1 TxDOT Internal Audit Report Equipment Maintenance and Repair Objective Determine if there are adequate policies, procedures, and practices for ensuring the adequate inspection, maintenance, and repair of TxDOT equipment/vehicles. Opinion Based on the audit scope areas reviewed, control mechanisms are effective and substantially address the risks considered significant relative to operational execution for the equipment program. The organization s system of internal controls provides reasonable assurance that most key goals and objectives will be achieved despite significant control gap corrections and improvement opportunities identified. Control gap corrections and improvement opportunities identified are likely to impact the achievement of the organization s business/control objectives but management has agreed to corrective action plans to address the relevant risks within six months. Overall Engagement Assessment Satisfactory Finding 1 Finding 2 Finding 3 Title Findings Completion and Documentation of Daily (Pre-Trip) Equipment/Vehicle Inspections Consistency of Region Preventive Maintenance (PM) Coordinator Inspections Review/Approval of Discrepancies on the Pre-Trip Inspection Checklist and Subsequent Equipment/Vehicle Release Control Design x Operating Effectiveness x x x Rating Needs Improvement Needs Improvement Needs Improvement Management concurs with the above findings and has prepared Management Action Plans to address the noted deficiencies. Internal Environment The department has an established structure, manuals, standard operating procedures, and various tools (e.g. electronic systems, flow chart and checklists) to help mitigate potential risks with this program. The Region Fleet Managers and District Equipment Custodians believe that there is a positive tone in the equipment program, integrity of data, and an attempt to identify and address problems in the program. Each Region has many different types of equipment with various maintenance/repair needs and an average fleet age of 11 years.
2 Summary Results Scope Area Finding Evidence Equipment/Vehicle Inspections of 59 (39%) equipment/vehicles did not have the required Pre-Trip Inspection Checklist Forms completed and documented 7 of 18 (39%) equipment/vehicles were not inspected by PM Coordinators as required in the West Region 14 of 24 (58%) equipment/vehicles had no evidence of the supervisor review/authorization for discrepancies identified on the Pre-Trip Inspection Checklists Equipment/Vehicle Maintenance N/A No Findings Equipment/Vehicle Repairs N/A No Findings Audit Scope The audit covered equipment/vehicle inspections, maintenance, and repairs in a sample of Districts at all four Regions. Audit work was conducted by Albert Bourque, Romy Grimmell, David Kossa, Jennifer Stanush, and Raymond Martinez (Engagement Lead). The audit was conducted from October 11, 2012 through December 14, Methodology Audit work included reviewing state laws, department/region policies and procedures, existing equipment flow charts, various General Services Division (GSD) reports, and other supporting information; interviewing GSD staff, Regional Fleet Managers, Preventive Maintenance (PM) Coordinators, and District Custodians; reviewing and analyzing equipment/vehicle inspections, maintenance and repair information from August through October The equipment/vehicle inspections were reviewed to determine if inspections were conducted, documented, and reported (e.g. maintenance and repair needs) in accordance with department requirements. Maintenance was reviewed to determine if equipment/vehicles were maintained properly. Repairs were reviewed to determine if repair needs identified were being addressed and repaired properly. 2 of 11 May 31, 2013
3 Testing samples were selected as follows: Two Districts within each Region - based on inspection results conducted from the GSD Two Maintenance Sections and one Area Office in each district - based upon the date of their last PM Coordinator inspections Three equipment/vehicles for each office - based upon the results of the PM Coordinator inspections The five most recently red-tagged equipment/vehicles in each Region, based on information provided by the Regional Equipment Shop Background This report was prepared for the Transportation Commission, TxDOT Administration and Management. The report presents the results of the Equipment Maintenance and Repair Audit, which was conducted as part of the Fiscal Year 2013 Audit Plan. Regional Fleet Management oversee capital equipment budgets, equipment purchasing and equipment repairs. The Districts manage the day-to-day operations with assistance from the Regions to include daily pre-trip inspections, preventive maintenance, and repairs. Since January this year, the Fleet organization has been working with a consultant to review the fleet organization and provide areas for improvement. The three main areas for improvements are: 1) reducing the fleet size, 2) improving fleet procurement, and 3) improving the fleet operating system (which includes fleet maintenance). Currently, the team is mainly focused on reducing the fleet size and setting up effective rental programs. There are pilots in three districts, and the plan forward is to do a similar effort in each of the districts. Furthermore, there are several topics that the fleet organization is undertaking to improve the overall functioning of the fleet organization. The fleet organization is also currently in the process of procuring a new Fleet Management System. This new system will replace EOS, and it will have a broad range of functionality, such as monitoring PM schedules, tracking asset utilization, and keeping up with warranty administration, etc. The new fleet organization structure has been stood up. Going forward, the entire fleet organization will be grouped together into one organization. One of the main changes in the new organization, as compared to the previous structure, is that there will be a lead PM manager overseeing the work of the PM coordinators in the field. This will ensure consistency and quality of the work. The team is working to implement 3 quick wins: 1) start using synthetic oil instead of rerefined oil, 2) installing telemetry on the fuel tanks to automatically monitor fuel usage, and 3) further roll-out of fuel cards across the state. 3 of 11 May 31, 2013
