DOCUMENT SCOPE OF WORK Telecommunications and Data

Size: px
Start display at page:

Download "DOCUMENT 002413.09 - SCOPE OF WORK Telecommunications and Data"

Transcription

1 DOCUMENT SCOPE OF WORK Telecommunications and Data 1. GENERAL: 1. The following scope of work is intended to be general in nature. The purpose of this summary of work is not to identify or list every scope of work item already shown on the Contract Documents and described in the specifications. The purpose is to coordinate, clarify, modify, and/or expand the scope of the work as shown and described. The intention is to have the successful Subcontractor perform all the related work shown on the Contract Documents other than those items specifically indicated below to be excluded. Attention is called to the Instruction to Bidders, General Conditions, Special Conditions and the Site Specific Safety Program for additional information. The Summary of Work takes precedence over the drawings and specifications in the event of a conflict in trade assignment or responsibility. The base work of this Subcontract includes the listed scope of work plus allowances. The requirements herein shall not be limited to the scope of work shown on the drawings and described in the specifications. The Bidder shall include all costs necessary to provide all work to meet the supplemental requirements of this scope of work. 2. DOCUMENTS: 1. General Contract between Turner and the Owner dated February 25, 2014 including all attachments. 2. Plans and Specifications prepared by Schooley Caldwell Associates as shown in the Documents List, the Project Phasing Plan, Project Schedule, Project Logistics Plan and the Preliminary Project SWPPP. 3. The Bid Manual prepared by Turner Construction dated 2/xx/ This specific scope of work for the Columbus Public Library (CML) Main Library. References in this scope of work are specific to the CML Main Library. 5. The following specification sections are listed as the responsibility of the Subcontractor in defining its area of work on this project: Div. 00 Procurement and Contracting Requirements Div. 01 General Requirements Basic Communication Requirements Agreement and Waiver for use of Electronic Documents a Heapy Engineering Release Form Basic Communication Materials and Methods Firestopping Grounding and Bonding for Communication Systems Communication Pathways and Support Equipment Communication Copper Backbone Cabling Communication Optical Fiber Backbone Cabling Communication Copper Horizontal Cabling 6. The Subcontractor is also responsible for trade specifications not specifically listed above but required by reference in the listed specifications or as required to perform the scope of work described herein, as well as the Bidding Requirements, Contracting Requirements, and the use of the Construction Documents as a whole. 7. This is a phased project. Reference the Project Phase Plan to identify sequence, schedule and limits of work for each phase. It will be necessary to coordinate the work of this contract including multiple mobilizations with the Project Phase Plan and Project Logistics Plan. Costs associated with this plan are to be included in the base bid.

2 3. SCOPE OF WORK SPECIFICALLY INCLUDES: Columbus Metropolitan Library This Subcontractor shall provide all necessary supervision, engineering, coordination, submittals, quality control, freight, labor, labor premium and overtime, materials, accessories, tools and equipment necessary to perform the Telecommunications and Data work and all related work as shown or inferable from the Contract Documents. The following items are not intended to be an all-inclusive listing of the work required, but shall merely highlight and/or clarify specific items of this scope. The work shall include, but not be limited to, the following items: A. General & Miscellaneous 1. The owner will maintain security for the library, but not special watchmen for trade contractors property or operations or work. All trade contractors shall be solely responsible for any loss or damage to their property prior to installation. 2. The GR subcontractor will provide an onsite project material handler for use by all subcontractors. The purpose is of the project material handler is to provide an efficient means to manage materials and deliveries as the site will not accommodate multiple pieces of material handling equipment. Use of the material handler is at risk. Any damage to this subcontractors materials inadvertently caused by use of the project material handler is the responsibility of this subcontractor. 3. The electrical subcontractor will provide temporary electric power during construction for safety lighting and small tools. Each trade contractor shall provide, at their own expense, any other power or lighting required to complete their work. 4. The HVAC subcontractor will provide temporary cooling, heating and ventilation for the general work areas. This excludes specific cooling needs in the TR s and MER as may be necessary for the operation of telecommunications equipment prior to the permanent systems coming on line. Such temporary cooling is the responsibility of this subcontractor. B. Division 27 Telecommunications 1. Attention is called to the General Notes on Drawing Sheet T0.01. Note that the conduit pathways, pull boxes, raceways, cable trays, and outlet boxes are the responsibility of the Electrical subcontractor. This subcontractor will be responsible for interduct, cable management systems, rack systems and associated support systems, as well as co-oordination with the Electrical contractor for the requirements of this scope. 2. The scope of work for the project includes the relocation of the TR s and MER. It is this subcontractor s responsibility to research existing systems and develop a written plan to maintain communication systems and provide for the efficient transfer of those systems to the permanent TR s and MER as construction progresses. The plan must identify and include temporary communications cabling including any necessary fiber optic cabling designed to maintain telecommunications and data systems in the occupied areas of the building during construction per the project phase plans. This plan must also be coordinated with the requirements of specification section item The scope of work for the Selective Demolition Subcontractor specifically excludes the removal of any telecommunications equipment or cabling. This Telecommunications Subcontractor is to terminate all telecommunications cabling at the TR/MER and remove all cabling and telecommunications equipment. After the cabling and equipment have been removed by this subcontractor, the Selective Demolition Subcontractor will remove existing conduit pathways. 4. The existing Sprint communications system in the building is to be salvaged, packaged, crated and delivered to the Owner by this subcontractor. 5. Provide all scheduled new installations of telecommunications work as shown on the SCA 2/9/15 T drawings and related specifications for the CML Main Library.

