1 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 J.Smits 1, M.R. Moens 2 *, M. Klootwijk 3, H. van Vliet 4 1 Delft University of Technology, Stevinweg 1, room 4.84, 26GA Delft, the Netherlands, jairsmits@gmail.com 2 ARCADIS, Utopialaan 4-48, 52 BA s-hertogenbosch, the Netherlands, m.r.moens@arcadis.nl 3 Municipality of Breda, Claudius Prinsenlaan 1, 48 DC Breda, the Netherlands, m.klootwijk@breda.nl 4 Delft University of Technology, the Netherlands, h.vandervliet@student.tudelft.nl *Corresponding author, m.r.moens@arcadis.nl ABSTRACT The existing control system for pumping stations is at the end of its life span in the municipality of Breda (the Netherlands). For this reason in 23 a decision was made to replace the system by a new control system, which is equipped with the most modern information and communication technologies. A field laboratory has been build for training purposes of the new system as well as to allow research in overflow measurements and flow-measurements in (partly-filled) sewers. There are many ways to regulate the flow. Experiments can be conducted with groundwater and wastewater. Using this field laboratory four different types of flow meters are tested in the range m3/h and compared with a fully calibrated flow meter in the pressure pipeline connected to the pump. Several types of tests have been carried out to determine the stabilization time and to test several flow meters for partly and fully filled sewers. It is found that some flow meters do not operate well under different circumstances. The accuracy of the flow meters is mostly about 5-1%, also in case of partly-filled sewers. The experiments have also shown that, despite measuring at the best locations and under optimal conditions, the accuracy remains 5-1%. KEYWORDS Field laboratory; Flow-measurement; Overflow measurements; Sewer; Stabilization time pag 1, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

2 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 INTRODUCTION The EU Water Framework Directive (WFD) was adopted in 2. Since then the water quality of open water and the treatment of sewerage water has great attention by many municipalities in the Netherlands. The municipalities have great interest in knowing the performance of their sewer system and whether there is a need to improve the performance. Monitoring the sewer system plays an important role in this. In Breda (the Netherlands), the existing control system for the pumping stations was at the end of its life span. As a consequence the maintenance became more costly and it was uncertain if the requirements set by the WFD could be met. For this reason, the municipality of Breda decided in 23 to modernize their sewer system by developing a new control system. This control system consists of the most modern information and communication techniques and will store large quantity of data from several sources of information. The new control system should give a clear overview of the performance of the sewer system and should lead to fewer combined sewer overflow events and a more optimized use of storage. A field laboratory has been build for training purposes of the new control system as well as to allow research in overflow measurements and flow-measurements in (partly-filled) sewers. There are many ways to regulate the flow. Experiments can be conducted with groundwater and real wastewater. In this paper the field laboratory and its capabilities are described in more detail. The paper also presents the findings on the stabilization time for flow in range of m 3 /h and presents some first results of tests conducted with different types of flow measurements devices using groundwater only. Figure 1. Schematics of the field laboratory. Four different flow meters are installed for testing. : electromagnetic flow meter (factory-calibrated) 1: ultrasonic flow meter (clamp-on) 2: electromagnetic flow meter (mouse) 3: doppler/ultrasonic flow meter 4. radar flow meter (contact-less) pag 2, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

3 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 To get insight in the best accuracy you can get under field conditions the possibilty was created to install the measurement devices at different locations. There was also direct access to the data of the calibrated flow meter. Field laboratory The field laboratory consists of three main parts: the pumping station, the overflow device and the sewer pipeline with two manholes, see figure 1. The manhole at the end, the inflow manhole, receives the pumped water and the one in the middle of the sewer is to install monitoring devices like flow-meters. Water can be pumped from the pumping station through the pressure tubes to the overflow device or to inflow-manhole. By gravity, water will flow through the sewer to the overflow device and eventually to the pumping station. Pumping station. Two pumps are installed in the pumping station (1.5 x 1.5 x 3.3 m). The small pump of 1.3 kw can pump water from the pumping station only to the overflow device. The large pump (9. kw) can pump water to the inflow manhole as well. Above each pump a calibrated electromagnetic flow meter is installed. These devices can measure the discharge with an accuracy of +/-.5%. The pressure tube connected to the large pump has a diameter of 315 mm above the ground and a diameter of 4 mm below the ground. The diameter of the pressure tube connected to the small pump is 1mm. Water can enter the pumping station through a 6 mm diameter concrete sewer pipe. Overflow device. A concrete wall is located in the middle of the overflow device (3. x 3. x 3. m). On top of the wall, structures of any design can be placed to represent overflow devices from the field. Downstream of the wall, a gate is located. The water can only pass the wall if the gate is closed. The gate must be partially opened to create a partially filled sewer, upstream of the overflow device. The small pump can pump water to either side of the wall, the large pump can only pump water upstream the wall. The water can enter through a pressure tube or through the sewer. Sewer pipeline. The sewer pipeline has a length of 5 m and a diameter of 6 mm. At the upstream end of the pipeline, the inflow manhole (1.5 x 1,5 x,8 m) is located. A second manhole with the same dimensions is located 15 meter downstream of the inflow manhole. Flow meters can be installed and connected to the control system in this manhole. Electromagnetic flow-meter. For the tests described in this paper, the electromagnetic flow-meter, which is located above the large pump, is used for reference. The flow-meter was calibrated in the manufacturers factory. The uncertainty of the meter is.5-2% for flow rates smaller than 1 m 3 /h and.5% for flow rates larger than 1 m3/h. METHODS Prior to tests with flow measurements from various flow-meters, the stabilization time for different flow-rates is determined. For comparison of flow measurements with the calibrated pag 3, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

