QA Procedure Page 1 Appendix A

Size: px
Start display at page:

Download "QA Procedure Page 1 Appendix A"

Transcription

1 *Changes from the previous QASE noted by "yellow" highlight of block Evaluation Summary Company: Prepared By: Section Element Manual Audit OK Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program and Manual Requirements 2.4 Management Responsibility 2.5 Production, Inspection, and Test Planning 2.6 Corrective and Preventative Actions 2.7 Document Control 2.8 Measuring and Testing Equipment 2.9 Purchasing and Contracting 2.10 Incoming Inspection 2.11 In-Process Inspection 2.12 Final Inspection 2.13 Inspection Status 2.14 Identification and Traceability 2.15 Process Control 2.16 Preservation, Packaging and Shipping 2.17 Quality Records 2.18 Nonconformance Control 2.19 Quality Program Review and Manual Revision 2.20 Process Capability/Statistical Methods 2.21 Internal Quality Audits 2.22 Training 2.23 Contract Review 2.24 Design Control QA Procedure Page 1 Appendix A

2 2.1 OBJECTIVE OF THE QUALITY ASSURANCE PROGRAM Has the contractor established a quality assurance program that includes all elements of the AAR M-1003 specification? Is it established and maintained by the contractor for the purpose of ensuring that materials, products, and services conform to contract requirements? Are the principal objectives of a quality program addressed as follows: Are all specified requirements fulfilled? Are non-conforming items prevented, detected early, and properly disposed of? Is there evidence of continuous improvement of the items produced, the processes producing them and/or the services provided? Does the documentation sufficiently outline requirements affecting quality in activities covered by this standard in order to verify that materials, products, and services meet contract, statutory, and regulatory requirements? 2.2 APPLICABILITY AND SCOPE Does the contractor's quality assurance program apply throughout all areas of contract performance including, as appropriate, the procurement, identification, stocking, inspection, and issuing of material; the entire process of manufacture including design control, fabrication, processing, inspection, and assembly; and the packaging, storing, and shipping of material; and the maintenance of equipment that affects quality? Does the program provide that measures be implemented to plan work and prevent defects? Does the program identify, nonconformances and initiate corrective action to eliminate their causes and potential for reoccurrence as early in the process as possible? QA Procedure Page 2 Appendix A

3 2.3 QUALITY ASSURANCE PROGRAM AND MANUAL REQUIREMENTS Does the contractor establish, implement, and maintain a quality assurance program according to the requirements of this specification? Does the contractor prepare a Quality Assurance Manual covering the requirements of this specification? Does the quality manual: include or make reference to the quality program s procedures? outline the structure of the documentation used in the quality program to plan and perform work so that nonconformities are prevented and those that do occur are detected and resolved? provide the means for its effective implementation and continuous improvement of the quality program? Has the approval of this manual by a senior management official been documented? Does the Quality Assurance Manual contain, at a minimum: a description of the organization? an inspection and test plan? a statement for reviewing and updating the manual? System function descriptions for paragraphs 2.6 through 2.24 that document purpose (intent of what is expected to be accomplished), scope (what activities and processes are included), and an outline of what shall be done? Does the contractor maintain a current subscription to AAR Circular Letters or demonstrate a system that provides access to current AAR Circular Letter information as it pertains to the contractor's operation? Does the contractor maintain a current copy of AAR Specification M-1003? QA Procedure Page 3 Appendix A

4 2.4 Management Responsibility Policy and Objectives Has the contractor defined and documented the organization's policy for quality, including objectives for quality and it's commitment to quality? Does the contractor ensure that this policy is understood, implemented, and maintained at all levels of the organization? Does the contractor ensure that quality assurance requirements are not subordinated to manufacturing or construction? Has the contractor defined the responsibility, authority and interrelationship of personnel who manage, perform and verify work affecting quality? Has their relationship been shown on organization charts or clearly described in writing? Responsibility and Authority Has the contractor appointed a management representative who, irrespective of other responsibilities, has the responsibility, organizational freedom and authority to: ensure that a quality program is established, implemented, and maintained in accordance with this specification? periodically review the performance of the quality program with senior management as a basis for improvement of the program? Initiate action to prevent the occurrence of any nonconformities relating to product, process, and quality program? Identify and record any problems relating to the product, process, and quality program? Initiate or recommend solutions to problems through designated channels? Verify the implementation of solutions? Control further processing, delivery, or installation of nonconforming product until the deficiency or unsatisfactory condition has been corrected? QA Procedure Page 4 Appendix A

