BLACKPOOL BRIDGES MAINTENANCE PROGRAMME SCOPING DOCUMENT FOR PROPOSED GROWTH FUND BID TO LANCASHIRE ENTERPRISE PARTNERSHIP

Size: px
Start display at page:

Download "BLACKPOOL BRIDGES MAINTENANCE PROGRAMME SCOPING DOCUMENT FOR PROPOSED GROWTH FUND BID TO LANCASHIRE ENTERPRISE PARTNERSHIP"

Transcription

1 PROGRAMME SCOPING DOCUMENT FOR PROPOSED GROWTH FUND BID TO LANCASHIRE ENTERPRISE PARTNERSHIP PREPARED BY: Wilde Consultants Ltd DATE: December 2014

2 FOR GROWTH DEAL FUNDING BLACKPOOL BRIDGES MAINTENANCE PROGRAMME REPORT CONTROL SHEET Version Date Status A December 2014 Draft for comment Prepared By Checked Approved RFF SAT SAT

3 BLACKPOOL BOROUGH COUNCIL STRATEGIC OUTLINE BUSINESS CASE FOR BLACKPOOL BRIDGES MAINTENANCE GROWTH FUND BID TO LANCASHIRE ENTERPRISE PARTNERSHIP SCOPING DOCUMENT INTRODUCTION AND PRINCIPLES This paper sets out the proposed scope of the Strategic Outline Business Case (SOBC) for intervention for Lancashire Enterprise Partnership (LEP) Growth Deal funding for the maintenance of Blackpool s ten strategic bridges and highway structures. These bridges provide key transport links both into and within Blackpool and their continued use is essential for the social and economic wellbeing of the town. The SOBC will set out the preferred way forward for the bridges and will present evidence for decisions to be made. The anticipated Growth Deal funding for the first phase of work to Blackpool s priority bridges is 4.23m. The project is defined by DfT as a small project (i.e. < 5.0m). A proportionate approach is therefore proposed to be adopted in the preparation of this business case. This is particularly appropriate given that there are ten bridges and structures being considered within this business case. A full rigorous assessments of all ten projects would be disproportionate and a more appropriate approach is proposed. Given that the nature of the proposed work is capitalised bridge maintenance (i.e. like for like ), the predicted do something outcomes will have no effect on highway network capacity or economic, social and environmental wellbeing other than to maintain the status quo. A comparison therefore has to be made of the effects that the do minimum option would have when compared to the existing conditions. It is anticipated that, for some of the ten bridges, the do minimum option would result in traffic restrictions such as weight/width restrictions or closure of the bridge to vehicular traffic with consequential detrimental effects on highway network capacity, and economic, social and environmental wellbeing. It is proposed therefore to discuss the do minimum and do something options for each bridge in outline. Where practicable and achievable, the economic impact and value for money of the scheme will be assessed in accordance with the WebTAG guidance. However, given that traffic modelling is not available for the Blackpool BC area, traffic count data will be utilised within the TUBA assessment. It is proposed to utilise the programme level TUBA assessment work previously undertaken by Jacobs (modified where appropriate) as a basis for economic assessment. Undertaking more rigorous assessments would be considered as disproportionate, costly and time-consuming. The previous work will be updated with recent traffic count data, revised traffic diversion routes and latest cost estimates.

4 Principles for agreement in advance of detailed assessment are therefore as follows: TUBA assessments to be undertaken on do minimum cases only where this requires implementation of permanent weight/width restrictions or closure of the bridge to vehicular traffic. Programme level TUBA assessment work previously undertaken by Jacobs UK Ltd to be utilised as a proportionate approach measure. Prioritisation of individual projects to be based on both quantitative assessment (where undertaken) and qualitative information (e.g. programming of work by Network Rail). TUBA, TEE, AMCB and PA tables to be generated collectively where possible (e.g. for works to bridges on Seasider s Way). PROPOSED FORMAT OF THE SOBC FOR BLACKPOOL BRIDGES MAINTENANCE It is proposed to develop and submit the proposal using the Strategic Outline Business Case Template (May 2014) previously provided by LEP. The scope of the proposed business case is as follows:

5 ACTIVITY DESCRIPTION AND LEP GUIDANCE/NOMENCLATURE SCOPING COMMENT DESCRIBING PROPOSAL FOR FINAL SOBC DFT REFERENCES 1. STRATEGIC CASE: Strategic case to be prepared by BBC 2. ECONOMIC CASE: WebTAG 2.1 VfM Please describe to what extent the proposed scheme has been assessed in terms of value for money. Also explain how this will be developed through the Outline Business Case to provide accurate benefit-cost ratio information. Where applicable, please include details of all options that have been appraised. VfM should also include reference to the proposed scheme s economic, social, environmental and public accounts impact. (in line with the DfT s Transport Appraisal Framework) The Transport Appraisal Process Plymouth Road Bridge Squires Gate Lane Bridge Waterloo Road Bridge TUBA 1.9.3

6 2.1.4 Devonshire Road Railway Bridge Princess Street Bridge

7 2.1.6 Gas Works Subway Chapel Street Bridge Rigby Road Bridge

8 2.1.9 Watson Road Bridge Harrowside Bridge Discussion on programme prioritisation Final prioritised programme of bridge maintenance works TUBA, TEE, AMCB and PA tables to be generated where appropriate Appendix B Commentary on the following to be included in each of the above proposed projects:

9 Noise Air Quality and pollution Landscape and towncape Heritage and historical resource Biodiversity Water/environmental Physical activity Journey quality Accidents 2.2 Economic Assumptions Please describe any economic assumptions made or that will be made as part of future appraisal work and the development of the Outline Business Case. 2.3 Sensitivity and Risk Profile If applicable, please describe how changes in economic, environmental and social factors could affect the impact of the proposed scheme in terms of its benefit and costs. Standard approaches and assumptions as per webtag guidance, e.g.: 2010 base year 60 year return period Standard approaches and assumptions as per webtag guidance. Sensitivity testing against scheme cost (inflation, construction costs, professional fees etc.). webtag webtag 2.4 VfM Statement Using the Appraisal Summary Table (AST) (see section 2.5), please include a summary of the conclusions from the Summary of AST required.

10 Value for Money assessment. The statement should provide a concise summary of the proposed scheme s economic, environmental, social and public accounts impact. 2.5 Preliminary Appraisal Summary Table AST to be generated for each bridge. 3. FINANCIAL CASE: 3.1 Affordability Statement Please explain how the affordability of the proposed scheme has been assessed. Affordability Assessment Cost estimates by Wilde Consulting Engineers (WCE) based on current market rates with similar projects in NW. Cross check with SPONS etc. 3.2 Financial Costs Please provide details of the Whole Life Costs of the proposed scheme and a profile of the costs over the period shown. See Scheme Costs Guidance Profile required Whole Life Costs ( m) Year 2015/ / / /19 >2019 Profile 3.3 Financial Cost Allocation Please illustrate how the Whole Life Costs (WLC) will be allocated between the organisations involved in the delivery of the proposed scheme. Profile required Local Growth Fund (WLC m) Profile Private Sector (WLC m)

11 Also provide a cost profile of the costs allocated to each organisation over the period shown. Profile Profile Other Public Sector (WLC m) 3.4 Financial Risk Please provide details of any financial risks associated with the delivery of the proposed scheme. Explain how these have been assessed and quantified. Have funds been committed? Identify any known shortfall in funding and provide evidence of how this shortfall will be addressed. BBC contribution (Initial funding for inspections and assessments). Scheme delivery in strict priority order. Construction cost inflation. Unknown contingencies (mitigated through advance site investigation and materials testing) It is understood that the initial bid for funding Blackpool s Bridges Maintenance programme was for 4.23m and that this has been approved in principle by LEP subject to submission of a SOBC. Since the initial submission further inspection and in-situ materials testing has been undertaken and feasibility/options reporting commenced. At time of writing it is anticipated that the total cost of completing the bridge maintenance programme is approximately 8.5m (Total cost of schemes in table below is 8.5m). Affordability beyond 4.23m is still being considered by BBC. Further applications for grant funding from LEP/Dft are not ruled out. For the purposes of this SOBC, projects will be prioritised up to a value of 4.23m. Third party involvement from Network Rail. 3.5 Financial Risk Management Please provide details of any risk allowance or contingency built into the Whole Life Costs of the project. Explain the rationale for the level of Risks on whole life costs construction inflation, environmental constraints. Risk identification, mitigation and management. Risk registers.