4 Together these improvements will greatly enhance PM oversight, and with timely and accurate data from the field, it will be easier to detect trends. Finally, having a single functional aligned fleet organization will greatly improve communications so we can take appropriate action when needed. We conducted this performance audit in accordance with Generally Accepted Government Auditing Standards and in conformance with the International Standards for the Professional Practice of Internal Auditing. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives. A defined set of control objectives was utilized to focus on operational goals for the identified scope areas. Our audit opinion is an assessment of the health of the overall control environment based on (1) the effectiveness of enterprise risk management activities throughout the audit period and (2) the degree to which the defined control objectives were being met. Our audit opinion is not a guarantee against operational sub-optimization particularly in areas not included in the scope of this audit. 4 of 11 May 31, 2013
5 Detailed Findings and Management Action Plans (MAP) Finding No. 1: Completion and Documentation of Daily (Pre-Trip) Equipment/Vehicle Inspections Some of the daily (Pre-Trip) inspections in the sampled Districts at each of the four Regions were not completed and documented as required. We found that 23 of 59 (39%) pieces of equipment/vehicles did not have the required Pre-Trip Inspection Checklist Forms for the equipment/vehicle usage during the sample period. Multiple factors contributed to the status of these checklists including the operators forgetting to do the inspections as they were focused on other priorities and/or inconsistent oversight/monitoring. Region Equip./Vehicles without required inspection checklists East 10 of 14 (71%) North 7 of 15 (47%) South 4 of 12 (33%) West 2 of 18 (11%) Equipment Preventive Maintenance Manual (Chapter 5, Section 2 and Chapter 1, Section 2) The manual states that the Pre-Trip inspections should be performed daily and documented prior to equipment use. Inspections of light-duty vehicles, such as sedans and pickups, which are assigned to a specific operator, may be performed on a weekly basis. The daily preventive maintenance inspection is the primary responsibility of the operator. The Area Engineers and Maintenance Supervisors must ensure thorough daily inspections are completed and documented before equipment is operated. Region Fleet Management Standard Operating Procedures (SOPs) (Equipment Preventive Maintenance) The SOPs state that the operators are required to perform daily preventive maintenance inspections. Effect/Potential Impact: Not completing the daily Pre-Trip Inspection Checklist Forms as required increases the safety risk for the operator and the public. In addition, incomplete forms may lead to unforeseen maintenance, repair needs, or additional costs if repairs are postponed. Management Action Plan (MAP): MAP Owners: Dalton Pratt, North Region, Rhonda Branecky, South Region, Scott Koczman, East Region, and Ricky Nieman, West Region (Fleet Managers) 5 of 11 May 31, 2013
6 MAP Region Fleet Managers will work with the Districts and applicable supervisors to remind the operators of the requirement and importance of conducting and documenting the daily inspections (remind each section once per quarter). Evidence of these actions (e.g. , meeting agenda or log) should be maintained. Completion Date: February 15, 2013 MAP Owner: Glenn Hagler, Interim GSD Director MAP GSD will establish compliance reviews for the Preventive Maintenance Program to determine if the Districts are conducting and documenting the daily (Pre- Trip) inspections as required. These reviews will cover the daily (Pre-Trip) inspections, preventive maintenance, and repairs of equipment/vehicles. These reviews will be conducted on a quarterly basis and reported to the GSD Director, Chief Programs Officer, and the Deputy Executive Director/Chief Engineer. Completion Date: July 15, of 11 May 31, 2013
7 Finding No. 2: Consistency of Region Preventive Maintenance (PM) Coordinator Inspections Some Region inspections were not completed twice a year in the sampled Districts at the West Region. We found that 7 of 18 (39%) pieces of equipment/vehicles sampled were not inspected by the West Region as required. Compliance was not achieved as a result of the West Region not having PM Coordinators but instead Field Mechanics. These Field Mechanics weren t able to perform their required function and inspect all the equipment/vehicles in the Region as required. Equipment Preventive Maintenance Manual (Chapter 1, Section 3) The manual states that the PM Coordinator should visit each section twice a year, at a minimum, to inspect equipment. Region Fleet Management Standard Operating Procedures (SOPs) (Equipment Preventive Maintenance) The Region PM Coordinators are responsible for reviewing each piece of equipment for PM compliance two times each fiscal year (Note: the SOPs state that the requirement is three times each fiscal year, but this was decreased due to limited resources and this requirement will be reviewed by GSD in the near future). Effect/Potential Impact: Not conducting the biannual inspections increases the safety risk for the operator and the public which may lead to unforeseen maintenance, repair needs, or additional costs if repairs are postponed. Management Action Plan (MAP): MAP Owner: Donna Hill, West Region Director MAP 2.1 West Region will post and hire seven PM Coordinator positions in the Equipment Shops in the Region to ensure compliance with the PM Coordinator inspections that are required two times per year. Completion Date: February 15, of 11 May 31, 2013
