NORTH TAHOE HIGH SCHOOL Built 2006/1972 Area (Sq.Ft.) 87,791 Owned Portables 0 Leased Portables 0
|
|
- Jewel Waters
- 7 years ago
- Views:
Transcription
1 Built 2006/1972 Area (Sq.Ft.) 87,791 Owned Portables 0 Leased Portables 0 Building System Shell (Includes structural systems, roofing, window systems, foundations, painting and termite and dryrot control.) 213,628 Health & Safety (Includes security lighting, fire alarm systems, fire suppression systems and seismic upgrades.) Access Compliance (Includes wheelchair accessible ramps, drinking fountains, sinks and restrooms, appropriate signage, elevator additions, parking and path of travel, and door hardware.) 341,363 Traditional Infrastructure Includes major utility compones such as electrical switchgear and distribution, domestic water supply and piping, sewer and storm drain system and natural gas distribution systems.) Electronic Infrastructure (Low voltage systems Includes phone systems, intercom systems, data cabling, television, master clocks and bells, and intrusion alarm systems.) Permanent Classroom Improvements (Includes lighting, whiteboards, flooring, interior finishes and casework.) Portable Classroom Improvements/ Replacement (Includes replacement with slab on grade modular construction at 120,000 per classroom.) Other Buildings Repairs/Improvements (Include ancillary facilities such as multipurpose space, auditorium, administration, library, technology classrooms, laboratory classrooms and other specific function areas. Includes lighting, flooring, interior finishes, builtin equipment and casework.) Restroom Improvements (Include fixtures, lighting, flooring, partitions, mirrors, interior finishes, toilet accessories, electrical reuirements, and HVAC systems. accessability issues in ADA.) 20,483 Kitchens/Cafeterias (Includes interior items such as flooring, lighting wall finishes, casework with emphasis on the mechanical, electrical and special equipment required in a kitchen.) HVAC Systems ( Includes the mechanical components of heating and ventilation systems and the associated electrical and gas distribution to operate these systems. A/C was not considered.) 207,099 Site, Parking, Dropoff and Circulation (Includes items related to the renovation or replacement of the site paving and site concrete necessary for safe pedestrian and vehicular travel.) 24,000 Landscape and Irrigation (Includes upgrade, replacement or renovation of landscaping.) 312,000 Athletic/CoCurricular Facilities (Includes gymnasium space, tracks and fields, playground equipment, hardcourt pay area, pools and tennis courts.) 660,780 S 1,779,352 4/10/ of 30
2 STATE OF CALIFORNIA FIVE YEAR PLAN STATE ALLOCATION BOARD OFFICE OF PUBLIC SCHOOL CONSTRUCTION DEFERRED MAINTENANCE PROGRAM SAB 4020 (REV 01/05) Page 2 of 3 SCHOOL DISTRICT FIVEDIGIT DISTRICT CODE NUMBER (SEE CALIFORNIA PUBLIC SCHOO DIRECTORY) COUNTY CURRENT FISCAL YEAR THE DISTRICT: has not previously submitted a Five Year Plan. is submitting this updated/revised Five Year Plan which supersedes the plan currently on file with SAB. Part I Authorized District Representative The following individual has been designated as a district representative by the school board minutes: DISTRICT REPRESENTATIVE TITLE BUSINESS ADDRESS TELEPHONE NUMBER ADDRESS FAX NUMBER Part II Estimated Fiscal Year Data Project Category CURRENT FISCAL SECOND THIRD FISCAL FOURTH FISCAL YEAR FISCAL YEAR YEAR YEAR NUMBER OF PROJECTS FIFTH FISCAL YEAR 7 IMATE COST Asbestos Classroom Lighting Electrical Floor Covering HVAC Lead Painting Paving Plumbing Roofing Underground Tanks Wall Systems 8. Grand Total 0 9. Remarks:
3 STATE OF CALIFORNIA FIVE YEAR PLAN STATE ALLOCATION BOARD OFFICE OF PUBLIC SCHOOL CONSTRUCTION DEFERRED MAINTENANCE PROGRAM SAB 4020 (REV 01/05) Page 3 of List the school names where deferred maintenance projects are planned in this Five Year Plan: 11. Certifications: I certify as District Representative that: this work does not include ineligible items and that all work will be completed in accordance with program requirements, applicable laws and regulations. The distric shall maintain proper documentation in the event of an audit; and, the district understands that should an audit reveal that these funds were expendedfor other than eligible deferred maintenance costs the SAB will require the distric to return all inappropriately expended funds; and, The plans and proposals for expenditures of funds as outlined in this report were discussed in a public hearing at a regularly scheduled school board meeting on ; and the district has complied with all the other requirements of the E Beginning with the 2005/2006 fiscal year, the district has complied with Education Code Section (e) by establishing a facilities inspection system to ensure that each of its schools is maintained in good repair; and This form is an exact duplicate (verbatim) of the form provided by the OPSC. In the event a conflict should exist, then the language in the OPSC form will prevail. I certify under penalty of perjury under the laws of the State of California that the statements in this application and supporting documents are true and correct. SIGNATURE OF DISTRICT REPRESENTATIVE DATE
