Budget Monitoring 2013/14 General Fund, HRA and Capital Programme

Size: px
Start display at page:

Download "Budget Monitoring 2013/14 General Fund, HRA and Capital Programme"

Transcription

1 Open Decision Item One Corby Policy Committee 6 th August 2013 Budget Monitoring General Fund, HRA and Capital Programme SYNOPSIS BOX This report sets out the income and expenditure forecasts for the year in relation to the General Fund, the Housing Revenue Account (HRA) and the Capital Programme based on April to June expenditure. Where there are potential overspends, action plans should be provided by the relevant Heads of Service to bring expenditure back into line with budget. 1. Background Details In line with corporate budgetary control procedures, reports on the latest financial forecasts for in relation to both revenue and capital programmes are brought to this committee on a quarterly basis. This is the first full report for, and represents a full year forecast based on the period April to June. 2. Report General Fund Revenue The General Fund shows an underspend of 50k, against a gross budget of 49m. There are several projected over and underspends and these are broken down by Service Level in Appendix A. The key points to note are as follows: Chief Executive the overspend relates to additional subscription costs to SEMLEP. Assistant Chief Executive the underspend is in relation to a part year vacant post savings. Neighbourhood Pride whilst there is a salary saving of 3k, there is also an overspend of 8k for CCTV. This is in respect of a 25k budget saving that was put forward of which only 17k will be achieved in. Planning and Environmental Services although there are underspends on green waste disposal cost and increased recycling credits of 50k and contract savings on the environmental cleansing contract of 20k, there are expected planning income shortfalls of 57k. In addition there is a 42k pressure for the Rushden Lakes appeal. The decision to support the appeal as part of a consortium with Kettering, Northampton and Bedford was agreed at Leader/Deputy/CMT and was originally thought to cost around 25k. Costs have since escalated because Bedford Borough Council withdrew from the consortium and the duration of the inquiry was extended from 8 to 12 days Culture & Leisure the overspend is made up of 15k of additional repairs and maintenance costs at the Pool and 13k of lost income at the Golf Course due to weather enforced golf closures earlier in the year

2 Corporate Services - Finance the underspend is comes mainly from 66k of additional income from the Corby Enterprise Centre, slightly reduced by 6k of additional agency costs within legal services. CB Property although there are additional running and repairs and maintenance costs of 68k for Cube and Grosvenor House, these are more than offset by net additional income of 119k from the Council s commercial properties. Human Resources - the overspend is due to higher net salary and consultation costs for ongoing professional advice and support. Other although no underspend is currently showing, there is likelihood that there will be underspend on interest and borrowing costs as interest rates have continued to remain at historic low levels. This could be as high as 200k and as with last year, it will be recommended that should it materialize, it is transferred into the interest reserve, to help mitigate any unforeseen significant interest rate increases in the future. Achievement of Budget Savings The budget process approved savings of 809k. Of these savings, all but one is on target to be achieved. The one at risk is the CCTV saving referred to above, whereby a saving of 17k is likely to be achieved in the current year rather than the 25k originally assumed. Housing Revenue Account The HRA shows a projected underspend of 220k, against a gross budget of 23m. There are several projected over and underspends and these are broken down by Service Level in Appendix B. The key points to note are as follow. Responsive Repairs/General Management/Sheltered Housing/Emergency Alarms the variances are largely due to salary savings. Hostels/Single Persons Accommodation the overspend is due to a shortfall in service charges income. Supporting People no overspend is currently showing despite the withdrawal of funding from the County Council, since it is expected that OCPC will approve the introduction of revised working practices and benefit arrangements to cover the loss of funding. Other/Technical the underspend is due to a potential reduction in the bad debt provision of 66k and the purchase of additional leave of 29k. Income the shortfall on income reflects the delays in the new build programme which was originally assumed to be part of the income. There is also a potential additional weeks rental in the year. However, this is subject to a separate report and so no variance is assumed at this stage. Capital Programme A breakdown of the latest capital programme for and expenditure to the end of June is shown in Appendix C. For projects over 1m that cover more than 1 year a whole project life budget and forecast outturn is also shown

3 The only variance requiring approval within the Housing capital programme is 105k from external insulation works to fund 6 additional vehicles. 3 new budgets require approval within the General Fund capital programme. These are as follows: 168k of railway station improvements funded from S106 income m of Oakley Vale Infrastructure works, funded from future capital overage receipts. 62k for a Play area funded from Section Options to be considered (if any) This report demonstrates that both the General Fund and the Housing Revenue Account are showing relatively healthy positions as compared to the budget. No remedial action is therefore required at this stage of the financial year. 4. Issues to be taken into account:- Financial/Risks This report considers the key risks and financial issues in some detail. Legal There is a statutory requirement to maintain revenue balances on both the General Fund and HRA. Performance Information Financial performance should be considered in the context of levels of performance achieved in delivering services. Best Value, Community Safety, Human Rights, Equalities, Sustainability There are no issues in relation to these arising directly from this report. 5. Conclusion This report shows an underspend of 50k for the General Fund and an underspend of 220k for the HRA. No major adverse variances are currently being shown for the capital programme A robust approach to budgetary control continues with further scrutiny being applied during the financial year, including the 2014/15 budget process. A number of variances that have so far been identified will continue to be monitored during the course of the year with Heads of Service continuing to work up action plans to contain any potential overspends within their service areas. 6. Recommendations The Committee: (a) Note the financial position of the General Fund, the Housing Revenue Account and the Capital Programme contained in this report. (b) Instruct the relevant Heads of Service/Directors and the Director of Corporate Services to continue to review all areas of expenditure within the General Fund and the Housing Revenue Account with a view to maximising the net underspend

4 (c) Approve the virements and additions to the capital schemes as detailed under the Capital Programme section above. Background Papers Budget Monitoring Working Papers External Consultations None List of Appendices Appendix A General Fund Budget Monitoring Appendix B HRA Budget Monitoring Appendix C Capital Programme Monitoring Wards All Wards Officer to Contact Adrian Sibley, Director of Corporate Services, Ext