8 Finding No. 3: Review/Approval of Discrepancies on the Pre-Trip Inspection Checklist and Subsequent Equipment/Vehicle Release Instances were found where there was no evidence (e.g. signature or initials) that the supervisors reviewed the discrepancies identified by the operators on the Pre-Trip Inspection Checklist Forms in the sampled Districts at the North, South, and East Regions. In addition, there was no evidence that the supervisors authorized the equipment/vehicles to be used with the identified discrepancies. Testing identified 14 of 24 (58%) pieces of equipment/vehicles that had no evidence of supervisor review of discrepancies identified on the Checklists or the supervisor s authorization. The missing review/approval was due to multiple factors including the supervisors forgetting to document their review as they were focused on other priorities and/or had uncertainty about when the supervisor s signature is required on the Checklist or what the supervisor s signature signifies. The line on the bottom of the Checklist form states Supervisor s signature of Release (if required). Region Equip./Vehicles with no evidence of supervisor review South 4 of 4 (100%) North 8 of 9 (89%) East 2 of 4 (50%) West 0 of 7 (0%) In addition, some repair needs identified on the Checklists that may have been a safety hazard were not immediately addressed by the sampled Districts at the North and South Regions. Region Equip./ Vehicles not immediately addressed North 5 of 7 (71%) South 1 of 10 (10%) *business days Repair Examples: (delay in addressing/opening repair order for discrepancy) Driver s inside door handle --- delay time: 52 days* Top of shift lever loose delay time: 16 days* Gauges not working delay time: 15 days* Gauges not working, cracked windshield, needs new steering wheel ---- delay time: 47 days* Equipment Preventive Maintenance Manual (Chapter 1, Section 2) The manual states that the operators must report to the supervisor uncorrected discrepancies critical to safe and economic use of the equipment before the equipment is operated. Maintenance supervisors must review the daily inspection checklists that have a noted discrepancy for safety. 8 of 11 May 31, 2013
9 Region Fleet Management Standard Operating Procedures (SOPs) (Equipment Preventive Maintenance) The SOPs state the employees who operate equipment or vehicles will report problems that require repair using the On-Line Repair Order Process. The equipment custodian reviews daily inspection reports and discusses repair options with the Shop Coordinator as warranted. Effect/Potential Impact: By not documenting or obtaining the supervisor s 1) review of discrepancies identified on the Checklists or 2) authorization to use a piece of equipment/vehicle with discrepancies, preventive controls are bypassed that will reduce injury or harm to an operator since they may be using equipment/vehicle that was unsafe to use. This may also create a liability for the department if the operator/vehicle is involved in an accident. Management Action Plan (MAP): MAP Owners: Dalton Pratt, North Region, Rhonda Branecky, South Region, Scott Koczman, East Region, and Ricky Nieman, West Region (Fleet Managers) MAP Region Fleet Managers will: work with the Districts and applicable supervisors to remind them (once per quarter) to review any discrepancies for safety hazards or serviceability issues that were identified and reported on the Checklists and document this review on the Checklists work with the Districts and applicable supervisors to remind the operators (once per quarter) of the requirement and importance of reporting any identified discrepancies for safety hazards or serviceability issues work with GSD to review the Checklist forms and SOPs to determine if any clarification is needed regarding the supervisor s authorization to use the equipment/vehicle with identified discrepancies Evidence of these actions (e.g. , meeting agenda or log) will be maintained. Completion Date: February 15, 2013 MAP Owner: Glenn Hagler, Interim GSD Director MAP 3.2 GSD will establish compliance reviews for the Preventive Maintenance Program (as described in the MAP for Finding No. 1) to determine if the supervisors in the Districts are properly reviewing the discrepancies identified on the Checklists and are properly authorizing the equipment/vehicles to be used. Completion Date: July 15, of 11 May 31, 2013
10 Observations and Recommendations Audit Observation No. 1: Consistency of Discrepancy Reporting Some of the daily (Pre-Trip) inspections in the sampled Districts at North, South, and East Regions did not identify the same types of discrepancies that were identified by the Region PM Coordinator inspections. The Pre-Trip inspection Checklists were reviewed two weeks prior to the PM Coordinator s inspections. Examples of discrepancies that weren t identified by the operators include: oil leak, low tires, missing coolant cap, backup alarm not working, missing first aid kit, horn not working, lights not working, low power steering fluid, and windshield washer not working. Recommendation: The Region Fleet Managers should work with the Districts and applicable supervisors to help provide any additional training needed on conducting the daily equipment/vehicle inspections and to emphasize the importance of completing the inspections in a thorough manner. In addition, GSD should work with the Administration to determine if it would be beneficial to develop certifications for the PM Program. Audit Observation No. 2: Consistent Utilization of FleetTracks for Preventive Maintenance The consistent use of FleetTracks can help the Districts and Regions keep up with their preventive maintenance needs by identifying when preventive maintenance is due and providing alerts when it is past due. We found that 14 of 18 (78%) pieces of equipment/vehicles in the sampled Districts of the South Region showed past due items in FleetTracks. In addition, 6 of 6 (100%) District Custodians interviewed gave testimonial evidence stating that they were not utilizing FleetTracks to monitor their equipment/vehicle preventive maintenance needs. Recommendation: The South Region Fleet Manager should look into this to determine if the Districts in the South Region are having problems using FleetTracks or obtaining status reports or if the Districts need additional training on FleetTracks. 10 of 11 May 31, 2013
11 Summary Results Based on Enterprise Risk Management Framework Closing Comments The results of this audit were discussed with the GSD Interim Director, Region Support Center Directors, and Region Fleet Managers in an exit conference held on December 20, The results were also provided to the Office of General Counsel, the Chief Programs Officer and the Deputy Executive Director/Chief Engineer via . We would like to thank the employees contacted during this audit for their assistance and cooperation. 11 of 11 May 31, 2013