4 PROJECT: NORTH TAHOE HIGH SCHOOL THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT 87,791 GSF 2730 GATEWAY OAKS DR., #110 SUMMARY SACRAMENTO, CA PHONE: (916) COMPONENT REPORT Part IV ANNUAL BREAKOUTS FOR REPLACEMENT/ MAINTENANCE RECOMMENDED W/ MAINTENANCE FOOT REPAIRS (ESCALATED COST) YEAR CON REPAIRS RECOMMENDED SUMMARY STRUCTED (TODAY'S COST) REPAIRS 2006/ / / / /2011 ADMINISTRATION & CLASSROOMS 32, RROOMS 2, / ,983 27, ,341 LIBRARY 2, PERFORMING ARTS AUDITORIUM 3, GYM/LOCKER AREA & WEIGHT ROOM 7, ,994 1,338,533 26, ,198 17,617 18,674 1,017,716 KITCHEN/CAFETERIA 5, ,512 22, ,708 MUSIC ROOM 2, /1972 TECHNOLOGY/MEDIA ROOM 1, CIRCULATION 18, MISC STORAGE, JANITORS, ETC. 6, /1972 PERMANENT MODULAR S SITE WORK ,500 7,796,840 93,500 68,550 1,441,108 4,337,396 1,762, ,000 NEW GYMNASIUM 5, COSTS 87,791 1,472,989 9,184,505 93,500 95,569 1,700,058 4,355,809 1,782,305 1,250,765 COST PER FOOT Part II Estimated Fiscal Year Data Project Category NUMBER CURRENT OF FISCAL SECOND THIRD FOURTH FIFTH FISCAL PROJECTS YEAR FISCAL YEAR FISCAL YEAR FISCAL YEAR YEAR IMATE COST COMMENTS Asbestos Classroom Lighting 3,637 74, ,262 93,988 Includes ceiling work. Electrical Floor Covering 8,721 4,056 4,300 4, , ,024 HVAC 4,142 4,515 4,786 17, , ,981 Lead Painting 2,170 47,303 49,472 Paving Plumbing 5, , ,862 4, , ,387 Roofing 2,484 2,707 2,870 3, , ,884 Underground Tanks 37, , , ,500 1,239,110 All site work minus paving and electrical. Wall Systems 31,440 1,265,609 3,259,526 1,553, ,856 6,390,659 Includes drs/ window/ casework/ furnishings 8. Grand Total 0 95,569 1,700,058 4,355,809 1,782,305 1,250,765 9,184,505
5 PROJECT: NORTH TAHOE HIGH SCHOOL THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT 87,791 GSF 2730 GATEWAY OAKS DR., #110 SUMMARY SACRAMENTO, CA PHONE: (916) COMPONENT REPORT Part IV ANNUAL BREAKOUTS FOR REPLACEMENT/ MAINTENANCE RECOMMENDED W/ MAINTENANCE SUMMARY FOOT YEAR CON STRUCTED REPAIRS (TODAY'S COST) REPAIRS (ESCALATED COST) RECOMMENDED REPAIRS 2006/ / / / /2011 Site both Funding Source Funded, Alternate Unfunded Project Wood bleacher on the fields (not main) has broken boards (remove 5Year Projection Projects, Funding Sources Work Performed by 06/07 07/08 08/09 09/10 10/11 Approx. Total Cost Maintenance G Staff 1,000 1,000 Widen safety zone around Maint Staff / R field, eliminate hazards Contractor 20,000 20,000 Maint Staff / R ADA access Contractor 35,000 35,000 Maint Staff / R Refurbish Press Box Contractor 8,100 18,900 27,000 Maintenance M Bleacher repairs Staff 2,500 2,500 R Install narrow track Contractor 127, , ,000 R Construct a new weight room Contractor 462,000 1,078,000 1,540,000 Construct a new Voc Ed R related facility Contractor 1,125,000 2,625,000 3,750,000 Fix entry to the football field Maint Staff / R area Contractor 25,000 25,000 Mintenance of the wood gym OTHER floor on an annual basis Contractor 12,000 12,000 24,000 Replace, expand field between Maint Staff / softball and stadium Contractor 63, , ,000 R R Plumbing and locker room R refurbishing Contractor 112, , ,000 Shared costs Repairs to stadium area fo Maintenance M safety before graduation Staff 12,500 12,500 Shared costs Salvage of materials from old Maint Staff / M building/moving Contractor 5,000 5,000 Shared costs Maintenance M Water to stadium Staff Shared costs DM Roof repairs Contractor 5,000 5,000 Shared costs Salvage of materials from old Maint Staff / R building/moving Contractor 10,000 10,000 Shared costs Complete mods of mezzanine in the old gym area and halls in R the old gym area Contractor 170, , ,980 Shared costs M Fence repair Contractor 12,500 12,500 Shared costs Replace plumbing in field Maintenance M house restrooms Staff 1,500 1,500 Shared costs Maintenance M Rekeying Staff 1,250 1,250 Shared costs Maintenance G Ongoing field maintenance Staff 3,750 3,750 Shared costs R Install field border Contractor 5,000 5,000 Shared costs Total 68,600 1,428,900 3,915,694 1,635,286 12,000 7,060,480 LEGEND: OTHER "Other" Funds Proceeds from DM Deferred Maintenance Funds DF Developer Fee or COP Funds G Grounds Funds M Maintenance Funds C Measure C Funds R Measure R Funds Comments
6 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 32, GATEWAY OAKS DR., #110 ADMINISTRATION & CLASSROOMS YEAR CONSTRUCTED: (ORIGINAL 1972) CLASSROOMS RENOVATED '06 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) Part IV ANNUAL BREAKOUTS FOR MAINTENANCE IMATED RECOMMENDE D REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 32,102 BLDSF WALL FRAMING FR Steel Frame w. Metal Stud Infill 32,102 BLDSF FLOOR FRAMING FR Slab on Grade and Steel Frame to 2nd Story 32,102 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 16,051 SF ROOF Asphalt Comp w. Standing Seam Eave 16,051 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 16,051 BLDSF ROOF Roof Drains 16,051 BLDSF ROOF RWL's 16,051 BLDSF ROOF Scuppers 16,051 BLDSF EXTERIOR ENVELOPE SIDING SIDING Seal w. Graffitti o/ Brick Veneer 32,102 BLDSF EXTERIOR DOORS DRS HM Door 32,102 BLDSF DRS HM Frame 32,102 BLDSF DRS Exterior Hardware 32,102 BLDSF WINDOWS WND Dual Pane w. Aluminum Frame 32,102 SF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 32,102 SF PNT Tackable Walls 32,102 SF FLOORING FLR Mixed Flooring 32,102 SF CEILINGS ROOF Suspended TBar 32,102 SF INTERIOR DOORS DRS Doors 32,102 SF DRS Frames 32,102 SF DRS Interior Hardware 32,102 SF