12 risk/contingency allocated and how this will be managed. 3.6 Financial Accountability Please explain who will be responsible for managing the finances of the project. What arrangements are in place to ensure diligent financial management is in place? BBC corporate financial management. Audit, QA arrangements. CIPFA financial accounting and budgeting methodologies. 4. COMMERCIAL CASE 4.1 Commercial Viability Please outline the approach taken to assess commercial viability. Use of highly experienced civil engineering consultants involved in recent similar bridge projects in NW. Liaison with supplier market. Strategic objectives cost certainty, ECI to minimise risk and improve outturn certainty. 4.2 Procurement Strategy Please summarise potential procurement options available (e.g. partnership, framework, new competitive tender). Details of the intended procurement strategy and the rationale behind selecting it should be provided. Design consultant procurement (Trafford Framework) Contractors ECI, standard contracts and specs. Investigating ongoing as to the possible utilisation of an existing Contractor Framework from a neighbouring local authority. This would enable early contractor involvements and certainty of costs by using previously tendered framework rates.

13 4.3 Identification of Risks Please outline the main commercial risks associated with the scheme (e.g. at-risk funding (capital and revenue)) and what strategy is in place to monitor and review these risks. Political, management, statutory undertakers, land, TMA etc. Revenue and capital profiles. Stakeholder management plans Risk registers and management strategies 4.4 Risk Allocation Please describe how the risks identified in section 4.3 will be apportioned and shared to demonstrate that risks are allocated to the organisation / body best placed to manage them to ensure cost effective delivery. Risk register, monitoring, clear accountability, ECI and partnering. 4.5 Contract Management Please explain the contractual arrangements for delivering the proposed scheme. A high level overview of the implementation timescales should be included (append MS Project Programme, if preferred). Design consultants Trafford FW BBC to confirm contractor procurement requirements plus outline programme dates. 5. MANAGEMENT CASE 5.1 Governance Please describe the Project PRINCE 2 project governance project board to be defined.

14 Governance arrangements in relation to the Project Team; Project Sponsor/Project Manager; Project Board/Executive and their suitability to the role based on previous programmes of work. 5.2 Go/No-Go Milestones Please describe any outstanding Go/No-Go processes and Decision Milestones in relation to the progression of the proposed scheme. 5.3 Project Programme Please set out an indicative delivery programme, including key milestones. Any programme / project dependencies should be referenced. If applicable, please explain how the programme is aligned to relevant delivery strategies and plans. 5.4 Assurance and Approval Plans Please document any key assurance and approval milestones (including any independent assurance). 5.5 Communication and Stakeholder Management Please explain how key stakeholders will be engaged throughout the LEP funding, Cabinet approval, statutory undertakers, land acquisition. 5.3 Project Programme Management in accordance with BBC assurance frameworks. Stakeholder management plan. Communication plans. Initial liaison ongoing.

15 delivery of the scheme, including details of proposed consultation events. 5.6 Project/Programme Reporting Please describe the proposed reporting and approvals process. This must cover technical, financial, commercial and management elements. 5.7 Risk Management Strategy Please describe the scope of the Risk Management Strategy for the proposed scheme. Include details of the key risks including organisational accountabilities. 5.8 Monitoring and Evaluation Please summarise outline arrangements for monitoring and evaluating the performance of the proposed scheme. 5.9 Project Management Please summarise the overall approach for project management at this stage of the project. Appendix A Scheme Drawings Technical approval process via HA AIP process. BBC as TAA. Programme progress and financial reporting via Cabinet Member. Robust project and risk management strategies. Communication plan and stakeholder plan. PRINCE 2 Project Board. Cabinet Member. Stakeholders. Constructing Excellence KPIs inc. Client satisfaction, cost, time, H&S etc. Project and programme management by experienced PMs utilising MS Project. Reporting managed via communications and stakeholder strategies and plans. Appendix A Scheme Drawings

