LIC-IR70/SR310 Interchange Upgrade Stakeholder Meeting

Size: px
Start display at page:

Download "LIC-IR70/SR310 Interchange Upgrade Stakeholder Meeting"

From this document you will learn the answers to the following questions:

  • What traffic demands are anticipated?

  • What is the name of the bridge that was rehabilitated?

  • Who is responsible for the widening of the bridge?

Transcription

1 Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director LIC-IR70/SR310 Interchange Upgrade Stakeholder Meeting Dave Slatzer, P & E Administrator ODOT District 5 May 6, 2014

2 Agenda Project Introduction Study Area Purpose and Need of Project Alternatives Considered Proposed Improvements Maintenance of Traffic Scheme Aesthetic Treatment Considerations Project Funding Project Schedule Questions/Comments 2

3 Project Introduction Project Description Rehabilitation of the existing bridge Widen the existing bridge to accommodate future traffic demands and multi-use pathway Roadway widening/turn lane additions for future traffic demands Proposed Construction Costs Right-of-Way = $600,000 Construction = $12,700,000 Proposed Construction Start Construction Begin = Spring 2016 Construction End = Fall

4 Project Study Area 4

5 Purpose and Need Address Poor Bridge Conditions. Cracking and spalling on bottom of bridge Heavy Cracking along top of bridge Bridge abutments and backwalls showing detioration 5

6 Purpose and Need (cont.) Address Future Traffic Volumes Failing intersection operations (at the interchange) for Design Year (2036) Traffic Volumes Levels of Service E and F predicted at existing intersections in No- Build Alternative Traffic Analysis also yielded that intersections will be over capacity (v/c > 1.0) 6

7 No-Build Alternatives Considered No repairs/replacements; only routine maintenance Bridge Rehabilitation Alternatives Option 1 Replace bridge deck at existing width Option 2 Replace bridge deck, widen bridge deck only to accommodate 6-lane section Option 3 Replace bridge deck and widen bridge deck only to accommodate 6-lane and future multi-use path ODOT Preferred Alternative Option 4 Replace bridge deck, widen bridge to accommodate 6- lane section and multi-use path; roadway widening to Etna Crest Blvd./SR 310 and interchange ramps 7

8 ODOT Preferred Alternative Proposed Improvements Replace and widen bridge deck to accommodate 6-lanes of traffic and multi-use path Widen Eastbound off-ramp for additional turn lanes Widen SR 310 from Columbus Parkway to north of Dairy Queen drive Construct Multi-use path from Columbus Expressway to Etna Crest Boulevard (accommodates future pathway extensions) Signalize intersection of SR 310/Etna Crest Boulevard 8

9 ODOT Preferred Alternative 9

10 ODOT Preferred Alternative Bridge Detail Footer (use Insert>Headers & Footers to change) 10

11 Maintenance of Traffic Two Phases of MOT Part Width Construction - 1-Lane in each direction maintained Intermittent Ramp Closures Day Ramp Closures SR 310 Closures 7-14 Day Closures for Culvert Replacement and Full Depth Asphalt A + B Contracting Methods to be used for Closure Periods 11

12 Maintenance of Traffic Phase 1 Winter Season Phase 2 12

13 Aesthetic Considerations Roadway Lighting Interchange Landscaping Decorative Parapet Walls/Form Liners Decorative Fence 13

14 Roadway Lighting Estimated Costs = $300,000 Roadway Lighting along SR 310 and/or multi-use path to be paid for from Local Funding Sources Potential for MORPC Funds to be used to pay for lighting 14

15 Decorative Parapet/Form Liners Form Liners installed on inside and outside faces of parapet walls Standard Cost (est.) = $82,000 Decorative Cost (est.) = $183,000 Cost Difference = $101,000 15

16 Decorative Parapet/Form Liners 16

17 Decorative Fencing Vandal Fencing required on both sides of bridge Standard Cost (est.) = $32,200 Decorative Cost (est.) = $96,000 Cost Difference = $64,400 17

18 Decorative Fencing 18

19 Estimated Costs Project Funding Right-of-Way ($600,000) Construction ($12,700,000) Three Funding Sources ODOT ($4,500,000) MORPC ($7,050,000) Etna Township/Local Funds ($1,760,000) 19