7 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 32, GATEWAY OAKS DR., #110 ADMINISTRATION & CLASSROOMS YEAR CONSTRUCTED: (ORIGINAL 1972) CLASSROOMS RENOVATED '06 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) Part IV ANNUAL BREAKOUTS FOR MAINTENANCE IMATED RECOMMENDE D REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost PLUMBING PLUMBING WTR Plumbing Fixtures 32,102 SF WATER PIPING WTR Galvanized Steel 32,102 SF WASTE PIPING SWR Cast Iron 32,102 SF GAS PIPING GAS Black Steel 32,102 SF ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 32,102 SF POWER PWR MSB 32,102 SF PWR Distribution Panels 32,102 SF BLDG TRANSFORMER PWR Dry Type 32,102 SF LOW VOLTAGE SYSTEMS PWR Telephone 32,102 SF PWR Data 32,102 SF PWR CCTV 32,102 SF PWR PA 32,102 SF PWR Alarm 32,102 SF PWR Clock 32,102 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 32,102 SF HVAC VAV Box Zoning 32,102 SF VENTILATION AND EXHAUST HVAC Exhaust Fans 32,102 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 32,102 SF FIRE ALARM SYSTEMS LS Automatic 32,102 SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
8 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2, GATEWAY OAKS DR., #110 RROOMS YEAR CONSTRUCTED: 2006/ (Origninal 1972 Const, 1107sf) '06 Modernization SACRAMENTO, CA (E) Rms (63,64,71,72,84,85,129,130,133,134) PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 2,247 BLDSF WALL FRAMING Total Unit Price FR Steel Frame w. Wood/ Metal Stud Infill 2,247 BLDSF FLOOR FRAMING (Includes joist, blocking, post and piers) FR Slab on Grade and Steel Frame to 2nd Story 2,247 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 2,247 SF PNT Ceramic Tile 8' 2,247 SF FLOORING FLR Ceramic Tile 2,247 SF Clean and Seal (e) Ceramic Tile 2,247 SF , ,079 CEILINGS ROOF Gypsum Board 2,247 SF , ,262 INTERIOR DOORS DRS Doors 2,247 SF DRS Frames 2,247 SF DRS Interior Hardware 2,247 SF PLUMBING PLUMBING WTR Plumbing Fixtures 40 FIX , , , WATER PIPING WTR Galvanized Steel 2,247 SF WASTE PIPING SWR Cast Iron 2,247 SF GAS PIPING GAS Black Steel 2,247 SF
9 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2, GATEWAY OAKS DR., #110 RROOMS YEAR CONSTRUCTED: 2006/ (Origninal 1972 Const, 1107sf) '06 Modernization SACRAMENTO, CA (E) Rms (63,64,71,72,84,85,129,130,133,134) PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 2,247 SF POWER PWR MSB 2,247 SF PWR Distribution Panels 2,247 SF BLDG TRANSFORMER PWR Dry Type 2,247 SF LOW VOLTAGE SYSTEMS PWR Telephone 2,247 SF PWR Data 2,247 SF PWR CCTV 2,247 SF PWR PA 2,247 SF PWR Alarm 2,247 SF PWR Clock 2,247 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 2,247 SF VENTILATION AND EXHAUST HVAC Exhaust Fans 2,247 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 2,247 SF FIRE ALARM SYSTEMS LS Automatic 2,247 SF Total Unit Price COSTS CURRENT 18, ,341 2) BASED ON NUMBER OF IMATED YEARS OF
10 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2,604 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 LIBRARY YEAR CONSTRUCTED: 1972 (Relocated and Modernized '06) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 2,604 BLDSF WALL FRAMING Total Unit Price FR Steel Frame w. Wood Stud Infill 2,604 BLDSF FLOOR FRAMING (Includes joist, blocking, post and piers) FR Slab on Grade and Steel Frame to 2nd Story 2,604 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 2,604 SF ROOF Built up 2,604 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 2,604 BLDSF ROOF Roof Drains 2,604 BLDSF ROOF RWL's 2,604 BLDSF ROOF Scuppers 2,604 BLDSF EXTERIOR ENVELOPE SIDING SIDING Paint, Caulk and Seal 2,604 BLDSF EXTERIOR DOORS DRS HM Door 2,604 BLDSF DRS HM Frame 2,604 BLDSF DRS Exterior Hardware 2,604 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 2,604 SF FLOORING FLR VCT/ Carpet 2,604 SF CEILINGS ROOF Suspended TBar 2,604 SF INTERIOR DOORS DRS Doors 2,604 SF DRS Frames 2,604 SF DRS Interior Hardware 2,604 SF
11 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2,604 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 LIBRARY YEAR CONSTRUCTED: 1972 (Relocated and Modernized '06) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost PLUMBING PLUMBING ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 2,604 SF POWER PWR MSB 2,604 SF PWR Distribution Panels 2,604 SF BLDG TRANSFORMER PWR Dry Type 2,604 SF LOW VOLTAGE SYSTEMS PWR Telephone 2,604 SF PWR Data 2,604 SF PWR CCTV 2,604 SF PWR PA 2,604 SF PWR Alarm 2,604 SF PWR Clock 2,604 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 2,604 SF HVAC VAV Box Zoning 2,604 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 2,604 SF FIRE ALARM SYSTEMS LS Automatic 2,604 SF Total Unit Price COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