16 A4 copies of general arrangement drawings from PBI reports to be inserted. Appendix B webtag Tables and charts for TUBA Economic Appraisals Spreadsheets Results of TUBA Economic Appraisal, previously undertaken by Jacobs UK Ltd on behalf of LEP but adjusted for amended diversion routes. Additional tables, e.g. (Transport Economic Efficiency (TEE), Analysis of Monetised Costs and Benefits (AMCB) and Public Accounts Table (PAT). webtag Summary of Bridge Details and Proposals in Order of Strategic Network Priority Bridge Name and Brief Description Route Carried Route or Obstacle crossed Assessed Capacity Proposed Do Something Option Plymouth Road Bridge. Squires Gate Lane Bridge Waterloo Road Bridge Devonshire Road Railway Bridge A587 Plymouth A5230 Squires Gate Lane A5073 Waterloo Road Poulton to Blackpool North Railway Poulton to Blackpool North Railway Kirkham to Blackpool South Railway Disused Blackpool South to Central Station Railway B5124 Devonshire Road 40 Tonnes c way. Re-decking. 3 tonnes footways. 3.0m 40 tonnes Re-decking 1.25m 40 tonnes c way. Service bays 7.5 tonnes. Network Rail currently assess the bridge. Blackpool Council are currently reviewing the assessment with Network Rail. New VRS and parapet repairs, 200k Major maintenance works required 450k

17 Princess Street Bridge Gas Works Subway Chapel Street Bridge Rigby Road Bridge Watson Road Bridge (Owned by Network Rail) Harrowside Bridge Seasider s Way (unclassified) Seasider s Way (unclassified) Seasider s Way (unclassified) Seasider s Way (unclassified) Watson Road (unclassified) Harrowside West (unclassified) Princess Street No live load capacity. Re-decking 1.5m Footpath No live load capacity. Infilling 150k Chapel Street (unclassified) Rigby Road (unclassified) Kirkham to Blackpool South Railway Kirkham to Blackpool South Railway 40 tonnes Replace parapets and carry out concrete repairs 150k 40 tonnes Maintenance works 40 tonne C way 3 and 7.5 tonnes in footways 50k Replace parapets and new VRS 227k 40 tonnes Demolish and reconstruct. 1.3m (Inspection and assessment of the approach ramps currently being carried out. It his highly likely that the approach ramps will need to be replaced- cost currently unknown until the former completed)

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP

APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP COST BASE: Q4 2014/15 (Version A - 02/02/2015) CONTROL SHEET Version Date Status A February

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

Data Quality Policy. Appendix A. 1. Why do we need a Data Quality Policy?... 2. 2 Scope of this Policy... 2. 3 Principles of data quality...

Data Quality Policy. Appendix A. 1. Why do we need a Data Quality Policy?... 2. 2 Scope of this Policy... 2. 3 Principles of data quality... Data Quality Policy Appendix A Updated August 2011 Contents 1. Why do we need a Data Quality Policy?... 2 2 Scope of this Policy... 2 3 Principles of data quality... 3 4 Applying the policy... 4 5. Roles

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper december 08 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface The NSW Government is committed to the ongoing improvement of public services by ensuring

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Single Stage Light Business Case Template

Single Stage Light Business Case Template Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document

More information

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26 Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain

More information

Cost Management Guidelines for. 1 September 2010

Cost Management Guidelines for. 1 September 2010 Cost Management Guidelines for Public Transport Investment Projects 1 September 2010 Table of Contents Foreword iv 1. Introduction 1 1.1 Purpose Of The Guidelines 1 1.2 Applicability 1 1.2.1 Conventionally

More information

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead

Access Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead Access Fund for Sustainable Travel Guidance on Bidding Moving Britain Ahead July 2016 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

SMS0045 Construction Health and Safety Policy and Procedures

SMS0045 Construction Health and Safety Policy and Procedures SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY

DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1

More information

Business Continuity Policy. Version 1.0

Business Continuity Policy. Version 1.0 Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises

More information

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The

More information

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER AGENDA ITEM 8 TRANSPORT FOR LONDON BOARD SUBJECT: CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER DATE: 7 DECEMBER 2011 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this paper is to update

