1 STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED ELKO NEW MARKET INTERCEPTOR, CSAH 2 SEGMENT SCOTT COUNTY, ELKO, NEW MARKET, AND NEW MARKET TOWNSHIP, MINNESOTA FINDINGS OF FACT CONCLUSIONS OF LAW AND ORDER FINDINGS OF FACT Pursuant to Minn. R (2003), the Minnesota Pollution Control Agency (MPCA) staff has prepared an Environmental Assessment Worksheet (EAW) for the proposed Elko New Market Interceptor, CSAH 2 Segment Project. Based on the MPCA staff environmental review and other information in the record of the MPCA, the MPCA hereby makes the following,, : FACILITY HISTORY Background The cities of Elko and New Market are proposing to construct a package wastewater treatment plant to provide interim treatment capacity until late in this decade. At that time, a wastewater interceptor will be constructed that will divert flows from New Market Township to the Metropolitan Council Environmental Services Division facility at Empire. A two-mile portion of this interceptor will be constructed within the road right-of-way of County State Aid Highway (CSAH) 2, which will be constructed in The project will consist of the construction of approximately 10,000 feet of 48-inch pipe. After construction, the pipe will be temporarily plugged until construction of the remainder of the Elko-New Market Interceptor. No increase in flows will occur as a result of this project, as it represents the first leg of a separate project to be covered by a separate EAW that will address increases in flow and other service area conditions. Previous Environmental Review Environmental Review was performed on the Elko-New Market Wastewater Treatment Facility (WWTF) that was permitted in January of 2005 by the MPCA. That EAW was distributed on February 16, 2004, and a Negative Declaration on the need for an Environmental Impact Statement (EIS) was issued on June 24, An EAW entitled CSAH 2 from West of CSAH 91 to I-35 was prepared by the Scott County Highway Department and distributed on November 18, This EAW evaluated the environmental impacts of the CSAH 2 construction. The County Highway Department issued a Negative Declaration on the need for an EIS on February 3, TDD (for hearing and speech impaired only): (651) Printed on recycled paper containing at least 30% fibers from paper recycled by consumers

2 PROPOSED PROJECT DESCRIPTION Proposed New Construction The two-mile segment of the Elko-New Market Interceptor is proposed to be constructed before the rest of the interceptor in order to coordinate construction with Scott County s County Road 2 reconstruction project, and thereby minimize disruption to the environment as well as to people in the area. The County Road 2 segment of the interceptor has been sized to accommodate average wastewater flows of 7.3 million gallons per day (mgd) (peak flows will be 16.2 mgd); it will convey sanitary wastewater to the Empire WWTF in Empire Township after construction of the later phase of the interceptor extension. At this time, no wastewater will be conveyed by the pipe, and therefore, no increase in flows will occur as a result of the project. A separate EAW will be prepared for the remaining seven miles of interceptor to be installed in the future to serve portions of Elko, New Market and New Market Township. That EAW will address increases in flow as well as other service area conditions. Wastewater to be conveyed by the completed interceptor project will be within the range of normal strength domestic wastewater. The County Road 2 segment of the interceptor will begin at the intersection of County Road 91/Natchez Avenue in New Market and will proceed eastward along the north side of the County Road 2 reconstruction for approximately 10,000 feet to an endpoint just west of I-35. Construction of the sewer pipe will involve grading, excavation, backfilling, potential de-watering, and re-vegetation activities. Equipment to be used will include standard construction machinery such as trucks, backhoes, graders, compactors, bobcats, cranes, loaders, compressors, and possibly de-watering pumps. Construction of the project is anticipated to begin in the summer of 2005 and be completed in The proposed County Road 2 Segment of the Elko-New Market Interceptor will be needed to convey future wastewater flows from New Market Township. Eventual beneficiaries of the project will include residents and business operators in these areas, although service will not be provided as a result of this project. Service to these areas will be provided by construction of an additional seven miles of the Elko-New Market Interceptor sewer to be covered under a separate EAW. Environmental Concerns The following environmental concerns associated with the proposed CSAH 2 Segment of the Elko New Market Interceptor, were identified and addressed, in part, in the EAW. Several of these issues will be addressed at greater length in the EAW that will ultimately be prepared on the interceptor in its totality. Impacts of the construction of CSAH 2 upon wetlands in the area were discussed in the EAW prepared by the County in 2003: Short and long term impacts of construction on area flora and fauna. Stormwater runoff and erosion during construction of the interceptor and enabled development. Dust and noise caused by sewer construction. Impacts of enabled development on prime farmlands, infrastructure, and public services. 2

