1 THE STAR, DARLING HOTEL AND SPA PYRMONT, NSW H Nguyen BE (Hons), CPEng MIEAUST NPER Associate Director, Taylor Thomson Whitting Ltd, Sydney, Australia ABSTRACT The redevelopment at The Star in Sydney includes the brand new five star hotel and spa, The Darling, located at the southern end of the Casino on the site of the former Pyrmont Switching Station. The new hotel building structure includes an eleven storey hotel tower over three podium levels comprising retail, casino and hotel facilities and four basement levels incorporating loading dock, plant and parking. The building structure has been designed to allow for future Sydney Metro tunnels directly under the building. This paper discusses the structural design aspects of the hotel complex with regards to how the structural framing and design was improved from conventional design methods. It discusses current and future design practices for structural design trends that are tailored to achieve an architectural design vision. In this case, The Darling hotel presents an iconic, highly distinctive raked form tower, nine metre tall free standing feature sandstone walls and glass awnings with up to twenty metre cantilevers. The paper also outlines the processes involved in the design to integrate the new hotel with the existing Casino complex and to assess the effect of the future Sydney Metro tunnels on the building structure, where the proposed tunnel depth is close to the building foundation level. Figure 1: Eastern view with the raked form Tower, free standing stone wall and cantilevered awning Figure 2: Raked form tower

2 Keywords: Concrete structure, Raked Column, Vibration, Pool Isolation, Metro tunnel INTRODUCTION The redevelopment at The Star in Sydney includes the brand new five star Hotel and Spa, The Darling, located at the southern end of the Casino on the site of the former Pyrmont Switching Station. The new Hotel building structure is a conventional concrete frame structure with glass façade to the eleven storey tower and sandstone clad façade to the three storey podium. The three storey podium structure along Union Street is linked with the main tower structure with lightweight composite steel pedestrian bridges. The area between the two building structures is covered with a three storey high glass atrium that forms part of the Hotel entrance foyer. This paper focuses on the design aspects of the structure with regards to improving the structural grids, the raked form tower, floor vibration, cantilevered sandstone walls, cantilevered awning, the integration with the existing Casino complex and the allowance for future Sydney Metro tunnels. New Hotel Site New Hotel Site Figure 3: Site Plan Figure 4: N-S Cross section Figure 5: As Built Aerial View STRUCTURAL DESIGN The adopted floor system on the typical Hotel floor is a conventional flat plate system comprising 210 thick post tensioned slabs spanning up to 9 metres with 3 meters cantilevers. Slab thickness in the wet areas is reduced to 170 thick to allow for a 40mm set down, ensuring a flat soffit to the slab reducing formwork cost and achieving maximum ceiling heights. The podium and basement levels are comprised of post tensioned banded slab systems. Lateral stability of the building is provided by two main services cores at each end of the hotel floor plate. Although the hotel services lift starts at ground floor and loading dock level, the structural core walls are continued down to the foundation level. The major driver behind the structural grid adopted, was a desire to eliminate transfer structures throughout the building whilst accommodating the architectural layouts for the hotel, podium, loading dock, porte cochere and carpark levels. Structural Grids Historically, structural column grids were generally adopted to suit the function of each building use, ie hotel, casino, retail, loading dock, parking etc. This typically results in the requirement for transfer structures within the building. The existing Casino Hotel is one example of a building with numerous transfer levels. This design approach is quite common because the structural engineer tends to get involved at a later stage, following the completion of architectural scheme design and building layout.