20 Estimated Project Schedule Environmental Clearance Summer 2014 Right-of-Way Acquisition Fall 2014 to Fall 2015 Project Sale Winter 2016 Begin Construction Spring 2016 End Construction Fall

21 Next Steps Open House Public Meeting View Exhibits of Proposed Improvements Project representatives available for additional Q&A Project Comment Sheets available Request input on project and any transportation needs during construction Public Comment Drop-off Box available or mail to address on Comment Sheet Comments with contact information will be responded to. Public Comment Period Ends on June 3,

22 Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Questions/Discussion May 6, 2014

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1

More information

Nashville Area MPO Regional Freight Study fast action projects

Nashville Area MPO Regional Freight Study fast action projects Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007 DE 8 Concept Plan and Operations Study Dover Safety Advisory and Transportation Committee October 23, 2007 Purpose Develop a concept plan describing the aesthetic qualities of the corridor as a gateway

More information

I-25 / Rio Bravo Interchange

I-25 / Rio Bravo Interchange I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Presentation to Community Task Force July 9, 2007

Presentation to Community Task Force July 9, 2007 Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General

More information

Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza

Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Attendees: Richard Massey(SCO), Brenda Haygood(D-2), Jimmy Miller(D-3), Robert McCracken(PBS&J-D-3), Abel Sierra(D-5), Luis Lopez(D-6),

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future

More information

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT MANDATORY PRE-BID SIGN IN CDOT Carrie DeJiacomo, Program Engineer John Hall, Resident Engineer Telecia McCline, Project Manager Tammy Maurer, Assistant Project Manager David Evans/Hartwig Design Consultant

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_ 2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment

More information

Decision making in ODOT s Project Development Process. How to Use the Feasibility Study and Alternatives Evaluation Report in the PDP

Decision making in ODOT s Project Development Process. How to Use the Feasibility Study and Alternatives Evaluation Report in the PDP Decision making in ODOT s Project Development Process How to Use the Feasibility Study and Alternatives Evaluation Report in the PDP Decision making in ODOT s PDP: FS and AER O Susan Daniels, PE, AICP

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

DESIGN-BUILD SCOPE OF SERVICES. PROJECT No. 466842 FRA-SR315/IR670-Noisewall PID No. 87948

DESIGN-BUILD SCOPE OF SERVICES. PROJECT No. 466842 FRA-SR315/IR670-Noisewall PID No. 87948 DESIGN-BUILD SCOPE OF SERVICES PROJECT No. 466842 FRA-SR315/IR670-Noisewall PID No. 87948 STATE OF OHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, P.E., DIRECTOR THIS SCOPE OF SERVICES MUST BE INCLUDED IN

More information

Alternatives Evaluation Overview

Alternatives Evaluation Overview Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative

More information

Belmont Street Bridge Rehabilitation Project

Belmont Street Bridge Rehabilitation Project Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 A JOINT RESOLUTION OF THE GOVERNING BODIES OF DOUGLAS COUNTY AND THE CITY OF LAWRENCE CONCERNING THE SOUTH LAWRENCE TRAFFICWAY;

More information

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process Disputes and Claims 3 Processes Dispute Resolution and Administrative Claims Process Default Process C&MS 108.02 Partnering OR PN 108 -Dispute Review Board (DRB) Considered for use on projects over $20

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

700 Life-Cycle Cost Analysis... 700-1

700 Life-Cycle Cost Analysis... 700-1 Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...

More information

District 6. Business Plan

District 6. Business Plan District 6 Business Plan Fiscal Year 2014 District 6 Business Plan 22 ODOT District 6 Business Plan Fiscal Year 2014 Table of Contents 1.0 Executive Summary 1.1 The District Deputy Director s Message.4

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

SCOTTSDALE TRANSPORTATION COMMISSION REPORT

SCOTTSDALE TRANSPORTATION COMMISSION REPORT SCOTTSDALE TRANSPORTATION COMMISSION REPORT To: Transportation Commission From: Paul Basha, Transportation Director Meeting Date: September 19, 2013 Subject: SR-101 Pima Freeway Improvements ITEM IN BRIEF