3 Additional Concerns Described in Comment Letters No comment letters were received. Community Involvement in Process Community involvement regarding the EAW, per se, is limited to the standard Environmental Quality Board (EQB) required activities (mailing of the public notice to media in Scott and Dakota Counties and others who have expressed an interest in Public Notices and wastewater issues, publication in the EQB Monitor, distribution to EQB Monitor list plus all the added local contacts, copies available at proposer's office and local library, etc). The extra step taken by the MPCA has been to post the document on their Web site. PROCEDURAL HISTORY 1. Pursuant to Minn. R , subp. 18, Item A, an EAW was prepared by MPCA staff on the proposed project. Pursuant to Minn. R (2003), the EAW was distributed to the EQB mailing list and other interested parties on January 28, The MPCA notified the public of the availability of the EAW for public comment. A news release was provided to media in Dakota and Scott counties, as well as other interested parties on January 27, In addition, the EAW was published in the EQB Monitor on January 31, 2005, and available for review on the MPCA Web site at January 28, The public comment period for the EAW began on January 31, 2005, and ended on March 2, The MPCA did not receive any comment letters during the 30-day comment period. CRITERIA FOR DETERMINING THE POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS 4. Under Minn. R (2003), the MPCA must order an EIS for projects that have the potential for significant environmental effects that are reasonably expected to occur. In deciding whether a project has the potential for significant environmental effects, the MPCA must compare the impacts that may be reasonably expected to occur from the project with the criteria set forth in Minn. R , subp. 7 (2003). These criteria are: A. the type, extent, and reversibility of environmental effects; B. cumulative potential effects of related or anticipated future projects; C. the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority; and 3

4 D. the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other EISs. THE MPCA FINDINGS WITH RESPECT TO EACH OF THESE CRITERIA ARE SET FORTH BELOW Type, Extent, and Reversibility of Environmental Effects 5. The first criterion that the MPCA must consider, when determining if a project has the potential for significant environmental effects that are reasonably expected to occur, is the "type, extent, and reversibility of environmental effects" Minn. R , subp. 7.A (2003). The MPCA Findings with respect to each of these factors are set forth below. Reasonably expected short- and long-term impacts of construction on area flora and fauna: 6. The type and nature of potential short-term impacts on wildlife will include the disruptive effects of construction, including excavation, stockpiling of soils and materials, noise, potential erosion and sedimentation, and vehicle movement. Habitat and individual animals will be destroyed by the actual excavation or placement of stockpiled earth or bedding. Surviving small species may be forced to leave their territories and compete with established individuals in other areas. Larger species may be forced to relocate to portions of their territories that are not impacted. Seasonal activities such as nesting may be disrupted or curtailed, depending upon the season of construction. The project itself will not permanently displace wildlife; however, urban development enabled by the sanitary sewer line will cause a shift in the types and numbers of species present. Species tolerant of urban areas will remain, while others less tolerant will not. 7. The extent of reasonably expected short-term impacts of construction on area flora and fauna will initially be limited to the immediate area of construction, as described in Findings 6. However, long-term disruption will occur throughout the service area of the interceptor, as a consequence of enabled development and land use conversion from low density residential and agricultural land use to suburban residential land use. 8. The reversibility of reasonably expected short-and long-term impacts of construction on area flora and fauna will vary. Short-term disruption that does not include destruction of individual species or habitat will be reversible upon the cessation of construction. Long-term changes in species numbers and composition due to land use conversion would be, practically speaking, irreversible. 9. Comments received that expressed concerns regarding short-and long-term impacts of construction on area flora and fauna: No comment letters were received during the comment period. 4