5 2.4.3 Resources Does the (contractor's) organization ensure that adequate resources are identified and provided, including the assignment of trained personnel for the following: Management? Performance of work? Verification activities, including internal quality audits? Training? Management Review Does the contractor's management holding executive responsibility: Review the quality program at least annually to ensure its continuing suitability and effectiveness in satisfying the requirements of this specification and the contractor s quality policy and objectives? Does the review include at least but is not limited to the following: Internal and External quality audits? Internal and external nonconformances and/or Chapter 7 criteria? Corrective and Preventative Actions? Previous management review and action items? Changes to the quality system? Inspection results for example scrap rates, rework status, inspection data, and on-time delivery? Have records of such reviews been maintained? QA Procedure Page 5 Appendix A

6 2.5 Production, Inspection, and Test Planning Does the contractor do the following: Plan the production activities? Plan the inspection and test activities? Develop an inspection and test plan in accordance with Section 2.5.2? Update the plan to reflect inspection and test revision? The inspection and test plan may be of any format to suit the contractor s program. This includes flow charts, so long as all criteria from incoming inspection through packaging and shipping are addressed. Does it, however, do at least the following: Indicate each inspection and test point and its relative location in the processing cycle, including incoming inspection, preservation of items, packaging, and site inspection and testing? The contractor may include additional in-process inspection points for its own evaluation of quality Identify the characteristics to be inspected, examined, and tested at each point and specify acceptance criteria to be used? Identify inspection and test points where measurement and test records are maintained so that assessments required by Section can be met? Indicate mandatory hold points that require witnessing or verification of selected characteristics of an item or process, and beyond which the work shall not proceed? Define or refer to sampling plans and statistical process control, including the criteria for selection, if proposed, and indicate where they will be used? Define or refer to how verification of compliance to process procedures will be accomplished and documented? Where applicable, specify where lots or batches will be used? Indicate where subcontractor services will be employed? QA Procedure Page 6 Appendix A

7 2.6 Corrective and Preventative Actions Has the contractor continuously improved the effectiveness of the quality program through the use of corrective action, preventive action internal audit results (refer to 2.21) and actions resulting from management reviews (refer to 2.4.4)? Has the contractor implemented procedures for corrective action that include the following: Handling of customer complaints and reports of product/service nonconformance? Investigation of the root cause of the nonconformity relating to product, process, and quality program and recording of the results of the investigation? Determination of the corrective action needed to permanently eliminate the root cause of the nonconformity? Documenting assignment of responsibility to ensure corrective actions are implemented? Assignment and tracking of expected completion dates for corrective actions? Application of controls to ensure that corrective action is taken and is effective? Has the contractor implemented procedures for preventive action that include the following: The use of appropriate sources of information, such as process and work operations, that affect product quality, concessions, audit results, quality records, service reports, and customer complaints to detect, analyze, and eliminate causes of potential nonconformity? Initiation of preventive action and application of controls to ensure that the procedure is effective? Confirmation that relevant information on actions taken is submitted for management review? Have records of corrective and peventive actions been maintained? QA Procedure Page 7 Appendix A

8 2.7 DOCUMENT CONTROL 2.7 Has the contractor done the following: Establish and maintain documented procedures to control all documents affecting quality, including, to the extent applicable, documents of external origin such as standards and customer drawings? Establish and maintain a master list or equivalent documentcontrol procedure identifying the current revision status of documents? (This list or procedure must be available to preclude the use of invalid and/or obsolete documents.) Have documents been reviewed and approved for adequacy by authorized personnel prior to use? Has the contractor established controls to ensure the following: That the applicable issues of appropriate and understandable documents are available at all functional areas and inspection and test points where operations essential to the effective functioning of the quality program are performed? Applicable standards, internal procedures, and forms necessary to demonstrate compliance with this specification and any related technical requirements must be maintained in English, as well as the appropriate language for the user. M-1003 Certified Companies are required to maintain current English language versions of Applicable Standards, internal procedures and forms used in the quality program. (In general, AAR Requirements will not need to be translated to another language, provided the company's procedures meet the requirements of the AAR Rules.) With respect to forms, please note that it is not the committee s intent to require that completed forms, used to record inspection, test, etc. be maintained in both English and the appropriate language. As a minimum, M-1003 Certified Companies will be required to maintain current English language versions of all forms for use by the auditor That invalid and/or obsolete documents are promptly removed from all points of issue or use or otherwise assured against unintended use? QA Procedure Page 8 Appendix A

