1 Leading CEQA Cases on Water Supply Issues Jim Moose Remy Moose Manley, LLP 2016 Municipal Law Institute Symposium: Ensuring Integrity in 21st Century California: Water & Public Works in Our Arid State McGeorge School of Law February 5, Cases for Review Vineyard Area Citizens for Responsible Growth v. Rancho Cordova (2007) 40 Cal.4th 412 SCOPE v. County of LA (2007) 157 Cal.App.4th 149 Watsonville Pilots Assoc. v. City of Watsonville (2010)183 Cal.App.4th 1059 Cherry Valley Pass Acres and Neighbors v. City of Beaumont (2010) 190 Cal.App.4th 316 Preserve Wild Santee v. City of Santee (2012) 210 Cal.App.4th 260 Habitat and Watershed Caretakers v. City of Santa Cruz (2013) 213 Cal.App.4th Vineyard Area Citizens for Responsible Growth v. Rancho Cordova (2007) Major California Supreme Court decision on EIR adequacy, first such decision in many years EIR for 6,000-acre, 22,000-unit community plan and nearer-term 9,900-unit specific plan inadequate because EIR failed to adequately evaluate long-term water sources needed for build-out 3 1

2 Vineyard (cont.) Analysis of water supply was inadequate because it: Failed to provide an adequate description of long-term water sources, as briefly mentioned in challenged EIR and as discussed at greater length in prior EIR for Water Forum process EIR for land use plans failed to formally incorporate by reference information from Water Forum EIR, and contained numerical information at odds with parallel sets of water demand and water supply numbers in Water Forum EIR EIR was also inadequate because lead agency failed to recirculate after identifying possible significant biological impacts on Cosumnes River due to groundwater pumping associated with short-term water supply 4 Vineyard (cont.) Mitigation measure providing for the curtailment of development should water sources not materialize or be delayed is an appropriate tool under CEQA, but is not a substitute for an adequate impact analysis Adequate analysis should contain the following elements: a) identification of the water sources needed for full build-out; b) assessment of the environmental impacts associated with providing water for the project; 5 Vineyard (cont.) c) where there are both short-term and long-term supplies needed, analysis of long-term supplies and their impacts in at least programmatic level of detail; d) assessment of the extent to which identified water sources are certain or likely to be available; e) where it is impossible to confidently determine that anticipated future water sources will be available, identification of possible alternative water sources and analysis of the environmental impacts of curtailing planned development due to inadequate supplies 6 2

3 Vineyard (cont.) Note: CEQA analysis of how certain or likely proposed water sources are naturally raises the question of whether climate change could adversely affect the extent or reliability of such sources AB 32 declares that The potential adverse impacts of global warming include... a reduction in the quality and supply of water to the state from the Sierra snowpack[.] Global warming will have detrimental effects on some of California s largest industries, including agriculture, wine, tourism, skiing, recreational and commercial fishing, and forestry. (Health & Saf. Code, 38501, subds. (a), (b).) 7 SCOPE (2007) EIR for development project upheld Water supply for project a 41,000 afy transfer between two water agencies was reasonably likely despite pending litigation over water transfer Litigation over the transfer had not resulted in invalidation of transfer, and water had been delivered for several years Substantial evidence supported lead agency s determination that the water transfer would remain in place and the supply would continue to be delivered 8 SCOPE (cont.) Reasonable likelihood determination under Vineyard is a factual question for lead agency to resolve Case does not stand for general proposition that litigation over a water supply is never a basis for finding the supply to be uncertain 9 3

4 SCOPE (cont.) Practical implications Lead agencies must deal head-on with uncertainties associated with a proposed water supply for a land use project Courts should defer to reasonable likelihood determinations if supported by substantial evidence and rigorous analysis 10 Watsonville Pilots Assoc. v. City of Watsonville (2010) Court sets aside EIR for Watsonville s 2030 General Plan The FEIR adequately analyzed water supply: The analysis complied with the Vineyard decision A General Plan EIR need not establish a likely source of water The EIR included a detailed discussion of conservation and offsets that would provide sufficient water for future development The EIR included evidence to support its conclusions Watsonville Pilots (cont.) The area suffers from severe groundwater overdraft: The EIR concluded that overdraft will be a longterm problem The EIR was not required to resolve the overdraft problem, a feat that was far beyond its scope. 4

