Report of Investigation. into the fatal accident. on a mooring gang crew. at government mooring buoy A43. on 6 April 2007

Size: px
Start display at page:

Download "Report of Investigation. into the fatal accident. on a mooring gang crew. at government mooring buoy A43. on 6 April 2007"

Transcription

1 Report of Investigation into the fatal accident on a mooring gang crew at government mooring buoy A43 on 6 April 2007

2 2

3 Purpose of Investigation This incident is investigated, and published in accordance with the IMO Code for the Investigation of Marine Casualties and Incidents promulgated under IMO Assembly Resolution A.849(20). The purpose of this investigation conducted by the Marine Accident Investigation and Shipping Security Policy Branch (MAISSPB) of Marine Department is to determine the circumstances and the causes of the incident with the aim of improving the safety of life at sea and avoiding similar incident in future. The conclusions drawn in this report aim to identify the different factors contributing to the incident. They are not intended to apportion blame or liability towards any particular organization or individual except so far as necessary to achieve the said purpose. The MAISSPB has no involvement in any prosecution or disciplinary action that may be taken by the Marine Department resulting from this incident. 3

4 Table of Contents Page 1 Summary 2 2 Description of the Vessels and the Mooring Buoy 3 3 Sources of Evidence 9 4 Outline of Events 10 5 Analysis of Evidence 12 6 Conclusions 22 7 Recommendations 23 8 Submissions 24 9 Appendix 25 1

5 1. Summary 1.1 An accident happened at the government mooring buoy A43 on 6 April While a mooring gang of three were standing on the mooring buoy to secure the anchor chain of m.v. Metropolis to the buoy, the mooring buoy was suddenly tilted and the mooring eye fitting was lifted up from its cylindrical trunking. Two of the mooring gang crew fell into the water while the other fell and was trapped in the cylindrical trunking of the mooring buoy. The latter was crushed to death by the mooring eye fitting. 1.2 The investigation revealed that the Vessel was in motion and moved away from the mooring buoy after the mooring gang crew had secured the ship s anchor chain to the buoy. As a result, the mooring buoy was tilted and the mooring eye fitting was pulled out from the cylindrical trunking of the buoy. 1.3 The investigation has also identified the following contributory factors to the accident: The buoy mooring operation poses significant inherent risks to the mooring gang crew. They are required to remain on the mooring buoy for a prolonged period; Excessive discrepancy on the settings of propeller pitch angles existed between the local position and the bridge control console. The propellers produced thrust even the pitch control was put to zero ; and Poor communication among the working teams during the mooring operation.. 2

6 2. Description of the Vessels and the Mooring Buoy 2.1 M.V. "Metropolis " a) Particulars of the Vessel Name of the Vessel : " Metropolis " Port of Registry : Panama IMO No. : Official No. : A Call Sign : H9AJ Classification Society : Germanischer Lloyds Type of Ship : Passenger / Ro-Ro ship Year of Built : 1972 Built At : Kawasashi Heavy Industries Co. Ltd., Japan Ship Manager : Wallem Ship Management Ltd. Length : metres Breadth : metres Depth : 8.01 metres Gross Tonnage : 17,261 Deadweight : 3,472 Net Tonnage : Engine Power : 14,712 kw Fig. 1: The outlook of the passenger ship Metropolis 3

7 b) "Metropolis" (hereinafter referred as the Vessel) is a steel passenger ship built by Kawasashi Heavy Industries Co. Ltd., Japan in She is powered by two MAN-KAWASAKI V9V 40/54 diesel engines geared to two controllable pitch propellers, capable of developing a total power of 14,712 kw with a service speed knots. The Vessel was owned by Metropolis Cruise Co., Ltd. and managed by Wallem Shipmanagment Ltd. c) Engine movements of the Vessel can be controlled from the bridge by a duty officer. The Vessel is equipped with one bow thruster of 600 kw to provide side power to improve maneuverability at slow speed. d) The Vessel provides cruise to nowhere daily regular passenger services from its base in Hong Kong. e) The Vessel was normally assigned to moor at the mooring buoy A43 with the starboard anchor chain when in Hong Kong. 4

8 2.2 Pilot boat Harbour 32 a) Particulars of the Vessel Name of the Vessel : Harbour 32" Licence No. : B4523 Type of Ship : Transportation boat (Pilot launch) Year of Built : 1986 Built At : Cheoy Lee Shipyards Limited, Hong Kong Ship Owner : Joy Harbour Investment Ltd. Length : metres Breadth : 4.23 metres Depth : 1.69 metres Gross Tonnage : Net Tonnage : Engine Power : kw Fig. 2: The pilot boat Harbour 32 b) "Harbour 32" (hereafter referred as the Pilot Boat) is a fibre glass reinforced traffic launch built by Choey Lee Shipyard, Hong Kong in She is powered by a Cummins diesel engine and capable of developing total power of kw. The Pilot Boat is owned by Joy Harbour Investment Ltd. which is a subsidiary company Limited of Weal Ocean Limited. The Weal Ocean Limited is a principal contractor of the Hong Kong Pilot Association Limited 5

9 to provide pilot boats and mooring gang crew for pilotage and mooring services. c) A Coxswain, an Engineer and two sailors (Sailor A and Sailor B) were working as a team on board the Pilot Boat. During the buoy mooring operation, the Coxswain was at the helm of the Pilot Boat while the Engineer, the Sailor A and Sailor B were members of the mooring gang. 6

10 2.3 The mooring buoy a) Particulars of the mooring buoy Buoy number : A43 Class : A Identification number : HO308 Year of Manufacture : 2002 Built at : Guangxi Guijiang Shipyard, Wu Zhou, Guangxi, China Owner : Marine Department Outside diameter : 3.66 metres Depth : metres Weight : 6 metric tones (approximate) Weight of sinker : 90 metric tons Position of Sinker : N E Length of chain : 40 metres (approximate) Fig. 3: The mooring buoy A43 7

11 b) Mooring buoy is a floating device used to keep one end of the mooring cable on the water surface. There are 21 A Class and 10 B Class mooring buoys mostly laid within the port of Hong Kong for ship mooring. The mooring buoy A43 (hereafter referred as the mooring buoy) is one of the A Class mooring buoys for vessels not exceeding 183 metres in length. c) The mooring buoy is a steel cylindrical structure of 3.66 metres in diameter and metres in height. The watertight structure provides buoyancy for supporting the weight of the chain cable and the mooring eye fitting about 6.7 metric tones. At the centerline of the mooring buoy, there was a taper shaped cylindrical trunking for passing the chain cable and providing a self-aligned seat for the cable support (see fig.4). On top of the cable support, there was an eye shackle forming a mooring eye fitting for mooring to the anchor chain of a ship. Eye Shackle Cable Support Mooring eye fitting m 0.58 m Diameter 1.69m Diameter 3.66m The sinker Fig. 4: Drawing of the mooring buoy d) The lower end to chain cable is connected to a 90 metric tonnes sinker which sit on the seabed in the position of N E. 8

12 3. Sources of Evidence a) The Master and Crewmembers of passenger ship Metropolis b) The Coxswain and Crewmembers of pilot launch Harbour 32 c) The Hong Kong Pilot Association Limited d) The Weal Ocean Limited e) The Pilot on board Metropolis f) Vessel Traffic Centre, Marine Department g) Pilotage Unit, Marine Department h) Aids to Navigation and Mooring Unit, Marine Department 9