3 Within the new hotel, the proposed structural grid has been developed to make the car park efficient within an irregularly shaped site, whilst also working at all hotel floor layouts, gambling floor, hotel foyer, retail level, porte cochere and loading dock without transfer beams. Column sizes and shapes were selected to accommodate the function of each architectural area, ie long blade columns that fit within the hotel partition walls, exposed round columns in the podium and dock level and rectangular columns for parking levels. Column transitions and column offsets as shown in figure 6 play a major role in the effort to eliminate transfers. The design floor to floor heights of the new hotel were to match the existing Casino complex levels which are typically 2850mm for hotel and 2600mm for carpark levels. The elimination of deep transfer structures in the new hotel enabled these tight heights to be met whilst minimising the structural zone, leading to an improved, more flexible building for services interaction. Raked Form Tower At the eastern end of the hotel tower, the building floor plate increases in length gradually towards the east at each floor level and forms a distinctive raked form tower. A pair of sloping columns follows the raked façade to support vertical building loads. A full 3D finite element Strand7 model of the building structure was set up to determine structural member forces, building sway and stability for 36 load combination cases. Tension and compression forces at each end of the columns caused by its angle are resolved into the floor system then are globally resolved in the main core system. Interaction of these internal forces for strength, serviceability and global stability was carefully reviewed through the creation of the 3D finite element model. Figure 7 shows the internal stress in the floor for one load case. Stress distribution in the floor Fig 6: Typical column transition Main core Raked column Figure 7: Strand7 model Figure 8: Raked tower during construction Floor Vibration In recent years, the review of floor vibrations due to dynamic loads is commonly considered as part of the serviceability design, where in the past, floor vibration was usually ignored in the structural design of general floor plates, particularly in concrete structures. However, floor vibrations in thin long span post tensioned floors can be a particular issue, which could affect human comfort in occupied spaces. In the case of a hotel, it is critical for the hotel levels that floor vibration from either walking along the corridor or from using the swimming pool does not affect the occupants of the hotel rooms.

4 Vibration criterion for human comfort is normally expressed in terms of peak acceleration. For the hotel floor design, the peak acceleration is limited to 0.5%g as recommended in Floor Vibration due to Human Activity by Thomas Murray. The damping ratio is assumed to be 2% which is typical for this type of hotel floor. A finite element analysis was undertaken to predict the peak acceleration. Typically floors were modelled and designed using RAM Concept software. For vibration review, this model was then exported to Strand7 software in which the natural frequency of the floor was determined. The Strand7 analysis also showed the different mode shapes of the vibration pattern and indicated the most sensitive parts of the structure. Figure 9 indicates examples of mode shapes showing hot spots within the floor. Walking forces and response test points were located at these hot spots along the hotel corridor and from there the peak accelerations were calculated using the harmonic response solver within Strand7. Figure 9: Mode shapes showing hot spots within the Hotel floor With the assistance of these advanced software tools, the floor design has not only been optimised for strength design but also for serviceability design which covers both floor deflection and floor vibration criterion. Swimming Pool The pool is located in the north east corner of the level 3 outdoor area, directly over the gaming floor area. The pool is 29m long by 5m wide including the balance tank and constructed from reinforced concrete. The main building floor plate that supports the pool has a 25m long clear span in the direction of the pool to create a column free environment to the gaming floor below. Concrete upstand beams adjacent to the sides of the pool were adopted to minimise the impact to the gaming floor ceiling space as shown in figure 10. To prevent vibrations transmitting from the pool to the main structure, the pool structure was isolated by using isolation strips as shown in figure 11. Concrete upstand beam Figure 10: Cross section through the pool Figure 11: Pool shell deflection, isolation strip diagram and applied pressure

5 Due to the relative difference in stiffness between the base structure and the pool structure, the applied pressure from the pool on the isolation strips will vary across the length and width of the pool as the base slab deflects differently to the pool slab. A finite element analysis was undertaken to provide a prediction of deflections for the main floor plate which in turn were used to predict the distribution of pressure on the isolation strips. This is to ensure the isolated system is adequately loaded and the air gap between the main slab and the pool is not bridged. The use of this analysis method is an advance on past practices where isolation springs or strip loads were determined using a tributary area without consideration of the difference in stiffness between the pool and the main structure. Feature Sandstone Wall The 9 metre tall free standing feature sandstone wall is located at the corner of Union Street and Edward Street. The structural framing of the wall is comprised of a structural steel frame with a Y- shaped bracing member at the roof level which was set back behind the stone wall to achieve the full vertical slot aesthetic as required by the architect. A Unistrut and support angle system was fixed to the main steel frame and provided the support to the stone cladding. A 3D analysis model was set up for the structural design and allowed checks on both the vertical and horizontal deflection of the steel frame to ensure they are within the acceptable limits for stone cladding elements. Figure 12: Structural framing Figure 13: Y shaped bracing Glass Awning The glass awning over the east entry is approximately 26 meters long by 7 meters wide. The structural framing of the awning comprises two main rafters and a series of secondary members which are hung from the main beams and support the glazing. There are only three support points for the awning structure. The south east corner of the awning is supported by a cantilevered beam running in the north south direction. Support point Figure 14: Awning framing Figure 15: Buckling analysis