9 That any obsolete documents retained for legal and/or reference purposes shall be suitably identified and assured against unintended use? When changes are made to documents, does the contractor do the following: Ensure that changes to documents receive the same authorization as the original documents? Process all changes in writing so they are acted on promptly at the specified locations? Maintain a record of changes and, where practical, identify the nature of the changes? Are written notes on documents made by authorized persons according to established procedures? Have documents been revised and reissued after a practical number of changes have been issued? QA Procedure Page 9 Appendix A

10 2.8 MEASURING AND TEST EQUIPMENT Has the contractor established and maintained documented procedures to control, calibrate, and maintain all measuring and test equipment and devices used to verify item quality and to monitor special processes? Does the contractor, at prescribed intervals or prior to use, calibrate and adjust measurement and test equipment against certified equipment having a known valid relationship to nationally recognized standards? Where no national standard exists, does the contractor document the basis employed for calibration? (This can include industry or user standards.) Does the contractor maintain calibration documents that include equipment type, identification number, location, frequency of checks, description of check method, acceptance criteria, and action to take when results are unsatisfactory? Does the contractor identify measuring and testing equipment with a tag, sticker, or other suitable indicator to show the calibration status? Does the contractor maintain calibration records for measuring and test equipment? Does the contractor assess and document the validity of previous inspection and test results when measuring and test equipment are found to be out of calibration? Does the contractor ensure that environmental conditions are suitable for calibrations being carried out? Does the contractor ensure that the handling, storage, and preservation of measuring and testing equipment is such that the accuracy and fitness for use are maintained? Does the contractor safeguard all measuring and testing equipment from adjustments that would invalidate the calibration setting? QA Procedure Page 10 Appendix A

11 2.9 PURCHASING AND CONTRACTING Does the contractor do the following: Identify products to be purchased or subcontracted? Determine for those subcontracted items and purchased products an appropriate method of verifying that the products/services conform to specified requirements? Typical methods include but are not limited to: -inspection by subcontractor -source inspection by contractor -incoming inspection -objective evidence, such as certificates of compliance -surveillance of subcontractor Evaluate and select subcontractors based on documented assessments of their ability to meet contract and quality requirements? Survey and audit subcontractor's verification of quality at the subcontractor's plant or the site of processing as and when required? Maintain quality records of acceptable subcontractors? Do purchasing documents contain data clearly describing the items ordered, including the following, where applicable: The type, class, grade, or other precise identification, including AAR specification, drawings, or other technical specifications? The title or other positive identification and applicable issues of specifications, drawings, process requirements, inspection instructions, and other relevant technical data, including requirements for approval or qualification of items, procedures, process equipment, and personnel? The title, number, and issue of the quality standard to be used? The verification arrangements and method of product release? Does the contractor review and approve purchasing documents for adequacy of the specified requirements prior to release? When specified in the contract, are the contractor's customers afforded the right to verify at the subcontractor's plant and on the contractor's premises that subcontracted items conform to specified requirements? QA Procedure Page 11 Appendix A

12 2.9.4 Association of American Railroads Quality Assurance System Evaluation Checklist (QASE) 08/01/14 Verification by the customer shall not absolve the contractor of the responsibility to provide acceptable service, nor shall it preclude subsequent rejection by the customer. QA Procedure Page 12 Appendix A

13 2.10 INCOMING INSPECTION Does the contractor inspect, test, and identify incoming items as required by the inspection and test plans? Does the contractor check the objective evidence provided by subcontractors and suppliers as a means of verifying quality per the requirements of ? Does the contractor hold incoming items until the required inspection and tests are completed or the necessary inspection and test reports are received and verified (except when items are released under positive recall)? QA Procedure Page 13 Appendix A

14 2.11 IN-PROCESS INSPECTION Does the contractor inspect, test, and identify items as required by the inspection and test plan? Where inspection is not feasible, does the contractor monitor process methods? Does the contractor hold items until the required inspections and tests are complete or necessary reports are received and verified (except when items are released under positive recall)? Release under positive recall shall not preclude inspection, testing and identification as specified in paragraph Does the contractor identify nonconforming items? Does the contractor maintain documented procedures for the verification, storage, and preservation of the customer-supplied part(s)? Are any customer-supplied part(s) that are lost, damaged, nonconforming, or otherwise unsuitable for use recorded and reported to the customer? QA Procedure Page 14 Appendix A

