1 Summit Anchor Company, Inc. Safety From The Top Down Roof and Wall Safety/Tie-Back Anchors Suspended Access Systems and Fall Protection

2 Overview National Safety Standards OSHA regulations specifically require independent anchorages (suspension anchor and fall arrest anchor) capable of supporting 5,000 pounds when suspended maintenance work is performed. ANSI/IWCA I-14.1 (3.9 Anchorages) clearly states Building owners and window cleaning contractors shall not allow suspended work to be performed unless it has been determined that the building has provided identified and certified anchorage. Although roof and wall anchors alone may not satisfy all of the safety requirements of your structure, when properly designed and installed they can play a vital role in achieving compliance with both OSHA requirements and ANSI I-14 standards. Summit Anchor Company can provide anchorage that will facilitate whatever exterior maintenance might be required on your building. Some common examples of this type of maintenance are: Window cleaning Construction of the building Waterproofing and caulking Façade pressure washing Any interior or exterior maintenance where suspended work must be performed. 2

3 Anchors may be used to tie back boatswain chairs or portable outrigger beams for swing stage operations. Regardless of what mechanical suspension device may be used by your exterior maintenance contractor, there must be two independent means of support for each suspended worker. This is in accord with ANSI/IWCA I-14.1 ( C) which states: Anchorage of the lifeline should be independent of any portable support device. OSHA regulations and ANSI Safety Standards require two independent anchors for each suspended worker. One anchor suspends the workers equipment (i.e. boatswain chair) the other anchor is used to tie off fall arrest equipment or safety line. Summit Anchor Company can assist you to design a system to comply with OSHA and ANSI I-14 requirements. By utilizing our expertly engineered anchors along with a well designed anchor location roof plan, we provide the highest level of safety for suspended workers. Why Specify Summit Anchor Company? Our anchor eyes are drop forged, resulting in a stronger anchor than the common U-bar type anchors. According to the Forging Industry Association: Forgings have grain oriented to shape for greater strength. Machined bar and plate may be susceptible to fatigue and stress corrosion because machining cuts material grain pattern. In most cases, forging yields a grain structure oriented to the part, resulting in optimum strength, ductility, and resistance to impact and fatigue. Here are some other reasons... Corrosion resistance Our anchors are completely hot-dipped galvanized with stainless bolts. Hollow Structural Sections (HSS) are filled with molded urethane insulation to prevent condensation. Such condensation protection is absolutely essential in order to prevent corrosion when exposed to the elements found on the roof. Other manufacturers seldom fill their HSS or pipes with molded urethane insulation. 3

4 Figure 1 Summit Anchor Co. roof and wall anchor eyes are drop forged resulting in the strongest and most durable anchors on the market. No apparent permanent deflection is observed when testing our standard 10 tube anchors to 5,000 lb. CLICK HERE to view test report. OSHA/ANSI compliance Our anchors have been engineered and tested to comply with current OSHA regulations and ANSI I.14.1 safety standard for fall arrest and suspended maintenance. Custom design Our roof and wall anchors are designed for a variety of permanent attachments to reinforced concrete or structural steel. Summit roof and wall anchors can also be modified to fit virtually any structure. Roof flashings Available in stainless steel, copper, or spun aluminum (Figure 1) with Ethylene Propylene Diene Monomer (E.P.D.M.) top and bottom grommets that do not require messy caulking around anchor (Figure 2). Free consultations for architects and engineers throughout the complete design cycle on anchor layout and compliance issues. Anchors fabricated in the U.S.A. Figure 2 4

5 Forging Process for Anchor Eyes Anchor Forgings being manufactured in a 2,500 lb Double Acting Erie Forge Hammer Anchor Forgings being Trimmed & Pierced in 150 Ton Minster Trim Press Trimmed & Pierced Anchor Forging dropping into material handling container Close-up View of Trimmed & Pierced Anchor Forging 5