5 Cherry Valley Pass Acres and Neighbors v. City of Beaumont (2010) Court upholds water supply analysis for Sunny-Cal Specific Plan, which contemplated 560 residential units on 200 acres of ag land Cherry Valley overlies the Beaumont Groundwater Basin: Basin adjudication allocated project a 1,484 ac-ft/yr water right Cherry Valley (cont.) Baseline for analyzing water impact was 1,484 afy entitlement, not existing 50 afy use: Court held choice of baseline was a discretionary decision of how existing physical conditions without project could most realistically be measured City s decision was supported by substantial evidence: Adjudicated water right was close to prior egg farm water use at site Adjudicated water right was unaffected by closure of egg farm Groundwater entitlement is not a hypothetical allowable condition Cherry Valley (cont.) Water Supply Assessment (WSA) prepared for original, larger project proposal: Water district concluded that there is water sufficient for project Supplier described existing and future water sources in detail 5

6 Cherry Valley (cont.) Court rejects argument that alleged inconsistencies between WSA and water district s UWMP update were not addressed in the EIR: EIR satisfactorily showed a reasonable likelihood that water from an identified source would meet project demands over 20 years Project site has sufficient water right; water district has capacity to deliver that water Court not required to determine whether project demand will be met from sources other than the entitlement and water district EIR not required to show total water supply/demand within water district are in balance Project would cause no additional withdrawals from groundwater basin beyond existing overdraft conditions Preserve Wild Santee v. City of Santee Court strikes down EIR for Fanita Ranch project: 1,380 homes, village center, and 15 live/work units on 970 acres and 1,400 acres of open space Court upholds some aspects of EIR, but finds fault with water supply analysis Court finds water supply analysis to be defective Project was at subdivision map stage, and thus was subject to Senate Bill 221 requirements, including showing of firm assurances of future water supplies (see Gov. Code ) Project also required Water Supply Assessment (WSA) under Senate Bill 610 (see Wat. Code et seq.) But ultimate question was whether EIR adequately addresses the reasonably foreseeable impacts of supplying water to the project Vineyard Area Citizens case (2007) requires analysis of potential water supply alternatives where the uncertainties inherent in long-term land use and water planning make it impossible to confidently identify the future water sources 6

7 Project site was within Padre Dam Municipal Water District (PDWD) PWD gets its water from San Diego County Water Authority (SDCWA) SDCWA gets most of its water from Metropolitan Water District (MWD) MWD gets its water primarily from State Water Project (SWP) and Colorado River Aqueduct WSA estimated water demand at 881 acre feet per year (afy) EIR estimated water demand at 1,446 afy EIR failed to satisfy requirements of Vineyard Area Citizens case Water supply projections in addendum to WSA depend on supply projections in reliability plans of SDCWA and MWD MWD s projections and reliability plans depend heavily on reliability of SWP supplies MWD s Urban Water Management Plan (UWMP) stated that reliability goals could be met only if SWP yielded 1.5 Million Acre Feet (MAF) per year on average Increased yield in critically dry years to 650,000 afy Access to full contract amounts in wet years to replenish surface and groundwater storage August 2007 court decision involving SWP operations created at least shortterm uncertainty in MWD s SWP supplies WSA Addendum acknowledged that PDWD could not predict whether the court decision would lead to cutbacks and if so by how much EIR did not discuss uncertainties caused by court case or uncertainties relating to successful implementation of planned water development, water delivery, and water conservation projects 7

8 New EIR is therefore required to Evaluate the pros and cons of fulfilling the project s water needs Address the impacts of likely future water sources Provide a reasoned analysis of the circumstances affecting the likelihood of the water s availability (if City cannot confidently determine the availability of a reliable supply) Discuss possible replacement sources or alternatives to the use of anticipated water source and the environmental consequences of those contingencies EIR and WSA failed to address potential impacts of providing potable water to 10- acre lake portion of project Project included lake for treatment of stormwater Potable source was needed to fill lake Groundwater was available to recharge lake, but only if monitoring showed that water table drop of one meter did not damage riparian areas relying on water table Evidence showed difficulty of using groundwater for recharge without adversely affecting riparian areas Neither WSA nor EIR addressed potential effects of having to obtain recharge water from PDWD Habitat and Watershed Caretakers v. City of Santa Cruz Court finds only one problem with EIR for a proposed sphere of influence (SOI) amendment that, if approved by LAFCO, would allow City of Santa Cruz to provide water and sewer service to North Campus area of University of California Santa Cruz, consistent with 2005 UCSC Long Range Development Plan (LRDP) 8