15 2.12 FINAL INSPECTION Does the contractor inspect, test, and identify the final items as required by the inspection and test plan? Does the contractor review all inspection and test records and verify that the item has been inspected at all points shown in the inspection and test plan and that these records are complete? Does the contractor retain all inspection records as specified in Section 2.17? QA Procedure Page 15 Appendix A

16 2.13 INSPECTION STATUS Does the contractor provide means for ensuring that required inspections and tests are performed and that the acceptability of items with regard to inspections and tests performed is known throughout processing? Does the contractor establish and maintain a system for tags or stamped impressions on the item or its container or other physical means that indicates final acceptance of items? Final acceptance indicators, in-process indicators, and incoming inspection indicators must be unique Does the contractor show the identity of the contractor and its inspector on any inspection stamps used? Does the contractor provide measures for controlling status indicators, including the authority for application and removal of tags, stamps, or other physical means of indicating the inspection status? QA Procedure Page 16 Appendix A

17 2.14 IDENTIFICATION AND TRACEABILITY Where appropriate, does the contractor identify each item (lot, component, or part) to the applicable drawing, specification, or other technical document, from receipt through processing and shipping? Where traceability is specified, does the contractor assign to each item a unique identification that shall distinguish those items that are otherwise identical but that have been processed in separate batches? Record this identification on all process, inspection, and test records? QA Procedure Page 17 Appendix A

18 2.15 PROCESS CONTROL 2.15 Does the contractor identify and plan the production, installation, and servicing processes that directly affect quality and ensure that these processes are conducted under controlled conditions? Controlled conditions shall include but not be limited to the following: Adhere to documented procedures defining the work process where the absence of such procedures could adversely affect quality? Employ suitable process equipment in a suitable working environment? Comply with applicable codes, standards, specifications, documented procedures, and/or inspection and test plans (Section 2.5)? Monitor and control applicable process parameters and product characteristics? Approve procedures, processes, and equipment? Establish workmanship criteria in the clearest appropriate manner (e.g., written standards, reference standards, pictures, etc.)? Maintain equipment to ensure continuing conformity to product requirements? Ensure that special processes (including but not limited to welding, heat treating, plating, and non-destructive testing) are performed under controlled conditions in accordance with applicable codes, standards, specifications, and governmental and contractual requirements by qualified personnel using qualified equipment and procedures? Ensure that the qualification of personnel, procedures, and equipment complies with the requirements of applicable codes, standards, and specifications? Ensure that documentation for currently qualified personnel, processes, or equipment is maintained in accordance with the requirements of pertinent codes, standards, and specifications? QA Procedure Page 18 Appendix A

19 Define those special processes not covered by applicable codes, standards, or specifications? Where item quality requirements exceed the requirements of established codes, standards, and specifications, describe the necessary qualifications of personnel, procedures, and equipment? Have any required technical approvals been granted and/or maintained? Are technical requirements understood? Have any applicable AAR MSRP Compliance checklists, as defined in Appendix A, been completed, at least annually? Are they available for review, including verification that the requirements of applicable AAR technical standards, specifications, recommended practices, and technical checklists are being met? QA Procedure Page 19 Appendix A

20 2.16 PRESERVATION, PACKAGING, AND SHIPPING Does the contractor establish and maintain documented procedures for handling, storage, preservation, and delivery of product? Does the contractor provide methods of handling and storing product that prevent damage? Does the contractor control packing, packaging, and marking processes (including materials used) to the extent necessary to ensure conformance to specified requirements? Does the contractor apply appropriate methods for preservation and segregation of product when the product is under contractor control? Does the contractor arrange for the protection of the quality of the product after final inspection and test? (Where contractually specified, this protection shall be extended to include delivery to destination.) QA Procedure Page 20 Appendix A