5 10. The MPCA finds that the environmental review is adequate to address the concerns because: All potential short-and long-term impacts of construction on area flora and fauna that are reasonably expected to occur from the proposed project have been considered during the review process and methods to prevent these impacts have been developed. 11. The MPCA finds that the project, as it is proposed, does not have the potential for significant environmental effects based on the type, extent, and reversibility of environmental effects reasonably expected to occur as a result of short- and long-term impacts of construction on area flora and fauna. Reasonably expected environmental effects of this project associated with stormwater runoff and erosion during construction of the interceptor and enabled development: 12. The type and nature of any impacts associated with stormwater runoff and erosion during construction of the interceptor and enabled development: During construction of the interceptor, vegetation will be removed from the alignment of the project, and when precipitation falls on this devegetated earth, erosion can occur. Stormwater runoff can entrain sediment, and the sediment can be deposited in open water. The interceptor project is intended to provide sewer service to areas that are presently undeveloped. This will enable development to occur at a much higher density than exists at present. One consequence of such development is a substantial increase in the area of impervious surfaces, in the form of rooftops, sidewalks, driveways, roadways, and to a certain extent lawn grass. This impervious surface results in runoff, which entrains pollutants such as phosphorus and nitrate and contaminants present on the impervious surface, and which can cause soil erosion and entrained sediment. In addition, the amplitude of flow in receiving streams may increase, leading to additional erosion. 13. The extent of any impacts of stormwater runoff and erosion during construction of the interceptor and enabled development. The extent of construction stormwater impacts will depend upon the length of time required to reestablish vegetative cover, and the effectiveness of interim erosion control measures. Effects of stormwater from enabled development will depend on the density of development and upon mitigative measures implemented. Density of development is dictated by the City s Comprehensive Plan. This plan includes a Stormwater Management Plan. Subsequent residential development within the service area of this project will also be subject to a National Pollutant Discharge Elimination System (NPDES) General Permit for discharge of stormwater during construction activities (see Findings 37). Finally, proposed developments over 80 acres must undergo independent EAWs that will be performed on more specific development plans than are presently available. 14. The reversibility of any impacts of stormwater runoff and erosion during construction of the interceptor and enabled development. If stormwater runoff and erosion occur during construction, those effects are reversible if prompt implementation of Best Management Practices occurs. If stormwater runoff and erosion occurs as a result of development enabled by the project, it will be reversible to the extent that construction of stormwater controls, conveyance, and treatment facilities can be constructed retroactively. It is a far more acceptable strategy to provide such controls prior to or during the construction of the interceptor and enabled development. 5

6 15. Comments received that expressed concerns regarding impacts of stormwater runoff and erosion during construction of the interceptor and enabled development: No comment letters were received for this project. 16. The MPCA finds that the environmental review is adequate to address the impacts of stormwater runoff and erosion during construction of the interceptor and enabled development. All potential impacts of stormwater runoff and erosion during construction of the interceptor and enabled development that are reasonably expected to occur from the proposed project have been considered during the review process and methods to prevent these impacts have been developed. 17. The MPCA finds that the project as it is proposed does not have the potential for significant erosion and stormwater runoff during construction of the interceptor and enabled development based on the type, extent, and reversibility of environmental effects reasonably expected to occur. Reasonably expected impacts associated with dust and noise during construction: 18. Type and nature of impacts of dust and noise during construction: Construction of a wastewater interceptor is accomplished by the use of typical construction equipment, including trucks, backhoes, graders, compactors, bobcats, cranes, loaders, compressors, and possibly de-watering pumps. This equipment generates noise during its operation. 19. The extent of impacts of dust and noise during construction depends on the location of receptors and on the duration of construction as well as the time of construction. Nearest receptors are farmsteads and businesses along CSAH 2. Average exposure times are estimated at between two and four weeks. Construction will be limited to daytime hours. 20. The reversibility of impacts of dust and noise during construction: Dust and noise will cease upon the end of construction, and these impacts are completely reversible. 21. Comments received concerning dust and noise: No comments were received. 22. The MPCA finds that concerns about dust and noise during construction will be addressed by restricting construction to daytime hours and by the generally short duration of construction at any given point on the project alignment. 23. The MPCA finds that the environmental review is adequate to address the concerns because: All potential impacts associated with dust and noise during construction that are reasonably expected to occur from the proposed project have been considered during the review process and methods to prevent these impacts are available. 24. The MPCA finds that the project, as it is proposed, does not have the potential for significant environmental effects related to construction dust and noise based on the type, extent, and reversibility of environmental effects reasonably expected to occur. 6