4 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 electromagnetic flow meters, it is important to know the stabilization time at a given flow rate. If the flow fluctuates, measurements cannot be compared. Fluctuations in flow can be explained as follows: When the pump setting is changed in order to create a higher discharge, the water level in the pumping station drops. As a consequence, the pump characteristic changes. The water level in the pumping station will increase thereafter because it takes some time for the water to return to the pumping station. Again the pump characteristic changes and results in a different discharge. It takes some time before these fluctuations are dampened. When the fluctuations are dampened, the stabilization time is known. Two tests were performed to determine the stabilization time: - test 1: fully developed sewer, increasing and decreasing flow-rates in the range of m 3 /h; - test 2: partly filled sewer (< 5%), decreasing flow-rates in the range of 18-4 m 3 /h. The pump-setting (revolutions per minute) was increased every ten minutes by twenty rpm (~2.5 m 3 /h) for test 1. First the rpm-setting was decreased from 15 to 7 rpm at day 1. The second day, the rpm-setting was increased from 7 to 15 rpm. The rpm-setting was decreased from 15 to 7 rpm for the test 2. It was chosen to first let the rpm-setting decrease and then increase, because at some prior tests unexpected jumps in discharge occurred for the test with increasing rpm-settings. This jump did not occur at a test with decreasing rpm-settings. Instability during the filling process of the pressure tube may cause the jump in discharge with increasing rpm-settings. The pressure tube is filled more quickly if the pump is initially set at maximum rpm-setting. Once the pressure tube is completely filled, the actual test can start and instabilities are mostly avoided. In test 1, the discharge per rpm-setting of the series with decreasing rpm-settings and of the series with increasing rpm-setting are compared. For both series the moving average and the bandwidth of 1% is calculated. For this test, the moving average is calculated by incorporating every new measurement point to the total sum of measurements and then divide by the total number of measurements upon that measurement point. It is assumed that a stable situation has occurred if the moving average differs less than.2 m 3 /h over a period of 2 seconds. The stabilization time was computed in a different way for test 2. The moving average of test 1 is greatly influenced by the magnitude of instabilities which occur right after a change in pump-setting. The moving average in test 2 is computed as the average of the following ten measurement points. As a consequence, however, for the last ten measurement points of each rpm-setting, the moving average will come more closely to the actual measurement point. These moving averages are to be disregarded when determining the stabilization time. The stabilization time is determined by checking whether the moving average is not ever increasing or decreasing, if a sinusoidal-trend is distinguishable and if measured fluctuations are not too big (fluctuations must be below.5 m 3 /h). After the stabilization times for the two tests were determined, two tests with four different flow-meters were performed. At first three flow-meters were installed at different locations in the system. The first is an ultrasonic flow meter which is clamped on the pressure tube, see location 1 in figure 1. A mouse flow-meter, using the principle of Faraday s law to measure pag 4, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

5 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 the flow, is installed at location 2 and finally a Doppler flow-meter is installed at location 3. At the time that the measurements took place, logging the measurements was not possible. Therefore measurements are read and noted down on paper every ten minutes. After these tests another flow meter (radar) is installed at location 4. The first test with the flow-meters was performed in two days (3-5-27, ). On the first day the rpm setting was increased and on the second day it was decreased. The gate in the wall at the overflow device was closed so that a fully developed sewer was created upstream of the overflow device. The second test with the flow-meters was performed on one day ( ). The gate in the wall at the overflow device was opened so that the sewer was partially filled. Unfortunately there was little time to perform the test. Therefore the pump setting was decreased every 2 minutes to a setting at which the electromagnetic flow-meter measured a discharge of 1 m 3 /h less. Figure 2. Result of first test to determine the stabilization time. The sewer was fully filled during the test and the pump setting was decreased every ten minutes by 2 rpm from 13 rpm to 1 rpm and increased back to 13 rpm. pag 5, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

6 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 Figure 3. Discharge at pump setting 14 rpm. The left series is the discharge during the series with decreasing pump settings. The middle series represent the discharge during the series with increasing pump setting and the right series is the discharge after the accidental decrease of pump setting. RESULTS AND DISCUSSION Firstly the results from the tests to determine the stabilization time are discussed. Secondly the results from the tests with four flow-meters are given. Figure 2 shows the discharge over time of the first test. The sewer was fully filled during this test. By accident the pump setting was decreased instead of increased at t = 135 s and later there was a break of half an hour. Figure 3 shows an example of the discharge at the same pump-setting from the decreasing pump-setting series and from the increasing pump-setting series. Clearly, the average pag 6, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

