Bus Rapid Transit: An Overview

Size: px
Start display at page:

Download "Bus Rapid Transit: An Overview"

Transcription

1 An Overview Bus Rapid Transit: An Overview Herbert S. Levinson, Transportation Consultant Samuel Zimmerman and Jennifer Clinger, DMJM+Harris C. Scott Rutherford, University of Washington Abstract Bus Rapid Transit (BRT) is growing in popularity throughout the world. The reasons for this phenomenon include its passenger and developer attractiveness, its high performance and quality, and its ability to be built quickly, incrementally, and economically. BRT also provides sufficient transport capacity to meet demands in many corridors, even in the largest metropolitan regions. In the United States, the development of BRT projects has been spurred by the Federal Transit Administration s (FTA) BRT initiative. These projects have been undertaken, in part, because of the imbalance between the demand for New Starts funds and available resources. Decisions to make BRT investments should be the result of a planning process that stresses problem solving, addressing needs, and the objective examination of a full range of potential solutions, of which BRT is only one. Good planning practice means matching potential market characteristics with available rights-of-way. BRT involves an integrated system of facilities, services, amenities, operations, and Intelligent Transportation Systems (ITS) improvements that are designed to improve performance, attractiveness to passengers, image, and identity. Because they can be steered as well as guided, BRT vehicles can operate in a wide range of environments without forcing transfers or requiring expensive running way construction over the entire range of their operation. Through this flexibility, BRT can provide one-seat, high-quality transit performance over a geographic range beyond that of dedicated guideways. To the 1

2 Journal of Public Transportation, Vol. 5, No. 2, 2002 maximum extent practical, the system should transfer the service attributes of rail transit to BRT. Even where implementation of a comprehensive, integrated BRT system is not possible, many of its components can be adapted for use in conventional bus systems with attendant benefits in speed, reliability, and transit image/attractiveness. In summary, BRT is growing in popularity because it can be cost-effective and it works. This article describes BRT concepts and components, traces BRT s evolution, gives its current status, and outlines some of the findings to date of the Transportation Research Board s (TRB) Transit Cooperative Research Program (TCRP) A-23 project, Implementation Guidelines for Bus Rapid Transit. Introduction: What Is BRT? The FTA defines BRT as a rapid mode of transportation that can combine the quality of rail transit and the flexibility of buses (Thomas 2001). A more detailed definition, which was developed as part of the TCRP A-23 project, is: BRT is a flexible, rubber-tired rapid transit mode that combines stations, vehicles, services, running way, and ITS elements into an integrated system with a strong positive image and identity. BRT applications are designed to be appropriate to the market they serve and their physical surroundings and can be incrementally implemented in a variety of environments. In brief, BRT is a permanently integrated system of facilities, services, and amenities that collectively improve the speed, reliability, and identity of bus transit. In many respects, BRT is rubber-tired light rail transit (LRT), but with greater operating flexibility and potentially lower capital and operating costs. While BRT is often compared to LRT, other comparisons with rail modes may be more appropriate: Where BRT vehicles (buses) operate totally on exclusive or protected rights-of-way, the level of service provided can be similar to that of full Metrorail rapid transit. 2

3 An Overview Figure 1. Components of Bus Rapid Transit 3

4 Journal of Public Transportation, Vol. 5, No. 2, 2002 Where buses operate in combinations of exclusive rights-of-way, median reservations, bus lanes, and street running, the level of service provided is very similar to LRT. Where buses operate mainly on city streets in mixed traffic, the level of service provided is similar to a limited-stop tram/streetcar system. There are seven major components of BRT which relate to the key quality transit attributes of speed, reliability, and identity. Figure 1 describes these components in detail. Collectively, they form a complete rapid transit system that can improve customer convenience and reduce delays compared to local bus and street/trolley car systems (BRT Bus Rapid Transit 2001). Why BRT? There are many reasons for developing BRT systems, especially in a U.S. context. 1. Central business districts (CBDs) have continued to prosper and grow in ways that require more transport capacity and improved access, even though employment in U.S. CBDs is declining as a percentage of overall regional activity. Given the cost and environmental impacts associated with parking and road construction and the traditional urban form of most CBDs, improved and expanded public transport emerges as an important alternative for providing that capacity. In addition, many suburban-edge cities exceed the aggregate employment base of many bigcity CBDs but do not currently have the focus and density to make railbased rapid transit a cost-effective investment. 2. BRT systems can often be implemented quickly and incrementally. 3. For a given distance of dedicated running way, BRT is generally less costly to build than rail transit. Moreover, where BRT vehicles can reliably operate at high speeds on high-occupancy vehicle (HOV) lanes or general-purpose highways and streets over significant proportions of a given route, running way capital costs will be even lower compared to those for rail modes, which must be purpose-built over the entire distance covered. 4

5 An Overview 4. BRT can be the most cost-effective means of serving a broad variety of urban and suburban environments. BRT vehicles whether they are driver-steered or electronically guided can operate on streets, in freeway medians, on railroad rights-of-way, on aerial structures, and underground. BRT systems can also provide a broad array of express, limited-stop, and local all-stop services on a single facility without complex signal and guideway switching systems. 5. BRT can provide quality performance with sufficient transport capacity for most corridors in U.S. and Canadian cities. For example, the Ottawa transitway system s link to the CBD carries more people in the peak hour than most LRT segments in North America. The Brisbane South East Busway carries approximately the same number of maximum load point, peak-hour, peak-direction passengers about 10,000 per hour. Many BRT lines in South American cities carry peak-hour passenger flows that equal or exceed those on many U.S. and Canadian fully grade-separated rail rapid transit lines. For example, Bogota s TransMillenio system serves more than 25,000 peak-hour, peak-direction maximum load point riders. Figure Express Bus Rapid Transit Plan Chicago 5