21 2.17 QUALITY RECORDS Does the contractor maintain quality records as evidence of the following: The item or material meets this standard and contractual requirements? Personnel, procedures, and equipment for special processes are qualified as required by Section ? Selection and surveillance of subcontractors are met as required by Section 2.9.1? Does the contractor include in Section inspection and test records that identify the following: Either the reference drawing number and revision number or part number of the item? Applicable requirements? Specific inspections performed and results obtained? (If measurements are not required, include the basis of acceptance.) Nonconformance reports (see Section )? The date of inspection or test? The identity of the inspector or data recorder? Does the contractor do the following: Make quality records available for analysis and review? Identify, index, and file quality records for easy retrieval? Retain quality records for as long as necessary; at a minimum ensure compliance to applicable contractual, legal and/or technical specification requirements? Provide suitable environment for records to minimize deterioration or damage and to prevent loss? If electronic records are used does the contractor address, at a minimum, frequency of backups, type of media to be used for backups, and storage requirements? QA Procedure Page 21 Appendix A

22 2.18 Nonconformance Control Does the contractor control nonconforming conditions and continuously improve the effectiveness of the quality program? Has the contractor established and maintained measures for controlling nonconforming items that do the following: Define the responsibility and authority of those who dispose of nonconforming items? Detect and record nonconformance? Identify and hold nonconforming items for evaluation? Develop a disposition that has the concurrence of all responsible parties? Implement accepted disposition? Provide requirements for reinspecting and retesting repaired and reworked items? Advise the reporting company, the AAR, and affected customer purchasing and mechanical department heads in writing of the final disposition of returned/recalled materials identified as nonconforming to preclude unauthorized use, as per Chapter 7? Is the contractor complying with all Chapter7 requirements of AAR M-1003? Is the contractor properly using Forms QA 7.1, QA 7.2 and QA 7.3 as detailed in Chapter 7 of AAR M-1003? Are records of this activity maintained for three years as required by Chapter 7 of AAR M-1003? Provide holding areas or methods for segregating nonconforming items to prevent unauthorized use, shipment, or mixing with conforming items? (However, where physical segregation is not practical, tagging, marking, or other positive means of identification is acceptable.) Maintain records identifying nonconforming items, the nature and extent of nonconformance, its disposition, and objective evidence that repaired and reworked items have been reinspected or retested according to applicable documented procedures? QA Procedure Page 22 Appendix A

23 2.19 QUALITY PROGRAM REVIEW AND MANUAL REVISION Does the contractor review the quality assurance program and manual at least annually? Does the contractor maintain a completed Quality Assurance System Evaluation (QASE) Checklist, identifying the corresponding line item from their program that addresses each Following the review does the contractor update the quality assurance program and manual accordingly to reflect current quality assurance practices? Does the contractor submit revisions to the quality assurance program and manual to the AAR QA Program Coordinator or agent prior to 60 days before a scheduled M-1003 audit? Does the contractor prepare and submit more frequent upgrades in procedures and clarity in accordance with these specifications when deficiencies are identified and documented by the Quality Assurance Committee? QA Procedure Page 23 Appendix A

24 2.20 PROCESS CAPABILITY/STATISTICAL METHODS Does the contractor use statistical methods to evaluate and control the variability of processes that may include rework/repair, status, scrap rates, and inspection data? If not what do they do? Does the contractor use statistical methods to evaluate the capability and capacity to ensure materials, products, and services conform to contract requirements? If not what do they do? Does the contractor identify where statistical methods are used for control and continuing improvement of key product/process characteristics? (Suppliers shall then identify and classify product, process, and service characteristics for which statistical techniques will be used as a basis for the assurance and control of quality and acceptance or rejection of lots.) Does the contractor identify the need for the application of statistical methods to accomplish the following: Evaluate and control the variability of processes? Control key product/process characteristics for continuous improvement? Measure key performance indicators of the quality program? Does the contractor maintain documented procedures to implement and control the application of the statistical methods? QA Procedure Page 24 Appendix A

25 2.21 INTERNAL QUALITY AUDITS Does the contractor carry out internal quality audits to verify compliance with Specification M-1003 and the contractor s current quality assurance practices? Does the contractor schedule audits as follows: On the basis of the status and importance of the activity? They occur minimally once per year? They encompass a review of all 24 elements contained in Chapter 2 of this specification within a 12-month period? Have audits been performed in accordance with documented procedures (using appropriate checklists) by trained personnel who have the organizational freedom to record results and deficiencies as they are required? Have audit results been recorded and do they include evidence of conformance or nonconformance of a product, process or procedure to specified requirements? Are the results of audits documented and brought to the attention of the personnel having responsibility in the area audited? Have management personnel responsible for audited areas with nonconformances taken timely corrective action (ref ) on the deficiencies found by internal audits? Are follow-up activities verified and records kept of the implementation and effectiveness of the action taken? QA Procedure Page 25 Appendix A