5 General Fund Budget Monitoring Appendix A Based on Period April June 2014 Service Original Budget Latest Budget Expenditure Latest Budget Income Latest Budget Projected Outturn (Underspend)/O verspend A B C=B-A D E=D-C Chief Executive 1,078,996 1,933, ,035 1,071,936 1,080,246 8,310 Assistant Chief Executive 21, , ,215 23,300 9,690 (13,610) Neighbourhood Pride 823,423 1,230, , , ,153 4,680 Planning & Environmental Services 4,668,780 7,003,021 2,318,394 4,684,627 4,713,937 29,310 Culture & Leisure 2,737,029 5,497,368 2,702,320 2,795,048 2,822,792 27,744 Corporate Services 968,448 28,714,039 27,695,298 1,018, ,041 (59,700) CB Property (1,359,334) 3,151,911 4,520,065 (1,368,154) (1,418,908) (50,754) Human Resources 21, , ,843 29,339 33,119 3,780 Transport & Plant Admin - 13,800 13, Other - (Borrowing etc) 1,500,981 1,500,981 45,000 1,455,981 1,455,981 - General Fund Total 10,461,162 49,429,929 38,845,638 10,584,291 10,534,051 (50,240)

6

7 Capital Programme Monitoring Appendix C Housing (HRA) Capital Programme : as at the end of June 2013 Whole Life Whole Life Scheme Description Full Full Approved Latest Spend Projected Over/ Budget Outturn Budget Budget To Date Outturn (under) Comments Decent Homes Decent Homes : Kitchen & Bathrooms 1,114,000 1,114,000 87,942 1,114,000 0 Decent Homes : Central Heating Replacement 700, ,000 (42,572) 700,000 Final account still in progress - still awaiting some 0 contractor invoices Decent Homes : Rewires 200, ,000 (8,227) 200,000 0 Decent Homes : Entrance Doors/Flats/dwellings 200, ,000 24, ,000 Budget set on figure for Swan Doors - works now in-house with 0 potential underspend - too early to determine figure Capital Works Capital Works : Structural Works 75,320 75,320 15,462 75,320 0 Capital Works : Disabled Adaptations 400, ,000 29, , k payment just going through Capital Works : No Fines external insulation 1,125,000 1,020, ,020,000 Market testing being carried out - potential 1m funding from one fo two companies currently involved in the tender 0 process as per July OCPC report. 105k to be vired to purchase 6 additional vehicles. To Be Approved Major Roofing Works 259, , ,000 0 Stock Condition Survey 100, ,000 15, ,000 0 Capital Works : Velbert House Refurbishment 0 0 (79,764) 0 0 Final account not yet agreed - 30k discrepancy Orchard Upgrade 53,830 53,830 49,798 53,830 0 Project ongoing. Repairs Scheduling System 13,750 13,750 10,295 13,750 0 Vehicle Purchase 35, ,000 33, ,832 Small underspend - additional 105k required to be vired from (1,168) external insulation budget for 6 more vehicles as part of 9 required for DLO restructure. To Be Approved Asbestos Removal 394, ,000 42, ,000 0 Voids Major Works 84,000 84,000 65,710 84,000 0 Velbert House Roofing 140, , ,000 0 Budget set on 3 quotes received in July 2012 Health & Safety Ratings 200, ,000 14, ,000 0 Potential underspend but too early to project a figure. Sykes Court Roofing 100, , ,000 Potential 40% saving by carrying out comprehensive repair (40,000) on the framework contract. L.A.New Build L.A.New Build : Arran way 3,469,650 3,061, , ,000 45, ,000 0 L.A.New Build : Copenhagen Rd 1,428,000 1,427,780 90,760 90, ,760 0 L.A.New Build : Canada Sq 1,619,100 1,619, , , ,000 0 L.A.New Build : Finland Way 1,117,000 1,117,000 1,072,910 1,072,910 2,800 1,072,910 0 L.A.New Build : Garage Sites 4,025,000 4,025, , , ,090 0 HOUSING CAPITAL FEES 757, , ,000 0 Total Housing Programme 8,011,660 8,011, ,455 7,970,492 (41,168) Original Budget 8,011,660 Brought Forward from 2012/13 Latest Budget 8,011,660 Needs Approval for supplementary estimate 0

8 Appendix C General Fund Capital Programme : as at the end of June 2013 Whole Life Whole Life Scheme Description Full Full Approved Latest Spend Projected Over/ Budget Outturn Budget Budget To Date Outturn (under) Comments Corporate Director (Operations) Office Relocation to Corby Cube 24,689 24, ,689 0 To be vired to Cube SC802 - AMG approved Corby Cube & Parklands Gateway Project 47,612,000 47,612, (15,157) 0 0 Environmental Quality Travellers Site Extension 22,270 22, ,270 Carry forward required to provide for retention repayment 0 and refund to external grant provider. Terms of grant require funds not expended on project to be reimbursed. Carry forward budget funded from external grants, ERDF Electric Charge Posts 220, , , ,000 0 and SEMLEP. Carry forward budget funded by external loan from Zero Energy Homes 200, , ,000 0 SEMLEP. Feasibility study has indicated that the project will incur Corby Culvert 103, , significantly higher costs (circa 1m) and so the project is (103,840) now under review and will require a separate report. Any unspent amount will be carried forward. Railway Station Improvements 167, ,560 0 Funded from Section 106. To Be Approved Provision & Replacement of Wheeled Bins 40,000 40,000 37,841 40,000 0 Carry forward 64,980 plus 9080 claw back of funds as a Private Sector Housing - Home Repair Grants 74,060 74,060 52,019 74,060 0 result of breach of grant terms. Approved carry forward 76,160 plus 200,000 agreed CBC contribution plus 182,720 DCLG grant determination Disabled Facility Grants 458, ,880 39, , /14. Previously approved budget 378,000 based on 200,000 CBC contribution and 178,000 estimated grant from DCLG. Property Services Oakley Vale Phase 6 Development 2,270,410 2,270, ,440,920 75, ,066 Budget of 1,440,920 required to undertake infrastructure works. 13/14 spend projected at 797,066 as per latest (643,854) cashflow, remaining budget will require a carry forward to 14/15. Funded from overage on Capital Receipts. To Be Approved Culture & Leisure Coronation Park Rockingham Triangle Stadium 3,184,150 3,184, , ,000 (14,534) 250,000 0 Further OCPC report may be required Play Areas - Gretton Under 5's 0 61,680 54,825 61,680 0 Section 106 funded. To be approved Woodlands Improvements 273, ,000 55, ,000 0 Oakley Vale Community Facility 1,337,784 1,337, , , , ,630 0 Customer First 0 ICT Hardware Replacement 150, ,000 79, ,000 0 Neighbourhood Pride S106 - CCTV - Greatline/Tesco 8,660 8, ,660 0 S106 - CCTV - Priors Hall 6,440 6, ,440 0 Total General Fund Programme 2,418,469 4,088,629 1,123,623 3,340,935 (747,694) Additional Budgets requiring - OCPC Approval Oakley Vale Phase 6 Development - AMG Approved 11th June 1,440,920 Railway Station Improvements - AMG Approved 11th June 167,560 Play Areas - Gretton Under 5's 61,680 Latest Budget 4,088,629