7 Discharge (m3/h) 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 discharge is higher in the increasing series, but a stable situation is only reached (after 2 s) in the decreasing series. In general, the discharge was higher in the increasing pump-setting series than in the decreasing pump-setting series. A stable situation is more often reached within ten minutes after increasing the pump-setting than after decreasing the pump-setting. No evident relationship could be found between pump-setting and stabilization time. From the test with a partially filled sewer it is concluded that a stable situation is reached within ten minutes at discharges below 3 m 3 /h, but is seldom reached for discharges higher than 3 m 3 /h. Flow measurements by four flow meters 4, 35, 3, 25, 2, 15, 1, 5, Electromagnetic flowmeter Doppler flowmeter Ultrasonic flowmeter Mouse' flowmeter', Pump setting (rpm) Figure 4. Test result with four different flow meters; a (factory calibrated) electromagnetic -, Doppler -, ultrasonic - and mouse flow meter from a series with increasing pump settings and a fully filled sewer. In the first phase of the experimenets measurements from three different types of flow meters have been compared with the measurements from the factory-calibrated electromagnetic flow meter. Figure 4 and figure 5 show the results of the measurements by the four flow meters during the series where the pump setting was respectively increased and decreased and when the sewer was fully filled. The Doppler measurements below 2 m 3 /h (,2 m/sec) are very unstable and inaccurate. At a discharge of more than 3 m 3 /h, the Doppler meter constantly overestimates the discharge. The ultrasonic flow meter is the most accurate flow meter and the mouse flow meter is mostly underestimating the discharge. Figure 6 shows the results for partially filled sewers. Figure 7 shows the percentage of filling during this test. As the discharge decreases, water level in the sewer increases. The Doppler meter was able to measure flows lower than 2 m 3 /h. Again the ultrasonic flow meter was pag 7, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

8 Discharge (m3/h) 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 very accurate and the mouse flow meter generally underestimates the discharge and becomes less accurate at lower discharges. Flow measurements by four flow meters 4, 35, 3, 25, 2, 15, 1, 5, Electromagnetic flowmeter Doppler flowmeter Ultrasonic flowmeter Mouse' flowmeter', Pump setting (rpm) Figure 5. Test result with four different flow meters; an electromagnetic -, a Doppler -, ultrasonic - and a mouse flow meter from a series with decreasing pump settings and a fully filled sewer. pag 8, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

9 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 Figure 6. Test result with four different flow meters; an electromagnetic -, a Doppler -, ultrasonic - and a mouse flow meter from a series with decreasing pump settings and a partially filled sewer. Figure 7. Filling of the sewer during the test with three different flow meters and a series of decreasing pump settings. A summary of the measurements results of the different flow meters is given in table 1. In case the sewer pipe was fully filled, the accuracy is in the order of what is claimed by the manufacturer. The accuracy is slightly lower for the mouse flow meter in case of partially filled sewers, but can still be considered accurate enough in case the measurements are used for dimensioning and benchmarking the sewers. In case measurements are needed for calculations of water balances and for calibrations of computer models, then the accuracies pag 9, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

10 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 found for the mouse flow meter are somewhat low. Note that the ultrasonic flow meter measures the flow in the pressure tube, which is constantly totally filled. This is the reason that the results of fully and partially filled sewers pipes do not differ that much. Table 1. Summary of measurements results of three different flow meters. Type Location Accuracy According to manufacturer At 1% filling of sewer pipe At partially filled sewer pipe Doppler sewer unknown ~6-7% ~5% Mouse sewer ~5% ~2-4% ~8% Ultrasonic pressure tube ~1% ~.5-1% ~1% In the second phase of the experiments another type of flow-meter, which measures water surface velocity by using radar-detection, was tested (at ). The waterlevel is measured by ultrasonic waves. A great advantage of this type of meter is that there is no contact with the waste water and is thus less sensitive for pollution and needs less maintenance. The test was conducted for a partially filled sewer and for a fully filled sewer. At full-pipe flow the radar-meter switches to another measuring principle to measure the velocity. Prior to the test, water was pumped at the highest pump-setting for about 45 minutes to get a stabilized flow. After that the pump capacity has been lowered four times with 25 rpm. After this lowering there was a break of fifteen minutes. From each interval of ten minutes the average has been taken and compared with the calibrated Krohne-flow meter. The results of this experiment are presented in table 2. The test was repeated for a fully filled sewer. Due to computer problems the number of readings is limited. The handwritten results show an accuracy no more than 15% (at 1% filling, this particular radar flow-meter measuring principle is based on electromagnetic induction). pag 1, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

