1 Gymnasium Building Data Year Built: 1939 Total Floor Area: 14,611 SF Number of Stairs: 3 Elevator: IBC Classification none III-B, Non-Sprinklered General Description Building consists primarily of a main Gymnasium floor level at grade, with a two-story Locker Room/Weight Room structure at the south end, connecting to the High School, and a split-level Locker Room, Stage, Coaches Room and Storage structure at the north end. Structure over the Gymnasium is wood framing spanning between laminated wood arches. Insulation and liner were added to the inside of the arched roof in 2006, and new shingles were installed in Exterior walls are brick masonry with structural tile backup. Floor and roof framing in the two story sections are wood joists. A spray applied roof membrane has been installed on the low-slope roofs over these areas. Building Condition Report Exterior: Painting Rating: 3 Required: Hollow metal entrances, lintel angles, wood at window infills Condition: Average Average Life Expectancy: 8 years Life Remaining Based on Current Conditions: 2013 Exterior: Brick/Masonry Rating: 2 Material: Face Brick 2009 Campus Assessment Page GM.1

2 Condition: Fair Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2014 Notes: 1. Exterior brick is in fair condition. Cracking is evident from building movement and should be caulked, or control joints installed. 2. Tuckpointing required in 5-10 years. Exterior: Caulking Rating: 2 Material: Unkown Condition: Fair Average Life Expectancy: 20 years Life Remaining Based on Current Conditions: 2014 Notes: 1. Caulking should be replaced as masonry is repaired and windows replaced. Exterior: Windows Rating: 3 Material: Wood, with cement board infill wall at larger openings. Condition: Average Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2034 Notes: 1. Windows are in average condition, but infill of painted siding panels in larger openings creates a high-maintenance condition. Exterior: Exterior Doors Rating: 3 Material: Hollow Metal Condition: Average Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2034 Exterior: Roof Rating: 5 Material: Shingled roof over arched Gymnasium roof (installed 2009), spray applied roofing on lowslope areas (2008) Condition: Shingles are in very good condition, spray applied roofing is very good, but discolored. Page GM Campus Assessment

3 Average Life Expectancy: 20 years Life Remaining Based on Current Conditions: 2029 Interior: Ceiling Rating: 3 Material: Metal liner panel in Gymnasium, plaster in other areas Condition: Very Good at Gymnasium, fair to average at plastered areas Average Life Expectancy: 25 years Life Remaining Based on Current Conditions: 2019 Interior: Walls Rating: 3 Material: Structural tile, plaster, gypsum wall board Condition: Average Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2029 Interior: Doors Rating: 3 Material: Wood doors in hollow metal frames Condition: Doors installed in 1997 are in good condition, older doors are fair to poor Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2019 Interior: Hardware Rating: 3 Condition: Hardware installed in 1997 is in good condition, older hardware is fair to poor Average Life Expectancy: 50 years Life Remaining Based on Current Conditions: 2019 Interior: Interior Finishes Rating: 3 Materials: Vinyl tile and ceramic tile floors; painted plaster, gypsum board and metal liner panel ceilings, ceramic tile and structural glazed tile walls. Condition: Good Average Life Expectancy: 25 years Life Remaining Based on Current Conditions: 2019 Notes: 2009 Campus Assessment Page GM.3

