1 Ref.: TEP DK To : Frederikshavn Municipality: Jette Brønnum; Maibrit Lykkegaard; Maria Klitgaard; Boie Skov Frederiksen From : TEP DK Rachel Keown (HSE Coordinator) Copy : Nathalie Limet; Henrik Nicolaisen; Pablo Tallone, Aurelien Joathon (TEP DK) Date : Wednesday 8 th July 2015 Subject : Noise information for Frederikshavn Municipality - Vendsyssel-1 TOTAL in line with the Municipalities expectations delivered noise calculations on the 3rd July 2015 (reference TEP DK ). The noise modeling calculations showed that the installation of noise barriers to the north and west of the site will provide the necessary noise reduction to meet the noise limits at the receptors around the wellpad. Noise modeling TOTAL has awarded Golder Associates a number of environmental monitoring tasks, including the provision of noise modeling calculations submitted to the Municipality on Friday 3rd July 2015 (reference TEP DK ). The noise calculations were carried out by a noise specialist company called 103. As documented in the memo TEP DK , the major sources of noise are the generators that supply power for drilling and the mud pumps. The noise sources were modeled with the input data documented in Appendix 1. The noise modeling was based on the noise data obtained to date, including the attached report (Sound Power determination of work area for shale gas drilling, Total E&P, Dybvad Appendix 1). As discussed in the meeting of the 2nd July2 015, TOTAL has only just received this report from its contractor (issued in draft on 23rd June 2015 and finalized 7th July 2015). TOTAL attaches a copy of a letter from Golder advising the date of delivery for the noise deliverables to TOTAL (Appendix 2). As discussed, the lateness of the reports from its subcontractors has hindered the response time in order to respond to elevated noise concerns. TOTAL were clearly unhappy with this situation and as such reinforced dialogue with the closest neighbors throughout this period. The closest neighbors did not raise any major concerns regarding noise generated from drilling activities. The noise calculations provided to the Municipality on 3rd July 2015 shows that with implementation of additional noise mitigation on the north and west of the site will reduce noise experienced at the receptors around the site (in all 4 directions north, south, east and west). TOTAL has full filled the requirement asked of on the 2nd July 2015 to document the effectiveness of the noise mitigations that will be implemented. Noise mitigation As explained in the meeting of the 2nd July 2015, TOTAL has conducted additional informal noise measurements at the source of the noise in order to refine the noise mitigation measures proposed and to optimize the source reduction measures. The mitigation proposed has been selected based on the noise data available (from spot and continuous noise measurement campaigns). TOTAL have already identified a number of insitu alternatives to a north-west noise barrier that will reduce the noise at receptors including implementation of noise reduction barriers near the sources of noise and other buffering devices. The modeling calculations submitted on 3 rd July 2015, do not reflect these optimized noise mitigations as we need to understand further the effectiveness of these local measures which shall be done throughout the installation phase of the barriers etc. In any case the most effective measures will be implemented by July 20 th 2015 as agreed. TOTAL have taken good note of your remark on the local residence at Skævevej 104. As shown in the report submitted by TOTAL on July 3 rd 2015 the proposed noise measures reduce effectively the noise level at this specific location. With the implementation of point source noise mitigations TOTAL believe the noise experienced at this location will also be reduced and the appropriate noise limits respected. TOTAL also attach a technical note from 103 (Appendix 3), which details the noise measured at this address.

2 Next steps TOTAL are focusing time and resources on implementation of the noise mitigation barriers and local improvements keeping in mind the specific concerns that Frederikshavn Municipality have raised. TOTAL are planning the noise monitoring campaign to provide evidence to Frederikshavn Municipality that the noise limits are achieved with the noise mitigations that will be implemented. As agreed mitigation measures shall be implemented no later that 20th July 2015 and a report documenting the noise levels (performed by an accredited noise specialist) following the implementation of the mitigation shall be provided by the 10th August TOTAL remains at your disposal should you have any further enquiries regarding the noise. The following reports are appended to this memo: Appendix 1: Sound power determination of work area for shale gas drilling, total e&p, Dybvad. July 7th Appendix 2: Measurements and modeling of noise at vendsyssel-1 first sample round. 8th July Golder. Appendix 3: Technical note: environmental noise calculations to use within decisions making in environmental matters July 2015.

3 APPENDIX 1: SOUND POWER DETERMINATION OF WORK AREA FOR SHALE GAS DRILLING, TOTAL E&P, DYBVAD. JULY 7 TH

4 7. juli 2015 Telefon: Ref: SNT QA: REH Dok: SNT UK Sound Power determination of work area for shale gas drilling, Total E&P, Dybvad Miljømåling ekstern støj Østerbro Tommerup Tlf.: CVR nr.: Rådgivende ingeniørselskab Side 1 af 8

5 Assignment: Sound Power determination of work area for shale gas drilling, Total, Dybvad Klient: Golder Associates A/S Maglebjergvej 6, 1., 2800 Kgs. Lyngby Requestet by: Marlene Thorman Carried out by: René Hansen Summary: On the 6 th of May 2015 noise measurements performed in order to determine the sound power level of the plant for shale gas drilling: The sound power level L WA i db(a) re. 1pW was determined to: Frequvency [Hz] k 2k 4k 8k sum Average L pa 45,2 53,8 57,8 60,8 61,3 58,7 53,4 42,1 66,4 L WA 89,7 98,3 102,3 105,4 105,9 103,4 98,6 87,8 111,1 The calculated sound power level is used to calculated to noise at receiver position in report no. REH _UK. Page 2 of 8

6 Table of content 1. Introduction Measurement method Meteorological conditions Noise source Results The character of the noise Uncertainty References Measurement equipment... 7 Page 3 of 8

7 1. Introduction 103 ApS has carried out noise measurements for the client Golder Associates A/S in order to determine the sound power level of the work area for shale gas drilling at Dybvad. The measurements were carried out from 14:10 to 14:40 the 6 th of May The measurements were carried out by René Hansen, Certified for Miljømåling ekstern støj During the measurements and subsequent analysis in the laboratory the instruments in paragraph 9 were used. The entire measuring chain was calibrated before and after the measurement series. 2. Measurement method The measurements were carrie out in compliance with ISO 8297:1994 referred to as the process method in ref. 1: The measurement setup is shown in Fejl! Henvisningskilde ikke fundet.. Measurements were carried out in 16 positions around the enclosure, starting from the entrance of the work area. Note that measurement position 2 is discarded because the measured level at position 2 exceeds the average level of the measured levels more than 10 db( because of loose cable connector) The distance between measurement positions are 30 m. Page 4 of 8

8 Figure 1: Measurement setup. Measurement positions marked with X and number. During measurements and subsequent analysis in the laboratory the instrument in paragraph 9 were used. The entire measuring chain was calibrated before and after the measurement series. No correction of the background noise has been carried out as the background noise level is estimated to be more than 10 db below the total noise level. 3. Meteorological conditions The weather was clear, approximately. 2-3 m/s wind from south west and the temperature about 11 C. 4. Noise source The noise was stationary during measurements. The noise level was averaged over a period of 1 minute in each position. The acoustic center is about 2.5 m above the ground. Page 5 of 8

9 The sound power level is determined as follows: L WA a = L pa + 10 log( 2 S m + hm lm ) + log α P S m = Measurement contour area = m 2 h m = Measurement height = 6 meter l m = Measurement contour length = 491 meter a = measurement distance = 35 meter S p = Plant area = 2958 m 2 L m = Microphone correction = 0 + a S m + Lm ( S ) 0, Results Frequency [Hz] k 2k 4k 8k sum Average L pa 45,2 53,8 57,8 60,8 61,3 58,7 53,4 42,1 66,4 L WA 89,7 98,3 102,3 105,4 105,9 103,4 98,6 87,8 111,1 Table 1: Average A-weighted sound pressure level L pa in db re. 20 µpa, and calculated sound power level L WA in db re. 1 pw. The noise level for each measurement position is stated in Appendix The character of the noise Subjectively there were no clear audible tones or impulses at the measurement positions. 7. Uncertainty According to ref. 2, the measurement uncertainty σ is determined by the plant design and the average measurement distance. According to ref. 2 the measurement uncertainty is -2 db. This results in an extended uncertainty δ which in this case for the plant will be: δ = 1,7 σ = 1,7 2 = 3,4 db Page 6 of 8