11 Flow (m3/h) 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 radar-flow meter vs calibrated Krohne-meter Krohne Radar gem Radar gem Krohne 11: 11:3 236,57 12: Time 12:3 13: 13:3 Figure 8. Discharge during the experiment with the radar flow-meter and a partially filled sewer. The averages of the Krohne and Radar are given by gem Radar and gem Krohne. Table 2. Summary of measurements results of radar-flowmeter Type Location Accuracy According to manufacturer At 1% filling of sewer pipe At partially filled sewer pipe Radar sewer unknown > 15% ~5-15% CONCLUSIONS The field laboratory built by the municipality of Breda allows many different kinds of tests. A large range in flow rates can be created by which flow-meters and water level-meters can be tested. The meters can be placed in manholes, sewers and overflow devices. Testing different meters in a single test allows defining the accuracy of the meters under different flow conditions. A stable flow-rate occurs less frequent when the flow-rate is large. Once the flow is (more or less) stable, measurements from different meters can be compared. When conducting tests with large flow settings it takes longer than 1 minutes before the flow becomes stable. Four different flow-meters were tested in three different tests. The ultrasonic flow-meter, which is clamped on the pressure tube, has the highest accuracy of less than 1%. For fully filled sewers, the Doppler flow meter (<5% accuracy) performed better than the mouse flow-meter (<1% accuracy) and the radar flow-meter (< 15% accuracy). The accuracy of the three meters was around 1% for partially filled sewers. The Doppler-meter did not give good results at a velocity less than.2 m/sec. The experiments have shown that despite being free to choose the best location and conditions for the measurement device and despite having access to the data of the calibrated pag 11, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

12 11 th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 28 flow-meter, the accuracy remains 5-1%. Further research is necessary to get insight in the accuracy of in-situ calibration of measurement devices. It is to be expected that the accuracy will further decrease because of the difficult circumstances in sewer systems to perform an in-situ calibration using the velocity-profile. Measuring the flow in partly-filled sewers with an accuracy higher than 5-1% is a step forward towards modelkalibartion using (mobile) flow meters. ACKNOWLEDGEMENT We are very grateful to the staff of the sewerage department at the field laboratory in Breda. We also like to thank the following companies and organizations for the funding of the field laboratory: the municipality of Breda, Stichting RIONED, ARCADIS, Bergschenhoek Civiele Techniek, Flow-Tronic, IMD, Imtech and ITT Flygt. pag 12, J.Smits, M.R. Moens, M. Klootwijk, H. van Vliet,

11th International Conference on Urban Drainage, Edinburgh, Scotland, UK, 2008 MONITORING EQUIPMENT AND RESULTS The flow monitoring and sampling programme was conducted over two one week periods, with

More information

Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs

Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs Sanitary Sewer Overflows Leave Telltale Signs in Depth-Velocity Scattergraphs Patrick L. Stevens and Heather M. Sands ADS Environmental Services, Inc., Indianapolis, Indiana Sanitary sewer overflows (SSOs)

More information

Understanding the Flo-Dar Flow Measuring System

Understanding the Flo-Dar Flow Measuring System Understanding the Flo-Dar Flow Measuring System Independent tests verify non-contact flowmeter is highly accurate under both open channel and surcharge conditions TM Flo-Dar is the only non-contact open

More information

Analysis of pluvial flood damage based on data from insurance companies in the Netherlands

Analysis of pluvial flood damage based on data from insurance companies in the Netherlands Analysis of pluvial flood damage based on data from insurance companies in the Netherlands M.H. Spekkers 1, J.A.E. ten Veldhuis 1, M. Kok 1 and F.H.L.R. Clemens 1 1 Delft University of Technology, Department

More information

Flow Measurement Calibration and Measurement

Flow Measurement Calibration and Measurement Calibration and Measurement Flow Measurement Flow measurement for agricultural irrigation delivery can be accomplished with four general approaches. These categories are generalized below. I. Standard

More information

191: Calibration and Standards in Flow Measurement. Richard Paton National Engineering Laboratory, Scotland, UK 1 GENERAL PRINCIPLES

191: Calibration and Standards in Flow Measurement. Richard Paton National Engineering Laboratory, Scotland, UK 1 GENERAL PRINCIPLES 191: Calibration and Standards in Measurement Richard Paton National Engineering Laboratory, Scotland, UK 1 General Principles 1 2 Gravimetric Calibration of Liquid meters 2 3 Volumetric Calibration of

More information

MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO

MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO Authors: Ulf E. Roysted 1, Marit Melhuus 1 and Geir J. Lindholm 2 1. Oslo Water and Sewage Works(VAV), Herslebs gate 5, N-0561 Oslo e-mail:

More information

M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)

M6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy) M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity

More information

Application and results of automatic validation of sewer monitoring data

Application and results of automatic validation of sewer monitoring data Application and results of automatic validation of sewer monitoring data M. van Bijnen 1,3 * and H. Korving 2,3 1 Gemeente Utrecht, P.O. Box 8375, 3503 RJ, Utrecht, The Netherlands 2 Witteveen+Bos Consulting

More information

LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION

LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION 4th DAAAM International Conference on Advanced Technologies for Developing Countries September 21-24, 2005 Slavonski Brod, Croatia LEAK DETECTION IN UNDERGROUND PIPELINES OF MUNICIPAL WATER DISTRIBUTION