4 1. Newer finishes (1997 renovations) are in good condition. Original finishes such as plaster ceilings are in poor condition (sagging and cracking). Structural glazed tile walls are dingy and dated. 2. Flooring is adequate, but wood flooring should be considered for the Gymnasium. Mechanical: Heating System Rating: 4 1. Heating Source: The heating source for the gymnasium was originally steam from the boiler plant. In 2008 the steam was abandoned and individual electric unit heaters were installed to replace the steam. This was made possible due to the reduction in heating equipment required due to the re-insulation of the gymnasium roof. So the current heating source for the gymnasium is electricity. 2. Space Heating Equipment: a. The gymnasium is heated through two different sources, and Air Handling Unit and two large electric unit heaters hung directly in the gymnasium. The Air Handling Unit was installed in the 1997 Addition. This AHU has a hot water heating coil that is connected to the heat exchanger that was installed in the 1997 project. For when the AHU is of the gymnasium also has two electric unit heaters that were installed to replace the steam radiators that were eliminated in It is important to understand that the source of heat from the AHU is hot water that utilizes the off peak energy rate of the electric boiler. The cost of energy from the off peak electric boiler is about ½ to 1/3 of the cost of the heat from the electric unit heaters. The AHU should be used to heat the gymnasium as much as possible. b. In 2008 the steam heat that fed the back area including the stage, some small offices and the locker rooms was removed or abandoned and replaced with electric unit heaters. See photos M4, M5 M10, M11 and M12. The electric heaters work well, but like the electric heaters in the gymnasium they are on primary electrical power which is expensive when compared to the hot water heat. 3. Condition: a. The Air Handling Unit that was installed in 1997 is in good condition. b. The electric heaters that were installed in 2008 are in good condition. 4. Average Life Expectancy: a. The AHU will last at least until b. The electric heater will last about 10 years or until Recommendations: Use the AHU to heat the gymnasium as much as possible. Consideration should be given to providing hot water heat to the locker rooms and stage area if those areas are ever remodeled. Mechanical: Ventilation & Air Handling Rating: 4 1. Ventilation Equipment, Heating/Cooling Source and Distribution System: a. There is an AHU that was installed in 1997 that feeds the gymnasium. In 2007 a supply duct was extended from the original sidewall register to extend all the length of the gymnasium. See photos M1, M2 and M3. This made a big difference in getting the air evenly distributed across the gym. Condition: Good Average Life Expectancy: AHU 50 years Remaining Life Based on Current Condition: Recommendations: Use the AHU to heat the gymnasium as much as possible. Verify that when the AHU runs in unoccupied mode the fresh air dampers are closed tight. Consideration should be given to replacing the outside air dampers with new, ultra low leak dampers so the AHU can be run to heat the gym without the potential of heating undesired outside air that leaks in through the damper. Page GM Campus Assessment

5 Mechanical: Air Conditioning/Cooling Rating: NA 1. Cooling Source: The gymnasium does not have cooling. Replacing the existing AHU with an AHU that has cooling capabilities would be the best way to add cooling to the gym. 2. Recommendations: Air conditioning in a gym is dependant upon the owner s desires and the gym usage particularly in the summer. In some cases gymnasiums are used in the summer and there are concerns about over heating the athletes. This can also occur in the early fall and late spring. Mechanical: Temperature Control Rating: 3 1. Control System Type: The Air Handling Unit is provided with pneumatic temperature control. The controls where installed when the unit was installed in Condition: While pneumatic controls are no longer routinely installed in new installations the controls in this case are only 12 years old and in acceptable condition. 3. Average Life Expectancy: Pneumatic Remaining Life Based on Current Condition: Recommendations: Consideration should be given to upgrading the pneumatic controls with new electronic DDC Controls. This would be particularly helpful if it allowed the AHU to operate on a better schedule as far as unoccupied control to save energy. A new sequence of operation could also potentially result in energy savings during occupied hours. Mechanical: Humidification Rating: NA 1. The AHU for the gymnasium does not have humidification. In some gymnasiums humidification is required to keep the wood floor in shape. However the floor in this gym has not ever had humidity control and so none would need to be added. Mechanical: Sprinkler/Fire Protection Rating: NA 1. A fire protection sprinkler system is not provided. Mechanical: Plumbing Rating: 4 1. Plumbing Fixtures a. All of the plumbing fixtures in the gymnasium and locker rooms are in fair condition. While they are old they have been maintained well. See photos M7, M8 and M9. 2. Drain, Waste, and Vent Piping a. The majority of the waste and vent piping in the basement was installed in the 1939 and should be considered old and in poor condition. 3. Water Piping and Valves a. The majority of original the domestic hot and cold water piping has been replaced with copper over time. From our observations it appears that the domestic water piping is soldered copper. This piping is in fair condition. 4. Insulation a. The domestic water piping was mostly exposed and uninstalled. Insulated water piping would be probably damaged in the exposed state it is in. 5. Plumbing Equipment 2009 Campus Assessment Page GM.5