Tunbridge Wells Borough Council Decisions taken by the Cabinet on Thursday, 25 June 2015. That the report be noted. REASON(S) FOR DECISION:

Tunbridge Wells Borough Council Decisions taken by the Cabinet on Thursday, 25 June 2015. That the report be noted. REASON(S) FOR DECISION: Tunbridge Wells Borough Council s taken by the Cabinet on Thursday, 25 June 2015 Part A Items considered in public 10 Annual Report on the Use of RIPA by Tunbridge Wells That the report be noted. 11 Quarter

More information

MEDIUM TERM FINANCIAL PLAN 2014 to 2019

MEDIUM TERM FINANCIAL PLAN 2014 to 2019 CONTENTS Page 2 Page 7 Page 12 Page 14 Page 16 Page 21 Page 26 Page 28 Page 30 Page 31 Page 32 Sections 1: Introduction, Financial and Corporate Planning Section 2: The Council s Overall Financial Position

More information

Buckinghamshire & Milton Keynes Fire Authority

Buckinghamshire & Milton Keynes Fire Authority ITEM 6 Buckinghamshire & Milton Keynes Fire Authority MEETING Executive Committee DATE OF MEETING 18 March 2015 OFFICER LEAD MEMBER SUBJECT OF THE REPORT David Sutherland, Acting Director of Finance and

More information

CHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN

CHESHIRE FIRE AUTHORITY SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM TERM FINANCIAL PLAN CHESHIRE FIRE AUTHORITY Item 2 ITEM: 2 MEETING OF : FIRE AUTHORITY DATE : 12 FEBRUARY 2014 REPORT OF : CHIEF FIRE OFFICER AUTHOR : HEAD OF FINANCE SUBJECT : 2014-15 DRAFT BUDGET, COUNCIL TAX AND MEDIUM

More information

WOLVERHAMPTON HOMES BOARD (17/02/14) Revenue Expenditure Forecast for 2013/14 to 31 st December 2013

WOLVERHAMPTON HOMES BOARD (17/02/14) Revenue Expenditure Forecast for 2013/14 to 31 st December 2013 WOLVERHAMPTON HOMES BOARD (17/02/14) AGENDA ITEM 8A Open Report Title Status Author Contact No: Recommendations Key Risks or Contentious Issues Revenue Expenditure Forecast for 2013/14 to 31 st December

More information

Meeting the Decent Homes Standard

Meeting the Decent Homes Standard Meeting the Decent Homes Standard 1 What is the Council trying to achieve in relation to the Standard. Does the Council know the condition of their housing stock and their compliance with the decent homes

More information

The report summarises the outturn position for 2013/14 and the consequential impact on the Medium Term Financial Plan 2014/17.

The report summarises the outturn position for 2013/14 and the consequential impact on the Medium Term Financial Plan 2014/17. TRAFFORD BOROUGH COUNCIL Report to: Accounts & Audit Committee 26 June 2014 Executive - 28 July 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance Report

More information

CABINET 9 September 2014 KEY DECISION: YES MONEY MATTERS: 2014/15 REVIEW OF FINANCIAL PERFORMANCE AGAINST THE FINANCIAL STRATEGY

CABINET 9 September 2014 KEY DECISION: YES MONEY MATTERS: 2014/15 REVIEW OF FINANCIAL PERFORMANCE AGAINST THE FINANCIAL STRATEGY CABINET 9 September 2014 KEY DECISION: YES MONEY MATTERS: 2014/15 REVIEW OF FINANCIAL PERFORMANCE AGAINST THE FINANCIAL STRATEGY 1. Decision The Cabinet: 1.1 Noted the report and issues raised within.

More information

HOUSING REVENUE ACCOUNT KEY ISSUES CAPITAL OUTTURN 2014/15

HOUSING REVENUE ACCOUNT KEY ISSUES CAPITAL OUTTURN 2014/15 APPENDIX 4 HOUSING REVENUE ACCOUNT KEY ISSUES CAPITAL OUTTURN 2014/15 The spend for the year is 30,225,000. This can be compared with the budgeted figure for 2014/15 of 34,929,000 resulting in an under

More information

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance

Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance TRAFFORD COUNCIL Report to: Executive Date: 1 December 2014 Report for: Decision Report of: The Executive Member for Finance and the Director of Finance Report Title CAPITAL INVESTMENT PROGRAMME MONITORING

More information

Subject: HRA Financial Business Plan Review and Rent Increase Consultation Process. Report by: Head of Housing & Community Safety

Subject: HRA Financial Business Plan Review and Rent Increase Consultation Process. Report by: Head of Housing & Community Safety CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 5 ON THE AGENDA Report to: Housing Health and Care Committee Date of Meeting: 5 November 2015 Subject: HRA Financial Business Plan Review and Rent Increase

More information

Title: Corporate Asset Management Strategy

Title: Corporate Asset Management Strategy Title: Corporate Asset Management Strategy Date of issue: January 2015 Date of next review: January 2016 Author: V Thornton Service area applies to: Operations/Development Link to the Corporate Plane:

More information

FINANCIAL AND PERFORMANCE MANAGEMENT REPORT TO END OF QUARTER THREE (DECEMBER) 2012. Head of Finance and Head of Business Improvement & Partnerships

FINANCIAL AND PERFORMANCE MANAGEMENT REPORT TO END OF QUARTER THREE (DECEMBER) 2012. Head of Finance and Head of Business Improvement & Partnerships FINANCIAL AND PERFORMANCE MANAGEMENT REPORT TO END OF QUARTER THREE (DECEMBER) 2012 Submitted by: Portfolio: Wards Affected: Head of Finance and Head of Business Improvement & Partnerships Communications,

