1 CEA PRESPECTIVE ON Energy Efficiency in Coal Fired Power Stations CHANDRA SHEKHAR DIRECTOR,CEA

2 ALL INDIA PLANT LOAD FACTOR OF COAL BASED POWER PLANTS (%) FO pm 5.93 Av FO pm 5.71 AV FO pm 5.01 Av

3 GROWTH OF GENERATION GWH 1947 to generation Gwh

4 Installed Capacity as on (Type Wise) Hydro, , 16.00% [CATEGORY NAME], [VALUE], [PERCENTAGE] Nuclear, 4780, 1.87% Diesel, , [CATEGORY 0.47% NAME], [VALUE], [PERCENTAGE] Coal, , 60.22% Installed Capacity = MW

5 Installed Capacity as on (Type Wise) Nuclea r 2% Diesel 1% R.E.S 12% Hydro 18% Gas 9% Coal, , 58% Installed Capacity = MW

6 GENERATION Gen BU (14-15) upto 31 st Dec.793.7BU 722 last year Comprises Coal/lignite based BU (77.14% of total Gen.) on 60% Capacity Gas = BU(4.6% of total Gen.) on 9% Capacity, Hydro= BU (13.9% of total Gen.) on 17% Capacity In upto December,2014 COAL/Lignite 75.28% on 60.22% capacity Gas 4% on 9% Capacity Hydro 13.44% on % Capacity

7 Power position in the country ( ) HYDRO, , 14% 17% DIESEL, 1.85, 0% GAS, 44.52, 5% 9% NUCLEAR, 34.23, 3% BHUTAN IMP., 5.6, 1% COAL, 746.1, 77% 60% CAP.

8 CAPACITY ADDITION DURING 11 TH PLAN ( ) (in MW) Capacity addition target during 11 th Plan 78,700 Capacity Commissioned during 11 th Plan 54,964 MW MW coal 5156MW gas 5544MW hydro

9 CAPACITY ADDITION DURING 12 TH PLAN ( ) (in MW) Capacity addition target during 12 th Plan 88,537 Capacity already Commissioned during 12 th Plan (as on 31 Dec., 2014) Total COAL GAS Hydro State Pvt Central

10 Major Unit Sizes and Steam parameters Size Steam Parameter Design Efficiency MW ata/c/c (%) Year / 482 ~ / to / 535/ / ,150/535/ , /535/ / 538/ /535/ /535/565 ~ / /565/ Efficiency on HHV basis

11 PLF of Power Plants PLF State sector 65.57% % Central Sector 79.18% 76.11% Pvt % 68.67% ALL INDIA % 65.55% Loss of Generation due to Coal shortage 15.84BU 4.3BU Receipt of poor coal quality Backing Down Transmission constraints Gas Shortage

12 ALL INDIA Thermal PS last Five Years Efficiency Trend Capacity Analysed MW (13-14) 73 Stations Design Efficiency 36.75% Efficiency EFFICIENCY Efficiency YEAR

13 BOILER LOSSES to be taken care off seriously of COAL FIRED STATIONS

14 The major factors to be looked into in TURBINE SIDE LOSSES Main steam and reheat steam inlet parameters (For every 1 drop in Main Steam/ R H temperature than the designed value of 537 C, causes a heat loss of approx 0.67 KCal/KWh 1 KG/CM2 drop in Main Steam Pressure at Turbine Inlet than the design value i.e 150 KG/CM2 causes a heat loss of approx KCal/KWh) Turbine exhaust steam parameters Reheater and super heater spray Passing of high energy draining Loading on the turbine Boiler loading and boiler performance Operations and maintenance constraints Condenser performance and cooling water parameters Silica deposition and its impact on the turbine efficiency Inter stage sealing, balance drum and gland sealing Sealing fins clearances Nozzle blocks Turbine blade erosion Functioning of the valves Operational status of HP heaters

15 The major TURBINE CYCLE LOSSES

16 Major Possibilities for Condenser and Water pumping and Cooling tower

17 Heat rate GAURENTEED BY EQUIPMENT MANUFACTURER

18 Sl. Capacity Group(MW) PLF% Groupwise No. of Units Cap. in MW PLF% in 13-14/12-13/ /57.52/ /71.97/ /70.45/ /77.91/ /76.91/ /76.62/ /50.23/ /54.39/ Total /69.93/73.32 * No of units reviewed (Total commissioned 539/490 Cap Stations 143