6 A finite element model was set up to determine the buckling length of the main rafter. The analysis included the stiffeners and lateral restraint from the cantilevered beam. The results from this analysis enabled us to optimise the steel section for both strength and serviceability. DESIGN INTERGRATION WITH THE EXISTING CASINO COMPLEX Part of the redevelopment was the integration with the existing Complex, which included providing a network of continuous pedestrian links from all streets through the site, a new porte cochere for the hotel, an extension of the main gaming floor at level 1, improvements to the Lyric Theatre loading dock and extension of the existing underground carpark. Interface to existing building At the interface between the existing Casino and the new hotel, two existing columns were required to be removed to provide a column free environment in the gaming floor. In order to maintain headroom at the existing level, where the columns have been removed, a transfer beam was installed at the roof level in lieu of lower level with the load from the existing column hung to the new transfer beam. Carpark The existing carpark within the Casino Complex is a split level parking structure which did not work well within the new hotel site due to its irregular shape. As such, the adopted parking structure has maximised the number of parking spaces, integrated well with the existing carpark and removed the requirement for the additional structure typically associated with split level carparks and ramps. Loading dock Improvement to the existing Lyric theatre dock involved a dock extension to enable access for 19m articulated trucks and their entry and exit movements. The new hotel loading dock level was also developed to suit the requirements of the Lyric Theatre dock. Structural column locations were adopted to suit both the new hotel dock and the extension of the existing Lyric Theatre dock. STRUCTURAL DESIGN FOR FUTURE SYDNEY METRO TUNNELS The proposed future Sydney Metro tunnels comprise twin bored tunnels which run across the site in the East-West direction from Pyrmont Street to Edward Street directly underneath the building. Two options for tunnel alignment were proposed by Sydney Metro as they could not confirm the position of the tunnels. Figure 16: Proposed tunnel alignment Figure 17: Tunnel depth from foundation level A detailed engineering assessment was carried out to determine the potential impact on the building structure from the future construction of the underground tunnels, and also the effect of the building foundation loads on the feasibility of constructing the tunnels so close to the buildings footings.

7 Future tunnel excavation will alter the stress in the ground and the building loads above will alter the stresses in the tunnel lining. Both have the potential to cause excessive movement to the hotel super structure and affect the performance of the tunnel. Therefore, any displacements due to excavation of the proposed future tunnels are critical when considering the structural and foundation design of the structure. An independent verification of the impact of the Hotel building loads on the proposed future tunnels was also undertaken by the engineers for Sydney Metro. Following a series of design iterations, a finite element analysis and consultation process with Sydney Metro, it was agreed that the top of the proposed tunnels will run approximately 5m below the bulk excavation at Pyrmont Street down to about 7m at Edward Street. The minimum distance between the footing founding level and the top of the tunnel is approximately 3955mm. In conjunction with Douglas Partners, a numerical analysis in 3D was carried out. Our assessment of the impact on the hotel supper structure was then based on the following outputs: Total settlement of column footing due to building load application and future tunnel excavation Incremental settlement due to tunnel excavation after construction of the building Differential settlement between footings at the building column grid after construction of the building A 3D model was set up for the area where the most joints cluster within the bedrock as identified in the geotechnical investigation. This model considered the worst case footings based on their locations and the magnitude of footing loads relative to the tunnels location. The additional strength of the tunnel lining was not considered in the analysis. The assessment was limited to the zone of influence around the tunnels, generally defined by vertical and horizontal boundaries including Protection Zone, First Reserve and Second Reserve as set by Sydney Metro design guidelines. Figure 18: 3D finite element model of tunnel with building loads above At the hotel site, the material under the foundation level and around the future tunnels is high strength sandstone with regular joint and bedding plane as shown in figure 18. Results from the 3D analysis indicated a maximum total settlement of approximately 11.5mm due to the building loads and excavation of the tunnels. Approximately 8.5mm is due to building loads and 3mm due to tunnel excavation. Maximum total differential settlement between individual footings is approximately 6mm or span/1500.

