1 Contaminated Land Air Quality Environmental Audit Partnership No: OC STONEHENGE FARM QUARRY for: Hanson UK August 2013 R1708-R02-v2 Smith Grant LLP, Station House, Station Road, Ruabon, Wrexham, LL14 6DL tel: fax: web: Members: A F Smith (Chairman), K E Hawkins, B J Thomas
2 1 DOCUMENT CONTROL SHEET Report Title: Client: Stonehenge Farm Quarry Dust Monitoring Scheme Hanson UK Report Reference Number: R1708-R02 Report Status: final Version: v2 Report Date: August 2013 For: Smith Grant LLP Author Name Position Signature Date pp L Dreiling BSc Consultant 22nd August AIEMA MIEnvSci 2013 MIAQM Checked A F Smith BSc PhD MCIWM SiLC Member 22nd August 2013 Document Revision Record: Version Report Status Date Details of Revision v1 draft 09/08/13 for client comment v2 final 22/08/13 minor edits/clarification
3 2 Contents 1 Introduction 2 Monitoring Rationale 3 Monitoring Methodology 4 Reporting and Review Drawing D02 Dust Monitoring Positions
4 3 1 Introduction 1.1 Hanson UK have been granted permission for the extraction of sand and gravel and associated processing, silt ponds, conveyors and ancillary works at Stonehenge Farm, Northmoor, Oxfordshire. 1.2 The operations will be governed by planning conditions which have been determined by Oxfordshire County Council (OCC), including the following condition in respect of dust management: 30 No development shall take place until a scheme of measures for the suppression of dust, has been submitted to and approved in writing by the Minerals Planning Authority. The scheme shall include: a) The suppression of dust caused by the moving and storage of soil and overburden, stone and other materials within the site; b) Dust suppression on haul roads, including speed limits The approved scheme shall be implemented and complied with at all times. 1.3 The operations will also be subject to other conditions which are relevant to dust emissions, including: 11 maintenance and cleaning of site access roads and vehicles, 12 sheeting of loaded vehicles. 1.4 Hanson UK instructed Smith Grant LLP (SGP) to prepare a dust management scheme in respect of condition 30. This was prepared and submitted to OCC who subsequently requested additional dust monitoring to accompany the scheme. This report describes the rationale behind the proposed monitoring scheme, the methodology to be used, reporting and review arrangements. 1.5 The dust monitoring scheme will be subject to regular review to ensure its continuing effectiveness. 2 Monitoring Rationale 2.1 Sources and Receptors The planned extraction area and mineral processing / storage areas are separated by a 1.5 km conveyor to transport sand and gravel in wet or damp condition for processing and loading to road haulage. The conveyor is not considered likely to be a significant source of airborne
5 4 dust, and largely follows a route through open farmland. The process and stock storage area is a long-established facility surrounded by farmland and flooded old gravel workings, and are remote from dust-sensitive receptors. This leaves the extraction area as a potential source of fugitive dust The site will be restored using topsoil and subsoil stripped from the site prior to the commencement of extraction. The soils will be placed in peripheral storage bunds or placed directly into areas ready for restoration. There will be no import of materials for restoration purposes The site will be worked in 6 phases. Phases 1, 3 and 5 will be worked wet and phases 2, 4 and 6 dewatered and dry worked. Wet working will utilise a 360 excavator to dig the mineral and to form a wet stockpile. A wheeled loader will transport the drained material to an electric powered conveyor. Dry working will be undertaken using a loading shovel to dig the material and load it onto the conveyor. Dewatering will take place in phases 2, 4 and 6 prior to extraction. The pumped water will be discharged to a settling lagoon within the phase 1 area or into a series of recharge ditches used to maintain groundwater levels within the surrounding land Phases 2 and 3 of the extraction area lie to the immediate south and west respectively of residential properties within the Park Farm settlement, off Standlake Road. Further residential properties lie to the north and west of Phase 3 and Standlake Road, including Gaunt Mill and Standlake Village. Southwest of Phase 4 is Newbridge Mill Cottage, whilst Stonehenge Farm lies to the southeast. Phases 1, 5 and 6 are relatively isolated from potential receptors, with Northmoor Village lying about 1km northeast of phase Much of the quarry site is surrounded by intensive arable farming which will itself be a source of dust from soils and crop processing at certain times of year. 2.2 Meteorological Conditions The annual wind rose for Brize Norton, 12 km west of the site, is provided below This shows the prevailing wind direction as from the southwest. On this basis, residential properties to the northeast of the extraction area are most likely to be at risk from dustblow, although other than Park Farm these are all at least 500m distant from the dry-worked phases.