13 4. Outline of Events 4.1 In the morning of 6 April 2007, m.v. Metropolis (hereafter referred as the Vessel) returned to Hong Kong waters after a cruise to nowhere trip. At 0837, the Vessel arrived Tathong Channel pilot station ( N E) where a pilot boat Harbour 32 (hereafter referred as the Pilot Boat) had been standing by. A pilot came onboard the Vessel from the Pilot Boat there. 4.2 The Pilot Boat and the Vessel proceeded to the mooring buoy A43 which the Vessel was going to be moored. At about 0850, the Pilot Boat arrived at the mooring buoy, the mooring gang crew (Sailor A and Sailor B) put a wire sling on the eye shackle of the mooring buoy. The mooring gang crew returned to the Pilot Boat, then she sailed towards the Vessel. 4.3 At 0855, the main engines and the bow thruster of the Vessel stopped. She was about 150 metres east of the mooring buoy with a drifting speed of about 1 knot towards the mooring buoy. The mooring gang crew (Sailor A and Sailor B) picked up one end of the Vessel s headline rope from the Pilot Boat to the buoy. The mooring gang crew immediately returned to the Pilot Boat after securing the headline rope to the wire sling at the mooring buoy. 4.4 The crewmembers at the foredeck of the Vessel retrieved the headline in order to pull the Vessel close to the mooring buoy. At 0900, the Vessel was brought to the position of the mooring buoy. The mooring crew consisted of the Engineer, the Sailor A and the Sailor B boarded the mooring buoy to secure the anchor chain to the mooring buoy. After securing the anchor chain, the mooring eye fitting was suddenly pulled up by the anchor chain caused the mooring buoy to tilt at a large angle. 4.5 The Engineer and the Sailor B fell into the sea while the Sailor A fell and trapped inside taper shape cylindrical trunking when sinker chain cable returned back to the cylindrical trunking. The cable support crushed the head of the Sailor A (see figure 5). The Engineer and Sailor B were not injured and swam back to the Pilot Boat. 4.6 The Sailor A suffered serious injury and remained inside the lower portion of the cylindrical trunking of the mooring buoy. The Coxswain and the Pilot reported the incident to the Pilot Association and Vessel Traffic Centre of Marine Department respectively. Soon rescue team arrived and the Sailor A was taken out from the mooring buoy chain trunking. He was conveyed to North Point Pier and was certified dead by an Ambulance Officer. 10

14 The movement of the Vessel. Movements of the anchor chain and mooring eye fitting (moving upward) Movements of the anchor chain and mooring eye fittings (moving forward) Fig. 5: Sketches showing the sequences of the accident 11

15 5. Analysis of Evidence Manning of the Vessel 5.1 The Vessel had a crew of 224 Chinese and 1 Malaysia nationals. The deck department consisted of 1 Master, 1 Chief Officer, 3 Second Officer, 1 Bosun, 1 Carpenter, 3 Able Seamen, 3 Ordinary Seamen. The engine department consisted of 1 Chief Engineer, 1 Second Engineer, 1 Third Engineer, 1 Fourth Engineer, 2 Electricians 3 Motormen, 4 Wipers and 3 Fitters. The remaining crewmembers were belonged to catering department. 5.2 During the buoy mooring operation, the Vessel mainly consisted of three working parties. The bridge team, the foredeck team and the engine room team. The bridge team was manned by the Master, two Second Officers, an Able Seaman and the Pilot for maneuvering the Vessel. The foredeck team was manned by the Chief Officer, the Bosun, the Carpenter, two Able Seamen and three Ordinary Seamen controlling the mooring ropes and anchor chain. The engine room was manned by the Chief Engineer, the Third Engineer and an Oiler. The manning scale of the Vessel for the buoy mooring operation is found to be adequate. The Master 5.3 The Master held a Chinese Certificate of Competency as Master. He had 14 years of seagoing experience and had been sailing as master for 7 years. He had been working on board the Vessel since February The Pilot 5.4 The Pilot held a Canadian Certificate of Competency as Master and a class I Hong Kong Harbour Pilot License. He had more than ten years seagoing experience and he joined the Hong Kong Pilot Association Ltd. (the Association) as a harbour pilot in The Coxswain 5.5 The Coxswain of the Pilot Boat had been serving for the Weal Ocean Limited since He was promoted to a Coxswain in Apart from taking charge of the Pilot Boat, he was also responsible for monitoring the situation and providing support while the mooring gang working on the mooring buoy. 12

16 The Sailor A (the deceased) 5.6 The Sailor A had been serving for the Weal Ocean Limited since Prior joining the Weal Ocean Limited, he was a fisherman working for local fishing vessels. According to the Coxswain and the crewmembers of the Pilot Boat, Sailor A was experienced in mooring operation. Working fatigue 5.7 The working period of the mooring gang crew was on 24-hour basis. After taking a day of rest, the Coxswain and the mooring gang crew started their work in the morning of 6 April, i.e. few hours prior to the accident. It appears that fatigue is not a contributory factor to the accident. Control of the Vessel during the mooring operation 5.8 During the buoy mooring operation, the Master ordered engine movements and one of the Second Officers was at engine control to maneuver the Vessel. The Pilot gave advice to the Master whenever necessary. Both the Master and the Pilot commented that the buoy mooring operation was in good working order before the happening of the accident. The environmental conditions 5.9 The accident happened in the morning with good daylight. The weather was cloudy and clear with good visibility. Northerly wind about 1 knot was prevailing in the area. Tidal stream current was running westerly at about 0.7 knot. The effects of the wind and the tidal current would cause the Vessel to drift in a westerly direction. At time of the accident, the heading of the Vessel was abeam to the direction of the tidal stream. The current pushed the Vessel to the west sideway at its maximum rate from the starboard side. As the anchor chain of the Vessel had been secured to the mooring buoy, the movement of the Vessel was restricted by the sinker of the mooring buoy and its chain cable. At this juncture, the Vessel was swung into the direction of the current as shown in figure 6. As a result, high dragging force was put on the chain cable. 13

17 The Vessel (final position) The mooring buoy Movement of the Vessel The Vessel (initial position) The sinker (on the seabed) Tidal current Fig. 6: Effects of tidal current to the Vessel Buoy mooring procedures 5.10 According to the Buoy mooring diagram provided by the Association that the ship s crew and the mooring gang crew should follow the procedures on the Preparation for Buoy Mooring and the Final Mooring Arrangement after Secured to Buoy (see figure 7) Ship s crew is required to make preparation work according to the procedures on the Preparation for Buoy Mooring. On completion of the buoy mooring operation, chain rope, and headline are to be rigged as in the drawing as in the Final Mooring Arrangement after Secured to Buoy. During the mooring operation, the mooring gang crew are responsible to carry out the following work procedures: To secure the headline onto the eye shackle of the mooring buoy with a wire sling when the ship is about 100 metres from the mooring buoy; To secure the chain rope (anchor chain) onto the eye shackle of the mooring buoy when the bow of the ship is above at the position of the mooring buoy; To disengage the headline, pass it through the eye shackle and tie it with the messenger rope from the Vessel. The headline is then retrieved to the ship and serves as a slip rope and secured to the ship. The slip rope can be used to heave the ship to the buoy for disconnecting the mooring chain on departure. 14