3 6. Submits shop drawings of all New TR s and MER rooms with equipment dimensions and work space requirements shown. Include full descriptions of all necessary power requirements and locations for coordination with the Electrical Subcontractor. 7. Provide interim testing and commissioning of all systems that will serve the phase 2 occupied spaces. 4. SPECIAL INSTRUCTIONS: 1. The below topics and other special instructions appear in more detail in the Special Conditions document. The below is intended only to call special attention to these topics and is not intended to replace information found in Special Conditions. 1. Retainage Conditions shall be in accordance with section of the General Conditions and per the Ohio Revised Code Sections ,.13, and Cost-Loaded Schedule: Provide cost information associated with each schedule line item within this scope of work. Additionally, provide updated cost-loaded schedule information with each monthly application for payment. See the Special Conditions for more information. 3. OSHA 30 Hour Certification: Reference the document Safety Program for additional information. An OSHA 30 hour certified person must be on site 100% of the time. The OSHA 30hr certification must be within the past three years of the award of the subcontract. 4. Required Paperwork: Reference the document Safety Program for additional information. Various paperwork is required ranging from daily (ex: STAs and DCRs) to situational (ex: JHAs and other checklists). It is this Subcontractor s sole responsibility to complete all paperwork accurately and by the time required. 5. Ladders Last Policy: Reference the document Safety Program for additional information. Turner s Ladders Last Policy will be a requirement of the project. Subcontractor will be required to utilize other, safer means of accessing elevated work, and shall utilize ladders only as a last resort. 6. Lean Construction: Reference the Special Conditions for additional information, but particular attention shall be paid to the Nothing Hits the Floor requirements. 7. Builders Risk Insurance: The owner will carry Builder s Risk insurance and the Subcontractor will be covered as noted in the contract Turner has with the Owner. Reference Article 11 of the agreement. Deductible to be covered by the Subcontractor as noted in Article Pollution Liability Insurance: This Subcontractor is responsible to carry Pollution Liability Insurance policy covering $5,000,000 per occurrence and $10,000,000 aggregate. 5. THE SCOPE OF WORK SPECIFICALLY EXCLUDES: 1. Power requirements for telecommunications equipment in the TR s and MER. 2. Conduit pathways, pull boxes, raceways, cable trays, and outlet boxes. 3. Hazardous material abatement, except following OSHA protocol for notification and material handling. 6. ALTERNATES: 1. The following Alternate(s) may be accepted by Turner Construction Company, at its sole discretion, and incorporated herein as part of the Scope of Work for the respective price. Inasmuch as these Alternates were anticipated from the inception of the project and were priced accordingly, all overhead, profit and escalation has been included within the lump sum amount and the price shall remain firm throughout the duration of the project, unless specifically noted herein.