6 5 WIND ROSE FOR BRIZE NORTON N.G.R: 4292E 2067N ALTITUDE: 82 metres a.m.s.l OBS. 2.1% CALM 0.0% VARIABLE 20% 10% 5% 0% > KNOTS SEASON: ANNUAL Period of data: Jan Dec Phasing The potential for dustblow towards receptors is considered to be low given the method of working and wet/damp nature of the deposits, perimeter screening and distance to most receptors (Park Farm excepted). Any risks to residential receptors outside the site will be greatest during short term operations such as soil stripping, bund formation and restoration, activities that need to be undertaken under dry soil conditions to preserve the soil structure Longer term mineral extraction in the dewatered deposits (phases 2, 4 and 6) may present limited potential for dust emissions, and of these, phase 2 is the most sensitive due to proximity to Park Farm. 2.4 Monitoring Requirement Due to the low level of dust risk assessed for the site, no baseline (pre-commencement) dust monitoring has been previously required or undertaken, and therefore it is assumed that typical rural deposition values 1 will prevail (10-50 mg m -2 day -1 ), although these may be substantially higher at times due to farming operations. The concern over dust emissions relates primarily to nuisance dust deposition causing soiling at the receptor location Fine particulate emissions are considered very unlikely to be a health issue due to the low source potential from wet or damp deposits, and due to high dispersion; experience from 1 Environmental Effects of Surface Mineral Workings, Waller Associates for DoE, 1991
7 6 similar sites has shown negligible changes in long or short term airborne concentrations of fine particulates and no potential for breaches of EU Limit Values set to protect human health The OCC request for dust monitoring will be implemented to coincide with the development works at the quarry, including site topsoil and overburden strip and bund formation, and conveyor installation. OCC has indicated that the monitoring should be undertaken at the site boundaries with respect to potential off-site migration of dust towards existing and future proposed residential development. The purpose of the dust monitoring will therefore be to: acquire information on background and site-generated dust sources, relate the date to dust observations or complaints, inform the regular review of effectiveness of dust controls, and, if necessary determine the requirement for any additional mitigation measures / modification to the dust management plan Outline guidance on dust monitoring methods is provided in Annex 1 "Dust" to MPS2 2. This notes that monitoring must be: specific to the type of dust that it is to detect (i.e. total deposition of undissolved particulates); quality assured / controlled, and information provided on calibration and servicing. 3 Monitoring Methodology 3.1 Visual Monitoring All operations with the potential to cause airborne dust emissions will be monitored by the Quarry Manager, or appointed person, at least once per day. This will include visual assessment of any impacts at a downwind location on the site boundary All observations and findings, including weather conditions, will be recorded in a log-book kept specifically for the purpose Should visible dust be generated, the Quarry Manager will act promptly to identify the source(s) and take the necessary corrective action. Each event, its' cause and the remedial action taken will be recorded in the site log-book If necessary, the Quarry Manager will instruct the suspension of any operation or process causing visible dust emissions until such time as the situation has been resolved. 2 Minerals Policy Statement 2, Controlling and Mitigating the Environmental Effects of Mineral Extraction in England, ODPM, 2005
8 Site staff will be instructed to inform the Quarry Manager whenever visible dust emissions are observed, or appear likely to occur, as a result of any operation or process. 