2. Natura 2000 Impact Assessment

Size: px
Start display at page:

Download "2. Natura 2000 Impact Assessment"

Transcription

1 . Natura 2000 Impact Assessment

2 2. Natura 2000 Impact Assessment 2.1 Background, Objectives and Legal Principles The European Union s "Flora-Fauna-Habitat Directive" (Council Directive 92/43/EEC FFH-CD) of 1992 aims to advance the goal of preserving biological diversity. Measures to achieve this include a Europe-wide network of protection sites. The focus is on specific habitats and specific flora and fauna which are of European significance. The NATURA 2000 Network includes both Sites of Community Importance as per the FFH council directive and also European Bird Sanctuaries as defined by the Birds Directive (Art. 10(1) Nos. 5 and 6 Federal Nature Conservation Act). The network should be coherent throughout Europe (Art. 3 FFH-CD). In place of coherence the German Federal Nature Conservation Act also refers to cohesion and continuity ; the Berlin Nature Conservation Law (BNCL) refers to continuity of the network. In addition to a spatial-functional network it should also be ensured that NATURA 2000 habitats and flora and fauna are represented. The relevant conservation targets must be defined in order to protect and/or restore the favourable conservation status of an area. All plans, measures, changes or disturbances which could give rise to significant impairments to those components of the site that are of a critical interest for relevant conservation objectives are inadmissible (Deterioration Ban, Sect. 22b(5) and Sect. 16(2) BNCL, Art. 6(2) FFH-CD). Assessing impact, also known as the Natura 2000 Impact Assessment (NIA 2000), is intended to ensure that plans and projects do not give rise to impairments to the conservation objectives for these sites. In 1998 Germany put the European directives into national legislation by means of the Federal Nature Conservation Act (FNCA) and in 2003 Berlin put them into state legislation by means of the Berlin Nature Conservation Law. Annex 4.3 gives a tabular overview of the statutory sources. Berlin has registered 15 Natura 2000 sites, which cover just over 7% of the federal state s entire area. 2.2 Scope of Application A NIA 2000 is required whenever a project subject to approval or a plan being compiled could give rise to significant impairments to those components of the site that are of a critical interest for relevant conservation objectives of a Natura 2000 site. An impact assessment is also required if such impairments could be caused by the effects of the project or plan concerned in combination with other plans or measures (Sect. 16(2) FNCA). The scope of application is defined by means of the definition of the terms projects and plans in the Federal Nature Conservation Act (Sect. 10(1) Nos. 11 and 12 FNCA) and Sect. 35 FNCA (see Chap. 2.4). A NIA 2000 is required in order to clarify whether a project or plan falls under these definitions and could thus possibly give rise to significant impairments. 26 Environmental Assessment Berlin s Guide for Urban and Landscape Planning

3 Europe-wide conservation Natura 2000 sites in Berlin Information on the implementation of the EU directives on Fauna-Flora-Habitat (FFH) and bird protection Bird sanctuary Special Protected Area (SPA) FFH area Tegeler Fließtal Schloßpark Buch SPA and FFH areas Forest and natural park area Baumberge Spandauer Forst Tegel Waterworks Falkenberger Rieselfelder Water Zitadelle Spandau Fort Hahneberg Fließwiese Ruhleben Grunewald Pfaueninsel Western Düppeler Forst Friedrichshagen Waterworks Müggelspree/ Müggelsee Teufelsseemoor Müggelspree Wilhelmshagen- Woltersdorfer Dünenzug Fig. 13 Environmental Assessment Berlin s Guide for Urban and Landscape Planning 27

4 4 In its judgement of 10 January 2006, the European Court of Justice ruled that the FNCA did not sufficiently implement the scope of application of the NIA 2000 assessment obligation. 2.3 Procedure and Participation In the case of NIA 2000 s of projects, the procedural stages and thus also the participation of other government authorities; other representatives of public concern and the general public conform to the relevant authorisation procedures, e.g. a planning approval procedure subject to rail law. In the case of plans and programmes in accordance with Sect. 35, 1 st sentence, No. 2 FNCA, a NIA 2000 entails the execution of a Strategic Environmental Impact Assessment (Sect. 14c German Environmental Impact Assessment Act EIA Act). This legislation aims to achieve conformity of the NIA 2000 with the procedural standards for EIA s (SANGENSTEDT 2001). The authority which is responsible for deciding on approval of a project or plan is first obliged to inform the supreme authority for conservation and landscape management without delay regarding this matter (Sect. 17(1) BNCL).The latter carries out the preliminary NIA 2000 and reaches a decision on whether a NIA 2000 is required. Carrying out of any further procedures relating to the NIA 2000 lies mainly within the scope of responsibility of the authority conducting the relevant planning approval or approval process. The officially recognised conservation associations in Berlin are given an opportunity to inspect papers relating to, and comment on, the matter in hand (Sect. 39a BNCL). In certain cases, the European Commission must be involved and/or informed (see Chapters 2.8 and 2.9). 2.4 Preliminary NIA 2000 At the outset of a procedure the following questions are used to clarify whether a NIA 2000 is required ( preliminary assessment or screening ): 1. Does the case involve a plan or project as defined by Sect. 10 FNCA? 2. Could the project/plan in combination with others give rise to significant impairments on a protected site and/or the conservation objectives for a Natura 2000 site? (Chap. 2.6). The term project is defined in broad terms in Sect. 10 of the Federal Nature Conservation Act; projects are thus: a) projects and measures within a site of Community importance or a European bird sanctuary, insofar as they require a decision by an authority or a notification to an authority or are being conducted by a government authority, b) interventions in nature and landscape within the meaning of Sect. 18 FNCA, insofar as they require a decision by an authority or a notification to an authority or are being conducted by a government authority and c) facilities subject to authorisation under the Federal Immission Control Act and water uses which require a permit or a licence under the Federal Water Act, insofar as they, either individually or in combination with other projects or plans, have a significant impact on a site of Community importance or a European bird sanctuary (Sect. 10(1) No. 11 FNCA) Environmental Assessment Berlin s Guide for Urban and Landscape Planning

