1 Contaminated Land Air Quality Environmental Audit Partnership No: OC STONEHENGE FARM QUARRY for: Hanson UK August 2013 R1708-R02-v2 Smith Grant LLP, Station House, Station Road, Ruabon, Wrexham, LL14 6DL tel: fax: web: Members: A F Smith (Chairman), K E Hawkins, B J Thomas

2 1 DOCUMENT CONTROL SHEET Report Title: Client: Stonehenge Farm Quarry Dust Monitoring Scheme Hanson UK Report Reference Number: R1708-R02 Report Status: final Version: v2 Report Date: August 2013 For: Smith Grant LLP Author Name Position Signature Date pp L Dreiling BSc Consultant 22nd August AIEMA MIEnvSci 2013 MIAQM Checked A F Smith BSc PhD MCIWM SiLC Member 22nd August 2013 Document Revision Record: Version Report Status Date Details of Revision v1 draft 09/08/13 for client comment v2 final 22/08/13 minor edits/clarification

3 2 Contents 1 Introduction 2 Monitoring Rationale 3 Monitoring Methodology 4 Reporting and Review Drawing D02 Dust Monitoring Positions

4 3 1 Introduction 1.1 Hanson UK have been granted permission for the extraction of sand and gravel and associated processing, silt ponds, conveyors and ancillary works at Stonehenge Farm, Northmoor, Oxfordshire. 1.2 The operations will be governed by planning conditions which have been determined by Oxfordshire County Council (OCC), including the following condition in respect of dust management: 30 No development shall take place until a scheme of measures for the suppression of dust, has been submitted to and approved in writing by the Minerals Planning Authority. The scheme shall include: a) The suppression of dust caused by the moving and storage of soil and overburden, stone and other materials within the site; b) Dust suppression on haul roads, including speed limits The approved scheme shall be implemented and complied with at all times. 1.3 The operations will also be subject to other conditions which are relevant to dust emissions, including: 11 maintenance and cleaning of site access roads and vehicles, 12 sheeting of loaded vehicles. 1.4 Hanson UK instructed Smith Grant LLP (SGP) to prepare a dust management scheme in respect of condition 30. This was prepared and submitted to OCC who subsequently requested additional dust monitoring to accompany the scheme. This report describes the rationale behind the proposed monitoring scheme, the methodology to be used, reporting and review arrangements. 1.5 The dust monitoring scheme will be subject to regular review to ensure its continuing effectiveness. 2 Monitoring Rationale 2.1 Sources and Receptors The planned extraction area and mineral processing / storage areas are separated by a 1.5 km conveyor to transport sand and gravel in wet or damp condition for processing and loading to road haulage. The conveyor is not considered likely to be a significant source of airborne

5 4 dust, and largely follows a route through open farmland. The process and stock storage area is a long-established facility surrounded by farmland and flooded old gravel workings, and are remote from dust-sensitive receptors. This leaves the extraction area as a potential source of fugitive dust The site will be restored using topsoil and subsoil stripped from the site prior to the commencement of extraction. The soils will be placed in peripheral storage bunds or placed directly into areas ready for restoration. There will be no import of materials for restoration purposes The site will be worked in 6 phases. Phases 1, 3 and 5 will be worked wet and phases 2, 4 and 6 dewatered and dry worked. Wet working will utilise a 360 excavator to dig the mineral and to form a wet stockpile. A wheeled loader will transport the drained material to an electric powered conveyor. Dry working will be undertaken using a loading shovel to dig the material and load it onto the conveyor. Dewatering will take place in phases 2, 4 and 6 prior to extraction. The pumped water will be discharged to a settling lagoon within the phase 1 area or into a series of recharge ditches used to maintain groundwater levels within the surrounding land Phases 2 and 3 of the extraction area lie to the immediate south and west respectively of residential properties within the Park Farm settlement, off Standlake Road. Further residential properties lie to the north and west of Phase 3 and Standlake Road, including Gaunt Mill and Standlake Village. Southwest of Phase 4 is Newbridge Mill Cottage, whilst Stonehenge Farm lies to the southeast. Phases 1, 5 and 6 are relatively isolated from potential receptors, with Northmoor Village lying about 1km northeast of phase Much of the quarry site is surrounded by intensive arable farming which will itself be a source of dust from soils and crop processing at certain times of year. 2.2 Meteorological Conditions The annual wind rose for Brize Norton, 12 km west of the site, is provided below This shows the prevailing wind direction as from the southwest. On this basis, residential properties to the northeast of the extraction area are most likely to be at risk from dustblow, although other than Park Farm these are all at least 500m distant from the dry-worked phases.

