Solar Power Plants FAQs

Size: px
Start display at page:

Download "Solar Power Plants FAQs"

Transcription

1 Solar Power Plants FAQs Solar Power industry in India is gaining more and more prominence with each passing day. The domestic/off-grid industry is picking up speed too. Owing to the queries we are receiving regarding the various issues pertaining to Solar Power Plant setup, we thought it would be a great idea to put together a bunch of questions and answer the same. We shall keeping adding to the list as we keep receiving more queries. So, here are the most Frequently Asked Questions and our answers for the same. Do let us know in case you would like us to answer any more questions. Also, kindly point out any inaccuracies/mistakes that you may find here so that we can correct the same for the benefit of everyone. How much land is required to setup a 1 MW solar power generation Unit? The land required for a 1 MW power plant setup is around acres for Crystalline technology and around acres for Thin-Film technology. This is only a rough benchmark and may vary based on technology and efficiency of panels. What is the life-time of a typical Solar Power plant? The useful life of a typical Solar Power plant is considered to be 25 years. This is the duration for which long-term PPAs are signed and financial models are built. However, Solar Power plants can run beyond 25 years while producing a lower output. Many Solar Panel manufacturers guarantee an output of 90% at the end of 10 years and 80% at the end of 25 years. What would be the total project cost excluding the cost of land? Total project cost per MW would be in the range of Rs.6.5 Crores-Rs.8 Crores depending on the kind of technology you are using, whether or not you are using

2 tracking systems, the kind of EPC Contractor you choose for power plant system etc. CERC recently announced the benchmark tariff for setup of Solar PV and Thermal Plants in India. Here s the link to the document containing more details: The table below indicates CERC determined benchmark cost for Financial Year What would be the O & M cost? Central Electricity Regulatory Commission (CERC) benchmark costs for O&M is Rs lakhs/year/mw for with a 5.72% increase every year. This varies from project to project based on the number of people you employ for maintenance, frequency of cleaning of panels, onsite-engineer availability etc..

3 What would be the per unit production cost? Per unit production cost is dependent on how much cost you are setting up the power plant for. Accordingly, the per unit sale cost can be set based on the expected returns. Is there any subsidy available for Solar Power plant setup? Capital Subsidy of 30% is applicable only for captive power plants up to 100 KW. This is expected to be increased to 500 KW for FY but an official confirmation regarding the same is still awaited. Subsidy will not be applicable in case of sale of power. We would like to setup a Solar power plant in Andhra Pradesh but we have not participated in AP solar bidding. What are the other options? Since you have not participated in AP Solar Bidding, one other way would be the REC route. You can sell the generated power to APTRANSCO or third party consumer. Through this route, you sell power to APTRANSCO/third party and also claim RECs for the same. This way, you will be able to get a base tariff (APPC) from APTRANSCO and then additional revenue can be generated through sale of Solar RECs. However, it is to be kept in mind that the following additional benefits may be availed for a Solar PV Project commissioned before June 2014 subject to the condition that REC benefits are not availed: Exemption from Electricity Duty Exemption of Wheeling Charges, Transmission Charges and Cross-subsidy Charges Refund of VAT Refund of Stamp Duty and Registration Charges for purchase of However, it has to be kept in mind that REC revenue is market driven and can fluctuate as both demand and supply are pretty low on Solar front right now.