Internal Audit Follow-Up Report. Equipment Maintenance and Repair. TxDOT Office of Internal Audit. Jan J
Internal Audit Follow-Up Report Equipment Maintenance and Repair TxDOT Office of Internal Audit Jan J Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously
More informationMONTANA STATE PRISON POLICIES AND PROCEDURES. Signature: /s/ Mike Mahoney Effective Date: 6/5/00 Signature: /s/ Ross Swanson Effective Date: 6/5/00
MONTANA STATE PRISON POLICIES AND PROCEDURES Policy No.: MSP 1.2.18 Chapter #1: ADMINISTRATION AND MANAGEMENT Section #2: Fiscal Management Page 1 of 4 (plus attachment) Revision Date: Signature: /s/ Mike
More informationInternal Audit Report. Highway Condition Reporting TxDOT Office of Internal Audit
Internal Audit Report Highway Condition Reporting TxDOT Office of Internal Audit Objective To evaluate data integrity in the Highway Condition Report. Opinion Based on the audit scope areas reviewed, control
More informationSeattle Public Schools The Office of Internal Audit
Seattle Public Schools The Office of Internal Audit Internal Audit Follow-up Report (Previously Maintenance and Transportation) Issue Date: October 6, 2015 Background On March 19, 2013, the Office of Internal
More informationSEATTLE OFFICE Vehicles and Local Transportation Lead: Treasurer UW-K and / or CEO, UW-K
12. VEHICLES Contents 12. Vehicles... 1 12.1 Roles and Responsibilities... 1 12.2 Vehicle Procurement... 2 12.2.A Inventory... 2 12.2.B Disposition... 2 12.2.C Vehicle Insurance... 2 12.2.D Licensure and
More informationCHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS
CHAPTER 5 - SAFETY ASSESSMENTS, LOG OF DEFICIENCIES AND CORRECTIVE ACTION PLANS A. INTRODUCTION... 1 B. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 1 C. SAFETY PROGRAM ASSESSMENT PROCESS... 3 D. FACILITY-MAINTAINED
More informationInternal Audit Report. Right of Way Acquisition TxDOT Office of Internal Audit
Internal Audit Report Right of Way Acquisition TxDOT Office of Internal Audit Objective Evaluate the right of way acquisition process for efficiency and compliance. Opinion Based on the audit scope areas
More informationVICE PRESIDENT, DELIVERY OPERATIONS. Management Alert Suspension or Delay of Scheduled Vehicle Maintenance (Report Number DR-MA-15-001)
February 10, 2015 MEMORANDUM FOR: EDWARD F. PHELAN, JR. VICE PRESIDENT, DELIVERY OPERATIONS E-Signed by Robert Batta VERIFY authenticity with e-sign FROM: SUBJECT: Robert J. Batta Deputy Assistant Inspector
More informationHOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST
` HOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST A portion of your noncommercial driving test will be conducted on a closed course to test your basic control of the vehicle, and a
More informationEquipment and Fleet Maintenance Review
Internal Audit Issue Date: July 2014 Report Number: FY2014-04 Executive Summary AUDIT OF: Equipment and Fleet Maintenance Review DATE: Fieldwork performed May 2014 June 2014 AUDIT RATING: Acceptable [
More informationInternal Audit Checklist
Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions
More informationFLEET SAFETY PROGRAM - SAMPLE
FLEET SAFETY PROGRAM - SAMPLE Fleet Safety Program - Sample Your organization seeks to provide a safe and secure environment for all drivers and passengers of our vehicles. While financial costs arising
More information310 Seymour Lansing, MI 48933 Telephone: (517) 487-6550 Fax: (517) 487-6977. Lansing Housing Commission. Policy No. 2010-2 Resolution 1098
310 Seymour Lansing, MI 48933 Telephone: (517) 487-6550 Fax: (517) 487-6977 Lansing Housing Commission Vehicle Standard Operating Procedure Vehicle Standard Operating Procedure The purpose of this Standard
More informationVehicle Maintenance Policies and Procedures
Vehicle Maintenance Policies and Procedures Adopted: 09/20/2011 1 Table of Contents Introduction:... 4 Goals and objectives:... 5 Goals:... 5 Objectives:... 5 Preventative Maintenance:... 6 Daily... 6
More informationCAR DAILY VEHICLE PRE CHECKS INFORMATION. Page 1 of 6
Page 1 of 6 CAR DAILY VEHICLE PRE CHECKS INFORMATION There are approximately 2.5 million vehicles in national fleet in Ireland. As vehicles age they are subject to wear and tear and unless attended to
More informationMobile Equipment Service. Scope of Work
Mobile Equipment Service Scope of Work Reviewed By: Approved By: Version 1.0 Date 8-08-07 Author K. Vandenbussche 1 BACKGROUND The MESC s program will provide superior on-site equipment, service, technology,
More informationNRCS New Mexico Vehicle Fleet Management Guide
NRCS New Mexico Vehicle Fleet Management Guide TABLE OF CONTENTS PURPOSE REVIEW POLICY/PROCEDURE 1. Definitions 2. Roles and Responsibilities 3. Vehicle Acquisition and Replacement 4. Vehicle Assignments
More informationInternal Audit Follow-Up Report. Inventory Management TxDOT Office of Internal Audit
Internal Audit Follow-Up Report Inventory Management TxDOT Office of Internal Audit Objective Assess the status of corrective actions for Management Action Plans (MAPs) previously communicated in the Inventory
More informationGround Support Equipment Safety Inspection Program 2
Safety Inspection Program 2 Figure 1 SFO Core Values Safety Inspection Program 3 TABLE OF CONTENTS Executive Summary 5 Policy 5 Purpose 6 Program Description 8 GSE Safety Inspection Process 11 Vehicle
More informationTHE TEXAS A&M UNIVERSITY SYSTEM (TAMUS) FLEET VEHICLE USE GUIDELIINES
THE TEXAS A&M UNIVERSITY SYSTEM (TAMUS) FLEET VEHICLE USE GUIDELIINES Definitions System Fleet Manager Individual appointed by the Vice Chancellor for Business Services responsible for ensuring compliance
More informationAUDIT REPORT 04-11 FUEL CARD MANAGEMENT 2004 AUGUST
AUDIT REPORT 04-11 FUEL CARD MANAGEMENT 2004 AUGUST Audit Report 04-11 Page 2 INDEX SECTION I EXECUTIVE SUMMARY Introduction Overview Audit Conclusion Business Unit Response SECTION II ANALYSIS OF ISSUES
More informationFLEET MANAGEMENT. Fleet Management s motto is If you make the time for us, We will make the time for you.