More information

LOCAL AUTHORITY MAJOR SCHEMES APPLICATION FOR FULL APPROVAL

LOCAL AUTHORITY MAJOR SCHEMES APPLICATION FOR FULL APPROVAL LOCAL AUTHORITY MAJOR SCHEMES APPLICATION FOR FULL APPROVAL Scheme Name Rail Growth Package Local Authority West Yorkshire Combined Authority (WYCA) STRATEGIC CASE 1.1 Has the Strategic Case for the scheme

More information

STAG Technical Database Section 13

STAG Technical Database Section 13 Risk and Uncertainty May 2014 Transport Scotland Once printed or downloaded this document is considered to be uncontrolled. For the current version refer to the Scot-TAG section of the Transport Scotland

More information

TENDER DOCUMENT PROCEDURE FOR MAJOR WORKS CONTRACTS USING AS 2124 1992 GENERAL CONDITIONS OF CONTRACT

TENDER DOCUMENT PROCEDURE FOR MAJOR WORKS CONTRACTS USING AS 2124 1992 GENERAL CONDITIONS OF CONTRACT TENDER DOCUMENT PROCEDURE FOR MAJOR WORKS CONTRACTS USING AS 2124 1992 GENERAL CONDITIONS OF CONTRACT MAIN ROADS Western Australia Tender Document Procedure Page 1 of 18 Document 07/4351 Issued 9/03/2011

More information

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE

INVESTING IN REFORM INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN STOCKPORT DRAFT BUSINESS CASE INVESTING IN REFORM IIS Programme/Project Name: Project Name: Portfolio: IIS Outcome: IIS Board SRO: IIS Project Lead: Public Realm and Solutions SK Communities

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com

More information

Project Management Framework

Project Management Framework Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project

More information

Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility Project Hub No.

Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility Project Hub No. /PROJECT INITIATION DOCUMENT 01202 458213 pmo@bournemouth.gov.uk (template version 0.20) Outline Business Case (OBC) Full Business Case (FBC) Project Initiation Document (PID) Strategic Waste Facility

More information

Service Delivery Plan 2007/8 Template 1. Delivery plan

Service Delivery Plan 2007/8 Template 1. Delivery plan Delivery plan Theme Leisure & Environment Clean and safe streets and public places with the Council maintaining and enforcing high standards of cleanliness throughout the borough. 1. Deliver a proactive

More information

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY PROJECT MANAGEMENT GUIDELINES FOR PROJECTS FUNDED BY THE NATIONAL TRANSPORT AUTHORITY (UP TO 20 MILLION IN VALUE) december 2011 Table of Contents Section A 1. Introduction 4 1.1 Purpose 4 1.2 Applicability

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance TRAFFORD COUNCIL Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance Report Title CAPITAL INVESTMENT PROGRAMME MONITORING

More information

Corporate Governance Service Business Plan 2011-2016. Modernising Services

Corporate Governance Service Business Plan 2011-2016. Modernising Services Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How

More information

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS

PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS HEAD OF WASTE STRATEGY AND CONTRACTS NORTH LONDON WASTE AUTHORITY Agenda Item No: REPORT TITLE: PROCUREMENT PROGRAMME PROCUREMENT OF CONSULTANTS REPORT OF: HEAD OF WASTE STRATEGY AND CONTRACTS FOR SUBMISSION TO: DATE: AUTHORITY MEETING 11

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 Contents Foreword... 1 Introduction... 3 Asset Management Framework... 6 Strategy for Main Asset Groups... 8 Data Management... 22 Best Practice

More information

Author: Mike Younghusband, Hertfordshire County Council

Author: Mike Younghusband, Hertfordshire County Council HERTFORDSHIRE LOCAL TRANSPORT BODY 4 th March 2014 TRANSPORT PROJECT GATEWAYS Author: Mike Younghusband, Hertfordshire County Council 1 Purpose of Report 1.1 To inform the LTB of Hertfordshire County Council