More information

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016

HIGH PEAK BOROUGH COUNCIL. Report to the Corporate Select Committee. 19th January 2016 AGENDA ITEM 5 HIGH PEAK BOROUGH COUNCIL Report to the Corporate Select Committee 19th January 2016 TITLE: EXECUTIVE COUNCILLOR: CONTACT OFFICER: WARDS INVOLVED: Housing Revenue Account (HRA) Business Plan

More information

Capital Programme 2016/17-2020/21

Capital Programme 2016/17-2020/21 Capital Programme 2016/17-2020/21 General Fund Capital Programme Annual Sums Expenditure 1 Alleygating To prevent anti-social behaviour with other benefits such as reduced street cleansing and highway

More information

a) raises the funds required by the Council to meet approved service levels in the most effective manner;

a) raises the funds required by the Council to meet approved service levels in the most effective manner; ITEM FINANCIAL STRATEGY 2016/17 2020/21 Report By Chief Financial Officer SCOTTISH BORDERS COUNCIL 11 February 2016 1 PURPOSE AND SUMMARY 1.1 This report seeks approval for the financial strategy for the

More information

ASSET MANAGEMENT GROUP 18 JUNE 2015 FINANCIAL MONITORING UPDATE REPORT 2014-15 OUTTURN LOUISE ALLISON, FINANCIAL SERVICES MANAGER

ASSET MANAGEMENT GROUP 18 JUNE 2015 FINANCIAL MONITORING UPDATE REPORT 2014-15 OUTTURN LOUISE ALLISON, FINANCIAL SERVICES MANAGER ASSET MANAGEMENT GROUP 18 JUNE 2015 SUBJECT: REPORT BY: LEAD OFFICER: FINANCIAL MONITORING UPDATE REPORT 2014-15 OUTTURN DIRECTOR OF RESOURCES LOUISE ALLISON, FINANCIAL SERVICES MANAGER 1. Purpose of Report

More information

COUNTY COUNCIL LOCAL COMMITTEE FOR BARROW

COUNTY COUNCIL LOCAL COMMITTEE FOR BARROW COUNTY COUNCIL LOCAL COMMITTEE FOR BARROW Meeting date: 12 th September 2012 From: Corporate Director Resources LOCAL COMMITTEE DEVOLVED BUDGET 2012-2013 MONITORING REPORT HIGHWAYS BUDGET 1.0 EXECUTIVE

More information

SLOUGH BOROUGH COUNCIL. Mike Jennings Head of Asset Management PART I FOR CONNSIDERATION & COMMENT

SLOUGH BOROUGH COUNCIL. Mike Jennings Head of Asset Management PART I FOR CONNSIDERATION & COMMENT SLOUGH BOROUGH COUNCIL REPORT TO: Overview & Scrutiny Committee DATE: 7 th February 2008 CONTACT OFFICER: Mike Jennings Head of Asset Management (For all enquiries) (01753) 875850 WARD(S): All PART I FOR

More information

REPORT FOR RESOLUTION. SUBJECT: Treasury Management Annual Report 2009-10

REPORT FOR RESOLUTION. SUBJECT: Treasury Management Annual Report 2009-10 REPORT FOR RESOLUTION COMMITTEE: Council DATE: 14th July 2010 SUBJECT: Treasury Management Annual Report 2009-10 REPORT OF: City Treasurer PURPOSE OF REPORT: To report the Treasury Management activities

More information

Report of the Cabinet Member for Finance : Councillor Max Schmid

Report of the Cabinet Member for Finance : Councillor Max Schmid 2014_15 CRM Month 7 Page 1 of 33 London Borough of Hammersmith & Fulham CABINET 5 JANUARY 2015 CORPORATE REVENUE MONITOR 2014/15 MONTH 7 Report of the Cabinet Member for Finance : Councillor Max Schmid

More information

[to be completed by Democratic Services] Council 27 February 2015

[to be completed by Democratic Services] Council 27 February 2015 Council Title of Report: Report No: Decisions plan reference: Report to and date/s: Portfolio holder: Lead officer: Purpose of report: Budget and Council Tax Setting: 2015/16 and Medium Term Financial

More information

council Of Brazil - Tax Year 2014

council Of Brazil - Tax Year 2014 Meeting: Overview and Scrutiny Board Date: 9 July 2014 Full Council 17 July 2014 Wards Affected: All Wards Report Title: Provisional Outturn 2013/14 Subject to Audit Executive Lead Contact Details: Mayor

More information

Housing Asset Management Strategy 2013-2043

Housing Asset Management Strategy 2013-2043 Housing Asset Management Strategy 2013-2043 1 Introduction 1.1 The asset management strategy sets out the approach Islington takes when deciding what types of long term investment are needed in our homes

More information

Revenue Expenditure Outturn 2014-2015

Revenue Expenditure Outturn 2014-2015 1. Purpose of the Report Eden District Council Executive 7 July 2015 Scrutiny Co-ordinating Board 10 September 2015 Revenue Expenditure Outturn 2014-2015 Lead Officer: Director of Finance Lead Portfolio:

More information

PROPERTY DISPOSAL AND CAPITAL PROGRAMME SUB COMMITTEE

PROPERTY DISPOSAL AND CAPITAL PROGRAMME SUB COMMITTEE Purpose: For Decision PAPER B Committee PROPERTY DISPOSAL AND CAPITAL PROGRAMME SUB COMMITTEE Date TUESDAY, 13 JANUARY 2015 Title CAPITAL PROGRAMME 2015/16 Report of/to LEADER OF THE COUNCIL EXECUTIVE

More information

PROVISIONS, RESERVES AND CONTINGENT ASSETS & LIABILITIES Finance

PROVISIONS, RESERVES AND CONTINGENT ASSETS & LIABILITIES Finance PROVISIONS, RESERVES AND CONTINGENT ASSETS & LIABILITIES Finance Version 3 January 2015 Not protectively marked Introduction This note covers the subjects of provisions, reserves and contingent assets

More information

ADULT SERVICES AND HEALTH OVERVIEW AND SCRUTINY PANEL

ADULT SERVICES AND HEALTH OVERVIEW AND SCRUTINY PANEL Public Document Pack ADULT SERVICES AND HEALTH OVERVIEW AND SCRUTINY PANEL TUESDAY, 2ND FEBRUARY, 2016 At 7.00 pm in the COUNCIL CHAMBER - TOWN HALL, SUPPLEMENTARY AGENDA PART I ITEM SUBJECT PAGE NO 6.