5 The term plans includes the following in the sense of the Federal Nature Conservation Act: Plans and decisions from prior procedures which have to be complied with or taken into account in official decisions insofar as they are likely, either individually or in combination with other plans or projects, to have a significant impact on a site of Community importance or a European bird sanctuary (Sect. 10(1) No. 12 FNCA). The obligation to assess covers, for e.g.: 1. Route determinations of federal highways and federal waterways as well as 2. Regional development plans and regional plans covering the state of Berlin. These include the States of Berlin-Brandenburg Development Programme and the development plans of the Laender (Chap. 3.4). 3. Land development plans und development plans (Chap. 3.4). An impact assessment is not required: if the plan or project concerned is designed to implement the objectives of the FFH-CD or the Birds Council Directive (see Sect. 16 BNCL and Sect. 10 FNCA). in the case of building projects in areas with development plans under Sect. 30 of the Federal Building Code and during the plan proposal procedure under Sect. 33 Federal Building Code (Sect. 37(1) FNCA). Fig. 14: Procedural steps of the FFH impact assessment under Sect. 34 and 35 FNCA 1. Preliminary impact assessment Criteria: plan or project as per Sect. 10(1) FNCA In combination with other projects of plans significant impact on a Natura 2000 site regarding its protection purposes or for the conservation objectives of key elements possible Question: Are the preconditions fulfilled which make a NIA 2000 necessary? Yes NIA 2000 required 2. Natura 2000 Impact Assessment Criteria: Relevant impact of the project or plan Significance of the changes to be expected Question: Can the project or plan give rise to significant impairments on the conservation objectives for the components of a critical interest for a NATURA 2000 site? Exceptional case 3. Assessment of exceptional circumstances Yes No No NIA 2000 not required Approval of the project and/or passing of the plan possible Inadmissibility of the project or plan Criteria: no reasonable, acceptable alternatives imperative reasons of a primarily public interest measures to preserve coherence possible In the case of significant impairments to key habitats or species: limited exceptional reason under Sect. 16(4) BNCL As applicable: statement by the Commission Question: Do the circumstances required for an exceptional approval exist? No Inadmissibility of the project or plan Yes Approval of the project or passing of the plan possible Environmental Assessment Berlin s Guide for Urban and Landscape Planning 29

6 Fig. 15: New construction of a cycle path in a NATURA 2000 site (FFH site Müggelspree, Müggelsee) As a result of the preliminary assessment, considerable impairments could be avoided due to a compatible cycle track arrangement and appropriate construction of the paths. If, as a matter of principle, the plan or programme falls within the scope of application of the NIA 2000, it must be clarified whether individual cases in combination with other plans or projects could result in a significant effects on a Natura 2000 site (relevance assessment). During the preliminary assessment the effect of possible combinations is only considered in general terms. The more information on the proposed project or plan (and thus its impact factors) which the supreme authority for conservation and landscape management has, the easier it is for it answer the question of relevance. In the interest of a prompt decision the objectives and specifications of the plan and/or the objectives and the technical design of the project on the part of the project proponent (or the planning office/consultant) should thus be described as concretely and clearly as possible. It is recommended that, in conjunction with the supreme authority for conservation and landscape management, options be sought to modify the project or plan at this stage of the planning process in order to make it possible to exclude any significant impairments to Natura 2000 sites (Figure 15). Should this be successful the concluding result of the preliminary assessment will be that no further steps in the NIA 2000 process are required. If significant impairments cannot be excluded, then a NIA 2000 will be required. The result of the preliminary assessment must be documented in a clear and transparent manner. 2.5 Specifying the Scope of Assessment With regard to the assessment content of the NIA 2000 study it should be clarified (if necessary in a scoping meeting), which impact factors of a project or plan are relevant, which other plans and projects must be taken into consideration due to a possible cumulative impact (Sect. 16(2) BNCL), which types of habitat as well as species and its habitats could be affected and what impact, measured according to the conservation objectives, could occur in Natura 2000 sites, how the area under assessment should be delimited (including consideration of areas for any coherence protection measures which may be required), if additional assessment is required and if specialist experts should be consulted, which assessment methods should be used. Furthermore an assessment should be carried out regarding whether an alternative assessment will be necessary. In such a case it is recommended that the alternatives to be assessed are taken into consideration to the fullest extent possible. Specifying of the scope of assessment takes place in consultation with the supreme authority for conservation and landscape management and, if required, with other parties involved. Should an EIA or a strategic EIA be required for a project or plan, it is advised that a joint scoping meeting and documentation of the agreements reached be carried out (Chap. 1). 30 Environmental Assessment Berlin s Guide for Urban and Landscape Planning

7 2.6 NIA 2000 Study The NIA 2000 study is the technical cornerstone of the NIA The structure of the NIA 2000 study can be based on existing templates (e.g. EISENBAHNBUNDESAMT 2005, Annex IV 1; KÖPPEL et al. 2004, 320). The sample maps developed for federal road building agencies can provide useful pointers when compiling maps for preliminary NIA 2000 s for projects (Federal Ministry of Transport, Building and Urban Affairs 2004) Description of the Site Concerned NIA 2000s assess formally specified NATURA 2000 sites with their habitats as stated in the FFH Directive (Annex I); the habitats of the flora and fauna listed (Annex II) and the habitats of the birds listed in the Birds Directive, in addition to the corresponding conservation objectives. The objective is to protect (or restore) the favourable conservation status of the habitats or species concerned. The supreme authority for conservation and landscape management can provide information concerning current protection of the area concerned. Special protection area ordinances specify in detail protection purposes in accordance with the corresponding conservation objectives. Since many of Berlin s Natura 2000 sites are already classified as nature reserves or areas of outstanding natural beauty special protection area ordinances and, in some cases, also preservation and development plans have already been compiled for the sites. Often, however, the protection purposes fixed in these documents do not comply with the requirements specified by the NATURA 2000 regulations; the special protection area ordinances must thus be amended accordingly. The general conservation objectives are stated in the Natura 2000 sites public announcement of and in the Official Gazette for Berlin (Amtsblatt für Berlin) No. 48 of , p et sqq. Assessments focusing on single areas and conservation objectives must be carried out on presentation of the management plan. The supreme authority for conservation and landscape management can provide advice and information in this regard. Favourable conservation status is the status required to ensure long-term, Europe-wide protection of the habitats and species covered by the FFH Council Directive and the Birds Directive. The conservation status of a natural habitat is considered to be favourable if its natural range and areas it covers within that range are stable or increasing, the specific structure and functions which are necessary for its long-term maintenance exist and are likely to continue to exist for the foreseeable future, and the conservation status of its typical species is favourable (Art. I e FFH-CD). The conservation status of a species is considered to be favourable if population dynamics data on the species indicate that it is maintaining itself on a long-term basis as a viable component of its natural habit, the natural range of this species is neither being reduced nor is it likely to be reduced for the foreseeable future and there is, and will probably continue to be, a sufficiently large habitat to maintain its populations on a long-term basis (Art. I i FFH-CD). When favourable conservation status, which may not be impaired, is a stated protection objective it is also simultaneously the benchmark for assessment of the impact of plans and projects. Environmental Assessment Berlin s Guide for Urban and Landscape Planning 31

