CITY OF NEW ORLEANS. Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project

Size: px
Start display at page:

Download "CITY OF NEW ORLEANS. Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project"

Transcription

1 CITY OF NEW ORLEANS Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project 8/7/2014

2 Agenda Background Project Scope Lessons Learned Discussion 2

3 Superdome Central Business District French Quarter Convention Center Cruise Ship Terminal 3

4 Background Project concept initiated by New Orleans bid to host Super Bowl DPW thoroughly assessed conditions of Central Business District/French Quarter streets Partnership with the Ernest N. Morial New Orleans Exhibit Hall Authority identified scope of work Until recently, many New Orleans French Quarter streets were in poor condition. 4

5 Background Hospitality Zone legislation failed Cooperative Endeavor Agreement between the City and Convention Center authorizes $6.5 million to implement the Downtown Infrastructure Improvement Project Project budget presented to City Council Budget Committee - May Full City Council vote and approval - June 20, 2013 Hospitality Zone legislation called for establishment of a 10-yr tax that would fund repairs to 100-miles of roadway within the zone 5

6 Existing potholes and sink holes allow standing water on the roadway. Poor gutter lines prevent water from reaching the drainage system. Composite Pavement. Last Paved: Iberville St. Resurfacing N. Rampart St. to N. Peters St. Pre-Existing Conditions 6

7 Julia St. Convention Center Blvd. to Loyola Ave. Pre-Existing Conditions A combination of repeated patching and curb settlement left portions of Julia St. unappealing and without a clear curb/roadway boundary. Composite Pavement. Last paved:

8 Pavement Condition Pavement Deterioration Curve Excellent Good Every $1 in Maint cost here Fair Poor will cost $4 to $5 if delayed to here. Very Poor 8 Failure Time (Years) A normal pavement maintenance program will continuously restore the pavement condition to excellent.

9 Downtown Infrastructure Improvements Project and Scope of Work Intersection of Julia St. / Convention Center Blvd. Intersection enhancement; decorative plaza Julia St. Iberville St. Regional Planning Commission/City Match $2.5 million investment Convention Center to Loyola - White topping North Rampart to North Peters- White topping and drainage point repairs S. Peters (Calliope to Canal) Baronne (Canal to Calliope) Project Cost Estimate $3,851,000 French Quarter Lighting Dauphine/Canal/Decatur/Dumaine $1,000,000 Drainage Limited point repairs to improve drainage French Quarter and Central Business District $500,000 Signage / Striping Street signs and striping cross walks $100,000 Sanitation Improvements to sanitation services to be used over a 2-year period including new bins and enhanced operations $1,000,000 TOTAL INVESTMENT $6,451,000

10 Communications Strategic Communication Frequent, transparent communication with stakeholders Stakeholder Concerns Resident and employee access to on-street and parking structures Possible lost revenue Access to loading docks/dumpsters Limited parking/temporary conversion of roadways Continual access to sidewalks during construction Specific construction timelines and duration DPW hosted three formal community meetings and several informal smallgroup sessions with affected stakeholders to discuss DIIP. 10

11 Neighborhood Engagement Phoned and ed Dorsiere, Iberville and Julia St. businesses and HOAs in May/June 2013 Iberville St. pre-construction community meeting - mid-july Julia St. pre-construction community meetings - mid-july Regular weekly updates Communications Regular updates to project fact sheet 11

12 Project Scope Replaced asphalt composite roadways with ultra thin concrete (white topping) Used high-early strength concrete (4, 12 and 24 hour mixes) at driveways to address stakeholder concerns Factors considered when replacing roadway: Cost Increased durability Increased design life Increased reflectively to improve street light illumination Concrete cure time is 72-hours vs. asphalt immediate cure, however tradeoff is increased life expectancy. Concrete is anticipated to last 30+ years. 12

13 Concrete Mix Design Ultra thin 3.5 inch, high early strength concrete mix 72-hour mix at 3,000 PSI 28-days mix at 4,000 PSI Expected life is 30+ years Cost per sq yard ~ $40-60 Project Scope On average, PSI was reached at 48-hours allowing the busy Iberville and Julia Street roadways to be opened a day earlier than standard concrete roadways. 13

14 Project Scope White Topping Polypropeline fiber reinforcement Maturity meters used in lieu of concrete cylinders. Meters checked at 4, 12, 24 and 72- hours to measure PSI No forms, joints, or steel needed Three times the normal dosage of polypropeline fibers were used to reinforce the DIIP concrete mix. 14 Maturity meters measure time and temperature of placed concrete on site vs. concrete cylinders which must be tested at lab.