3.2 Deposition Monitoring Dust monitoring, using combined deposition / direction gauges, will be carried out at three locations around the perimeter of the quarry, as shown on drawing no. -d01, to identify upwind and downwind total dust deposition and source direction information. The monitoring positions will be varied in accordance with the phasing of the quarry operation to ensure that the most sensitive boundary is monitored Monitoring equipment will comprise combined 'frisbee' type deposition gauges with collecting bottles and bird screens, and direction gauges. The direction gauges will comprise circular adhesive strips to provide 360 o directional data on sources, and an estimate of effective area coverage, a measure of soiling. The monitors will be mounted on level ground where possible, between the extraction area and perimeter, on stands a minimum of 1.5m above ground level, and a minimum of 3m from trees or hedges Samples will be collected over consecutive periods of 1 month by trained operators. Sampling equipment will be inspected during each visit and any evidence of damage or contamination will be noted and corrective actions taken as appropriate The analyses of dust samples will be carried out at UKAS-accredited laboratories and will include measurement of total and undissolved particulate (expressed as mg m -2 day -1 ), ph and daily effective area coverage (as %). The results will be reported to Hanson monthly. 3.3 Phasing Monitoring stations s1 and s3 are expected to remain in the positions shown throughout the site operations. Station s1 provides baseline data upwind of the site in the prevailing wind direction, but will also record any perimeter deposition from phase 4 towards Newbridge Mill Cottage under easterly or northeasterly winds. Station s3 will provide monitoring of the boundary with Park Farm throughout the operations, and particularly during conveyor loading in phases 1, 3 and 5, and dry working of phases 2, 4 and 6 during southerly or southeasterly winds Station s2 will be located at the northern side of phase 3 during the working of phases 1-3, to provide monitoring of the boundary with Standlake Road and properties towards Standlake Village. On development of phases 4-6 the gauge will be moved to the eastern end of phase 4 to provide coverage of properties to the east during westerly, northwesterly or northerly winds.
9 It is proposed to continue dust monitoring throughout the operational period, however the duration and frequency of monitoring will be subject to review on the basis of the results obtained. 4 Reporting and Review 4.1 General Requirements Dust results will be reported to OCC quarterly together with a short assessment. This will compare results to the expected rural background, and will note any particular weather conditions over the period that could have affected general dust conditions. The assessment will review the nature of site operations, dust observations and mitigation measures employed over the period An annual review will be held to assess the effectiveness of monitoring and opportunity for any relaxation or requirement for modification of the monitoring requirement based upon experience of the operational site and monitoring data over the preceding period.
10 Drawing
11 s2 3 1 s s2a s1 SM I T H G R A NT Environmental Consultancy LLP Smith Grant LLP, Station House Station Road, Ruabon, Wrexham, LL14 6DL Tel: Fax: consult@smithgrant.co.uk Project: STONEHENGE FARM, NORTHMOOR phase extraction area Drawing: dust monitoring station Drawn: phases 1-3, stations s1 (upwind), s2 and s3; phases 4-6, stations s1 (upwind), s2a and s3 Date: DUST MONITORING POSITIONS ld 09/08/2013 Job No: R1708 Checked: afs Scale: A3 Drg No: R1708-R02-D01
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationSOUTH COOGEE TRANSPORT MANAGEMENT PLAN
SOUTH COOGEE TRANSPORT MANAGEMENT PLAN On behalf of : DEPARTMENT FOR PLANNING & INFRASTRUCTURE Prepared by: ENV Australia A.C.N. 091 839 520 Mezzanine Level, Central Park 152-158 St Georges Terrace Perth
More informationWellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review
Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationWorking in a quarry guidelines
Working in a quarry guidelines July 2011 Introduction Not much material exists on quarries in SA. In the mining industry, quarries are often not focussed on or dealt with although a quarry in SA is a mine.
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationApplication by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)
Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or
More informationCompliance Noise Monitoring
Monitoring Byron Centre The Manse Road Myocum HEALTH SCIENCE ENVIROMENTAL EDUCATION ENVIRONMENTAL AUDITOR Monitoring Byron Centre The Manse Road Myocum Prepared for: Byron Shire Council Version 1.0 Date:
More informationApplicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde
Concrete Batch Plant Investigations 1 Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers under 5 ft 3 are
More informationMEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.
MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationTERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
More informationMAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM
MAC-ENC-PRO-057 AIR QUALITY MONITORING Document Owner Donna McLaughlin, Environment Superintendent Document Approver Rob Hayes, Manager Environment Revision History Version No. Date Published Details 1.2
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationGalloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
More informationTownsville Dust Monitoring Program. March 2008 to December 2009
Townsville Dust Monitoring Program March 2008 to December 2009 Prepared by: Air Quality Sciences Department of Environment and Resource Management State of Queensland (Department of Environment and Resource
More informationInquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
More informationWERRIS CREEK COAL PRP U1: MONITORING RESULTS WHEEL GENERATED DUST
Report WERRIS CREEK COAL PRP U1: MONITORING RESULTS WHEEL GENERATED DUST WERRIS CREEK COAL PTY LTD Job ID. 07487c 29 July 2014 PROJECT NAME: Werris Creek Coal PRP U1: Monitoring Results Wheel Generated
More informationLiquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
More informationThe Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
More informationThe key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:
Introduction Snowy Hydro Limited (Snowy Hydro) relies on precipitation falling over the catchments of the Snowy Mountains to supply water for the production of hydro-electricity. Cloud seeding over this
More informationCCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas
CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas October 15, 2015 The world's leading sustainability consultancy CPS Energy CCR Fugitive Dust Control Plan Calaveras
More informationOSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
More informationTaylor Wimpey UK Ltd. December 2007
Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked
More informationPermit Number: 3.1/062712/CP
POLLUTION PREVENTION AND CONTROL ACT 1999 ENVIRONMENTAL PERMITTING (ENGLAND AND WALES) REGULATIONS 2010 (amended) Permit Number: 3.1/062712/CP Installation Address: Bardon Concrete Warren Street Attercliffe
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationOn Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationPLANNING. Minerals Policy Statement 2: Controlling and Mitigating the Environmental Effects of Minerals Extraction in England
Minerals are essential for development and through that for our quality of life and creation of sustainable communities. Minerals planning ensures that the need for minerals by society and the economy
More informationRiver Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
More informationAircraft Noise Control at London Luton Airport. August 2015
Aircraft Noise Control at London Luton Airport August 2015 Aircraft Noise Control at London Luton Airport Foreword London Luton Airport (LLA) continues to place aircraft noise high on its agenda. We recognise
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationThe River Ribble is one of the longest rivers in the North West of England
River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety
More informationDidcot Further Expansion
Didcot Further Expansion Landscape and Visual Resources Appendix 2 to the RPS Examination Statement Prepared by: October 2011 RPS Mallams Court 18 Milton Park Abingdon Oxon OX14 4RP Tel 01235 838 200 Fax
More informationFLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
More informationSURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
More informationFinal Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES
ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite
More informationEnvironmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
More informationChapter 9: Water, Hydrology and Drainage Land West of Uttoxeter
Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater
More informationEmergency Flood Damage Reduction Program April 2013 (revised) Program Profile
Emergency Flood Damage Reduction Program April 2013 (revised) Program Profile Purpose The Emergency Flood Damage Reduction program (EFDRP) provides assistance with the implementation of emergency flood
More informationUSING THE ROAD MAINTENANCE AGREEMENT TEMPLATE
USING THE ROAD MAINTENANCE AGREEMENT TEMPLATE The Ministry of Government Relations has created a draft Road Maintenance Agreement template for municipalities and industry to use cooperatively. The primary
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationTHE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission
Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:
More informationControlling Dust. Dr Claire Holman. London Pollution Study Group 11 th February 20134. Brook Cottage Consultants
Controlling Dust Dr Claire Holman London Pollution Study Group 11 th February 20134 Brook Cottage Consultants 1 Contents AIRUSE Dust Suppression IAQM Guidance AIRUSE EU LIFE+ Project developing measures
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More informationAsbestos Storage Facility Plan Examples
Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationAsbestos Monitoring Plan Former ROF Bishopton
Asbestos Monitoring Plan Former ROF Bishopton September 2010 1 Table of Contents 1. Introduction... 3 1.1. Summary of Key Requirements... 3 1.2. Setting... 4 1.3. About Exova... 4 1.4. Scope of this Document...
More informationGUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS
GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result
More informationPollution & Noise from Demolition & Construction Sites
CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.