4 Number Description Refer to for details 1 Balcony and Decorative Metal Railing 2 Existing Elevator Cab Finish Upgrades 3 Site Work West Terrace Modifications 4 Site Work East Terrace Modifications 5 Replace all Existing Ceilings in Public Areas 6 Grease Interceptor 7 Deduct Study Room Fit-out 8 Removal and Replacement of Concrete Sidewalk 9 Building East Elevation Interior Shades 10 Re-Aligning of Stone Piers 11 Upgrade Public Address System 12 LED Lighting Fixtures Decision Date Add/ Deduct Amount: 7. ALLOWANCES: 1. The Contract Sum shall be the addition of a base bid amount plus allowances. The value of the allowance shall be determined by multiplying the allowance quantity times a unit price. The unit price quoted on the Form of Proposal will be used to adjust the allowance and contract value up or down based on the authorized net actual quantity. The Subcontractor s cost for all overhead and profit shall be included in the base bid amount and not in the allowance portion of the Contract Sum. There will be no modifications to the unit price for overhead and profit for adjustments to the allowance quantity, up or down. It is expressly understood and agreed that all additional work will be completed within the original schedule. The Subcontractor shall be responsible to bring additional equipment to the project as necessary to meet the original schedule. The unit cost shall include all labor, material and equipment costs associated with overtime, second shift work, weekend work, etc. as required to maintain the original schedule. Number Description: Unit: $/Unit: 1 Labor 400 Hrs. 2 Materials $10, UNIT PRICES: 1. The following Unit Prices may be used by Turner Construction Company to calculate the value of changes in scope and/or to adjust allowances. Inasmuch as these Unit Prices were anticipated from the inception of the project and were priced accordingly, all overhead, profit and escalation has been included within the lump sum amount and the price shall remain firm throughout the duration of the project, unless specifically noted herein. Number Description: Unit: $/Unit: 1 9. LABOR RATES & EQUIPMENT RATES: 1. The following Labor Rates & Equipment Rates may be used by Turner Construction Company to calculate the value of changes in scope and/or to adjust allowances. Inasmuch as these Labor or Equipment Rates were anticipated from the inception of the project and were priced accordingly, all escalation has been included within the rate and the rate shall remain firm throughout the duration of the project, unless specifically noted herein. The labor rates include all wages, fringes,

5 taxes, and insurance. Overhead and profit will be added to the labor components of any changes according to the formula for changes. 2. See separate labor rate matrix Wage Rates Form; Subcontractor should plan to have the labor rates form completed by the scope review meeting (after bids are received and before the contract is awarded). 3. Subcontractor will need to provide an equipment rates sheet on subcontractor s own form to be completed by the scope review meeting (after bids are received and before the contract is awarded). 10. PAYMENT AND PERFORMANCE BOND: 1. If a Payment and Performance Bond is required by this contract, Subcontractor and its surety hereby agree to execute and deliver to Turner in connection with the issuance of Change Orders under this contract, Rider A amendments increasing the amount (penal sum) of the performance and payment bonds when Subcontractor is requested by Turner to do so. The reasonable premiums or other charges paid by Subcontractor for the procurement of the Rider A amendment requested by Turner will be paid as a part of the Change Order. 2. Not required. 11. SCHEDULE 1. The Project Schedule is included in this bid package as a means of conveying timelines of major activities and milestone dates. Through submission of a bid, this Subcontractor acknowledges and accepts the Project Schedule as included in this bid package, and assumes responsibility for accomplishing the work within the time frames required per the Project Schedule. 2. The Project Construction Start is. The Project Completion Date is June 1, The Project Schedule will be issued by Addendum. 3. Refer to Article III of the Supplemental Terms & Conditions, Planning & Scheduling, for participation and cooperation required of this contractor in development and adjustment of the co-ordinated project schedule. END

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS 1. Cost Certification Guidelines PAGE I General 1 II Identity of Interest

More information

Exhibit 1 to Part 3 Project-Specific Terms

Exhibit 1 to Part 3 Project-Specific Terms Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: July 2013) This Exhibit 1 to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains

More information

All other provisions of the contract documents, plans and specifications shall remain unchanged.

All other provisions of the contract documents, plans and specifications shall remain unchanged. B. Supplementary Conditions a. Reference Page CS-5, Section 11.0 Insurance, Section C3.3-11 Insurance Item c.7: Delete paragraph and replace with the following: Environmental Impairment Liability Coverage

More information

Exhibit 1 to Part 3 Project-Specific Terms

Exhibit 1 to Part 3 Project-Specific Terms Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: May 2014) Part 3 (2013 Lump Sum Agreement Between Department and Design-Builder), Part 4 (2013 General Conditions of Contract

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY STAFF REPORT FOR CALENDAR ITEM NO.: 14 FOR THE MEETING OF: November 13, 2014 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Amending Contract No. 08-04-CMGC-000, authorizing Webcor/Obayashi Joint Venture