4 Kindly refer to our monthly newsletter REChronicles ( for more and up-to-date information on the REC market. Download documents relevant to Andhra Pradesh Solar Policy here: What would be the per unit expected sale price? This depends on the mode of sale of power and the consumer of power. In the case of sale of power to DISCOM, the prevailing Average Pooled Power Purchase Cost (APPC) will be applicable. In the case of sale of power to 3 rd Party consumer, a mutually agreed price can be agreed upon and accordingly a PPA can be signed. It is to be kept in mind that several additional charges such as Wheeling Charges, Distribution Charges, Open-Access Charges, Cross-Subsidy Charges are applicable in the case of sale of power to 3 rd party. These charges vary from State-to-State and DISCOM-to-DISCOM. What permissions/clearances are required to setup a Solar PV Plant? A certain set of permissions need to be obtained and documents need to be submitted in order to setup a Solar PV plant. These may vary from state-to-state. In order to get a Solar PV Project Accredited by AP State Load Dispatch Center (AP SLDC) for REC mechanism, the following are the statutory clearances and environmental clearances to be furnished: Industrial Clearance Land conversion (Agricultural to Non-Agricultural) Environmental Clearance Certificate from APPCB, Hyderabad Contract labour license from AP Labour Department Fire Safety certificate from AP Fire Department Latest tax receipt from the Municipal/Gram Panchayat for the factory land.

5 Auditor compliance certificate regarding fossil fuel utilization Approval from Chief Electrical Inspector Clearance from Forest department Also, all necessary approvals/agreements before start of Solar PV project construction are to be furnished as and when necessary. These include the following: Land purchase Power Evacuation arrangement permission letter from DISCOM Confirmation of Metering Arrangement and location ABT meter type, Manufacture, Model, Serial No. details for Energy Metering. Copy of PPA (important as Preferential PPA projects are not eligible for REC mechanism) Proposed Model and make of plant equipment Undertaking for compliance with the usage of fossil fuel criteria as specified by MNRE Details of Connectivity with DISCOM Connectivity Diagram and Single Line Diagram of Plant Details of pending court cases with APERC, Supreme Court of India, High Court of A.P. or any other courts Any other documents requested by AP SLDC While these are the documents that AP SLDC requires for REC project accreditation, these are typically the clearances/documents required in general for a Solar PV project.

G.O.MS.No. 8 Dated 12.02.2015 Read the following:-

G.O.MS.No. 8 Dated 12.02.2015 Read the following:- GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------

More information

TELANGANA SOLAR POWER POLICY 2015

TELANGANA SOLAR POWER POLICY 2015 TELANGANA SOLAR POWER POLICY 2015 1 GLOSSARY COD CII GoTS GoI MNRE MoP NCE NOC NSM PCB PPA PV R&D REC RPPO RLDC SGST SLDC SPC SPP SPV SRP Scheduled Commercial Operations Date Confederation of Indian Industry

More information

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com

Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com Draft ver2 Solar Power Policy Uttar Pradesh 2012 Suggestions to be sent to : dirupneda@rediffmail.com ho_nmk@rediffmail.com 1 TABLE OF CONTENTS S.No Contents Page No 1. PREAMBLE 3 2. OBJECTIVES 3 3. OPERATIVE

More information

Analysis of state-wise RPO Regulation across India

Analysis of state-wise RPO Regulation across India The Renewable Purchase Obligations (RPO) has been the major driving force in India to promote the renewable energy sector. But the State Electricity Regulatory Commissions (SERCs) have defined their respective

More information

all that you want to know About Rajasthan Solar Energy

all that you want to know About Rajasthan Solar Energy all that you want to know bout Rajasthan Solar Energy Policy, 2014 General 01 Registration Land Timelines Fee & Charges 06 08 11 13 all that you want to know bout Rajasthan Solar Energy Policy, 2014 Rajasthan

More information

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1. OBJECTIVE : 1.1. This procedure shall provide guidance to the entities to implement

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2012 Regulation No. 1 of 2012

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)

More information

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY

PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY PROCEDURE FOR ACCREDITATION OF RENEWABLE ENERGY GENERATION PROJECT FOR RENEWABLE ENERGY CERTIFICATE BY STATE AGENCY 1 Objective (1) This procedure shall provide guidance to the entities to implement Renewable

More information

POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012

POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012 POLICY FOR IMPLEMENTATION OF SOLAR POWER BASED PROJECTS IN MADHYA PRADESH, 2012 (1) Preamble Energy is a prime mover of the development of any economy. While conventional fuels like coal and oil have been