18 Fig. 7: Buoy mooring diagram 5.12 The Weal Ocean Limited, the principal contractor of the Association provides a Guidelines for Mooring for the mooring gang crew (see appendix 1). The purpose of the guidelines is only to lay down steps for the mooring gang crew to complete their task but not appropriately address the safety precautions for the mooring gang crew. It also appeared that the mooring gang crew was not aware of the existence of the guidelines. They relied on their experience. 15

19 The time sequence of work before the accident 5.13 The mooring gang crew had boarded the mooring buoy three times for the mooring operation. The time sequence of the work before the accident was as follows: Time Work done Location of the mooring The Vessel s gang crew velocity (Approximate) 0850 Placed a wire sling onto the The Sailor A and the Sailor 5 knots at mooring buoy. B on the mooring buoy. course 296 o Returned to the Pilot Boat immediately on completion of the work Took the headline rope The Sailor A, the Sailor B 1 knot at from the Vessel s foredeck and the Engineer on board course 296 o crew. the Pilot Boat Secured the headline rope The Sailor A and the Sailor 1 knot at with the wire sling onto the B on the mooring buoy. course 318 o eye shackle of the mooring Returned to the Pilot Boat buoy. immediately on completion of the work Engaged the Vessel s anchor The Engineer, Sailor A and 1 knot at chain to the eye shackle of the Sailor B on the course 336 o the mooring buoy; mooring buoy. Disengaged the headline rope from the eye shackle; Took a messenger rope from the Vessel and tied it up to the headline rope. The accident happened at about 0902 when the mooring gang crew were tying 16

20 up the messenger and the mooring rope, anchor chain lifting up the mooring eye fitting and tilting the mooring buoy. Movement of the Vessel while working on the mooring buoy 5.14 Based on the radar track record from Vessel Traffic Centre, the movements of the Vessel were recorded as follows: 22 o 18.1 N Passenger ship Asia Star Position of buoy sinker A17 The Vessel Position of buoy sinker A43 22 o 17.9 N o 12.7 E 114 o 12.9 E 114 o 13.1 E Time Heading Turning angle The angular movement of the Vessel (deg/sec) 0 100m 200m 300m 400m (Average) Fig. 8: Movements of the Vessel during the mooring operation The rate of turn of the Vessel was estimated to be about per second (table in figure refers). The speed of the Vessel was about 1 knot when she arrived at the mooring buoy s position. The mooring gang crew boarded the mooring buoy 17

21 for the mooring work operation while the Vessel was in the position close to the maximum outreach of the mooring buoy The maximum horizontal outreach of the mooring eye fitting from the sinker was about metres (see fig 9). According to the plotting of the radar track record. The Vessel had reached the maximum horizontal outreach at the time of the accident around As the Vessel continued to move, the mooring buoy chain cable was dragged and the mooring eye fitting could be drawn out from the mooring buoy. The Vessel (Looking aft) Mooring eye fitting The sinker m Maximum horizontal outreach m m Fig. 9: Sketch of the maximum outreach of the mooring eye fitting 5.16 Shortly prior to the accident, both the Pilot and the Coxswain found that the Vessel was moving significantly. After the Pilot confirmed with the Coxswain of the Pilot Boat that astern engine power was needed, he immediately advised the Master of the Vessel for astern power. However, the accident happened before the action could be taken by the Master. 18

22 Communication 5.17 During the mooring operation, the view from the bridge to the mooring gang crew was obstructed by the superstructure of the Vessel (see figure 10). Figure 10: The view from the bridge to the mooring buoy V.H.F. sets were provided for communication between various parties. The Coxswain and the Chief Officer should report the progress of the mooring, the Vessel s movement, etc to the Pilot and the Master respectively. However, the communication between the various parties was found inadequate, most of the information had not been reported to the bridge team prior to the accident. According to the records of the V.H.F. conversation from Vessel Traffic Centre, it appeared that there were no communications between them prior to the accident. The first communication between the Pilot and the Coxswain was only transpired when the Pilot observed the speed of the Vessel was abnormally fast. Controllable pitch propellers 5.18 During the mooring operation, the propellers pitch angle at the bridge control console was put to zero pitch positions. If errors existed between the bridge control and local position, the propellers were not in neutral position and the Vessel was still in motion. The discrepancy in settings at the control of the controllable pitch propellers were verified with the following results: 19

23 Port Propeller Pitch Starboard Propeller Pitch Reading at bridge control 0 º 0 º Reading at local position 1 º (Forward) 0.25 º (Astern) Discrepancy on the pitch angles was found between the bridge control and the local control position. As such even the bridge control was put at zero position, resultant forward movement and starboard turning moment from the propellers might still act on the Vessel during the mooring operation. Relative movements between the Vessel and the mooring buoy 5.19 The combined effects on the discrepancy in settings of the pitch of the propellers, the Vessel s momentum and tidal stream caused the Vessel to move during the mooring operation. The Vessel was moving and turning steadily while it was reaching the mooring buoy. If the speed and turn rate of the Vessel could be lowered during the mooring operation, the risk of lifting up the mooring eye fitting and tilting the mooring buoy would be reduced. For the sake of safety, the mooring gang crew should not board the mooring buoy when there is still an excessive relative movement between the Vessel and the mooring buoy. Working practice for the mooring operation 5.20 The mooring equipment e.g. shackles, anchor chain and the required tools are heavy items. The mooring gang crew would need both the physical strength and team work to complete the mooring operation in a short period of time. There is always a danger that the ship s residual speed may cause the tilting of the mooring buoy and lifting of mooring eye shackle. Existing working practice requires the crew to complete each individual task on the buoy and return to the launch as soon as possible. According to the mooring gang crew, in case of buoy tilting and lifting of mooring eye shackle, the mooring crew would either jump into water or onto their pilot boat to escape. It appears that the mooring procedures need to be reviewed by relevant parties, in particular the necessary safety precautionary measures to be taken. 20

24 Cause of death 5.21 The head of the Sailor A was crushed by the mooring eye fitting which support the chain cable with a total weight of about 6.7 metric tones. He died of multiple injuries due to crushing and grinding effects between the mooring eye fitting and the buoy. 21

25 6. Conclusions 6.1 An accident happened at the government mooring buoy A43 on 6 April While a mooring gang of three were standing on the mooring buoy to secure the anchor chain of the Vessel to the buoy, the mooring buoy was suddenly tilted and the mooring eye fitting was lifted up from its cylindrical trunking. Two of the mooring gang crew fell into the water while the other fell and was trapped in the cylindrical trunking of the mooring buoy. The latter was crushed to death by the mooring eye fitting. 6.2 The investigation revealed that the Vessel was in motion and moved away from the mooring buoy after the mooring gang crew had secured the ship s anchor chain to the buoy. As a result, the mooring buoy was tilted and the mooring eye fitting was pulled out from the cylindrical trunking of the buoy. 6.3 The investigation has also identified the following contributory factors to the accident: The buoy mooring operation poses significant inherent risks to the mooring gang crew. They are required to remain on the mooring buoy for a prolonged period; Excessive discrepancy on the settings of propeller pitch angles existed between the local position and the bridge control console. The propellers still produced thrust even the pitch control was put to zero ; and Poor communication among the working teams during the mooring operation. 22