More information

ARTICLE 11. INSURANCE AND BONDS

ARTICLE 11. INSURANCE AND BONDS Provide submittals to Architect / Engineer that are required by any governing body or other authorities. Upon receipt of the Contractor s list, the Architect will make an inspection to determine whether

More information

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

a. Proposals shall be submitted in a sealed envelope and addressed as follows: 1 CITY OF ATCHISON REQUEST FOR QUALIFICATIONS & PROPOSAL HVAC SERVICES JANUARY 1, 2014 THROUGH DECEMBER 31, 2014 DUE: DECEMBER 10, 2013 10:00 A.M. The City of Atchison (City) invites interested and qualified

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This

More information

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software. DESCRIPTION: '108-01, Start and Progress of Work, is hereby amended to require that the Contractor furnish and participate in a computerized CPM (critical path method) network scheduling system. The purpose

More information

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK MD ANDERSON AGREEMENT No. This Agreement is made as of, 20xx (the Effective Date ), by and between The Owner: M D Anderson Cancer Center c/o Sourcing

More information

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No.

REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. FY15-805-67 Manchester-Boston Regional Airport is soliciting Proposals from qualified

More information

CSC-DIVISION 1-MASTER SECTIONS Description

CSC-DIVISION 1-MASTER SECTIONS Description CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant

More information

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015 Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,

More information

2301.1 Scope: Communications and Electronic Systems addressed in this section include:

2301.1 Scope: Communications and Electronic Systems addressed in this section include: Chapter 23 COMMUNICATIONS / ELECTRONIC SYSTEMS SECTION 2301 - GENERAL 2301.1 Scope: Communications and Electronic Systems addressed in this section include: 1. Fire Alarm System 2. Telecommunication and

More information

CHAPTER 5. ALLOWABLE COSTS TO BE REPORTED ON FORM HUD-92330-A

CHAPTER 5. ALLOWABLE COSTS TO BE REPORTED ON FORM HUD-92330-A CHAPTER 5. ALLOWABLE COSTS TO BE REPORTED ON FORM HUD-92330-A 5-1. DATE TO WHICH FORM HUD-92330-A IS COMPUTED. Form HUD-92330-A is completed to reflect the general contractor's cost of construction as

More information

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum Document A101 2007 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

Questions, Item number referenced in the RFP, and HACG s responses follow:

Questions, Item number referenced in the RFP, and HACG s responses follow: 5 February 2016 Response to Questions regarding Construction Management Services RFP for The Housing Authority of Columbus, GA, (HACG) RAD1 Limited Scope Rehabilitation dated 1/20/2016 Questions, Item

More information

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:

The Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract: The Role of Construction Managers FIDIC offers two contributions on the question of the role of a construction manager in a construction contract: A. Notes on the use of FIDIC in the Middle East B. A Communication

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS TEMPO PARK IMPROVEMENTS PROJECT # 2012-3-4202-86 1.01 SCOPE OF WORK DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS The Contractor shall perform, furnish and complete the following

More information

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for DRAFT CONSTRUCTION MANAGER-AT-RISK AGREEMENT between Houston Independent School District and [insert legal name of firm] for [insert name of school or project] CONSTRUCTION MANAGER-AT-RISK AGREEMENT TABLE

More information

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM DC STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM Document No. 525 Second Edition, 2010 Design-Build Institute of America Washington, Design-Build Institute of America - Contract

More information

INVITATION TO BID. Contractor Services Associated with:

INVITATION TO BID. Contractor Services Associated with: INVITATION TO BID Contractor Services Associated with: COMMUNITY CENTER AT 330 WINDSOR AVENUE ROOF REPAIR AND RESTORATION PROJECT 330 WINDSOR AVENUE WINDSOR, CT 06095 THIS IS A REQUEST FOR PROPOSALS AND

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C22 or B, with ASB & HAZ Certification Bid

More information

NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law

NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law Page 1 NEW JERSEY ADMINISTRATIVE CODE Copyright 2015 by the New Jersey Office of Administrative Law *** This file includes all Regulations adopted and published through the *** *** New Jersey Register,

More information

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS SECOND ADDENDUM TO RFP DOCUMENTS REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS 11/9/2015 To All Potential Bidders: This

More information

Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern:

Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern: Norsouth Construction Company of Georgia, Inc. Bid Information and Requirements To Whom it May Concern: Norsouth Construction Company of Georgia, Inc. is dedicated to the highest standards of integrity

More information

CONTRACT DATA SHEET TELEPHONE/DATA INSTALLATION & REPAIR CONTRACT #: 1015-14 CONTRACT DATES: 12/16/14-11/30/15

CONTRACT DATA SHEET TELEPHONE/DATA INSTALLATION & REPAIR CONTRACT #: 1015-14 CONTRACT DATES: 12/16/14-11/30/15 CONTRACT DATA SHEET Monroe County Division of Purchasing 200 County Office Building, Rochester NY 14614 TITLE: TELEPHONE/DATA INSTALLATION & REPAIR CONTRACT #: 1015-14 CONTRACT DATES: 12/16/14-11/30/15

More information

CSTM 102 Spring 2013. Construction Documents to Contract Documents

CSTM 102 Spring 2013. Construction Documents to Contract Documents CSTM 102 Spring 2013 Construction Documents to Contract Documents The Construction Industry THE PROJECT TEAM A Project and a Client A Designer Constructors THE GAME PLAN Risk Management Scope of Work The

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

THIS AGREEMENT is made effective as of this day of in the year of.

THIS AGREEMENT is made effective as of this day of in the year of. STANDARD FORM OF CONSTRUCTION MANAGEMENT AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER (Where the basis of payment is Cost of the Work with a guaranteed maximum price) THIS AGREEMENT is made effective

More information

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices [Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1

More information

HEANEY General Contracting, Inc.

HEANEY General Contracting, Inc. HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO. 16-019-665 ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and

More information

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered

More information

ADMINISTRATIVE PROCEDURES

ADMINISTRATIVE PROCEDURES ADMINISTRATIVE PROCEDURES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS HARRISBURG, PENNSYLVANIA MAY 2014 EDITION DEPARTMENT OF GENERAL SERVICES BUREAU OF CONSTRUCTION ADMINISTRATIVE PROCEDURES TABLE OF CONTENTS

More information

GENERAL INFORMATION. REQUIRED SERVICES: are described in the enclosure consisting of 4 pages, dated 3/29/12 OR: are described as follows:

GENERAL INFORMATION. REQUIRED SERVICES: are described in the enclosure consisting of 4 pages, dated 3/29/12 OR: are described as follows: These documents consist of three parts (Part A - Request for Proposals; Part B - Proposal Form; Part C - Contract Award, Notice to Proceed & Invoice Summary), -- plus the current edition dated February

More information

HOW TO ESTIMATE THE COST OF A COMMERCIAL FIRE ALARM SYSTEM

HOW TO ESTIMATE THE COST OF A COMMERCIAL FIRE ALARM SYSTEM HOW TO ESTIMATE THE COST OF A COMMERCIAL FIRE ALARM SYSTEM By Robert Tranford DATE WRITTEN: MAY 25, 2004 The author is Robert Tranford. He obtained an Electrical Masters in 1981. He then founded and served

More information

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP 08-09-DOTPL-004

NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP 08-09-DOTPL-004 NOTICE OF REQUEST FOR PROPOSALS (RFP) RFP 08-09-DOTPL-004 ADDENDUM 1 Wide & Metropolitan Area Network Re- Design, Installation, and Configuration Consultant Services September 25, 2009 ADDENDUM 1 RFP 08-09-DOTPL-004

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

ADDENDUM No. 3 May 25, 2016

ADDENDUM No. 3 May 25, 2016 ADDENDUM No. 3 May 25, 2016 GREENWICH PUBLIC SHCOOLS 1 WESTERN JR. HIGHWAY, OPENING DATE: JUNE 2, 2016 OPENING TIME: 9:00AM BID NUMBER: 2076-16 The following ADDENDUM is issued to clarify items appearing

More information

Pricing of Construction Contract Change Order Documentation

Pricing of Construction Contract Change Order Documentation The contract language contained in this Exhibit will supplement and take precedence over all other change order pricing contract provisions in the Contract Documents provided by the Owner, Design-Builder

More information

Section 00 73 16 2014-02-06 Insurance Conditions

Section 00 73 16 2014-02-06 Insurance Conditions Section Cover Page Section 00 73 16 2014-02-06 Use this Section to specify for construction contracts when Section 00 72 00 - General Conditions of Contract is used. Use this Section as is; do not modify

More information

Schedule of Prices. Project Name Contract No. Contract Number

Schedule of Prices. Project Name Contract No. Contract Number Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule

More information

Delaware Community Schools

Delaware Community Schools REQUEST FOR PROPOSALS GUARANTEED ENERGY SAVINGS and Facility Improvement Program November 4, 2009 Table of Contents I. Request For Proposal... 3 II. Time Line... 4 III. Proposal Content and Format... 5

More information

DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle

DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) 1.1 PROJECT INFORMATION A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle B. Owner: Brownsville Housing Finance Corporation.