More information

REGENERATION AND ENVIRONMENT SCRUTINY COMMITTEE 17TH FEBRUARY 2015

REGENERATION AND ENVIRONMENT SCRUTINY COMMITTEE 17TH FEBRUARY 2015 REGENERATION AND ENVIRONMENT SCRUTINY COMMITTEE 17TH FEBRUARY 2015 SUBJECT: BUDGET MONITORING AND TRADING ACCOUNT REPORT 2014/2015 REPORT BY: ACTING DEPUTY CHIEF EXECUTIVE 1. PURPOSE OF REPORT 1.1 To inform

More information

Actual Spend 31 March 2010. Savings / Over/(Under) Spends. Slippage into 2010-11

Actual Spend 31 March 2010. Savings / Over/(Under) Spends. Slippage into 2010-11 APPENDIX 4 ( 8 June Provisonal Outturn - Capital ) - Book at in May CHILDREN'S SERVICES FORMULA CAPITAL Formula Capital 2006/07 30 30 (30) 0 Remaining carry forward allocation cannot be carried forward

More information

- NOT PROTECTIVELY MARKED -

- NOT PROTECTIVELY MARKED - Report to: Police & Crime Commissioner 27 July 2015 Outturn 2014/15 Report of the Chief Finance Officers Contacts: Carolyn Williamson, PCC Chief Finance Officer 01962 871400, carolyn.williamson@hants.gov.uk

More information

Foreword from the Deputy Chief Executive

Foreword from the Deputy Chief Executive Foreword from the Deputy Chief Executive Wigan Council is one of the largest local authorities in the country with a population in excess of 300,000, more than 140,000 residential properties and a yearly

More information

Executive 29 October 2015

Executive 29 October 2015 Executive 29 October 2015 Report of the Assistant Director - Finance, Property & Procurement Portfolio of the Executive Member for Finance and Performance The Future of York s Guildhall & Riverside Summary

More information

Author: Adrian Pengelly Role: Director of Assets. Recommendations: 1. That the review of the Assets Directorate budget pressures for 2014/15 is noted.

Author: Adrian Pengelly Role: Director of Assets. Recommendations: 1. That the review of the Assets Directorate budget pressures for 2014/15 is noted. Cornwall Housing Limited Report Template for DLT Agenda No: 7 Report to: The Board Part 1 Date: 27 July 2015 Title: Assets Directorate Budget Pressures 2014/15 Author: Adrian Pengelly Role: Director of

More information

Kenny Dick, Head of Finance and Corporate Governance. To present draft budget proposals for 2014/15 to the Board for approval.

Kenny Dick, Head of Finance and Corporate Governance. To present draft budget proposals for 2014/15 to the Board for approval. 2014-15 Draft Budget Report to: Board Date: 28 March 2014 Report by: Report No. Kenny Dick, Head of Finance and Corporate Governance Agenda Item: 9 PURPOSE OF REPORT To present draft budget proposals for

More information

Lodge Park Sports Centre Bars and Catering Service

Lodge Park Sports Centre Bars and Catering Service Open Decision Item 3 One Corby Policy Committee 11 th April 2006 Lodge Park Sports Centre Bars and Catering Service SYNOPSIS BOX For members to consider the options at Lodge Park Sports Centre for the

More information

WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18. Report of the Treasurer, Director of Finance, Chief Executive and

WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18. Report of the Treasurer, Director of Finance, Chief Executive and WEST MERCIA BUDGET 2013/14 MEDIUM TERM FINANCIAL PLAN 2013/14 TO 2017/18 Report of the Treasurer, Director of Finance, Chief Executive and Chief Constable 1. Recommendation The Commissioner is recommended

More information

MINUTES of a meeting of CABINET held on 16 April 2013 at County Hall, Matlock. PRESENT Councillor A I Lewer (in the Chair) Councillors J A Allsop, J

MINUTES of a meeting of CABINET held on 16 April 2013 at County Hall, Matlock. PRESENT Councillor A I Lewer (in the Chair) Councillors J A Allsop, J MINUTES of a meeting of CABINET held on 16 April 2013 at County Hall, Matlock. PRESENT Councillor A I Lewer (in the Chair) Councillors J A Allsop, J P Harrison, Mrs C A Hart, C W Jones, B Lewis, M V Longden,

More information

Subject: Prudential Indicators 2016/17 to 2020/21

Subject: Prudential Indicators 2016/17 to 2020/21 CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 04 ON THE AGENDA Report to: Special Council Date: 23 February 2016 Subject: Prudential Indicators 2016/17 to 2020/21 Report by: Depute Chief Executive

More information

Annual Report of Internal Audit 2012/13

Annual Report of Internal Audit 2012/13 Open Decision Item 4 Audit & Governance Committee 19 th June 2013 Annual Report of Internal Audit 2012/13 SYNOPSIS To report on Internal Audit s opinion of the overall adequacy and effectiveness of the

More information

Manchester City Council Report for Resolution. Greater Manchester Housing Investment Fund. The Chief Executive, City Treasurer and City Solicitor

Manchester City Council Report for Resolution. Greater Manchester Housing Investment Fund. The Chief Executive, City Treasurer and City Solicitor Manchester City Council Report for Resolution Report to: Council 1 April 2015 Subject: Report of: Greater Manchester Housing Investment Fund The Chief Executive, City Treasurer and City Solicitor Purpose

More information

ITEM NO: 5. Date: 21 September 2015. Reporting Officer:

ITEM NO: 5. Date: 21 September 2015. Reporting Officer: ITEM NO: 5 Report To: OVERVIEW (AUDIT) PANEL Date: 21 September 2015 Reporting Officer: Cllr J M Fitzpatrick - First Deputy (Performance and Finance) Ben Jay - Assistant Executive Director, (Finance) Subject:

More information

Specification Essential Desirable

Specification Essential Desirable High Standards High Expectations Learning through Partnership Person Specification: Facilities Manager It is expected that the successful candidate will satisfy the following specification Specification