12 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 3,428 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 PERFORMING ARTS AUDITORIUM YEAR CONSTRUCTED: 1972 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 3,428 BLDSF WALL FRAMING FR Steel Frame w. Wood Stud Infill 3,428 BLDSF FLOOR FRAMING FR Slab on Grade and Steel Frame to 2nd Story 3,428 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 3,428 SF ROOF Built up 3,428 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 3,428 BLDSF ROOF Roof Drains 3,428 BLDSF ROOF RWL's 3,428 BLDSF ROOF Scuppers 3,428 BLDSF EXTERIOR ENVELOPE SIDING Paint, Caulk and Seal 3,428 BLDSF EXTERIOR DOORS DRS HM Door 3,428 BLDSF DRS HM Frame 3,428 BLDSF DRS Exterior Hardware 3,428 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 3,428 SF FLOORING FLR VCT 3,428 SF CEILINGS ROOF Acoustical Tile 3,428 SF FURNISHINGS INTERIOR DOORS DRS Doors 3,428 SF DRS Frames 3,428 SF DRS Interior Hardware 3,428 SF
13 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 3,428 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 PERFORMING ARTS AUDITORIUM YEAR CONSTRUCTED: 1972 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost PLUMBING WTR Plumbing Fixtures 3,428 SF WATER PIPING WTR Galvanized Steel 3,428 SF WASTE PIPING SWR Cast Iron 3,428 SF GAS PIPING GAS Black Steel 3,428 SF ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 3,428 SF POWER PWR MSB 3,428 SF PWR Distribution Panels 3,428 SF BLDG TRANSFORMER PWR Dry Type 3,428 SF LOW VOLTAGE SYSTEMS PWR Telephone 3,428 SF PWR Data 3,428 SF PWR CCTV 3,428 SF PWR PA 3,428 SF PWR Alarm 3,428 SF PWR Clock 3,428 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 3,428 SF VENTILATION AND EXHAUST HVAC Exhaust Fans 3,428 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 3,428 SF FIRE ALARM SYSTEMS LS Automatic 3,428 SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
14 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 7,350 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 GYM/LOCKER AREA & WEIGHT ROOM YEAR CONSTRUCTED: 1972 (NOT INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est STRUCTURAL 137% 192% Replacement cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 7,350 BLDSF WALL FRAMING (Includes Interior, Exterior wall framing w/blocking and shear sheathing, posts, headers and insulation) FR Steel Frame w. Wood Stud Infill 7,350 BLDSF FLOOR FRAMING FR Slab on Grade and Steel Frame to 2nd Story 7,350 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 7,350 SF ROOF Built up w. foam/ fabric overlay 7,350 RFSF ,186 2,484 2,707 2,870 3, ,781 FLASHING AND SHEET METAL ROOF Expansion Joints 7,350 BLDSF ROOF Roof Drains 7,350 BLDSF ROOF RWL's 7,350 BLDSF ROOF Scuppers 7,350 BLDSF EXTERIOR ENVELOPE SIDING SIDING R/R Wood Siding (20%) Paint, Caulk and Seal 800 BLDSF , ,231 EXTERIOR DOORS DRS HM Door 7,350 BLDSF ,813 1,341 29,226 DRS HM Frame 7,350 BLDSF ,813 1,341 29,226 DRS Exterior Hardware 7,350 BLDSF , ,997 WINDOWS WND Steel Frame 7,350 SF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 7,350 SF ,341 1,517 33,071 PNT Ceramic Tile 8' (locker rms) 2,000 SF ,296 1,586 1,729 1,832 1, ,856 FLOORING FLR Wood Sport Floor 7,350 SF ,517 3,570 3,892 4,125 4, ,311 GYM MAINTENANCE OF THE WOOD GYM FLOORS ON AN ANNUAL BASIS LS 40 4 CEILINGS ROOF Exposed 2,000 SF FURNISHINGS INTERIOR DOORS DRS Doors 7,350 SF , ,382 DRS Frames 7,350 SF , ,382 DRS Interior Hardware 7,350 SF , ,766
15 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 7,350 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 GYM/LOCKER AREA & WEIGHT ROOM YEAR CONSTRUCTED: 1972 (NOT INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est STRUCTURAL 137% 192% Replacement cost PLUMBING PLUMBING WTR Plumbing Fixtures 28 FIX , , , ,768 1,935 2,110 2,236 2, ,180 WATER PIPING WTR Galvanized Steel 7,350 SF , ,169 WASTE PIPING SWR Cast Iron 7,350 SF , ,169 GAS PIPING GAS Black Steel 7,350 SF , ,490 ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 7,350 SF ,161 3,408 74,295 POWER PWR MSB 7,350 SF PWR Distribution Panels 625 AMPS BLDG TRANSFORMER PWR Dry Type 7,350 SF LOW VOLTAGE SYSTEMS PWR Telephone 7,350 SF PWR Data 7,350 SF PWR CCTV 7,350 SF PWR PA 7,350 SF PWR Alarm 7,350 SF PWR Clock 7,350 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 7,350 SF ,307 2,286 2,492 2,641 2, ,594 VENTILATION AND EXHAUST HVAC Exhaust Fans Locker Rms 3,540 SF , ,795 ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 7,350 SF ,443 1,369 1,492 1,582 1,676 91,368 FIRE ALARM SYSTEMS LS Automatic 7,350 SF COSTS CURRENT 983,994 26, ,198 17,617 18,674 1,017,716 2) BASED ON NUMBER OF IMATED YEARS OF
16 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 5,572 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 KITCHEN/CAFETERIA YEAR CONSTRUCTED: 1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 5,572 BLDSF WALL FRAMING Total Unit Price FR Steel Frame w. Wood Stud Infill 5,572 BLDSF FLOOR FRAMING FR Slab on Grade and Steel Frame to 2nd Story 5,572 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 5,572 SF ROOF Built up and Metal Roofing 2,786 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 2,786 BLDSF ROOF Roof Drains 2,786 BLDSF ROOF RWL's 2,786 BLDSF ROOF Scuppers 2,786 BLDSF EXTERIOR ENVELOPE SIDING SIDING Paint, Caulk and Seal 5,572 BLDSF EXTERIOR DOORS DRS HM Door 5,572 BLDSF DRS HM Frame 5,572 BLDSF DRS Exterior Hardware 5,572 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 5,572 SF FLOORING FLR VCT/ Tile 5,572 SF CEILINGS ROOF Acoustica/ Washable TBar 5,572 SF INTERIOR DOORS DRS Doors 5,572 SF DRS Frames 5,572 SF DRS Interior Hardware 5,572 SF