19 VARIOUS FACTOR EFFECTING HEAT RATE Measurement System COAL CONSUMTION GCV CALCULATION GROSS & AUX Power OIL Consumption COOLING TOWER CT Efficiency CW Flow Partial Load Tie up LOSS Evacuation LOSS Load Throw off/loss BOILER EFFICIENCY APH Seal Leakage Mill Fineness Soot Blowing Loss Boiler Blow Down H2 in Coal Loss Moisture in Coal Loss Moisture in Air Loss Water Chemistry O2 Control Flue Gas Exit Temp. Dry Flue Gas Loss SWAS steam Draining Air Ingress Insulation Missing Attemperation Loss Unburnt Loss TURBINE Heat Rate Low Rated MS/RH Temp & Pressure Gland and Drain Valve Leakages HL in Drip System Failure Heat Loss in Drip Pump Failure/NA Air Ingress High Dissolved O2, D/A Vent HP/IP/LP Cylinder Efficiency Missing Insulation TDBFP Efficiency HP/LP Heater Performance Condenser Low Vacuum, Tube Cleaning Sub cooling COAL H2 in Coal Moisture Coal Burning in Yard Sulphur in Coal Coal Blending

20 Efforts towards improvement in Efficiency of Thermal Power Generation

21 Adoption of Supercritical Technology Efficiency gain of about 2 % is possible over sub critical units First Supercritical unit of 660 MW Commissioned in Dec- 2010, 800 MW in July,12 33 Units with total capacity MW operating Supercritical to constitute ~40%(~25000MW) coal fired capacity addition in 12 th Plan ( ) 100% coal fired capacity addition in 13 th Plan and beyond to be supercritical

22 EFFICIENCY IMPROVEMENT THROUGH RENOVATION AND MODERNISATION Programme To restore rated capacity and design parameters such as Heat Rate, APC, SOC etc.. To make the operating units well equipped with modified/ augmented latest technology. To overcome technological obsolescence and non-availability of spares. To improve the performance parameters in terms of PLF, Efficiency, Forced Outages, Availability and Reliability. To reduce maintenance requirements and enhance the ease in maintenance. Compliance of stringent environmental norms, safety and other statutory requirements.

23 Renovation & Modernization of old thermal power stations is an economical option to supplement capacity addition programme for increased power availability and Efficiency Extension of useful economic life of generating units by another years. To focus on full load operation of the unit beyond their original design life. Uprating of Generating Unit. Improvement beyond design parameters.

24 Drivers for E E R&M Availability of Coal, Land & Water is becoming more difficult for new power projects. Coal is an exhaustible natural resource. Hence, its saving through efficiency enhancement is desirable. R&M results in lower Specific Coal Consumption. R&M is one of the most cost effective measure for getting additional generation. Additional generation from old units becomes available in very short duration. 24 ( Contd--)

25 The benefits expected from Comprehensive R&M in a typical 200/210 MW unit include : - - Increased output by about 4-8% - Improved Unit Heat Rate by 10-15% - Extended Plant Life by about years. There is a shift from Generation Maximisation to Generation Optimisation with efficiency enhancement. Efficiency enhancement of about 8-10% is feasible in the existing LMZ units. Increased emphasis on Environment for clean technology. The environmental norms are getting more and more stringent.

26 11 th Plan R&M Programme & Achievements ( ) Programme (MW) Achievement (MW) Life Extension Programme (LEP) 7318 (53 units) 1291 (13 Units) R&M Programme (76 units) (59 units) Total (129 units) (72 units) 26

27 12 th Plan R&M Programme ( ) Programme (MW) Achievement (MW) Life Extension Programme (LEP) (70 units) ( ) ( 12 Units ) R&M Programme (65 units) ( 09 units ) Total (135 units) ( 21 units ) 27

28 RETIREMENT OF POWER PLANTS Retirement in a systematic manner an ongoing activity with focus on closing down Small and Old units Units of non-reheat type Units having very low design efficiencies Units having very low actual efficiency

29 Present Methodology for Retirement of units Units deviating more from design to retire first Retirement is linked to commissioning of new units In case of Gas based, Technology changing rapidly. Faster retirement could be considered to keep abreast with technology development

30 RETIREMENTS OF OLD UNITS Details of Retirements : 11 th Plan MW has already been retired comprising mainly of small size ( <100 MW),old and non reheat units 12 th Plan12-17( Planned) MW (< 100 MW coal units, > 35 years old Gas stations) till date 771 MW 13 th Plan (Planned) about 4000MW