More information

Wind Power Programme in India

Wind Power Programme in India Wind Power Programme in India Ministry of New & Renewable Energy 1 st August 2012, New Delhi 1 Renewable Power Sector in INDIA Share of Installed Renewable Capacity 13% 4% 13% 70% Wind Solar Hydro Biomass

More information

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Shri. K.J.Mathew, Chairman Shri. C. Abdulla, Member Shri. M.P.Aiyappan, Member Petition No. CT/SOLAR JNNSM/KSERC/2010 August 4,

More information

Draft Jharkhand State Solar Power Policy 2015

Draft Jharkhand State Solar Power Policy 2015 Draft Jharkhand State Solar Power Policy 2015 Government of Jharkhand Department of Energy Notification No. ------ Date:./2015 Preamble: In order to reduce the dependence on fossil fuel based generation,

More information

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background Renewable Energy Certificate Mechanism for India Background ABPS Infrastructure Advisory India is abundantly gifted with a variety of renewable energy (RE) sources. However, not all states are endowed

More information

Can India Create an Incentive Based Regime for Significant Power Industries on Renewable Energy? Rajiv Lall Managing Director, IDFC

Can India Create an Incentive Based Regime for Significant Power Industries on Renewable Energy? Rajiv Lall Managing Director, IDFC Can India Create an Incentive Based Regime for Significant Power Industries on Renewable Energy? Rajiv Lall Managing Director, IDFC Washington DC, 15 th October 2008 Renewable Energy Outlook Renewable

More information

COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER

COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER COMBINED SUMMARY OF STATE POLICIES FOR SOLAR POWER Sl. Name of State/ Description Andaman and Nicobar Island 1 Order Date Policy for power Generation through New and Renewable Energy Sources in Andaman

More information

Methodology for Solar Power Projects

Methodology for Solar Power Projects Annexure E Methodology for Solar Power Projects This methodology is applicable to the solar power projects included in the composite policy for new and renewable (non-conventional energy sources) power

More information

Renewable Energy Certificate Mechanism

Renewable Energy Certificate Mechanism Opportunities in Financing Renewable Energy Projects focusing on FiT and RECs Balawant Joshi Director, balawant@gmail.com, balawant.joshi@abpsinfra.com In this presentation.. Investment Potential for Renewable

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Government of Jharkhand Department of Energy. Notification

Government of Jharkhand Department of Energy. Notification Draft Jharkhand State Solar Power Policy 2015 Government of Jharkhand Department of Energy Notification No. ------ Date:./2015 Preamble: In order to reduce the dependence on fossil fuel based generation,

More information

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading

Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Renewable Purchase Obligation (RPO) / Renewable Energy Certificates (REC) Advisory and Trading Target Clients v Renewable Energy Generators in India v RPO mandated entities in India v Investors seeking

More information

Renewable Energy. and Renewal Energy Certificates in Indian Context

Renewable Energy. and Renewal Energy Certificates in Indian Context Renewable Energy and Renewal Energy Certificates in Indian Context With the increasing demand of energy and growing depletion of resources for energy generation, a global movement towards production of

More information

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014

DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014 DRAFT OF THE GOA STATE GOVERNMENT POLICY TOWARDS RENEWABLE, SOLAR ENERGY AND ENERGY CONSERVATION- GOA 2014 Drafted by Goa Energy Development Agency (GEDA) team for the approval by the State Govt. of Goa

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of

More information

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE PRESENTATION BY : MR KESHAV PRASAD MEMBER, DELEGATION OF THE CONFEDERATION OF INDIAN INDUSTRY (CII) & CHIEF OPERATING OFFICER, IL&FS ENERGY

More information

Policy. For. Development of Micro & Mini Hydro Power Projects upto 2 MW-2015. Government of Uttarakhand. Page 1

Policy. For. Development of Micro & Mini Hydro Power Projects upto 2 MW-2015. Government of Uttarakhand. Page 1 Policy For Development of Micro & Mini Hydro Power Projects upto 2 MW-2015 Government of Uttarakhand Page 1 No. 54/I/2015-03/21/2014 Dehradun : Dated : 31 st January, 2015 1. Uttarakhand, a state richly