8 The estimated settlements due to tunnel excavation and the differential settlements between column footings are relatively small. With these settlements, the building structure falls into Risk Category 1 or negligible damage classification, based on CIRIA RP30, 1996 in the table below, which provides a recommended limit of 10mm and a maximum slope of building less than 1/500. Figure 19: Deflection contour plot Table 1: Damage Classification CIRIA RP30, 1996 During excavation and construction of the Hotel foundations, an engineering geological mapping report was carried out to verify the geological conditions. The geological features identified during excavation were judged to be generally consistent with the assumptions in the model. This process also validated the structural and geotechnical design of the Hotel structure. The aid of advanced 3D analysis software and the use of numerical analysis from a geotechnical engineer are an improvement on past practices, where deep transfer options over the tunnels would normally have been adopted as a structural solution. CONCLUSION Current structural design practice with the increased adoption of the use of advanced finite element software tools will assist the structural engineer in improving and optimising the structural design solutions for both strength and serviceability of future structures. Early involvement and a proactive approach from the structural engineer on the project will provide a major opportunity to express innovative and practical engineering solutions and to assist the architect to achieve their design vision. Architectural design trends will evolve with more unusual design shapes, large spans, offset cores, leaning towers, taller towers, vertical garden, etc. Structural design trends will also have to continue to evolve and support these visions. Figure 20: Aerial view at November 2009 Figure 21: Aerial view at September 2010 Acknowledgements Additional acknowledgement goes to the design and project team responsible for the delivery of this project; Michael Henry of Echo Entertainment, Greig Chandler and Thomas Lay of APP, Russell Lee, Joe Agius, Alex Small and John Seligman of Cox Richardson, Daniel Murphy and Mark Ciano of Brookfield Multiplex, Charles Marais of Douglas Partners, Richard Green, Michael King, Malay Sengupta and Dean Genner, of Taylor Thomson Whitting.

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT Property Inspection 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT March 2013 This document has been prepared for the benefit of Clint Marston. No liability is accepted by this company

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements

More information

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations

More information

Figure 5-11. Test set-up

Figure 5-11. Test set-up 5.5. Load Procedure A uniform load configuration was used for the load tests. An air bag, placed on the top surface of the slab, was used for this purpose, and the load was applied by gradually increasing

More information

King Post Wall Information

King Post Wall Information King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to

More information

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for: HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

Technical Assignment 2 TABLE OF CONTENTS

Technical Assignment 2 TABLE OF CONTENTS 2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

Conceptual design and design examples for multi-storey buildings

Conceptual design and design examples for multi-storey buildings Brussels, 18-20 February 2008 Dissemination of information workshop 1 Conceptual design and design examples for multi-storey buildings Dr.-Ing. Christian Müller Dipl.-Ing. Matthias Oppe RWTH Aachen Overview

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the

More information

Commerzbank Head Office. Frankfurt am Main

Commerzbank Head Office. Frankfurt am Main Commerzbank Head Office Frankfurt am Main 2 Commerzbank Head Office Conception The Commerzbank head-office building not only adds an impressive feature to Frankfurt s skyline. Viewed from close quarters

More information

Structural Assessment Report

Structural Assessment Report Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive

More information

Section A Roof Truss

Section A Roof Truss Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel

More information

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems: Reading Assignment SLAB DESIGN Chapter 9 of Text and, Chapter 13 of ACI318-02 Introduction ACI318 Code provides two design procedures for slab systems: 13.6.1 Direct Design Method (DDM) For slab systems