31 Efforts under IGEN Programme Mapping of 85 Thermal units done and all the recommended measure have been implemented Guided for adoption of Better O&M Practices 55 Ebsilon Professional Professional Software Licenses provided to 15 Utilities GSECL, HPGCL, PSPCL, MAHAGENCO, CSPGCL, MPPGCL, RRVUNL, NLC, TANGEDCO, OPGCL, TVNL, DVC, APGENCO, UPRVUNL, and GIPCL

32 TRAINING on USE OF EBSILON.under IGEN TRAINING TO 100 ENGINEERS HAS BEEN IMPARTED ON EBSILON PROFESSIONAL SOFTWARE (This training has been imparted by GERMAN and Indian EBSILON EXPERTS)

33 IGEN contd.. Introduction of Online BPOS and Other Activities for OLDER TPS for 200MW and Above The Boiler Performance Optimization System (BPOS) is an online computer system which monitors and optimizes boiler operation. Module for soot blowing management. In the closed loop mode of operation at Suratgarh TPS INTRODUCTION to energy efficiency through Efficiency measure and Better Operation and Maintenance Practices

34 85 Units MAPPING STUDIES Capacity range of units No. of units Average Design Gross Heat Rate (kcal/kwh) Average Operating Gross Heat Rate (kcal/kwh) Average Deviation (%) Range of operating GHR (kcal/kwh) MW MW MW MW MW MW MW

35 MAJOR REASONS FOR THE HIGH OPERATING GROSS HEAT RATE 1. Low combustion efficiency due to improper air-fuel ratio. 2. Poor performance of milling system to meet new demand. 3. Low turbine cylinder efficiency 4. High dry gas losses due to poor heat transfer 5. Poor sealing and heat transfer in air pre-heaters 6. Low condenser vacuum. 7. High air ingress in the boiler and high heat loss due to poor insulation 8. Improper mill maintenance due to poor spare availability 9. Poor quality of coal 10.High auxiliary power consumption

36 Section wise Unit Heat rate losses in a particular unit

37 Saving Potential of Coal Based State Power Plants emerged out through current case studies on 70% plf Million tonnes of Oil equivalent (MToe) Case Studies 5.07 All State Utilities

38 Comparison of average Unit Heat Rate of different unit sizes MW 125MW 210MW 250MW 500MW Average Design Load Average Operating

39 Variations in Boiler Efficiency Boiler Efficiency (%) MW 125MW 210MW 250MW 500MW LOAD Design Average Operating Average

40 Total Parameters 120 MW (2) 125 MW (1) 210 MW (12) 250 MW (1) 500 MW (1) Total (toe) Short Term Potential ( toe) MS pressure MS Temp RH Temp Condenser Vacuum UBC in Fly Ash UBC in bottom ash Makeup Excess air Long Term Potential ( toe) RH Spray SH Spray Exit Gas Temp Change in FW temp HPT Efficiency IPT Efficiency LPT Efficiency HPH TTD HPH DCA LPH TTD LPH DCA

41 PAT Scheme Perform, Achieve and Trade scheme- aim is to improve Efficiency of the thermal plants both coal & gas based. Total Target Set for thermal power stations= 3.2 MTOE out of total MTOE Threshold limit to be DC = 30,000 tons of oil equivalent (TOE) per annum ( all power plants above MW will be covered in PAT scheme) MOP notified net heat rate reduction targets to 144 Thermal power Stations. Stations to achieve the targets within 3 years from date of notification i.e by Penalty for non achievement

42 Thermal Power Plant Groups under PAT Scheme Thermal Power Plants [144 Nos] Coal/Lignite [97] Gas [40] Diesel [7]

43 Target Setting for Reduction of NHR Deviation in Net Station Heat Rate from Design Net Heat Rate Reduction Target for Deviation in Net Station Heat Rate (%) Up to 5 % 10 % More than 5% and Up to 10 % 17 % More than 10% and Up to 20% 21 % More Than 20 % 24 % TARGET SET ARE UNDER NORMALISATION

44 Actual Heat Rate Deviations S.No. Particulars No. of Stations in the range of 27% SHR deviation(below 5%) 2. No. of Stations in the range of SHR deviation(5-below 10%) 3. No. of Stations in the range of SHR deviation(10-20%) 4. No. of Stations with SHR deviation of more than 20% 32% 26% 15% (ALL INDIA HEAT RATE DEVIATION wrt Design 10.04% (Huge potential)