10 8. References 1. Vejledning nr. 5/1993: Beregning af ekstern støj fra virksomheder 2. ISO 8297: Acoustics Determination of sound power levels of multisource industrial plants for evaluation of sound pressure levels in the environment Engineering method 9. Measurement equipment The following equipment was used: Instrument Model Serial no. Sound & Vib.analyzer Svantek 979 No Calibrator 0.1dB-Stell No Microphone G.R.A.S. 40 EA No Page 7 of 8

11 Appendix 1 Results Frequency [Hz] k 2k 4k 8k sum Average 45,5 53,8 58,0 60,8 61,3 58,7 53,4 42,1 66,5 L pa,1 40,1 48,7 51,6 56,9 58,3 56,0 50,1 39,8 62,8 L pa,2 see note in paragrapg 2 L pa,3 35,7 47,4 48,4 53,2 55,1 53,0 48,1 37,3 59,6 L pa,4 34,3 45,9 47,8 51,4 52,9 51,4 48,6 38,4 58,1 L pa,5 36,4 48,0 50,6 53,6 54,7 52,7 50,0 39,7 60,0 L pa,6 37,8 49,3 50,6 53,6 54,6 52,9 49,7 38,6 60,1 L pa,7 41,1 51,4 56,1 58,6 57,9 56,1 52,2 41,8 63,9 L pa,8 41,4 50,0 54,7 59,2 58,3 56,4 51,9 40,2 64,0 L pa,9 48,4 56,8 59,0 62,1 61,9 59,6 54,8 43,2 67,6 L pa,10 45,6 55,3 60,9 64,4 64,2 63,1 58,6 46,2 69,9 L pa,11 44,9 56,4 58,8 62,3 62,3 60,4 55,3 42,4 67,8 L pa,12 46,2 54,3 58,6 61,1 62,0 58,3 51,7 39,6 66,8 L pa,13 52,7 57,3 61,9 65,0 66,6 63,1 56,5 45,9 71,0 L pa,14 49,4 58,6 63,7 65,2 65,4 61,9 55,8 45,7 70,8 L pa,15 47,5 53,7 57,6 60,2 61,1 57,6 51,6 40,2 65,9 L pa,16 39,5 47,9 52,4 56,5 57,5 54,2 47,7 35,6 62,0 Page 8 of 8

12 APPENDIX 2: MEASUREMENTS AND MODELLING OF NOISE AT VENDSYSSEL-1 FIRST SAMPLE ROUND. 8 TH JULY GOLDER.

13 July Projekt nr HSE Coordinator Rachel Keown TOTAL E&P DENMARK B.V. Nyhavn 43, 2 DK-1051 København K Denmark DK Environmental Monitoring MEASUREMENTS AND MODELLING OF NOISE AT VENDSYSSEL-1 FIRST SAMPLE ROUND To Rachel Keown As part of the environmental monitoring program Golder Associates A/S with the assistance of 103, a specialist company certified for sound measurements and modelling, has conducted the first sound monitoring round. The noise monitoring aimed to identify how the baseline noise pattern is modified by the project. The noise monitoring consists of two measurements; a short time measurement of the source strength and a period of continuous measurement at the six nearest dwellings around the site and at the site. The full reports can be seen in the appendix. The final reports were delivered from 103 to Golder and Total at July 7th It is Golder s understanding that the reports answer the questions Frederikshavn Municipality has issued Total regarding noise, including mitigating measures. Best Regards GOLDER ASSOCIATES A/S Thomas Hougaard Consultant Marlene Thorman Approved Signatory Golder Associates A/S Maglebjergvej 6, 1., DK 2800 Kgs. Lyngby, Denmark Tel: Fax: Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America Registered in Denmark at Maglebjergvej 6, 1. sal, DK-2800 Kgs. Lyngby, Denmark. CVR Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation.

14 APPENDIX 3: TECHNICAL NOTE: ENVIRONMENTAL NOISE CALCULATIONS TO USE WITHIN DECISIONS MAKING IN ENVIRONMENTAL MATTERS JULY 2015.

15 Technical note 7. juli 2015 Telefon: Our ref.:snt QA.: REH Dok: REH UK Subject: Environmental noise Shale gas drilling, Total, Dybvad To: Marlene Thorman, Golder Associates A/S. From: René Hansen Concerning: Environmental noise calculations to use within decisions making in environmental matters. Summary The expected Noise Rating Level L r has been calculated in 7 receiver positons which are pointed out to be closest to the shale gas drilling area of Total E&P Denmark. The sound power level of the noise sources are based on measurements of the existing plant. The measurement of the sound power level is described in report 2022-Lydeffektbestemmelse ISO-8297 Total Dybvad, document no. SNT L r Weekdays Saturday Sunday Evenin Forenoo Afternoo Evenin Evenin Day g Night n n g Night Day g Night MP1. Skævevej ,1 44,1 44,1* 44,1 44,1 44,1 44,1* 44,1 44,1 44,1* MP1 Skævevej sal 46,2 46,2 46,2* 46,2 46,2 46,2 46,2* 46,2 46,2 46,2* MP2. Skævevej ,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 MP3. Skævevej ,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 MP4. Skævevej ,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 MP4 Skævevej sal 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 MP5. Ovnstrupvej 6 47,4 47,4 47,4* 47,4 47,4 47,4 47,4* 47,4 47,4 47,4* MP5 Ovnstrupvej 6 1. sal 51,0 51,0* 51,0* 51,0 51,0* 51,0* 51,0* 51,0* 51,0* 51,0* MP6. Blåkildevej 18 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 MP7 On Site 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 Calculated Noise Rating Level at receiver positions in db(a) re. 20 µpa. Based on these calculations it is most likely that the noise limits are exceeded in the evening- and night periods at receiver positions MP1, MP2 and MP5. The uncertainties of the calculations are 3.7dB. The recommended noise limit is thereby exceeded significantly at receivers MP1 and MP5 during weekdays (in the periods evening and night), Saturday (afternoon, evening and night) and Sunday (day, evening and night) respectively. All (marked*). Østerbro Tommerup Tlf.: CVR nr.: Rådgivende ingeniørselskab Page 1 of 10

16 Table of contents 1. Introduction The environment and noise sources of the drilling area Noise limits Background noise The method used for calculation Assumptions and sound power levels Results The character of the noise Conclusion References... 8 Page 2 of 10

17 1. Introduction On behalf of Total E&P via Golder Associates A/S 103 ApS has carried out noise calculations related to the activity of shale gas drilling at Dybvad. The calculations document the noise exposure in the immediate area. 2. The environment and noise sources of the drilling area Total E&P Denmark shale gas drilling (named the company) is located at Ovnsturpvej in open countryside approximately 5 km northwest of Dybvad in Nordjylland. The company primarily consists of a drilling rig and associated diesel generators, auxiliaries, mud systems and equipment for handling drill pipes. See Appendix 1. The area is defined as open country. Ovnstrupvej 6 which is the nearest receiver position is located north east of the company. The terrain is predominantly acoustical soft. The company belongs to and is operated by Total E&P Denmark. An overview of the area and the receiver positions are shown in Fejl! Henvisningskilde ikke fundet.. The nearest residential area an receiver point is Ovnstrupvej 6 which is approximately 240 m from the company. Page 3 of 10