More information

SALISBURY NHS FOUNDATION TRUST

SALISBURY NHS FOUNDATION TRUST SALISBURY NHS FOUNDATION TRUST PAPER SFT 3139 TITLE CAPITAL DEVELOPMENT REPORT TO THE TRUST BOARD FOR THE PERIOD FEBRUARY MAY 2011 PURPOSE OF PAPER The purpose of this paper is to up-date the Board on

More information

To provide an update for the Cabinet and the Scrutiny Committee on:

To provide an update for the Cabinet and the Scrutiny Committee on: 16. INFORMATION ITEMS FOR CONSIDERATION BY THE CABINET (a) PROGRESS NOTE ON IMPROVEMENTS TO THE COUNCIL S COMPLAINTS HANDLING PROCEDURES Purpose To provide an update for the and the Scrutiny Committee

More information

APPENDIX B - PL1 Homes that meet people s needs and aspirations

APPENDIX B - PL1 Homes that meet people s needs and aspirations APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable

More information

CABINET MEMBER FOR ADULT SOCIAL CARE 21st July, 2014. Present:- Councillor Doyle (in the Chair); Councillors Andrews and Pitchley.

CABINET MEMBER FOR ADULT SOCIAL CARE 21st July, 2014. Present:- Councillor Doyle (in the Chair); Councillors Andrews and Pitchley. ADULT SOCIAL CARE - 21/07/14 12H CABINET MEMBER FOR ADULT SOCIAL CARE 21st July, 2014 Present:- Councillor Doyle (in the Chair); Councillors Andrews and Pitchley. H13. DECLARATIONS OF INTEREST There were

More information

ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING AND CONSERVATION BUSINESS GROUP PROVISIONAL OUTTURN 2004/05

ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING AND CONSERVATION BUSINESS GROUP PROVISIONAL OUTTURN 2004/05 Appendix C4 ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING AND CONSERVATION BUSINESS GROUP 1. INTRODUCTION PROVISIONAL OUTTURN 2004/05 1.1 The accounts for 2004/05 are substantially closed, although

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

Finance and Housing Stock Options Appraisal

Finance and Housing Stock Options Appraisal APPENDIX 7 Date: June 2013 Finance and Housing Stock Options Appraisal Prepared for: Southwark Council Prepared by: Savills (UK) Limited 33 Margaret Street London W1G 0JD Contents 1. Executive Summary...

More information

Page 7. London Borough of Sutton

Page 7. London Borough of Sutton Page 7 Agenda Item 3 London Borough of Sutton The Executive - 5 July 2011 Joint Report of the Strategic Director Resources and Executive Head of Policy and Customer Services BUSINESS AND FINANCIAL PLANNING

More information

Leasing scheme information

Leasing scheme information Leasing scheme information Introduction Thank you for your interest in Genesis Housing Association leasing scheme. This information booklet sets out the stages, the requirements and the factors you will

More information

Care & Residential Services Debt Management & Recovery Policy

Care & Residential Services Debt Management & Recovery Policy Care & Residential Services Debt Management & Recovery Policy Fair and reasonable Collecting debt quickly Version 1 April 2015 Debt Management & Recovery Policy Page 1 Trafford Council Table of Contents

More information

HAVERING S BUDGET 2013-2014. Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce. www.havering.gov.

HAVERING S BUDGET 2013-2014. Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce. www.havering.gov. HAVERING S 2013-2014 Cheryl Coppell Chief Executive Andrew Blake-Herbert Group Director, Finance & Commerce www.havering.gov.uk CONTENTS Page Number Section A SUMMARY REVENUE POSITION 2 Budget Summary

More information

Item No. 18 GREATER MANCHESTER FIRE & RESCUE AUTHORITY AUDIT COMMITTEE 23 RD JUNE 2010 AUTHORITY 24 TH JUNE 2010

Item No. 18 GREATER MANCHESTER FIRE & RESCUE AUTHORITY AUDIT COMMITTEE 23 RD JUNE 2010 AUTHORITY 24 TH JUNE 2010 GREATER MANCHESTER FIRE & RESCUE AUTHORITY Item No. 18 AUDIT COMMITTEE 23 RD JUNE 2010 AUTHORITY 24 TH JUNE 2010 TREASURY MANAGEMENT ANNUAL REPORT 2009/10 Report of the Treasurer 1. Introduction and Background

More information

HUNTINGDONSHIRE DISTRICT COUNCIL. Corporate Plan Integrated Performance Report

HUNTINGDONSHIRE DISTRICT COUNCIL. Corporate Plan Integrated Performance Report Public Key Decision - No HUNTINGDONSHIRE DISTRICT COUNCIL Title/Subject Matter: Meeting/Date: Executive Portfolio: Report by: Ward(s) affected: Corporate Plan Integrated Report Overview and Scrutiny (Social

More information

Housing revenue account self-financing. Introductory guide for councillors

Housing revenue account self-financing. Introductory guide for councillors Housing revenue account self-financing Introductory guide for councillors Environment, housing, planning and waste Contents Introduction 4 The HRA subsidy system 5 The HRA self-financing settlement 6

More information

CHESTERFIELD BOROUGH COUNCIL PRIVATE SECTOR HOUSING RENEWAL STRATEGY DRAFT FOR CONSULTATION

CHESTERFIELD BOROUGH COUNCIL PRIVATE SECTOR HOUSING RENEWAL STRATEGY DRAFT FOR CONSULTATION CHESTERFIELD BOROUGH COUNCIL PRIVATE SECTOR HOUSING RENEWAL STRATEGY 2012 2015 DRAFT FOR CONSULTATION October 2011 CONTENTS 1. Introduction 2. Links to other corporate strategies and policies 3. Policy

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

4 Year Capital Programme 2014-2018

4 Year Capital Programme 2014-2018 4 Year Capital Programme 2014-2018 January 2014 1. Introduction The Commissioner is supportive of capital expenditure which improves the efficiency and effectiveness of the service provided to the public

More information

Governance, Risk and Best Value Committee

Governance, Risk and Best Value Committee Governance, Risk and Best Value Committee 2.00pm, Wednesday 23 September 2015 Internal Audit Report: Integrated Health & Social Care Item number Report number Executive/routine Wards Executive summary

More information

Manchester City Council. Report for Resolution. City Treasurer, Chief Executive and City Solicitor

Manchester City Council. Report for Resolution. City Treasurer, Chief Executive and City Solicitor Item 4(k) Manchester City Council Report for Resolution Report to: Council 7 March 2012 Subject: Council Tax Resolution for 2012/13 Report of: City Treasurer, Chief Executive and City Solicitor Summary