6 a. There is a relatively new hot water heater that is in fair condition. See photo M6 6. Condition: Fair 7. Average Life Expectancy: Electric Water heater 8 years 8. Recommendations: We would recommend plumping fixture and piping be replaced only if there was a major upgrade to the entire locker rooms. Electrical: Distribution Equipment Rating: 3 Description: 120/208V, 200A, branch circuit panelboard located on the stage area. This panel is fed from the main building switchgear. Manufacturer: Square D Condition: Good Average Life Expectancy: 30 years Life Remaining Based on Current Condition: This equipment should not need to be considered for replacement until the year Note: This equipment was installed in 1997 as part of the High School Addition/Remodeling project. Electrical: Lighting Systems Rating: 4 Description: Surface-mounted high-bay metal halide fixtures with additional industrial fluorescent fixtures for instantaneous walk-through lighting. Condition: Very Good Average Life Expectancy: 20 years Life Remaining Based on Current Condition: The equipment should not need to be considered for replacement until the year Notes: This lighting system was installed in See attached photo E3. Electrical: Emergency Lighting Rating: 1 Description: Condition: Poor Wall-mounted battery packs. Average Life Expectancy: 20 years Life Remaining Based on Current Condition: These fixtures have outlasted their life expectancy and should be replaced at the next opportunity. Note: The existing emergency lighting system may not currently meet the minimum light level requirement. Electrical: Stage Lighting System Rating: NA Page GM Campus Assessment

7 Description: The stage lighting is currently non-existent. Electrical: Sound System Rating: 3 Manufacturer: Bose Condition: Good Average Life Expectancy: 20 years Life Remaining Based on Current Condition: The equipment should not need to be considered for replacement until the year Note: The sound system was installed in Campus Assessment Page GM.7

8 A1: Gymnasium, north interior elevation A2: Gymnasium, south interior elevation A3: Bleachers A4: Stage A5: Basement Locker Room Toilets A6: Varsity Locker Room Page GM Campus Assessment

9 A7: Varsity Locker Room A8: Varsity Locker Room Shower A9: Varsity Locker Room toilet stalls A10: Varsity Locker Room lavatories A11: Second floor weight room A12: Installation of new shingle roofing 2009 Campus Assessment Page GM.9

10 A13: North Elevation A14: Lintel angle bearing A15: Typical Gymnasium window and infill A16: Joint cracking near exterior door opening M1: Supply Air Duct Extended into Gym M2: Supply Duct and Return Air Grille Page GM Campus Assessment

11 M3: Gymnasium AHU M4: Abandoned Steam Piping on Wall and Replacement Suspended Electric Heater M5: Suspended Electric Heater M6: Electric Water Heater for Showers M7: Shower Piping and Faucet M8: Floor Mounted Water Closet 2009 Campus Assessment Page GM.11

12 M9: Countertop Lavatory M10: Through the Wall Exhaust Fan M11: Abandoned Steam Radiators in Locker Room M12: Electric Heater In Locker Room E5: Gymnasium Lighting Page GM Campus Assessment

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL. The Netcong Board of Education Netcong, Morris County New Jersey. Roof Replacement Project

DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL. The Netcong Board of Education Netcong, Morris County New Jersey. Roof Replacement Project DETAILED SCOPE OF WORK FOR THE NETCONG ELEMENTARY SCHOOL The Netcong Board of Education Netcong, Morris County New Jersey Roof Replacement Project Health and Safety Renovation Projects Roof Replacement

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Crepps Home Inspection

Crepps Home Inspection Crepps Home Inspection 651 Lincoln Drive Elizabethown, KY 42701 (270) 734-3845 www.crepps-hi.com jcrepps@yahoo.com Inspected By: Josh Crepps HI - 3058 Repair Report Prepared For: John & Jane Doe Property