7 Reasonably expected impacts associated with the enabled development on prime farmlands, infrastructure, and public services: 25. The type and nature of impacts associated with the enabled development on prime farmlands, infrastructure, and public services: Development enabled by wastewater interceptors occurs at a far higher density than that supported by individual sewage treatment systems. This density results in the conversion of agricultural and open space land use to suburban residential land use. The land use conversion also creates a demand for infrastructure and services such as stormwater collection, conveyance and treatment, utilities such as gas, water, and power, residential and arterial streets, schools, police, and fire protection. 26. The extent of impacts associated with the enabled development on prime farmlands, infrastructure, and public services: Enabled development is the result of a consciously intended, designed provision of wastewater collection services to areas undergoing urbanization. In such areas, comprehensive plans are prepared that channel this development in an orderly fashion, so that infrastructural needs are met, and so that adverse environmental impact is minimized. 27. The reversibility of impacts associated with the enabled development on prime farmlands, infrastructure, and public services: Enabled development and land use conversion, practically speaking, are irreversible. Once the development occurs, demand on infrastructure is irreversible as well. 28. Comments received concerning the impacts of enabled development on prime farmlands, infrastructure, and public services: No comments were received. 29. The MPCA finds that the environmental review is adequate to address the concerns because: all potential impacts associated with enabled development that are reasonably expected to occur from the proposed project have been considered during the review process and methods to prevent these impacts are available. 30. The MPCA finds that the project, as it is proposed, does not have the potential for significant environmental effects associated with enabled development based on the type, extent, and reversibility of environmental effects reasonably expected to occur. Cumulative Potential Effects of Related or Anticipated Future Projects 31. The second criterion that the MPCA must consider, when determining if a project has the potential for significant environmental effects that are reasonably expected to occur, is the "cumulative potential effects of related or anticipated future projects," Minn. R , subp. 7.B (2003). The MPCA findings with respect to this criterion are set forth below. 32. There are, and will be, several related projects in the area. Lateral sewer extensions will further enable development. The ultimate proposed land use for the area is urban residential and commercial development, with the timing of urbanization varying according to demand for housing, commercial and industrial property, the intention of local developers, and the availability of infrastructure. The consequences of this enabled development are varied and multiple. Change of land use from open space, farmland, and wildlife habitat to urban neighborhoods is the most obvious. 7

8 This, in turn, results in alterations of species types and numbers. Increased impervious surfaces can cause the generation of greater volumes of stormwater runoff, which if not properly provided for, can cause erosion and water quality degradation. Increased populations can result in traffic congestion and vehicle-related air emissions. Increases in demand on all infrastructures, including schools, police and fire protection, utilities such as gas, water, and power, and transportation will also occur with development. However, development has been occurring throughout our history and the means of avoiding adverse environmental impacts associated with it are well understood. Development of the area will be subject to compliance with the City s comprehensive plans, including Sewer Policy Plans, Recreational Plans, Stormwater Management Plans, and various ordinances. 33. Related projects will also be subject to additional environmental review, pursuant to Minn. R and Minn. R , including under the residential, commercial, or industrial mandatory categories for EAW preparation. Lateral sewer extensions may require additional EAWs under the wastewater category, Minn R , subp. 18 A. An EAW on the entire Elko New Market Interceptor will also be prepared. 34. Other than the discussion in Findings 32 above, the EAW and MPCA follow-up evaluation did not disclose any specific related or anticipated future projects that may interact with this project in such a way as to identify any potential cumulative environmental impacts that are reasonably expected to occur. 35. In considering the cumulative potential effects of related or anticipated future projects, the MPCA finds that the reasonably expected cumulative effects from this project will not be significant. The Extent to Which the Environmental Effects Are Subject To Mitigation by Ongoing Public Regulatory Authority 36. The third criterion that the MPCA must consider, when determining if a project has the potential for significant environmental effects that are reasonably expected to occur, is "the extent to which the environmental effects are subject to mitigation by ongoing public regulatory authority," Minn. R , subp. 7.C (2003). The MPCA findings with respect to this criterion are set forth below. 8