6 5 WIND ROSE FOR BRIZE NORTON N.G.R: 4292E 2067N ALTITUDE: 82 metres a.m.s.l OBS. 2.1% CALM 0.0% VARIABLE 20% 10% 5% 0% > KNOTS SEASON: ANNUAL Period of data: Jan Dec Phasing The potential for dustblow towards receptors is considered to be low given the method of working and wet/damp nature of the deposits, perimeter screening and distance to most receptors (Park Farm excepted). Any risks to residential receptors outside the site will be greatest during short term operations such as soil stripping, bund formation and restoration, activities that need to be undertaken under dry soil conditions to preserve the soil structure Longer term mineral extraction in the dewatered deposits (phases 2, 4 and 6) may present limited potential for dust emissions, and of these, phase 2 is the most sensitive due to proximity to Park Farm. 2.4 Monitoring Requirement Due to the low level of dust risk assessed for the site, no baseline (pre-commencement) dust monitoring has been previously required or undertaken, and therefore it is assumed that typical rural deposition values 1 will prevail (10-50 mg m -2 day -1 ), although these may be substantially higher at times due to farming operations. The concern over dust emissions relates primarily to nuisance dust deposition causing soiling at the receptor location Fine particulate emissions are considered very unlikely to be a health issue due to the low source potential from wet or damp deposits, and due to high dispersion; experience from 1 Environmental Effects of Surface Mineral Workings, Waller Associates for DoE, 1991

7 6 similar sites has shown negligible changes in long or short term airborne concentrations of fine particulates and no potential for breaches of EU Limit Values set to protect human health The OCC request for dust monitoring will be implemented to coincide with the development works at the quarry, including site topsoil and overburden strip and bund formation, and conveyor installation. OCC has indicated that the monitoring should be undertaken at the site boundaries with respect to potential off-site migration of dust towards existing and future proposed residential development. The purpose of the dust monitoring will therefore be to: acquire information on background and site-generated dust sources, relate the date to dust observations or complaints, inform the regular review of effectiveness of dust controls, and, if necessary determine the requirement for any additional mitigation measures / modification to the dust management plan Outline guidance on dust monitoring methods is provided in Annex 1 "Dust" to MPS2 2. This notes that monitoring must be: specific to the type of dust that it is to detect (i.e. total deposition of undissolved particulates); quality assured / controlled, and information provided on calibration and servicing. 3 Monitoring Methodology 3.1 Visual Monitoring All operations with the potential to cause airborne dust emissions will be monitored by the Quarry Manager, or appointed person, at least once per day. This will include visual assessment of any impacts at a downwind location on the site boundary All observations and findings, including weather conditions, will be recorded in a log-book kept specifically for the purpose Should visible dust be generated, the Quarry Manager will act promptly to identify the source(s) and take the necessary corrective action. Each event, its' cause and the remedial action taken will be recorded in the site log-book If necessary, the Quarry Manager will instruct the suspension of any operation or process causing visible dust emissions until such time as the situation has been resolved. 2 Minerals Policy Statement 2, Controlling and Mitigating the Environmental Effects of Mineral Extraction in England, ODPM, 2005