26 7. Recommendations 7.1 A copy of this report should be sent to the Master, the Management Company of the Vessel, the Pilot, the Association and the Weal Ocean Limited advising them the findings of this incident. 7.2 It is recommended that a working group formed by the Association, Weal Ocean Limited, Pilotage Unit and Mooring Unit of Marine Department to review the working procedures for the mooring operation with an aim to reduce the risk level of the mooring gang crew. 7.3 The Association and the Weal Ocean Limited is to be reminded to take necessary steps to enhance the safety awareness of the mooring gang crew safety. 7.4 The Master and the Management Company is to be reminded to ensure that: Propeller pitch indicators should be check periodically for accuracy; and To take necessary steps to enhance the effective communication arrangements between parties during mooring operation. 23

27 8. Submissions 8.1 In the event that the conduct of any person or organization is criticized in a casualty investigation report, it is the policy of the Hong Kong Marine Department that a copy of the draft report is given to that person or organization so that they have the opportunity to rebut the criticism or offer evidence not previously available to the investigating officer. 8.2 The final draft report was sent to following parties for their comments: a. The Management Company of the Vessel b. The Master of the Vessel c. The Chief Engineer of the Vessel d. The Chief Officer of the Vessel e. The Pilot of the Vessel f. The Hong Kong Pilot Association Limited g. The Weal Ocean Limited h. The Coxswain of the Pilot Boat i. The Engineer of the the Pilot Boat j. The Sailor of the Pilot Boat 8.3 Comments were received from the Hong Kong Pilot Association Limited, no submissions were received by other parties. The final draft report has been amended as appropriate. 24

28 Appendix Working procedures from Weal Ocean Limited 25

29 26

Report of Investigation. into the Crew Fatality Caused. by a Deck Lifter Onboard. M.V. Dyvi Adriatic

Report of Investigation. into the Crew Fatality Caused. by a Deck Lifter Onboard. M.V. Dyvi Adriatic Report of Investigation into the Crew Fatality Caused by a Deck Lifter Onboard M.V. Dyvi Adriatic on 30 June 2005 Purpose of Investigation This incident is investigated, and published in accordance with

More information

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008

Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Report of Investigation into the fatal accident happened on board m.v. Najran at Kwai Chung Container Terminal on 15 May 2008 Purpose of Investigation This incident is investigated, and published in accordance

More information

Accident Report. Injury Pacific Way. 26 November 2005 Class A

Accident Report. Injury Pacific Way. 26 November 2005 Class A Accident Report Injury Pacific Way 26 November 2005 Class A SUMMARY Pacific Way Injury A crewmember suffered an injury to his wrist when the handle connected to the manually powered windlass that he was

More information

INVESTIGATION OF THE GROUNDING OF MV FULL CITY IMO No. 9073672 AT SASTEIN JULY 31st 2009

INVESTIGATION OF THE GROUNDING OF MV FULL CITY IMO No. 9073672 AT SASTEIN JULY 31st 2009 1 PRELIMINARY REPORT INVESTIGATION OF THE GROUNDING OF MV FULL CITY IMO No. 9073672 AT SASTEIN JULY 31st 2009 Released August 26th 2009 INTRODUCTION At 0044 hrs local time on July 31st the Accident Investigation

More information

National Transportation Safety Board Washington, D.C. 20594

National Transportation Safety Board Washington, D.C. 20594 E PLURIBUS UNUM NATIONAL TRA SAFE T Y N S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Marine Accident Brief Accident No.: DCA-05-MM-018 Vessel: Bahamas-flag passenger

More information

SUMMARY REPORT. December 2014

SUMMARY REPORT. December 2014 SUMMARY REPORT December 2014 KARLA C Allision on 13 April 2014 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Denmark Tel. +45 72 19 63 00 E-mail: dmaib@dmaib.dk Website:

More information

REPORT Dry cargo ship STEEL QUEEN - PBDM grounding on 20 March 2005

REPORT Dry cargo ship STEEL QUEEN - PBDM grounding on 20 March 2005 Dry cargo ship STEEL QUEEN - PBDM grounding on 20 March 2005 2005-04-15 Dry Cargo Ship -STEEL QUEEN - PBDM grounding on 20 March 2005 Our reference: 080202-05-15553 Maritime Casualty Sten Anderson Investigation

More information

MINISTRY OF TRANSPORTATION OF THE REPUBLIC OF LITHUANIA MARINE SHIP ACCIDENT AND INCIDENT INVESTIGATION MANAGER

MINISTRY OF TRANSPORTATION OF THE REPUBLIC OF LITHUANIA MARINE SHIP ACCIDENT AND INCIDENT INVESTIGATION MANAGER MINISTRY OF TRANSPORTATION OF THE REPUBLIC OF LITHUANIA MARINE SHIP ACCIDENT AND INCIDENT INVESTIGATION MANAGER MARINE SHIP ACCIDENT INVESTIGATION FINAL REPORT 2/7/2014 No. (E)-TA-2 The purpose of this

More information

National Transportation Safety Board

National Transportation Safety Board National Transportation Safety Board Marine Accident Brief Allision of Bulk Carrier Anna Smile with Louis Dreyfus Grain Elevator Accident no. Vessel name Accident type Location DCA14LM013 Anna Smile Allision

More information

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS SC BALTIC Occupational Accident on 29 April 2008 Division for Investigation of Maritime Accidents. Danish Maritime Authority, Vermundsgade

More information

International Maritime Pilots Assoication Association Internationale des Pilotes Maritimes Asociascisn Internacional de Practicos Maritime-portuarios

International Maritime Pilots Assoication Association Internationale des Pilotes Maritimes Asociascisn Internacional de Practicos Maritime-portuarios International Maritime Pilots Assoication Association Internationale des Pilotes Maritimes Asociascisn Internacional de Practicos Maritime-portuarios INTERNATIONAL MARITIME ORGANIZATION ORGANISATION MARITIME

More information

CASUALTY REPORT. HELLE STEVNS Accident at work August 21, 1999. 8 March 2000. Case 199903359 File 01.40.50

CASUALTY REPORT. HELLE STEVNS Accident at work August 21, 1999. 8 March 2000. Case 199903359 File 01.40.50 CASUALTY REPORT The INVESTIGATION DIVISION 38 C, Vermundsgade P.O. Box 2589 DK-2100 Copenhagen Ø Phone 39 17 44 00 Fax 39 17 44 16 E-mail oke@dma.dk www.sofartsstyrelsen.dk 8 March 2000 HELLE STEVNS Accident

More information

GUIDANCE NOTES ON RISK ASSESSMENT FOR EVENTS IN HARBOUR AUTHORITY AREAS NOTIFICATION AND STANDARD EVENT PLANNING RISK ASSESSMENT GUIDANCE NOTE

GUIDANCE NOTES ON RISK ASSESSMENT FOR EVENTS IN HARBOUR AUTHORITY AREAS NOTIFICATION AND STANDARD EVENT PLANNING RISK ASSESSMENT GUIDANCE NOTE GUIDANCE NOTES ON RISK ASSESSMENT FOR EVENTS IN HARBOUR AUTHORITY AREAS NOTIFICATION AND STANDARD EVENT PLANNING RISK ASSESSMENT GUIDANCE NOTE The DfT (Department for Transport) Port Marine Safety Code