9 37. The following permits or approvals will be required for the interceptor project: Unit of Government Permit or Approval Required Status A. U.S. Army Corps of Engineers (USACE) Application for Wetland/Water Project Public Linear Utility Project (GP/LOP-98-MN-Section 404 Activities in Minnesota) B. MPCA Approval of Facility Plan and Construction Plans and Specifications (for Minnesota Public Facilities Authority funding eligibility) C. MPCA Application for NPDES General Permit for discharge of stormwater during construction activities for construction that will disturb more than one acre of non-impervious surface D. MPCA Application for Sewer Extension Permit E. Minnesota Department of Natural Resources (DNR) F. Minnesota Department of Health (MDH) G. Minnesota Department of Transportation (MnDOT) H. Scott County Highway Department Application for General Permit for Temporary Water Appropriations Application for Water Well Permits Application for Utility Permit on Trunk Highway Right of Way (form 2525) Application for Utility Permit on County Highway Right of Way by construction contractor if more than 10,000 gallons per day of water is appropriated (if dewatering wells are necessary) I. Scott County Application for Grading Permit J. City of Elko Application for Minnesota Wetland Conservation Act (WCA) Certificate of No Loss or Exemption for temporary wetland impacts in the city of Elko 9

10 Unit of Government Permit or Approval Required Status K. City of New Market Application for Minnesota WCA Certificate of No Loss or Exemption for temporary wetland impacts in the city of New Market L. New Market Township Application for Minnesota WCA Certificate of No Loss or Exemption for temporary wetland impacts in the New Market M. Minnesota Public Facilities Authority (jointly with MPCA) Township Application for State Revolving Loan Fund Program for Construction The above-listed permits include general and specific requirements for mitigation of environmental effects of the project, as follows: A. USACE, Application for Wetland/Water Project Public Linear Utility Project (GP/LOP-98- MN-Section 404 Activities in Minnesota). This general permit provides language describing procedures and permissions regarding excavation and placement of excavated material within a wetland during various activities, including placement of wastewater sewers. B. MPCA, approval of facility plan and construction plans and specifications (for Minnesota public facilities authority funding eligibility) construction plans and specifications for the project are submitted to the MPCA for technical review and approval. This review is performed to ensure that the facility design is consistent with good engineering practice and state and federal criteria. C. MPCA, Application for NPDES General Permit for Discharge of Stormwater During Construction Activities. The project owner must apply to the MPCA for a NPDES Permit. That application includes a series of statements, which must be affirmed by the permittee. These statements include assurances that sediment and erosion control plans have been or will be prepared, that the plans will be compliant with the NPDES General Permit and that the proposer will adhere to these plans. The sediment and erosion control plan will provide more detail as to the specific measures to be implemented and will also address: phased construction; vehicle tracking of sediment; inspection of erosion control measures implemented; and time frames in which erosion control measures will be implemented. The requirements of the NPDES General Permit referenced above provide that all exposed soil areas within 100 lineal feet of a water of the state, or within 100 feet of a curb, gutter, storm-sewer inlet, drainage ditch or stormwater conveyance system, shall have temporary protection or permanent cover for those exposed areas. The requirement is dependent upon the slopes in the area. The NPDES General Permit is enforceable by the MPCA. 10

11 D. MPCA, Application for Sewer Extension Permit. After completion of administrative and technical reviews by MPCA staff, State Disposal System Permits will be required for the interceptors and each lateral sewer that will connect to them. Review of sewer extension permits will verify that hydraulic capacity exists in the receiving wastewater interceptor systems and the treatment facility. The City will have a legal obligation to enforce adopted local stormwater laws. If the MPCA discovers that the community has failed to implement and enforce its stormwater laws in a manner that protects receiving water quality and quantity, the MPCA may subject it to administrative penalties including denial of future sanitary sewer extensions. E. DNR, Application for General Permit for Temporary Water Appropriations Approval of dewatering through a DNR Water Appropriation Permit is required when the amount of appropriation exceeds 10,000 gallons per day, or one million gallons per year. This permit regulates the appropriation of ground water so that any water supply wells are not adversely impacted by dewatering activities. F. MDH, Application for Water Well Permits. This permit will assure that any dewatering wells will be compliant with the State Well Code. G. MnDOT, Application for Utility Permit on Trunk Highway Right of Way (form 2525)* this permit assures that the crossing under State Trunk Highway 61 is accomplished in a manner that will not adversely impact the highway. H. Scott County Highway Department, Application for Utility Permit on County Highway Right of Way (form 2525)* this permit assures that the construction under CSAH 2 is accomplished in a manner that will not adversely impact the highway. I. Scott County, Application for Grading Permit. Assures review of the grading plan, erosion and sediment control plan, Stormwater Management Plan and other natural resource issues, such as wetlands. J. City of Elko, Application for Minnesota WCA Certificate of No Loss or Exemption for temporary wetland impacts in the City. Minn. R , subp. 6 exempts utilities from WCA. Impacts upon the wetland are to be minimized to the extent practicable. K. City of New Market, Application for WCA Certificate of No Loss or Exemption for temporary wetland impacts in the City. Minn. R , subp. 6 exempts utilities from WCA. Impacts upon the wetland are to be minimized to the extent practicable. L. Township of New Market, Application for Minnesota WCA Certificate of No Loss or Exemption for temporary wetland impacts in Township of New Market. Minn. R , subp. 6 exempts utilities from WCA. Impacts upon the wetland are to be minimized to the extent practicable. 38. The MPCA finds that ongoing public regulatory authority will address any significant potential environmental effects that were identified as reasonably expected to occur. 11

