How To Study The Historic Resources Of The Project

Size: px
Start display at page:

Download "How To Study The Historic Resources Of The Project"

Transcription

1 Name: Project Cultural Resources Survey Designation: Cultural 01 Study Short Description: Identify resources affected by the project that are eligible for the National Register of Historic Places. Applicable Hydro Projects/Developments: All Prerequisite Study Designation: NA I. Study Objective Identify sites eligible for the National Register of Historic Places (Historic Properties) within the Project s Area of Potential Effects (APE). This is the first step in assessing the effects of project operation on historic properties. Specific work activities planned for this study include Refinement of the existing basinwide historic context to provide a greater focus on regional patterns; Update Duke s existing GIS-based database of known archaeological and historic sites; Consultation with the Catawba Indian Nation and Eastern Band of Cherokee Indians about Native American sites affected by the project; Archaeological survey of Duke Power owned islands within project reservoirs; and, Assessment of project powerhouses and dams to determine if they are Historic Properties. II. Basis FERC requires applicants to address Historic Properties in Exhibit E of the license application (18CFR4.51.f.4). Requirements for consideration of cultural resources are further spelled out in the implementing regulations of Section 106 of the National Historic Preservation Act (36 CFR Part 800). Projects may affect Historic Properties through the following: Lake use permitting of non-project uses; Erosion of historic properties located on the shoreline of project reservoirs or immediately downstream of the project; Recreational use of project lands; and, Management of project facilities like dams and powerhouses that are historic properties. III. Geographic and Temporal Scope Survey activities will be confined to areas directly affected by project operations or Area of Potential Effect (APE). This includes lands within the project boundary, access areas owned by Duke Power and lands downstream of the project. (See Figure 1) Due to the size of the project, the results of previous archaeological surveys, and property ownership constraints only selected areas of the APE will be cultural 01.doc Page 1 of 5 Revision Date: 10/21/04

2 surveyed. These areas were identified with input from members of the Cultural Resources Resource Committee. Surveys of shoreline areas can only be effectively conducted during annual drawdowns or during abnormal situations that cause the reservoirs to be lowered for a significant period of time (i.e., long-term droughts). This is due to the limits of Duke Power ownership (and the project boundary) to the full pond elevation. The following reservoirs have annual drawdowns: Reservoir Peak drawdown (feet below Month of Peak normal operating level) Drawdown James 6 February Norman 6 February Wateree 2.5 January Based upon the results of shoreline surveys of Lake James and Lake Norman conducted in 2002 and 2003, no additional shoreline surveys are planned on Lake James and Lake Norman. Due to the minor drawdown anticipated on Lake Wateree and the results of surveys conducted on Fishing Creek Lake in 2003 during a drought, no shoreline surveys are planned for Lake Wateree. Due to the lack of drawdowns on the remaining reservoirs, no shoreline surveys are planned. Additional surveys within the reservoirs during prolonged drawdowns will be addressed during development of the Historic Properties Management Plan (see Cultural 02). Duke will survey all Duke-owned islands that have not been previously surveyed within the project reservoirs to identify previously unknown archaeological and historic sites. These islands can be surveyed at any point throughout the year with the exception of Heron Island in Lake Norman which hosts as a heron rookery from April through August. In addition, Duke will assess all project powerhouses and dams to determine if they are Historic Properties. IV. Summary of Existing Data Duke Power began implementing a Programmatic Agreement for cultural resources in Activities implemented to date include: Development of a basinwide historic context for the project area; Development of a GIS-based database containing all known archaeological and historical sites compiled from the NC and SC State Historic Preservation Office (SHPO) files; Modification of lake user agreements to address discovery of historic and archaeological resources during approved activities; Development of a GIS-based draft predictive model for Lake James, Lake Norman and Fishing Creek Lake; and, Archaeological surveys of portions of the shoreline of Lake James, Lake Norman and Fishing Creek Lake as well as islands within the three reservoirs. Thomason and Associates has developed a draft document titled National Register Eligibility Study of Seven Hydroelectric Projects in the Nantahala Area, North Carolina, that provides an overview of the development of hydroelectric power in western North Carolina. Extensive amounts of data are also available from local historical commissions, museums, the University of North Carolina at Chapel Hill research laboratory of archaeology and land trusts. Duke Energy s archives also contain information about previous archaeological surveys and other historic era documents. cultural 01.doc Page 2 of 5 Revision Date: 10/21/04