FLEET MANAGEMENT Department Mission/Purpose Statement We are dedicated to be a well managed, responsive and preferred provider of fleet services and to meet all fuel, mechanical repairs, towing and vehicle
More informationUniversity of Leicester. Vehicle Fleet Management Procedures
University of Leicester Vehicle Fleet Management Procedures Estates & Facilities Management Division September 2011 1 Introduction The University fleet of vehicles includes all vehicles owned by the University
More informationDepartment of Motor Vehicles
New York State Office of the State Comptroller Thomas P. DiNapoli Division of State Government Accountability Motor Vehicle Financial Security and Safety Responsibility Acts: Assessable Expenses for the
More informationTRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL
TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL Length of Lesson: 30 minutes TRAINER NOTES: Hand out lesson plan at the beginning of the
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationNYU Safety Policy Manual
NYU Safety Policy Manual Page 1 of 8 PURPOSE To provide guidance for the implementation of New York University's (NYU) Fleet Safety Program, which includes selection of drivers who operate University vehicles.
More informationNHTSA s Oversight of Vehicle Safety Defects and Highway Safety Grants
Before the Commerce, Science, and Transportation Committee Subcommittee on Consumer Protection, Product Safety, and Insurance United States Senate For Release on Delivery Expected at 2:30 p.m. EST Tuesday
More informationInternal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit
Internal Audit Report Toll Operations Contract Management TxDOT Office of Internal Audit Objective To determine whether the Toll Operations Division (TOD) contract management structure is designed and
More informationElements of a Successful Preventive Maintenance (PM) Program
Elements of a Successful Preventive Maintenance (PM) Program Preventive maintenance (PM) is the key to any successful maintenance program for commercial motor vehicles. Through preventive maintenance,
More informationINTERNAL AUDIT DIVISION AUDIT REPORT 2013/073
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073 Audit of maintenance and building services provided by the Office of Central Support Services at Headquarters Overall results relating to the Office of Central
More informationVEHICLE MAINTENANCE PROGRAM
VEHICLE MAINTENANCE PROGRAM Vehicle Maintenance Program The goals of the vehicle maintenance program of (Insert Name of Agency) are to support safe, reliable, and high quality transit services while making
More informationLATE SUBMISSION OF TRAVEL EXPENSE CLAIMS, UNFILED TRAVEL EXPENSE REPORTS, AND RECONCILIATION OF PREPAID EXPENSES
Report Office of the General Auditor August 31, 2011 Internal Audit Report for August 2011 Summary Three reports were issued during the month: Employee and Director Expense Reports Audit Report Quarterly
More informationCity of Santa Barbara City Vehicle Use Policy
City of Santa Barbara City Vehicle Use Policy Approved by: James L. Armstrong City Administrator Policy effective: July 1, 2007 Purpose Provide written guidelines on the use of and safe operation of City
More informationConstruction Bond Audit Report. Office of Auditor General
Construction Bond Audit Report (This page was left blank) TABLE OF CONTENTS Executive Summary 5 Background, Scope and Objectives, and Methodology....7 Audit Findings, Recommendations, and Management s
More informationNATIONAL TRANSPORT AND SAFETY AUTHORITY
NATIONAL TRANSPORT AND SAFETY AUTHORITY SCHOOL TRANSPORTATION SAFETY GUIDELINES BY THE NATIONAL TRANSPORT AND SAFETY AUTHORITY School transportation plays an important and long-term role in the lives of
More informationPURPOSE REVIEW POLICY/PROCEDURE. 1. Definitions. a. CCG Texas Council on Competitive Government.
PURPOSE The purpose of the University of Texas at Austin s Vehicle Fleet Management Plan (Plan) is to implement provisions of House Bill 3125, Acts 76 th Legislature, which mandate the Office of Vehicle
More informationENGINEERING AND CONSTRUCTION BULLETIN
ENGINEERING AND CONSTRUCTION BULLETIN No. 2014-13 Issuing Office: CECW-CE Issued: 22 May 2014 Expires: 22 May 2016 Subject: Contractor Performance Assessment Reporting System (CPARS) Transition Guidance
More informationAudit and Advisory Services
Audit and Advisory Services Integrity, Innovation and Quality April 2012 Table of Contents Table of Contents EXCUTIVE SUMMARY... I 1.0 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 OBJECTIVES... 2 1.3 SCOPE
More informationAutomotive Maintenance Merit Badge Workbook
Merit Badge Workbook This workbook can help you but you still need to read the merit badge pamphlet. The work space provided for each requirement should be used by the Scout to make notes for discussing
More informationSCHOOL BUS ADMINISTRATIVE, MAINTENANCE AND MECHANICAL SERVICES AGREEMENT
SCHOOL BUS ADMINISTRATIVE, MAINTENANCE AND MECHANICAL SERVICES AGREEMENT between the Barberton City School District and the Norton City School District 1 STATEMENT OF PURPOSE The Barberton City School
More informationAUSTIN INDEPENDENT SCHOOL DISTRICT INTERNAL AUDIT DEPARTMENT TRANSPORTATION AUDIT PROGRAM
TRANSPORTATION GENERAL: The Transportation Department provides transportation of students to and from school and other special trips. The aim of an effective transportation service delivery system must
More informationLink 2 Vehicle Maintenance System
Link 2 Vehicle Maintenance System Link 2 Data Module - Monitors Critical Vehicle Information - Records CAN J1939 data bus for engine, transmission and ABS along with aerial, PTO and generator information