8 Site staff will be instructed to inform the Quarry Manager whenever visible dust emissions are observed, or appear likely to occur, as a result of any operation or process. 3.2 Deposition Monitoring Dust monitoring, using combined deposition / direction gauges, will be carried out at three locations around the perimeter of the quarry, as shown on drawing no. -d01, to identify upwind and downwind total dust deposition and source direction information. The monitoring positions will be varied in accordance with the phasing of the quarry operation to ensure that the most sensitive boundary is monitored Monitoring equipment will comprise combined 'frisbee' type deposition gauges with collecting bottles and bird screens, and direction gauges. The direction gauges will comprise circular adhesive strips to provide 360 o directional data on sources, and an estimate of effective area coverage, a measure of soiling. The monitors will be mounted on level ground where possible, between the extraction area and perimeter, on stands a minimum of 1.5m above ground level, and a minimum of 3m from trees or hedges Samples will be collected over consecutive periods of 1 month by trained operators. Sampling equipment will be inspected during each visit and any evidence of damage or contamination will be noted and corrective actions taken as appropriate The analyses of dust samples will be carried out at UKAS-accredited laboratories and will include measurement of total and undissolved particulate (expressed as mg m -2 day -1 ), ph and daily effective area coverage (as %). The results will be reported to Hanson monthly. 3.3 Phasing Monitoring stations s1 and s3 are expected to remain in the positions shown throughout the site operations. Station s1 provides baseline data upwind of the site in the prevailing wind direction, but will also record any perimeter deposition from phase 4 towards Newbridge Mill Cottage under easterly or northeasterly winds. Station s3 will provide monitoring of the boundary with Park Farm throughout the operations, and particularly during conveyor loading in phases 1, 3 and 5, and dry working of phases 2, 4 and 6 during southerly or southeasterly winds Station s2 will be located at the northern side of phase 3 during the working of phases 1-3, to provide monitoring of the boundary with Standlake Road and properties towards Standlake Village. On development of phases 4-6 the gauge will be moved to the eastern end of phase 4 to provide coverage of properties to the east during westerly, northwesterly or northerly winds.

9 It is proposed to continue dust monitoring throughout the operational period, however the duration and frequency of monitoring will be subject to review on the basis of the results obtained. 4 Reporting and Review 4.1 General Requirements Dust results will be reported to OCC quarterly together with a short assessment. This will compare results to the expected rural background, and will note any particular weather conditions over the period that could have affected general dust conditions. The assessment will review the nature of site operations, dust observations and mitigation measures employed over the period An annual review will be held to assess the effectiveness of monitoring and opportunity for any relaxation or requirement for modification of the monitoring requirement based upon experience of the operational site and monitoring data over the preceding period.

10 Drawing

11 s2 3 1 s s2a s1 SM I T H G R A NT Environmental Consultancy LLP Smith Grant LLP, Station House Station Road, Ruabon, Wrexham, LL14 6DL Tel: Fax: consult@smithgrant.co.uk Project: STONEHENGE FARM, NORTHMOOR phase extraction area Drawing: dust monitoring station Drawn: phases 1-3, stations s1 (upwind), s2 and s3; phases 4-6, stations s1 (upwind), s2a and s3 Date: DUST MONITORING POSITIONS ld 09/08/2013 Job No: R1708 Checked: afs Scale: A3 Drg No: R1708-R02-D01

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN SOUTH COOGEE TRANSPORT MANAGEMENT PLAN On behalf of : DEPARTMENT FOR PLANNING & INFRASTRUCTURE Prepared by: ENV Australia A.C.N. 091 839 520 Mezzanine Level, Central Park 152-158 St Georges Terrace Perth

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Working in a quarry guidelines

Working in a quarry guidelines Working in a quarry guidelines July 2011 Introduction Not much material exists on quarries in SA. In the mining industry, quarries are often not focussed on or dealt with although a quarry in SA is a mine.

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or

More information

Compliance Noise Monitoring

Compliance Noise Monitoring Monitoring Byron Centre The Manse Road Myocum HEALTH SCIENCE ENVIROMENTAL EDUCATION ENVIRONMENTAL AUDITOR Monitoring Byron Centre The Manse Road Myocum Prepared for: Byron Shire Council Version 1.0 Date:

More information

Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde

Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde Concrete Batch Plant Investigations 1 Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers under 5 ft 3 are

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

MAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM

MAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM MAC-ENC-PRO-057 AIR QUALITY MONITORING Document Owner Donna McLaughlin, Environment Superintendent Document Approver Rob Hayes, Manager Environment Revision History Version No. Date Published Details 1.2

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Townsville Dust Monitoring Program. March 2008 to December 2009

