safety in Employment Act 1992 The Health Safety in Employment Act 1992 requires that all employers develop emergency

More information

1. Rules for users of powered wheelchairs and powered mobility scooters

1. Rules for users of powered wheelchairs and powered mobility scooters Jersey Highway Code Introduction The Minister for Transport and Technical Services has issued directions for the guidance of road users, the Highway Code. The Highway Code for Jersey is the Official Highway

More information

TRANSPORT PLAN COMMUNICATION Mariah Carey CONCERT

TRANSPORT PLAN COMMUNICATION Mariah Carey CONCERT TRANSPORT PLAN COMMUNICATION Mariah Carey CONCERT Date: 2016-04-26 (Tuesday) Gates Open: 17:00 Supporting Act(s): 19:30 Main Act: 20:45 End: 23:00 Avoid peak hour traffic Use public transport Event ticket

More information

Economy, Transport and Environment Department. Traffic Management Policy & Guidance

Economy, Transport and Environment Department. Traffic Management Policy & Guidance Economy, Transport and Environment Department Traffic Management Policy & Guidance January 2014 Contents Part 1- Introduction to Traffic Management Traffic Management Strategy Legislation and the Legal

More information

SITE MANAGEMENT PLAN 2013

SITE MANAGEMENT PLAN 2013 1 SITE MANAGEMENT PLAN 2013 GROUNDS OF THE ROYAL HOSPITAL CHELSEA, LONDON SW3 RHS CHELSEA FLOWER SHOW January, 2013 2 1. RHS CHELSEA FLOWER SHOW: PROJECT & KEY FACTS Overview The RHS Chelsea Flower Show

More information

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions. Householder Application for Planning Permission for Works or Extension to a Dwelling and for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address

More information

Event Safety Management Plan - Template for Event Organisers

Event Safety Management Plan - Template for Event Organisers Event Safety Management Plan - Template for Event Organisers The following information has been put together to help you plan your event. It follows the structure of an Event Safety Management Plan so

More information

SECTION A OFFICIAL EVENTS

SECTION A OFFICIAL EVENTS 1 The Official Special Olympics Sports Rules for Football (Soccer) shall govern all Special Olympics competitions. As an international sports program, Special Olympics has created these rules based upon

More information

Travel Advice for Malmo FF. Tuesday 25 August 2015. Kick off 2045hrs (UK +1 hour) Gates Open 1hr30min before Kick Off.

Travel Advice for Malmo FF. Tuesday 25 August 2015. Kick off 2045hrs (UK +1 hour) Gates Open 1hr30min before Kick Off. Travel Advice for Malmo FF Tuesday 25 August 2015 Kick off 2045hrs (UK +1 hour) Gates Open 1hr30min before Kick Off About Malmo FF Malmo FF was founded in 1910 reaching Allsvenskan, the top Swedish division

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

THE PONY CLUB RISK ASSESSMENT CHECK LIST - SUMMER CAMP

THE PONY CLUB RISK ASSESSMENT CHECK LIST - SUMMER CAMP Start Date Finish Date Location Map Reference Access Road Dual Carriageway. Single Carriageway. Unclassified. Track. Warning signs. Post stewards. High visibility clothing. One way system. Police action.

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

May 2015. The Right Direction. The Mayor s Strategy for improving transport safety, security and reliability in London 2015-2017 Executive Summary

May 2015. The Right Direction. The Mayor s Strategy for improving transport safety, security and reliability in London 2015-2017 Executive Summary May 2015 The Right Direction The Mayor s Strategy for improving transport safety, security and reliability in London 2015-2017 Executive Summary Greater London Authority May 2015 Published by Greater London

More information

TRANSPORTATION ACORNS PROJECTS LIMITED. 124 High Street, Eton, Berkshire Proposed Retail and Residential Development Stage 1 Road Safety Audit

TRANSPORTATION ACORNS PROJECTS LIMITED. 124 High Street, Eton, Berkshire Proposed Retail and Residential Development Stage 1 Road Safety Audit ACORNS PROJECTS LIMITED TRANSPORTATION 124 High Street, Eton, Berkshire For ADL Transportation Limited Prepared by Acorns Projects Limited Safety Traffic Project Management & Highway Engineering Consultants

More information

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety. Document Name: Driving Skills Date Created: 8 October 2013 Date Reviewed: 4 February 2014 Date Approved: 29 July 2015 Purpose: To outline necessary driving skills required to maximize driving safety. Overview:

More information