8 Fig. 16: Fließwiese Ruhleben (Berlin, Charlottenburg) Thanks to the NIA 2000 carried out to assess the impact of the development of the River Spree, it was possible to sustain this habitat, home to the great crested newt (Annex II of the FFH-CD), as it was recognised that this wet area could possibly dry out as a result. The NIA 2000 study requires a description and assessment of the site and/or the area affected which takes the conservation objectives into consideration and covers the situation of the key components and priority species or habitats. Key elements of a site are its habitats as defined by the FFH-CD and the Birds Directive, and the species covered by these directives (see Sect. 16(2) BNCL). Any specific species and habitats which are not included in the directives but are relevant for the favourable conservation status of a site in particular the characteristic species of the habitat concerned can be included among the key components (SSYMANK et al. 1998). This also applies to abiotic elements of nature and the landscape as well as to structural characteristics such as, for example, the intactness of a site (see EISENBAHNBUNDESAMT 2005, Part IV and KÖPPEL et al. 2004). If applicable, it may be necessary to identify the key components in the impact assessment study. Priority protection objects are at special risk and thus accorded special protection by the European Community. Priority habitats are listed and identified in Annex I, priority species in Annex II of the NIA 2000 regulations. Information on Natura 2000 sites in Berlin is provided in a flyer produced by the Senate Department for Urban Development (SENSTADT 2005). In order to be able to predict to what extent the project or plan could give rise to impairments to a Natura 2000 site an assessment of its specific sensitivities vis-à-vis the impact factors of the plan or project is required. In the case of the FFH habitats this also requires knowledge of their characteristic species. Assignments of such species to habitats are given, for e.g., in the Handbook of the European NATURA 2000 protected sites system published by the Federal Nature Conservation Agency (SSYMANK et al. 1998) and in the Interpretation Manual of European Habitats (EUROPEAN COMMISSION 1999) Description of the Project or Plan The project or the plan and/or the impact factors which could be of significance for the NATURA 2000 site should be described by the project proponent as concretely as possible to facilitate an assessment of their impact. Impact relationships can also exist across larger spatial distances; for this reason the assessment cannot be limited solely to the plan/project site. 32 Environmental Assessment Berlin s Guide for Urban and Landscape Planning

9 Since the starting point for assessing impact interrelationships is the Natura 2000 site in question and its specific conservation objectives, other plans and projects which could also result in a cumulative impact together with the proposed plan or project must be included in assessments (Federal Nature Conservation Agency 2004; EUROPEAN COMMISSION 2000, No ). Should it be foreseeable that a project or plan is inadmissible due to its significant impact and that a special approval procedure will be requested (Chap. 2.8), it is strongly recommended that acceptable alternatives also be sought from the outset and that their characteristics and impact factors be described. In the event of a special approval procedure and in order to be able to assess whether grounds for a special exception are applicable to the proposal, it is also expedient to include the formulations for the exceptional facts such as public interest, imperative, etc. in the explanatory statement relating to the proposal Assessment of Impairments and Their Relevance (Prediction of Impact) Probable impairments can be predicted by means of a comparison of the proposal s impact factors and the sensitivities of the species and habitats within the site. The objective is to show the specific impact on individual partial areas of the Natura 2000 site. This consideration may not, however, be solely limited to these individual areas. Rather more, the imperative is to assess to what extent there could be impairments to the Natura 2000 site in its entirety. This can also include changes to abiotic factors insofar as they represent key elements for the conservation objectives. The decisive issue in this regard is the relevance of the impact to be expected. Assessments are always on a case-by-case basis. It is sufficient to establish that a proposal could give rise to significant impairments without this having to be certain or provable. Factors taken into consideration include the duration, intensity and scope of the negative impact. The site s conservation objectives are the benchmark for evaluating relevance and thus, generally, the favourable conservation status to be protected or restored which is correspondingly aspired to. Any impairment ban relates to the favourable conservation status. Should the conservation status be favourable, it may not be impaired by the proposal; should it be compromised, then its improvement may not be hindered. When defining relevance, the significance of the FFH site within the NATURA 2000 network must be taken into consideration (criteria in Annex III FFH-CD). When assessing the extent of impairments, any planned compensatory measures shall have an alleviating impact. Should special protection area ordinances with deviating regulations be in place, they must be complied with (Sect. 17(4) BNCL). The Berlin Nature Conservation Law states that there have been significant impairments to a site particularly if those habitats which are key to the conservation objectives or the protection aim are impaired or if the species which caused the site to be designated are significantly disturbed or if there are significant impairments to measures for protection or restoration of a favourable conservation status (Sect. 16(2) 2 nd sentence BNCL). Environmental Assessment Berlin s Guide for Urban and Landscape Planning 33

10 Options for avoidance and minimisation include, among others, changes to the dimensioning of buildings; optimising the timetable for building works (e.g. to avoid birds breeding seasons); using more environment-friendly building procedures or the use of mechanisms to reduce impairments (e.g. immission control planting, crossing aids). Fig. 17: FFH site Schloßpark Buch Within the scope of a preliminary NIA 2000 assessment regarding changes to the system of ditches it was possible to avoid significant impairments to the habitat Measures of Avoidance and Minimisation Following conclusion of the impact prediction, the NIA 2000 study compiles measures of avoidance and minimisation ( damage-limitation measures ). If negative consequences for the conservation objectives of a protected site can be avoided or significantly limited, this can result in the effects falling below the significance threshold. There is a clear differentiation between these measures and coherence protection measures (FISCHER-HÜFTLE 2003; Chap. 2.9). 2.7 Results of the Assessment In cooperation with the supreme authority for conservation and landscape management the government authority in charge of the procedure formulates the results of the assessment and reaches a conclusion regarding the impact of the plan or project it is either negative, and thus inadmissible, or neutral/positive, and thus admissible. In the case of planning establishment procedures and permits with a concentration impact a conclusion is sufficient. A project or plan is particularly inadmissible if it could have significant impairments to those components of a Natura 2000 site which are key for the conservation objectives or protection purposes either individually or in combination with other projects or plans (Sect. 16(2) BNCL) 2.8 Assessment of Exceptional Circumstances If the NIA 2000 comes to the conclusion that the project or plan will give rise to impairments and is thus inadmissible then a subsequent special assessment can examine whether there is still any other possible way of approving the project or plan. Two steps are required for this: 1. assessment whether there are reasonable alternatives, 2. assessment of the exceptional circumstances. 34 Environmental Assessment Berlin s Guide for Urban and Landscape Planning