Townsville Dust Monitoring Program. March 2008 to December 2009 Townsville Dust Monitoring Program March 2008 to December 2009 Prepared by: Air Quality Sciences Department of Environment and Resource Management State of Queensland (Department of Environment and Resource

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

WERRIS CREEK COAL PRP U1: MONITORING RESULTS WHEEL GENERATED DUST

WERRIS CREEK COAL PRP U1: MONITORING RESULTS WHEEL GENERATED DUST Report WERRIS CREEK COAL PRP U1: MONITORING RESULTS WHEEL GENERATED DUST WERRIS CREEK COAL PTY LTD Job ID. 07487c 29 July 2014 PROJECT NAME: Werris Creek Coal PRP U1: Monitoring Results Wheel Generated

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report: Introduction Snowy Hydro Limited (Snowy Hydro) relies on precipitation falling over the catchments of the Snowy Mountains to supply water for the production of hydro-electricity. Cloud seeding over this

More information

CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas

CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas October 15, 2015 The world's leading sustainability consultancy CPS Energy CCR Fugitive Dust Control Plan Calaveras

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Permit Number: 3.1/062712/CP

Permit Number: 3.1/062712/CP POLLUTION PREVENTION AND CONTROL ACT 1999 ENVIRONMENTAL PERMITTING (ENGLAND AND WALES) REGULATIONS 2010 (amended) Permit Number: 3.1/062712/CP Installation Address: Bardon Concrete Warren Street Attercliffe

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

PLANNING. Minerals Policy Statement 2: Controlling and Mitigating the Environmental Effects of Minerals Extraction in England

PLANNING. Minerals Policy Statement 2: Controlling and Mitigating the Environmental Effects of Minerals Extraction in England Minerals are essential for development and through that for our quality of life and creation of sustainable communities. Minerals planning ensures that the need for minerals by society and the economy

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Aircraft Noise Control at London Luton Airport. August 2015

Aircraft Noise Control at London Luton Airport. August 2015 Aircraft Noise Control at London Luton Airport August 2015 Aircraft Noise Control at London Luton Airport Foreword London Luton Airport (LLA) continues to place aircraft noise high on its agenda. We recognise

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

The River Ribble is one of the longest rivers in the North West of England

The River Ribble is one of the longest rivers in the North West of England River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety

More information

Didcot Further Expansion

Didcot Further Expansion Didcot Further Expansion Landscape and Visual Resources Appendix 2 to the RPS Examination Statement Prepared by: October 2011 RPS Mallams Court 18 Milton Park Abingdon Oxon OX14 4RP Tel 01235 838 200 Fax

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile

Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile Purpose The Emergency Flood Damage Reduction program (EFDRP) provides assistance with the implementation of emergency flood

More information

USING THE ROAD MAINTENANCE AGREEMENT TEMPLATE

USING THE ROAD MAINTENANCE AGREEMENT TEMPLATE USING THE ROAD MAINTENANCE AGREEMENT TEMPLATE The Ministry of Government Relations has created a draft Road Maintenance Agreement template for municipalities and industry to use cooperatively. The primary

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

Controlling Dust. Dr Claire Holman. London Pollution Study Group 11 th February 20134. Brook Cottage Consultants

Controlling Dust. Dr Claire Holman. London Pollution Study Group 11 th February 20134. Brook Cottage Consultants Controlling Dust Dr Claire Holman London Pollution Study Group 11 th February 20134 Brook Cottage Consultants 1 Contents AIRUSE Dust Suppression IAQM Guidance AIRUSE EU LIFE+ Project developing measures

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems 9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Asbestos Monitoring Plan Former ROF Bishopton

Asbestos Monitoring Plan Former ROF Bishopton Asbestos Monitoring Plan Former ROF Bishopton September 2010 1 Table of Contents 1. Introduction... 3 1.1. Summary of Key Requirements... 3 1.2. Setting... 4 1.3. About Exova... 4 1.4. Scope of this Document...