15 15 Project Scope

16 Project Scope Scoring 3 ft x 3 ft pattern will reduce cracking Simplifies future repairs Added flexibility increases longevity Aesthetically pleasing Scoring adds dimension and character to the project, infuses with the surrounding community. 16

17 17 Project Results

18 Lessons Learned Communications with stakeholders is critical throughout the project. Coordination with utilities and other planned projects and special events is key. Pilot project helped pave the way for success. 18

19 19 Questions?

20 Downtown Infrastructure Improvements Additional Scope of Work Streetlight repairs or conversions Drainage Point Repairs Striping 20

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

INVESTMENT OFFERING. Peter Pan Motel. 110 N. 13th Street Las Vegas, Nevada 89101. Peter Pan Motel Las Vegas, Nevada

INVESTMENT OFFERING. Peter Pan Motel. 110 N. 13th Street Las Vegas, Nevada 89101. Peter Pan Motel Las Vegas, Nevada INVESTMENT OFFERING Peter Pan Motel 110 N. 13th Street Las Vegas, Nevada 89101 Table of Contents Section I Section II Section III Section IV Section V Section VI Summary Business Description Property Description

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES

COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES COMMUNITY REDEVELOPMENT AGENCY FAÇADE IMPROVEMENT PROGRAM GUIDELINES SEPTEMBER 2007 PURPOSE Clearwater s tropical environment provides many opportunities for festive activities and amenities for the downtown

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Resurfacing Concrete. Page 1 of 5

Resurfacing Concrete. Page 1 of 5 Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)

More information

MAINTENANCE. Infrastructure. Introduction. Safety. Policies & Programs. Summary EXISTING CONDITIONS

MAINTENANCE. Infrastructure. Introduction. Safety. Policies & Programs. Summary EXISTING CONDITIONS PAGE 2-60 installed in September and October 2014. At these locations the City of Greensboro installed Pyro Posts and ZELT Inductive Loops, provided by NCDOT for the program, to differentiate between pedestrians

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL

LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL LIFE-CYCLE COST ANALYSIS PROCEDURES MANUAL Note to the User To use this manual, the reader must have the life-cycle cost analysis software program RealCost, Version 2.2 California Edition. The program

More information

MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings

MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings MDOT Construction Field Services Update 2013 MDOT LAP/Consultant Construction Kickoff Meetings Topic Overview Contract Administration Issues & Trends e-construction Documentation Buy America Construction

More information

Section 801 Driveway Access Onto Public Right-of-Ways

Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00 Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00. Definitions. The following words and terms, when used in this Article, shall have the following meanings, unless the

More information

ROOFS - Guidance for Repair, Maintenance and Replacement

ROOFS - Guidance for Repair, Maintenance and Replacement ROOFS - Guidance for Repair, Maintenance and Replacement Guilford Association Architectural Committee ROOFING Slate and tile roofs are a critical design feature of Guilford homes. The homes were designed

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT

CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT I. PROPOSAL INFORMATION AND SCORING These guidelines detail

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS STANDARD SPECIFICATIONS Standard Slope: Unless otherwise specified on the permit, the sidewalk grade shall be sloped upward from the existing curb at a rate of 2% (approx. ¼ inch per foot). New work required

More information

TOWN OF NEW HAVEN ROAD PLAN

TOWN OF NEW HAVEN ROAD PLAN 1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served

More information

City of St. Petersburg Development Services. February 2006. Driveways for Residential Properties

City of St. Petersburg Development Services. February 2006. Driveways for Residential Properties City of St. Petersburg Development Services February 2006 Citizen s s Guide to Driveways for Residential Properties Pursuant to Section 29-909 of the City s Zoning Ordinance, all passenger motor vehicles

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Residential Driveway Installation Requirements. Table of Contents

Residential Driveway Installation Requirements. Table of Contents Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential

More information

PROJECT WEBSITE: www.torranceca.gov/23009.htm. A. Project Map - see map attached at end of this document

PROJECT WEBSITE: www.torranceca.gov/23009.htm. A. Project Map - see map attached at end of this document (with Citywide Cross-Gutter Improvements and Crenshaw Blvd Repairs) COMMUNITY MEETING March 3, 2014 7:00 PM Bartlett Senior Citizens Center, Ritsema Hall - 2nd floor 1318 Cravens Avenue, Torrance, California

More information

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association

More information

Life Cycle Cost Analysis

Life Cycle Cost Analysis Ronald Collins Pavement Technology a Division of Astec, Inc. LCCA is an analysis technique that builds on the well founded principles of economic analysis to evaluate the over-the-long-term economic efficiency

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT 40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together

More information

General Statement of Duties

General Statement of Duties VILLAGE OF LA GRANGE JOB DESCRIPTION POSITION TITLE: DEPARTMENT: REPORTS TO: General Utility Worker Public Works Director of Public Works Appointment Appointment of this position is made by the Director