9 BACKGROUND City sued UCSC over EIR for 2005 Long Range Development Plan (LRDP), resulting in comprehensive settlement agreement addressing off-site housing and traffic concerns LRDP contemplated the development of North Campus, an area outside the City s territorial boundaries and SOI Agreement contemplated that City and UCSC jointly request LAFCO to grant SOI amendment allowing City to provide extraterritorial water and sewer service to North Campus City was not required to file SOI application, but had to do so in order to trigger UCSC s commitment relating to provision of oncampus housing Consistent with agreement, City as lead agency prepared an EIR to support its application to LAFCO for the SOI amendment CITY S WATER SUPPLY SITUATION City has long suffered from a water supply deficit in dry years, requiring significant cutbacks Only viable long-term solution is proposed desalination plant, as described in 2006 Integrated Water Plan Without desalination plant, the situation will grow even more challenging in future years due to: possible cutbacks in the City s use of certain surface water sources due to impacts on listed fish species the threat of salt water intrusion from overuse of groundwater possible impacts from climate change EIR concluded that desalination plant was not reasonably likely water supply within meaning of Vineyard: Although plant was the most likely future water source, its future was uncertain until design, environmental review and regulatory approvals are completed Although 2006 EIR for City s Integrated Water Plan included program-level review for plant, project level review was still to be completed Proposed plant would be shared with Soquel Creek Water District Because service to expanded UCSC would exacerbate existing problem unless and until desalination plant came on line, EIR called water supply impact significant and unavoidable 9

10 Under Vineyard, an EIR is not required to establish a likely source of water, but may satisfy CEQA by addressing the reasonably foreseeable impacts of supplying water to project acknowledging the degree of uncertainty involved discussing reasonably foreseeable alternatives to preferred (though uncertain) supply disclosing significant foreseeable environmental effects of each alternative source, as well as mitigation measures to minimize significant effects City s EIR met these standards by discussing the impact of the project on the City s water supply acknowledging the City s inadequate supplies noting that the construction of a desalination facility was uncertain EIR acknowledged the harsh reality that, absent construction of desalination plant, the project would increase the ongoing imbalance between supply and demand require additional conservation by existing customers during droughts and in future normal years Court: EIR should have included a limited water alternative Draft EIR addressed two alternatives: No Project Modified SOI alternative excluding undeveloped land from SOI Draft EIR rejected possible alternatives that would Relocate proposed growth from North Campus to Main Campus Redirect new student enrollment to other UC campuses Final EIR added annexation alternative 10

11 City was not required to consider reduced-development alternative Under Cortese-Knox-Hertzberg Act, LAFCO cannot impose any conditions that would directly regulate land use density or intensity, property development, or subdivision requirements (Gov. Code, 56375(a)(6)) In contrast, LAFCO would not be precluded from approving a limited water alternative allowing some, but not all, proposed development in North Campus This would partially meet project objectives This would secure UCSC housing commitments under settlement agreement CKH would allow LAFCO to condition the provision of water service on water supply availability Options include conditioning development on supply ceiling by requiring City to decrease off-site demand before meeting new demand on campus 11

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Municipal Water District of Orange County. Regional Urban Water Management Plan

Municipal Water District of Orange County. Regional Urban Water Management Plan Municipal Water District of Orange County Regional Urban Water Management Plan Municipal Water District of Orange County Water Reliability Challenges and Solutions Matt Stone Associate General Manager

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

The Planning Process. 1 O WOW 1.0 Plan Moving Towards Sustainability

The Planning Process. 1 O WOW 1.0 Plan Moving Towards Sustainability The Planning Process The development of this One Water One Watershed (OWOW) 2.0 Plan is built upon the planning process of the past to address the challenges of the future. The first phase of OWOW, known

More information

San Diego Water Resources Mix and Drought Planning

San Diego Water Resources Mix and Drought Planning Supply Reliability for San Diego through a Diverse Water Resources Mix and Drought Planning Dana L. Friehauf, San Diego County Water Authority DWR/NWRI Drought Response Workshop November 6, 2012 1990-91:

More information

8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses.

8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses. RESOLUTION NO. 14-071 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PACIFIC GROVE CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT (FEIR), ADOPTING THE MITIGATION MONITORING AND REPORTING PLAN, AND APPROVING

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: Corralitos Creek Water Supply and Fisheries Enhancement Project Project

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

CHAPTER 1 INTRODUCTION. 1.1 Requirements for the Watershed Sanitary Survey (WSS)

CHAPTER 1 INTRODUCTION. 1.1 Requirements for the Watershed Sanitary Survey (WSS) CHAPTER 1 INTRODUCTION 1.1 Requirements for the Watershed Sanitary Survey (WSS) The California Surface Water Treatment Rule (CSWTR), in Title 22, Article 7, Section 64665 of the California Code of Regulations