More information

MagneW 3000 PLUS Flowmeter for Open Channel

MagneW 3000 PLUS Flowmeter for Open Channel MagneW 3000 PLUS Flowmeter for Open Channel Wastewater treatment application Yamatake Corporation October 2002 MagneW 3000 PLUS Open Channel type 1 Contents Environmental protection ISO 14000 Regulation

More information

CEE 370 Fall 2015. Laboratory #3 Open Channel Flow

CEE 370 Fall 2015. Laboratory #3 Open Channel Flow CEE 70 Fall 015 Laboratory # Open Channel Flow Objective: The objective of this experiment is to measure the flow of fluid through open channels using a V-notch weir and a hydraulic jump. Introduction:

More information

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark Urban run-off volumes dependency on rainfall measurement method - Scaling properties of precipitation within a 2x2 km radar pixel L. Pedersen 1 *, N. E. Jensen 2, M. R. Rasmussen 3 and M. G. Nicolajsen

More information

HEAVY OIL FLOW MEASUREMENT CHALLENGES

HEAVY OIL FLOW MEASUREMENT CHALLENGES HEAVY OIL FLOW MEASUREMENT CHALLENGES 1 INTRODUCTION The vast majority of the world s remaining oil reserves are categorised as heavy / unconventional oils (high viscosity). Due to diminishing conventional

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

Head Loss in Pipe Flow ME 123: Mechanical Engineering Laboratory II: Fluids

Head Loss in Pipe Flow ME 123: Mechanical Engineering Laboratory II: Fluids Head Loss in Pipe Flow ME 123: Mechanical Engineering Laboratory II: Fluids Dr. J. M. Meyers Dr. D. G. Fletcher Dr. Y. Dubief 1. Introduction Last lab you investigated flow loss in a pipe due to the roughness

More information

Sewerage Management System for Reduction of River Pollution

Sewerage Management System for Reduction of River Pollution Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

Custody Transfer Measurement. with the V-Cone Flowmeter

Custody Transfer Measurement. with the V-Cone Flowmeter Custody Transfer Measurement with the V-Cone Flowmeter Stephen A. Ifft McCrometer Inc. Hemet, California, USA Abstract This paper will discuss the approval of the McCrometer V-Cone flowmeter for custody

More information

AN INSTRUMENT FOR GRAVIMETRIC CALIBRATION OF FLOW DEVICES WITH CORROSIVE GASES. J. O. Hylton C. J. Remenyik Oak Ridge National Laboratory *

AN INSTRUMENT FOR GRAVIMETRIC CALIBRATION OF FLOW DEVICES WITH CORROSIVE GASES. J. O. Hylton C. J. Remenyik Oak Ridge National Laboratory * AN INSTRUMENT FOR GRAVIMETRIC CALIBRATION OF FLOW DEVICES WITH CORROSIVE GASES J. O. Hylton C. J. Remenyik Oak Ridge National Laboratory * Paper prepared for the 4 th International Symposium on Fluid Flow

More information

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector Magne3000 PLUS Smart Electromagnetic Flowmeter Open channel Flowmeter Detector Model NNK150/951 OVERVIE The Magne3000 PLUS Electromagnetic Flowmeter is submersible type of flowmeter mainly used for flow

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

LLB-OCMFM 2000 PORTABLE DOPPLER AREA-VELOCITY FLOWMETER

LLB-OCMFM 2000 PORTABLE DOPPLER AREA-VELOCITY FLOWMETER LLB-OCMFM 2000 PORTABLE DOPPLER AREA-VELOCITY FLOWMETER System for flow measurement, data acquisition and transmission for wastewater with long battery life With Long Life Battery Open Channel Flow Meter

More information

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data

Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data Peeling the Onion of Meter Accuracy Two Steps to Evaluating Flow Meter Data ABSTRACT Patrick L. Stevens, PE ADS Environmental Services 9 S. Cloverdale St., Suite B Seattle, WA 988 It is a natural desire

More information

Testing Protocol for Differential Pressure Measurement Devices API MPMS Chapter 22.2

Testing Protocol for Differential Pressure Measurement Devices API MPMS Chapter 22.2 Testing Protocol for Differential Pressure Measurement Devices API MPMS Chapter 22.2 Steve Baldwin Chevron Energy Technology Company Houston, Texas USA Casey Hodges CEESI Measurement Solutions. Nunn, Colorado

More information

HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS

HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS JAMES LI (1) & CELIA FAN (2) (1) Department of Civil Engineering, Ryerson University, Toronto, Canada, jyli@ryerson.ca

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

1 WATERFLUX - Comparisonon COO 2010-08-17. Rectangular Magmeter in water applications

1 WATERFLUX - Comparisonon COO 2010-08-17. Rectangular Magmeter in water applications 1 WATERFLUX - Comparisonon COO 2010-08-17 Rectangular Magmeter in water applications Jef Neven KROHNE WATERMETERS $3000 EMF Price C&I (mechanical) water meters Residential water meters $30 Water Metering

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

CONDITION ASSESSMENT AND RISK MANAGEMENT OF WATER MAINS SAVES TENS OF MILLIONS OF EUROS?