17 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 5,572 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 KITCHEN/CAFETERIA YEAR CONSTRUCTED: 1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost PLUMBING PLUMBING ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 5,572 SF POWER PWR MSB 5,572 SF PWR Distribution Panels 5,572 SF BLDG TRANSFORMER PWR Dry Type 5,572 SF LOW VOLTAGE SYSTEMS PWR Telephone 5,572 SF PWR Data 5,572 SF PWR CCTV 5,572 SF PWR PA 5,572 SF PWR Alarm 5,572 SF PWR Clock 5,572 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 5,572 SF VENTILATION AND EXHAUST HVAC Exhaust Fans MAU 5,572 SF , ,708 ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 5,572 SF FIRE ALARM SYSTEMS LS Automatic 5,572 SF Total Unit Price COSTS CURRENT 15, ,708 2) BASED ON NUMBER OF IMATED YEARS OF
18 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2,674 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 MUSIC ROOM YEAR CONSTRUCTED: 2006/1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 2,674 BLDSF WALL FRAMING Total Unit Price FR Steel Frame w. Wood Stud Infill 2,674 BLDSF FLOOR FRAMING FR Slab on Grade and Steel Frame to 2nd Story 2,674 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame 2,674 SF ROOF Built up 1,337 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 1,337 BLDSF ROOF Roof Drains 1,337 BLDSF ROOF RWL's 1,337 BLDSF ROOF Scuppers 1,337 BLDSF EXTERIOR ENVELOPE SIDING SIDING Paint, Caulk and Seal 2,674 BLDSF EXTERIOR DOORS DRS HM Door 2,674 BLDSF DRS HM Frame 2,674 BLDSF DRS Exterior Hardware 2,674 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 2,674 SF FLOORING FLR Carpet 2,674 SF CEILINGS ROOF Suspended TBar 2,674 SF
19 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2,674 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 MUSIC ROOM YEAR CONSTRUCTED: 2006/1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMENDE D REPAIRS 2006/ / / / /2011 should equal Est. Total Est Replacement STRUCTURAL 137% 192% replacement cost cost INTERIOR DOORS DRS Doors 2,674 SF DRS Frames 2,674 SF DRS Interior Hardware 2,674 SF PLUMBING PLUMBING ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 2,674 SF POWER PWR MSB 2,674 SF PWR Distribution Panels 2,674 SF BLDG TRANSFORMER PWR Dry Type 2,674 SF LOW VOLTAGE SYSTEMS PWR Telephone 2,674 SF PWR Data 2,674 SF PWR CCTV 2,674 SF PWR PA 2,674 SF PWR Alarm 2,674 SF PWR Clock 2,674 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 2,674 SF VENTILATION AND EXHAUST HVAC Exhaust Fans 2,674 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 2,674 SF FIRE ALARM SYSTEMS LS Automatic 2,674 SF Total Unit Price COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
20 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 1,374 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 TECHNOLOGY/MEDIA ROOM YEAR CONSTRUCTED: 1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT Part IV ANNUAL BREAKOUTS FOR MAINTENANCE FOOT SUB MARK UPS (3) IMATED T COST RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est STRUCTURAL 137% 192% Replacement cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 1,374 BLDSF WALL FRAMING FR Steel Frame w. Wood Stud Infill 1,374 BLDSF ROOF FRAMING FR Slab on Grade and Steel Frame to 2nd Story 1,374 BLDSF ROOF Built up 1,374 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 1,374 BLDSF ROOF Roof Drains 1,374 BLDSF ROOF RWL's 1,374 BLDSF ROOF Scuppers 1,374 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 1,374 SF FLOORING FLR Non Conductive Flooring 1,374 SF CEILINGS ROOF Exposed 1,374 SF FURNISHINGS INTERIOR DOORS DRS Doors 1,374 SF DRS Frames 1,374 SF DRS Interior Hardware 1,374 SF
21 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 1,374 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 TECHNOLOGY/MEDIA ROOM YEAR CONSTRUCTED: 1972 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT Part IV ANNUAL BREAKOUTS FOR MAINTENANCE FOOT SUB MARK UPS (3) IMATED T COST RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est STRUCTURAL 137% 192% Replacement cost ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 1,374 SF POWER PWR MSB 1,374 SF PWR Distribution Panels 910 sf BLDG TRANSFORMER PWR Dry Type 1,374 SF LOW VOLTAGE SYSTEMS PWR Telephone 1,374 SF PWR Data 1,374 SF PWR CCTV 1,374 SF PWR PA 1,374 SF PWR Alarm 1,374 SF PWR Clock 1,374 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 1,374 SF HVAC Spit System 1,374 SF VENTILATION AND EXHAUST HVAC Exhaust Fans Weight Room Only 3,840 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 1,374 SF FIRE ALARM SYSTEMS LS Automatic 1,374 SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
22 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 18,687 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 CIRCULATION YEAR CONSTRUCTED: 2006 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 18,687 BLDSF WALL FRAMING FR Steel Frame w. Wood Stud Infill 18,687 BLDSF ROOF FRAMING FR Slab on Grade and Steel Frame to 2nd Story 9,344 SF ROOF Asphalt Comp w. Standing Seam Eave 9,344 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 9,344 BLDSF ROOF Roof Drains 9,344 BLDSF ROOF RWL's 9,344 BLDSF ROOF Scuppers 9,344 BLDSF EXTERIOR ENVELOPE SIDING SIDING Seal w. Graffitti o/ Brick Veneer 18,687 BLDSF EXTERIOR DOORS DRS HM Door 18,687 BLDSF DRS HM Frame 18,687 BLDSF DRS Exterior Hardware ReKey Drs 18,687 BLDSF WINDOWS WND Aluminum Frame 18,687 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 18,687 SF FLOORING FLR VCT 18,687 SF CEILINGS ROOF Acoustical Tile 18,687 SF FURNISHINGS INTERIOR DOORS DRS Doors 18,687 SF DRS Frames 18,687 SF DRS Interior Hardware 18,687 SF