More information

East Niles Community Services District 2010 Urban Water Management Plan

East Niles Community Services District 2010 Urban Water Management Plan East Niles Community Services District 60182838.401 June 2011 East Niles Community Services District Timothy P. Ruiz, PE - General Manager AECOM Joshua T. Nord, PE - District Engineer 5001 E. Commercenter

More information

Olivenhain Municipal Water District 2014 Strategiic Pllan

Olivenhain Municipal Water District 2014 Strategiic Pllan Olliivenhaiin Muniiciipall Diistriict Olivenhain Municipal District 2014 Strategiic Pllan 1 Olivenhain Municipal District table of contents Introduction 3 Our Values 4 Our Vision 5 Our Mission 6 Our Goals

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator

Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the

More information

LAND USE & NATURAL RESOURCES

LAND USE & NATURAL RESOURCES LAND USE & NATURAL RESOURCES SECOND QUARTER 2011 VOLUME 2 COX CASTLE & NICHOLSON LLP 2011 SECOND QUARTER CEQA CASE LAW UPDATE There was substantial CEQA activity in the Courts of Appeal during the second

More information

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION. February 12, 2015

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION. February 12, 2015 CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION Resolution No. R15-001 Amendment to the Water Quality Control Plan for the Los Angeles Region to Incorporate Stakeholder-Proposed Groundwater

More information

2010 CEQA CASE LAW UPDATE

2010 CEQA CASE LAW UPDATE 2010 CEQA CASE LAW UPDATE PREPARED FOR THE UCLA EXTENSION LAND USE LAW AND PLANNING CONFERENCE JANUARY 21, 2011 LOS ANGELES Written Summary of Cases by Michael Zischke (415) 262-5109, MZischke@coxcastle.com

More information

Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) 533-5800 QUESTION PRESENTED

Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) 533-5800 QUESTION PRESENTED Office of The City Attorney City of San Diego MEMORANDUM MS 59 (619) 533-5800 DATE: TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers City Attorney Climate Action Plan QUESTION PRESENTED Are the

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

JOHN D. BAKKER. In connection with these and related utility and infrastructure matters, John frequently advises clients on. John D.

JOHN D. BAKKER. In connection with these and related utility and infrastructure matters, John frequently advises clients on. John D. JOHN D. BAKKER John D. Bakker Principal 555 12th Street, Suite 1500 Oakland, CA 94607 T: 510.808.2000 F: 510.444.1108 jbakker@meyersnave.com Practice Groups Land Use Municipal and Special District Law

More information

Securing California s Water Future

Securing California s Water Future T H E M E T R O P O L I TA N W AT E R D I S T R I C T O F SOUTHERN CALIFORNIA Securing California s Water Future John Arena, Business Outreach Program Manager Presented to SAME Orange County Post February

More information

Subject: Draft Groundwater Sustainability Plan Emergency Regulations Public Comment

Subject: Draft Groundwater Sustainability Plan Emergency Regulations Public Comment Delivered by email to: SGMPS@water.ca.gov California Department of Water Resources Attn: Lauren Bisnett P.O. Box 942836 Sacramento, CA 94236 Subject: Draft Groundwater Sustainability Plan Emergency Regulations

More information

Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space

Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space Multiple Species Conservation Program County of San Diego A Case Study in Environmental Planning & The Economic Value of Open Space Amy M. Fox Land Use Law Case Study Autumn Semester, 1999 Multiple Species

More information

DOCKET NO. D-2004-008-2 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area

DOCKET NO. D-2004-008-2 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area This DRAFT docket has been prepared for the purposes of the scheduled public hearing and may be substantially modified as a result of the public hearing process prior to Commission action. 8/26/2013 4:17

More information

Subject: YLWD Comments on the Mandatory Conservation Proposed Regulatory Framework

Subject: YLWD Comments on the Mandatory Conservation Proposed Regulatory Framework April 13, 2015 Felicia Marcus Chairperson, State Water Resources Control Board Attn: Jessica Bean 1001 I Street, 24 th Floor Sacramento CA 95814 Subject: YLWD Comments on the Mandatory Conservation Proposed

More information

City of Fort Collins Water Supply and Demand Management Policy

City of Fort Collins Water Supply and Demand Management Policy City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management

More information

The Bathtub Ring. Shrinking Lake Mead: Impacts on Water Supply, Hydropower, Recreation and the Environment

The Bathtub Ring. Shrinking Lake Mead: Impacts on Water Supply, Hydropower, Recreation and the Environment University of Colorado Law School Colorado Law Scholarly Commons Books, Reports, and Studies Getches-Wilkinson Center for Natural Resources, Energy, and the Environment 2015 The Bathtub Ring. Shrinking