More information

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters. SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

8. EXTERIOR SITE LIGHTING

8. EXTERIOR SITE LIGHTING 8. EXTERIOR SITE LIGHTING Goal: Exterior lighting should be used to provide illumination for the security and safety of entry drives, parking, service and loading areas, pathways, courtyards and plazas,

More information

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation

More information

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

CHAPTER 2 LCCA APPROACHES

CHAPTER 2 LCCA APPROACHES 2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Street Audit Tool: Web 2.0 Tools

Street Audit Tool: Web 2.0 Tools Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

COPPER BEECH TOWNHOME DEVELOPMENT

COPPER BEECH TOWNHOME DEVELOPMENT COPPER BEECH TOWNHOME DEVELOPMENT This 28 acre, 30 Townhome development is slated to open doors in time for the 2007 2008 college school year. To accommodate this project s tight time line, Dennis Corporation

More information

CONSTRUCTION COST ESTIMATES

CONSTRUCTION COST ESTIMATES Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1

More information

OHIO ASPHALT PAVING CONFERENCE

OHIO ASPHALT PAVING CONFERENCE OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

Members of the City of Bloomington Common Council Susie Johnson, Director, Department of Public Works Date: July 20, 2009

Members of the City of Bloomington Common Council Susie Johnson, Director, Department of Public Works Date: July 20, 2009 Department of Public Works 2010 Budget Proposal Memorandum To: From: Members of the City of Bloomington Common Council Susie Johnson, Director, Department of Public Works Date: July 20, 2009 In preparation

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post

More information

B. Improve the appearance and character of areas surrounding new development.

B. Improve the appearance and character of areas surrounding new development. Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Gardnerville Water Company Regular Board Meeting Minutes Tuesday, April 8, 2014 5:00 p.m. Board Room 1579 Virginia Ranch Rd Gardnerville, NV 89410

Gardnerville Water Company Regular Board Meeting Minutes Tuesday, April 8, 2014 5:00 p.m. Board Room 1579 Virginia Ranch Rd Gardnerville, NV 89410 Gardnerville Water Company Regular Board Meeting Minutes Tuesday, April 8, 2014 5:00 p.m. Board Room 1579 Virginia Ranch Rd Gardnerville, NV 89410 Board Members Present: Barbara Henningsen, Chairman Mark

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

FRENCH QUARTER ECONOMIC DEVELOPMENT DISTRICT

FRENCH QUARTER ECONOMIC DEVELOPMENT DISTRICT FRENCH QUARTER ECONOMIC DEVELOPMENT DISTRICT RESOLUTION NO. R-2015-1 CITY HALL: May 7, 2015 BY: DISTRICT MEMBER RAMSEY (BY REQUEST) SECONDED BY: A RESOLUTION authorizing the publication of a notice describing

More information

Kirkwood Road Reconstruction - On-line 311 CIP Campaign

Kirkwood Road Reconstruction - On-line 311 CIP Campaign Kirkwood Road Reconstruction - On-line 311 CIP Campaign PLEASE help in further establishing the public record and your position IN FAVOR OF Kirkwood Reconstruction by doing the following: (This can take

More information

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between

More information

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

City Manager s FY 2017 Proposed Budget. City of Fairfax, VA City Council Meeting February 23, 2016

City Manager s FY 2017 Proposed Budget. City of Fairfax, VA City Council Meeting February 23, 2016 City Manager s FY 2017 Proposed Budget City of Fairfax, VA City Council Meeting February 23, 2016 FY 2017 Budget Calendar March 1, 2016 (Work Session) March 8, 2016 (Regular Meeting) March 22, 2016 (Regular

More information

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Overview of RRSS Bond Scope and Budget (including accountability

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013

City Streets as State Highways Maintenance Guidelines Briefing Summary March 21, 2013 Streets as Highways Maintenance Guidelines Briefing Summary March 21, 2013 Background Within the of Washington there are over 500 centerline miles of Streets that also function as Highways. Cities that

More information

Workflow Information Packet Land Development Projects

Workflow Information Packet Land Development Projects Workflow Information Packet Land Development Projects Typical Construction Flow Diagram for Land Development Projects Construction Plans Approved and Construction Permit Issued by Loudoun Water Pre-Construction

More information

CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN

CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN I. General CENTRAL BUSINESS DISTRICT IMPROVEMENTS DEVELOPMENT PLAN AND TAX INCREMENT FINANCING PLAN Mt. Pleasant, Michigan DEVELOPMENT PLAN This report is intended to describe the methodology involved

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Screening Transportation Assets for Vulnerability

Screening Transportation Assets for Vulnerability Screening Transportation Assets for Vulnerability Impacts of Climate Change and Variability on Transportation Systems & Infrastructure (Gulf Coast Study, Phase 2) FHWA Office of Planning Environment and