23 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 18,687 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 CIRCULATION YEAR CONSTRUCTED: 2006 (INCLUDED W. '06 MODERNIZATION) SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 18,687 SF POWER PWR MSB 18,687 SF PWR Distribution Panels 18,687 SF BLDG TRANSFORMER PWR Dry Type 18,687 SF LOW VOLTAGE SYSTEMS PWR Telephone 18,687 SF PWR Data 18,687 SF PWR CCTV 18,687 SF PWR PA 18,687 SF PWR Alarm 18,687 SF PWR Clock 18,687 SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only 18,687 SF VENTILATION AND EXHAUST HVAC Exhaust Fans 18,687 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 18,687 SF FIRE ALARM SYSTEMS LS Automatic 18,687 SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
24 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 6, GATEWAY OAKS DR., #110 MISC STORAGE, JANITORS, ETC. YEAR CONSTRUCTED: 2006/1972 SACRAMENTO, CA PHONE: (916) FOOT SUB MARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FOUNDATION COMPONENT REPORT FR Concrete 6,422 BLDSF WALL FRAMING FR Steel Frame w. Wood Stud Infill 6,422 BLDSF ROOF FRAMING FR Slab on Grade and Steel Frame to 2nd Story 3,211 SF ROOF Asphalt Comp w. Standing Seam Eave 3,211 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 3,211 BLDSF ROOF Roof Drains 3,211 BLDSF ROOF RWL's 3,211 BLDSF ROOF Scuppers 3,211 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 6,422 SF FLOORING FLR Sealed Concrete 6,422 SF CEILINGS ROOF Exposed 6,422 SF FURNISHINGS INTERIOR DOORS DRS Doors 6,422 SF DRS Frames 6,422 SF DRS Interior Hardware ReKey Drs 6,422 SF ELECTRICAL SYSTEMS LIGHTING LTG Fixtures 3,840 SF POWER PWR MSB 6,422 SF PWR Distribution Panels 6,422 SF BLDG TRANSFORMER PWR Dry Type 6,422 SF LOW VOLTAGE SYSTEMS PWR Telephone 6,422 SF PWR Data 6,422 SF PWR CCTV 6,422 SF PWR PA 6,422 SF PWR Alarm 6,422 SF PWR Clock 6,422 SF MECHANICAL SYSTEMS VENTILATION AND EXHAUST HVAC Exhaust Fans 6,422 SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in 6,422 SF FIRE ALARM SYSTEMS LS Automatic 6,422 SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
25 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2730 GATEWAY OAKS DR., #110 PERMANENT MODULAR S YEAR CONSTRUCTED: 0 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB M ARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete BLDSF WALL FRAMING (Includes Interior, Exterior wall framing w/blocking and shear sheathing, posts, headers and insulation) FR Premanufactured BLDSF FLOOR FRAMING FR Premanufactured BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Steel Frame SF ROOF Built up RFSF FLASHING AND SHEET METAL EXTERIOR ENVELOPE SIDING SIDING Paint, Caulk and Seal BLDSF EXTERIOR DOORS DRS HM Door BLDSF DRS HM Frame BLDSF DRS Exterior Hardware BLDSF WINDOWS CANOPIES FR Common Cooridor BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only SF FLOORING FLR Wood Sport Floor SF CEILINGS ROOF Exposed SF
26 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 2730 GATEWAY OAKS DR., #110 PERMANENT MODULAR S YEAR CONSTRUCTED: 0 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB M ARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement STRUCTURAL 137% 192% cost FURNISHINGS INTERIOR DOORS DRS Doors SF DRS Frames SF DRS Interior Hardware SF PLUMBING PLUMBING NONE ELECTRICAL SYSTEMS LIGHTING LTG Fixtures SF POWER PWR MSB SF PWR Distribution Panels SF BLDG TRANSFORMER PWR Dry Type SF LOW VOLTAGE SYSTEMS PWR Telephone SF PWR Data SF PWR CCTV SF PWR PA SF PWR Alarm SF PWR Clock SF MECHANICAL SYSTEMS HVAC HVAC Air Handler Gas heat only SF VENTILATION AND EXHAUST HVAC Exhaust Fans SF ADD TO ABOVE SYSTEMS (Includes ductwork, fire smoke dampers, grilles, diffusers and dampers) HVAC Add rough in SF FIRE ALARM SYSTEMS LS Automatic SF COSTS CURRENT 2) BASED ON NUMBER OF IMATED YEARS OF
27 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT ACRES GATEWAY OAKS DR., #110 SITE WORK YEAR CONSTRUCTED: 0 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB M ARK UPS (3) SITEWORK 1 2 IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement cost CLEAR/ GRUB AND CUT AND CUT AND FILL Inadequate drainage to all field areas SITE Clear and Grub ACRES ,227 7,161 10,036 CAMPSUS WIDE IMPROVEMENTS site fields Wood bleacher on the fields (not main) has broken boards (remove 1 LS 1 1,000 site fields Widen safety zone around field, eliminate hazards 1 LS 1 20,000 20,000 20,000 20,000 20,000 35,000 site safety ADA access 1 LS 1 35,000 35,000 35,000 35,000 27,000 other other Refurbish Press Box 1 LS 1 27,000 27,000 27,000 8,100 18,900 2,500 site fields Bleacher repairs 1 LS 1 2,500 2,500 2,500 2,500 site fields Install narrow track 1 LS 1 127, , ,000 wall fields Construct a new weight room 1 LS 1 1,078,000 2,625,000 