More information

COMMENTS ON THE CADIZ CONSERVATION, RECOVERY, AND STORAGE PROJECT DRAFT ENVIRONMENTAL IMPACT REPORT

COMMENTS ON THE CADIZ CONSERVATION, RECOVERY, AND STORAGE PROJECT DRAFT ENVIRONMENTAL IMPACT REPORT March 13, 2012 Attn: Tom Barnes, ESA 626 Wilshire Boulevard, Ste. 1100 Los Angeles, CA 90017 Telephone: 213-599- 4300 Fax: 213-599- 4301 COMMENTS ON THE CADIZ CONSERVATION, RECOVERY, AND STORAGE PROJECT

More information

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

2014-2019. Business Plan

2014-2019. Business Plan 2014-2019 Business Plan August 2014 Table of Contents CHAPTER 1 - Introduction Overview 1-1 Guiding Principles and Policies 1-2 Related Planning Documents 1-4 Current Business Trends 1-7 Business Plan

More information

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE

More information

Chapter 4.0 - Impacts of the Proposed Project

Chapter 4.0 - Impacts of the Proposed Project Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill

More information

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION DISCUSSION OF INFORMATION PRESENTED IN THIS CHAPTER This chapter contains information regarding the operation of the Los Angeles District of California American Water as well as tables that summarize the

More information

List of Tables... iii. List of Figures... iv. List of Appendices... v. List of Abbreviations and Acronyms... vi

List of Tables... iii. List of Figures... iv. List of Appendices... v. List of Abbreviations and Acronyms... vi Table of Contents List of Tables... iii List of Figures... iv List of Appendices... v List of Abbreviations and Acronyms... vi Section 1: Introduction and Plan Preparation... 1-1 1.1 Requirement for an

More information

FINAL WORK PROGRAM FISCAL YEAR 2016-2017 Adopted March 28, 2016

FINAL WORK PROGRAM FISCAL YEAR 2016-2017 Adopted March 28, 2016 EXHIBIT A LAFCO of Monterey County Final Work Program for Fiscal Year 2016-2017 Adopted on March 28, 2016 LOCAL AGENCY FORMATION COMMISSION OF MONTEREY COUNTY FINAL WORK PROGRAM FISCAL YEAR 2016-2017 Adopted

More information

Topic 9: Data Collection, Management, and Reporting

Topic 9: Data Collection, Management, and Reporting Topic 9: Data Collection, Management, and Reporting Department of Water Resources - Sustainable Groundwater Management Program August 31, 2015 1.0 PURPOSE The purpose of this paper is to provide information

More information

Water Conservation Measurement in California - A Guide

Water Conservation Measurement in California - A Guide 2010 URBAN WATER MANAGEMENT PLAN June 22, 2011 DEVELOPING I N N O V AT I V E DESIGN SOLUTIONS ELK GROVE WATER DISTRICT A DEPARTMENT OF THE FLORIN RESOURCE CONSERVATION DISTRICT 2010 URBAN WATER MANAGEMENT

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Texas Motor Speedway Area Master Plan January 2009 WATER INFRASTRUCTURE

Texas Motor Speedway Area Master Plan January 2009 WATER INFRASTRUCTURE WATER AND SEWER INFRASTRUCTURE Water and Sewer Infrastructure in the TMS Study Area Streets and other transportation infrastructure are addressed in Chapter 6 of this plan. Non-transportation infrastructure

More information

ARIZONA DEPARTMENT OF WATER RESOURCES

ARIZONA DEPARTMENT OF WATER RESOURCES ARIZONA DEPARTMENT OF WATER RESOURCES WATER MANAGEMENT REQUIREMENTS FOR SOLAR POWER PLANTS IN ARIZONA ADWR CONTACT: Jeff Tannler, Statewide Active Management Area Director Arizona Department of Water Resources

More information

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main MokeWISE Program Scope of Work: April 2015 Abstract... 2 Background Information... 2 Calaveras Public Utility District... 2 Water Rights... 2 Water Supply... 2 Project Information... 3 Project Description...

More information

UTILITIES AND SERVICE SYSTEMS

UTILITIES AND SERVICE SYSTEMS Comprehensive Plan Update Draft Existing Conditions Report - City of Palo Alto - August 29, 2014 TABLE OF CONTENTS 13.... 13-1 13.1 WATER SUPPLY AND CONSERVATION...13-1 13.1.1 Environmental Setting...