More informationtips How smallchangescan saveyou big, &
warehousesafety tips How smallchangescan saveyou big preventaccidentsreduceinjuries, & increaseproductivity.. Table of Contents Welcome Statement...4 Safety Policy Statement...5 Guiding Principles...6
More informationCoastal Community Action Program WSDOT Owned Vehicle Maintenance Plan
Coastal Community Action Program WSDOT Owned Vehicle Maintenance Plan Mission Statement Coastal Community Action Program s (CCAP) vehicle maintenance mission is to effectively and efficiently provide safe,
More informationAQ1101 - RESPONSIBILITY CODE FOR USE OF INTERIOR HEALTH FLEET VEHICLES
1.0 PURPOSE AQ1101 - RESPONSIBILITY CODE FOR USE OF INTERIOR HEALTH FLEET VEHICLES To provide a framework for the administration of the IH Fleet Vehicle Program and to outline the use and responsibilities
More informationA Guide to the Use of Maintenance Software and Computer Storage of Maintenance Records
A Guide to the Use of Maintenance Software and Computer Storage of Maintenance Records Saving lives, safer roads, cutting crime, protecting the environment Introduction For a full understanding of the
More informationFlorida Department of Highway Safety and Motor Vehicles Office of Inspector General
OFFICE OF INSPECTOR GENERAL Inspector General Julie M. Leftheris, CPA Motor Carrier Safety June 28, 2013 Assistance Program Grant Audit Report 201213-11 Executive Summary The U.S. Department of Transportation
More informationThe Denver Fleet Management Division. Past and Present Past
Past and Present Past The history of the Denver Fleet Management Division goes as far back as horse-and-buggy days. It's not a hemi, but REAL horsepower! Memories of the 801 Larimer facility Wheels and
More informationAudit of Milwaukee Fire Department Fixed Assets Controls
Audit of Milwaukee Fire Department Fixed Assets Controls MARTIN MATSON City Comptroller AYCHA SIRVANCI, CPA Audit Manager City of Milwaukee, Wisconsin August 2013 Table of Contents Transmittal Letter...1
More informationPreventative Maintenance Policies and Plan
Preventative Maintenance Policies and Plan The objectives of the NECTD Preventative Maintenance Policies and Plan are: Ensure that assets are protected and maintained so that they reach their maximum useful
More informationENACTED BY LEGISLATURE: MAY 20, 2002 CITE AS: 6 HCC 8-16. 1. Authority. See basic document (Occupational Safety and Health Program Act).
HO-CHUNK NATION CODE (HCC) TITLE 6 PERSONNEL, EMPLOYMENT AND LABOR CODE SECTION 8 OCCUPATIONAL SAFETY AND HEALTH PROGRAM ACT OF 2002 SUBSECTION 16 FLEET SAFETY ENACTED BY LEGISLATURE: MAY 20, 2002 CITE
More informationEXECUTIVE SUMMARY. PURPOSE OF REPORT To provide Council with a report on the Follow Up Audit of CVOR-Fleet.
TO SERVICE AREA City Council CAO Administration- Internal Audit DATE June 23, 2014 SUBJECT NUMBER CVOR Fleet Follow-up Audit Report CAO-A-1407 EXECUTIVE SUMMARY PURPOSE OF To provide Council with a report
More informationOFFICE OF THE CITY CONTROLLER
OFFICE OF THE CITY CONTROLLER CITY-WIDE MOTOR VEHICLE FOLLOW-UP REVIEW Sylvia R. Garcia, City Controller Judy Gray Johnson, Chief Deputy City Controller Steve Schoonover, City Auditor Report No. 01-11
More informationPolicy Contact: Director of Facilities Management gbowerso@mines.edu. Issued: April 2008. Revised: April 2015. Finance & Administration
1.0 BACKGROUND AND PURPOSE The Colorado School of Mines ( Mines or the University ) withdrew from the State Fleet Program on July 1, 2008, and established the campus vehicle fleet service under Facilities
More informationInspection and Testing of Water-Based Systems
Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level III Content Outline The candidate for NICET certification at Level III in the Inspection and Testing of Water-Based
More informationOFFICE OF THE CITY AUDITOR
OFFICE OF THE CITY AUDITOR PERFORMANCE AUDIT OF FUEL SERVICE CARDS Paul T. Garner Assistant City Auditor Prepared by: Theresa Hampden, CPA Audit Manager Regina Cannon Auditor October 29, 2004 Memorandum
More informationFleet Services Review - Strategy for the Fleet Services Division. Government Management Committee
GM6.1 STAFF REPORT ACTION REQUIRED Fleet Services Review - Strategy for the Fleet Services Division Date: August 31, 2015 To: From: Wards: Reference Number: Government Management Committee Director, Fleet
More informationNew Fleet Management Software System
New Fleet Management Software System The Fleet Services staff received training in October 2003, and early 2004, in preparation for the installation of a new fleet management software system. Training
More informationVehicle Management Plan 2008 07 22 revision
Vehicle Management Plan March 18, 2008 University of Florida Physical Plant Division Preamble... 3 Purpose... 5 Vehicle Management... 7 Composition... 7 Cost Savings from Vehicle Reduction... 7 Grant Funded
More informationBoerne Independent School District Job Description
Boerne Independent School District Job Description Job Title: Fleet Manager Wage/ Hour Status: Reports to: Director of Transportation Pay Grade: Department: Transportation Date Revised: 12/4/2015 Primary
More informationADMINISTRATIVE PROCEDURES MANUAL
REGULATION NUMBER: EFFECTIVE DATE: FLEET MANAGEMENT OPERATING PROCEDURES PURPOSE: To establish procedures and policies to ensure that the Alachua County Board of County Commissioners vehicles and motorized
More informationCOUNTY OF GREENVILLE EQUIPMENT MANAGEMENT SYSTEM
COUNTY OF GREENVILLE EQUIPMENT MANAGEMENT SYSTEM I POLICY The equipment management system provides detail and management information about replacement and operation costs for the County s rolling equipment.