More information

Design methodology and numerical analysis of a cable ferry

Design methodology and numerical analysis of a cable ferry Design methodology and numerical analysis of a cable ferry SNAME Annual Meeting; Nov 6-8, 2013, Bellevue, WA Paper #T35 Author name(s): Dean M. Steinke (M)1, Ryan S. Nicoll1 (V), Tony Thompson2 (M), Bruce

More information

Fatal fall overboard during loading operations M/V Azoresborg, Bilbao, Spain

Fatal fall overboard during loading operations M/V Azoresborg, Bilbao, Spain DUTCH SAFETY BOARD Fatal fall overboard during loading operations M/V Azoresborg, Bilbao, Spain 1 van 24 Fatal fall overboard during loading operations M/V Azoresborg, Bilbao, Spain, 27 February 2013 The

More information

MARINE ACCIDENT REPORT January 2015

MARINE ACCIDENT REPORT January 2015 MARINE ACCIDENT REPORT January 2015 DIVER MASTER Foundering on 4 August 2014 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Denmark Tel. +45 91 37 63 00 E-mail: dmaib@dmaib.dk

More information

MARINE SAFETY INVESTIGATION REPORT

MARINE SAFETY INVESTIGATION REPORT Marine Safety Investigation Unit MARINE SAFETY INVESTIGATION REPORT Safety investigation into the serious injury on board the Maltese registered general cargo HOPA at the Port of Caronte, France on 16

More information

Personal injury accident on the MV KATRINE KROG on 17 September 2007 at Rüsterbergen pilot station

Personal injury accident on the MV KATRINE KROG on 17 September 2007 at Rüsterbergen pilot station Federal Higher Authority subordinated to the Ministry of Transport, Building and Urban Affairs Summary Investigation Report 449/07 Marine casualty Personal injury accident on the MV KATRINE KROG on 17

More information

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS. R U D O K O P & A T L A N T I C C o l l i s i o n o n 2 1 M a y 2 0 0 8

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS. R U D O K O P & A T L A N T I C C o l l i s i o n o n 2 1 M a y 2 0 0 8 MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS R U D O K O P & A T L A N T I C C o l l i s i o n o n 2 1 M a y 2 0 0 8 Report from the Division for Investigation of Maritime Accidents

More information

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships Regulation of 5 September 992 No. 704 concerning operating arrangements on Norwegian ships Laid down by the Norwegian Maritime Directorate on 5 September 992 pursuant to the Act of 9 June 903 no. 7 relating

More information

London Array. Operations and Maintenance

London Array. Operations and Maintenance London Array londonarray.com London Array Operations & Maintenance Base Port of Ramsgate Military Road Ramsgate CT11 9LG Registered in England and Wales No 04344423 Operations and Maintenance 1 2 Operations

More information

Report of Accident or Other Occurrence

Report of Accident or Other Occurrence Marine Safety Branch GPO Box 2520 Darwin NT 0801 Report of Accident or Other Occurrence Telephone: 08 8924 7100 Facsimile: 08 8924 7009 Email: marinesafety@nt.gov.au Note: Section 117 of the Marine Act

More information

Fatal fall overboard during loading operations

Fatal fall overboard during loading operations DUTCH SAFETY BOARD Introduction Falling from heights make up for one of the most frequent kinds of accident on board ships. In the past two years 30 of such accidents have been reported to the Dutch Safety

More information

Safety of Life at Sea, 1974 (SOLAS)

Safety of Life at Sea, 1974 (SOLAS) Safety of Life at Sea, 1974 (SOLAS) Prof. Manuel Ventura Ship Design I MSc in Marine Engineering and Naval Architecture Chap. III. Lifesaving Appliances and Arrangements 1 Cargo Ships Cargo Ships - Case

More information

Passenger Terminal Amsterdam

Passenger Terminal Amsterdam Fact sheet large cruise ships to Passenger Terminal Amsterdam Port of Amsterdam Amsterdam-IJmond Pilot Organization 2009 Version: November 6 th 2009 This fact sheet provides information on the passage

More information

Learn to Sail at MIT

Learn to Sail at MIT Learn to Sail at MIT Please read this before the next class and practice your knots: the bowline and the stunsail tack bend. Rigging Check with the dock staff to see if there are any restrictions. Grab

More information

Marine Guide for Ship Masters Contents

Marine Guide for Ship Masters Contents Marine Guide for Ship Masters Contents Marine Guide for Ship Masters... 1 Port Operating Company... 2 Harbour Authority... 2 Location... 2 Pilotage... 2 Pilot Boat... 3 Pilot Ladder... 3 Pilots and Tugs

More information

CODES OF CONDUCT FOR VESSELS AND CRAFT USING THE CATTEWATER

CODES OF CONDUCT FOR VESSELS AND CRAFT USING THE CATTEWATER PORT OF PLYMOUTH CATTEWATER HARBOUR COMMISSIONERS 2 The Barbican, Plymouth, PL1 2LR Tel: 01752 665934 Fax: 01752 253624 e-mail: info@plymouthport.org.uk PLYMOUTH PILOTAGE SERVICE 2 The Barbican, Plymouth,

More information

The Engine Department

The Engine Department The Engine Department The Engine Department of a cruise ship is part of the Marine Operations Division. Although the Engine Department team is primarily responsible for the safe and smooth operation of

More information

Safety Study from the DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS

Safety Study from the DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS from the DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS Mooring Accidents on board merchant ships 1997-2006 Divsion for Investigation of Maritime Accidents. Danish Maritime Authority, Vermundsgade 38

More information

E S T E L L E M Æ R S K A c c i d e n t t o s e a f a r e r s o n 3 0 O c t o b e r 2 0 0 9

E S T E L L E M Æ R S K A c c i d e n t t o s e a f a r e r s o n 3 0 O c t o b e r 2 0 0 9 MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS E S T E L L E M Æ R S K A c c i d e n t t o s e a f a r e r s o n 3 0 O c t o b e r 2 0 0 9 Divsion for Investigation of Maritime

More information

IMO. MSC/Circ.707 19 October 1995. Ref. T1/2.04 GUIDANCE TO THE MASTER FOR AVOIDING DANGEROUS SITUATIONS IN FOLLOWING AND QUARTERING SEAS

IMO. MSC/Circ.707 19 October 1995. Ref. T1/2.04 GUIDANCE TO THE MASTER FOR AVOIDING DANGEROUS SITUATIONS IN FOLLOWING AND QUARTERING SEAS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020-7735 7611 Fax: 020-7587 3210 Telex: 23588 IMOLDN G IMO E MSC/Circ.707 19 October 1995 Ref. T1/2.04 GUIDANCE TO THE

More information

1 PORT TAXES 0,29. Ships less than 500 T minimum 36,59 Ships more than 500 T minimum 295,54

1 PORT TAXES 0,29. Ships less than 500 T minimum 36,59 Ships more than 500 T minimum 295,54 DEMOCRATIC REPUBLIC OF CONGO PORT EXPENSES HARBOUR DUES 1 PORT TAXES 0,29 Ships less than 500 T minimum 36,59 Ships more than 500 T minimum 295,54 2 GENERAL DUES - BANANA ESTUARY (or return) 0,29 - BANANA

More information

CALCULATING WHEEL-OVER POINT

CALCULATING WHEEL-OVER POINT Asia-Pacific Journal of Marine Science&Education, Vol. 2, No. 1, 2012, pp. 27-46 CALCULATING WHEEL-OVER POINT Vladimir N. Drachev The article consists of two parts. The first one presents a ship turning

More information

MOORING, TOWING OR HAULING EQUIPMENT ON ALL VESSELS - SAFE INSTALLATION AND SAFE OPERATION

MOORING, TOWING OR HAULING EQUIPMENT ON ALL VESSELS - SAFE INSTALLATION AND SAFE OPERATION MARINE GUIDANCE NOTE MGN 308 (M+F) MOORING, TOWING OR HAULING EQUIPMENT ON ALL VESSELS - SAFE INSTALLATION AND SAFE OPERATION Notice to all Builders, Repairers, Owners, Operators, Masters, Skippers, Officers

More information

Pilot on the Bridge Role, Authority and Responsibility. Necessity of Bridge Team Management.