6 Weld to Beam Roof Anchor (SM-4) Cast in Place Balcony Anchor (SM-5-RB) Cast in Place Wall Anchor (SM-82) Cast in Place Roof Anchor (SM-5) Bolt Through Roof Anchor Summit Model #SM-1-4B Epoxy Mounted Roof Anchor Summit Model #SM-2-8-PL Wrap Around Beam Roof Anchor Summit Model #SM-3-J Wrap Around Beam and Slab Roof Anchor Summit Model #SM-3-S NOTE: Summit anchors are capable of supporting 5,000 lb. ultimate load and 1,250 lb. allowable load. Anchors may fail due to improper installation or inadequate supporting structure. Serious injury or death may result from anchor failure. Installation of anchors must be performed under the supervision of a professional engineer with experience in suspended access equipment. Additionally, anchors shall be tested under the supervision of a P.E. and certified before being placed into service. 6

7 Wrap Around Beam Roof Anchor Summit Model #SM-3 Weld to Beam Roof Anchor at Beam Intersection Summit Model #SM-4-I Weld to Beam Roof Anchor Summit Model #SM-4 Cast-In-Place Roof Anchor Summit Model #SM-5 7

8 Bolt Through Wall Anchor Summit Model #SM PL Cast-In-Place Wall Anchor with Spacer Summit Model #SM PL-HSS Cast-In-Place Wall Anchor Summit Model #SM PL Epoxy Mounted Wall Anchor Summit Model #SM-83-8-PL 8

9 Standard Epoxy Mounted Wall Anchor Summit Model #SM PL Bolt Through CMU Wall Anchor Summit Model #SM-85 Epoxy Mounted Recessed Balcony Anchor Summit Model #SM-RB-2 Cast-In-Place Recessed Balcony Anchor Summit Model #SM-RB-5 9

10 Design and Layout Compliance with OSHA regulations and ANSI standards requires more than the best anchors on the market. Careful planning is required before installation of any roof or wall anchors. Factors to be considered include structural building elements and layout requirements before proceeding with an anchor location plan. Minimum Requirements Current OSHA/ANSI standards require compliant fall protection and suspended maintenance equipment on all buildings. 1) OSHA/ANSI standards require 2 independent anchors for each worker (one for rigging of suspension equipment and one for personal fall arrest) whenever suspended work is performed. 2) OSHA/ANSI standards state anchors must be capable of supporting 5000 lbs. load. 3) OSHA/ANSI state that anchors should not be placed within 6 ft. of the roof edge unless a 42 Wall anchors may be mounted on structurally adequate in. parapet exists or fall protection is provided to curbs and parapets access those anchors safely. 4) ANSI I14.1 Window Cleaning Safety Standard requires that anchor spacing should not exceed 12 ft. Preliminary Anchor Layout Procedures Before placing the first anchor on your building, pertinent rigging and structural factors need to be taken into consideration. A careful examination of the architectural/structural plans is required to determine what type of anchorage should be used and where it must be placed. This exam should include the following: 1) Identification of all areas needing access by suspended workers. These areas are, but not limited to: a) Window locations that may require access by suspended workers (any window above 20 ft.). b) Building façade requiring periodic maintenance (i.e. re-caulking and waterproofing) will generally require suspended work to be performed on the building. c) Any other part of the building requiring access by workers above 6 ft. from grade. 10 Buildings over 300 ft. are well suited for a permanently installed powered platform, because Rope descents shall not exceed 300 feet (ANSI/IWCA I.14.1, Para ).

11 d) Additional building features that may require special access equipment. Such features may include buildings over 300 ft., overhangs, atria, and sloped roofs. 2) Identification of location where workers will access anchors. Verify that safe access is provided to these areas by doors, roof hatch etc. Examples of these locations where anchors may be located are as follows: a) Main roofs b) Lower roofs c) Balconies 3) Determine if rope descent systems or swing stage equipment or both will be used to access the buildings façade. 4) Verify that the parapet wall is of sufficient strength to support the loads imposed (when rope decent systems are used) although OSHA or ANSI guidelines do not specify 1,800 lbs. is considered acceptable. Parapet must be capable of supporting the load imposed by workers. Some buildings may require the addition of a davit or portable outrigger arm to eliminate the load to a non load-bearing parapet wall. Parapets must be capable of supporting the load imposed by workers. A non load-bearing parapet may incorporate davits or outrigger arms to avoid overloading to the parapet. Portable Outrigger Examples as follows: a) Roof slabs b) Concrete beams c) Concrete curbs d) Steel beams e) Mechanical roof supports 5) Examine structural drawings for areas suitable for attaching roof or wall anchors. Note that OSHA and ANSI requirements state anchors must be capable of supporting 5,000 lbs. without failure (see Specifications for more detail). 6) Lay out anchors in accordance with anchor layout guidelines. Anchors need to be situated in a way so as to provide workers ropes or cables unobstructed access when rigging. 11