45

46 THANKS CEA website:

Committed to make a better world

Committed to make a better world Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to

More information

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS CONFERENCE PROCEEDINGS OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS by Edward K. Levy, Nenad Sarunac, and Carlos Romero Energy

More information

Energy Efficiency Improvement in Thermal Power Plants

Energy Efficiency Improvement in Thermal Power Plants International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume-2, Issue-1, December 2012 Energy Efficiency Improvement in Thermal Power Plants Genesis Murehwa,

More information

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Boiler Calculations Sebastian

More information

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation

More information

4 th EU Sout Africa Clean Coal Working Group Meeting

4 th EU Sout Africa Clean Coal Working Group Meeting 4 th EU Sout Africa Clean Coal Working Group Meeting Hybrid Concentrated Solar Power (CSP) Concept Case Study for the Medupi Power Stationy Falk Hoffmeister Head of Sales and Business Development. Dr.

More information

Effect of condenser vacuum on performance of a Reheat Regenerative 210 MW Fossil-Fuel based Power Plants.

Effect of condenser vacuum on performance of a Reheat Regenerative 210 MW Fossil-Fuel based Power Plants. Effect of condenser vacuum on performance of a Reheat Regenerative 210 MW Fossil-Fuel based Power Plants. Shailendra Pratap Singh 1, George Phlip 2, Saurabh Kumar Singh 3 1 Research Scholar Singhania University,

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

Webpage: www.ijaret.org Volume 3, Issue IV, April 2015 ISSN 2320-6802

Webpage: www.ijaret.org Volume 3, Issue IV, April 2015 ISSN 2320-6802 Efficiency Assessment and Improvement of at Super Thermal Power Station Vikram Singh Meena 1, Dr. M.P Singh 2 1 M.Tech in Production Engineering, Jagannath University, Jaipur, Rajasthan, India Vikrammeena134@gmail.com

More information

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System FINE TUNING EXPERIENCE OF A CFBC BOILER By K.K.Parthiban / Boiler specialist / Venus Energy Audit System Introduction The Industrial boilers have been seeing a growth in capacity in the recent years. Current

More information

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater

More information

Skoda Supercritical Steam Turbine 660 MW

Skoda Supercritical Steam Turbine 660 MW Skoda Supercritical Steam Turbine 660 MW Jiri Fiala Head of Engineering Dept. Skoda Power s.r.o. 27th of October 2010 Vrnjacka Banja - Serbia ŠKODA History Establishment of the company in 1859 Mr. Emil

More information

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management

More information

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Operational Flexibility Enhancements of Combined Cycle Power Plants Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Siemens AG, Energy Sector Germany POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October

More information

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 6 (Sep. - Oct. 2013), PP 25-29 Performance of the Boiler and To Improving the Boiler Efficiency

More information

ADVANCED SOFTWARE TOOLS FOR OPTIMIZATION OF POWER PLANT PERFORMANCE

ADVANCED SOFTWARE TOOLS FOR OPTIMIZATION OF POWER PLANT PERFORMANCE ADVANCED SOFTWARE TOOLS FOR OPTIMIZATION OF POWER PLANT PERFORMANCE ARC Tenth India Forum, Hyderabad 5-7 July, 2012 Transforming Industry and Infrastructure through New Processes and Technologies Debasish

More information

How To Reduce Coal Power Plant Emissions

How To Reduce Coal Power Plant Emissions Emissions from coal fired power Generation Workshop on IEA High Efficiency, Low Emissions Coal Technology Roadmap Date: 29 November 2011 Location: New Delhi Osamu Ito Energy Technology Policy Division

More information

www.universityquestions.in

www.universityquestions.in DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT: ME6701-POWER PLANT ENGINEERING YEAR/SEM: III/V UNIT-I COAL BASED THERMAL POWER PLANTS 1. What are the processes of rankine cycle?