3 V. Methodology Duke Power will utilize a qualified cultural resources consultant(s) to conduct all surveys and historic structure evaluations. Historic Context: Duke Power will prepare a Request for Proposals (RFP) and submit it to qualified cultural resource management consultants. The scope of the work will be to identify prehistoric and historic settlement and use patterns for each reservoir area as well as regional patterns encompassing more than one reservoir. Specific issues to be addressed include the locations of historic communities within the reservoir areas, how the acquisition of lands for the project affected these communities, locations of cemeteries prior to inundation, locations of relocated cemeteries, and the locations of historic roads and railroads prior to development of the projects. This work will build upon the historic context developed as part of PA. Development of the context should include a cartographic survey of historic era maps as well as other historic documents to identify areas of the reservoirs that have the greatest potential to have intact archaeological and historic sites. This work will incorporate an update of Duke Power s existing GIS database of known archaeological and historic sites within the APE. Information sources will include both the state s site files as well as information obtained from other entities including, but not limited to, UNC-Chapel Hill s research lab of archaeology, local historic commissions, local museums and other organized entities. Information for sites included in the database will be consistent with the parameters in the current database. The revised database will be provided to the NC and SC SHPO s upon its completion. Archaeological Surveys: Duke Power will prepare a RFP and submit it to qualified archaeological consultants. The survey intensity will provide for recommendations of National Register eligibility when feasible. Current impacts, if any, to sites will be identified. When sites extend beyond Duke Power s property or, in the case of islands, below the lake surface, this information will be noted. No survey work will be conducted on property not owned by Duke Power. All work will conform to the standards of the state in which the surveys are conducted. Islands to be surveyed will be identified utilizing Duke Power s high resolution aerial photography. The locations and boundaries of any sites located during the survey will be recorded utilizing GPS equipment (projection NAD 83 in feet). Project Powerhouses and Dams Evaluation: Duke Power will prepare a RFP and submit it to qualified historic structures consultants. The scope of the evaluation will include development of a historic context for the development of hydroelectric power in North and South Carolina. Study report shall include, but not be limited to, site plans, identification of original equipment and features, modified components of facilities and any elements contributing to a facility s eligibility. All powerhouses and dams will be evaluated regardless of a facility having been previously assessed. All project structures associated with each development will be assessed as a complex as opposed to individual structures. Tribal Sites: Duke Power will consult with the Catawba Indian Nation (CIN) and the Eastern Band of Cherokee Indians (EBCI) to determine if important tribal sites are being affected by the project. Distribution of any information gathered through this process will be determined by Duke, the CIN and the EBCI prior to documentation of any tribal sites. Cultural resources Resource Committee (RC) members will be invited to provide comments on RFP s developed for these studies and any proposals Duke Power receives (without cost data) in response to the RFP s. Members of the cultural resources RC can recommend consultants to be considered for any work; however, Duke reserves the right to select which parties are invited to participate in the bidding process and, ultimately, which consultant is selected to conduct the survey. cultural 01.doc Page 3 of 5 Revision Date: 10/21/04

4 Duke will provide all draft reports to members of the study team for 30 days review and comment. Duke Power will not provide archaeological site data to individuals who are not affiliated with the SHPO or a Tribal Historic Preservation Office (THPO) without the concurrence of the SHPOs and THPOs. The historic context and powerhouse assessments will be provided to the public. However, no information Duke considers confidential for facility security reasons will be released to the public. The bidding process will be facilitated by Duke Power s primary technical consultant Devine, Tarbell & Associates, Inc. VI. Schedules and Required Conditions All work will be initiated as soon as the working group finalizes the study plan. The draft historic structures report shall be completed by June 30, The historic context and archaeological survey reports shall be completed by February 1, VII. Use of Study Results The results of the surveys and assessment will be utilized in developing the Historic Properties Management Plan (HPMP). The HPMP is further described in Cultural 02. VIII. Study Participants Name Organization Phone # Applicant Lead Jennifer Huff Duke Power Hydro jrhuff@dukeenergy.com Licensing Agency Leads Lee Novick NC Department of Lee.novick@nc Cultural Resources mail.net Juliana.hoekstra Juliana Supporting Consultants Other Participants Richard Sidebottom Chad Long Deborah Joy Paul Webb Wenonah Haire Sandra Reinhardt SC Department of Archives and History Legacy Research Assoc TRC Garrow Assoc Catawba Indian Nation sidebottom@scd ah.state.sc.us long@scdah.stat e.sc.us djoy@legacyresearch.com pwebb@trcsolutio ns.com wenonahh@ccp pcrafts.com sandrar@ccppcr afts.com Michelle Hamilton Eastern Band of Cherokee Indians michhami@nccherokee.com cultural 01.doc Page 4 of 5 Revision Date: 10/21/04