More information

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS 8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the

More information

ASHULIA APPARELS LTD. Client Summary Report

ASHULIA APPARELS LTD. Client Summary Report Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary

More information

Bracing Webs in Trusses that have Dissimilar Configurations

Bracing Webs in Trusses that have Dissimilar Configurations Bracing Webs in Trusses that have Dissimilar Configurations Released April 25, 2006 Issue: Truss Design Drawings (TDD) that are prepared in accordance with ANSI/TPI 1, National Design Standard for Metal

More information

9.3 Two-way Slabs (Part I)

9.3 Two-way Slabs (Part I) 9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

OPTIMAL DIAGRID ANGLE TO MINIMIZE DRIFT IN HIGH-RISE STEEL BUILDINGS SUBJECTED TO WIND LOADS

OPTIMAL DIAGRID ANGLE TO MINIMIZE DRIFT IN HIGH-RISE STEEL BUILDINGS SUBJECTED TO WIND LOADS International Journal of Civil Engineering and Technology (IJCIET) Volume 6, Issue 11, Nov 215, pp. 1-1, Article ID: IJCIET_6_11_1 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=6&itype=11

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

How To Build A Gambrel Roof And A Gable End Roof

How To Build A Gambrel Roof And A Gable End Roof Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect

More information

Module 5 (Lectures 17 to 19) MAT FOUNDATIONS

Module 5 (Lectures 17 to 19) MAT FOUNDATIONS Module 5 (Lectures 17 to 19) MAT FOUNDATIONS Topics 17.1 INTRODUCTION Rectangular Combined Footing: Trapezoidal Combined Footings: Cantilever Footing: Mat foundation: 17.2 COMMON TYPES OF MAT FOUNDATIONS

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British

More information

[TECHNICAL REPORT I:]

[TECHNICAL REPORT I:] [Helios Plaza] Houston, Texas Structural Option Adviser: Dr. Linda Hanagan [TECHNICAL REPORT I:] Structural Concepts & Existing Conditions Table of Contents Executive Summary... 2 Introduction... 3 Structural

More information

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO SIKA SYSTEMS FROM BASEMENT TO ROOF BASEMENT TO ROOF SOLUTIONS FOR ELEPHANT HOUSE AT ZURICH ZOO PROJECT DESCRIPTION The Kaeng Krachan Elephant

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

A 38-story design-build steel structure features a staggered-truss frame

A 38-story design-build steel structure features a staggered-truss frame ALADDIN HOTEL A 38-story design-build steel structure features a staggered-truss frame Robert J. McNamara is president of McNamara/Salvia, Inc., in Boston. Among his more notable projects during his more

More information

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

Seismic Isolated Hospital Design Practice in Turkey: Erzurum Medical Campus

Seismic Isolated Hospital Design Practice in Turkey: Erzurum Medical Campus Seismic Isolated Hospital Design Practice in Turkey: Erzurum Medical Campus J. Kubin, D. Kubin, A. Özmen, O.B. Şadan, E. Eroğlu Prota Engineering Design and Consultancy Services Inc. H. Sucuoğlu, S. Akkar

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

Costs of Base-isolation and Earthquake Insurance in New Zealand

Costs of Base-isolation and Earthquake Insurance in New Zealand Costs of Base-isolation and Earthquake Insurance in New Zealand A. W. CHARLESON & N.J. ALLAF Faculty of Architecture and Design Victoria University, Wellington, New Zealand. 2012 NZSEE Conference ABSTRACT:

More information

Hunter College school of Social Work Thesis Proposal

Hunter College school of Social Work Thesis Proposal Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing

More information

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA 234 Abstract RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA Eng. Nandana Abeysuriya B.Sc. Eng (Hons), M.Eng.,C.Eng.,FIE(SL), Int PE(SL) 1A, Ananda Road, Melder Place, Nugegoda, Sri Lanka. Tel/Fax:

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

Peninsula Place, Greenwich, London

Peninsula Place, Greenwich, London Concepts Products Service Peninsula Place, Greenwich, London 1 Project Report Peninsula Place, Greenwich, London Designed as one of the most sustainable commercial buildings in the UK, with a BREEAM rating

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified: Date: 2/15/2016 Project: To: Middleton Public Library Roof Repair Pamela K. Westby Library Director Middleton Public Library 7425 Hubbard Avenue Middleton WI 53562 Pamela, Strategic Structural Design,

More information

Timber Frame Construction

Timber Frame Construction Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

How To Design A Post Tensioned Deck For A Building

How To Design A Post Tensioned Deck For A Building SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University

More information

INTRODUCTION TO BEAMS

INTRODUCTION TO BEAMS CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

Joist. Reinforcement. Draft 12/7/02

Joist. Reinforcement. Draft 12/7/02 Joist Reinforcement Draft 12/7/02 1 JOIST REINFORCING The purpose of this CSD Design Aid is to provide procedures and suggested details for the reinforcement of open web steel joists. There are three basic

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT Troy Oliver 1, Mark Rea 2 ABSTRACT: This paper provides an overview of the work undertaken in the design of multiple buildings for one of

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: eakimovs@inzenierbuve.lv Ainars

More information

STEEL BUILDINGS IN EUROPE. Multi-Storey Steel Buildings Part 2: Concept Design

STEEL BUILDINGS IN EUROPE. Multi-Storey Steel Buildings Part 2: Concept Design STEEL BUILDINGS IN EUROPE Multi-Storey Steel Buildings Part 2: Concept Design. Multi-Storey Steel Buildings Part 2: Concept Design 2 - ii FOREWORD This publication is a second part of a design guide,

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

Practice Note 2014-62

Practice Note 2014-62 Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National

More information

The Collapse of Building 7 by Arthur Scheuerman December 8, 06

The Collapse of Building 7 by Arthur Scheuerman December 8, 06 The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

Design Manual to BS8110

Design Manual to BS8110 Design Manual to BS8110 February 2010 195 195 195 280 280 195 195 195 195 195 195 280 280 195 195 195 The specialist team at LinkStudPSR Limited have created this comprehensive Design Manual, to assist

More information

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2013 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E. SHARP Focus BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E. AESS serves as the focal point of a small eye-care office in Austin. YOU COULD SAY THAT Eye Physicians of Austin had a clear vision for its

More information

Light Steel Modular Construction

Light Steel Modular Construction Technical Information Sheet ED014 Light Steel Modular Construction R M Lawson BSc PhD CEng MICE MIStructE MASCE ACGI This Information Sheet reviews the various forms of building modules constructed using

More information

3D Drawing. Single Point Perspective with Diminishing Spaces

3D Drawing. Single Point Perspective with Diminishing Spaces 3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be

More information

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for:

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for: A Full Service Real Estate Inspection & Engineering Firm for Houston, Texas 77089 August 30, 2012 Prepared for: CLIENT S NAME MAILING ADDRESS Houston, Texas 77089 Prepared by: Charles J. Jenkins, P.E.

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Scheme 3: Rehabilitation of Heritage Building and Redevelopment

Scheme 3: Rehabilitation of Heritage Building and Redevelopment Scheme 3: Rehabilitation of Heritage Building and Redevelopment 135 Keefer Street Constructed in 1910 for the Vancouver Gas Company, the building and surrounding site was used primarily by blacksmiths

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP

SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

WORK SCOPE. Domains in which we work:

WORK SCOPE. Domains in which we work: WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial

More information

Window Thermal Performance Optimization in Governmental Emirati Housing Prototype in Abu Dhabi, UAE

Window Thermal Performance Optimization in Governmental Emirati Housing Prototype in Abu Dhabi, UAE Window Thermal Performance Optimization in Governmental Emirati Housing Prototype in Abu Dhabi, UAE Abuimara, Tareq A 1 ; Tabet Aoul, Kheira A. 1 1 Department of Architectural Engineering, United Arab

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,

More information

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208

BROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information