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

EFFICIENCY WITH DIFFERENT GCV OF COAL AND EFFICIENCY IMPROVEMENT OPPORTUNITY IN BOILER

EFFICIENCY WITH DIFFERENT GCV OF COAL AND EFFICIENCY IMPROVEMENT OPPORTUNITY IN BOILER EFFICIENCY WITH DIFFERENT GCV OF COAL AND EFFICIENCY IMPROVEMENT OPPORTUNITY IN BOILER Chetan T. Patel 1, Dr.Bhavesh K. patel 2, Vijay K. Patel 3 M.E. in Energy Engineering 4 th sem, Government Engineering

More information

steam centre of excellence Steam Boiler System Optimization

steam centre of excellence Steam Boiler System Optimization Steam Boiler System Optimization Introduction Gas Cost Metering Fluids Fuel, Water, Steam Steam Costs Boiler House Stack Losses Boiler Waterside Surfaces Blowdown Current Natural Gas Cost Projected Cost

More information

Efficiency on a large scale CFB Steam Boilers

Efficiency on a large scale CFB Steam Boilers Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch

More information

Efficiency Assessment of Condensing Steam Turbine

Efficiency Assessment of Condensing Steam Turbine Efficiency Assessment of Condensing Steam Turbine DOSA ION, Department of Mechanical Engineering, Industrial Engineering and Transportation University of Petrosani Address Str. Universitatii nr. 20, 332006,

More information

IMPROVING THE EFFICIENCY OF THERMAL EQUIPMENTS OF 210 MW TPS THROUGH THERMAL AUDIT

IMPROVING THE EFFICIENCY OF THERMAL EQUIPMENTS OF 210 MW TPS THROUGH THERMAL AUDIT IMPROVING THE EFFICIENCY OF THERMAL EQUIPMENTS OF 210 MW TPS THROUGH THERMAL AUDIT MUDITA DUBEY 1 Prof. ABHAY SHARMA 2 M.TECH IV SEM 1 Dept. of Mechanical Engg. 2 GGITS, Jabalpur ABSTRACT In the present

More information

(To be published in Part II, Section 3, Sub-section (ii) of Gaztte of India) MINISTRY OF POWER NOTIFICATION

(To be published in Part II, Section 3, Sub-section (ii) of Gaztte of India) MINISTRY OF POWER NOTIFICATION (To be published in Part II, Section 3, Sub-section (ii) of Gaztte of India) DRAFT MINISTRY OF POWER New Delhi, the, 1999 NOTIFICATION S.O.------------------- In exercise of the powers conferred by sub-section

More information

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED

More information

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author BIOPOWER 5 CEX 1 Wärtsilä 10 January 2012 Presentation name / Author GENERAL INFORMATION ELECTRICAL OUTPUT 4.3 5.5 MWe HEAT OUTPUT Up to 10 MWth (16 t/h steam 1,3 bara) FUEL TYPE Wood chips, bark, saw

More information

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN Authors: Presenter: T. Efrat, Yu Haimiao Tomer Efrat Deputy Manager, Thermal Process Dept. IDE Technologies

More information

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units. COGENERATION 1. INTRODUCTION... 1 2. TYPES OF COGENERATION SYSTEMS... 2 3. ASSESSMENT OF COGENERATION SYSTEMS... 10 4. ENERGY EFFICIENCY OPPORTUNITIES... 14 5. OPTION CHECKLIST... 16 6. WORKSHEETS... 17

More information

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT

TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT TARIFF DETERMINATION METHODOLOGY FOR THERMAL POWER PLANT 1. Background The Electricity Act 2003 has empowered the Central Electricity Regulatory Commission (CERC) to specify the terms and conditions for

More information

Chapter 2.2: Boilers

Chapter 2.2: Boilers Chapter 2.2: Boilers Part I: Objective type Questions and Answers 1. The minimum capacity of any closed vessel which generates steam under Indian Boilers Regulation Act is. a) 2.275 liters b) 22.75 kilo

More information

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY

More information

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS ASME ORC 2015 3rd International Seminar on ORC Power Systems 12-14 October 2015, Brussels, Belgium PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS Vittorio

More information

Last update: January 2009 Doc.: 08A05203_e

Last update: January 2009 Doc.: 08A05203_e Last update: January 2009 Doc.: 08A05203_e Organic Rankine Cycle (ORC) modules ORC is a commercial technology for distributed production of combined heat and power from various energy sources. TURBODEN

More information

International Journal of Engineering Research and Development

International Journal of Engineering Research and Development International Journal of Engineering Research and Development eissn : 2278-067X, pissn : 2278-800X, www.ijerd.com Volume 4, Issue 8 (November 202), PP. 94-00 Investigation of Improvement in Boiler Efficiency

More information

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with

More information

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG) BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT

More information

Thermodynamical aspects of the passage to hybrid nuclear power plants

Thermodynamical aspects of the passage to hybrid nuclear power plants Energy Production and Management in the 21st Century, Vol. 1 273 Thermodynamical aspects of the passage to hybrid nuclear power plants A. Zaryankin, A. Rogalev & I. Komarov Moscow Power Engineering Institute,