More information

Pipe Repair Strategies on I-29

Pipe Repair Strategies on I-29 Pipe Repair Strategies on I-29 Research Advisory Committee 2012 Andy Mastel NDDOT- Materials and Research Division Pipe Location In the Fargo District Along Interstate 29 RP 75, North Bound Pipe Description

More information

HIGHWAYS AND PUBLIC IMPROVEMENTS DEPARTMENT

HIGHWAYS AND PUBLIC IMPROVEMENTS DEPARTMENT HIGHWAYS AND PUBLIC IMPROVEMENTS DEPARTMENT 181 182 PUBLIC WORKS 183 PUBLIC WORKS PLANNING PERIOD: FY2010-11 THROUGH FY2014-15 FISCAL BUDGET PLANNING YEAR: FY2012-13 FUND: General Fund COST CENTER NUMBER

More information

SNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS

SNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS 1 TABLE OF CONTENTS SECTION: 1) Introduction Page 2 2) Scope of Program Page 2 3) General Instructions Page 3 4) Storm Procedures Page 3 5) Snow Removal Operating Procedures Page 4 6) Snow Ordinance Page

More information

CITY OF GLOUCESTER PLANNING BOARD MEETING MINUTES DECEMBER 20, 2012 7:00 P.M.

CITY OF GLOUCESTER PLANNING BOARD MEETING MINUTES DECEMBER 20, 2012 7:00 P.M. CITY OF GLOUCESTER PLANNING BOARD MEETING MINUTES DECEMBER 20, 2012 7:00 P.M. Kyrouz Auditorium, City Hall, 9 Dale Avenue, Gloucester Richard Noonan, Chair Members Present: Rick Noonan, Chair, Mary Black,

More information

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL FORM CM 36 5 0 CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL April 28, 2009 AGENDA ITEM Report on bids received for the Greenbriar Road and Adjacent Streets Rehabilitation Project. (1) Motion Awarding

More information

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions.

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions. 2011-7 AN ORDINANCE ESTABLISHING STANDARDS FOR THE PRIVATE STORM DRAIN INLET RETROFITTING AND AMENDING THE "CODE OF THE TOWNSHIP OF PRINCETON, NEW JERSEY, 1968". BE IT ORDAINED by the Township Committee

More information

TRANSPORTATION: ROAD CONSTRUCTION WARRANTIES. William E. Hamilton, Senior Fiscal Analyst

TRANSPORTATION: ROAD CONSTRUCTION WARRANTIES. William E. Hamilton, Senior Fiscal Analyst fiscal forum March 2001 A Legislative Briefing Mitchell E. Bean, Director P. O. Box 30014, Lansing, MI 48909-7514 517-373-8080! FAX 517-373-5874! www.house.state.mi.us/hfa TRANSPORTATION: ROAD CONSTRUCTION

More information

Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.

Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted. Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,

More information

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland

More information

Quality Assurance Concepts. Outline

Quality Assurance Concepts. Outline Quality Assurance Concepts Peter C. Taylor Outline What is quality? Who cares? How do we get it? What is the important stuff? 1 Defining Quality Simple Definition (Philip Crosby) Quality: Conformance to

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

PAVEMENT CUT AND REPAIR STANDARDS MANUAL. Department of Public Works and Transportation. City of Dallas

PAVEMENT CUT AND REPAIR STANDARDS MANUAL. Department of Public Works and Transportation. City of Dallas PAVEMENT CUT AND REPAIR STANDARDS MANUAL Department of Public Works and Transportation City of Dallas October 2003 TABLE OF CONTENTS Preface and Acknowledgements PART 1 Pavement Cut and Repair Standards

More information

ASPHALT & CONCRETE SPECIFICATIONS

ASPHALT & CONCRETE SPECIFICATIONS ASPHALT REPAIR & RESURFACE GENERAL PARAMETERS The intent of these specifications is to provide detailed specifications for contractors to fallow for parking lot repairs. The property manager or construction

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

Dancing Willows Condominium HOA, Inc.

Dancing Willows Condominium HOA, Inc. Dancing Willows Condominium HOA, Inc. October 28, 2013 C/O Stillwater Community Management 15400 W 64 th Ave Suite 9E53 Arvada, CO 80007 p. (303) 872-9224 f. (303) 309-0468 Holly.Bristol@scmhoa.com RE:

More information

City of Indian Rocks Beach, Florida NFIP Number 125117

City of Indian Rocks Beach, Florida NFIP Number 125117 City of Indian Rocks Beach, Florida NFIP Number 125117 Floodplain Management Plan / Local Mitigation Strategy Annual Report - September 2015 Introduction The City of Indian Rocks Beach has been an active

More information

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to

More information