More information

Delivery Management Guidelines Delivery Process 2 - Project Management

Delivery Management Guidelines Delivery Process 2 - Project Management Delivery Management Guidelines Delivery Process 2 - Project Management Version control Version 9-1 Date 2010-10-18 Status Approved The IDMS Prov Infr Strat DP1: Portfolio Management DP1-1 Infrastructure

More information

QUALITY MANAGEMENT PLAN

QUALITY MANAGEMENT PLAN QUALITY MANAGEMENT PLAN Project Name EfW CHP Facility, North Yard, Devonport Project Number: C1005 Location: North Yard, Devonport Dockyard, Plymouth Approved by: Dated: Signed: KIER Project Manager Reviewed

More information

Internal Audit Report. Chief Executive s Unit. Review of Contract Management

Internal Audit Report. Chief Executive s Unit. Review of Contract Management Internal Audit Report Chief Executive s Unit Review of Contract Management February 2010 CONTENTS 1. BACKGROUND 1 Page 2. AUDIT SCOPE AND OBJECTIVES 1 3. AUDIT APPROACH 1 4. AMENDED PROCESS 2 5. SUMMARY

More information

A SUSTAINABLE. ANNEx 9: USEr S GUIDE To TEChNICAL FoLDErS

A SUSTAINABLE. ANNEx 9: USEr S GUIDE To TEChNICAL FoLDErS A SUSTAINABLE journey To work IN SoUTh yorkshire ANNEx 9: USEr S GUIDE To TEChNICAL FoLDErS CONTENTS 1. Introduction...2 1.1. The Annex Documents...2 1.2. This Document...2 2. Folder A -Walking and Cycling

More information

Section 1 Summary and Recommendations

Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 10 December 2015 Subject: Key Decision: Responsible Officer: Portfolio Holder: Exempt: Decision subject to Call-in: Wards affected: Homes for Harrow: Building homes

More information

6.0 Procurement procedure 1 Infrastructure

6.0 Procurement procedure 1 Infrastructure Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement

More information

Internal Audit Strategic and Annual Plans 2015/16

Internal Audit Strategic and Annual Plans 2015/16 Internal Audit Strategic and Annual Plans 2015/16 Financial Scrutiny and Audit Committee 10 February 2015 Agenda Item No 8 Summary: This report provides an overview of the stages followed prior to the

More information

EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET. 21 st April 2015. Social Care Case Management System

EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET. 21 st April 2015. Social Care Case Management System EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET 21 st April 2015 Social Care Case Management System Report of the Director for People STRATEGIC AIM: Creating a Safer Community

More information

PUBLIC SECTOR BUSINESS CASES USING THE FIVE CASE MODEL GREEN BOOK SUPPLEMENTARY GUIDANCE ON DELIVERING PUBLIC VALUE FROM SPENDING PROPOSALS

PUBLIC SECTOR BUSINESS CASES USING THE FIVE CASE MODEL GREEN BOOK SUPPLEMENTARY GUIDANCE ON DELIVERING PUBLIC VALUE FROM SPENDING PROPOSALS PUBLIC SECTOR BUSINESS CASES USING THE FIVE CASE MODEL GREEN BOOK SUPPLEMENTARY GUIDANCE ON DELIVERING PUBLIC VALUE FROM SPENDING PROPOSALS 2 BUSINESS CASE GUIDANCE Index Forewords Chapters 1. Introduction

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines 2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects

More information

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Water Mains Rehabilitation Framework (NI) Northern Ireland Water PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million

More information

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan Rotherham Metropolitan Borough Council Appendix A Street Lighting Sustainable Energy Action Plan October 2010 Streetpride Service Summary Modern street lighting provides many benefits to the community

More information

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton davep@logit.com.au Mobile

More information

connected excellence in all we do Turnaround Management

connected excellence in all we do Turnaround Management connected excellence in all we do Turnaround Management Turnaround Delivery Team Function and Responsibility Purpose of the function is to facilitate effective turnarounds by maximising work done during

More information

Residential Development Travel Plan

Residential Development Travel Plan Residential Development Travel Plan A Template for Developers Name of Development (Address) Name of Developer (Contact Details) Date of Travel Plan For office use: Planning reference.. /.. /.. Residential

More information

Oxford City Council Managing Capital Projects

Oxford City Council Managing Capital Projects www.pwc.co.uk Internal Audit Report 2014/2015 August 2015 Oxford City Council Managing Capital Projects Table of Contents 1. Executive Summary... 3 2. Background and scope... 5 3. Detailed findings...