More information

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY

PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY PROCEDURE FOR ISSUANCE OF RENEWABLE ENERGY CERTIFICATE TO THE ELIGIBLE ENTITY BY CENTRAL AGENCY 1. OBJECTIVE 1.1. This procedure shall provide guidance to the entities to implement Renewable Energy Certificate

More information

REPORT ON DEVELOPMENT OF REC FRAMEWORK IN INDIA PRICING OF RENEWABLE ENERGY AND RENEWABLE ENERGY CERTIFICATES

REPORT ON DEVELOPMENT OF REC FRAMEWORK IN INDIA PRICING OF RENEWABLE ENERGY AND RENEWABLE ENERGY CERTIFICATES 1 REC MECHANISM REPORT ON DEVELOPMENT OF REC FRAMEWORK IN INDIA PRICING OF RENEWABLE ENERGY AND RENEWABLE ENERGY CERTIFICATES Submitted by : Anand Parmar 2 REC MECHANISM Introduction: India has sustained

More information

DELHI ELECTRICITY REGULATORY COMMISSION

DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION

More information

POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No.

POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No. Draft PPA POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED AND M/s. NCE SOLAR PPA No. 1. This Power Purchase Agreement ( Agreement ) entered into this day of between

More information

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter

More information

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Introduction Clean energy promotion in India Focus on

More information

F. No. 66/185/2016 -WE Ministry of New & Renewable Energy

F. No. 66/185/2016 -WE Ministry of New & Renewable Energy F. No. 66/185/2016 -WE Ministry of New & Renewable Energy India has set an ambitious target of reaching 175 GW of installed capacity from renewable energy sources including 100 GW from solar and 60 GW

More information

Consultative Paper on Comprehensive Tariff Order on Solar Power. (Comments/Suggestions are invited on or before 31.08.2013)

Consultative Paper on Comprehensive Tariff Order on Solar Power. (Comments/Suggestions are invited on or before 31.08.2013) TAMIL NADU ELECTRICITY REGULATORY COMMISSION Consultative Paper on Comprehensive Tariff Order on Solar Power (Comments/Suggestions are invited on or before 31.08.2013) 1. Introduction 1.1 The importance

More information

Karnataka Electricity Regulatory Commission. Discussion note on

Karnataka Electricity Regulatory Commission. Discussion note on Karnataka Electricity Regulatory Commission Discussion note on Draft KERC (Forecasting, Scheduling, Deviation settlement and related matters for Wind and Solar Generation sources) Regulations, 2015. 1.0.

More information

[SOLAR SUCCESS] Customer Benefits

[SOLAR SUCCESS] Customer Benefits [Solar power Smarter, cleaner, brighter] [SOLAR SUCCESS] Customer Overview The General Services Administration (GSA) Federal Building is a four-story building in the heart of downtown Sacramento, CA. The

More information

National Electricity Policy 03-Feb-2005

National Electricity Policy 03-Feb-2005 National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development

More information

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001

KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001 KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G. Road, Bangalore-560 001 Present: Shri M.R.Sreenivasa Murthy Chairman Shri Vishvanath Hiremath Shri K. Srinivasa

More information

Renewable Energy Certificate Mechanism in India

Renewable Energy Certificate Mechanism in India 16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 92 Renewable Energy Certificate Mechanism in India S.K.Soonee, CEO*, Minaxi Garg, DGM #, and Satya Prakash, Engineer # Abstract India has

More information

Tamil Nadu WiNd ENErgy ProfilE

Tamil Nadu WiNd ENErgy ProfilE Tamil Nadu WiNd ENErgy ProfilE Wind energy in Tamil Nadu has witnessed tremendous growth propelling the State to the number one position in India in terms of renewables. However the challenge that remains

More information

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters

More information

SMALL SOLAR. 2014 Nebraska Wind and Solar Conference and Exhibition. Guy C. Smith October 29, 2014