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

PULASKI AND DUBLIN MIDDLE SCHOOLS

PULASKI AND DUBLIN MIDDLE SCHOOLS PULASKI AND DUBLIN MIDDLE SCHOOLS HVAC/ ELECTRICAL/ WINDOW REPLACEMENT STUDY DUBLIN MIDDLE SCHOOL REPORT BY: PULASKI MIDDLE SCHOOL P.C. Plaza Suite 1 10 Church Avenue SE Roanoke, VA 24011-2104 540.342.6001

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

BUDGETING ROOFING EXTERIOR

BUDGETING ROOFING EXTERIOR BUDGETING The budgeting information provided is offered for rough estimating purposes. We have provided you with typical life expectancies where possible. For specific quotes, contact at least three appropriate

More information

DIVISION OF CAPITAL ASSET MANAGEMENT AND MAINTENANCE THE COMMONWEALTH OF MASSACHUSETTS STANDARD SPECIFICATIONS MGL CHAPTER 149A CM-AT-RISK PROJECTS

DIVISION OF CAPITAL ASSET MANAGEMENT AND MAINTENANCE THE COMMONWEALTH OF MASSACHUSETTS STANDARD SPECIFICATIONS MGL CHAPTER 149A CM-AT-RISK PROJECTS DIVISION OF CAPITAL ASSET MANAGEMENT AND MAINTENANCE THE COMMONWEALTH OF MASSACHUSETTS STANDARD SPECIFICATIONS MGL CHAPTER 149A CM-AT-RISK PROJECTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Basic Ice Rink Building Design Scope

Basic Ice Rink Building Design Scope OVERVIEW: Basic Ice Rink Building Design Scope In order to create the most energy efficient building possible, and based upon costeffective amortization schedules, JBURLEY has produced this quick overview

More information

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet. Architectural Elements Support Facilities A. System Description 1. Architectural support facilities include the lobby, classroom, fitness room, office area, staff toilet/showers, public toilet/lockers,

More information

Home Management Checklist: Spring

Home Management Checklist: Spring Home Management Checklist: Spring HVAC System Attic Plumbing and Electrical Service air conditioning unit (Ventilation inspected as part of service call). Ensure gutters are discharging water away from

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

PEABODY ELEMENTARY SCHOOL

PEABODY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1880 BUILDING AREA 37,800 SF CURRENT PROGRAM CAPACITY 210 ENROLLMENT 2008 165 WARD 6 PROPOSED PROGRAM CAPACITY 220 Site Plan PEABODY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

Total Home Inspection Checklist

Total Home Inspection Checklist Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

If there are any further questions with regards to the report or inspection, please call.

If there are any further questions with regards to the report or inspection, please call. National Home Inspection Ltd. 1055 Woodbine Avenue Toronto, Ontario M4C 4C2 TEL: (416) 467-7809 FAX: (416) 429-5443 April 15, 2014 SUMMARY INSPECTION REPORT PROPERTY: 75 Fairlawn Avenue, Toronto, Ontario

More information

Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06

Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 These guidelines supersede all previous instructions. It is crucial that these energy guidelines be observed in the operation

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property

More information

Home Inspection Report 108 Springhaven Dr Oak Grove, USA 12345

Home Inspection Report 108 Springhaven Dr Oak Grove, USA 12345 Home Inspection Report 108 Springhaven Dr Oak Grove, USA 12345 Patrick Nash Patrick Nash Home Inspection email@sample.com (123)456-7890 September 23, 2014 Foundation Construction Slab (block and fill)

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems Chignecto-Central Regional School Board Highland Consolidated Middle School Mechanical Systems Prepared by: Neil Van Rossum, P.Eng. CJ MacLellan & Associates Antigonish, Nova Scotia November 2012 CJM File:

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228 Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

Vari Inspection Services

Vari Inspection Services Cover Page Vari Inspection Services Property Inspection Report Inspection prepared for: Sample Real Estate Agent: None - Date of Inspection: 5/13/2015 Inspector: Tony Vari License # HI8047 23110 STRD 54

More information

Inspection Report. provided by: Delaware Property Inspection. Inspector: Richard Hiddemen (302)355-1748