More informationPOLICY SUBJECT: EFFECTIVE DATE: 5/31/2013. To be reviewed at least annually by the Ethics & Compliance Committee COMPLIANCE PLAN OVERVIEW
Compliance Policy Number 1 POLICY SUBJECT: EFFECTIVE DATE: 5/31/2013 Compliance Plan To be reviewed at least annually by the Ethics & Compliance Committee COMPLIANCE PLAN OVERVIEW Sound Inpatient Physicians,
More informationMANATEE COUNTY SCHOOL DISTRICT RISK ASSESSMENT UPDATE PROCESS REPORT
MANATEE COUNTY SCHOOL DISTRICT RISK ASSESSMENT UPDATE PROCESS REPORT Shinn & Company LLC was contracted by the Manatee County School Board (the Board ) to update the current risk assessment. The initial
More informationFLORIDA DEPARTMENT OF JUVENILE JUSTICE PROCEDURE
PROCEDURE Title: Vehicle Operations Procedures Related Policy: FDJJ 1306 I. DEFINITIONS Accident An incident that occurs with a state owned vehicle operated by an authorized operator that results in damage
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION PROCEDURES MANUAL PROGRAM AND PROJECT MANAGEMENT SECTION 6: QUALITY ASSURANCE PROCEDURE: PM 6.02 TITLE: QUALITY ASSURANCE AUDITS DATE:
More informationEnhancing Productivity through Safety
Enhancing Productivity through Safety Reduce costs and boost employee performance with a comprehensive lift truck safety program Yale Materials Handling Corporation Enhancing Productivity through Safety
More informationMAINTENANCE PROTECTIONPLAN
LET FORD PROTECT YOU ON THE ROAD AHEAD TRAVELLING WELL WITH FORD PROTECTION PLAN (FMPP) CONFIDENCE FOR THE ROAD AHEAD When you decide to purchase or lease your vehicle, you want the peace of mind that
More informationRADLEY ACURA RED FLAG IDENTITY THEFT PROTECTION PROGRAM and ADDRESS DISCREPANCY PROGRAM
RADLEY ACURA RED FLAG IDENTITY THEFT PROTECTION PROGRAM and ADDRESS DISCREPANCY PROGRAM SUMMARY OF OUR PROGRAM AND PROCESSES This dealership is committed to protecting its customers and itself from identity
More informationMeasuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
More informationCOMPANY VEHICLE OPERATING POLICY Effective May 2013
COMPANY VEHICLE OPERATING POLICY Effective May 2013 TABLE OF CONTENTS 1. INTRODUCTION...3 2. VEHICLE ASSIGNMENTS AND POOL TRUCKS...4 3. VEHICLE MAINTENANCE AND OPERATION...6 4. VEHICLE SAFETY AND REGULATIONS...7
More informationCTAA - SAFETY AND SECURITY OFFICER PROGRAM (CSSO)
CTAA - SAFETY AND SECURITY OFFICER PROGRAM (CSSO) 1 Training Agenda: Morning Session-Day 1: Introduction Leadership and Administration Transit Operations Afternoon Session-Day 1: Maintenance and Technology
More informationWorking Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE
WP 05-WH1401 Revision 4 6-Ton Electric Forklifts 74-H-010B Technical Procedure EFFECTIVE DATE: 01/04/06 John Guy APPROVED FOR USE WP 05-WH1401 Rev. 4 Page 2 of 10 TABLE OF CONTENTS INTRODUCTION... 3 REFERENCES...
More informationReview of Toronto Transit Commission, Non-Revenue Vehicle Fuel Card Controls Need Immediate Improvement
AUDITOR GENERAL S REPORT ACTION REQUIRED Review of Toronto Transit Commission, Non-Revenue Vehicle Fuel Card Controls Need Immediate Improvement Date: February 6, 2015 To: From: Wards: TTC Audit Committee
More informationMEMORANDUM. SUBJECT: Management Response to Performance Review of Fleet Services Division, Report No. 09-10
BERTHA W. HENRY, County Administrator 115 S. Andrews Avenue, Room 409 Fort Lauderdale, Florida 33301 954-357-7362 FAX 954-357-7360 DATE: MEMORANDUM TO: FROM: Board of County Commissioners Bertha W. Henry,
More informationFleet Management Procedure
Fleet Management Procedure Complete Policy Title: Facility Services Fleet and Non- Fleet Maintenance/Operations Approved by: P Administration ate of Original Approval: Responsible Executive: Assistant
More informationWhy are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
More informationLauren Sundararajan, CFE, Internal Audit Manager
Interdepartmental Correspondence Sheet Date: June 17, 2016 To: From: Copies to: Subject: Harry Black, City Manager Lauren Sundararajan, CFE, Internal Audit Manager Internal Audit Committee Reginald Zeno,
More informationLexington-Fayette Urban County Government Division of Internal Audit
Lexington-Fayette Urban County Government Division of Internal Audit INTERNAL AUDIT REPORT DATE September 23, 2005 TO: CC: FROM: RE: Teresa Ann Isaac, Mayor Milton Dohoney, Chief Administrative Officer
More informationChapter 3 Office of Human Resources Absenteeism Management
Office of Human Resources Absenteeism Management Contents Section A - Background, Objective and Scope............................ 24 Section B - Criterion 1 - Communicating Expectations.......................