More information

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single

More information

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 TABLE OF CONTENTS Description Page Number SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 Indeck Keystone Energy, LLC. 5451 Merwin Lane, Suite 100 Erie,

More information

Germany Energy efficiency report

Germany Energy efficiency report Germany Energy efficiency report Objectives: 231 TWh of end-user energy savings by 216 Overview 29 2-29 (% / year) Primary intensity (EU=1) 1 99 + -1.3% - CO 2 intensity (EU=1) 16 - -1.6% - CO 2 emissions

More information

Coal-fired power plant efficiency improvement in India

Coal-fired power plant efficiency improvement in India Coal-fired power plant efficiency improvement in India Colin Henderson November 2015 IEA Clean Coal Centre Coal-fired power plant efficiency improvement in India Author: IEACCC Ref: Colin Henderson CCC/

More information

Recovery Boiler Research Needs An Industry Perspective

Recovery Boiler Research Needs An Industry Perspective Recovery Boiler Research Needs An Industry Perspective Andrew Jones International Paper 7th International Colloquium on Black Liquor Combustion and Gasification International Paper Recovery Operation Goals

More information

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines Dipl.-Ing. Till Augustin October, 7 th 2010 Solid Biomass Cogeneration with Spilling Steam Engines Contents: Who is Spilling

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

Steam Power Plants as Partners for Renewable Energy Systems

Steam Power Plants as Partners for Renewable Energy Systems Steam Power Plants as Partners for Renewable Energy Systems Hans-Joachim Meier Head of VGB Competence Centre 4 Environmental Technology, Chemistry, Safety and Health VGB PowerTech e.v., Essen, Germany

More information

ENERGY EFFICIENCY IN POWER PLANTS

ENERGY EFFICIENCY IN POWER PLANTS Plenary session Producing more with less: Efficiency in Power Generation ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart, Wim Kok, Pierre Ploumen KEMA Power Generation & Sustainables ENERGY EFFICIENCY

More information

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency

More information

Energy Efficient Operations and Maintenance Strategies for Boilers

Energy Efficient Operations and Maintenance Strategies for Boilers Energy Efficient Operations and Maintenance Strategies for Boilers Large, complex and widely used, industrial boilers are major consumers of fuel. Proper operations and maintenance (O&M) procedures must

More information

Low grade thermal energy sources and uses from the process industry in the UK

Low grade thermal energy sources and uses from the process industry in the UK Low grade thermal energy sources and uses from the process industry in the UK Yasmine Ammar, Sharon Joyce, Rose Norman, Yaodong Wang, Anthony P. Roskilly Sustainable Thermal Energy Management in the Process

More information

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES INTRODUCTION This tutorial is designed for students wishing to extend their knowledge of thermodynamics to a more

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

Progress on High Efficiency Coal Power Plants

Progress on High Efficiency Coal Power Plants CoalFleet for Tomorrow Progress on High Efficiency Coal Power Plants Dr. Jeff Phillips Sr. Program Manager, Generation McIlvaine Webcast March 1, 2012 CoalFleet for Tomorrow is a registered service mark

More information

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 4, Number 3 (2011), pp. 281-289 International Research Publication House http://www.irphouse.com Performance Analysis

More information

BEST PRACTICES IN INDIAN POWER PLANTS

BEST PRACTICES IN INDIAN POWER PLANTS Compiled by: BEST PRACTICES IN INDIAN POWER PLANTS S No. Topics Implemented power plant 1 Performance Improvement Heat rate & Auxiliary power consumption 1.1 Smart wall blowing system for optimizing wall

More information

T@W Good Practice Form

T@W Good Practice Form T@W Good Practice Form Setting Title: Public-private Partnership Leading to a New CHP Plant Utilising Fibre Sludge and Biomass Country: Location: Sweden Mariestad in West Sweden Region Start date: 1999

More information

Small Scale Coal Power Plant in Indonesia

Small Scale Coal Power Plant in Indonesia Small Scale Coal Power Plant in Indonesia Taufik Sastrawinata Director Technology and Business Development of PT. Advance Technology Indonesia and Secretary General of Indonesian Coal Society Indonesia

More information

SAMPLE CHAPTERS UNESCO EOLSS

SAMPLE CHAPTERS UNESCO EOLSS STEAM TURBINE OPERATIONAL ASPECTS R.A. Chaplin Department of Chemical Engineering, University of New Brunswick, Canada Keywords: Steam Turbines, Operation, Supersaturation, Moisture, Back Pressure, Governing

More information

Boiler and Steam Efficiency What does it mean?