12 Anchor Layout Procedure 1) Place anchors in line with work areas requiring service (see diagram below). 2) Provide two independent anchors for each descent. 3) Anchors may be offset no more than 15 degrees from perpendicular, provided displacement of the rope under load may be eliminated (see anchor spacing chart). Note: ANSI I.14.1 bases anchor layout on tie backs placed no more than 15 degrees from a perpendicular line with the suspension point. It has been interpreted that a lanyard can increase the anchor spacing, but, this will increase the fall arrest distance, so the presumed offset of a workers lanyard should be kept to a minimum. This is in harmony with OSHA regulations which state that fall arrest distances should be no more than 6 ft. 4) Do not place anchors behind obstructions such as HVAC units. Anchor location and spacing may need to be adjusted to avoid such obstructions. 5) Do not place anchors within 6 ft. of parapet wall unless a 42 in. parapet or guardrail is provided. Suggested Anchor Spacing Distance Between Anchors and Point of Suspension (Drop) 12

13 Design Assistance We provide a single source contact, from meticulous planning of a roof anchor layout to expert installation of the system. Summit Anchor takes great care to ensure that the highest level of safety is met every step of the way. Our roof anchors and wall anchors are OSHA compliant and cost effective. Summit Anchor Company is happy to assist architects, engineers, building owners and managers with the design of OSHA/ANSI compliant fall protection systems. We can provide a preliminary anchor layout plan. This initial consultation and preliminary design service is offered free of charge. Contact Summit Anchor Co., for assistance with your anchor layout. To provide you with the best system for your project, we request that you provide us with the following information: 1) architectural and structural roof plans 2) building elevation plans 3) section drawings showing parapet and mechanical room walls 4) additional drawings showing details relevant to suspended maintenance on building façade Summit Anchor Company is dedicated to the highest quality product and expert installation of our equipment. To ensure maximum safety and optimal use of our equipment call us to today for your free initial consultation

Davit Systems and Outriggers

Davit Systems and Outriggers Safety From The Top Down Davit Systems and Outriggers Suspended Access Systems and Fall Protection Davits Overview Standards in the United States and Canada require a building to provide certified anchorages

More information

Horizontal Cable Systems

Horizontal Cable Systems Safety From The Top Down Suspended Access Systems and Fall Protection Overview Horizontal cable systems are generally installed as a permanent fall protection system, typically consisting of two terminating

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc. SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the

More information

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date: 03-01-2000

Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date: 03-01-2000 1. General Requirements (OSHA References: OSHA 29 CFR 1926.503) 1.1 Elkhorn Construction, Inc. employee-owners and subcontractors are required to use fall protection equipment or systems when an assessment

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

`Fall Protection Guidelines in Construction

`Fall Protection Guidelines in Construction `Fall Protection Guidelines in Construction A Publication Provided by: 1681 Campus Delivery Fort Collins, Colorado 80523 (970) 491-6151 email: ohss@lamar.colostate.edu web: http://www.bernardino.colostate.edu/public/

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

SCOPE This guideline applies to all construction projects on Emory University properties, including renovation projects.

SCOPE This guideline applies to all construction projects on Emory University properties, including renovation projects. 1762 Clifton Road, Suite 1200 Atlanta, Georgia 30322 (404) 727-5922 FAX: (404) 727-9778 FALL PROTECTION DESIGN AND CONSTRUCTION GUIDELINES PURPOSE The purpose of this guideline is to provide safe design

More information

S T A B I L I Z A T I O N S Y S T E M S

S T A B I L I Z A T I O N S Y S T E M S S T A B I L I Z A T I O N S Y S T E M S 03 11 24 23 MAINTENANCE EQUIPMENT 10 Window Washing Systems YOUR SUSPENDED EQUIPMENT & FALL PROTECTION EXPERTS (Head Office) 765 Westney Road S Ajax, ON L1S 6W1

More information

Installation Instructions:

Installation Instructions: Portable Guardrail System Model Numbers: 7900060, 7900061, 7900062, 7900063 Installation Instructions: Portable Guardrail System This instruction is intended to meet the Manufacturer s Instructions requirement