SMALL SOLAR. 2014 Nebraska Wind and Solar Conference and Exhibition. Guy C. Smith October 29, 2014 SMALL SOLAR 2014 Nebraska Wind and Solar Conference and Exhibition Guy C. Smith October 29, 2014 TYPES OF SOLAR PROJECTS Concentrated Solar Projects (CSP) Systems generate solar power using mirrors or

More information

Electricity in Egypt

Electricity in Egypt T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity

More information

Distributed Generation: Frequently Asked Questions

Distributed Generation: Frequently Asked Questions Distributed Generation: Frequently Asked Questions 1) What is distributed generation (DG)? Generating technologies located close to where the electricity is being used that are connected to the electric

More information

Full Scale Program for Renewable Energy in Egypt

Full Scale Program for Renewable Energy in Egypt Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions

More information

Renewable Energy Feed-in Tariff Projects Regulations

Renewable Energy Feed-in Tariff Projects Regulations for Consumer Protection and Renewable Energy Feed-in Tariff Projects Regulations Oct. 2014 EgyptERA s crew has prepared this document so as to answer all the questions related to the renewbales supporting

More information

POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED POWER PURCHASE AGREEMENT BETWEEN SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED AND M/s. NCE SOLAR PPA No. This Power Purchase Agreement ( Agreement ) entered into on this day of 20 between Southern

More information

Solar Energy Update. Transportation & Environment Committee Presentation June 11, 2012

Solar Energy Update. Transportation & Environment Committee Presentation June 11, 2012 Solar Energy Update Transportation & Environment Committee Presentation June 11, 2012 1 Background Purpose: Update from February 13, 2012 briefing Feasible Projects Convention Center Solar Farm(s) DPD/DFD

More information

S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20

S. No. Year Obligation expressed as percentage of energy consumption (%) 1 2011-12 6.00 2 2012-13 7.10 3 2013-14 8.20 Background paper for prescribing Renewable Purchase Obligation (RPO) for Captive consumption of CPP & open access consumers in the State for the period ending March, 2017 and related amendment in regulations:

More information

Solar Purchase Power Agreements Brief Sheet

Solar Purchase Power Agreements Brief Sheet Solar Purchase Power Agreements Brief Sheet The Essentials A Power Purchase Agreement is a contract between multiple parties, one who generates electricity for the purpose of sale (the seller) and one

More information

The Real Cost of Electrical Energy. Outline of Presentation

The Real Cost of Electrical Energy. Outline of Presentation 2 Outline of Presentation Data Sources Electricity Demand and Supply Cost to Meet Demand Profile Electricity Pricing Cost Impact of Dispatching Generation (Load Following) Simplifying Assumptions Electricity

More information

Delhi Solar Energy Policy, 2015

Delhi Solar Energy Policy, 2015 DRAFT VERSION FOR PUBLIC COMMENT Delhi Solar Energy Policy, 2015 GOVERNMENT OF NCT OF DELHI DELHI SECTRETARIAT, I.P. ESTATE, NEW DELHI- 110002 10 September 2015 NOTIFICATION The Government of NCT of Delhi

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH. Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7. PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO 220-221, SECTOR 34-A, CHANDIGARH Petition No.26 of 2010 (Suo Motu) Date of Order: 7.7.2010 In the matter of : Determination of generic levellised generation

More information

Success in Scaling-up Solar Energy in Rajasthan, India

Success in Scaling-up Solar Energy in Rajasthan, India Success in Scaling-up Solar Energy in Rajasthan, India Shreemat Pandey Principal Secretary to Chief Minister Rajasthan, India 1. Introduction Solar power is attractive because it is abundant and offers

More information

MODEL SOLAR POWER PURCHASE AGREEMENT UNDER COMPETITIVE BIDDING ROUTE

MODEL SOLAR POWER PURCHASE AGREEMENT UNDER COMPETITIVE BIDDING ROUTE MODEL SOLAR POWER PURCHASE AGREEMENT UNDER COMPETITIVE BIDDING ROUTE POWER PURCHASE AGREEMENT BETWEEN POWER DISTRIBUTION COMPANY OF LIMITED AND M/s. NCE SOLAR PPA No. 1. This Power Purchase Agreement (