18 N Figure 1: Plan of the area. The reference points are indicated as shown below: MP1 Skævevej 112 MP2 Skævevej 111 MP3 Skævevej 104 MP4 Skævevej 108 MP5 Ovnstrupvej 6 MP6 Blåkildevej 18 MP7 On site Page 4 of 10

19 3. Noise limits The recommended noise limits for the area of the receiver positions are according to the Environmental Protection Agency s department guideline no. 5/1984 Ekstern støj fra virksomheder as shown in Table 1. On Fejl! Henvisningskilde ikke fundet. the geographical location of the receiver positions are shown related to the company. Time period Monday-Friday Kl. 07:00-18:00 Saturday Kl. 07:00-14:00 Monday-Friday Kl. 18:00-22:00 Saturday Kl. 14:00-22:00 Sunday Kl. 07:00-22:00 All week Kl. 22:00-07:00 MP1. Skævevej MP2. Skævevej MP3. Skævevej MP4. Skævevej MP5. Ovnstrupvej MP6. Blåkildevej MP7. On Site Table 1: Recommende limits for Noise Rating Level (L r in db(a) re. 20 µpa) applied to outdoor noise in free field. 4. Background noise The background noise is estimated to primarily from traffic on surrounding roads. 5. The method used for calculation The calculation of the environmental noise is carried out according to the Environmental Protection Agency s guideline in ref. 1. The calculation includes general data about distances, acoustic properties of the terrain, sound barriers and buildings, etc. All relevant noise sources are modeled as an area source indicating the position and the sound power. The calculation has been carried out using SoundPlan, ver. 7.3, Update The location of the noise source is shown in Appendix 1. The following symbols have been used: : Area source (eg. Generators, mud pumps etc.) Page 5 of 10

20 6. Assumptions and sound power levels Noise data which is used as input for the calculations are measured and calculated sound power levels of the existing plant and is described in report 2022-Lydeffektbestemmelse ISO-8297 Total Dybvad, document no. SNT The major noise sources during drilling are as follows: Power Generators Generators and mud pumps It is assumed that all fixed noise sources at the plant are operating at 100 % around the clock seven days a week. The height and acoustic center of the noise source is about 2 m above ground. At the nearest receiver position MP5 the distance to the nearest noise sources are about meters. 7. Results Noise calculations have been carried related to 7 receiver positions around the company. At each receiver position a height of 1.5 m above the local terrain is used. However at MP1, MP4 and MP5 a receiver height corresponding to 1 st floor has also been used. The location of the receiver positions are shown in Fejl! Henvisningskilde ikke fundet.. L Aeq Weekdays Saturday Sunday Day Evening Night Forenoon. Afternoon Evening Night Day Evening Night MP1. Skævevej ,1 44,1 44,1 44,1 44,1 44,1 44,1 44,1 44,1 44,1 MP1 Skævevej sal 46,2 46,2 46,2 46,2 46,2 46,2 46,2 46,2 46,2 46,2 MP2. Skævevej ,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 MP3. Skævevej ,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 MP4. Skævevej ,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 MP4 Skævevej sal 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 MP5. Ovnstrupvej 6 47,4 47,4 47,4 47,4 47,4 47,4 47,4 47,4 47,4 47,4 MP5 Ovnstrupvej 6 1. sal 51,0 51,0 51,0 51,0 51,0 51,0 51,0 51,0 51,0 51,0 MP6. Blåkildevej 18 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 MP7 On Site 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 Table 2: Calculated equivalent A-weighted sound pressure level in db(a) re. 20 µpa at each receiver position. For information an ISO noise contour map showing the noise level around the company is attached (see Appendix 2) The noise contour map is calculated at a receiver height of 1.5 m and a grid size of 5 m. It should be mentioned that when calculating ISO noise contour maps the software program includes reflections for receiver positions close to buildings. These levels can therefore be up to 3 db than free field levels. Page 6 of 10

21 The uncertainty of the calculated noise levels are carried out according to ref. 3 and are calculated to 3.7dB. 8. The character of the noise It is no expected that the company will give rise to clearly audible tones in the surrounding receiver positions. In the document no. REH Immissionsmåling af støj fra Total E&P, Denmark, Skifergas-boring, Dybvad tone analysis has been carried out at the nearest receiver position resulting in no clearly audible tones. Likewise no clearly audible impulses could be detected. Therefore no 5 db annoyance penalty has been added to the calculated equivalent A-weighted sound pressure level L Aeq. The noise rating level L r is therefore equals the calculated sound pressure level L Aeq. 9. Conclusion Noise calculations of the expected Noise Rating Level have been carried out in 7 receiver positions in the nearest surroundings to Total E&P Denmark shale gas drilling. Noise data which is used as input for the calculations are measured and calculated sound power levels of the existing plant and is described in report 2022-Lydeffektbestemmelse ISO-8297 Total Dybvad, document no. SNT Weekdays Saturday Sunday L r Day Evening Night Forenoon Afternoon Evening Night Day Evening Night MP1. Skævevej ,1 44,1 44,1* 44,1 44,1 44,1 44,1* 44,1 44,1 44,1* MP1 Skævevej sal 46,2 46,2 46,2* 46,2 46,2 46,2 46,2* 46,2 46,2 46,2* MP2. Skævevej ,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 43,4 MP3. Skævevej ,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 39,8 MP4. Skævevej ,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 40,0 MP4 Skævevej sal 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 42,1 MP5. Ovnstrupvej 6 47,4 47,4 47,4* 47,4 47,4 47,4 47,4* 47,4 47,4 47,4* MP5 Ovnstrupvej 6 1. sal 51,0 51,0* 51,0* 51,0 51,0* 51,0* 51,0* 51,0* 51,0* 51,0* MP6. Blåkildevej 18 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 38,9 MP7 On SIte 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 63,6 Calculated Noise Rating Level L r in db(a) re. 20 µpa at receiver positions. Based on these calculations it is most likely that the noise limits are exceeded in the evening- and night periods at receiver positions MP1, MP2 and MP5. The uncertainties of the calculations are 3.7dB. The recommended noise limit is thereby exceeded significantly at receivers MP1 and MP5 during weekdays (in the periods evening and night), Saturday (afternoon, evening and night) and Sunday (day, evening and night) respectively. All (marked*). Page 7 of 10

22 10. References 1. Beregning af ekstern støj fra virksomheder Vejledning nr. 5, 1993 Miljøstyrelsen 2. Ekstern støj fra virksomheder Vejledning nr. 5, 1984 Miljøstyrelsen. 3. Orientering nr. 3 Usikkerhed på beregnede niveauer af ekstern støj fra virksomheder Referencelaboratoriet Page 8 of 10

23 Appendix 1 Overview of noise sources Page 9 of 10

24 Appendix 2 ISO-Noise contour map Page 10 of 10

ORIENTERING FRA MILJØSTYRELSENS REFERENCELABORATORIUM FOR STØJMÅLINGER

ORIENTERING FRA MILJØSTYRELSENS REFERENCELABORATORIUM FOR STØJMÅLINGER ORIENTERING FRA MILJØSTYRELSENS Environmental noise regulation in Denmark Orientering nr. 45 JEL/PFI/ilk 17. januar 2012 This paper gives an overview of the Danish legislation in dealing with environmental

More information

As a minimum, the report must include the following sections in the given sequence:

As a minimum, the report must include the following sections in the given sequence: 5.2 Limits for Wind Generators and Transformer Substations In cases where the noise impact at a Point of Reception is composed of combined contributions due to the Transformer Substation as well as the

More information

Noise from large wind turbines (with focus on low frequencies)

Noise from large wind turbines (with focus on low frequencies) Noise from large wind turbines (with focus on low frequencies) Christian Sejer Pedersen M.Sc. EE., Ph. D. Associate professor Acoustics, Department of Electronic Systems, Aalborg University Fredrik Bajers

More information

Proposed Operation of a Pre Shredder. Ward Recycling, Griffon Road, Ilkeston, Derbyshire. Noise Assessment. Report Number: R15.