Pilot on the Bridge Role, Authority and Responsibility. Necessity of Bridge Team Management. Pilot on the Bridge Role, Authority and Responsibility. Necessity of Bridge Team Management. Captain Ajaz Peermohamed Gard (UK) Limited London, United Kingdom Captain Ajaz Peermohamed Senior Claims Executive

More information

Emergency Response Plan. at sea also valid in case of Flooding, where applicable

Emergency Response Plan. at sea also valid in case of Flooding, where applicable Plan 1. Grounding, Stranding at sea also valid in case of Flooding, where applicable 2. Application Shorebased Organisation All Ships prepared: approved: released: Revision 0 HLS Management 2006-11-24

More information

Vessels reporting duties on the NSR

Vessels reporting duties on the NSR The Arctic 2030 Project: Feasibility and Reliability of Shipping on the Northern Sea Route and Modeling of an Arctic Marine Transportation & Logistics System 1-st Industry Seminar: NSR s Legislation, Tariff

More information

Ship Monitoring System using Communication Satellite for Maritime Safety

Ship Monitoring System using Communication Satellite for Maritime Safety Ship Monitoring System using Communication Satellite for Maritime Safety K. INOUE, H. USUI, K. HIRONO, W. SERA Faculty of Maritime Sciences, Kobe University, Japan. Abstract Any subsequent action to ensure

More information

1. SLACK TIDES refer to tide with strength not exceeding 0.5 knots.

1. SLACK TIDES refer to tide with strength not exceeding 0.5 knots. DEFINITIONS 1. SLACK TIDES refer to tide with strength not exceeding 0.5 knots. 2. SLACK WATER refers to the interval when the strength of the tidal stream is very weak or at zero knots. This is usually

More information

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request. SweOffshore Fabriksgatan 10 SE-412 50 Gothenburg, Sweden +46(0)31 788 78 00 commercial@sweoffshore.com www.sweoffshore.com SweOffshore Accommodation concept, Supporting our Customers in achieving the most

More information

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS. N I N A N I T U & A F R I C A N Z E B R A C o l l i s i o n 6 J u l y 2 0 1 0

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS. N I N A N I T U & A F R I C A N Z E B R A C o l l i s i o n 6 J u l y 2 0 1 0 MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS N I N A N I T U & A F R I C A N Z E B R A C o l l i s i o n 6 J u l y 2 0 1 0 Division for Investigation of Maritime Accidents Danish

More information

National Transportation Safety Board

National Transportation Safety Board National Transportation Safety Board Marine Accident Brief Fire On Board Motor Yacht Ocean Alexander 85E06 Accident no. Vessel name Accident type Location DCA13LM029 Ocean Alexander 85E06 Fire Date July

More information

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Boatmaster s Licenses

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Boatmaster s Licenses CIRCULAR Local 2013-001 DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Boatmaster s Licenses Ref SCV Code. Companies operating SCV certificated vessels under the flag of Antigua and Barbuda.

More information

Australian Maritime Safety Authority

Australian Maritime Safety Authority Australian Maritime Safety Authority About the Australian Maritime Safety Authority The Australian Maritime Safety Authority (AMSA) is a statutory authority established under the Australian Maritime Safety

More information

United Kingdom Maritime Pilot s Association. Piloting Vessels Fitted With Azimuthing Control Devices (ACD s)

United Kingdom Maritime Pilot s Association. Piloting Vessels Fitted With Azimuthing Control Devices (ACD s) United Kingdom Maritime Pilot s Association Piloting Vessels Fitted With Azimuthing Control Devices (ACD s) Azimuth Controlled Device (ACD) Vessel MPX The purpose of this booklet is to assist the pilot

More information

How To Secure To A Boat

How To Secure To A Boat Mooring Equipment A Conservancy maintained mooring consists of a heavy black iron chain riser, which is attached to a sinker or ground chain. The swivel allows the boat to swing freely at the mooring without

More information

World Vessel Traffic Services Guide - United Kingdom - Port of London

World Vessel Traffic Services Guide - United Kingdom - Port of London World Vessel Traffic Services Guide - United Kingdom - Port of London Approaches The Port of London is normally approached using one of three channels. The main Deep Water route is from the North East

More information

REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS

REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS REPUBLIC OF LIBERIA BUREAU OF MARITIME AFFAIRS Marine Notice SAF-004 Rev. 04/05 TO: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AGENTS AND RECOGNIZED ORGANIZATIONS SUBJECT: Lifeboat

More information

DAY SKIPPER AND LOCAL WATERS SKIPPER PRACTICAL AND ORAL GENERAL KNOWLEDGE QUESTIONS

DAY SKIPPER AND LOCAL WATERS SKIPPER PRACTICAL AND ORAL GENERAL KNOWLEDGE QUESTIONS DAY SKIPPER AND LOCAL WATERS SKIPPER PRACTICAL AND ORAL GENERAL KNOWLEDGE QUESTIONS (Updated 22 August 2012) This list has been devised to give candidates a feel for the range of questions that could be

More information

MARINE ACCIDENT REPORT April 2013

MARINE ACCIDENT REPORT April 2013 MARINE ACCIDENT REPORT April 2013 ANNA MÆRSK Fatal accident to seafarer on 27 March 2012 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Tel. +45 91 37 63 00 E-mail:

More information

Laws and price drive interest in LNG as marine fuel

Laws and price drive interest in LNG as marine fuel Laws and price drive interest in LNG as marine fuel The use of LNG as a marine fuel is one of the hottest topics in shipping. This growing interest is driven by legislation and price. By Henrique Pestana

More information

MOOREX mooring system

MOOREX mooring system MOOREX mooring system The peace-of-mind mooring system Modern ships are difficult to moor safely Ship sizes grow but berths and mooring arrangements remain the same as before. Operators often face the

More information

STANDARDS OF TRAINING, EVALUATION AND CERTIFICATION OF TURKISH MARITIME PILOTS

STANDARDS OF TRAINING, EVALUATION AND CERTIFICATION OF TURKISH MARITIME PILOTS STANDARDS OF TRAINING, EVALUATION AND CERTIFICATION OF TURKISH MARITIME PILOTS Ali CÖMERT 1, Özkan POYRAZ 2 1 Captain, Maritime Pilot (Strait of Istanbul), Turkish Maritime Organisation Inc. (TDİ A.Ş.),