Inspection Report. provided by: Delaware Property Inspection. Inspector: Richard Hiddemen (302)355-1748 Inspection Report provided by: Delaware Property Inspection Inspector: Richard Hiddemen (302)355-1748 ASHI # 243377 DPR #H4-0000018 DDA #06-444 Delaware 1992105842 Wilmington #03857 New Castle #2010-845

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report The Board of Trustees of Chinook's Edge School Division No. 73 Reed Ranch School B146A Olds Report run on: April 15, 211 9:24 AM Building Name: Address: Location: Building

More information

LIFESTYLE AMENITIES HEALTHY ENHANCEMENTS.

LIFESTYLE AMENITIES HEALTHY ENHANCEMENTS. LIFESTYLE AMENITIES In addition to a rooftop terrace and bicycle storage located in the building, residents will be provided with access to a community-use facility.* The facility will include: pool full

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

QUOTATION FOR EXAMPLE BATHROOM RENOVATION QUOTATION FOR EXAMPLE BATHROOM RENOVATION Prepared For: PEGASUS Client 99 Washington St Melrose, MA 02176 Quotation valid for 90 from: 12/21/10 PEGASUS Design-To-Build is pleased to have the opportunity

More information

Propery Inspection Report

Propery Inspection Report Propery Inspection Report Cover Page,, Ok Inspection prepared for: Date of Inspection: 9/28/2014 Time: 8:30 AM Age of Home: 2011 MOL Weather: Clear 62 degrees Inspector: License #130 5400 Hwy 177, Marland,

More information

Crowsnest Pass Facility Evaluation Report Pass Community Swimming Pool Avenue Blairmore, Alberta

Crowsnest Pass Facility Evaluation Report Pass Community Swimming Pool Avenue Blairmore, Alberta - 1 - Crowsnest Pass Facility Evaluation Report Pass Community Swimming Pool 11973 20 Avenue Blairmore, Alberta Architecture Arndt Tkalcic Bengert October, 2014 - 2 - Table of Contents: Table of Contents.

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

Inspecton Report. Property Address:

Inspecton Report. Property Address: Inspecton Report Provided by: National Home Inspections Inspector: Bob Smith 456 S Main Denver, CO 46312 (645) 423-3242 bob@nationalhomeinspections.com www.nationalhomeservices.com Property Address: 873

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Full House Inspection Services

Full House Inspection Services Full House Inspection Services HOME IMPROVEMENT COSTS The following costs are intended as ballpark estimates of repairs and/or improvements to a typical three bedroom home. The costs are based on information

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Anthony Marshall, P.Eng., CEM January 2012 For Creative Trust for Arts & Culture Table of Contents Introduction

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

Residential Adjustments. Overview 4.1

Residential Adjustments. Overview 4.1 Overview 4.1 Summary This chapter contains an overview of residential structural components, quality of construction, main dwellings, and construction types. It also provides adjustments such as wall height,

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

Single Family Basement Finish

Single Family Basement Finish Single Family Basement Finish Purpose of Guide The purpose of this guide is to assist you in the permit process for your project. This handout is intended as a basic plan submittal under the 2009 International

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

FLORIDA SOLAR ENERGY CENTER

FLORIDA SOLAR ENERGY CENTER FLORIDA SOLAR ENERGY CENTER Creating Energy Independence High Performance Existing Homes Partnerships and Research Janet McIlvaine Research Analyst, Florida Solar Energy Center A Research Institute of

More information

Applications for building permits will not be reviewed until all of the required information has been submitted.

Applications for building permits will not be reviewed until all of the required information has been submitted. NOTICE: Applications for building permits will not be reviewed until all of the required information has been submitted. Once all items are submitted a minimum of ten (10) working days are required to

More information

19 Ellis Park Road, Toronto

19 Ellis Park Road, Toronto 19 Ellis Park Road, Toronto Inspection Report September 9, 2015 19 Ellis Park Road, Toronto Inspection Report Overall Condition: This is a solidly built older double-brick home that is in fairly original

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY The list below contains those building elements most commonly found in buildings found in a condominium

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information