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

General Dental Council Website Review: Dental Professionals Survey Invitation to Tender

General Dental Council Website Review: Dental Professionals Survey Invitation to Tender General Dental Council Website Review: Dental Professionals Survey Invitation to Tender Summary 1. The General Dental Council (GDC) invites tender proposals for a research project on the usability of the

More information

1. Background and business case

1. Background and business case 1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons

More information

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property

More information

SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead)

SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead) STRATEGIC RISK REPORT QUARTER 1 APRIL TO JUNE 2007 APPENDIX A SR0001 Maintaining Business Continuity including the Council s response to major civil emergencies. (Interim Programme Lead) Over 75% of business

More information

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT

London Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY

More information

Risk Management Procedure

Risk Management Procedure Purpose of this document Develop and document procedures and work instructions for Risk Management to cover the project Stages set out in the Project Process Map. The purpose of this procedure is to identify

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

The report summarises the outturn position for 2013/14 and the consequential impact on the Medium Term Financial Plan 2014/17.

The report summarises the outturn position for 2013/14 and the consequential impact on the Medium Term Financial Plan 2014/17. TRAFFORD BOROUGH COUNCIL Report to: Accounts & Audit Committee 26 June 2014 Executive - 28 July 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance Report

More information

KIRKLEES COUNCIL CABINET. Present: Councillor Sheard (in the Chair) Councillors Calvert, McBride, O'Neill, Pandor and C Scott

KIRKLEES COUNCIL CABINET. Present: Councillor Sheard (in the Chair) Councillors Calvert, McBride, O'Neill, Pandor and C Scott CAB 24 Contact Officer: Andrea Woodside - Tel. 01484 221000 KIRKLEES COUNCIL CABINET Tuesday 6 May 2014 Present: Councillor Sheard (in the Chair) Councillors Calvert, McBride, O'Neill, Pandor and C Scott

More information

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020 HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 05-00 STRATEGIC ROAD NETWORK 4,00 miles of motorways and major A roads A billion tonnes of freight transported each year 4 million people drive on the

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

Shared service centres

Shared service centres Report by the Comptroller and Auditor General Cabinet Office Shared service centres HC 16 SESSION 2016-17 20 MAY 2016 4 Key facts Shared service centres Key facts 90m estimated savings made to date by

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

Executive 29 October 2015

Executive 29 October 2015 Executive 29 October 2015 Report of the Assistant Director - Finance, Property & Procurement Portfolio of the Executive Member for Finance and Performance The Future of York s Guildhall & Riverside Summary

More information

Project Appraisal and Scrutiny Committee Recommendation. E-mail, file storage system and server upgrades

Project Appraisal and Scrutiny Committee Recommendation. E-mail, file storage system and server upgrades Cambridge City Council To: Report by: Scrutiny committee: Wards affected: Executive Councillor for Customer Services and Resources James Nightingale, Head of ICT Client Services Strategy and Resources

More information

South Norfolk Council Business Continuity Policy

South Norfolk Council Business Continuity Policy South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

Wiltshire Highways Asset Management Strategy

Wiltshire Highways Asset Management Strategy Wiltshire Highways Asset Management Strategy May 2015 1 Wiltshire Highways Asset Management Strategy Contents 1. Introduction 3 The Importance of Highway Infrastructure to Wiltshire 3 Contribution of Highways

More information

Appendix A - Executive Summary

Appendix A - Executive Summary Appendix A - Executive Summary With the termination of the non-recyclable (residual) waste disposal contract in March 2014, Cheshire East Council (CEC) commissioned AMEC Environment & Infrastructure UK

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Place Scrutiny Briefing AGENDA ITEM 13

Place Scrutiny Briefing AGENDA ITEM 13 Place Scrutiny Briefing AGENDA ITEM 13 Meeting date: 13.7.15 Heading: Joint Spatial Plan and Joint Transport Study - Update Ward: All Bristol wards Author: Sarah O Driscoll Ext. No: 36722 Officer presenting