More information

Business Planning & Budgetary Control 2012/13

Business Planning & Budgetary Control 2012/13 Cymdeithas Tai Cantref Cyf Final Internal Audit Report Business Planning & Budgetary Control 2012/13 Date of fieldwork: October November 2012 Date of draft report: November 2012 Date of final report: November

More information

Review of Capital Expenditure. Sedgefield Borough Council Audit 2007/08 September 2008

Review of Capital Expenditure. Sedgefield Borough Council Audit 2007/08 September 2008 Review of Capital Expenditure Sedgefield Borough Council Audit 2007/08 September 2008 Contents Summary report 3 Appendix 1 Action plan 10 Status of our reports The Statement of Responsibilities of Auditors

More information

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014

Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Financial Planning Assessment Vale of Glamorgan County Borough Council Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Status of report This document has been prepared for the internal

More information

Service Delivery Plan 2007/8 Template 1. Delivery plan

Service Delivery Plan 2007/8 Template 1. Delivery plan Delivery plan Theme Leisure & Environment Clean and safe streets and public places with the Council maintaining and enforcing high standards of cleanliness throughout the borough. 1. Deliver a proactive

More information

Charities Accounting Standard Accounting Template Explanatory Notes

Charities Accounting Standard Accounting Template Explanatory Notes Charities Accounting Standard Accounting Template Explanatory Notes Introduction Purpose of Accounting Template The Accounting Template is designed to help smaller charities prepare and present financial

More information

iii. the analysis of the impact of the Economic downturn (Annex 2 and 3) iv. an update on Planning obligations (Section 106) (Annex 4)

iii. the analysis of the impact of the Economic downturn (Annex 2 and 3) iv. an update on Planning obligations (Section 106) (Annex 4) OVERVIEW & SCRUTINY COMMITTEE Agenda Item: 7 15 th DECEMBER 2010 CORPORATE HEALTH PERFORMANCE 2 REPORT OF: CHIEF EXECUTIVE AUTHOR: PETER FLYNN TELEPHONE: 01737 276011 E-MAIL: peter.flynn@reigate-banstead.gov.uk

More information

EAST AYRSHIRE COUNCIL CABINET 21 OCTOBER 2009 TREASURY MANAGEMENT ANNUAL REPORT FOR 2008/2009 AND UPDATE ON 2009/10 STRATEGY

EAST AYRSHIRE COUNCIL CABINET 21 OCTOBER 2009 TREASURY MANAGEMENT ANNUAL REPORT FOR 2008/2009 AND UPDATE ON 2009/10 STRATEGY EAST AYRSHIRE COUNCIL CABINET 21 OCTOBER 2009 TREASURY MANAGEMENT ANNUAL REPORT FOR 2008/2009 AND UPDATE ON 2009/10 STRATEGY Report by Executive Head of Finance and Asset Management 1 PURPOSE OF REPORT

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model

Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model Appendix 5 Oadby and Wigston Borough Council: HRA self-financing business plan model As we enter the final quarter of 2013/14, the HRA business plan model has been updated to reflect activity in 2013/14

More information

FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE. Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm

FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE. Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm FINANCE AND ASSET MANAGEMENT SUB-COMMITTEE Meeting held at the Civic Centre, Uxbridge on Tuesday 20 June 2000 at 7.30pm Councillors: Robert Benson John Morse Jonathan Bianco Norman Nunn-Price Steve Carey

More information

COUNCIL TAX 2015-16. There is a statutory requirement for the Council Tax for 2015/16 to be set before 11th March 2015.

COUNCIL TAX 2015-16. There is a statutory requirement for the Council Tax for 2015/16 to be set before 11th March 2015. Agenda Item No. 10 COUNCIL - 12 FEBRUARY 2015 COUNCIL TA 2015-16 Summary The Executive has considered the draft service plans and budgets and the overall Council Tax requirement for 2015/16 and has recommended

More information

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012

SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 SCRUTINY COMMITTEE ITEM 04 28 MARCH 2012 INTERNAL AUDIT PLAN Report of the: Director of Finance Contact: John Turnbull or Gillian McTaggart Urgent Decision?(yes/no) No If yes, reason urgent decision required:

More information

The future delivery of Out Of Hours Call Centre Activity

The future delivery of Out Of Hours Call Centre Activity Open Decision Item 6 Overview and Scrutiny Panel 4 th February 2015 The future delivery of Out Of Hours Call Centre Activity SYNOPSIS In this report Members are asked to consider the findings of the working

More information

Of which 140,938-3,224-137,714 Administration

Of which 140,938-3,224-137,714 Administration DEPARTMENT: HM TREASURY, Supplementary Estimate 2013-14 INTRODUCTION and KEY POINTS The Estimate covers the administration costs of the core Treasury, the Debt Management Office (DMO), United Kingdom Financial

More information

Empty Property Activity Report

Empty Property Activity Report Empty Property Activity Report Salford City Council April 2014 Contents page 1.0 Introduction...1 1.1 Background 1.2 Salford City Council 2.0 Achievements of the Empty Property Team...2 2.1 The invest

More information

Item: TfL Prudential Indicators 2016/17 to 2018/19

Item: TfL Prudential Indicators 2016/17 to 2018/19 Board Date: 17 March 2016 Item: TfL Prudential Indicators 2016/17 to 2018/19 This paper will be considered in public 1 Summary 1.1 This paper sets out the proposed TfL borrowing limits and other Prudential

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: Clive.wright@shropshire.gov.uk Tel: 01743 252007 1.0 Summary

More information

If you have any queries on this paper, please contact Marc Stoner on 020 7580 5861

If you have any queries on this paper, please contact Marc Stoner on 020 7580 5861 Board meeting Agenda item 8 Subject 2014 Financial Outturn Status Purpose For Note From Marc Stoner, Financial Controller History Parent Committee First submitted Revision Number N/A 1 If you have any

More information

a) Financial Yes b) Community Yes Councillor Nick Rushton 01530 412059 nicholas.rushton@nwleicestershire.gov.uk

a) Financial Yes b) Community Yes Councillor Nick Rushton 01530 412059 nicholas.rushton@nwleicestershire.gov.uk NORTH WEST LEICESTERSHIRE DISTRICT COUNCIL APPENDIX 2 CABINET 9 DECEMBER 2014 Title of Report CAPITAL PROGRAMMES GENERAL FUND, COALVILLE SPECIAL EXPENSES AND HOUSING REVENUE ACCOUNT (H.R.A). PROJECTED