5 cultural 01.doc Page 5 of 5 Revision Date: 10/21/04

NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report

NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report NPLOTH7 GIS Database Development Mission (2619), Bryson (2601), Franklin (2603), Dillsboro (2602) Final Report Introduction Duke Power Nantahala Area (Duke) is in the process of relicensing the Mission,

More information

Appendix E-10. Consultation Record. Cultural Resource Committee

Appendix E-10. Consultation Record. Cultural Resource Committee Appendix E-10 Consultation Record Cultural Resource Committee Cultural Resources Resource Committee Meeting Summary Date: October 14, 2009 Location: Duke's Wenwood Operation Center, Greenville, SC Participants:

More information

Yadkin Hydroelectric Project (FERC No. 2197) Cultural Resources Issue Advisory Group Meeting August 27, 2003

Yadkin Hydroelectric Project (FERC No. 2197) Cultural Resources Issue Advisory Group Meeting August 27, 2003 Yadkin Hydroelectric Project (FERC No. 2197) Cultural Resources Issue Advisory Group Meeting August 27, 2003 Alcoa Conference Center Badin, North Carolina Final Meeting Summary Meeting Agenda See Attachment

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

The National Historic Preservation Act of 1966 as Amended (NHPA)

The National Historic Preservation Act of 1966 as Amended (NHPA) I. THE LAW: THE LEGAL FRAMEWORK FOR HISTORIC PRESERVATION Federal Laws and Regulations Early Legislation The Antiquities Act of 1906 The documentation and treatment of historic resources, archaeological

More information

www POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS

www POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS www Preserving America s Heritage ADVISORY COUNCIL ON HISTORIC PRESERVATION POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS Preamble: This policy offers leadership

More information

October 11, 2005. Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000

October 11, 2005. Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000 October 11, 2005 Sharon Stohrer State Water Resources Control board P.O. Box 2000 Sacramento, CA 95812-2000 Re: Maidu Cultural and Development Group CEQA Scoping Comments for the Environmental Impact Report

More information

36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004)

36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004) 1 36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004) Subpart A -- Purposes and Participants Sec. 800.1 Purposes. 800.2 Participants in the Section

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior IN REPLY REFER TO: NATIONAL PARK SERVICE 1849 C Street, N.W. Washington, D.C. 20240 H36(2256) PROGRAMMATIC AGREEMENT AMONG. THE NATIONAL PARK SERVICE, AND CONNECTICUT

More information

FWS Cultural Resource Management Planning

FWS Cultural Resource Management Planning I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.

More information

Managing Superfund Cleanups with National Historic Preservation Act Concerns

Managing Superfund Cleanups with National Historic Preservation Act Concerns Managing Superfund Cleanups with National Historic Preservation Act Concerns Anne Dailey, Remedial Project Manager US EPA (on detail from Region 10) Purpose and Goals Provide a basic overview of NHPA requirements

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

Notice of Intent to Conduct Scoping and to Prepare a Draft Environmental Impact Statement for

Notice of Intent to Conduct Scoping and to Prepare a Draft Environmental Impact Statement for This document is scheduled to be published in the Federal Register on 10/07/2015 and available online at http://federalregister.gov/a/2015-25509, and on FDsys.gov DEPARTMENT OF COMMERCE National Oceanic

More information

Guidelines for Preparing Cultural Resources Management Archaeological Reports

Guidelines for Preparing Cultural Resources Management Archaeological Reports Guidelines for Preparing Cultural Resources Management Archaeological Reports Submitted to the Historic Preservation Office July 2000 Reports must be submitted as individual documents for accessioning

More information

Eagle Nest Location Map

Eagle Nest Location Map EXHIBIT 12 EXHIBIT 13 #* Project Boundary Primary Zone - 330' Buffer #* Secondary Zone - 660' Buffer Eagle Nest 0 400 800 1,200 Feet This map and all data contained within are supplied as is with no warranty.