26 2.22 TRAINING Has the contractor established and maintained approved procedures for identifying training needs, providing for the training, and evaluating the effectiveness of that training of all personnel involved in activities affecting quality? Has the contractor created and maintained job descriptions? Does the contractor define basic job responsibilities and qualification requirements? Have personnel involved in special or key processes (including but not limited to, welding, heat treating, painting, coating, pressure treating, product inspection, and internal quality auditing) been qualified by both function-specific training and applicable work experience? Are training records maintained for qualified personnel as long as they remain qualified or as required by other regulatory requirements? Has the contractor defined the measures to ensure that personnel are aware and knowledgeable of their specific responsibilities for quality? Has the contractor provided the necessary instruction and means whereby those personnel can develop, achieve, and maintain proficiency? QA Procedure Page 26 Appendix A

27 2.23 CONTRACT REVIEW Before submission of an offer by the contractor, or at the acceptance of a contract or order (statement of requirement), has the offer, contract, or order been reviewed by the contractor to ensure the following: The requirements are adequately defined and documented? (Where no written statement of requirement is available for an order received by verbal means, has the contractor ensured that the order requirements are agreed to before their acceptance?) Any differences between the contract or accepted order requirements and those in the offer are resolved? The contractor has the capability to meet the contract or accepted order requirements? When servicing is specified in the contract or order, has the contractor established and maintained documented procedures for performing, verifying, and reporting that the servicing meets the specified requirements? Does the contractor identify how an amendment to a contract is made and correctly transferred to the responsible personnel within the contractor's organization? Does the contractor maintain records of contract reviews? QA Procedure Page 27 Appendix A

28 2.24 DESIGN CONTROL Has the contractor established and maintained documented procedures to control and verify the design and development planning of the product in order to ensure that the specified requirements are met? Where product design, redesign, or modifications are not usually performed, does the design procedures address how adherence to existing design criteria is maintained? Where product design, redesign, or modifications are not usually performed, does the contractor define the procedure when a design change is required? Has the contractor prepared plans for each design and development activity? Do the plans include the review, verification and validation requirements that are appropriate to each design and development activity? Do the plans describe or reference these activities and define responsibility for their implementation. Are the design and development activities assigned to qualified personnel equipped with adequate resources? Are the plans updated as the design evolves? Are organizational and technical interfaces between different groups who contribute to the design process defined and the necessary information documented, transmitted, and regularly reviewed? Does the contractor manage the interfaces between the different groups to ensure effective communication and clear assignment of responsibility? QA Procedure Page 28 Appendix A

29 Are design and development input requirements relating to the product, including applicable statutory and regulatory requirements, functional and performance requirements and where applicable, information derived from previous similar designs and other requirements essential for design and development identified and documented and their selection reviewed for adequacy by the contractor? Are incomplete, ambiguous, or conflicting requirements resolved with those responsible for imposing these requirements? Does design input take into consideration the results of any contract review activities? Is planning output updated as appropriate, as the design and development activity progresses? Has design and development output been documented and expressed in terms that can be verified against design input requirements and validated (see Section )? Does design and development output do the following: Meet the design and development input requirements? Contain or make reference to acceptance criteria? Identify those characteristics of the design that are crucial to the safe and proper functioning of the product (e.g., operating, storage, handling, maintenance, and disposal requirements)? Provide appropriate information for purchasing, production, and servicing provision? Are design and development output documents reviewed before release? QA Procedure Page 29 Appendix A

30 At appropriate stages of design, are formal documented reviews of the design and development results planned and conducted, to evaluate the ability of the results to meet design and development input requirements? Does the review identify any problems and propose appropriate resolution actions? Have design reviews included representatives of functions concerned with the design and development stage(s) being reviewed? Are records of such reviews maintained? Are necessary actions documented? At appropriate stages of design, has design verification been performed to ensure that the design and development output meets the design and development input requirements? Have the design and development verification measures and any necessary actions been recorded? Has design validation been performed to ensure that product conforms to defined user needs and/or requirements? (if specified application or intended use are known is the resulting product capable of meeting the requirements of the intended use?) Does the contractor do the following: Complete validation prior to the delivery or implementation of the product, wherever practicable? Maintain records of the results of validation and any necessary actions? Are all design and development changes and modifications identified, documented, reviewed, and validated as appropriate, and then approved by authorized personnel? Does the review include evaluation of the effect of the changes on constituent parts and product already delivered? Does the contractor maintain records of the review of changes and any necessary actions? QA Procedure Page 30 Appendix A