More information

University of Kentucky

University of Kentucky University of Kentucky Debt Policy Purpose To fulfill its mission, the University of Kentucky must make ongoing strategic capital investments in academic, student life, healthcare, and other plant facilities

More information

Report title: Extension to Temporary boiler provision for Myatts Field South

Report title: Extension to Temporary boiler provision for Myatts Field South Officer delegated decision Decision Due: 2 November 2015 Report title: Extension to Temporary boiler provision for Myatts Field South Ward: Vassall Report Authorised by: Sue Foster, Strategic Director

More information

Date: 31st July 2014. Tel: Tel: 01706 924328. Section 151 Officer Monitoring Officer

Date: 31st July 2014. Tel: Tel: 01706 924328. Section 151 Officer Monitoring Officer Subject: Coroners Hosted Service Status: For Publication Report to: Overview and Scrutiny Committee Date: 31st July 2014 Cabinet Member: Cecile Biant Report of: Chris Sheader Author: Mark Dalzell Author

More information

SCARBOROUGH BOROUGH COUNCIL

SCARBOROUGH BOROUGH COUNCIL SCARBOROUGH BOROUGH COUNCIL CABINET 26 JULY 2005 AGENDA ITEM NO REPORT OF THE HEAD OF ENVIRONMENTAL HEALTH SERVICES HEHS/05/43 on THE NORTH YORKSHIRE 'WISH' PURPOSE OF REPORT This report outlines the progress

More information

Manchester City Council Report for Resolution

Manchester City Council Report for Resolution Manchester City Council Item 8 Manchester City Council Report for Resolution Report To: Executive 24 March 2009 Subject: Report of: Transfer of Housing On Call Services Director of Housing Summary This

More information

A guide to our company and our services. www.phjones.co.uk

A guide to our company and our services. www.phjones.co.uk A guide to our company and our services www.phjones.co.uk NATIONWIDE COVERAGE local expertise Introduction Since it s formation in 1963, PH Jones has continued to grow through the provision of excellent

More information

Ensuring a high quality maintenance service for the Council s housing stock.

Ensuring a high quality maintenance service for the Council s housing stock. Repairs and Maintenance 360 Scrutiny Review 1. Introduction 1.1 London Borough of Ealing own or manage around 18,000 properties. The stock is a mixture of housing and low and high rise flats, ranging in

More information

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities

More information

STRATEGIC RISK BOARD MINUTES

STRATEGIC RISK BOARD MINUTES STRATEGIC RISK BOARD Wednesday, 10 September 2014 from 11.30am to 12.20pm MINUTES Present: Apologies: Nick Eveleigh (Chairman), Alison Chessell, Tony Preston, Averil Price, Lita Smith, Dan Wright and Councillor

More information

1.2 These Financial Regulations shall come into force on 19 th December 2012

1.2 These Financial Regulations shall come into force on 19 th December 2012 Part 4F FINANCIAL REGULATIONS GENERAL FR1 1.1 These Financial Regulations are made pursuant to the Local Government Act 1972 Section 151 the Accounts and Audit (England) Regulations 2011 (as amended) and

More information

Terms and Definitions Used

Terms and Definitions Used VOTE Labour B.7 303 Terms and Definitions Used ACC Accident Compensation Corporation CEP / FTA Closer Economic Partnership / Free Trade Agreement EEO Equal Employment Opportunities ERA Employment Relations

More information

1.1 To provide highlight reports for all the Council s corporately significant projects, covering the period up to the end of June 2006.

1.1 To provide highlight reports for all the Council s corporately significant projects, covering the period up to the end of June 2006. The Executive Agenda item: On 12 September Report Title: Programme Highlight Report June 2006 Forward Plan reference number (if applicable): Report of: The Chief Executive Wards(s) affected: All Report

More information

H 7. Factoring Policy. If you require this policy in a different format please ask a member of staff. Date of Approval Oct 12 Review Due Dec 15

H 7. Factoring Policy. If you require this policy in a different format please ask a member of staff. Date of Approval Oct 12 Review Due Dec 15 H 7 Factoring Policy If you require this policy in a different format please ask a member of staff Date of Approval Oct 12 Review Due Dec 15 1.0 The Association s Objective 1.1 Elderpark Housing Association

More information

Table of Contents. 1 P a g e

Table of Contents. 1 P a g e Table of Contents Financial Regulations 2 General... 2 Accounting Procedures... 2 Internal Audit... 3 Budget Planning And Preparation... 3 Power To Incur Expenditure Within Approved Estimates... 4 Budget

More information

ASSET MANAGEMENT STRATEGY 2014-2017

ASSET MANAGEMENT STRATEGY 2014-2017 ASSET MANAGEMENT STRATEGY 2014-2017 EXECUTIVE SUMMARY Eight years after its creation, Stafford and Rural Homes (SARH) is at an exciting stage of its journey as a leading housing association in the Midlands.

More information

HILLCREST HOUSING ASSOCIATION LIMITED MAINTENANCE POLICY

HILLCREST HOUSING ASSOCIATION LIMITED MAINTENANCE POLICY HILLCREST HOUSING ASSOCIATION LIMITED POLICY NO. AM14 MAINTENANCE POLICY 1.0 INTRODUCTION 1.1 This policy describes our arrangements for ensuring that our properties are well maintained and kept in good

More information

Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council

Badger BC. Investments Ltd. Business Plan 2014 2017. A wholly owned subsidiary of Broxbourne Borough Council Badger BC Investments Ltd Business Plan 2014 2017 A wholly owned subsidiary of Broxbourne Borough Council Contents Summary 3 Governance and management structure 4 Rights, obligations and decision making

More information

APPENDIX B: FINANCIAL PLANNING AND CONTROL OF RESOURCES

APPENDIX B: FINANCIAL PLANNING AND CONTROL OF RESOURCES APPENDIX B: FINANCIAL PLANNING AND CONTROL OF RESOURCES 1 PERFORMANCE PLANS 1.1 The key controls for performance plans are: (a) to ensure that all relevant plans are produced and that they are consistent

More information