Boiler and Steam Efficiency What does it mean? PACIA Carbon Solutions Forum 3-29 September 20 Boiler and Steam Efficiency What does it mean? Andrew Hook - Area Manager, Nalco 1 Purpose, Process, Payoff Purpose: To explain boiler and steam efficiencies

More information

Tips for burner modulation, air/fuel cross-limiting, excess-air regulation, oxygen trim and total heat control

Tips for burner modulation, air/fuel cross-limiting, excess-air regulation, oxygen trim and total heat control Boiler control Tips for burner modulation, air/fuel cross-limiting, excess-air regulation, oxygen trim and total heat control Boilers are often the principal steam or hot-water generators in industrial

More information

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences Matts Strömberg Soderenergi AB, Sweden Presented at Power Gen Europe 2011 Milan, Italy

More information

THEORETICAL ANALYSIS OF THE PERFORMANCE OF DUAL PRESSURE CONDENSER IN A THERMAL POWER PLANT

THEORETICAL ANALYSIS OF THE PERFORMANCE OF DUAL PRESSURE CONDENSER IN A THERMAL POWER PLANT INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6340(Print), ISSN 0976 6340 (Print) ISSN 0976 6359

More information

Integrated. for Steam Power Plants

Integrated. for Steam Power Plants Integrated Service Solutions for Steam Power Plants Services for thermal power plants Alstom is dedicated to keeping thermal power plants competitive. Thanks to our OEM expertise and involvement in around

More information

PI System O&M Management Tool in Power Generation Industry. 27 October 2011. Barış Başer O&M Group Manager

PI System O&M Management Tool in Power Generation Industry. 27 October 2011. Barış Başer O&M Group Manager PI System O&M Management Tool in Power Generation Industry 27 October 2011 Barış Başer O&M Group Manager Scope of Presentation AK Enerji Generation Portfolio Changing Market Conditions, Impacts to CCGTs

More information

World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014

World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 From Safe by Accident? by Judy Agnew & Aubrey Daniels Despite decades of reduction in safety related deaths and injuries on the job,

More information

DE-TOP User s Manual. Version 2.0 Beta

DE-TOP User s Manual. Version 2.0 Beta DE-TOP User s Manual Version 2.0 Beta CONTENTS 1. INTRODUCTION... 1 1.1. DE-TOP Overview... 1 1.2. Background information... 2 2. DE-TOP OPERATION... 3 2.1. Graphical interface... 3 2.2. Power plant model...

More information

Trouble Shooting. Pump

Trouble Shooting. Pump Trouble Shooting Pump Trouble Possible Cause Remedy Oil leaking in the area of water pump crankshaft Worn crankshaft seal, bad bearing, grooved shaft, or failure of retainer o-ring. Excessive play on crankshaft

More information

Boiler & Pressure Vessel Inspection discrepancies and failures

Boiler & Pressure Vessel Inspection discrepancies and failures Boiler & Pressure Vessel Inspection discrepancies and failures Water Heaters / Pressure Vessels Pressure Vessels are inspected once every three years. This requires a test of A: safety relief devices B:

More information

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace Content 1. Technical overview cogeneration plant and heating network 2. Investment of the facility 3. Experiences

More information

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS UNIT 61: ENGINEERING THERMODYNAMICS Unit code: D/601/1410 QCF level: 5 Credit value: 15 OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS 2 Be able to evaluate

More information

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. 1) Introduction This Expression of Interest (EoI) seeks response

More information

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT Atef M Al Baghdadi Water and Electricity Authority Abu Dhabi, U.A.E Keywords : Power Plant, Boiler Capacity, Electrical Power

More information

How To Power A Power Plant With Waste Heat

How To Power A Power Plant With Waste Heat Power Generation Siemens Organic Rankine Cycle Waste Heat Recovery with ORC Answers for energy. Table of Contents Requirements of the Future Power Supply without extra Fuel Siemens ORC-Module Typical Applications

More information

Half the cost Half the carbon

Half the cost Half the carbon Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within

More information

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Mark Schiffhauer, ATSI Engineering Services Cameron Veitch, Combustion and Energy Systems Scott Larsen, New York State Energy

More information

Stora Enso Fors Ltd Sweden

Stora Enso Fors Ltd Sweden THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden

More information

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

HOW TO SELECT A LOW VOLUME (L.V ) BOILER HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement

More information

System Assessment Capabilities for Fossil Fuel Power Stations

System Assessment Capabilities for Fossil Fuel Power Stations System Assessment Capabilities for Fossil Fuel Power Stations Technical Services LifeCycle Advantage Educational Services Consulting Technology Advantage The mission of Flowserve Technical Services is

More information

GLOBACON 05 HVAC Systems for Cogen

GLOBACON 05 HVAC Systems for Cogen GLOBACON 05 HVAC Systems for Cogen Track 2, Session 2B Advanced HVAC and Building Systems Date: March 24th, 2005 Gearoid Foley President Integrated CHP Systems Corp. Integrated CHP Systems Corp. Electricity

More information

Steam Turbine Concepts for the Future Volatile Power Market

Steam Turbine Concepts for the Future Volatile Power Market Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation

More information

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further

More information

Attachment J-C18.1. HVAC Work Instructions

Attachment J-C18.1. HVAC Work Instructions . RFP: Attachment J-C18.1 HVAC Work Instructions NNC13ZFD017J SOW Item No. Title Page C18-02 Control Air Systems Annual PM 2 C18-03 Split System AC Indoor Section Annual PM 3 C18-04 Condensing Unit Semi-Annual

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours: Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:

More information

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant Supercritical CO2 Power Cycle Symposium September 9-10, 2014 Pittsburg, Pennsylvania USA Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant Dr. Leonid Moroz, Dr. Maksym

More information

Hybrid Modeling and Control of a Power Plant using State Flow Technique with Application

Hybrid Modeling and Control of a Power Plant using State Flow Technique with Application Hybrid Modeling and Control of a Power Plant using State Flow Technique with Application Marwa M. Abdulmoneim 1, Magdy A. S. Aboelela 2, Hassen T. Dorrah 3 1 Master Degree Student, Cairo University, Faculty

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information

COMBUSTION. In order to operate a heat engine we need a hot source together with a cold sink

COMBUSTION. In order to operate a heat engine we need a hot source together with a cold sink COMBUSTION In order to operate a heat engine we need a hot source together with a cold sink Occasionally these occur together in nature eg:- geothermal sites or solar powered engines, but usually the heat

More information

BOILER EFFICIENCY F7 Energy eco-efficiency opportunities in Queensland Foundries

BOILER EFFICIENCY F7 Energy eco-efficiency opportunities in Queensland Foundries BOILER EFFICIENCY F7 Energy eco-efficiency opportunities in Queensland Foundries Don t boil your money away Boilers are used by some foundries to provide steam and hot water. Boilers use large amounts

More information

912 MW Supercritical Boiler for the next Coal Fired Plant Generation

912 MW Supercritical Boiler for the next Coal Fired Plant Generation 912 MW Supercritical Boiler for the next Coal Fired Plant Generation Konrad Ebert, Dr. Michael Kübel (1) Heinz Lorey, Wolfgang Michele (2) (1) EnBW Kraftwerke AG, Stuttgart/Germany (2) ALSTOM Boiler Deutschland

More information

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: 31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI

More information

Overview of Waste Heat Recovery for Power and Heat

Overview of Waste Heat Recovery for Power and Heat Overview of Waste Heat Recovery for Power and Heat Dave Sjoding Northwest Clean Energy Application Center Washington State University Extension Energy Program Waste Heat Recovery for Power and Heat Workshop

More information

CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai

CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries RENERGY 2013 Innovation Session 9 th May 2013 Chennai T.S.Venkataraman & T.G.Sundara Raman Esvin Advanced

More information

Pre-designed Steam Turbines

Pre-designed Steam Turbines Industrial Power Pre-designed Steam Turbines The comprehensive product range up to 12 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / steamturbines A Full Range

More information

Continuous flow direct water heating for potable hot water

Continuous flow direct water heating for potable hot water Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial

More information

A Case Study on Coal to Natural Gas Fuel Switch

A Case Study on Coal to Natural Gas Fuel Switch A Case Study on Coal to Natural Gas Fuel Switch by Brian Reinhart, P.E. Presenter Alap Shah Mark Dittus Ken Nowling Bob Slettehaugh Black & Veatch December 12, 2012 INTRODUCTION In the United States, natural

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

Printing and Publishing Energy Savings Guide

Printing and Publishing Energy Savings Guide Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand

More information

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication

More information