More information

Existing Wind Power Policies and Incentives

Existing Wind Power Policies and Incentives Existing Wind Power Policies and Incentives Consultation on National Wind Energy Mission January 9, 2014 New Delhi Wind Power Progress (in MW) Potential (at 80 m) : 1,02,000 Achievement so far : 20,150

More information

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility Alternative Energy Made in Florida Solar Power Plants for Commercial, Government, and Utility L a w r e n c e H e f l e r C a r l o s G o n z a l e z I d put my money on the sun and solar energy. What

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3 rd & 4 th Floor, Chanderlok Building, 36, Janpath, New Delhi 110 001 Tel : 23753920/ Fax : 23753923 Ref.No.: 2/7(8)/2008-RIMS/Policy/CERC Dated: 29 th

More information

DOCUMENT FOR EXPRESSION OF INTEREST FOR EMPANELMENT OF ADVERTISING AGENCIES

DOCUMENT FOR EXPRESSION OF INTEREST FOR EMPANELMENT OF ADVERTISING AGENCIES THE ANDHRA PRADESH DAIRY DEVELOPMENT CO-OPERATIVE FEDERATION (APDDCF) LIMITED, LALAPET, HYDERABAD DOCUMENT FOR EXPRESSION OF INTEREST FOR EMPANELMENT OF ADVERTISING AGENCIES ANDHRA PRADESH DAIRY DEVELOPMENT

More information

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay.

Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay. Can India s Future Needs of Electricity be met by Renewable Energy Sources? S P Sukhatme Professor Emeritus IIT Bombay August 2014 Outline of Talk 1. Introduction - The Present Scenario 2. Estimating India

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT Board of Education Report

LOS ANGELES UNIFIED SCHOOL DISTRICT Board of Education Report Report Number: 70-08/09 Date: Subject: Approval of a Power Purchase Agreement to Install a Photovoltaic Solar Panel Array at Three Schools Responsible Staff: Name Office/Division Joseph A. Mehula, Chief

More information

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT

( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT ( Extract from Haryana Government Gazette, dated the 6 th December,2005) HARYANA GOVERNMENT RENEWABLE ENERGY DEPARTMENT NOTIFICATION The 23 rd November, 2005 POLICY FOR PROMOTING GENERATION OF ELECTRICITY

More information

Financial Analysis of Solar Photovoltaic Power plant in India

Financial Analysis of Solar Photovoltaic Power plant in India Financial Analysis of Solar Photovoltaic Power plant in India M. Ganga Prasanna, S. Mahammed Sameer, G. Hemavathi Department of Management Studies MadanapalleInstitute of Technology& Science Post Box No:

More information

INDEX S. No. PARTICULARS Note:

INDEX S. No. PARTICULARS Note: INDEX S. No. PARTICULARS T1 Profit & Loss Account - Transmission Business T2 Profit & Loss Account - SLDC Business T3 Annual Revenue Requirement - Transmission Business T4 Annual Revenue Requirement -

More information

Distributed Energy Resource Options and The Importance of The Electric Power Grid

Distributed Energy Resource Options and The Importance of The Electric Power Grid Distributed Energy Resource Options and The Importance of The Electric Power Grid David K. Owens Executive Vice President Edison Electric Institute National Conference of State Legislatures Webinar on

More information

Subject: Draft Scheme for development of Solar Parks and Ultra Mega Solar power projects circulation for comments reg.