Proposed Operation of a Pre Shredder. Ward Recycling, Griffon Road, Ilkeston, Derbyshire. Noise Assessment. Report Number: R15. Ward Recycling, Griffon Road, Ilkeston, Derbyshire Date: 3 rd August 2015 Report Number: R15.1100-2-AG Spire Environmental Consultants Limited Dunston Innovation Centre Dunston Road Chesterfield S41 8NG

More information

WA PREMIX (WA LIMESTONE)

WA PREMIX (WA LIMESTONE) Rochdale Holdings Pty Ltd A.B.N. 85 009 049 067 trading as: HERRING STORER ACOUSTICS Suite 34, 11 Preston Street, Como, W.A. 6152 P.O. Box 219, Como, W.A. 6952 Telephone: (08) 9367 6200 Facsimile: (08)

More information

Trans Bay Cable Project (400 MW) Preliminary Audible Noise Study

Trans Bay Cable Project (400 MW) Preliminary Audible Noise Study Page 1 of 5 Preliminary Audible Noise Study Pittsburg 10 th Street, N-S Orientation Rev. Date Section Page Remarks Signature 0 17.11.06 all all first issue Page 2 of 5 1 Audible Noise Study 1.1 Basis The

More information

11.0 NOISE EMISSIONS RISKS AND MANAGEMENT

11.0 NOISE EMISSIONS RISKS AND MANAGEMENT 11.0 NOISE EMISSIONS RISKS AND MANAGEMENT This PER and associated appendices make reference to both the Approved Gorgon Gas Development and the Revised Gorgon Gas Development, which is the subject of this

More information

Noise Design Advice. Noise can be a major factor to consider in any new development.

Noise Design Advice. Noise can be a major factor to consider in any new development. Noise Design Advice Noise can be a major factor to consider in any new development. This design advice is to help those involved in development in Leeds achieve an acceptable noise environment for people

More information

Investigation of sound insulation for a Supply Air Window field measurements and occupant response

Investigation of sound insulation for a Supply Air Window field measurements and occupant response Investigation of sound insulation for a Supply Air Window field measurements and occupant response Lars Sommer SØNDERGAARD 1 ; Søren Vase LEGARTH 2 1 DELTA, Denmark ABSTRACT The Danish Environmental Protection

More information

Acoustic Terms, Definitions and General Information

Acoustic Terms, Definitions and General Information Acoustic Terms, Definitions and General Information Authored by: Daniel Ziobroski Acoustic Engineer Environmental and Acoustic Engineering GE Energy Charles Powers Program Manager Environmental and Acoustic

More information

Unique Visits. Returning Visits Total 1,538 1, Average Unique Visits

Unique Visits. Returning Visits Total 1,538 1, Average Unique Visits Side 1 af 9 30-10- 15:11:04 30 October Summary Log: No Limit Total 1,538 1,186 771 415 Average 5 4 3 1 Day Date Sunday 30th October 7 3 3 0 Saturday 29th October 2 1 0 1 Friday 28th October 2 2 1 1 Thursday

More information

Environment Protection Act 1970

Environment Protection Act 1970 Environment Protection Act 1970 STATE ENVIRONMENT PROTECTION POLICY (CONTROL OF MUSIC NOISE FROM PUBLIC PREMISES) No. N-2 No. S43, 18/7/1989, Gazette 3/8/1989 As varied 16/3/1999, No. G12, Gazette 25/3/1999

More information

TECHNICAL GUIDELINE. Requirements For The Reduction Of Construction and Demolition Noise

TECHNICAL GUIDELINE. Requirements For The Reduction Of Construction and Demolition Noise إرشاد فني TECHNICAL GUIDELINE Number رقم (9) متطلبات خفض الضجيج الناتج من أعمال البناء أو الهدم Requirements For The Reduction Of Construction and Demolition Noise أبريل April 2011 قسم الدراسات والتخطيط

More information

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT Appendix E Environmental Noise Impact Assessment Executive Summary The purpose of this environmental

More information

One noise monitoring location currently being used- AN2. The sound meter records in the 1/3 octave band.

One noise monitoring location currently being used- AN2. The sound meter records in the 1/3 octave band. Weekly Environmental Report Corrib Gas Pipeline th Week Ending 7 September 2011 1 Monitoring Data 1.1 Monitoring Equipment Noise Weather Station TSS Sondes Discharge pipe flow One noise monitoring location

More information

An Introduction to Sound and Wind Turbines. Mark Bastasch, PE March 2011

An Introduction to Sound and Wind Turbines. Mark Bastasch, PE March 2011 An Introduction to Sound and Wind Turbines Mark Bastasch, PE March 2011 What is Sound? A rapid pressure fluctuation above and below the static atmospheric pressure measured in decibels (db) Typical sound

More information

NORD2000 VS. THE EXISTING NORDIC PROPAGATION MODELS

NORD2000 VS. THE EXISTING NORDIC PROPAGATION MODELS NORD2000 VS. THE EXISTING NORDIC PROPAGATION MODELS John Klinkby DELTA Danish Electronics, Light & Acoustics Abstract: After more than 5 years the developers completed the new Nordic propagation model

More information

Acoustic Assessment Report HAF Wind Energy Project Township of West Lincoln, Ontario

Acoustic Assessment Report HAF Wind Energy Project Township of West Lincoln, Ontario Acoustic Assessment Report HAF Wind Energy Project Township of West Lincoln, Ontario Prepared for: Vineland Power Inc. 222 Martindale Road St. Catharines, Ontario L2R 7A3 Prepared by: Ian R. Bonsma, PEng

More information

Compliance Noise Monitoring

Compliance Noise Monitoring Monitoring Byron Centre The Manse Road Myocum HEALTH SCIENCE ENVIROMENTAL EDUCATION ENVIRONMENTAL AUDITOR Monitoring Byron Centre The Manse Road Myocum Prepared for: Byron Shire Council Version 1.0 Date:

More information

Assessment of low-frequency noise due to windturbines in relation to low-frequency background

Assessment of low-frequency noise due to windturbines in relation to low-frequency background Assessment of low-frequency noise due to windturbines in relation to low-frequency background noise Eugène de Beer (e.debeer@peutz.nl) Peutz bv, Paletsingel 2, 2718 NT, Zoetermeer, The Netherlands. Summary

More information

Pemberton Sawmill Noise Regulation 17 Variation. Auswest Timbers Pty Ltd

Pemberton Sawmill Noise Regulation 17 Variation. Auswest Timbers Pty Ltd Pemberton Sawmill Noise Regulation 17 Variation Auswest Timbers Pty Ltd Report 1366 Regulation 17 Report 20 September 2010 Released: 20/09/10 Comment period closes: 18/10/10 ISSN 1836-0483 (Print) ISSN

More information

A model noise declaration to satisfy the European Machinery and Outdoor Noise Directives

A model noise declaration to satisfy the European Machinery and Outdoor Noise Directives A model noise declaration to satisfy the European Machinery and Outdoor Noise Directives Paul BRERETON 1 Health and Safety Executive, United Kingdom ABSTRACT A forestry woodchipper has been used to produce

More information

Attended Noise Monitoring - Quarter Ending December 2013

Attended Noise Monitoring - Quarter Ending December 2013 Big Island Mining Pty Ltd Majors Creek Road Majors Creek Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

BEDELL CORPORATE TRUSTEES LIMITED AND ATRIUM TRUSTEES LIMITED AS JOINT TRUSTEES OF THE BURTON ROAD UNIT TRUST

BEDELL CORPORATE TRUSTEES LIMITED AND ATRIUM TRUSTEES LIMITED AS JOINT TRUSTEES OF THE BURTON ROAD UNIT TRUST Branston Depot, Burton on Trent BEDELL CORPORATE TRUSTEES LIMITED AND ATRIUM TRUSTEES LIMITED AS JOINT TRUSTEES OF THE BURTON ROAD UNIT TRUST Technical Report 13-IAC002 February 13 Innovate Acoustics is

More information

Planning Statement. Project Prince William School, Oundle. Prepared for Lend Lease

Planning Statement. Project Prince William School, Oundle. Prepared for Lend Lease Planning Statement Project Prince William School, Oundle Prepared for Lend Lease Published 7 September 2015 Telephone +44(0)1787 247595 Website www.srltsl.com London, Birmingham, Manchester, Sudbury Quality

More information

MEMORANDUM. We request that you pass this report on to other members of the Team as required.