More information

RZ Guardrail System Installation Manual

RZ Guardrail System Installation Manual TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form 3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

WORKING AT HEIGHT & ITS WOES

WORKING AT HEIGHT & ITS WOES WORKING AT HEIGHT & ITS WOES Capital Safety EMEA HOW FAR WILL A PERSON FALL IN...? TIME seconds DISTANCE metres 1 4.9 2 19.6 3 44.1 4 78.4 ABSOLUTELY ZERO MARGIN FOR ERROR! 2FT?!? 6FT?!? 50FT?!?! COMMON

More information

S A F E T Y & T I E - B A C K A N C H O R S

S A F E T Y & T I E - B A C K A N C H O R S Pro-Bel Enterprises 00 MAINTENANCE EQUIPMENT Limited 0 window washing systems S A F E T Y & T I E - B A C K A N C H O R S Window Cleaning/ Suspended Maintenance Equipment & Fall Protection Systems - 8

More information

Chapter 3: Fall Protection/ Scaffolding Safety

Chapter 3: Fall Protection/ Scaffolding Safety Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related

More information

Working at Heights and Fall Protection

Working at Heights and Fall Protection Standard Operating Procedures Working at Heights and Fall Protection Last Modified: JAN 2013 1 of 6 Working at Heights and Fall Protection I Purpose Serious accidents can result from falls. All employees

More information

Fall Protection Guidelines

Fall Protection Guidelines OCT 2015 1 of 6 Fall Protection Guidelines 1.0 PURPOSE To establish the requirements and procedures to protect employees and other persons conducting work from hazards associated with falling from one

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

PivotLoc Ladder Systems

PivotLoc Ladder Systems N25 ACCESS AND SAFETY EQUIPMENT SPECIFICATION CLAUSES PivotLoc Ladder Systems To be read with The Main Contract Preliminaries, General Conditions, Sub-Contract Preliminaries. MINIMUM CONTRACTOR STANDARD

More information

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.

More information

How To Make A Fall Arrest Anchor System

How To Make A Fall Arrest Anchor System FALL ARREST TETHER TRACK RIGID RAIL ANCHOR SYSTEMS DESIGN: MOUNTING STYLE: LENGTHS: Built to withstand 900 pound maximum arresting force Ceiling mounted or free standing monorail & bridge anchor systems

More information

Fall Protection Basics for Construction Activities

Fall Protection Basics for Construction Activities Fall Protection Basics for Construction Activities Washington State has revised fall protection rules, effective April 1, 2013. This booklet provides an overview of the requirements. www.lni.wa.gov/safety

More information

What is Seismic Retrofitting?

What is Seismic Retrofitting? What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes

More information

Safe Operating Procedure

Safe Operating Procedure Safe Operating Procedure (Revised 5/14) PERSONAL FALL ARREST SYSTEMS Introduction In 2011, falls to a lower level were the second leading cause of occupational fatalities across all industries, claiming

More information

Miller Engineered Solutions Customized Fall Protection Solutions. NEW! Now featuring Rigid Rail Systems

Miller Engineered Solutions Customized Fall Protection Solutions. NEW! Now featuring Rigid Rail Systems Miller Engineered Solutions Customized Fall Protection Solutions NEW! Now featuring Rigid Rail Systems Custom systems for fall protection needs Vast network of trained and certified installer partners

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria

More information

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412

Drew University Ladder Safety Program Policy and Inspection Procedure Draft 0412 PURPOSE To establish and define the procedures to ensure that ladders at Drew University are installed, used, inspected and maintained in accordance with applicable standards. REFERENCES OSHA Portable

More information

MANUFACTURED HOUSING USED AS DWELLINGS

MANUFACTURED HOUSING USED AS DWELLINGS MANUFACTURED HOUSING USED AS DWELLINGS SECTION AE101 SCOPE AE101.1 General. These provisions shall be applicable only to a manufactured home used as a single dwelling unit and shall apply to the following:

More information

System. Stability. Security. Integrity. 150 Helical Anchor

System. Stability. Security. Integrity. 150 Helical Anchor Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