CONDITION ASSESSMENT AND RISK MANAGEMENT OF WATER MAINS SAVES TENS OF MILLIONS OF EUROS? CONDITION ASSESSMENT AND RISK MANAGEMENT OF WATER MAINS SAVES TENS OF MILLIONS OF EUROS? International Public Works Conference 2011 Canberra 21-25 August 2011 Geert Jan van Heck 24-8-2011 Overview of the

More information

Scattergraph Principles and Practice Practical Application of the Froude Number to Flow Monitor Data

Scattergraph Principles and Practice Practical Application of the Froude Number to Flow Monitor Data Scattergraph Principles and Practice Practical Application of the Froude Number to Flow Monitor Data Kevin L. Enfinger, P.E. and Patrick L. Stevens, P.E. ADS Environmental Services 4940 Research Drive

More information

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used: Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is

More information

UNDER DRAINAGE AND FILTER DESIGN

UNDER DRAINAGE AND FILTER DESIGN UNDER DRAINAGE AND FILTER DESIGN Tailings and HLP Workshop 28 April to 1 May 2010 INTRODUCTION The internal drainage is of crucial importance to the reliability and safety of a tailings dam throughout

More information

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K. CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung,, H. Kainz and K. König 1 Linz AG Wastewater, Wiener Straße 151, A-41 Linz, Austria Municipality

More information

Energy and Flow Measurement for Hydronic Systems

Energy and Flow Measurement for Hydronic Systems Energy and Flow Measurement for Hydronic Systems Presented By: George Szyszko Applications Consultant MCR for ONICON Incorporated Why Measure Thermal Energy? To control something, you must first measure

More information

Experiment 3 Pipe Friction

Experiment 3 Pipe Friction EML 316L Experiment 3 Pipe Friction Laboratory Manual Mechanical and Materials Engineering Department College of Engineering FLORIDA INTERNATIONAL UNIVERSITY Nomenclature Symbol Description Unit A cross-sectional

More information

IFC 070 Technical Datasheet

IFC 070 Technical Datasheet IFC 070 Technical Datasheet Electromagnetic signal converter Battery driven with low energy consumption Quick and easy to install and operate External data logger and GSM module for remote data transfer

More information

Modelling of Urban Flooding in Dhaka City

Modelling of Urban Flooding in Dhaka City Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding

More information

Broad Crested Weirs. I. Introduction

Broad Crested Weirs. I. Introduction Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp

More information

Flow Measurement Options for Pipeline and Open Channel Flow

Flow Measurement Options for Pipeline and Open Channel Flow Flow Measurement Options for Pipeline and Open Channel Flow October 2013 Presented by Molly Skorpik - 2013 Montana Association of Dam and Canal Systems Conference Irrigation Training and Research Center

More information

A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER

A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER A TEST RIG FOR TESTING HIGH PRESSURE CENTRIFUGAL COMPRESSORS MODEL STAGES AT HIGH REYNOLDS NUMBER P. NAVA, M.PROFETI, M. GIACHI, F.SARRI GE-NUOVO PIGNONE G.P.MANFRIDA UNIVERSITY OF FLORENCE Italia Presented

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

Flow Measurement. Larry Schwankl. Irriga0on Specialist, UC Coopera0ve Extension 559-646- 6569 schwankl@uckac.edu hep://ucanr.

Flow Measurement. Larry Schwankl. Irriga0on Specialist, UC Coopera0ve Extension 559-646- 6569 schwankl@uckac.edu hep://ucanr. Flow Measurement Larry Schwankl Irriga0on Specialist, UC Coopera0ve Extension 559-646- 6569 schwankl@uckac.edu hep://ucanr.org/schwankl Flow Measurement - Background Flow in a pipe: Flow Measurement -

More information

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005 City of Edmonton Page 1 of 5 This guideline will apply to all new developments involving singledetached, semi-detached or duplex houses in the City of Edmonton effective January 1, 2006. Preamble: This

More information

Flow Like An Egyptian: The Basics of Open channel flow

Flow Like An Egyptian: The Basics of Open channel flow Flow Like An Egyptian: The Basics of Open channel flow Walt Boyes,as ISA Life Fellow, Fellow of InstMC, Chartered Measurement and Control Technologist, Editor of Control and ControlGlobal.com and principal

More information

Risk and vulnerability assessment of the build environment in a dynamic changing society

Risk and vulnerability assessment of the build environment in a dynamic changing society Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. linmei.nie@sintef.no

More information

UDG Spring Conference Birmingham 2016

UDG Spring Conference Birmingham 2016 Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke

More information

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80 FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80 List of symbols T f average temperature at the flow header, C T r average temperature at the return header, C f average water

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

Ultrasonic Meters: A Natural Choice To Measure Gas Flow

Ultrasonic Meters: A Natural Choice To Measure Gas Flow Pipeline & Gas Journal July issue 2000: Ultrasonic Meters: A Natural Choice To Measure Gas Flow by Jesse Yoder, Flow Research, Wakefield, Massachusetts Anyone who is familiar with natural gas flow measurement