More information

TABLE OF CONTENTS CHAPTER 1: CHAPTER 2:

TABLE OF CONTENTS CHAPTER 1: CHAPTER 2: TABLE OF CONTENTS LIST OF ACRONYMS 6 GLOSSARY 6 INTRODUCTION 8 CHAPTER 1: THE HISTORY AND REGULATORY BASIS FOR SHORELINE MANAGEMENT The Federal Power Act 11 Public Recreation 12 License Article 5 12 Standard

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

September 2004 INTRODUCTION

September 2004 INTRODUCTION NATIONWIDE PROGRAMMATIC AGREEMENT FOR REVIEW OF EFFECTS ON HISTORIC PROPERTIES FOR CERTAIN UNDERTAKINGS APPROVED BY THE FEDERAL COMMUNICATIONS COMMISSION September 2004 INTRODUCTION WHEREAS, Section 106

More information

Request for Proposal (RFP) for Housing and Tenant Software

Request for Proposal (RFP) for Housing and Tenant Software Cover Letter, Tribal Housing Authority for the Catawba Indian Nation Request for Proposal (RFP) for Housing and Tenant Software To Whom it May Concern: You are invited to submit a proposal for a much needed

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Phase III: Data Recovery and Mitigation

Phase III: Data Recovery and Mitigation Phase III: Data Recovery and Mitigation Introduction... 51 Developing a Data Recovery Plan... 51 Methods and Techniques for Data Recovery... 53 Reporting the Results of Data Recovery Projects... 55 Interested

More information

06 February 2007 PRACTITIONER S HANDBOOK AASHTO CONSULTING UNDER SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT

06 February 2007 PRACTITIONER S HANDBOOK AASHTO CONSULTING UNDER SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT AASHTO PRACTITIONER S HANDBOOK 06 February 2007 CONSULTING UNDER SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT This Handbook provides recommendations for complying with Section 106 of the National

More information

Appendix F. Programmatic Agreement

Appendix F. Programmatic Agreement Appendix F Programmatic Agreement DRAFT PROGRAMMATIC AGREEMENT AMONG THE U. S. ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, THE NATIONAL PARK SERVICE, AND THE NEW YORK STATE HISTORIC PRESERVATION OFFICE

More information

FHWA Section 106 Programmatic Agreement

FHWA Section 106 Programmatic Agreement FIRST AMENDED PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, THE CALIFORNIA STATE HISTORIC PRESERVATION OFFICER, AND THE CALIFORNIA DEPARTMENT

More information

SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS

SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS Issued By Kentucky State Historic Preservation Office Kentucky Heritage Council Site Protection Program 300 Washington

More information

National policy encompasses both preserving

National policy encompasses both preserving Affordable Housing and Historic Preservation Advisory Council on Historic Preservation s Policy Statement Adopted November 9, 2006 National policy encompasses both preserving historic resources and providing

More information

How to Write the Construction Management RFQ/RFP

How to Write the Construction Management RFQ/RFP 2011-06-07 How to Write the Construction Management RFQ/RFP Setting Up a Project for Success Today's Objectives The Art of RFQ/RFP writing First things first Determining the optimum Project Delivery Method

More information

Mehmet Secilmis, GISP Environmental Engineer/GIS Specialist Dewberry Parsippany, NJ msecilmis@dewberry.com

Mehmet Secilmis, GISP Environmental Engineer/GIS Specialist Dewberry Parsippany, NJ msecilmis@dewberry.com Bridge Inventory Using GIS City of New Haven, CT Mehmet Secilmis, GISP Environmental Engineer/GIS Specialist Dewberry Parsippany, NJ msecilmis@dewberry.com (973) 576-9640 Introduction City of New Haven

More information

Iowa Department of Transportation Concurrent NEPA / 404 Process

Iowa Department of Transportation Concurrent NEPA / 404 Process Iowa Department of Transportation Concurrent NEPA / 404 Process Project Name: County: Dallas County Project No.: HDP-8260(629) 71-25 Concurrence Point 2: PIN: N/A Public Land Survey System: Sections 16,21,22,23,26,27,28

More information

WYOMING STATE PROTOCOL APPENDIX I GLOSSARY

WYOMING STATE PROTOCOL APPENDIX I GLOSSARY WYOMING STATE PROTOCOL APPENDIX I GLOSSARY Advisory Council on Historic Preservation (ACHP) Established by the National Historic Preservation Act (1966), the ACHP is an independent executive agency that

More information

Advisory Council On Historic Preservation

Advisory Council On Historic Preservation Advisory Council On Historic Preservation The Old Post Office Building 1100 Pennsylvania Avenue, NW, #809 Washington, DC 20004 MEMORANDUM OF AGREEMENT AMONG THE U.S. DEPARTMENT OF HOUSING AND URBAN Al'ID

More information

Appendix G Process For Protection of Proposal Information For

Appendix G Process For Protection of Proposal Information For Process For Protection of Proposal Information For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC DRAFT Entergy Services, Inc. March 24June 8, 2016 APPENDIX