More information

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012. RIBA Plan of Work 2013: Consultation document The RIBA is undertaking a comprehensive review of the RIBA Plan of Work. This document sets out the reasons and the rationale behind that review as well as

More information

PERFORMANCE DATA QUALITY POLICY

PERFORMANCE DATA QUALITY POLICY PERFORMANCE DATA QUALITY POLICY 2007 / 08 Improvement Service May 10 th 2007 Data Quality Policy V7 10.05.07 1 INTRODUCTION / BACKGROUND Good quality performance data is accurate, valid, reliable, timely,

More information

Strategy. Strategy for Lorry Parking Provision in England

Strategy. Strategy for Lorry Parking Provision in England Strategy Strategy for Lorry Parking Provision in England Contents 1 Introduction 1 2 Strategic Objectives 3 3 Action Plan 5 4 Action Plan Matrix 17 Disclaimer: While the Department for Transport (DfT)

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

London Underground Environment Strategy

London Underground Environment Strategy London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment

More information

Meeting the Decent Homes Standard

Meeting the Decent Homes Standard Meeting the Decent Homes Standard 1 What is the Council trying to achieve in relation to the Standard. Does the Council know the condition of their housing stock and their compliance with the decent homes

More information

NZ Transport Agency Page 1 of 23

NZ Transport Agency Page 1 of 23 NZ Transport Agency Page 1 of 23 Risk Management 1 Introduction The Highways and Network Operations (HNO) group supports the NZ Transport Agencies strategic objectives through the delivery of Capital Projects

More information

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac Guide TfNSW Configuration Management and Asset Assurance Committee Submissions Guide Important Warning This document is one of a set of standards developed solely and specifically for use on public transport

More information

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Action Note 14/15 27 August 2015 Issue 1. Raising skills levels within the UK workforce is key to delivering sustainable

More information

INTERIM ADVICE NOTE 185/15

INTERIM ADVICE NOTE 185/15 INTERIM ADVICE NOTE 185/15 Updated traffic, air quality and noise advice on the assessment of link speeds and generation of vehicle data into speed-bands for users of DMRB Volume 11, Section 3, Part 1

More information

Safety Excellence Matrix

Safety Excellence Matrix Safety Excellence Matrix 1 = Performance just meets minimum standards 2 = Performance is satisfactory got the basics 3 = Performance is good going beyond the norm 4 = Performance is very good best practice

More information

1 Photo courtesy of Bechtel Photo Library. HS2 Jobs Analysis. Leo Eyles. Albion Economics

1 Photo courtesy of Bechtel Photo Library. HS2 Jobs Analysis. Leo Eyles. Albion Economics 1 Photo courtesy of Bechtel Photo Library HS2 Jobs Analysis Leo Eyles June 2013 Chapter 1 Introduction Overview was asked by the Industry Leaders Group (ILG) established by Greengauge 21 (GG21) to undertake

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20.

Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20. Invitation to Quote for General Fund Assets Revaluation for Resource Accounting 2015/16-2019/20. Deadline for submission 12 Noon, Friday 18 th December 2015 Kettering Borough Council Municipal Offices

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Competence Criteria for Associate (ACIBSE)

Competence Criteria for Associate (ACIBSE) Competence Criteria for Associate (ACIBSE) FACTSHEET A21 The competence criteria for the Associate grade of CIBSE (ACIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,

More information

INSERT COMPANY LOGO/HEADER

INSERT COMPANY LOGO/HEADER LICENCE REFERENCE No. Insert licence reference number RISK ASSESSMENT METHODOLOGY STAGE & STEP Insert methodology stage and step, e.g. Stage 3 Step 1 REPORT VERSION Insert report version no., e.g. Draft,

More information

Capital Planning Guidelines

Capital Planning Guidelines Capital Planning Guidelines Contents Capital Planning Guidelines... 1 1. INTRODUCTION... 3 2. CAPITAL PROJECTS EVALUATION PROCESS... 3 3. APPRAISAL PROCESS UNDERTAKEN BY DEPARTMENTS... 4 3.1 Extension

More information