More information

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

How To Manage Transportation Asset Management

How To Manage Transportation Asset Management 1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012

More information

2015 OPERATIONAL PROGRAMS SCHEDULE

2015 OPERATIONAL PROGRAMS SCHEDULE Project Manager Service Provider Timeline/Status DWQMS Internal Audit BluMetric Environmental DWQMS External Audit Off-site audit - November 6th 2015 SAI Global On-site audit - December 15th - 16th 2015

More information

PUBLIC MEETING & WORK SESSION

PUBLIC MEETING & WORK SESSION PUBLIC MEETING & WORK SESSION I-94 REHABILITATION PROJECT DETROIT Hosted by the Michigan Department of Transportation with assistance from INTRODUCTIONS Project Team 3 PURPOSE OF MEETING Part 1: Part 2:

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

CONSTRUCTION COST ESTIMATES

CONSTRUCTION COST ESTIMATES Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1

More information

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013 Streets as Highways Maintenance Guidelines Briefing Summary March 21, 2013 Background Within the of Washington there are over 500 centerline miles of Streets that also function as Highways. Cities that

More information

GOV. SCOTT S FLORIDA FIRST BUDGET WILL MAKE FLORIDA FIRST IN TRANSPORTATION INFRASTRUCTURE BY INVESTING $9.9 BILLION

GOV. SCOTT S FLORIDA FIRST BUDGET WILL MAKE FLORIDA FIRST IN TRANSPORTATION INFRASTRUCTURE BY INVESTING $9.9 BILLION GOV. SCOTT S FLORIDA FIRST BUDGET WILL MAKE FLORIDA FIRST IN TRANSPORTATION INFRASTRUCTURE BY INVESTING $9.9 BILLION NOVEMBER 23, 2015 Tom Yu, (850) 414-4573 tom.yu@dot.state.fl.us TALLAHASSEE Governor

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage

More information

How To Manage Big Data For The Ohio Department Of Transportation

How To Manage Big Data For The Ohio Department Of Transportation Big Data & Asset Management Ohio Planning Conference 2014 John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Big Data: Asset Management Andrew Williams, Administrator Office

More information

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D Open House Public Meeting for the State Project: State Project S310-25/2-0.10 Federal Project: BR-0252(001)D May 7, 2015 Old Glen Jean Bank Glean Jean, WV 4:00-7:00 PM www.transportation.wv.gov PROJECT

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

Ohio Department of Transportation Prebid Questions

Ohio Department of Transportation Prebid Questions Project No. 093005 Sale Date - 12/9/2009 Question Submitted: 11/10/2009 Are all underdrains to be replaced in both resurface and full depth areas? Where are the underdrains to be placed? In areas where

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) To: From: Contact Information: Roland Bartl, Planning, Town of Acton, 472 Main St. Acton MA 01440; 978-264-9639;

More information

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to

More information

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:

More information

Transportation Asset Management Planning in Ohio OTEC 2014

Transportation Asset Management Planning in Ohio OTEC 2014 Transportation Asset Management Planning in Ohio OTEC 2014 John R. Kasich, Governor Jerry Wray, Director Discussion Items Why are we doing this? Taking Care of What we have Making the System work better

More information

PRIVATELY OPERATED TOURIST INFORMATION CENTER SIGNS GENERAL INFORMATION & APPLICATION

PRIVATELY OPERATED TOURIST INFORMATION CENTER SIGNS GENERAL INFORMATION & APPLICATION PRIVATELY OPERATED TOURIST INFORMATION CENTER SIGNS GENERAL INFORMATION & APPLICATION Dear Applicant: Enclosed is a copy of MassDOT - Highway Division's Privately Operated Tourist Information Center Signs

More information

Maintenance Management and Asset Management

Maintenance Management and Asset Management Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July

More information

TOWN OF NEW HAVEN ROAD PLAN

TOWN OF NEW HAVEN ROAD PLAN 1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served

More information

Introduction & Welcome

Introduction & Welcome Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1 Project Overview

More information

Transportation Management Plan Template

Transportation Management Plan Template DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County

More information

Status of ODOT s Culvert Management Program

Status of ODOT s Culvert Management Program Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Status of ODOT s Culvert Management Program Kyle Brandon, P.E. Roadway Hydraulic Engineer Office of Hydraulic Engineering