More information

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County 121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Project No. 637-044 Chelan County ORDER MODIFYING AND APPROVING LAKE CHELAN FISHERY PLAN,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Issued: November 19, 2015 Ah Nab Awen Park - Photo courtesy of Blaine Courts REQUEST FOR PROPOSALS Professional Planning Services City of Grand Rapids Parks & Recreation 2017-2021 Strategic Master Plan

More information

CONCEPT PLAN APPLICATION

CONCEPT PLAN APPLICATION TOWN OF CHAPEL HILL CONCEPT PLAN APPLICATION Applicant In formation Name: Address: The Cedars of Chapel Hill, L.L.C. 100 Cedar Club Circle City: Chapel Hill State: N.C. Zip: 27517 Phone (Work): 9 19-945-4500

More information

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN

Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN Columbia River Project Water Use Plan LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN CLBMON-45 Lower Columbia River Fish Indexing Surveys 31 August 2007 1.0 OVERVIEW LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN

More information

Request for Proposal Autodesk CAD Support

Request for Proposal Autodesk CAD Support Request for Proposal Autodesk CAD Support Introduction Denver Water is inviting your firm to submit a proposal to provide Autodesk product-based services and support to meet the requirements of Denver

More information

Rural Business Enterprise Loan Program (RBE)

Rural Business Enterprise Loan Program (RBE) Courthouse PO Box 607 Carlton, MN 55718 Rural Business Enterprise Loan Program (RBE) Mailing Address: Carlton County Economic Development Office PO Box 607 Carlton, MN 55718 (218) 384-9597 or (218)384-9564

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

REAL PROPERTY STATUS REPORT (COVER PAGE) Page: of : Pages. 1. Federal Agency and Organizational Element to Which Report is Submitted:

REAL PROPERTY STATUS REPORT (COVER PAGE) Page: of : Pages. 1. Federal Agency and Organizational Element to Which Report is Submitted: REAL PROPERTY STATUS REPORT (COVER PAGE) Page: of : Pages 1. Federal Agency and Organizational Element to Which Report is Submitted: 2. Federal Grant(s) or Other Identifying Number(s) Assigned by Federal

More information

Emergency Conservation Program

Emergency Conservation Program Materials Prepared for Federation of Southern Cooperatives Epes, Alabama September 11, 2009 Emergency Conservation Program by Karen R. Krub Farmers Legal Action Group, Inc. 360 North Robert Street, Suite

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

One Hundred Thirteenth Congress of the United States of America

One Hundred Thirteenth Congress of the United States of America H. R. 3080 One Hundred Thirteenth Congress of the United States of America AT THE SECOND SESSION Begun and held at the City of Washington on Friday, the third day of January, two thousand and fourteen

More information

May 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr.

May 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr. May 11, 2015 Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700 Dear Mr. Felder, The Coyote Valley Band of Pomo Indians hereby objects to the

More information

EPA PARCELS PROJECT. Cadastral Data Exchange and RESTful APIs. Funded by US EPA Grant 83431001. Prepared for EN2014

EPA PARCELS PROJECT. Cadastral Data Exchange and RESTful APIs. Funded by US EPA Grant 83431001. Prepared for EN2014 EPA PARCELS PROJECT Cadastral Data Exchange and RESTful APIs Funded by US EPA Grant 83431001 Prepared for EN2014 February 20, 2014 2 Today s Topics Collaboration in North Carolina Parcels Business Case

More information

The National Historic Preservation Act As amended through December 19, 2014 and Codified in Title 54 of the United States Code

The National Historic Preservation Act As amended through December 19, 2014 and Codified in Title 54 of the United States Code The National Historic Preservation Act As amended through December 19, 2014 and Codified in Title 54 of the United States Code [The National Historic Preservation Act ( Act ) became law on October 15,

More information

Rural Residential Buildable Lands Inventory

Rural Residential Buildable Lands Inventory The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...

More information

REQUEST FOR PROPOSAL BANFF TRAIL MASTER PLAN. Issued by the Town of Banff. P.O. Box 1260, 110 Bear St. Banff, AB T1L 1A1

REQUEST FOR PROPOSAL BANFF TRAIL MASTER PLAN. Issued by the Town of Banff. P.O. Box 1260, 110 Bear St. Banff, AB T1L 1A1 REQUEST FOR PROPOSAL TOWN OF BANFF TRAIL MASTER PLAN Issued by the Town of Banff Date of RFP Issue: June 2, 2014 Closing Date for Response: June 17, 2014 Contract Name: Agency Contact Person: Address:

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS Before discussing the uses and importance of long-term water-level data, it is useful to review essential components of a water-level monitoring

More information

Request for Proposal. Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA

Request for Proposal. Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA Request for Proposal Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA 1 Table of Contents: Section A: Project Scope... 3 Section B: Background...