More information

Groundwater Law Today and Tomorrow: Court Decisions and Their Impact

Groundwater Law Today and Tomorrow: Court Decisions and Their Impact Groundwater Law Today and Tomorrow: Court Decisions and Their Impact 14 th Annual Bell County Water Symposium November 18, 2014 - Belton Presented by: Ty Embrey tembrey@lglawfirm.com (512) 322-5829 816

More information

RESOURCE MANAGEMENT SERVICES 440 Harcourt Avenue Telephone (831) 899-6737 Seaside, CA 93955 FAX (831) 899-6211

RESOURCE MANAGEMENT SERVICES 440 Harcourt Avenue Telephone (831) 899-6737 Seaside, CA 93955 FAX (831) 899-6211 RESOURCE MANAGEMENT SERVICES 440 Harcourt Avenue Telephone (831) 899-6737 Seaside, CA 93955 FAX (831) 899-6211 June 30, 2015 Andrew Barnsdale c/o Environmental Science and Associates 550 Kearny Street,

More information

JENNIFER L. HARDER jharder@pacific.edu Cal. Bar. No. 205819

JENNIFER L. HARDER jharder@pacific.edu Cal. Bar. No. 205819 QUALIFICATIONS SUMMARY JENNIFER L. HARDER Cal. Bar. No. 205819 Experienced attorney, author, speaker, and water law educator with nine years of experience practicing at leading California water law firm,

More information

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT

RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT CHAPTER 14 RESTRICTING GROUNDWATER WITHDRAWALS TO PROTECT WATER RESOURCES: ECONOMIC IMPACT ASSESSMENT Grace Johns and Lisa A. McDonald Economic analysis methods have been used in Florida to identify positive

More information

STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, 2015. Debbie Hill, Associate Planner dhill@brentwoodca.gov 9386-A1

STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, 2015. Debbie Hill, Associate Planner dhill@brentwoodca.gov 9386-A1 STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, 2015 PREPARED BY: AGENDA ITEM & FILE NUMBER: PROJECT DESCRIPTION: PROJECT SIZE & LOCATION: GENERAL PLAN: ZONING: OWNER/APPLICANT: Debbie

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

BARTKIEWICZ, KRONICK & SHANAHAN

BARTKIEWICZ, KRONICK & SHANAHAN BARTKIEWICZ, KRONICK & SHANAHAN PAUL M. BARTKIEWICZ A PROFESSIONAL CORPORATION STEPHEN A. KRONICK 1011 TWENTY-SECOND STREET RICHARD P. SHANAHAN SACRAMENTO, CALIFORNIA 95816-4907 ALAN B. LILLY TEL (916)

More information

Irvine Ranch Water District Drought Response What Works and Plans for 2015

Irvine Ranch Water District Drought Response What Works and Plans for 2015 Irvine Ranch Water District Drought Response What Works and Plans for 2015 2015 Drought Response Workshop February 25, 2015 Fiona Sanchez Director of Water Resources Presentation Agenda IRWD Background

More information

International Commission On Large Dams Environment August 2000. A Viewpoint from the International Commission on Large Dams

International Commission On Large Dams Environment August 2000. A Viewpoint from the International Commission on Large Dams Dams and the International Commission On Large Dams Environment August 2000 A Viewpoint from the International Commission on Large Dams Dams Help Manage Water A Critical Resource Water is a critical natural

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Village of Spring Valley Comprehensive Plan 2009-2029

Village of Spring Valley Comprehensive Plan 2009-2029 Chapter 8: Intergovernmental Cooperation Introduction Intergovernmental communication, coordination, and cooperation can make a significant difference in the implementation and administration of a comprehensive

More information

INTRODUCTION. State Law and Local Planning. The General Plan. Zoning. Subdivisions. Other Ordinances and Regulations. Annexation and Incorporation

INTRODUCTION. State Law and Local Planning. The General Plan. Zoning. Subdivisions. Other Ordinances and Regulations. Annexation and Incorporation INTRODUCTION This is a citizen's guide to land use planning as it is practiced in California. Its purpose is to explain, in general terms, how local communities regulate land use and to define some commonly

More information

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN

CITY OF BEVERLY HILLS URBAN WATER MANAGEMENT PLAN 2005 URBAN WATER MANAGEMENT PLAN Mayor Linda J. Briskman Vice Mayor Stephen P. Webb City Council Jimmy Delshad Frank M. Fenton Barry Brucker City Manager Roderick J. Wood Director of Public Works David

More information

June 19, 2013. Administrative and Finance Committee

June 19, 2013. Administrative and Finance Committee Attention: Administrative and Finance Committee Adopt the Water Authority s rates and charges for calendar year 2014, amend and restate the amounts and requirements of the System Capacity Charge and Water

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Threshold Determination: California Case Law