11 Following selection of the alternatives to be assessed (possibly as early on as the time when the scope of assessment was defined), the assessment of alternatives catalogues and assesses impairments and compares them with the original solution. The assessment of alternatives ends with a conclusion regarding whether reasonable, acceptable alternatives exist or not. The next step, assessing the exceptional circumstances, is only embarked upon if proof can be presented that there are no other reasonable alternatives which will give rise to less serious impairments to Natura 2000 sites. Proof of these circumstances must be provided by the project proponent and/or the government authority presenting the plans. Exceptional admissibility is only possible if: the proposal is in the public interest, this interest is overriding, and outweighs those NATURA 2000 interests which are affected (Sect. 16(3) 1 st sentence BNCL). If, in the case of a project giving rise to significant impairments to a site with priority habitats or species, the imperative exceptional reasons do not exist and the project should still be carried out despite this, an opinion from the European Commission must be obtained. This shall be obtained by the competent authority via the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety. The Commission has issued a form detailing the information required in such a case (EURO PEAN COMMISSION 2000, Annex IV). The Commission s opinion must be taken into consideration. Fig. 18: Osmoderma eremita, a priority species from Annex II of the FFH-CD If there will be significant impairments to priority species or priority habitats on the site concerned, the project or plan may only be pursued and/or approved if the imperative considerations which are raised also fulfil the following criteria: They are related to human health, public safety including national defence and protection of the civilian population or the project or plan will have (additional) beneficial consequences of primary importance for the environment (Sect. 16(4) BNCL). 2.9 Designing Coherence Protection Measures If it is planned to approve a plan or project despite its significant impairments to a Natura 2000 site, all necessary measures must be taken to ensure the continued coherence of the NATURA 2000 network. If this is not possible then the proposal shall be deemed inadmissible. Environmental Assessment Berlin s Guide for Urban and Landscape Planning 35

12 The following are examples of measures: measures within the site affected which were not in any case planned within the context of the relevant conservation objectives, spatial expansion of a site, creation of new habitats in another Natura 2000 site or their expansion. Fig. 19: Brimstone butterfly on a Carthusian pink The coherence protection measures will be detailed by the project proponent or the authority proposing the plan in the NIA 2000 study; assessed and stipulated by the authority managing the procedure in cooperation or consultation with the supreme authority for conservation and landscape management. Carrying out of the measures shall be by the project proponent (Sect. 16(5) BNCL). The type and extent of these measures shall be related to the adversely affected habitats/species within the same biogeographical region. Complete functional compensation will be required. The measures must be stipulated prior to approval of the proposal and are binding. As a general matter of course they must be implemented before any damage is done, since the overall status must be preserved at any given time. In exceptional cases an application for the addition of a site that is suitable for compensation into the NATURA 2000 network with the carrying out of additional enhancing measures shall also be considered to be a coherence protection measure. If measures are carried out on sites which were not previously part of the NATURA 2000 network a (retroactive) registration of these sites as a component of the network is required. In many cases, a proposal for which a special assessment in accordance with FFH law is carried out also involves intervention in nature or landscape. The coherence protection measures and the compensatory and substitute remediation measures as stipulated by intervention regulations must then be designed in such a way that they are as congruent as possible (Sect. 16(6) BNCL); the requirements for coherence protection measures must be complied with. Measures by the habitat association may possibly also support the coherence of the NATURA 2000 network. Lastly, the European Commission shall be informed via the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety of the measures taken (Sect. 16(5) BNCL). A European Commission is also available for this purpose. 36 Environmental Assessment Berlin's Guide for Urban and Landscape Planning

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

adoption the Adjustment of the German Federal Building Law to EU Guidelines (EAGBau). When conducting the Flora and Fauna Sensitivity Audit it is

adoption the Adjustment of the German Federal Building Law to EU Guidelines (EAGBau). When conducting the Flora and Fauna Sensitivity Audit it is Environmental Audits should draw on the status of the environmental stocktake in landscape planning. The nature conservation and landscape management objectives specified in the Landscape Planning Program

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

No. 132. Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act

No. 132. Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act NB: UNOFFICIAL TRANSLATION FINLAND No. 132 Land Use and Building Act (132/1999, amendment 222/2003 included) In accordance with the decision of Parliament the following is enacted: Chapter 1 General provisions

More information

Federalizing Process in Italy Challenges from an International Perspective. Case Study Germany: How did Germany disentangle competences?

Federalizing Process in Italy Challenges from an International Perspective. Case Study Germany: How did Germany disentangle competences? Federalizing Process in Italy Challenges from an International Perspective Case Study Germany: How did Germany disentangle competences? Dr. Bernd Kuster, Federal Ministry of the Interior, Berlin At this

More information

Brussels in Brief. Natura 2000 A Safety Net for Europe s Nature

Brussels in Brief. Natura 2000 A Safety Net for Europe s Nature Brussels in Brief Brussels in Brief is a regular feature of the IUCN Newsletter produced by the Institute for European Environmental Policy (IEEP) in Brussels. It provides a platform to explain the substance

More information

Dresden University of Technology. Faculty of Computer Science. Doctorate Regulations

Dresden University of Technology. Faculty of Computer Science. Doctorate Regulations Dresden University of Technology Faculty of Computer Science Doctorate Regulations dated 10th January 2014 Please note, that the German version is the only legally binding text. Conformant with 40 and

More information

Policies and programmes to achieve food security and sustainable agriculture

Policies and programmes to achieve food security and sustainable agriculture HUNGARY Agriculture (Government focal point(s): Ministry of Agriculture and Rural Development Mr. Zoltán Kárpáti: tel: +361-301-3533, fax: +361-301-5949, e-mail: karpatiz@fvm.hu and Ms. Rita Francia: tel:

More information

Ordinance on Specialised Waste Management Companies (Entsorgungsfachbetriebeverordnung - EfbV) *) of 10 September 1996

Ordinance on Specialised Waste Management Companies (Entsorgungsfachbetriebeverordnung - EfbV) *) of 10 September 1996 Ordinance on Specialised Waste Management Companies (Entsorgungsfachbetriebeverordnung - EfbV) *) of 10 September 1996 The Federal Government, having heard the parties concerned, and pursuant to Article

More information

Planning application process improvements

Planning application process improvements Planning application process improvements Government response to consultation January 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement

More information

Green Infrastructure Case Study Template

Green Infrastructure Case Study Template Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case

More information

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Context Regulatory Impact Assessment (RIA) began in Western

More information

Pre-application service for Nationally Significant Infrastructure Projects

Pre-application service for Nationally Significant Infrastructure Projects Pre-application service for Nationally Significant Infrastructure Projects Prospectus for Applicants Version 1 (May 2014) In this prospectus... This is a clickable PDF Executive summary 3 1 2 3 Purpose

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and

More information

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:

More information

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July

More information

THE PRINCIPLE OF SUBSIDIARITY

THE PRINCIPLE OF SUBSIDIARITY THE PRINCIPLE OF SUBSIDIARITY In areas which do not fall within the Union s exclusive competence, the principle of subsidiarity, laid down in the Treaty on European Union, defines the circumstances in

More information

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for:

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for: Ms Megan Richardson Aquamarine Power Ltd. Elder House 24 Elder Street Edinburgh EH1 3DX 14 February 2012 Dear Ms. Richardson, CONSENT FOR THE CONSTRUCTION AND OPERATION OF AN OFFSHORE DEMONSTRATOR WAVE

More information

1999 No. 2083 CONSUMER PROTECTION. The Unfair Terms in Consumer Contracts Regulations 1999

1999 No. 2083 CONSUMER PROTECTION. The Unfair Terms in Consumer Contracts Regulations 1999 STATUTORY INSTRUMENTS 1999 No. 2083 CONSUMER PROTECTION The Unfair Terms in Consumer Contracts Regulations 1999 Made - - - - 22nd July 1999 Laid before Parliament 22nd July 1999 Coming into force 1st October

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 30.12.2004 COM(2004) 839 final REPORT FROM THE COMMISSION ON MONITORING THE APPLICATION OF COMMUNITY LAW (2003) OVERALL POSITION 21st ANNUAL REPORT {SEC(2004)

More information

Deposits and investments with Deutsche Bank AG are covered by two German protection

Deposits and investments with Deutsche Bank AG are covered by two German protection Deposits and investments with Deutsche Bank AG are covered by two German protection schemes: 1. Entschädigungseinrichtung deutscher Banken GmbH (EdB), the German private commercial bank s statutory compensation

More information

Liechtenstein. Heinz Frommelt. Sele Frommelt & Partners Attorneys at Law Ltd

Liechtenstein. Heinz Frommelt. Sele Frommelt & Partners Attorneys at Law Ltd Sele Frommelt & Partners Attorneys at Law Ltd Heinz Frommelt Sele Frommelt & Partners Attorneys at Law Ltd Legislation and jurisdiction 1 What is the relevant legislation and who enforces it? is a member

More information

National Report to the Fourth Session of the United Nations Forum on Forests CYPRUS JANUARY 2004

National Report to the Fourth Session of the United Nations Forum on Forests CYPRUS JANUARY 2004 National Report to the Fourth Session of the United Nations Forum on Forests CYPRUS JANUARY 2004 Format for national reporting to UNFF4, 8 August 2003 1 I. Key Contacts Head of Forestry in Cyprus: Name:

More information

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests

More information

Factsheet on the Scope of EU merger control

Factsheet on the Scope of EU merger control BUNDESKARTELLAMT July 2004 GENERAL POLICY DEPARTMENT Factsheet on the Scope of EU merger control This factsheet provides information on the distribution of powers between the European Commission and the

More information

Fundamental Principles of Financial Auditing

Fundamental Principles of Financial Auditing ISSAI 200 ISSAI The 200 International Fundamental Standards Principles of Supreme of Financial Audit Institutions, Auditing or ISSAIs, are issued by INTOSAI, the International Organisation of Supreme Audit

More information

Instruction booklet. Non-country-specific embargo measures to combat terrorism

Instruction booklet. Non-country-specific embargo measures to combat terrorism Instruction booklet Non-country-specific embargo measures to combat terrorism Publication data Published by: Federal Office of Economics and Export Control (BAFA) Frankfurter Strasse 29, 65760 Eschborn

More information

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL L 218/82 EN Official Journal of the European Union 13.8.2008 DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL DECISION No 768/2008/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of

More information

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES

THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES THE DECOMMISSIONING OF THE UK NUCLEAR INDUSTRY S FACILITIES Introduction 1. This statement of the UK Government and devolved administrations policy on the decommissioning of nuclear facilities updates

More information

Environmental impact assessment (EIA)

Environmental impact assessment (EIA) October 2005 Environmental impact assessment (EIA) a campaigner's guide What is this guide for? Environmental Impact Assessment (EIA) is a key aspect of many large scale planning applications. It is a

More information

The Århus Convention by Jens Hamer, ERA

The Århus Convention by Jens Hamer, ERA The Århus Convention by Jens Hamer, ERA I. Introduction This dossier deals with the so called Århus Convention, an international environmental treaty aiming at involving citizens in the environmental decision

More information

Fit and Proper Principles paper

Fit and Proper Principles paper 38 Fit and Proper Principles paper 39 Fit and Proper Principles Objective 1. To ensure that supervisors of entities within a financial conglomerate are able to exercise their responsibilities to assess

More information

Strategy of the German Government on the use of off-shore wind energy

Strategy of the German Government on the use of off-shore wind energy Strategy of the German Government on the use of off-shore wind energy in the context of its national sustainability strategy Ministries involved: Federal Ministry for the Environment, Nature Conservation

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 May 2012. 9441/12 Interinstitutional File: 2008/0090 (COD) LIMITE INF 75 API 56 JUR 253 CODEC 1153

COUNCIL OF THE EUROPEAN UNION. Brussels, 4 May 2012. 9441/12 Interinstitutional File: 2008/0090 (COD) LIMITE INF 75 API 56 JUR 253 CODEC 1153 COUNCIL OF THE EUROPEAN UNION Brussels, 4 May 2012 9441/12 Interinstitutional File: 2008/0090 (COD) LIMITE INF 75 API 56 JUR 253 CODEC 1153 NOTE from: Presidency to Permanent Representatives Committee

More information

SEA PRE SCREENING REPORT (COVER NOTE ) PART 1. An SEA Pre Screening Report is attached for the plan, programme or strategy (PPS) entitled:

SEA PRE SCREENING REPORT (COVER NOTE ) PART 1. An SEA Pre Screening Report is attached for the plan, programme or strategy (PPS) entitled: SEA PRE SCREENING REPORT (COVER NOTE ) PART 1 To: SEA.gateway@scotland.gsi.gov.uk or SEA Gateway Scottish Eecutive Area 1 H (Bridge) Victoria Quay Edinburgh EH6 6QQ PART 2 An SEA Pre Screening Report is

More information

The Public Participation Process in Cyprus

The Public Participation Process in Cyprus The Public Participation Process in Cyprus Priority Actions Programme Regional Activity Centre Split, February 2007 Table of Contents 1. Introduction... 1 2. Benefits of Public Participation in Decision

More information

HDE position on legislative package to regulate payment systems (MIF and PSD II)

HDE position on legislative package to regulate payment systems (MIF and PSD II) [Transparency Register No.: 31200871765-41] HDE position on legislative package to regulate payment systems (MIF and PSD II) November 2013 I. Einleitung I. Introduction The German Retail Federation HDE

More information

F i r s t N a t i o n a n d M é t i s Consultation Policy Framework. June 2010

F i r s t N a t i o n a n d M é t i s Consultation Policy Framework. June 2010 F i r s t N a t i o n a n d M é t i s Consultation Policy Framework June 2010 Table of Contents 1. Introduction.... 2 2. Duty to Consult Policy................................................. 3 1. Policy