MEMORANDUM. We request that you pass this report on to other members of the Team as required. MEMORANDUM TO: Odete Pinho, HB Lanarc DATE: Jan. 17, 2013 FAX NO: 604- FILE NO.: HBL.001.12 FROM: Daniel Lyzun, P. Eng.; David Hung, B. Eng. PAGE: 1 of 6 SUBJECT: Proposed MK Delta Option 4 Project, Delta,

More information

5 COMPLIANCE ASSESSMENT RESULTS

5 COMPLIANCE ASSESSMENT RESULTS 5 COMPLIANCE ASSESSMENT RESULTS In this section, the detailed results of the compliance assessment are reported for each residential receiver in turn. It is noted that the baseline survey described in

More information

Re: Wildwood, 2-6 High Street, Kingston, KT1 1EY - Proposed Restaurant - External Plant Noise Assessment - Revised

Re: Wildwood, 2-6 High Street, Kingston, KT1 1EY - Proposed Restaurant - External Plant Noise Assessment - Revised Ref: MDR/J2553b 7 th September 2015 Extracair Installations Ltd Endeavour House 59-61 Sterte Avenue West Poole Dorset BH15 2AJ For the attention of Mr J Emery Dear Sirs Re: Wildwood, 2-6 High Street, Kingston,

More information

Comparison of predicted and measured wind farm noise levels and implications for assessments of new wind farms

Comparison of predicted and measured wind farm noise levels and implications for assessments of new wind farms Paper Number 30, Proceedings of ACOUSTICS 2011 2-4 November 2011, Gold Coast, Australia Comparison of predicted and measured wind farm noise levels and implications for assessments of new wind farms Tom

More information

The existing 2006 wind energy development guidance limit criteria are interpreted as allowing the following limits for wind turbine noise:

The existing 2006 wind energy development guidance limit criteria are interpreted as allowing the following limits for wind turbine noise: Department of Environment, Community and Local Government 20 th February 2014 Re: Response to Draft Revised Planning Guidelines Dear Sir/Madam, Element Power (EPI) welcomes the opportunity to make a submission

More information

Dynamic sound source for simulating the Lombard effect in room acoustic modeling software

Dynamic sound source for simulating the Lombard effect in room acoustic modeling software Dynamic sound source for simulating the Lombard effect in room acoustic modeling software Jens Holger Rindel a) Claus Lynge Christensen b) Odeon A/S, Scion-DTU, Diplomvej 381, DK-2800 Kgs. Lynby, Denmark

More information

GUIDELINE ON BOUNDARY NOISE LIMIT FOR AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS IN NON-INDUSTRIAL BUILDINGS

GUIDELINE ON BOUNDARY NOISE LIMIT FOR AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS IN NON-INDUSTRIAL BUILDINGS GUIDELINE ON BOUNDARY NOISE LIMIT FOR AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS IN NON-INDUSTRIAL BUILDINGS 1. Scope This guideline sets out the maximum boundary noise emission limits for air

More information

Façade acoustic design strategy Proposed residential development Irvin Avenue, Saltburn

Façade acoustic design strategy Proposed residential development Irvin Avenue, Saltburn strategy Proposed residential development Report Number: 1420.1 Version: A Date: 13 th October 2008 Prepared by: Checked by: Andrew Gibson Jack Harvie-Clark Apex Acoustics Limited Design Works William

More information

Miljøudvalget 2013-14 MIU Alm.del Bilag 422 Offentligt

Miljøudvalget 2013-14 MIU Alm.del Bilag 422 Offentligt Miljøudvalget 2013-14 MIU Alm.del Bilag 422 Offentligt Project: 24-01-2014 18:57 / 1 DECIBEL - Main Result Calculation: 10x Vestas V117-3.3 MW+ all existing WTGs - værditab Noise calculation model: Danish

More information

INTER-NOISE 2006 3-6 DECEMBER 2006 HONOLULU, HAWAII, USA

INTER-NOISE 2006 3-6 DECEMBER 2006 HONOLULU, HAWAII, USA INTER-NOISE 2006 3-6 DECEMBER 2006 HONOLULU, HAWAII, USA An effective new approach to isolate plumbing stub-outs in residential construction Jeffrey P. Kwolkoski, P.E., INCE Bd. Cert. a D. L. Adams Associates,

More information

Noise impact assessment of mass rapid transit systems in Delhi city

Noise impact assessment of mass rapid transit systems in Delhi city Indian Journal of Pure & Applied Physics Vol. 49, April 2011, pp. 257-262 impact assessment of mass rapid transit systems in Delhi city Naveen Garg a, Omkar Sharma a & S Maji b a Acoustics, Ultrasonic,

More information

Proceedings of Meetings on Acoustics

Proceedings of Meetings on Acoustics Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Education in Acoustics Session 2aED: Tools for Teaching Advanced Acoustics

More information

WindPRO version 2.9.207 Apr 2013 Project:

WindPRO version 2.9.207 Apr 2013 Project: WindPRO version.9.07 Apr 0 Printed/Pae Windpark Linewaard 9-6-0 :0 / NL-98 MK Odijk + 6 7 876 DECIBEL - Main Result Calculation: x N7-.MW-0mHH - mode - ord DUTCH RULES FOR NOISE CALCULATION. The calculation

More information

TABLE OF CONTENTS. I. Introduction II. Evaluation of Noise Exposure. -2- A. Initial Determination -2- B. Periodic Monitoring.

TABLE OF CONTENTS. I. Introduction II. Evaluation of Noise Exposure. -2- A. Initial Determination -2- B. Periodic Monitoring. TABLE OF CONTENTS I. Introduction.. -2- II. Evaluation of Noise Exposure. -2- A. Initial Determination -2- B. Periodic Monitoring. -2- C. Corrective Actions.. -3- III. Engineering and Administrative Control

More information

Active noise control in practice: transformer station

Active noise control in practice: transformer station Active noise control in practice: transformer station Edwin Buikema 1 ; Fokke D. van der Ploeg 2 ; Jan H. Granneman 3 1, 2, 3 Peutz bv, Netherlands ABSTRACT Based on literature and extensive measurements

More information

THE USE OF MEASUREMENTS & GPS FOR NOISE MAPPING. Douglas Manvell

THE USE OF MEASUREMENTS & GPS FOR NOISE MAPPING. Douglas Manvell THE USE OF MEASUREMENTS & GPS FOR NOISE MAPPING Douglas Manvell Brüel & Kjær Sound & Vibration Measurements A/S Skodsborgvej 307, 2850 Nærum dmanvell@bksv.com BNAM2004-1 1. INTRODUCTION The following gives

More information

MCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises

MCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises MCS 020 MCS Planning Standards For permitted development installations of wind turbines and air source heat pumps on domestic premises This Standard is the property of Department of Energy and Climate

More information

Project Report. EFP-06 project Low Frequency Noise from Large Wind Turbines. Measurements of Sound Insulation of Facades