Threshold Determination: California Case Law Threshold Determination: California Case Law Center for Biological Diversity v. County of San Bernardino (Super. Ct. San Bernardino County, filed Apr. 11, 2007, No. CIV SS 0700293). The California AG filed

More information

Delaware River Basin Commission

Delaware River Basin Commission Delaware River Basin Commission Interstate Council on Water Policy Annual Conference Drought Management in the Delaware River Basin Amy Shallcross, PE Water Resources Management September 30, 2015 A river

More information

Attachment 6: Monitoring, Assessment, and Performance Measures

Attachment 6: Monitoring, Assessment, and Performance Measures Attachment 6: Monitoring, Assessment, and Performance Measures Contents Monitoring, Assessment and Performance Measures... 1 Monitoring, Assessment and Performance Measures Attachment 6 presents the anticipated

More information

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework

More information

SUPERIOR COURT OF CALIFORNIA COUNTY OF LOS ANGELES

SUPERIOR COURT OF CALIFORNIA COUNTY OF LOS ANGELES 2 3 4 5 6 7 8 9 SUPERIOR COURT OF CALIFORNIA COUNTY OF LOS ANGELES 10 11 12 13 14 15 16 ANTELOPE VALLEY GROUNDWATER CASES Included Consolidated Actions: Los Angeles County Waterworks District No. 40 v.

More information

Addressing Declining Elevations in Lake Mead

Addressing Declining Elevations in Lake Mead Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station

More information

Michigan State University Ingham County Health Department Tri- County Regional Planning Commission Land Use and Health Resource Team

Michigan State University Ingham County Health Department Tri- County Regional Planning Commission Land Use and Health Resource Team HEALTH IMPACT ASSESSMENT OF THE URBAN AND RURAL SERVICES MANAGEMENT POLICY Mid- Michigan Region Health In All Project Michigan State University Ingham County Health Department Tri- County Regional Planning

More information

Southern California Area Office Water Conservation Field Services Program Grants (based on original awarded amount)

Southern California Area Office Water Conservation Field Services Program Grants (based on original awarded amount) Southern California Area Office Water Conservation Field Services Program Grants (based on original awarded amount) Year Recipient Project Title Description Reclamation Contribution Water Savings 23 Metropolitan

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

Sustainability Brief: Water Quality and Watershed Integrity

Sustainability Brief: Water Quality and Watershed Integrity Sustainability Brief: and Watershed Integrity New Jersey depends on water resources for the health of our people, the strength of our economy, and the vitality of our ecosystems. The quality of our water

More information

San Diego s Water Supply Future

San Diego s Water Supply Future San Diego s Water Supply Future Securing water for future generations & a growing economy with conservation and supply independence BUILDING INDUSTRY ASSOCIATION OF SAN DIEGO COUNTY POSITION PAPER ON WATER

More information

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Extended Abstract # 15 Whitney R. Leeman, J. Matthew Gerken, and Jeffrey A. Henderson

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Water Resources Review Committee

Water Resources Review Committee Water Resources Review Committee Members of the Committee Representative Randy Fischer, Chair Senator Gail Schwartz, Vice-Chair Senator Greg Brophy Senator Mary Hodge Senator Matt Jones Senator Ellen Roberts

More information

Getting More Out of the Water We Have

Getting More Out of the Water We Have Water Recycling and Reuse California has the potential to recycle enough water to meet 30-50% of the household water needs of our projected population growth. California Recycled Water Task Force Getting

More information

2015 -- H 6042 S T A T E O F R H O D E I S L A N D

2015 -- H 6042 S T A T E O F R H O D E I S L A N D LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced

More information

9.1. Adequacy of Available Data and Monitoring Efforts

9.1. Adequacy of Available Data and Monitoring Efforts 9. DATA MANAGEMENT Data management is a crucial aspect of successful implementation of the ARB IRWMP and its component projects. This section discusses the adequacy of available data and monitoring efforts,

More information

Building Resilient Infrastructure for the 21 st Century

Building Resilient Infrastructure for the 21 st Century Building Resilient Infrastructure for the 21 st Century 1 Maria Mehranian Cordoba Corporation & Los Angeles Regional Water Quality Control Board October 19, 2014 24 th Annual Lake Arrowhead Symposium:

More information

DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, 2014. Values Statements.

DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, 2014. Values Statements. DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, 2014 Values Statements. The Board opposes any new transfers of water from the

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

3.13 Energy Conservation

3.13 Energy Conservation 3.13 Energy Conservation Overview of Impacts The analytical approach taken by this Subsequent EIR is described in Section 3.0 (Introduction to Environmental Analysis). The following section provides a

More information

Oregon. Climate Change Adaptation Framework

Oregon. Climate Change Adaptation Framework Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate

More information

Section 7: Data Management, Technical Analyses, and Plan Performance

Section 7: Data Management, Technical Analyses, and Plan Performance Section 7: Data Management, Technical Analyses, and Plan Performance This section is organized into two parts to summarize the data management, technical analyses, and performance of the Upper Santa Clara

More information

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.