More information

College of the Siskiyous Insurance Requirements

College of the Siskiyous Insurance Requirements College of the Siskiyous Insurance Requirements Minimum Insurance Coverages for 2016 Pre-Qualification Contractor Insurance. The Contractor shall obtain and maintain the following insurance coverages with

More information

CONSTRUCTION CONTRACT TERMINOLOGY

CONSTRUCTION CONTRACT TERMINOLOGY PAGE 1 ALLOWANCE - in bidding, an amount budgeted for an item for which no exact dollar amount if available; a contingency for unforeseen costs; the classification of connected parts or members according

More information

SECTION 01 32 00 - PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS

SECTION 01 32 00 - PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS SECTION 01 32 00 - PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS A. The term Baseline Schedule, as used throughout the contract documents, shall refer to a fixed projection of the project

More information

Core & Shell Construction. Rules and Regulations

Core & Shell Construction. Rules and Regulations Core & Shell Construction Rules and Regulations 1. Protection: During the construction Contractor shall endeavor to protect all areas of work from damage caused by workers, weather or equipment. 2. Permits

More information

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT 04-2016 CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT This Construction Management-at-Risk Agreement ( Agreement ), by and between the Lone Star College, hereinafter referred to as LSC or Owner, and, hereinafter

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

The West Lafayette Engineering Department is requesting quotes for sidewalk repairs needed in the Barbarry Subdivision.

The West Lafayette Engineering Department is requesting quotes for sidewalk repairs needed in the Barbarry Subdivision. May 19th, 2016 RE: REQUEST FOR QUOTES 2016 Sidewalk Replacement The West Lafayette Engineering Department is requesting quotes for sidewalk repairs needed in the Barbarry Subdivision. The enclosed Quote

More information

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS I. GENERAL A. All work to be performed under the change order must be itemized, including the work of all subcontractors. B. Items must be relevant

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

City of Michigan City Housing Rehabilitation Program RFP Page 1 of 5

City of Michigan City Housing Rehabilitation Program RFP Page 1 of 5 CITY OF MICHIGAN CITY REDEVELOPMENT COMMISSION COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) HOUSING REHABILITATION PROGRAM REQUEST FOR PROPOSAL (RFP) 100 East Michigan Boulevard Michigan City, IN 46360 The

More information

T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes

T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes The graduate has reliably demonstrated the ability to 1. analyze a client's needs

More information

Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06

Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06 SECTION 01310 CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. Construction Progress Schedule: The CONTRACTOR shall submit a detailed work progress schedule showing all work in a graphic format suitable

More information

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments. OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager

More information

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR DB-BIM Contract No. 5890 07/14 Project No. 02-3210 AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR 1 DB-BIM Contract

More information

Reference Guide for Obtaining Permits and Utility Services For New Construction

Reference Guide for Obtaining Permits and Utility Services For New Construction Reference Guide for Obtaining Permits and Utility Services For New Construction (Revised 04-2012) Table of Contents City Offices Telephone Numbers...1 Application for Utilities...2 Building Permits New

More information

Aitkin County Land Department ------------------------------------------------------------------ 209 2 nd St. NW Room 206 Aitkin, MN 56431

Aitkin County Land Department ------------------------------------------------------------------ 209 2 nd St. NW Room 206 Aitkin, MN 56431 Aitkin County Land Department ------------------------------------------------------------------ 209 2 nd St. NW Room 206 Aitkin, MN 56431 218-927-7364 December 28, 2015 Request for Quotes Aitkin Campground

More information

SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION SECTION 013200a - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 Related Documents A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS The Competitive Solicitation Acknowledgement Form must be completely filled in. This may be done on line then printed or you may

More information

Bid/Contract Insurance Requirements (Insurance Manual)

Bid/Contract Insurance Requirements (Insurance Manual) The Regents of the University of California University Controlled Insurance Program (UCIP) Bid/Contract Insurance Requirements (Insurance Manual) for the [CAMPUS] [PROJECT] Construction Project Need a