More informationTHE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
More informationOCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING
OCCUPATIONAL AND ENVIRONMENTAL MEDICINE WING NOISE AND VIBRATION DIVISION Report: OEM/04/14 Dated January 2014 A REPORT ON AN ENVIRONMENTAL NOISE SURVEY OF AIRCRAFT ACTIVITY AT RAF BRIZE NORTON Approved
More information10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
More informationSite Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
More informationTERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
More informationANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
More informationPIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
More informationLAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET. on a Farm Business Tenancy for a term of up to 5 years *********
LAND AT MANOR HOUSE FARM WIGHILL, TADCASTER TO LET on a Farm Business Tenancy for a term of up to 5 years ********* HIGHLY PRODUCTIVE ARABLE LAND SET IN A RING FENCE with the option of a GENERAL PURPOSE
More informationCHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
More informationSoil Treatment Facility Guidance
State of Alaska DEPARTMENT OF ENVIRONMENTAL CONSERVATION DIVISION OF SPILL PREVENTION AND RESPONSE CONTAMINATED SITES PROGRAM Soil Treatment Facility Guidance November 7, 2002 TABLE OF CONTENTS PURPOSE...1
More informationoil care Looking after your heating oil in the south east
oil care Looking after your heating oil in the south east We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
More informationContents Page 1. INTRODUCTION...3
Contents Page 1. INTRODUCTION...3 2. AGGREGATES LEVY CREDIT SCHEME (ALCS)...4 2.1 RESPONSIBILITY FOR THE SCHEME...4 2.2 ADMINISTERING THE SCHEME...4 2.3 MEMBERSHIP OF THE SCHEME...5 2.4 CURRENT REGULATORY
More informationS/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).
RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year
More information2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.
1. Purpose The Environmental Protection Act 1994 (EP Act) enables listing of land on the environmental management register (EMR) if either a notifiable activity has been or is being conducted, or the land
More informationLifting Equipment - Work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.
LIFTING EQUIPMENT POLICY Background and Legislation The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) apply in all premises and work situations subject to the Health and Safety at Work,
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationBeseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
More informationTRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE
TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE Gunnedah Quarry Products Pty Ltd Gunnedah, NSW AUGUST 2014 QUALITY ASSURANCE This document has been prepared, checked and released in accordance
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationDraft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
More informationHOW TO... Be Aware of Your Environmental Legal Responsibilities
HOW TO... Be Aware of Your Environmental Legal Responsibilities How to... Be Aware of Your Environmental Legal Responsibilities You have legal responsibilities for the impact your business has on the environment.
More informationWEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationenvironment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
More informationBasements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
More informationHow To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
More informationPLANNING SERVICES UNIT
SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is
More informationPackage Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
More informationNational Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards
National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards Version 1.0 February 2014 Maintenance Management standards Maintenance Management Systems 1.
More informationRevenue and Financing Policy
Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.
More informationFREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011. Environmental Protection Agency (EPA)
FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011 Environmental Protection Agency (EPA) Are the levels we re seeing in precipitation likely to lead to
More informationCOST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
More informationSustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationGuidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
More informationLAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992
LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992 This arrangement ( Agreement ), which is an access arrangement for the purposes
More informationHow To Manage Asbestos At A Recycling Facility
Guidelines for managing asbestos at construction and demolition waste recycling facilities Lead Author: Location/Dept: Industry Regulation Licensing Branch (IRLB) Waste Industries, IRLB Issued Date: 18/12/2012
More informationLAND USE APPLICATION SUMMARY SHEET. Planner: C. Gathman Hearing Date: October 6, 2015
LAND USE APPLICATION SUMMARY SHEET Planner: C. Gathman Hearing Date: October 6, 2015 Case Number: Applicant: USR15-0038 Wells Trucking, LLC Address: 32010 County Road 63, Gill, CO 80624 Representative:
More informationMonitoring Program Waste
Procedure Document No. 2792 Document Title Monitoring Program Waste Area HSE Issue Date Major Process Environment Sub Process Authoriser Darryl Cuzzubbo Asset President Version Number 14 TABLE OF CONTENTS
More informationINDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8
1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix
More informationPollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
More informationWILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta
More informationNAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
More information