More information

General Terms and Conditions of the Titelbild Subtitling and Translation GmbH, D- 10711 Berlin, Status July 2012. Preamble

General Terms and Conditions of the Titelbild Subtitling and Translation GmbH, D- 10711 Berlin, Status July 2012. Preamble General Terms and Conditions of the Titelbild Subtitling and Translation GmbH, D- 10711 Berlin, Status July 2012 Preamble The present General Terms and Conditions ( GTC ) shall apply to all contracts and

More information

December 2004 Paper 2004/21

December 2004 Paper 2004/21 The Scottish Environment Protection Agency (SEPA) and Sustainable Development Statutory Guidance to SEPA made under Section 31 of the Environment Act 1995 December 2004 Paper 2004/21 Crown copyright 2005

More information

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation

Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Liability for ecological damage: the added value of the Environmental Liability Directive for nature conservation Valerie Fogleman Consultant, Stevens & Bolton LLP Professor of Law, Cardiff University

More information

Guidance on the 'Regulation on access to spatial data sets and services of the Member

Guidance on the 'Regulation on access to spatial data sets and services of the Member Infrastructure for Spatial Information in Europe Guidance on the 'Regulation on access to spatial data sets and services of the Member States by Community institutions and bodies under harmonised conditions'

More information

VIENNA RESOLUTION 4 CONSERVING AND ENHANCING FOREST BIOLOGICAL DIVERSITY IN EUROPE

VIENNA RESOLUTION 4 CONSERVING AND ENHANCING FOREST BIOLOGICAL DIVERSITY IN EUROPE FOURTH MINISTERIAL CONFERENCE ON THE PROTECTION OF FORESTS IN EUROPE 28 30 April 2003, Vienna, Austria VIENNA RESOLUTION 4 CONSERVING AND ENHANCING FOREST BIOLOGICAL DIVERSITY IN EUROPE 1. Recognising

More information

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS 5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS The methods that are used to conduct the environmental impact assessment (EIA) of the Project are described in this section. The EIA uses a methodological framework

More information

Sure Start children s centres statutory guidance. For local authorities, commissioners of local health services and Jobcentre Plus

Sure Start children s centres statutory guidance. For local authorities, commissioners of local health services and Jobcentre Plus Sure Start children s centres statutory guidance For local authorities, commissioners of local health services and Jobcentre Plus April 2013 Contents Summary 3 Sure Start children s centres statutory guidance

More information

Rights of residence for researchers from non-eu countries in Germany. Overview on potential residence permits pursuant to the German Residence Act

Rights of residence for researchers from non-eu countries in Germany. Overview on potential residence permits pursuant to the German Residence Act Rights of residence for researchers from non-eu countries in Germany Overview on potential residence permits pursuant to the German Residence Act Overview on potential residence permits for researchers

More information

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act)

183/2006 Coll. ACT of 14 th March 2006. on town and country planning and building code (Building Act) Contents and text 183/2006 Coll. latest wording of the text 183/2006 Coll. ACT of 14 th March 2006 on town and country planning and building code (Building Act) The Parliament passed this Act of the Czech

More information

Education programme standards for the registered nurse scope of practice Approved by the Council: June 2005

Education programme standards for the registered nurse scope of practice Approved by the Council: June 2005 Education programme standards for the registered nurse scope of practice Approved by the Council: June 2005 1 Introduction The Nursing Council of New Zealand ( the Council ) governs the practice of nurses,

More information

Environmental Impact Assessment of National Road Schemes A Practical Guide

Environmental Impact Assessment of National Road Schemes A Practical Guide Environmental Impact Assessment of National Road Schemes A Practical Guide Revision 1, 20 November, 2008 CONTENTS LIST OF BOXES...iii LIST OF TABLES...iv LIST OF FIGURES...iv 1.0 INTRODUCTION 1.1 Introduction...2

More information

CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT

CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT CHAPTER E12 - ENVIRONMENTAL IMPACT ASSESSMENT ACT ARRANGEMENT OF SECTIONS PART I General principles of environmental impact assessment SECTION 1.Goals and objectives of environmental impact assessment.

More information

I. BASIC PROVISIONS. Subject of regulation

I. BASIC PROVISIONS. Subject of regulation LAW ON ENVIRONMENTAL IMPACT ASSESSMENT Published in the Official Gazette of the Republic of Serbia, No. 135/2004 ( Službeni glasnik Republike Srbije, br. 135/04) I. BASIC PROVISIONS Subject of regulation

More information

Restructure, Redeployment and Redundancy

Restructure, Redeployment and Redundancy Restructure, Redeployment and Redundancy Purpose and Scope From time to time the Lake District National Park Authority will need to reorganise its services and staffing to meet changes that arise in future

More information

Date of issue: 06-03-2007

Date of issue: 06-03-2007 Noise and Vibrations Occupational Safety and Health Ordinance 1 Ordinance on the protection of workers against the risks arising from exposure to noise and vibrations (Noise and Vibrations Occupational

More information

Ref: ED Responding to Non-Compliance or Suspected Non-Compliance with Laws and Regulations

Ref: ED Responding to Non-Compliance or Suspected Non-Compliance with Laws and Regulations October 15. 2015 IAASB Ref: ED Responding to Non-Compliance or Suspected Non-Compliance with Laws and Regulations FSR - danske revisorer welcomes this project to ensure consistency between ISAs and the

More information

Ireland Treasury Shares Guide IBA Corporate and M&A Law Committee 2014

Ireland Treasury Shares Guide IBA Corporate and M&A Law Committee 2014 Ireland Treasury Shares Guide IBA Corporate and M&A Law Committee 2014 Contact Paul White A&L Goodbody, Dublin pwhite@algoodbody.com Contents Page GENERAL OVERVIEW 2 REGULATORY FRAMEWORK 3 ACQUISITION

More information

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Isle of Wight Biodiversity Partnership August 2010 1. Introduction 1.1 This document

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

National Parks and Wildlife Service

National Parks and Wildlife Service ISSN 2009-4086 National Parks and Wildlife Service Conservation Objectives Series Kilkee Reefs SAC 002264 Page 1 of 9 National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht,

More information

Built Environment Accessibility: The Irish Experience

Built Environment Accessibility: The Irish Experience Built Environment Accessibility: The Irish Experience Eoin O Herlihy and Jim Winters National Disability Authority 25 Clyde Road Dublin 4 Telephone: 00-353-1-6080400 Text phone: 00-353-1-6080400 Facsimile:

More information

General Conditions of Purchase (as of March 2002) Abbr.: AEB 03-2002 of the Salzgitter Bauelemente GmbH, Salzgitter