12 The Extent to Which Environmental Effects can be Anticipated and Controlled as a Result of Other Available Environmental Studies Undertaken by Public Agencies or the Project Proposer, Including Other EISs. 39. The fourth criterion that the MPCA must consider is "the extent to which environmental effects can be anticipated and controlled as a result of other available environmental studies undertaken by public agencies or the project proposer, including other EISs." Minn. R , subp. 7.D (2003). The MPCA findings with respect to this criterion are set forth below. 40. The following documents were reviewed by MPCA staff as part of the potential environmental impact analysis for the proposed project. This list is not intended to be exhaustive. The MPCA also relies on information provided by the project proposer, commenters, staff experience with literally hundreds of sewer extensions, and other available information. Completed data portions of the County Road 2 Segment of the Elko New Market Interceptor EAW. The January 28, 2005, EAW. 41. In addition, the process of designing and constructing wastewater interceptors is very routine. The community of civil engineers that are involved in design and construction, as well as the community of regulators of the industry, are very familiar with the routine principles of design and construction of interceptor sewers. 42. There are no elements of the project that pose the potential for significant environmental effects that cannot be addressed in the project design and permit development processes, or by regional and local plans. 43. Based on the environmental review, previous environmental studies, and MPCA staff expertise on similar projects, the MPCA finds that the environmental effects of the project that are reasonably expected to occur can be anticipated and controlled. CONCLUSIONS OF LAW 44. The MPCA has jurisdiction in determining the need for an EIS for this project. The EAW, the permit development process, the facility planning process, and the evidence in the record are adequate to support a reasoned decision regarding the potential significant environmental effects that are reasonably expected to occur from this project. 45. Areas where the potential for significant environmental effects may have existed have been identified and appropriate mitigation measures have been incorporated into the project design and permits. The project is expected to comply with all MPCA standards. 46. Based on the criteria established in Minn. R (2003), there are no potential significant environmental effects reasonably expected to occur from the project. 12

13 47. An EIS is not required. 48. Any findings that might properly be termed conclusions and any conclusions that might properly be termed findings are hereby adopted as such. ORDER The Minnesota Pollution Control Agency determines that there are no potential significant environmental effects reasonably expected to occur from the CSAH 2 Segment of the Elko New Market Interceptor Project and that there is no need for an Environmental Impact Statement. IT IS SO ORDERED Commissioner Sheryl A. Corrigan Minnesota Pollution Control Agency Date 13

MINNESOTA POLLUTION CONTROL AGENCY Industrial Division

MINNESOTA POLLUTION CONTROL AGENCY Industrial Division A summary of the potential environmental issues associated with this proposed Project is included in the proposed Findings of Fact, Conclusions of Law, and Order. Based on the analysis contained in the

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY INTRODUCTION

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY INTRODUCTION STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED DULUTH/NORTH SHORE SEWER PROJECT ST. LOUIS AND LAKE

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. A Construction Management Plan (CMP) shall be submitted for all projects in Pitkin

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction,

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Downspout Disconnection Program FAQs

Downspout Disconnection Program FAQs Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: April 17, 2014...Agenda Item *3 Company: Docket No. Minnesota Power E015/GP-13-978 In the Matter of the Application of Minnesota

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-88b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED JOE AND CHRIS WIENEKE FARMS PROJECT LISMORE

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Inland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director

Inland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Inland Wetlands and Watercourses Permit Water Quality Certification Permittee: Connecticut Department