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

Tronair Quality Manual

Tronair Quality Manual Tronair, Inc. 1740 Eber Road Holland, Ohio U.S.A. 43528-9794 http://www.tronair.com/ Tronair Quality Manual Authored By: David L. Kidd WARNING: No part of this document may be reproduced in any form, without

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Livestock and Seed Program Meat Grading & Certification Branch MGC Instruction 800 May 9, 2005 Page

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

Quality Management Plan Procedure

Quality Management Plan Procedure Quality Management Plan Procedure Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Plan Overview... 1 Introduction... 1 Objectives...

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010 Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22 ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality

More information

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

Example of a food company quality

Example of a food company quality Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision

More information

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE 1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior

More information

The President of Inductors Inc. is the senior executive responsible for operations.

The President of Inductors Inc. is the senior executive responsible for operations. Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

ISO-9001:2000 Quality Management Systems

ISO-9001:2000 Quality Management Systems ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

Micro Plastics, Inc. Quality Manual

Micro Plastics, Inc. Quality Manual ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company

More information

BASE CONSTRUCTION INC

BASE CONSTRUCTION INC BASE CONSTRUCTION INC 14252 CULVER DRIVE A-630 IRVINE,CA 92604-0326 OFFICE:949 387-3471 Shop 714 994 9563 CELL:949 735-5292 FAX:949 786-8753 QUALITY ASSURANCE and QUALITY CONTROL MANUAL 1 TABLE OF CONTENTS

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008. ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

Contents. Management Policy Manual SEM USA Page 2 of 12

Contents. Management Policy Manual SEM USA Page 2 of 12 SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

The Prophotonix (UK) Ltd Quality manual

The Prophotonix (UK) Ltd Quality manual The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page

More information

Technical Manufacturing Corporation (TMC) Quality Manual

Technical Manufacturing Corporation (TMC) Quality Manual Technical Manufacturing Corporation (TMC) Quality Manual 15 Centennial Drive Peabody MA 01960 Revision: 19 Pages: 2 of 15 Date Issued: 03/13/2013 1. Table of Contents 1. TABLE OF CONTENTS... 2 2. ABOUT

More information

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL Page 1 of 25 ABC COMPANY INC QUALITY MANUAL Page 2 of 25 DOCUMENT INTRODUCTION PURPOSE OF THIS MANUAL This describes the quality management system at ABC Company Ltd, Buffalo, USA described as the Organization,

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

Quality Management System Manual ISO9001:2008

Quality Management System Manual ISO9001:2008 Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have

More information

Mossfiel Electrical & Safety Management Pty Ltd

Mossfiel Electrical & Safety Management Pty Ltd ISO 9001:2008 QUALITY MANAGEMENT PLAN Be warned. Any reproduction of this quality management system or associated documents without the express permission of the company and

More information

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1. This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA

More information

QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14

QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14 QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

Quality Manual. 14910 SE Morning Way Suite 102 Clackamas OR 97015

Quality Manual. 14910 SE Morning Way Suite 102 Clackamas OR 97015 Quality Manual 14910 SE Morning Way Suite 102 Clackamas OR 97015 Effective Date: 10/27/08 Schedule QM 01 Revision: 1 Page 1 of 1 This document has been approved for use by... (ISO Representative) at Revision

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years

More information

Rockwell Automation Quality Management System

Rockwell Automation Quality Management System Rockwell Automation Quality Management System Our Quality Policy Rockwell Automation is committed to a global quality system focused on customer solutions. We achieve this through superior products and

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager

More information

Checklist. Standard for Medical Laboratory

Checklist. Standard for Medical Laboratory Checklist Standard for Medical Laboratory Name of hospital..name of Laboratory..... Name. Position / Title...... DD/MM/YY.Revision... 1. Organization and Management 1. Laboratory shall have the organizational

More information

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared

More information

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013 UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd

More information

fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Quality Program Plan Revision 6, June 2008

fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Quality Program Plan Revision 6, June 2008 ^ fin DULLES CORRIDOR METRORAIL PROJECT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY DULLES CORRIDOR METRORAIL PROJECT Quality Program Plan Revision 6, June 2008 Prepared and Approved By: o^lfr Jon D. Chri^tensen

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents

More information