More information

TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS

TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS Dirksen Senate Office Building, Room 628 White Mountain

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Planning Resource Guide. Climate Change Adaptation through Land Use Planning

Planning Resource Guide. Climate Change Adaptation through Land Use Planning Planning Resource Guide Climate Change Adaptation through Land Use Planning i The new Provincial Planning regulation continues to promote sound land use planning and express the provincial interest in

More information

1/12/2016 Board Meeting 8-3 Attachment 1, Page 1 of 94. Integrated Water Resources Plan. DRAFT 2015 Update

1/12/2016 Board Meeting 8-3 Attachment 1, Page 1 of 94. Integrated Water Resources Plan. DRAFT 2015 Update 1/12/2016 Board Meeting 8-3 Attachment 1, Page 1 of 94 Integrated Water Resources Plan DRAFT 2015 Update 1/12/2016 Board Meeting 8-3 Attachment 1, Page 2 of 94 Foreword The Metropolitan Water District

More information

BEAUMONT S PIONEERING CFD

BEAUMONT S PIONEERING CFD BEAUMONT S PIONEERING CFD Prepared for Beaumont City Council Prepared By Development Services Department Comprehensive Infrastructure Development What is Beaumont s CFD? The CFD is part of Beaumont s Comprehensive

More information

Foothill Municipal Water District Recycled Water Project

Foothill Municipal Water District Recycled Water Project Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,

More information

APPENDIX G WATER SUPPLY ASSESSMENT

APPENDIX G WATER SUPPLY ASSESSMENT APPENDIX G WATER SUPPLY ASSESSMENT THIS PAGE INTENTIONALLY LEFT BLANK February 2013 BLYTHE MESA SOLAR PROJECT Water Supply Assessment PREPARED BY: 731 East Ball Road, Suite 100 Anaheim, CA 92805 (714)

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Much Ado About Kelo: Eminent Domain and Farmland Protection

Much Ado About Kelo: Eminent Domain and Farmland Protection Much Ado About Kelo: Eminent Domain and Farmland Protection December 2005 In the case of Kelo v. the City of New London, the Supreme Court ruled that the Connecticut city could acquire land by eminent

More information

Drought Response Program: Draft Funding Criteria for Review and Comment

Drought Response Program: Draft Funding Criteria for Review and Comment Drought Response Program: Draft Funding Criteria for Review and Comment U.S. Department of the Interior Bureau of Reclamation WaterSMART Program February 2015 Summary In fiscal year (FY) 2015, the Bureau

More information

The North State: Implementing the California Water Action Plan February 24, 2014

The North State: Implementing the California Water Action Plan February 24, 2014 The North State: Implementing the California Water Action Plan February 24, 2014 The North State Water Alliance applauds Governor Brown s California Water Action Plan (Action Plan) and his call for comprehensive

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

~xccuti\lc :Bcpertmcnt

~xccuti\lc :Bcpertmcnt ~xccuti\lc :Bcpertmcnt ~tote of ~lifornia EXECUTIVE ORDER B-29-15 WHEREAS on January 17, 2014, I proclaimed a State of Emergency to exist throughout the State of California due to severe drought conditions;

More information

Water Quantity Trading & Banking: Concepts and Illustrations. Kurt Stephenson Dept. of Agricultural & Applied Economics October 15, 2015

Water Quantity Trading & Banking: Concepts and Illustrations. Kurt Stephenson Dept. of Agricultural & Applied Economics October 15, 2015 Water Quantity Trading & Banking: Concepts and Illustrations Kurt Stephenson Dept. of Agricultural & Applied Economics October 15, 2015 Groundwater Management Roles: Commonwealth and Users What GW goal

More information

Cross-Valley Contractors Interim Renewal Contracts

Cross-Valley Contractors Interim Renewal Contracts Draft Finding of No Significant Impact Cross-Valley Contractors Interim Renewal Contracts Prepared by: Ben Lawrence Natural Resources Specialist South-Central California Area Office Date: Concurred by:

More information

Water Services Act (119/2001)

Water Services Act (119/2001) NB: Unofficial translation Ministry of Agriculture and Forestry, Finland Water Services Act (119/2001) Chapter 1 General provisions Section 1 Objective (1) The objective of this Act is to ensure water

More information