Project Report. EFP-06 project Low Frequency Noise from Large Wind Turbines. Measurements of Sound Insulation of Facades We help ideas meet the real world Project Report EFP-06 project Low Frequency Noise from Large Wind Turbines Measurements of Sound Insulation of Facades Client: Danish Energy Authority Page 1 of 27 30

More information

DATE: July 12, 2004 SUBJECT: Gaudet School Chiller Noise Survey Results

DATE: July 12, 2004 SUBJECT: Gaudet School Chiller Noise Survey Results 799 MIDDLESEX TNPK. BILLERICA MA 01821-3445 PHONE: 978-670-5339 FAX: 978-667-7047 E-mail: nonoise@ noise-control.com JOB MEMO TO: John McKenney COMPANY: McKenney Mechanical Contractors, Inc. FROM: Jesse

More information

TM ETRS-TM35FIN-ETRS89 WTG

TM ETRS-TM35FIN-ETRS89 WTG DECIBEL - Main Result Calculation: 6 x V126 x HH150 Noise calculation model: ISO 9613-2 General Wind speed: 8,0 m/s Ground attenuation: General, Ground factor: 0,4 Meteorological coefficient, C0: 0,0 db

More information

RONDA - CPX Trailer Initial Test Results

RONDA - CPX Trailer Initial Test Results RONDA - CPX Trailer Initial Test Results Renzo TONIN; Attila SZABO Renzo Tonin & Associates (NSW) Pty Ltd, 1/418A Elizabeth St, SURRY HILLS, NSW 2010 Australia ABSTRACT RONDA (ROad Noise Data Acquirer)

More information

Proposed Residential Development Former Llantarnam School and Leisure Centre Llantarnam NP44 3XB. Environmental Noise Assessment 4089/ENS1_Rev2

Proposed Residential Development Former Llantarnam School and Leisure Centre Llantarnam NP44 3XB. Environmental Noise Assessment 4089/ENS1_Rev2 Proposed Residential Development Former Llantarnam School and Leisure Centre Llantarnam NP44 3XB Environmental Noise Assessment 4089/ENS1_Rev2 4 th May 2016 For: Barratt Homes (South Wales) Ltd Oak House,

More information

A Noise Impact. Assessment of a Proposal. for a Concrete Block. Making Plant at Neilson s. Railway Sidings, Ise Valley. Industrial Estate,

A Noise Impact. Assessment of a Proposal. for a Concrete Block. Making Plant at Neilson s. Railway Sidings, Ise Valley. Industrial Estate, A Noise Impact Assessment of a Proposal for a Concrete Block Making Plant at Neilson s Railway Sidings, Ise Valley Industrial Estate, Wellingborough, Northamptonshire. D F Sharps C Eng FIMechE FIOA Acoustic

More information

5 Air Quality Impact Assessment During Operation at Tsing Yi

5 Air Quality Impact Assessment During Operation at Tsing Yi 5 Air Quality Impact Assessment During Operation at Tsing Yi 5.1 Introduction 5.1.1 With consideration of the nature of construction activities involved for the decommissioning of the Dock at Yam O Wan

More information

Noise Reduction of Dental Drill Noise

Noise Reduction of Dental Drill Noise Mechatronics 2008, June 23 25, University of Limerick, Ireland 1 Noise Reduction of Dental Drill Noise K R G Rotter *1, M A Atherton 2, E Kaymak 2 and B Millar 3 1 Department of Engineering Systems, London

More information

HIGHWAY 404 Extension

HIGHWAY 404 Extension HIGHWAY 404 Extension Public Information Centre for the Noise Study at Hwy 404 Extension April 13, 2015 Welcome Welcome to the Public Information Centre for the Highway 404 Extension Noise Study. Purpose:

More information

user s manual d:facto vocal mic

user s manual d:facto vocal mic user s manual d:facto vocal mic www.dpamicrophones.com/dfacto Application and use The DPA d:facto vocal mic is a high quality stage microphone with extraordinary natural sound, high separation from nearby

More information

Figure 1: The existing 12 300 kw turbines with the Avedøre power plant, source [3].

Figure 1: The existing 12 300 kw turbines with the Avedøre power plant, source [3]. HVIDOVRE OFFSHORE WIND FARM Hans Christian Sørensen SPOK ApS / Hvidovre Vindmøllelaug I/S, Blegdamsvej 4, DK 2200, Copenhagen N, Denmark, E-mail: consult@spok.dk, Phone: +45 35360219/+45 28110219, Fax:

More information

CFD Beyond the Whitespace. Datacentres Central & Eastern Europe

CFD Beyond the Whitespace. Datacentres Central & Eastern Europe CFD Beyond the Whitespace Datacentres Central & Eastern Europe September 2013 CONTENTS 1.0 Introduction 2.0 What is CFD? How it Works CFD in Data Centres 3.0 CFD Outside the White Space Case Study 4.0

More information

Ultrasonic Gas Leak Detection

Ultrasonic Gas Leak Detection Ultrasonic Gas Leak Detection What is it and How Does it Work? Because every life has a purpose... Ultrasonic Gas Leak Detection Introduction Ultrasonic gas leak detection (UGLD) is a comparatively recent

More information

COMPARISON OF METHODOLOGIES FOR CONTINU- OUS NOISE MONITORING AND AIRCRAFT DETECTION IN THE VICINITY OF AIRPORTS

COMPARISON OF METHODOLOGIES FOR CONTINU- OUS NOISE MONITORING AND AIRCRAFT DETECTION IN THE VICINITY OF AIRPORTS COMPARISON OF METHODOLOGIES FOR CONTINU- OUS NOISE MONITORING AND AIRCRAFT DETECTION IN THE VICINITY OF AIRPORTS Alejandro Osses Vecchi Laboratory of Acoustics, Sociedad Acustical S.A., C.P. 7770563, Ñuñoa,

More information

Sound Power Level determination of AEG KM880 electrically operated food preparation appliance

Sound Power Level determination of AEG KM880 electrically operated food preparation appliance Sound Power Level determination of AEG KM880 electrically operated food preparation appliance CHRISTER HEED AND ANDERS SÖRENSSON 4B1150 Stockholm March 2007 Marcus Wallenberg Laboratoriet för Ljud- och

More information

MONKTON PARK, CHIPPENHAM SKATE PARK. Noise Impact Assessment. Wiltshire Council 27 June 2013. www.machacoustics.com 0117 944 1388 Page 1 of 32

MONKTON PARK, CHIPPENHAM SKATE PARK. Noise Impact Assessment. Wiltshire Council 27 June 2013. www.machacoustics.com 0117 944 1388 Page 1 of 32 MONKTON PARK, CHIPPENHAM SKATE PARK Noise Impact Assessment Wiltshire Council 27 June 2013 www.machacoustics.com 0117 944 1388 Page 1 of 32 MONKTON PARK, CHIPPENHAM SKATE PARK Noise Impact Assessment Wiltshire

More information

Occupational Noise Exposure

Occupational Noise Exposure DRAFT SAMPLE WRITTEN Occupational Noise Exposure For Compliance With 1910.95 NOISE PROGRAM This Instruction: 1. Applies to all personnel. 2. With the exception of requirements for reference and termination

More information

Noise control technology. www.inercoacustica.com

Noise control technology. www.inercoacustica.com Noise control technology INERCO Acústica is the INERCO GROUP company specialized in engineering, developing technology, manufacturing and implementation of solutions for noise and vibration control. INERCO

More information

Charlton Christian College, Fassifern Master Plan Acoustic Assessment for the Proposed Facilities Upgrade

Charlton Christian College, Fassifern Master Plan Acoustic Assessment for the Proposed Facilities Upgrade Master Plan Acoustic Assessment for the Proposed Facilities Upgrade Report No. 20C-12-0116-TRP-266092-3 2 nd April 2013 Acoustics Vibration Air Quality Mechanical & Structural Systems Fluid Mechanics Sustainability

More information

Sound Power Measurement

Sound Power Measurement Sound Power Measurement A sound source will radiate different sound powers in different environments, especially at low frequencies when the wavelength is comparable to the size of the room 1. Fortunately

More information

The technology that lets you hear the fault only the fault! No traffic! No high heels! No talking! No noise!