More information

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING

OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING NOISE AND VIBRATION DIVISION Report: OEM/04/14 Dated January 2014 A REPORT ON AN ENVIRONMENTAL NOISE SURVEY OF AIRCRAFT ACTIVITY AT RAF BRIZE NORTON Approved

More information

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR) HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET. on a Farm Business Tenancy for a term of up to 5 years *********

LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET. on a Farm Business Tenancy for a term of up to 5 years ********* LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET on a Farm Business Tenancy for a term of up to 5 years ********* HIGHLY PRODUCTIVE ARABLE LAND SET IN A RING FENCE with the option of a GENERAL PURPOSE

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Soil Treatment Facility Guidance

Soil Treatment Facility Guidance State of Alaska DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE CONTAMINATED SITES PROGRAM Soil Treatment Facility Guidance November 7, 2002 TABLE OF CONTENTS PURPOSE...1

More information

oil care Looking after your heating oil in the south east

oil care Looking after your heating oil in the south east oil care Looking after your heating oil in the south east We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Contents Page 1. INTRODUCTION...3

Contents Page 1. INTRODUCTION...3 Contents Page 1. INTRODUCTION...3 2. AGGREGATES LEVY CREDIT SCHEME (ALCS)...4 2.1 RESPONSIBILITY FOR THE SCHEME...4 2.2 ADMINISTERING THE SCHEME...4 2.3 MEMBERSHIP OF THE SCHEME...5 2.4 CURRENT REGULATORY

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant. 1. Purpose The Environmental Protection Act 1994 (EP Act) enables listing of land on the environmental management register (EMR) if either a notifiable activity has been or is being conducted, or the land

More information

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.

Lifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it. LIFTING EQUIPMENT POLICY Background and Legislation The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply in all premises and work situations subject to the Health and Safety at Work,

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Beseck Switching Station Inspection

Beseck Switching Station Inspection Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV

More information

TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE

TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE Gunnedah Quarry Products Pty Ltd Gunnedah, NSW AUGUST 2014 QUALITY ASSURANCE This document has been prepared, checked and released in accordance

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

HOW TO... Be Aware of Your Environmental Legal Responsibilities

HOW TO... Be Aware of Your Environmental Legal Responsibilities HOW TO... Be Aware of Your Environmental Legal Responsibilities How to... Be Aware of Your Environmental Legal Responsibilities You have legal responsibilities for the impact your business has on the environment.

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

PLANNING SERVICES UNIT

PLANNING SERVICES UNIT SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is

More information

Package Treatment Plant Policy and Procedure

Package Treatment Plant Policy and Procedure Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are

More information

National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards

National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards Version 1.0 February 2014 Maintenance Management standards Maintenance Management Systems 1.

More information

Revenue and Financing Policy

Revenue and Financing Policy Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.

More information

FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011. Environmental Protection Agency (EPA)

FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011. Environmental Protection Agency (EPA) FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011 Environmental Protection Agency (EPA) Are the levels we re seeing in precipitation likely to lead to

More information

COST AND PERFORMANCE REPORT

COST AND PERFORMANCE REPORT COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992

LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992 LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992 This arrangement ( Agreement ), which is an access arrangement for the purposes

More information

How To Manage Asbestos At A Recycling Facility

How To Manage Asbestos At A Recycling Facility Guidelines for managing asbestos at construction and demolition waste recycling facilities Lead Author: Location/Dept: Industry Regulation Licensing Branch (IRLB) Waste Industries, IRLB Issued Date: 18/12/2012

More information

LAND USE APPLICATION SUMMARY SHEET. Planner: C. Gathman Hearing Date: October 6, 2015

LAND USE APPLICATION SUMMARY SHEET. Planner: C. Gathman Hearing Date: October 6, 2015 LAND USE APPLICATION SUMMARY SHEET Planner: C. Gathman Hearing Date: October 6, 2015 Case Number: Applicant: USR15-0038 Wells Trucking, LLC Address: 32010 County Road 63, Gill, CO 80624 Representative:

More information

Monitoring Program Waste

Monitoring Program Waste Procedure Document No. 2792 Document Title Monitoring Program Waste Area HSE Issue Date Major Process Environment Sub Process Authoriser Darryl Cuzzubbo Asset President Version Number 14 TABLE OF CONTENTS

More information

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8 1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information