More information

SERVICES TO SHIPPING LINES & AGENTS TARIFF REGULATIONS & MARINE USER CHARGES

SERVICES TO SHIPPING LINES & AGENTS TARIFF REGULATIONS & MARINE USER CHARGES A Strategic Business Unit of Port Authority of Trinidad and Tobago POSINCO TARIFF SERVICES TO SHIPPING LINES & AGENTS TARIFF REGULATIONS & MARINE USER CHARGES Effective January 1 st 2014 Head Office: Port

More information

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: + 47 91784699 Notice required:

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: + 47 91784699 Notice required: NAME OF PORT Region/City/Port : Geirangerfjord Cruise Port Internet Web Site Official Port Address: 6216 Geiranger Hellesylt www.stranda-hamnevesen.no GEIRANGERFJORD CRUISE PORT IMO registered Port Facilities

More information

RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE

RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE RISK MANAGEMENT IN THE NATIONAL SYSTEM A PRACTICAL GUIDE Contents Introduction 2 Terms associated with risk management 3 The risk management process

More information

TOOLS FOR IMPROVING SAFETY MANAGEMENT IN THE NORWEGIAN FISHING FLEET OCCUPATIONAL ACCIDENTS ANALYSIS PERIOD OF 1998 2006

TOOLS FOR IMPROVING SAFETY MANAGEMENT IN THE NORWEGIAN FISHING FLEET OCCUPATIONAL ACCIDENTS ANALYSIS PERIOD OF 1998 2006 Internat. Marit. Health, 2006, 57, 1-4 TOOLS FOR IMPROVING SAFETY MANAGEMENT IN THE NORWEGIAN FISHING FLEET OCCUPATIONAL ACCIDENTS ANALYSIS PERIOD OF 1998 2006 HALVARD L.AASJORD 1 ABSTRACT Reporting of

More information

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: + 47 99531717 Notice required:

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: + 47 99531717 Notice required: NAME OF PORT Region/City/Port : Geirangerfjord Cruise Port Internet Web Site Official Port Address: 6216 Geiranger Hellesylt www.stranda-hamnevesen.no GEIRANGERFJORD CRUISE PORT IMO registered Port Facilities

More information

Performance Condition When asked by a qualified assessor, On board ship or in an approved training program,

Performance Condition When asked by a qualified assessor, On board ship or in an approved training program, 17.1.A International Conventions Monitor compliance with legislative requirements Basic working knowledge of the relevant IMO conventions concerning safety of life at sea, security and protection of the

More information

NAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE- by Zalal Uddin Ahmed

NAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE- by Zalal Uddin Ahmed NAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE- by Zalal Uddin Ahmed The write up prepared to give detail idea as regards Chittagong port anchorage area, draft restriction, the types

More information

Statistical Summary Marine Occurrences 2013

Statistical Summary Marine Occurrences 2013 Statistical Summary Marine Occurrences 2013 Foreword This document provides Canadians with an annual summary of selected maritime safety data. It covers commercial vessels, which include all vessels registered

More information

AIS Overview. Evans Starzinger

AIS Overview. Evans Starzinger AIS Overview by Evans Starzinger Background AIS (Automatic Identification System) is a VHF radio system which automatically communicates vessel information (vessel identity, position, speed, etc) between

More information

Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China

Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China Prevention Pollution by Garbage from Ships in China E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China 1 General Ship source garbage has been identified as one of the

More information

Harbourmaster s Office Operation of Emergency Response Vessels within the Auckland Region. Navigation Safety Operating Requirements 2014

Harbourmaster s Office Operation of Emergency Response Vessels within the Auckland Region. Navigation Safety Operating Requirements 2014 Harbourmaster s Office Operation of Emergency Response Vessels within the Auckland Region Navigation Safety Operating Requirements 2014 Auckland Council Harbourmaster s Office Operation of Emergency Response

More information

Certification of seafarers

Certification of seafarers 1 (14) Date of issue: 19 June 2014 Entry into force: 1 August 2014 Validity: Indefinitely Legal basis: Act on Ships Crews and the Safety Management of Ships (1687/2009), sections 5(4), 17(6), 18(2), 19(4)

More information

World Vessel Traffic Services Guide - Australia - Melbourne

World Vessel Traffic Services Guide - Australia - Melbourne World Vessel Traffic Services Guide - Australia - Melbourne VHF Procedures Port of Melbourne VTS Area is divided into two Sectors. Sector 1: Lonsdale VTS (LVTS) Located at: POINT LONSDALE SIGNAL STATION

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

A Proven Barrier System Tested and Installed Worldwide

A Proven Barrier System Tested and Installed Worldwide ANTI TERRORIST BOAT BARRIER SYSTEM A Proven Barrier System Tested and Installed Worldwide Pneumatic Barrier System, designed and supplied to withstand 1,000,000 ft-lbs of Kinetic energy which represents

More information

Large Personal Injury Claims by Accident Type (Number)

Large Personal Injury Claims by Accident Type (Number) Mooring Incidents Large Personal Injury Claims by Accident Type (Number) STRUCK BY MOTOR VEHICLE BURNS CHEMICAL EXPOSURE STRAIN BY HOLDING OR CARR BURNS BY STEAM OR FLUIDS CRUISE CANCELLATION EXPLOSION

More information

Guidance on vessel traffic services (VTS) in Danish waters

Guidance on vessel traffic services (VTS) in Danish waters Translation. Only the Danish document has legal validity. Guidance no. 9680 of 16 December 2010 issued by the Danish Maritime Authority Guidance on vessel traffic services (VTS) in Danish waters Purpose

More information

Pilot Transfer Arrangements

Pilot Transfer Arrangements Shipping Industry Guidance on Pilot Transfer Arrangements International Chamber of Shipping International Maritime Pilots Association Also supported by Shipping Industry Guidance on Pilot Transfer Arrangements

More information

The rigging of ladders

The rigging of ladders Shipping industry guidance on The rigging of ladders for pilot transfer Ensuring compliance with SOLAS International Maritime Pilots Association International Chamber of Shipping International Shipping

More information

Azimuth thrusters. propulsors

Azimuth thrusters. propulsors Azimuth s Rolls-Royce is a global leader in the supply of azimuth s. In an azimuth the propeller rotates 360 around the vertical axis so the unit provides propulsion, steering and positioning thrust for

More information

Introduction to AIS White Paper

Introduction to AIS White Paper Introduction to AIS White Paper 1. Background AIS (Automatic Identification System) is the mariner s most significant development in navigation safety since the introduction of radar. The system was originally

More information

Safety Flash. IMCA Safety Flash 18/13 December 2013. 1 Fatality During Lifting Operations

Safety Flash. IMCA Safety Flash 18/13 December 2013. 1 Fatality During Lifting Operations AB Safety Flash IMCA Safety Flash 18/13 December 2013 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been

More information

Notice to all Ship Owners and Operators; Masters, and Deck Officers of Merchant Ships; Manufacturers, and Suppliers of Voyage Data Recorders.