General Conditions of Purchase (as of March 2002) Abbr.: AEB 03-2002 of the Salzgitter Bauelemente GmbH, Salzgitter General Conditions of Purchase (as of March 2002) Abbr.: AEB 03-2002 of the Salzgitter Bauelemente GmbH, Salzgitter 1. Area of validity (1) The present conditions shall apply to all supplies and services

More information

Written Contribution of the National Association of Statutory Health Insurance Funds of 16.11.2015

Written Contribution of the National Association of Statutory Health Insurance Funds of 16.11.2015 Written Contribution of the National Association of Statutory Health Insurance Funds of 16.11.2015 to the Public Consultation of the European Commission on Standards in the Digital : setting priorities

More information

STANDARD FOR AUDITING PROJECTS DEFINITIONS AND RULES

STANDARD FOR AUDITING PROJECTS DEFINITIONS AND RULES Deutsches Institut für Interne Revision e.v. (German Institute for Internal Auditing) DIIR Audit Standard No. 4 STANDARD FOR AUDITING S DEFINITIONS AND RULES DIIR Project Management Audit Project Group

More information

City of Fort Collins Water Supply and Demand Management Policy

City of Fort Collins Water Supply and Demand Management Policy City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management

More information

United States of America Takeover Guide

United States of America Takeover Guide United States of America Takeover Guide Contact Richard Hall Cravath, Swaine & Moore LLP rhall@cravath.com Contents Page INTRODUCTION 1 TENDER OFFERS VERSUS MERGERS 1 IN THE BEGINNING 2 REGULATION OF TENDER

More information

Message 791 Communication from the Commission - SG(2012) D/50777 Directive 98/34/EC Notification: 2011/0188/D

Message 791 Communication from the Commission - SG(2012) D/50777 Directive 98/34/EC Notification: 2011/0188/D Message 791 Communication from the Commission - SG(2012) D/50777 Directive 98/34/EC Notification: 2011/0188/D Reaction of the Commission to the response of a Member State notifying a draft regarding a

More information

The current institutional and legal context for biodiversity conservation and management is characterised by the following features:

The current institutional and legal context for biodiversity conservation and management is characterised by the following features: National BiodiversityStrategyandActionPlan (NBSAP),St. Lucia page 8 Resource tenure and access Most agricultural lands, and a majority of forest lands, are privately owned. Two significant trends can be

More information

Sustainability & Environmental Appraisal Tools Handbook. Section 4: Environmental Impact Assessment

Sustainability & Environmental Appraisal Tools Handbook. Section 4: Environmental Impact Assessment Sustainability & Environmental Appraisal Tools Handbook Section 4: Environmental Impact Assessment Contents How to use this Guidance 3 Introduction 4 What is Environmental Impact Assessment? 4 Why is Environmental

More information

From: Head of Prison Administration Department, Legislation and International Relations Research Office, Ministry of Justice

From: Head of Prison Administration Department, Legislation and International Relations Research Office, Ministry of Justice Translation of letter Undated From: Head of Prison Administration Department, Legislation and International Relations Research Office, Ministry of Justice To: DG JUST B.1 Ref: US-INT--2-4/4 Subject: Strengthening

More information

Grievance Policy. 1. Policy Statement

Grievance Policy. 1. Policy Statement Grievance Policy 1. Policy Statement The University is keen to provide a positive and supportive working environment for all of its employees, and as such will take every step to resolve issues in the

More information

2010 No. 490 WILDLIFE COUNTRYSIDE. The Conservation of Habitats and Species Regulations 2010

2010 No. 490 WILDLIFE COUNTRYSIDE. The Conservation of Habitats and Species Regulations 2010 STATUTORY INSTRUMENTS 2010 No. 490 WILDLIFE COUNTRYSIDE The Conservation of Habitats and Species Regulations 2010 Made - - - - 1st March 2010 Laid before Parliament 8th March 2010 Laid before the National

More information

The Right Hon Jack Straw MP Secretary of State for Foreign and Commonwealth Affairs Downing Street UK London SW1A 2AL

The Right Hon Jack Straw MP Secretary of State for Foreign and Commonwealth Affairs Downing Street UK London SW1A 2AL EUROPEAN COMMISSION Brussels, 23.I.2006 C(2006)168 Subject: State Aid N 73/2005 United Kingdom East Midlands Media Investment Sir, 1. PROCEDURE 1. By letter dated 14 February 2005, registered at the Commission

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 7 October 2003 (OR. en) 12858/03 RECH 152 OC 589

COUNCIL OF THE EUROPEAN UNION. Brussels, 7 October 2003 (OR. en) 12858/03 RECH 152 OC 589 COUNCIL OF THE EUROPEAN UNION Brussels, 7 October 2003 (OR. en) 12858/03 RECH 152 OC 589 LEGISLATIVE ACTS AND OTHER INSTRUMENTS Subject : Council Decision on the signing of the Framework Agreement between

More information

GREEN PROPERTY MANAGEMENT AGREEMENTS. Recommended clauses and actions for sustainable property management. www.dlapiper.com 01

GREEN PROPERTY MANAGEMENT AGREEMENTS. Recommended clauses and actions for sustainable property management. www.dlapiper.com 01 GREEN PROPERTY MANAGEMENT AGREEMENTS Recommended clauses and actions for sustainable property management www.dlapiper.com 01 CONTENTS 1. GREEN PROPERTY MANAGEMENT BETWEEN CONTRACT, CERTIFICATION AND SERVICE

More information

UNIVERSITY OF LONDON REGULATIONS FOR THE DEGREE OF MD (RES)

UNIVERSITY OF LONDON REGULATIONS FOR THE DEGREE OF MD (RES) abcdef UNIVERSITY OF LONDON REGULATIONS FOR THE DEGREE OF MD (RES) (Doctor of Medicine (Research)) With effect from September 2005 University of London Senate House Malet Street London WC1E 7HU August

More information

Making the polluter pay Environmental Damage Regulations March 2009

Making the polluter pay Environmental Damage Regulations March 2009 Making the polluter pay Environmental Damage Regulations March 2009 Introduction... 1 When do the Regulations apply?... 2 Type of damage... 2 Cause of damage... 3 When did the incident or damage occur?...