More informationCalifornia State University, Chico SUPPLEMENT to CSU Use of University and Private Vehicles Policy Guidelines
California State University, Chico SUPPLEMENT to CSU Use of University and Private Vehicles Policy Guidelines September 2005 INTRODUCTION The California State University, in conjunction with the state
More informationA D M I N I S T R A T I V E P O L I C Y
TITLE: VEHICLE USE POLICY APPROVED: July 1992 REVIEWED: December 2, 2002 April 11, 2006 December 8, 2008 NEXT REVIEW: 2011-2012 RESPONSIBILITY: Director, Campus Operations APPENDICES: CROSS-REFERENCE:
More informationNRP Training Series 2001 Financial Record Keeping
NRP Training Series 2001 Financial Record Keeping Copyright 2001 Minneapolis NRP - All Rights Reserved What is the role of the Treasurer? Generally, the treasurer is responsible for compiling and keeping
More informationCity of Milwaukee Employes Retirement System (ERS)
City of Milwaukee Employes Retirement System (ERS) Vendor Management Audit Report JANUARY 30, 2009 JEFFERSON WELLS 330 EAST KILBOURN AVENUE, SUITE 1075 MILWAUKEE, WI 53202 (414) 347-2345 SUSAN OBERMILLER,
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Auditor General s Report - Review of Toronto Transit Commission, Non-Revenue Vehicle Fuel Card Controls Need Immediate Improvement Date: February 19, 2015 To: From: TTC Audit
More informationOperation of Fork Lift Trucks Procedure
Reference: 3.22 Edition Date: 10 Feb 2011 Page 1 of 8 Operation of Fork Lift Trucks Procedure 1. PURPOSE The purpose of this Procedure is to define the rules for the safe operation of Forklift trucks within
More informationPowered Industrial Truck Safety Program
Powered Industrial Truck Safety Program TABLE OF CONTENTS Forklift Safety Program 1.0 Overview... 3 2.0 Policy.....3 3.0 Requirements 3 4.0 Purpose. 3 5.0 Scope......4 6.0 Forklift Procedures 4 6.0 Responsibilities.....6
More informationCost Saving Initiatives Case Study
Cost Saving Initiatives Case Study Effective tire programs are meeting an ongoing challenge for fleets Tires and tire related maintenance remain one of the highest single costs for fleets of all types
More informationWEEKLY SAFETY MEETING All Euramax Subsidiaries SEAT BELTS. Safety Meeting Contents. Meeting Notice. Leaders Guide. Employee Handout.
Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read
More informationForklift Safety Program Rev 1
Forklift Safety Program Rev 1 This Forklift Safety Program is hereby approved: Signature Date Revised: 12/12 Page 1 of 11 POWERED INDUSTRIAL TRUCKS Forklift Safety Program 1.0 PURPOSE To provide safe practices
More informationMOTOR VEHICLE FLEET MANAGEMENT POLICY FOR ADMINISTRATIVE DIVISION VEHICLES SECTION 01-03 ASSIGNMENT OF COUNTY MOTOR VEHICLES
Washington County Board of Supervisors PERSONNEL POLICIES AND PROCEDURES MANUAL FOR ADMINISTRATIVE DIVISION EMPLOYEES ATTACHMENTS ATTACHMENT C Effective Date: January 1, 1998 PART 01. GENERAL SECTION 01-01
More informationa. Proposals shall be submitted in a sealed envelope and addressed as follows:
1 CITY OF ATCHISON REQUEST FOR QUALIFICATIONS & PROPOSAL HVAC SERVICES JANUARY 1, 2014 THROUGH DECEMBER 31, 2014 DUE: DECEMBER 10, 2013 10:00 A.M. The City of Atchison (City) invites interested and qualified
More informationGarbage Truck Maintenance Follow-Up Audit A2015-04
Garbage Truck Maintenance Follow-Up Audit A2015-04 Issued by the June 1, 2015 EXECUTIVE SUMMARY The conducted a Follow-Up Audit of the Garbage Truck Maintenance Review Audit Report dated June 28, 2013.
More informationWater Well Drilling Rig or any associated motor vehicle or trailer used directly for that purpose.
Permit Type: Water Well Drilling Rig Water Well Drilling Rig or any associated motor vehicle or trailer used directly for that purpose. A Water Well Drilling Rig is defined as; a motor vehicle with a permanently
More informationWORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES
WHS UNIT WORKPLACE HEALTH AND SAFETY AUDITING GUIDELINES Contents 1 Purpose... 1 2 Scope... 1 3 Definitions... 1 4 Responsibilities... 1 4.1 WHS Unit... 1 4.2 Auditor(s)... 1 4.3 Managers of Faculties
More informationSCHOOL DISTRICT 70 - ALBERNI JOB DESCRIPTION
TITLE: Bus Driver SECTION: Transportation REPORTS TO: Operations Manager DATE: June 2008 SUMMARY SCHOOL DISTRICT 70 - ALBERNI JOB DESCRIPTION Reporting to the Operations Manager, the Bus Driver performs
More informationADMINISTRATIVE DIRECTIVE
6.01-5 1 of 5 October 21, 2015 I. PURPOSE To establish procedures for repair and servicing of City-owned vehicles by the Fleet Services Division (Fleet) of the General Services Department (GSD) at the
More information1004 VEHICLE AND FLEET SERVICE POLICY. I. Legislative Authority:
1004 VEHICLE AND FLEET SERVICE POLICY I. Legislative Authority: This policy is written in accordance with legislation passed by the Arkansas General Assembly, (Arkansas Code: 19-4-902, 19-4-905, 19-4-907,
More information