More information

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE

ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE 4-1-1 SHORT TITLE... 1 4-1-2 INTENT... 1 4-1-3 DEFINITIONS... 1 4-1-4 WATERING RESTRICTIONS... 4 4-1-5 WATER WASTE... 5 4-1-6 SPECIAL PERMITS... 6 4-1-7 VARIANCES, EXEMPTIONS AND APPEALS... 7 4-1-8 FEES;

More information

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

City of Beaumont, Texas Grading Permit Information

City of Beaumont, Texas Grading Permit Information General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Electronic Signature and Fee Payment Confirmation

Electronic Signature and Fee Payment Confirmation Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By

More information

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection

More information

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 CASS COUNTY COMMISSION POLICY MANUAL 38.07 SUBJECT: ORDINANCE #1998-2 (FLOOD DAMAGE PREVENTION) ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 NORTH DAKOTA COUNTY OF CASS ORDINANCE #1998-2 Be it ordained and

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS TH 23 New London to Paynesville 2-Lane to 4-Lane Conversion Project State Project No. 3408-18 Prepared by: Minnesota Department of Transportation June 2016 CONTENTS STATEMENT

More information

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1

IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

Standard Site Drainage and Erosion Control Details (August 15, 2006)

Standard Site Drainage and Erosion Control Details (August 15, 2006) City of St. Petersburg Construction Services and Permitting Standard Site Drainage and Erosion Control Details (August 15, 2006) Attached are the City Engineer s approved City standards dated September

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. PUBLIC COMMENT ON THE COUNTY LAND USE CODE D. PUBLIC

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

Buffer and Soil Loss Legislation

Buffer and Soil Loss Legislation Buffer and Soil Loss Legislation Laws of Minnesota 2015, 1 st Special Session, Chapter 4, Article 4 Sec. 72. Minnesota Statutes 2014, section 103B.101, is amended by adding a subdivision to read: Subd.

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS STATE OF NEW YORK COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by, ("Declarant"), A New York corporation with offices at,, New York.

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

DRAINAGE SERVICE CHARGES

DRAINAGE SERVICE CHARGES DRAINAGE SERVICE CHARGES Louisville and Jefferson County Metropolitan Sewer District 700 West Liberty Street Louisville, Kentucky 40203-1913 EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A

More information

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL FOREWORD This document contains the basis for NOAA and EPA s decision to fully approve Massachusetts Coastal Nonpoint

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

ENVIRONMENTAL PROTECTION AGENCY

ENVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL PROTECTION AGENCY Fees Requires application fees for state isolated wetlands permits to be credited to the Surface Water Protection Fund, which is used for the administration of surface water

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

WATER QUALITY CERTIFICATE. Installation of 24-inch diameter natural gas pipeline, 8.26 miles

WATER QUALITY CERTIFICATE. Installation of 24-inch diameter natural gas pipeline, 8.26 miles 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer WATER QUALITY CERTIFICATE Permittee: Attn: Tennessee Gas Pipeline Company LLC 1001 Louisiana Street Houston

More information

OPERATIONS & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT PRACTICES BACKGROUND

OPERATIONS & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT PRACTICES BACKGROUND OPERATIONS & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT PRACTICES BACKGROUND THIS OPERATIONS & MAINTENANCE AGREEMENT FOR STORMWATER MANAGEMENT PRACTICES ( Agreement ) made and entered into this day

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000823 ) Richard O. Malin ) FINDINGS, CONCLUSIONS ) AND DECISION For Approval of a Shoreline Substantial )

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Right-of Way Use Permit Application

Right-of Way Use Permit Application Right-of Way Use Permit Application 400 SW 152 nd Street, Suite 300 Burien, WA 98166 Phone: (206) 439-3161 Inspection: Line 206-439-3162 Email address: rowpermits@burienwa.gov For City Use Only Reviewed

More information

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY: ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. There were 10 comments received in response to an April 14, 2014

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

SECTION 1 PURPOSE AND POLICIES

SECTION 1 PURPOSE AND POLICIES SECTION 1 PURPOSE AND POLICIES These Rules and Regulations have been enacted to serve the public in securing the health, safety, and general welfare of the inhabitants of the Southwest Suburban Denver

More information

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 A JOINT RESOLUTION OF THE GOVERNING BODIES OF DOUGLAS COUNTY AND THE CITY OF LAWRENCE CONCERNING THE SOUTH LAWRENCE TRAFFICWAY;

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be

More information