More information

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4 How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work Table of Contents Section 1 Introduction page 3 Section 2 Types of Methods of Measurements page 4 Section 3 Project Specific

More information

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA Ivy Tech Community College of Indiana, hereinafter referred to as the Owner, furnishes the following information and special instructions to prospective Bidders desiring to submit Bids for the Work on

More information

MDB Harmonised Particular Conditions

MDB Harmonised Particular Conditions FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year 2014 (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

CONSTRUCTION MANAGER BOND AGREEMENT

CONSTRUCTION MANAGER BOND AGREEMENT CONSTRUCTION MANAGER BOND AGREEMENT This Supplemental Agreement dated as of April 29, 2014 between Pepper Construction Company ( Construction Manager ) and Northbrook Public Library ( Owner ) regarding

More information

DEMO Version. Owner and Contractor OCNMP103

DEMO Version. Owner and Contractor OCNMP103 Page 1 of 12 AGREEMENT made as of the in the year of (In words, indicate day, month and year) day of BETWEEN the Owner: (Name, address and other information) DEMO Version and the Contractor: (Name, address

More information

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

Checklist 26: How Owners Can Avoid Litigation on Construction Projects Checklist 26: How Owners Can Avoid Litigation on Construction Projects While it is impossible to completely avoid litigation on construction projects, certain steps can be taken to minimize the potential

More information

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1 REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Project Name: Continuing Services Construction Manager: April 2016 Edition AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER This Agreement Between Owner

More information

STANDARD CONTRACT EXECUTION FORMS

STANDARD CONTRACT EXECUTION FORMS THE BIDDING AND CONTRACT PROVISIONS Document Section 00 50 00 - Standard Contract Execution Forms (Standard Contract Set) STANDARD CONTRACT EXECUTION FORMS 1. EXECUTION OF THE AGREEMENT 1.1 Extraneous

More information

PUBLIC NOTICE Bid for Plumbing Repair- Service CITY OF WEST DES MOINES DEPARTMENT OF PUBLIC WORKS

PUBLIC NOTICE Bid for Plumbing Repair- Service CITY OF WEST DES MOINES DEPARTMENT OF PUBLIC WORKS PUBLIC NOTICE Bid for Plumbing Repair- Service CITY OF WEST DES MOINES DEPARTMENT OF PUBLIC WORKS Sealed bids will be received by the City of West Des Moines, Iowa on or before 2:00 p.m., Central Time,

More information

Fire Damage Repairs, 2510 Burton Street

Fire Damage Repairs, 2510 Burton Street Fire Damage Repairs, 2510 Burton Street Introduction: The Housing Authority of the County of San Joaquin (Authority) is seeking quotes from Class B General Building Contractors (Contractor) to provide

More information

SUCF PROJECT COST REPORTING GUIDE

SUCF PROJECT COST REPORTING GUIDE SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable

More information

How To Build A Data Backup System In Town Of Trumbull

How To Build A Data Backup System In Town Of Trumbull TOWN OF TRUMBULL, CONNECTICUT GENERAL INSTRUCTIONS TO BIDDERS The Town of Trumbull, Connecticut (hereinafter referred to as Town), through the Office of the Purchasing Agent, will accept sealed bids from

More information

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES PROGRAM REQUIREMENTS The District will provide funds to building owners who have or may experience sanitary sewer backups during periods of heavy rainfall for the installation of overhead sewers or backflow

More information

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS

ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ON-TIME AND ON-BUDGET: KEY ISSUES IN NEGOTIATING CONSTRUCTION CONTRACTS ACC REAL ESTATE COMMITTEE PRESENTATION SEPTEMBER 17, 2009 SEAN T. BOULGER, ESQ. WILMER CUTLER PICKERING HALE AND DORR LLP I. Introduction

More information

OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS

OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for the administration of construction

More information

388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email aromaswd@aol.com ADDENDUM NO. 1

388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email aromaswd@aol.com ADDENDUM NO. 1 388 Blohm Ave. PO Box 388 Aromas CA 95004-0388 (831)726-3155 FAX (831)726-3951 email aromaswd@aol.com May 6, 2015 To: All Plan Holders From: Vicki Morris General Manager Subject: Water Serviceline Installation

More information

RURAL UTILITIES SERVICE

RURAL UTILITIES SERVICE Rural Development United States Department of Agriculture RURAL UTILITIES SERVICE RUS Bulletin 1738-2 Rural Broadband Access Loan and Loan Guarantee Advance and Construction Procedures Guide Page 1 According

More information

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7.