Subject: Draft Scheme for development of Solar Parks and Ultra Mega Solar power projects circulation for comments reg. MOST IMMEDIATE No.30/18/2014-15-NSM भ रत सरक र/ Government of India नव न और नव करण य ऊर म त र लय / Ministry of New & Renewable Energy (NSM Coord. Group) ***** Block 14, CGO Complex, Lodi Road, New Delhi-03,

More information

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Grid Connected Solar Power in India Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Indian Power Sector (31 March 2012) Thermal Hydro Nuclear Renewable 1,31,353 MW

More information

Solar. for a brighter. future

Solar. for a brighter. future Solar for a brighter future Rajasthan Solar Energy Policy, 2014 Rajasthan Solar Energy Policy, 2014 Energy Department Government of Rajasthan Rajasthan, by virtue of its geography, enjoys the highest number

More information

Solar Purchase Obligation

Solar Purchase Obligation Solar Purchase Obligation Overview& Way Forward Abstract This brief white paper provides an overview of the solar purchase obligations and avenues to satisfy the SPO, in the specific context of the Tamil

More information

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC

Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC This agreement made at on this day of Two thousand between M/s. (Solar Power Generator name and address) hereinafter called the

More information

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT This Power Purchase agreement is entered into at (place).. on this. day of between Electricity Supply Company Limited

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity

More information

CHAIRMAN & MANAGING DIRECTOR, NATIONAL MINERAL DEVELOPMENT CORPORATION LIMITED(NMDC)

CHAIRMAN & MANAGING DIRECTOR, NATIONAL MINERAL DEVELOPMENT CORPORATION LIMITED(NMDC) No. 6/30/2014-PESB भ रत सरक र / Government of India क र म क एव प रर क षण ववभ ग / Department of Personnel & Training ल क उद यम चयन ब र / Public Enterprises Selection Board *** ब ल क स ख य 14, स ज ओ क म

More information

Energy Benefits Yolo Program: Solar FAQ

Energy Benefits Yolo Program: Solar FAQ Energy Benefits Yolo Program: Solar FAQ Please visit www.mygroupenergy.com/yolo Program Questions What is Energy Benefits Yolo? The Energy Benefits program is an effort of the Yolo Climate Compact and

More information

Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level

Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level Model Regulations on Forecasting, Scheduling and Deviation Settlement of Wind and Solar Generating Stations at the State level 2015 Contents MODEL REGULATIONS ON FORECASTING, SCHEDULING & DEVIATION SETTLEMENT

More information

DRAFT ORDER (SUO-MOTU)

DRAFT ORDER (SUO-MOTU) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 22163964/65/69 Fax: 22163976 E-mail: mercindia@mercindia.org.in

More information

DRAFT. Model Power Purchase Agreement for Solar Power Generation

DRAFT. Model Power Purchase Agreement for Solar Power Generation DRAFT Model Power Purchase Agreement for Solar Power Generation This Model PPA is applicable where the Parties intend to enter into a long term PPA for the entire useful life (i.e. 25 years) of the solar

More information

Current and expected contribution of RES-E in NA countries

Current and expected contribution of RES-E in NA countries Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Current and expected contribution of RES-E in NA countries Ehab Ismail Ameen General Manager of Planning

More information

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Egypt Renewable energy Projects Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Strategy Private Sector is our partner towards achieving our goal increasing

More information

To whom application is to be filed

To whom application is to be filed SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED 6-1-50, Corporate Office/Mint Compound/Hyderabad 063. www.tssouthernpower.com, email:seipc@tssouthernpower.com As per TELANGANA SOLAR POWER POLICY

More information

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND

IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND IREDA-NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY SUPPORTED BY THE NATIONAL CLEAN ENERGY FUND IREDA NCEF REFINANCE SCHEME REFINANCE SCHEME FOR PROMOTION OF RENEWABLE ENERGY

More information

Wilson Sonsini Goodrich & Rosati

Wilson Sonsini Goodrich & Rosati SOLAR POWER PURCHASE AGREEMENTS IREC TELEPHONE SEMINAR June 12, 2008 Peter D. Mostow, J.D. Partner, Clean Technology and Renewable Energy Practice Wilson Sonsini Goodrich & Rosati Agenda Legal Drivers

More information

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2 Solar and Wind Energy for Greenhouses A.J. Both 1 and Tom Manning 2 1 Associate Extension Specialist 2 Project Engineer NJ Agricultural Experiment Station Rutgers University 20 Ag Extension Way New Brunswick,