Super Slider ADJUSTABLE FROM 3.5-12 Model #HD26229

Super Slider ADJUSTABLE FROM 3.5-12 Model #HD26229 Super Slider ADJUSTABLE FROM 3.5-12 Model #HD26229 IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH. USERS

More information

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION 50.4(1) An owner of a place of employment, an employer and a contractor shall each ensure that each component of a fall-protection system is inspected

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing

More information

VERTICAL / FIXED BEAM CLAMP I-BEAM ANCHOR ADJUSTABLE FROM 4-14 Model # HD26249

VERTICAL / FIXED BEAM CLAMP I-BEAM ANCHOR ADJUSTABLE FROM 4-14 Model # HD26249 VERTICAL / FIXED BEAM CLAMP I-BEAM ANCHOR ADJUSTABLE FROM 4-14 Model # HD26249 IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

HIGH TENSION CABLE BARRIER

HIGH TENSION CABLE BARRIER Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section

More information

Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn

Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Safety.. Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Technical: Zinc plated forged heat treated steel,

More information

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for providing metal fabricated items like castings, gratings, hatchways, ladders,

More information

Common Problems with Walls

Common Problems with Walls Common Problems with Walls Common Problems with Walls There are problems and concerns that are shared by all walls and siding installations. In this article, we will learn about the following commonly

More information

CHECKLIST Fall Protection

CHECKLIST Fall Protection Walking/working surfaces can support employees. Employees are protected from falling from elevated surfaces through the use of guardrail systems, safety net systems; personal fall arrest systems, controlled

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

WEEKLY SAFETY MEETING

WEEKLY SAFETY MEETING Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read

More information

FALL PROTECTION PROGRAM

FALL PROTECTION PROGRAM FALL PROTECTION PROGRAM Page 2 of 15 Table of Contents Applicability... 3 Overview... 3 Definitions... 3 Responsibilities... 5 Risk Assessment... 6 Risk Management... 7 Roof Access Procedure 10 Rescue

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Staying on Your Feet: Fall Prevention for Construction

Staying on Your Feet: Fall Prevention for Construction Staying on Your Feet: Fall Prevention for Construction Fall Prevention for Construction Falling has been described as a cartoon happening in slow motion. Although seeing a person fall may be funny, injuries

More information

fall arrest. Contact your distributor or Guardian about policies regarding replacement of Guardian components involved in a fall.

fall arrest. Contact your distributor or Guardian about policies regarding replacement of Guardian components involved in a fall. Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR e) Allow the ring to slide over the end of the clevis pin and push the ring onto the clevis pin when it is centered. USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR &

More information

Wire Rope Extender Lanyard

Wire Rope Extender Lanyard Reliance Industries, LLC User Instructions for Wire Rope Extender Lanyard Model # 714004 Reliance Industries, LLC PO Box 140008 Denver, CO 80214 Ph. (800) 488-5751 Ph. (303) 424-8650 Fax (303) 424-8670

More information

FALL PROTECTION WORK PLAN

FALL PROTECTION WORK PLAN FALL PROTECTION WORK PLAN INSTRUCTIONS A written fall protection work plan must be implemented by each employer on a job site where a fall hazard of 10 feet or greater exists, in accordance with OSHA Standards.

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Scaffolding. The University of Tennessee Office of Environmental Health & Safety

Scaffolding. The University of Tennessee Office of Environmental Health & Safety Scaffolding The University of Tennessee Office of Environmental Health & Safety Do employees working on supported scaffolds need to be trained? Scaffolding: Three Main Groups: Suspended Supported Aerial

More information

Fall Protection Susan Harwood Grant Training Program 2013 Wood Frame Construction

Fall Protection Susan Harwood Grant Training Program 2013 Wood Frame Construction WRONG BETTER Fall Protection Susan Harwood Grant Training Program 2013 Wood Frame Construction Learning Objectives Understand how OSHA defines residential construction Understand the proper use of guardrails

More information

SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS

SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS 1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

Horizontal Lifeline. SideWalk Rope. User Instructions. 3M Occupational Health and Environmental Safety. Fall Protection Equipment

Horizontal Lifeline. SideWalk Rope. User Instructions. 3M Occupational Health and Environmental Safety. Fall Protection Equipment 3M Occupational Health and Environmental Safety Fall Protection Equipment SideWalk Rope Horizontal Lifeline User Instructions User Instructions for the 3M TM Side Walk 2-Man Rope Horizontal Lifeline System.