wall other Construct a new Voc Ed related facility 1 LS 1 1,125,000 25,000 site fields Fix entry to the football field area 1 LS 2 25,000 25,000 25,000 floor fields Mintenance of the wood gym floor on an annual basis 1 LS 2 12,000 12,000 site fields Replace, expand field between softball and stadium 1 LS 2 63, ,000 site safety Access to lower field from hardcourt (ADA) 1 LS 3 22,500 52,500 site Covered outdoor area for student gathering 1 LS 3 75, ,000 plumbing fields Plumbing and locker room refurbishing 1 LS 3 112, ,500 site fields Repairs to stadium area fo safety before graduation 1 LS 1 1,250 1,250 1,250 1,250 1,250 wall shell Salvage of materials from old building/moving 1 LS 1 5, site infra Water to stadium 1 LS 1 5,000 5,000 roof shell Roof repairs 1 LS 1 5,000 5,000 5,000 wall shell Salvage of materials from old building/moving 1 LS 1 10,000 Complete mods of mezzanine in the old gym area wall fields and halls in the old gym area 1 LS 3 170, ,286 site site Fence repair 1 LS 1 12,500 plumbing fields Replace plumbing in field house restrooms 1 LS 1 1,500 1,500 1,500 1,500 1,500 1,250 1,250 wall shell Rekeying 1 LS 1 1,250 1,250 1,250 3,750 site fields Ongoing field maintenance 1 LS 1 5,000 site fields Install field border 1 LS 1
28 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT ACRES GATEWAY OAKS DR., #110 SITE WORK YEAR CONSTRUCTED: 0 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB M ARK UPS (3) SITEWORK 1 2 SITE UTILITIES IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est Replacement cost SITE SANITARY SEWER Adequate SITE DOMIC WATER Adequate SITE STORM DRAIN Adequate SITE FIRE WATER Adequate SITE GAS Adequate SITE SITE LIGHTING Adequate SITE POWER UPGRADE FOR DATA Adequate SITE DATA SITE BACKBONE DISTRIBUTION Adequate GENERAL SITE WORK SITE (N) SCOREBOARD 1 LOT , , , , ,514 SITE IRRIGATION TO ALL FIELDS 250,000 SF ,000 10,400 11, ,687 SITE SYTHETIC TRACK 40,000 SF SITE ARTIFICIAL TURF SF SITE STADIUM SEATING SEAT SITE CONCESSION/ RROOM BLDG 1,200 SF COSTS CURRENT 454,500 93,500 68,550 1,441,108 4,337,396 1,762, ,000 2) BASED ON NUMBER OF IMATED YEARS OF
29 THE SIERRA W GROUP, LLC TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT GSF 5,315 (Common Space w. Middle School) 2730 GATEWAY OAKS DR., #110 GYM/LOCKER AREA & WEIGHT ROOM YEAR CONSTRUCTED: 2005 SACRAMENTO, CA PHONE: (916) COMPONENT REPORT FOOT SUB M ARK UPS (3) IMATED Part IV ANNUAL BREAKOUTS FOR MAINTENANCE RECOMMEND ED REPAIRS 2006/ / / / /2011 Total Est STRUCTURAL 137% 192% Replacement cost FOUNDATION (Includes continuous/grade beam/spread foundations w/slab on grade) Excludes pad preparation FR Concrete 5,315 BLDSF WALL FRAMING (Includes Interior, Exterior wall framing w/blocking and shear sheathing, posts, headers and insulation) FR Steel Frame w. Wood Stud Infill 5,315 BLDSF FLOOR FRAMING FR Slab on Grade 5,315 BLDSF ROOF FRAMING (Includes roof sheasthing/metal deck and facia) FR Wood Timber Construction 5,315 SF ROOF Asphalt Comp w. Standing Seam Eave 5,315 RFSF FLASHING AND SHEET METAL ROOF Expansion Joints 5,315 BLDSF ROOF Roof Drains 5,315 BLDSF ROOF RWL's 5,315 BLDSF ROOF Scuppers 5,315 BLDSF EXTERIOR ENVELOPE SIDING SIDING Seal w. Graffitti o/ Brick Veneer 5,315 BLDSF EXTERIOR DOORS DRS HM Door 5,315 BLDSF DRS HM Frame 5,315 BLDSF DRS Exterior Hardware 5,315 BLDSF WINDOWS WND Dual Pane w. Aluminum Frame 5,315 BLDSF CANOPIES FR Common Cooridor 5,315 BLDSF INTERIOR SYSTEMS WALL FINISHES (Includes gyp board) PNT Paint Only 5,315 SF PNT Tackable Walls 5,315 SF FLOORING FLR Wood Sport Floor 5,315 SF FLR Rubber Flooring to Corridor 14,500 SF Sheet vinyl SF CEILINGS ROOF Exposed 5,315 SF FURNISHINGS LOT , , , EA INTERIOR DOORS DRS Doors 5,315 SF DRS Frames 5,315 SF DRS Interior Hardware 5,315 SF
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationNovember 3, 2015 Bond and District Additional Assistance Election Information
November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements
More informationHamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More information17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationVeterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015
Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationDAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationKIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationHOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
More informationNominal Life Expectancy for Building Components
Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes
More informationSub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
More information48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationNORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
More informationExecutive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228
Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor
More informationCherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCrawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
More informationGramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
More informationRepair Project for April 7, 2009
Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationVan Vleck ISD Bond Election
Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to
More informationBond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
More informationPLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
More informationADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015
ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,
More informationPROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014
PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security
More informationNOTICE TO CONTRACTORS
NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationDesigning Schools To Reduce On-Going And Future Maintenance and Repair Costs
Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing
More informationProject Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
More informationPARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
More informationSchedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
More informationFacility Assessment Report, Montgomery Independent School District
THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationEstimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
More informationNewtown and Holland Middle Schools Construction Project Bid Review
Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,
More informationMEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
More informationEstimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More informationThink Of Us First! When It s Time to Distribute Your Plans
Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience
More informationCOST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
More informationSUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER
NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below
More informationPROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
More informationREVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
More informationHow To Plan A Building
State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site
More informationBuilding Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
More informationOPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
More informationSPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY
SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This
More informationINTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
More informationA Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
More informationHOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004
HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationSchematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN
More informationRESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
More informationLincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual
15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List Section 15.3 15.1 Project Manual Separately bound and being
More informationChicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
More informationFORENSIC INVESTIGATION QUESTIONNAIRE
FORENSIC INVESTIGATION QUESTIONNAIRE PSE Project Number: - - Project Name: Person(s) Interviewed: Relationship to House: Please answer the following questions to the best of your ability. Exact dates are
More informationSPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
More informationCLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
More informationWhitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.
Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal
More informationVJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS
VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS January 7, 2014 0 BASIS OF ESTIMATE The estimate is based on the drawings and documents received
More informationA Homeowner s Guide to Building Permits
A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is
More informationCOMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
More informationBond Priorities. Repairs and Maintenance. School Safety. Capacity
Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.
More informationSPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete
SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More informationDEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)
DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District
More informationELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
More informationBUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
More informationNAHB 1-00-0000 PRODUCT DEFINITION
NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationCITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST
CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all
More informationThe fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity
MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY
More informationConstruction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
More informationThe Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
More informationTotal Home Inspection Checklist
Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More informationLindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
More informationBUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
More information