More information

FERC No. 2157 Updated 1/2011 Page 2

FERC No. 2157 Updated 1/2011 Page 2 for the This (UDP) details the procedures for the unanticipated discovery of human remains or archaeological resources within the Area of Potential Effects for the (FERC No. 2157). The Snohomish County

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

State of Florida Department of Transportation

State of Florida Department of Transportation State of Florida Department of Transportation EXHIBIT A, SCOPE OF SERVICES RFP-DOT-12/13-6132DS TO PROVIDE DISTRICT-WIDE CULTURAL RESOURCE ASSESSMENT SURVEYS AND A BROAD RANGE OF RELATED WORK NATIONAL

More information

JOINT PUBLIC NOTICE June 28, 2016

JOINT PUBLIC NOTICE June 28, 2016 DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT CORPS OF ENGINEERS REGULATORY FUNCTIONS BRANCH P.O. BOX 60267 NEW ORLEANS, LA 70160 JOINT PUBLIC NOTICE June 28, 2016 STATE OF LOUISIANA DEPARTMENT OF ENVIRONMENTAL

More information

FirstNet Historic Preservation Requirements

FirstNet Historic Preservation Requirements FirstNet Historic Preservation Requirements Christopher Eck Federal Preservation Officer December 10, 2014 NEPA NEPA is considered an umbrella law as it provides a framework within which a wide variety

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

North Dakota GIS Program Report To Governor Jack Dalrymple. July 1, 2011 June 30, 2012

North Dakota GIS Program Report To Governor Jack Dalrymple. July 1, 2011 June 30, 2012 North Dakota GIS Program Report To Governor Jack Dalrymple July 1, 2011 June 30, 2012 Executive Order 2001-06: The committee shall issue a report to the Governor's office at the end of each fiscal year,

More information

The Real Estate Acquisition Process Brochure

The Real Estate Acquisition Process Brochure The Real Estate Acquisition Process Brochure Growth NOTES: North Carolina has one of the largest state-maintained highway systems in the country. Due to the rapid growth, transportation improvements are

More information

Region of Waterloo Finance Department Financial Services and Development Financing

Region of Waterloo Finance Department Financial Services and Development Financing Region of Waterloo Finance Department Financial Services and Development Financing To: Chair Jim Wideman and Members of the Planning and Works Committee Date: May 27, 2014 File Code: T16-01 Subject: Stage

More information

Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map

Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map Mark Schnur EES 5053 Remote Sensing Fall 2007 University of Texas at San Antonio, Department of Earth and Environmental Science, San Antonio,

More information

Consultation with Indian Tribes in the Section 106 Review Process: A Handbook

Consultation with Indian Tribes in the Section 106 Review Process: A Handbook Consultation with Indian Tribes in the Section 106 Review Process: A Handbook Table of Contents I. About this Handbook Page 1 II. Federal Government Consultation with Page 2 Indian Tribes III. Consultation

More information

MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.

MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy. MAPPING MINNEAPOLIS URBAN TREE CANOPY Why is Tree Canopy Important? Trees are an important component of urban environments. In addition to their aesthetic value, trees have significant economic and environmental

More information

MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION

MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND THE UNITED STATES ARMY CORPS OF ENGINEERS, WILMINGTON

More information

CHAPTER I: INTRODUCTION. Background

CHAPTER I: INTRODUCTION. Background CHAPTER I: INTRODUCTION Background California State Law requires each county to adopt a General Plan for the physical development of the county and any land outside its boundaries which bears relation

More information

STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION

STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION STATE LEVEL AGREEMENT BETWEEN THE NATRAL RESORCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION PRPOSE The NRCS, and New Jersey State Historic Preservation Officer (SHPO)

More information

South Carolina Department of Transportation Design-Build Projects Section

South Carolina Department of Transportation Design-Build Projects Section July 10, 2016 DESIGN-BUILD ACTIVE PROPOSALS: I-85 REHAB AND WIDENING REHAB FROM MM 77 TO MM 80, PHASE 1 WIDENING FROM EXIT 80 (S- 57) TO EXIT 90 (SC 105) & PHASE 2 WIDENING FROM EXIT 90 (SC 105) TO EXIT