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information

Flow Sensors. - mass flow rate - volume flow rate - velocity. - stream line parabolic velocity profile - turbulent vortices. Methods of measurement

Flow Sensors. - mass flow rate - volume flow rate - velocity. - stream line parabolic velocity profile - turbulent vortices. Methods of measurement Flow Sensors Flow - mass flow rate - volume flow rate - velocity Types of flow - stream line parabolic velocity profile - turbulent vortices Methods of measurement - direct: positive displacement (batch

More information

Table 1 DENSITY Density Solids Percent By Volume

Table 1 DENSITY Density Solids Percent By Volume Willard Says Useful stuff to know about hydraulic dredging. The Discharge Pipeline Slurry Density Slurry density is: Poorly understood. The ratio of the weights of a volume of slurry relative to an identical

More information

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory

More information

Grant Agreement No. 228296 SFERA. Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME. Capacities Specific Programme

Grant Agreement No. 228296 SFERA. Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME. Capacities Specific Programme Grant Agreement No. 228296 SFERA Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME Capacities Specific Programme Research Infrastructures Integrating Activity - Combination of

More information

Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29

Practice Problems on Pumps. Answer(s): Q 2 = 1850 gpm H 2 = 41.7 ft W = 24.1 hp. C. Wassgren, Purdue University Page 1 of 16 Last Updated: 2010 Oct 29 _02 A centrifugal with a 12 in. diameter impeller requires a power input of 60 hp when the flowrate is 3200 gpm against a 60 ft head. The impeller is changed to one with a 10 in. diameter. Determine the

More information

THE ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM

THE ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM THE ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM U.S. Environmental Protection Agency ETV Joint Verification Statement NSF International TECHNOLOGY TYPE: APPLICATION: TECHNOLOGY NAME: TEST LOCATION: COMPANY:

More information

SANITARY SEWER MASTER PLAN

SANITARY SEWER MASTER PLAN SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS

More information

Sample specifications for an effective Flow Monitoring Services RFP

Sample specifications for an effective Flow Monitoring Services RFP Sample specifications for an effective Flow Monitoring Services RFP Red copy indicates areas requiring specific input Each specification is numbered for quick identification 1. Project Specifications 1.1.

More information

Experiment (13): Flow channel

Experiment (13): Flow channel Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and

More information

Advanced Differential Pressure Flowmeter Technology V-CONE FLOW METER TECHNICAL BRIEF

Advanced Differential Pressure Flowmeter Technology V-CONE FLOW METER TECHNICAL BRIEF Advanced Differential Pressure Flowmeter Technology V-CONE FLOW METER TECHNICAL BRIEF Table of Contents Section 1 - General Introduction 1.1 1 Principles Of Operation 1.2 1 Reshaping The Velocity Profile

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology

Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology M. Siavashi School of Mechanical Engineering Iran University of Science and Technology W ebpage: webpages.iust.ac.ir/msiavashi Email: msiavashi@iust.ac.ir Landline: +98 21 77240391 Fall 2013 Introduction

More information

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8. Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that

More information

Liquid Flowmeters A Guide for Selecting a Flowmeter for Pressurized Systems

Liquid Flowmeters A Guide for Selecting a Flowmeter for Pressurized Systems Liquid Flowmeters A Guide for Selecting a Flowmeter for Pressurized Systems Selecting a meter requires a first-rate technical assessment of the pressurized system and a thorough evaluation of the capabilities

More information

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM

WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM WATER METER CALIBRATION, REPAIR, AND REPLACEMENT PROGRAM EPD Guidance Document AUGUST 2007 TABLE OF CONTENTS Part 1: OVERVIEW OF WATER METERING 3 SUMMARY 3 NECESSITY OF METERS 3 TYPES OF WATER METERS 4

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges

More information

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION

PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION PRSENTATION ON DRAINAGE SYSTEM OF DELHI EAST DELHI MUNICIPAL CORPORATION 25.07.2014 MAP OF DELHI SHOWING MCD s, NDMC & DCB ABOUT DELHI DELHI MANIFESTS UNCONTROLLED URBANISATION POPULATION INDUSTRIALISATION

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

Chapter 3 : Reservoir models

Chapter 3 : Reservoir models Chapter 3 : Reservoir models 3.1 History In earlier days, the dot graph of Kuipers was used to perform an impact assessment for combined sewer systems [Ribbius, 1951]. For a long period of rainfall, individual

More information

Application and results of automatic validation of sewer monitoring data

Application and results of automatic validation of sewer monitoring data Application and results of automatic validation of sewer monitoring data M. van Bijnen 1,3 * and H. Korving 2,3 1 Gemeente Utrecht, P.O. Box 8375, 3503 RJ, Utrecht, The Netherlands 2 Witteveen+Bos Consulting