Notice to all Ship Owners and Operators; Masters, and Deck Officers of Merchant Ships; Manufacturers, and Suppliers of Voyage Data Recorders. MARINE GUIDANCE NOTE MGN 272 (M) VOYAGE DATA RECORDER S (VDRs) PERFORMANCE TESTING Notice to all Ship Owners and Operators; Masters, and Deck Officers of Merchant Ships; Manufacturers, and Suppliers of

More information

MARINE ACCIDENT REPORT September 2012

MARINE ACCIDENT REPORT September 2012 MARINE ACCIDENT REPORT September 2012 RAMONA Collision with railway bridge 28 March 2012 The Danish Maritime Accident Investigation Board Vermundsgade 38 A DK-2100 Copenhagen O Tel. +45 39 17 44 40 E-mail:

More information

RESOLUTION MSC.255(84) (adopted on 16 May 2008)

RESOLUTION MSC.255(84) (adopted on 16 May 2008) RESOLUTION MSC.255(84) (adopted on 16 May 2008) ADOPTION OF THE CODE OF THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES FOR A SAFETY INVESTIGATION INTO A MARINE CASUALTY OR MARINE INCIDENT (CASUALTY

More information

Christchurch Boat Moorings & Storage

Christchurch Boat Moorings & Storage Christchurch Boat Moorings & Storage Christchurch Harbour Boat Moorings Location Christchurch Harbour is set midway between the Solent and Poole Harbour and provides access to one of the most popular areas

More information

MARINE ACCIDENT REPORT March 2013

MARINE ACCIDENT REPORT March 2013 MARINE ACCIDENT REPORT March 2013 VEGA SAGITTARIUS Grounding on 16 August 2012 The Danish Maritime Accident Investigation Board Carl Jacobsens Vej 29 DK-2500 Valby Tel. +45 91 37 63 00 E-mail: dmaib@dmaib.dk

More information

Dry Bulk Carriers Vessel: Bulk Americas

Dry Bulk Carriers Vessel: Bulk Americas Vessel: Bulk Americas Dry Bulk Americas Ltd. NKK Tsuneishi Heavy Industries 23 November 2011 Delivery 30 January 2012 Panama Panama 5650737 3EZH3 Bulk Carrier 185.78 M 32.36 18.0 M 12.80 M Deadweight (S.S.W.)

More information

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2 SIMON STEVIN The world s largest FALL PIPE & ROCK DUMPING Vessel 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2 The world s largest fall pipe & rock

More information

ITF CRUISE SHIP SAFETY POLICY

ITF CRUISE SHIP SAFETY POLICY ITF CRUISE SHIP SAFETY POLICY INTRODUCTION The ITF Cruise Ship Safety Policy reflects the additional measures required as a result of the great number of passengers and crew carried and builds upon the

More information

points of sail beating reaching running

points of sail beating reaching running History of Sailing Throughout history sailing has been instrumental in the development of civilization. The earliest representation of a ship under sail appears on an Egyptian vase from about 3500 BC.

More information

GUIDE TO RECOVERY TECHNIQUES

GUIDE TO RECOVERY TECHNIQUES E ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 GUIDE TO RECOVERY TECHNIQUES MSC.1/Circ.1182/Rev.1 21 November 2014 1 The Maritime Safety Committee, at its ninety-fourth

More information

Rigging for Rescue Notes

Rigging for Rescue Notes The term 'highline' often inappropriately referred to as a 'Tyrolean' refers to a system that uses a track rope (mainline) to suspend a load over a span. Highlines can be much more practical for rescue

More information

OFFSHORE WIND Peter Robert

OFFSHORE WIND Peter Robert OFFSHORE WIND Peter Robert Business Development Manager Offshore Wind Damen Shipyards Group Phone: +31 (0)183 655177 Mobile: +31 (0)6 22856004 E-mail: peter.robert@damen.com ABOUT DAMEN FOUNDER: KOMMER

More information

Weta Class Rules. This introduction provides an informal background and is not part of the Weta class rules.

Weta Class Rules. This introduction provides an informal background and is not part of the Weta class rules. Introduction The Weta is a trimaran developed by Weta Marine Ltd. Weta hulls, beams, hull appendages, rigs and sails shall only be manufactured by Weta Marine Ltd or their appointed manufacturers. A hull,

More information

GOFREP Master s Guide

GOFREP Master s Guide VEETEEDE AMET ESTONIAN MARITIME ADMINISTRATION 27 December 2010 GOFREP Master s Guide 2 (8) Contents 1 GOFREP IN GENERAL... 3 1.1 Categories of ships required to participate... 3 1.2 Information provided...

More information

STEVNS POWER Capsizing and foundering during anchor handling operation on 19 October 2003

STEVNS POWER Capsizing and foundering during anchor handling operation on 19 October 2003 CASUALTY REPORT Date: 28. juni 2004 Case: 199940518 DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS DANISH MARITIME AUTHORITY Vermundsgade 38 C DK-2100 Copenhagen Ø STEVNS POWER Capsizing and foundering

More information

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE

More information

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 Manning 1. Manning should comply with U.S. Coast Guard regulations

More information

Domestic Shipping. Safety Management System. Company:

Domestic Shipping. Safety Management System. Company: Domestic Shipping Safety Management System Company: Contents: Introduction: 1.0 General 2.0 Safety and Environmental Protection Policies 2.1 Company Safety Policy 2.2 Company Environmental Protection Policy

More information

THE NEXT REVOLT 18 BATTERY COASTAL TRAFFIC REVOLT IN BRIEF

THE NEXT REVOLT 18 BATTERY COASTAL TRAFFIC REVOLT IN BRIEF 18 BATTERY COASTAL TRAFFIC THE NEXT REVOLT Could present-day technology improve the cost and effectiveness of shortsea shipping while enhancing safety and environmental performance? Yes, it could! Taking

More information

2. Isle of Man Merchant Shipping (Medical Stores) Regulations 2001

2. Isle of Man Merchant Shipping (Medical Stores) Regulations 2001 File Reference: Dear Sir/Madam, Requirements and Guidelines for the Survey and Certification of New and Existing Vessels Registering with the Isle of Man Ship Registry In order to ensure that the survey

More information

Good practice. Enclosed lifeboat launching. It s your ship and equipment look after them and they will look after you GOOD PRACTICE

Good practice. Enclosed lifeboat launching. It s your ship and equipment look after them and they will look after you GOOD PRACTICE Enclosed lifeboat launching NUMBER 72 Counterweight rigged correctly, externally All crew aware of operation through drills and lecture Monthly checks as per SMS The brake wire should fall free from the

More information

MSV FENNICA MSV FENNICA SHORT VESSEL DESCRIPTION VESSEL DETAILS

MSV FENNICA MSV FENNICA SHORT VESSEL DESCRIPTION VESSEL DETAILS MSV FENNICA SHORT VESSEL DESCRIPTION The Fennica is a multifunctional vessel based on a modified icebreaker design with dieselelectric propulsion. The vessel is specially designed for a wide range of offshore

More information

Marine Accidents SØULYKKESRAPPORT FRA OPKLARINGSENHEDEN

Marine Accidents SØULYKKESRAPPORT FRA OPKLARINGSENHEDEN Marine Accidents 2009 SØULYKKESRAPPORT FRA OPKLARINGSENHEDEN The Danish Maritime Authority 2009, Vermundsgade 38C, 2100 Copenhagen Ø Telephone 39 17 44 00 - Fax 39 17 44 01 www.sofartsstyrelsen.dk sfs@dma.dk

More information

Activity #1-HS What is a Seismometer? High School Level

Activity #1-HS What is a Seismometer? High School Level Activity #1-HS What is a Seismometer? High School Level Objective Students will learn that a seismometer detects 3 components of motion and that a seismogram is the record of an earthquake. Background

More information