The technology that lets you hear the fault only the fault! No traffic! No high heels! No talking! No noise! Silence Careful handling, night work and filtering was yesterday Today we have a new definition of silence The innovation in fault pinpointing Several new, innovative methods of the digiphone + will ensure

More information

Sound Intensity Testing Procedures for Determining Sound Power of HVAC Equipment

Sound Intensity Testing Procedures for Determining Sound Power of HVAC Equipment ANSI/AHRI Standard 230 2013 Standard for Sound Intensity Testing Procedures for Determining Sound Power of HVAC Equipment Approved by ANSI on April 15, 2014 IMPORTANT SAFETY DISCLAIMER AHRI does not set

More information

TECHNICAL APPENDIX A10.2: NOISE MONITORING CALIBRATION CERTIFICATES AND RECORD SHEETS

TECHNICAL APPENDIX A10.2: NOISE MONITORING CALIBRATION CERTIFICATES AND RECORD SHEETS Gorpley Wind Farm Technical Appendix A10.2 Environmental Statement Noise Monitoring Calibration Certificates and Record Sheets TECHNICAL APPENDIX A10.2: NOISE MONITORING CALIBRATION CERTIFICATES AND RECORD

More information

Basin Bridge project. Appendix B to Construction Environmental Management Plan - Proposed Construction Noise and Vibration Management Plan (CNVMP)

Basin Bridge project. Appendix B to Construction Environmental Management Plan - Proposed Construction Noise and Vibration Management Plan (CNVMP) Appendix B to Construction Environmental Management Plan - Proposed Construction Noise and Vibration Management Plan (CNVMP) Opus International Consultants Limited Central Laboratories 138 Hutt Park Road,

More information

Noise Assessment For Proposed EfW & IBA Facility. Paving Way North Hykeham Lincolnshire. For. Fichtner Consulting Engineers. Acting on Behalf of

Noise Assessment For Proposed EfW & IBA Facility. Paving Way North Hykeham Lincolnshire. For. Fichtner Consulting Engineers. Acting on Behalf of 56a Leabrooks Road Somercotes Derbyshire DE55 4HB Tel No: 01773 607483 Fax No: 01773 603331 E-mail: nvc.acoustics@btopenworld.com Noise Assessment For Proposed EfW & IBA Facility At Paving Way North Hykeham

More information

RD547 water leak detector

RD547 water leak detector Quick Start User Guide RD547 water leak detector 90/UG100INT/01 ISSUE 1 11/2014 Important: This guide provides basic operation instructions and is intended as a field reference only. It also contains important

More information

Best Available Techniques for Control of Noise & Vibration

Best Available Techniques for Control of Noise & Vibration Best Available Techniques for Control of Noise & Vibration R&D Technical Report P4-079/TR/1 S Mitchell Research Contractor: Environment Resources Management Publishing Organisation Environment Agency,

More information

WindPRO version Jan 2011 Project:

WindPRO version Jan 2011 Project: 20130312 21:03 / 1 DECIBEL Main Result Noise calculation model: ISO 96132 General Wind speed: m/s Ground attenuation: General, Ground factor: 0,5 Meteorological coefficient, C0: 0,0 db Type of demand in

More information

UNDERGROUND OPERATION INTEGRA COAL UNDERGROUND NOISE MANAGEMENT PROGRAM (NMP) EMS 002-3. Incorporating a Noise Monitoring Protocol

UNDERGROUND OPERATION INTEGRA COAL UNDERGROUND NOISE MANAGEMENT PROGRAM (NMP) EMS 002-3. Incorporating a Noise Monitoring Protocol UNDERGROUND OPERATION INTEGRA COAL UNDERGROUND NOISE MANAGEMENT PROGRAM (NMP) EMS 002-3 Incorporating a ise Monitoring Protocol 1: March 2007 TABLE OF CONTENTS Page 1 INTRODUCTION... 1 1.1 Background...

More information

FIRST CONCLUSION ABOUT THE END IMPLEMENTATION: EGRA SPANISH ROAD STRATEGIC NOISE MAPPING EXPERIENCE

FIRST CONCLUSION ABOUT THE END IMPLEMENTATION: EGRA SPANISH ROAD STRATEGIC NOISE MAPPING EXPERIENCE INTER-NOISE 2007 ISTANBUL, TURKEY FIRST CONCLUSION ABOUT THE END IMPLEMENTATION: EGRA SPANISH ROAD STRATEGIC NOISE MAPPING EXPERIENCE Itziar Aspuru, Jesús Rubio, Fernando Segués y Mariló Jiménez Fecha:

More information

Construction noise: overview of regulations of different countries

Construction noise: overview of regulations of different countries Construction noise: overview of regulations of different countries Jan H. Granneman 1 Peutz bv Paletsingel 2, 2718 NT Zoetermeer, Netherlands ABSTRACT Regulations for the control of construction noise

More information

EWEA Technology Workshop: Wind Turbine Sound 2014, Malmö Noise Protection Regulations for Wind Turbines in Germany

EWEA Technology Workshop: Wind Turbine Sound 2014, Malmö Noise Protection Regulations for Wind Turbines in Germany For our Environment EWEA Technology Workshop: Wind Turbine Sound 2014, Malmö Noise Protection Regulations for Wind Turbines in Germany Thomas Myck Andrea Bauerdorff Section I 3.4 Noise Abatement of Industrial

More information

COOKING THE ROOF CFD BEYOND THE WHITE SPACE

COOKING THE ROOF CFD BEYOND THE WHITE SPACE COOKING THE ROOF CFD BEYOND THE WHITE SPACE Alex Nock 20 November 2013 CONTENTS 1. Introduction» Introduction to RED» Modeling in Data Centres 1. What is CFD» How it works» CFD in Data Centres 3. Cooking

More information

Lynwood Quarry Minor Modification Noise Impact Assessment

Lynwood Quarry Minor Modification Noise Impact Assessment REPORT 30-1938 -R1 PREPARED FOR PO Box 838 TORONTO NSW 2283 1 SEPTEMBER 2010 HEGGIES PTY LTD ABN 29 001 584 612 PREPARED BY: Level 1, 14 Watt Street Newcastle NSW 2300 Australia (PO Box 1768 Newcastle

More information

DOCUMENTED PROCEDURE MANUAL

DOCUMENTED PROCEDURE MANUAL NAPIT REGISTERED INSTALLERS DOCUMENTED PROCEDURE MANUAL CONTENTS 1. INTRODUCTION 2. DEFINITIONS 3. RESPONSIBILITY FOR QUALITY 4. DOCUMENT AND DATA CONTROL 5. CUSTOMER ENQUIRIES AND QUOTATIONS 6. CONTRACTS

More information

SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR1 Teutonic Outswing Vinyl Entrance Door

SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR1 Teutonic Outswing Vinyl Entrance Door ACOUSTIC Page of 5 9/8/204 SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR Teutonic Outswing Vinyl Entrance Door Prepared for: Kolbe and Kolbe Millwork Co., Inc. Attn: Ms. Tasha Verhasselt 323

More information

Wavelength and End Correction in a Recorder

Wavelength and End Correction in a Recorder ISB Journal of Physics, Vol. 3, Iss. 1 January 2009 http://www.isjos.org Wavelength and End Correction in a Recorder Shuaihang (Susan) Wang Abstract The wavelength and end correction was investigated as