More information

Organizational Effectiveness

Organizational Effectiveness Carolina Survey Organizational Effectiveness Results DIS DIS DIS Clarity The University has specific and measurable goals I am clear on the 3-5 priorities that are most important to improving the University

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

Solar Generation In Indian Country: A Case Study

Solar Generation In Indian Country: A Case Study Solar Generation In Indian Country: A Case Study Solar Building Blocks-Tribal Lands Abundant Sunlight Access to Transmission Business Site Lease: 25 U.S.C. 415 Rights-of-Way Power Purchase Agreement Water

More information

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN

SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN SITE INVESTIGATIONS OF THE BEACH EROSION PROBLEM AT MAHO BEACH, ST. MAARTEN Performed February 2003 Performed by: Dr. Lee E. Harris, Ph.D., P.E. Associate Professor of Ocean Engineering & Oceanography

More information

Request for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming

Request for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming Request for Proposals for Topographic Mapping Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming Proposals due: 2:00PM MDT July 1, 2015 Proposals may be delivered to: Teton

More information

Seminole Geography. Using GIS as a Tool for. Tribal Historic Preservation Office

Seminole Geography. Using GIS as a Tool for. Tribal Historic Preservation Office Seminole Geography Using GIS as a Tool for Tribal Historic Preservation Offices Presentation at the 2008 ESRI International User Conference San Diego, California Juan J. Cancel, B.A. & Paul N. Backhouse

More information

Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey

Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Introduction The following data entry guidelines are to be followed for new Data Sharing System (DSS) entries. When updating previously

More information

Federal Emergency Management Agency, DHS 206.431. SOURCE: 55 FR 35537, Aug. 30, 1990, unless otherwise noted.

Federal Emergency Management Agency, DHS 206.431. SOURCE: 55 FR 35537, Aug. 30, 1990, unless otherwise noted. Federal Emergency Management Agency, DHS 206.431 (d) A State may appeal a determination by the Regional Administrator on any action related to Federal assistance for fire suppression. Appeal procedures

More information

SITE MONITORING, AFFIRMATIVE CULTURAL RESOURCE MANAGEMENT FOR CACHE CREEK PUBLIC LANDS, LAKE COUNTY, CALIFORNIA

SITE MONITORING, AFFIRMATIVE CULTURAL RESOURCE MANAGEMENT FOR CACHE CREEK PUBLIC LANDS, LAKE COUNTY, CALIFORNIA SITE MONITORING, AFFIRMATIVE CULTURAL RESOURCE MANAGEMENT FOR CACHE CREEK PUBLIC LANDS, LAKE COUNTY, CALIFORNIA Marlene L. Greenway Bureau of Land Management Sonoma State University ABSTRACT Prehistoric

More information

1816, Independence Hall 1850, Washington s Headquarters

1816, Independence Hall 1850, Washington s Headquarters Historic Preservation: An Evolving Relation with Our Past 1816, Independence Hall 1850, Washington s Headquarters 1 Mount Vernon Ladies Association, 1853 Ann Pamela Cunningham United States 100 th Birthday

More information

How To Write A Right Of Way Certificate

How To Write A Right Of Way Certificate CHAPTER 14 RIGHT OF WAY CERTIFICATION TABLE OF CONTENTS 14.01.00.00 INTRODUCTION 01.00 General 01.01 Definition 02.00 Projects Requiring R/W Certification 03.00 Projects Exempt From R/W Certification 04.00

More information

Plug CRM Gaps in the U.S.

Plug CRM Gaps in the U.S. Preventing Archaeological Disasters and Facilitating Cultural Resource Protection: One Nonprofit s Attempt to Plug CRM Gaps in the U.S. Tonight s Conversation Archaeological Disasters - How I came to be

More information

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION)

BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) BIG CREEK Nos. 1 AND 2 (FERC Project No. 2175) VOLUME 1 (BOOK 1 OF 27 BOOKS) INITIAL STATEMENT, EXHIBITS A, B, C, D AND H (PUBLIC INFORMATION) CD NO. 1 OF 19 CDS Initial Statement Exhibit A: Description

More information

Eastern Band of Cherokee Indians Title IV- B, Subparts 1&2 2010-2014 Final Report

Eastern Band of Cherokee Indians Title IV- B, Subparts 1&2 2010-2014 Final Report Eastern Band of Cherokee Indians Title IV- B, Subparts 1&2 2010-2014 Final Report Submitted By: Barbara Jones 1 Eastern Band of Cherokee Public Health and Human Services 2 Background Information The Eastern