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION, JAIPUR Suo-Motu In the matter of Determination of Benchmark Capital Cost for Solar PV and Solar Thermal Power Projects for FY 2013-14 and resultant Generic

More information

Enhancing the corporate energy performance

Enhancing the corporate energy performance www.pwc.com/india Enhancing the corporate energy performance Energy efficiency and Renewable energy, GRID Emerging Energy Markets Some Concerns in the Indian energy scenario India faces formidable challenges

More information

Planning for Arizona s Energy Future

Planning for Arizona s Energy Future Planning for Arizona s Energy Future Brad Albert, General Manager of Renewable Resources Arizona Public Service Co. National Conference of State Legislators (NCSL), Energy Task Force December 8, 2010 Regulatory

More information

HARNESS. Utilising solar energy to save money

HARNESS. Utilising solar energy to save money HARNESS Utilising solar energy to save money Why consider solar? No control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill be

More information

Corporate Summary. Company Background

Corporate Summary. Company Background Corporate Summary Company Background Energy Lease Pty Ltd is a new business, established in 2014 as a specialty financier and asset manager of solar energy systems and energy efficient equipment. The business

More information

Haryana Government Renewable Energy Department. Notification The 4 th September, 2014 Haryana Solar Power Policy, 2014

Haryana Government Renewable Energy Department. Notification The 4 th September, 2014 Haryana Solar Power Policy, 2014 Haryana Government Renewable Energy Department Notification The 4 th September, 2014 Haryana Solar Power Policy, 2014 No. 19/14/14-5Power.- The Government of Haryana has formulated Haryana Solar Power

More information

Frequently Asked Questions About. Japan s Feed-in- Tariff System

Frequently Asked Questions About. Japan s Feed-in- Tariff System Frequently Asked Questions About Japan s Feed-in- Tariff System Spring 2013 JAPAN S FEED-IN-TARIFF SYSTEM SPRING 2013 Naoki Watanabe 1. What are the Key Steps in the Process of Getting FIT Approval of

More information

PICO HYDROPOWER PROMOTION PROJECT

PICO HYDROPOWER PROMOTION PROJECT Date: 04/02/2013 PICO HYDROPOWER PROMOTION PROJECT With support of MNRE through EMC Energy Management Centre-Kerala Central Financial Assistance Features CFA of Rs. 1,10,000 per project For Pico hydel

More information

Direct and Indirect Taxation-Law : 1 and : Practice

Direct and Indirect Taxation-Law : 1 and : Practice Direct and Indirect Taxation-Law : 1 and : Practice RollNo... Time allowed : 3 hours Maximum marks : 100 Total number of questions : 8 Total number of printed pages : 6 NOTE : All references to sections

More information

UNDERSTANDING SOLAR POWER CLAIMS:

UNDERSTANDING SOLAR POWER CLAIMS: UNDERSTANDING SOLAR POWER CLAIMS: Best Practices for Hosting, Leasing, and Owning Solar Generation Presenters: Jenny Heeter, NREL Robin Quarrier, CRS Bryce Smith, OneEnergy Renewables Feb 26, 2015 NREL

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. L-1/12/2010-CERC Dated: 14 th January, 2010 NOTIFICATION In exercise of powers conferred under sub-section (1) of Section 178 and Section 66 read

More information

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions Stationary Energy Storage Solutions 3 Stationary Energy Storage Solutions 2 Stationary Energy Storage Solutions Stationary Storage: Key element of the future energy system Worldwide growing energy demand,

More information

F.No. 334/8/2016-TRU Government of India Ministry of Finance Department of Revenue (Tax Research Unit)

F.No. 334/8/2016-TRU Government of India Ministry of Finance Department of Revenue (Tax Research Unit) To, F.No. 334/8/2016-TRU Government India Ministry Finance Department Revenue ( Research Unit) Circular No. 192/02/2016- Principal Chief Commissioners Customs and Central Excise (All) Principal Chief Commissioners

More information