More information

Air Quality Assessment 326 Hume Highway, Bankstown

Air Quality Assessment 326 Hume Highway, Bankstown AFS Capital Pty Ltd L2, 210 Clarence Street Sydney NSW 2000 Attention: Alex Sicari Dear Alex (SLR) has been commissioned by AFS Capital Pty Ltd to provide an for a proposed mixed use development to be

More information

SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR2 Teutonic Outswing Vinyl Entrance Door

SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR2 Teutonic Outswing Vinyl Entrance Door ACOUSTIC Page of 5 SOUND TRANSMISSION CLASS TEST REPORT Series/Model: T-DR2 Teutonic Outswing Vinyl Entrance Door Prepared for: Kolbe and Kolbe Millwork Co., Inc. Attn: Ms. Tasha Verhasselt 323 South th

More information

The way a cabinet should sound. UCoustic Sound Proof Enclosures

The way a cabinet should sound. UCoustic Sound Proof Enclosures UCoustic Sound Proof Enclosures UCoustic Sound-Proof Enclosures Capable of up to 28.5DBa noise attenuation Independently tested by MIRA Test Laboratories (Sound Power Measurement in accordance with ISO3744)

More information

Construction Noise Management Guideline for Major Transport Infrastructure Projects

Construction Noise Management Guideline for Major Transport Infrastructure Projects th Proceedings of 20 International Congress on Acoustics, ICA 2010 23-27 August 2010, Sydney, Australia Construction Noise Management Guideline for Major Transport Infrastructure Projects Cedric Roberts,

More information

CASE STUDY. History. National Renewable Energy Laboratory Testing Wind Turbine Power Generators using PULSE. United States of America

CASE STUDY. History. National Renewable Energy Laboratory Testing Wind Turbine Power Generators using PULSE. United States of America CASE STUDY National Renewable Energy Laboratory Testing Wind Turbine Power Generators using PULSE United States of America Industrial Products PULSE The National Renewable Energy Laboratory (NREL) is operated

More information

Environmental and Social Review Summary. Can-Pack Ukraine

Environmental and Social Review Summary. Can-Pack Ukraine Environmental and Social Review Summary Can-Pack Ukraine This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed in advance of the MIGA Board consideration of the proposed

More information

Data Centres A complete solution to noise control and acoustic packages

Data Centres A complete solution to noise control and acoustic packages Data Centres A complete solution to noise control and acoustic packages Introduction World class noise control. Expertise you can trust. IAC Acoustics is world-renowned for providing cost effective solutions

More information

Noise risk as described in instructions for printing machinery supplied in Europe

Noise risk as described in instructions for printing machinery supplied in Europe Noise risk as described in instructions for printing machinery supplied in Europe Paul Brereton Health and Safety Executive, Liverpool, United Kingdom. Jacqueline Patel Health and Safety Laboratory, Buxton,

More information

LABORATORY MEASUREMENTS ON THE EFFICIENCY OF SOUND REDUCING FURNITURE PADS OF TYPE SILENT SOCKS

LABORATORY MEASUREMENTS ON THE EFFICIENCY OF SOUND REDUCING FURNITURE PADS OF TYPE SILENT SOCKS Report 08-113-R1 06/11/2008 4 pages, 1 appendix Akustikverkstan AB, St Bryne, 531 94 Järpås, tel +46 (0)6-59 37 99 pontus.thorsson@akustikverkstan.se LABORATORY MEASUREMENTS ON THE EFFICIENCY OF SOUND

More information

List of Contents. 1.Introduction The reference measurement procedure Additional requirements...3

List of Contents. 1.Introduction The reference measurement procedure Additional requirements...3 ANEMOMETER CALIBRATION PROCEDURE Version 2 October 2009 List of Contents 1.Introduction...3 2. The reference measurement procedure...3 3. Additional requirements...3 1. INTRODUCTION The MEASNET Anemometer

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

Noise Impact Feasibility Study for the Proposed Canadian Tire Truck Warehouse Distribution Centre Caledon (Bolton), Ontario

Noise Impact Feasibility Study for the Proposed Canadian Tire Truck Warehouse Distribution Centre Caledon (Bolton), Ontario Noise Impact Feasibility Study for the Proposed Canadian Tire Truck Warehouse Distribution Centre Caledon (Bolton), Ontario Prepared for Canadian Tire Real Estate Limited 2180 Yonge St. P.O. Box 770, Toronto,

More information

NOISE IMPACT ASSESSMENT BOMEN INDUSTRIAL SEWAGE TREATMENT FACILITY BOMEN. WAGGA WAGGA

NOISE IMPACT ASSESSMENT BOMEN INDUSTRIAL SEWAGE TREATMENT FACILITY BOMEN. WAGGA WAGGA Postal Address P.O. Box 432 Gladesville N.S.W. 1675 AUSTRALIA A.C.N. 068 727 195 A.B.N. 19 068 727 195 Telephone: 02 9879 4544 Fax: 02 9879 4810 Email: AtkinsAcoustics@bigpond.com.au Atkins Acoustics and

More information

NZDF Temporary Military Training Activities. Palmerston North City Council

NZDF Temporary Military Training Activities. Palmerston North City Council NZDF Temporary Military Training Activities for Palmerston North City Council File No. N1447TMT Version 22 nd June 2014 Nigel Lloyd Director of Acoustic Services E-mail: nigel@acousafe.co.nz 98 NZDF Temporary

More information

SMARTPHONE AS NOISE LEVEL METER?

SMARTPHONE AS NOISE LEVEL METER? SMARTPHONE AS NOISE LEVEL METER? Jacopo Fogola, Stefano Masera and Vincenzo Bevacqua Regional Agency for the Protection of the Environment of Piedmont (Arpa Piemonte), via Pio VII 9, 10135 Turin, Italy

More information

Noise Measurement Procedures Manual. Second Edition July 2008

Noise Measurement Procedures Manual. Second Edition July 2008 Noise Measurement Procedures Manual Second Edition July 2008 Environment Division Department of Environment, Parks, Heritage and the Arts NOISE MEASUREMENT PROCEDURES MANUAL Second Edition July 2008

More information

The Role of Acoustics in Curtain Wall Design:

The Role of Acoustics in Curtain Wall Design: The Role of Acoustics in Curtain Wall Design: Strategies to Achieve Desired Performance Criteria April 22, 2015 John LoVerde, Principal VENEKLASEN ASSOCIATES, INC. Goals Basics of Acoustics Ratings in

More information

Guidelines for the Management of 50Hz Magnetic Fields in Office Buildings Owned and Managed by the Queensland Department of Housing and Public Works

Guidelines for the Management of 50Hz Magnetic Fields in Office Buildings Owned and Managed by the Queensland Department of Housing and Public Works Technical Services Guidelines for the Management of 50Hz Magnetic Fields in Office Buildings Owned and Managed by the Queensland Department of Housing and Public Works Page 2 of 11 Guidelines for the Management

More information

Aircraft Noise Control at London Luton Airport. August 2015

Aircraft Noise Control at London Luton Airport. August 2015 Aircraft Noise Control at London Luton Airport August 2015 Aircraft Noise Control at London Luton Airport Foreword London Luton Airport (LLA) continues to place aircraft noise high on its agenda. We recognise

More information

NEW HOME CONSTRUCTION SINGLE FAMILY

NEW HOME CONSTRUCTION SINGLE FAMILY Single Family Home Submittal Requirements Updated 10/2012 City Hall: (651) 747-3900 Building Inspections: (651) 747-3910 Planning Department: (651) 747-3912 Fax: (651) 777-9615 Electrical Inspector: (612)

More information

MICROPHONE SPECIFICATIONS EXPLAINED

MICROPHONE SPECIFICATIONS EXPLAINED Application Note AN-1112 MICROPHONE SPECIFICATIONS EXPLAINED INTRODUCTION A MEMS microphone IC is unique among InvenSense, Inc., products in that its input is an acoustic pressure wave. For this reason,

More information