More information

Tree Management Guidelines

Tree Management Guidelines Tree Management Guidelines Overview Tree Management Guidelines The trees that make up Brisbane s urban forest create much of our subtropical landscape character and biodiversity. Almost half of the city

More information

Key functions in the system of governance Responsibilities, interfaces and outsourcing under Solvency II

Key functions in the system of governance Responsibilities, interfaces and outsourcing under Solvency II Responsibilities, interfaces and outsourcing under Solvency II Author Lars Moormann Contact solvency solutions@munichre.com January 2013 2013 Münchener Rückversicherungs Gesellschaft Königinstrasse 107,

More information

Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job

Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job Contracts Manager Purpose of the Job As Contracts Manager you will manage all aspects of the Grounds Maintenance contracting business safely and efficiently, maximising profitability through the completion

More information

Recent case-law of the Court of Justice of the European Union and of the (Supreme) Administrative Courts in public procurement litigation

Recent case-law of the Court of Justice of the European Union and of the (Supreme) Administrative Courts in public procurement litigation Recent case-law of the Court of Justice of the European Union and of the (Supreme) Administrative Courts in public procurement litigation 1. National legal system Answers to the questionnaire by the Supreme

More information

Status: 1 January 2006

Status: 1 January 2006 Status: 1 January 2006 Act on Occupations in Geriatric Nursing (Geriatric Nursing Act - AltPflG) in the version of the announcement of 25 August 2003 (Federal Law Gazette I, p. 1690), last amended by Article

More information

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009

Environmental Liability Regulations. Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 Environmental Liability Regulations Kevin Motherway Environmental Liability Unit EPA Waste Workshop, Athlone 23 rd of October 2009 The Environmental Liability Regulations (ELR)* S.I. No. 547 of 2008 in

More information

The guidance will be developed over time in the light of practical experience.

The guidance will be developed over time in the light of practical experience. Freedom of Information Act Awareness Guidance No. 14 International Relations The Information Commissioner s Office (ICO) has produced this guidance as part of a series of good practice guidance designed

More information

PROMOTION AND PROTECTION OF INVESTMENT BILL

PROMOTION AND PROTECTION OF INVESTMENT BILL REPUBLIC OF SOUTH AFRICA PROMOTION AND PROTECTION OF INVESTMENT BILL (As introduced in the National Assembly (proposed section 75); explanatory summary of Bill published in Government Gazette No. 39009

More information

OPINION OF THE EUROPEAN CENTRAL BANK

OPINION OF THE EUROPEAN CENTRAL BANK EN OPINION OF THE EUROPEAN CENTRAL BANK of 8 October 2008 at the request of the Belgian Ministry of Finance on a preliminary draft law on measures promoting financial stability and in particular establishing

More information

BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994

BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 Ref: BR/14/2009 OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 INTRODUCTION

More information

ew EU Forest strategy: conclusions adopted by the Council

ew EU Forest strategy: conclusions adopted by the Council COUCIL OF TH UROPA UIO N Brussels, 19 May 2014 9944/14 (OR. en) PRSS 297 ew U Forest strategy: conclusions adopted by the Council The Council adopted conclusions which welcome the new U Forest Strategy

More information

Fourth European Conference of Ministers responsible for the Cultural Heritage

Fourth European Conference of Ministers responsible for the Cultural Heritage Fourth European Conference of Ministers responsible for the Cultural Heritage (Helsinki, 30-31 May 1996) Final Declaration and resolutions Meeting in Helsinki on 30-31 May 1996 for their 4th European conference,

More information

Trust School Proposals

Trust School Proposals Trust School Proposals A Guide for Governing Bodies and Local Authorities For further information: School Organisation Unit DCSF Mowden Hall Darlington DL3 9BG Tel: 01325 735749 Email: school.organisation@education.gsi.gov.uk

More information

DAIMLER GROUP NORTH AMERICAN COMPANIES

DAIMLER GROUP NORTH AMERICAN COMPANIES DAIMLER GROUP NORTH AMERICAN COMPANIES General Purchasing Conditions for IT Part H Individual Software Development, Maintenance and Customization 1 Subject Matter / Scope of Performance 1.1 General The

More information

ASSOCIATION OF PERSONAL INJURY LAWYERS SCOTLAND Standard of competence for Litigators

ASSOCIATION OF PERSONAL INJURY LAWYERS SCOTLAND Standard of competence for Litigators ASSOCIATION OF PERSONAL INJURY LAWYERS SCOTLAND Standard of competence for Litigators INTRODUCTION Standards of occupational competence Standards of occupational competence are widely used in many fields

More information

on the Proposal for a Regulation of the European Parliament and of the Council laying

on the Proposal for a Regulation of the European Parliament and of the Council laying Opinion of the European Data Protection Supervisor on the Proposal for a Regulation of the European Parliament and of the Council laying down measures concerning the European single market for electronic

More information

Statewatch analysis. EU Reform Treaty Analysis no. 3.1: Revised text of Part One of the Treaty establishing the European Community (TEC)

Statewatch analysis. EU Reform Treaty Analysis no. 3.1: Revised text of Part One of the Treaty establishing the European Community (TEC) Introduction Statewatch analysis EU Reform Treaty Analysis no. 3.1: Revised text of Part One of the Treaty establishing the European Community (TEC) Prepared by Professor Steve Peers, University of Essex

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Terms for the participation in the electronic cash system of the German banking industry

Terms for the participation in the electronic cash system of the German banking industry Terms of Acceptance Terms for the participation in the electronic cash system of the German banking industry 1. Participation in the electronic cash system of the German banking industry The Company is

More information

Foreign Trade and Payments Act (Außenwirtschaftsgesetz - AWG) of 6 June 2013 (Federal Law Gazette I p. 1482)

Foreign Trade and Payments Act (Außenwirtschaftsgesetz - AWG) of 6 June 2013 (Federal Law Gazette I p. 1482) 1 Working Translation Foreign Trade and Payments Act (Außenwirtschaftsgesetz - AWG) of 6 June 2013 (Federal Law Gazette I p. 1482) Table of contents Part 1 Legal transactions and actions Section 1 Principles

More information

COMMISSION OF THE EUROPEAN COMMUNITIES GREEN PAPER

COMMISSION OF THE EUROPEAN COMMUNITIES GREEN PAPER EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 11.11.2009 COM(2009) 624 final GREEN PAPER on obtaining evidence in criminal matters from one Member State to another and securing its admissibility

More information

General Protocol relating to the collaboration of the insurance supervisory authorities of the Member States of the European Union March 2008

General Protocol relating to the collaboration of the insurance supervisory authorities of the Member States of the European Union March 2008 CEIOPS-DOC-07/08 General Protocol relating to the collaboration of the insurance supervisory authorities of the Member States of the European Union March 2008 CEIOPS e.v. - Westhafenplatz 1 60327 Frankfurt

More information

Competencies for the nurse practitioner scope of practice

Competencies for the nurse practitioner scope of practice Competencies for the nurse practitioner scope of practice Approved by Council September 2008 Nurse practitioner scope of practice Nurse practitioners are expert nurses who work within a specific area of

More information

Experiences in the application of Espoo Convention Spain

Experiences in the application of Espoo Convention Spain Environmental Impact Assessment in Spain Experiences in the application of Espoo Convention Spain Aurora Hernando Garcinuño Subdirección General de Evaluación Ambiental Ministerio de Medio Ambiente y Medio

More information