More information

Pipeline design. concrete for life

Pipeline design. concrete for life Pipeline design concrete for life Pipeline Design Pipeline design - hydraulic Graph showing relative velocity and discharge in a circular pipe for any depth of flow 1.0 0.9 0.8 0.7 Proportional depth of

More information

Thames Water key Messages for London Borough of Ealing 25 th October 2005

Thames Water key Messages for London Borough of Ealing 25 th October 2005 Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property

More information

measurement, but almost any pipe elbow can be calibrated Elbow meters are not as potentially accurate as venturi,

measurement, but almost any pipe elbow can be calibrated Elbow meters are not as potentially accurate as venturi, Lecture 14 Flow Measurement in Pipes I. Elbow Meters An elbow in a pipe can be used as a flow measuring device much in the same way as a venturi or orifice plate The head differential across the elbow

More information

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Know the Flow. Flowmetering Training Manual

Know the Flow. Flowmetering Training Manual Know the Flow Flowmetering Training Manual Acknowledgments ANCID and its member organisations National Program for Irrigation Research and Development Goulburn Murray Water Training Centre Manly Hydraulics

More information

ELASTOMERIC INLINE CHECK VALVES FOR CONTROL AND PREVENTION OF SANITARY SEWER OVERFLOW

ELASTOMERIC INLINE CHECK VALVES FOR CONTROL AND PREVENTION OF SANITARY SEWER OVERFLOW A Red Valve Company And Tideflex Technologies White Paper 600 North Bell Avenue Carnegie, PA 15106 (412)279-0044 www.redvalve.com ELASTOMERIC INLINE CHECK VALVES FOR CONTROL AND PREVENTION OF SANITARY

More information

The photoionization detector (PID) utilizes ultraviolet

The photoionization detector (PID) utilizes ultraviolet Chapter 6 Photoionization Detectors The photoionization detector (PID) utilizes ultraviolet light to ionize gas molecules, and is commonly employed in the detection of volatile organic compounds (VOCs).

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

Getting the Best Measurement From Your Turbine Meters

Getting the Best Measurement From Your Turbine Meters Getting the Best Measurement From Your Turbine Meters PAUL W. TANG, M.Sc., P.Eng. TERASEN GAS SURREY, BC, CANADA Introduction Many factors influence the quality of turbine meter flow measurement. Recognizing

More information

Configure It. www.krohne-direct.com. The intelligent e-commerce solution

Configure It. www.krohne-direct.com. The intelligent e-commerce solution www.krohne-direct.com Configure It The intelligent e-commerce solution 4Online select and order platform for the complete KROHNE quotations 4Reliable device configuration, extremely easy to use 4Online

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Guidelines for Performing Infiltration/Inflow Analyses And Sewer System Evaluation Survey

Guidelines for Performing Infiltration/Inflow Analyses And Sewer System Evaluation Survey COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION ONE WINTER STREET, BOSTON, MA 02108 617-292-5500 Guidelines for Performing Infiltration/Inflow

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Experiment # 3: Pipe Flow

Experiment # 3: Pipe Flow ME 05 Mechanical Engineering Lab Page ME 05 Mechanical Engineering Laboratory Spring Quarter 00 Experiment # 3: Pipe Flow Objectives: a) Calibrate a pressure transducer and two different flowmeters (paddlewheel

More information

Closed Loop Pressure Control for the Extrusion Process

Closed Loop Pressure Control for the Extrusion Process Closed Loop Pressure Control for the Extrusion Process By John Pacini Updated by Douglas Joy Extrusion is a continuous process and successful economic production depends on maintaining stable output and

More information

WaReg The Flow Regulator

WaReg The Flow Regulator WaReg The Flow Regulator Flow regulation Overloading in sewerage works and drainage systems can be avoided by using an attenuation reservoir, or by directing flow to a less sensitive area. Automatic flow

More information

Applying LDV to Air and Water Flow Measurements: Research Activities & Accreditation. Matthew A. Rasmussen, Danish Technological Institute

Applying LDV to Air and Water Flow Measurements: Research Activities & Accreditation. Matthew A. Rasmussen, Danish Technological Institute Applying LDV to Air and Water Flow Measurements: Research Activities & Accreditation Matthew A. Rasmussen, Danish Technological Institute Euramet Flow Meeting Danish Technological Institute, Taastrup 10-12

More information

Laminar and Turbulent flow. Flow Sensors. Reynolds Number. Thermal flow Sensor. Flow and Flow rate. R = Mass Flow controllers

Laminar and Turbulent flow. Flow Sensors. Reynolds Number. Thermal flow Sensor. Flow and Flow rate. R = Mass Flow controllers Flow and Flow rate. Laminar and Turbulent flow Laminar flow: smooth, orderly and regular Mechanical sensors have inertia, which can integrate out small variations due to turbulence Turbulent flow: chaotic

More information

Overview of the state of the art heat measurement technologies for larger solar thermal systems

Overview of the state of the art heat measurement technologies for larger solar thermal systems Overview of the state of the art heat measurement technologies for larger solar thermal systems Overview of the state of the art heat measurement technologies for larger solar thermal systems... 1 Introduction...

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information