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

Introduction to Fall Protection. The University of Tennessee Office of Environmental Health & Safety

Introduction to Fall Protection. The University of Tennessee Office of Environmental Health & Safety Introduction to Fall Protection The University of Tennessee Office of Environmental Health & Safety What is Fall Protection? Fall protection is the backup system planned for a worker who could loose his

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

Introduction to Fall Protection

Introduction to Fall Protection Introduction to Fall Protection with John Evinger CRSP (204)228-8277 INSERT YOUR LOGO HERE Expected results of the day Today I will provide you with information to make you realize that you don t have

More information

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS

More information

Product Name: Beamer 2000

Product Name: Beamer 2000 Product Name: Beamer 2000 Part #: 00101; 00103 Instruction Manual Do not throw away these instructions! Read and understand these instructions before using equipment! Introduction 1 Applicable Safety Standards

More information

Fall Protection and Fall Prevention. San José State University Environmental Health and Safety Facilities Development & Operations

Fall Protection and Fall Prevention. San José State University Environmental Health and Safety Facilities Development & Operations Fall Protection and Fall Prevention San José State University Environmental Health and Safety Facilities Development & Operations Learning Objectives To understand the hazards of falls To understand when

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest. OSHA Susan Harwood Training - AGC

Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest. OSHA Susan Harwood Training - AGC Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest Learning Objectives Identify the components of a proper personal fall arrest system (PFAS) Understand how to calculate total fall distance

More information

It should be noted that this revised standard does not address the construction industry, window cleaning belts, and sports-related activities.

It should be noted that this revised standard does not address the construction industry, window cleaning belts, and sports-related activities. ANSI Z359 OVERVIEW INTRODUCTION ANSI Z359.1 was introduced in 1992 when standards for common fall protection equipment and methods in the workplace did not exist. That year 600 work-related falls resulted

More information

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product: Instructions for the following series products: Parapet Wall Anchor (model number: 8523178) User Instruction Manual for Parapet Wall Anchor This manual is intended to meet the Manufacturer s Instructions

More information

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

4.3.5 - Breakaway Walls

4.3.5 - Breakaway Walls 4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

NORTH CAMPUS EXPANSION HOUSTON METHODIST HOUSTON, TEXAS

NORTH CAMPUS EXPANSION HOUSTON METHODIST HOUSTON, TEXAS NORTH CAMPUS EXPANSION HOUSTON METHODIST HOUSTON, TEXAS FAÇADE ACCESS DESIGN DEVELOPMENT NARRATIVE DECEMBER 18, 2014 Prepared For: Chris Cook, AIA, LEED, AP Principal WHR Architects, Inc. 1111 Louisiana

More information

PUMP JACK SYSTEM AND ACCESSORIES

PUMP JACK SYSTEM AND ACCESSORIES Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair

More information

EMPLOYEE FALL PROTECTION

EMPLOYEE FALL PROTECTION EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

Specifications for Lightning Protection. ASAE Engineering Practice

Specifications for Lightning Protection. ASAE Engineering Practice Chapter 8: Lightning Specifications for Lightning Protection ASAE safety standards are not laws. They are recommended voluntary standards used by designers, engineers, manufacturers and users of the equipment,

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

Fall Protection Program

Fall Protection Program Fall Protection Program Policy: It is the policy of our company to provide fall protection for employees exposed to fall hazards greater than 7 ½ feet. Fall hazards include but, are not limited to; work

More information

COMPANY ESTIMATOR BID DAY PHONE NO.

COMPANY ESTIMATOR BID DAY PHONE NO. COMPANY ESTIMATOR BID DAY PHONE NO. Work Package: Structural Steel Fabrication & Erection The work in each bid package shall include but shall not be limited to all labor, burden, fringe benefits, materials,

More information

COURSE INFORMATION SHEET

COURSE INFORMATION SHEET Course ID: HGT - WRKHT COURSE OVERVIEW WORKING AT HEIGHTS Working at Heights is an approved Ontario Ministry of Labour (MOL) program (Approved Training Program ID # WAH56789). This program was designed

More information

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated) (Fixed Lite Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Awning Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Casement Window Illustrated) BRICK VENEER CONSTRUCTION (Horizontal

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information