More information

WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS WHEREAS, WHEREAS, 126

WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS WHEREAS, WHEREAS, 126 FINAL PROGRAMMATIC AGREEMENT AMONG THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, THE BUREAU OF LAND MANAGEMENT CALIFORNIA, AND THE CALIFORNIA OFFICE OF HISTORIC PRESERVATION REGARDING NATIONAL HISTORIC

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established

More information

CURRENT FEDERAL ACTION

CURRENT FEDERAL ACTION STATEMENT OF FINDINGS US ARMY ENGINEER DISTRICT, GALVESTON FINAL TREATMENT PLAN HUMAN REMAINS AND ARCHEOLOGICAL MATERIALS FROM THE BUCKEYE KNOLL SITE (41VT98) INTRODUCTION This statement of findings presents

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

Non-English Translation and Translation Authentication of Documents I. ONLY CERTIFIED SMALL BUSINESSES ARE ELIGIBLE FOR AWARD.

Non-English Translation and Translation Authentication of Documents I. ONLY CERTIFIED SMALL BUSINESSES ARE ELIGIBLE FOR AWARD. Non-English Translation and Translation Authentication of Documents I. ONLY CERTIFIED SMALL BUSINESSES ARE ELIGIBLE FOR AWARD. The Department of General Services has designated this contract as a Small

More information

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES I. PURPOSE OF REQUEST. The City of Edgewood is requesting statements of qualifications from professional consulting firms licensed

More information

HYDROELECTRIC PERMITTING MANUAL FOR PENNSYLVANIA February 2015

HYDROELECTRIC PERMITTING MANUAL FOR PENNSYLVANIA February 2015 HYDROELECTRIC PERMITTING MANUAL FOR PENNSYLVANIA February 2015 Prepared by Pennsylvania Environmental Council Acknowledgements It is with gratitude that we acknowledge the many hours contributed by the

More information

Blackfeet Nation Energy Organization Development

Blackfeet Nation Energy Organization Development Blackfeet Nation Energy Organization Development First Steps to Renewable Energy Grant Awarded by Department of Energy Presented by Jeri Lawrence Blackfeet Renewable Energy Director Introduction The Blackfeet

More information

September 2005. Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI

September 2005. Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI Worcester Historical Museum Worcester, MA September 2005 mawald/ld/0909700/graphics/covers/september05cover

More information

ADWR GIS Metadata Policy

ADWR GIS Metadata Policy ADWR GIS Metadata Policy 1 PURPOSE OF POLICY.. 3 INTRODUCTION.... 4 What is metadata?... 4 Why is it important? 4 When to fill metadata...4 STANDARDS. 5 FGDC content standards for geospatial metadata...5

More information

Previous Process. All Section 106 documents & consultations with SHPO go from Caltrans to FHWA for review & transmittal & back again

Previous Process. All Section 106 documents & consultations with SHPO go from Caltrans to FHWA for review & transmittal & back again Previous Process All undertakings subject to Section 106* All Section 106 documents & consultations with SHPO go from Caltrans to FHWA for review & transmittal & back again Transmittal times dependent

More information

WHEREAS, MnDOT, as PROJECT sponsor, has been invited by the FHW A to sign this PA in accordance with 36 CFR 800.6(c)(2); and

WHEREAS, MnDOT, as PROJECT sponsor, has been invited by the FHW A to sign this PA in accordance with 36 CFR 800.6(c)(2); and PROGRAMMATIC AGREEMENT PURSUANT TO SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT BETWEEN THE FEDERAL HIGHWAY ADMINISTRATION AND THE MINNESOTA STATE HISTORIC PRESERVATION OFFICE REGARDING THE WINONA

More information

Federal Energy Regulatory Commission 5.1

Federal Energy Regulatory Commission 5.1 Federal Energy Regulatory Commission 5.1 period prescribed for making such payment, interest and penalty charges will be assessed. Interest and penalty charges will be computed in accordance with 31 U.S.C.

More information

RFP for Graphic Design for Interpretative Signage and Yard Signs Amendment: Answers to Questions July 15, 2014

RFP for Graphic Design for Interpretative Signage and Yard Signs Amendment: Answers to Questions July 15, 2014 RFP for Graphic Design for Interpretative Signage and Yard Signs Amendment: Answers to Questions July 15, 2014 Questions: 1) Is it possible to get a photo of the existing exhibit structures? Sign post

More information

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON 1. INTRODUCTION The Washington State Department of Transportation (WSDOT)

More information