More information

EXECUTIVE SUMMARY CHAPTER 6

EXECUTIVE SUMMARY CHAPTER 6 EXECUTIVE SUMMARY CHAPTER 6 This Bridge Development Report was prepared to document the decision process and recommendations for constructing a bridge carrying Maitland Boulevard (eastbound) over I-4 as

More information

Harlem River Bridges Access Plan

Harlem River Bridges Access Plan Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:

More information

Advancements in GPR for a Sustainable Tomorrow

Advancements in GPR for a Sustainable Tomorrow Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,

More information

Section Two: Stanford Perimeter Trail

Section Two: Stanford Perimeter Trail IMAGE SOURCE: JONAS FLAKEN, FLICKR (CREATIVE COMMONS) IMAGE SOURCE: DONJD2, FLICKR (CREATIVE COMMONS) Section Two: Stanford Perimeter Trail ~ 22 ~ 2 Sta nford Perimeter Trail 2.1 Project Description The

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

Risk - Based Inspection Frequencies

Risk - Based Inspection Frequencies Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The

More information

BAYLOR UNIVERSITY New Stadium Downtown Community Meeting

BAYLOR UNIVERSITY New Stadium Downtown Community Meeting BAYLOR UNIVERSITY New Stadium Downtown Community Meeting Agenda Introductions Goals of Meeting Stadium Overview Parking Supply & Demand Downtown Opportunities Q&A 20 Minutes 20 Minutes Partnership Between

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Truss Bridges of Kentucky

Truss Bridges of Kentucky ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire

More information

Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas

Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas Presented by: Rafael Aldrete, Texas A&M Transportation Institute NACTO Designing Cities Regional Conference Phoenix

More information

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

FOR IMMEDIATE RELEASE September 17, 2013 Contact: NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

Sign Combo Permit Application For a Development and Building Permit for Permanent Signs

Sign Combo Permit Application For a Development and Building Permit for Permanent Signs Sign Combo Permit Application For a Development and Building Permit for Permanent Signs City File #: Development Services (HSBC Bank Place) 5th Floor, HSBC Bank Place 10250-101 Street NW Edmonton, AB T5J

More information

How To Build A City Of Virginia Beach Arena

How To Build A City Of Virginia Beach Arena City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014 July 8, 2014 Presentation

More information

BEAUMONT S PIONEERING CFD

BEAUMONT S PIONEERING CFD BEAUMONT S PIONEERING CFD Prepared for Beaumont City Council Prepared By Development Services Department Comprehensive Infrastructure Development What is Beaumont s CFD? The CFD is part of Beaumont s Comprehensive

More information

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Report to INFRASTRUCTURE SERVICES Committee for noting

Report to INFRASTRUCTURE SERVICES Committee for noting 15-377 Subject: Prepared by: Capital Works Programme 2015/16 Tairāwhiti Roads Alexios Kavallaris (Capital Manager - Tairāwhiti Roads) Meeting Date: 22 October 2015 Report to INFRASTRUCTURE SERVICES Committee

More information

Road Asset Management

Road Asset Management Road Asset Management A Tolling Experience July 2011 Barry King Construction & Asset Engineer ConnectEast Group Australia s largest road project ConnectEast EastLink is owned and operated by ConnectEast.

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

INDOT 2000-2025 Long Range Plan

INDOT 2000-2025 Long Range Plan Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process

More information

CHAPTER 2 LCCA APPROACHES

CHAPTER 2 LCCA APPROACHES 2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program

More information

Squrriel Hill Tunnel Rehabilitation Detours. The following pages are detour routes for weekend daytime/nightime traffic.

Squrriel Hill Tunnel Rehabilitation Detours. The following pages are detour routes for weekend daytime/nightime traffic. Squrriel Hill Tunnel Rehabilitation Detours The following pages are detour routes for weekend daytime/nightime traffic. 1 P:\1555 s\21535146 - Squirrel Hill Tunnel Rehab\Cadd\Presentation\Press Release\WB_Day_Detour.dgn

More information

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 This page intentionally left blank. PAGE 12 MINNESOTA GO MNDOT TRANSPORTATION

More information