6. Q: A: No, however it is anticipated that the PM firm will need to understand FEMA and HUD CDBG compliance as part of the scope of services. 7. HHC Program Manager Request for Proposals (RFP) for Consulting Services Project # 6161 Questions & Answers Date: October 1, 2015 1. Q: In CR#2017007 would schedule outsourcing be considered as an appropriate

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas Request For Proposal Furnish Schneider Business Park Signs Design Build Services For the Cibolo Economic Development Corporation Cibolo, Texas The City of Cibolo, Texas Economic Development Corporation

More information

GUIDANCE AND MODEL LANGUAGE

GUIDANCE AND MODEL LANGUAGE Document A503 2007 Guide for Supplementary Conditions INTRODUCTION Purpose of This Guide Arrangement of This Guide How to Use This Guide Choice of Location for Contract Provisions Modifications to the

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS Bids will be received at the office of the Niles City School District, 100 West Avenue, Niles, Ohio, 44446 until 12:00 PM on Friday, March 22, 2013 and will be opened and read immediately

More information

WASHINGTON SUBURBAN SANITARY COMMISSION

WASHINGTON SUBURBAN SANITARY COMMISSION APPENDI B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. 1. INSURANCE REQUIREMENTS A. INSURANCE: The Contractor shall be required to maintain insurance for

More information

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll

Certified Payrolls Certified Payrolls Submittal Requirements Notice of Delinquent Certified Payroll Certified Payrolls Certified Payrolls Weekly certified payrolls covering the s and sub s workforce shall be submitted to the engineer on all MDOT-let contracts. Certified payrolls are required for all

More information

CUESTA COLLEGE SAN LUIS OBISPO COMMUNITY COLLEGE DISTRICT

CUESTA COLLEGE SAN LUIS OBISPO COMMUNITY COLLEGE DISTRICT CUESTA COLLEGE SAN LUIS OBISPO COMMUNITY COLLEGE DISTRICT SERVING CUESTA COLLEGE/ NORTH COUNTY CAMPUS/ SOUTH COUNTY CAMPUS REQUEST FOR PROPOSAL Technology Consulting Services San Luis Obispo Community

More information

How To Bid On A Building Project In San Jose

How To Bid On A Building Project In San Jose NOTICE TO CONTRACTORS INVITATION FOR BIDS The REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE invites sealed written proposals for the CIVIC AUDITORIUM BOILER SYSTEM REPLACEMENT PROJECT ( Project ), located

More information

13.17.6.1 ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; 13.17.6.1 NMAC Rn & A, 13 NMAC 17.6.

13.17.6.1 ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; 13.17.6.1 NMAC Rn & A, 13 NMAC 17.6. TITLE 13 CHAPTER 17 PART 6 INSURANCE WORKERS COMPENSATION INSURANCE PREMIUM ADJUSTMENT PROGRAM 13.17.6.1 ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; 13.17.6.1

More information

CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT

CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT CSA CONSTRUCTION, INC. 2314 McAllister Road Houston, Texas 77092 SUBCONTRACTOR AGREEMENT THIS AGREEMENT made this day of Month, Year, by and between CSA CONSTRUCTION, INC., a Texas corporation whose principal

More information

Request for Proposal

Request for Proposal Request for Proposal Design, Build, Lease Rooftop Solar PV System RFP# 14-2015 Calabogie Community Rink, 574 Mill Street, Calabogie, Ontario Proposal Closing Date: September 25, 2015; 2:00 PM Local Time

More information

COMMUNICATIONS 270000-1

COMMUNICATIONS 270000-1 SECTION 270000 COMMUNICATIONS PART 1 - GENERAL 1.1 INTRODUCTION/ RELATED DOCUMENTS A. These specifications establish technical and operation requirements for various technologies planned for the CityWalk

More information

April 22, 2009 REQUEST FOR PROPOSALS (RFP)

April 22, 2009 REQUEST FOR PROPOSALS (RFP) April 22, 2009 REQUEST FOR PROPOSALS (RFP) The New Jersey Schools Development Authority (NJSDA) is seeking proposals to engage a contractor to provide HVAC preventative maintenance and repairs at NJSDA

More information