6 Journal of Public Transportation, Vol. 5, No. 2, BRT is well suited to extend the reach of rail transit lines providing feeder services to/from areas where densities are too low to cost effectively extend the rail corridor. Examples of this application are the South Dade Busway in South Miami-Dade County and the Pie IX Busway in Montreal. 7. BRT can be integrated into urban environments in ways that foster economic development and transit- and pedestrian-friendly design. For example, in Boston, Ottawa, and Brisbane, BRT has been part of integrated transit and land-use strategies. Evolution of BRT The concept of bus rapid transit is not new. Plans and studies for various BRTtype alternatives have been prepared since the 1930s, although there has been a greater emphasis on BRT in recent years than ever before. Major Proposals BRT proposals were developed for Chicago in 1937, Washington D.C. in , St. Louis in 1959, and Milwaukee in A brief discussion of these plans follows Chicago Plan. The concept of bus rapid transit was first suggested in Chicago (Harrington, Kelker, and DeLeuw 1937). A 1937 plan (Figure 2) called for converting three west-side rail rapid transit lines to express bus operation on superhighways with on-street distribution in central areas and downtown Washington D.C. Plan. Design studies for BRT within freeway medians were developed as part of the Transportation Survey for the National Capital Region (Mass Transportation Survey 1959). It was recommended that in planning of future radial freeways a cross section... be provided to afford maximum flexibility and reserve capacity for vehicles as well as for the mass movement of people. Under this plan there would be a three- or four-lane roadway for traffic in each direction. These roadways would be separated by a 64-foot mall with 51 feet from center-to-center of the columns supporting cross-street bridges. In the first stage, this wide mall would be landscaped and held available for 6

7 An Overview Figure 3. Proposed Regional Bus Rapid Transit Plan St. Louis,

8 Journal of Public Transportation, Vol. 5, No. 2, 2002 future developments; public transportation would consist of express buses operating in the general traffic lanes. They would make stops at appropriate intervals on the parallel service roads without special station facilities or at simple stations within the end span of the crossstreet bridges. Express bus service eventually would be converted to BRT and rail within the median St. Louis Plan. The 1959 Transportation Plan included an 86-mile BRT system, of which 42 miles were to be on special grade-separated bus roadways (W. C. Gilman and Co. 1959). Figure 3 shows the arrangement of the proposed busways and BRT lines. The focus of this proposal was an elevated loop road encircling part of downtown St. Louis, measuring six blocks north and south and five blocks east and west. The loop contained a 60-foot-wide operating deck that included a sidewalk, or passenger-loading platform, located on the inner side of the deck to mesh with one-way clockwise operation of buses. It provided a three-lane bus roadway approximately 37 feet wide. The BRT system cost totaled $175 million (exclusive of freeways) Milwaukee Transitway Plan. Milwaukee s proposed 1990 Transitway Plan included 107 miles of express bus routes over the freeway system plus an 8-mile east west transitway (Barton-Aschman Associates 1971). The plan, shown in Figure 4, called for 39 stations (excluding downtown) and 33,000 parking spaces. During the 1990 design-hour, 600 buses would enter the Milwaukee CBD as compared with 135 in Costs for the BRT transit system were estimated at $151 million (1970) of which $40 million were for the transitway. The plan was integrated with existing and proposed freeways. Concept Studies Several planning research studies have described the parameters where BRT would work and how it might be configured. Transportation and Parking for Tomorrow s Cities. This 1966 study set forth broad planning guidelines (Wilbur Smith and Associates 1966). It indicated that bus rapid transit is especially suitable in cities where downtown most attracts its visitors from a wide, diffused area. It stated: BRT could involve lower capital costs, provide greater coverage, better serve low- and medium-density areas, and more readily adapt to 8

9 An Overview changing land-use and population patterns than rail systems. BRT also has applicability in larger cities of much higher density because of its operational flexibility, and that with proper downtown terminal design, bus rapid transit systems could provide adequate capacities to meet corridor demands in nearly all of the Nation s cities which did not have rail systems. To achieve high average speeds on downtown approaches, buses could operate within reserved lanes or exclusive freeway rights-of-way on key radial routes and travel outward to the intermediate freeway loop, with provision for subsequent expansion (Figure 5). Downtown, buses would operate preferably on private rights-of-way and penetrate the heart of the core area (either above or below ground) or, alternatively, they could enter terminals. Successful BRT, however, would require... careful coordination between highway and transit officials in all stages of major facility planning. In this regard, resolution of several major policy questions will go far toward early implementation of BRT systems. These questions include: 1. extent to which exclusive bus facilities will quality for federal aid under existing programs, 2. need for separate designs on approaches to the inner freeway loops and downtown, 3. minimization or elimination of costly ventilation systems to facilitate underground operation, 4. development of financing policies for downtown bus tunnels, and 5. development of bus trains or special bus designs to minimize downtown station requirements and expedite downtown loading. The report indicated that a small amount of special right-of-way in conjunction with the urban freeway system (where necessary to assure good peakhour speeds) could generally provide effective regional rapid transit. It was conservatively estimated that freeways, BRT, local transit, and arterials under existing capabilities of cars and buses could accommodate peak-hour 9

10 Journal of Public Transportation, Vol. 5, No. 2, 2002 Figure 4. Proposed 1990 Milwaukee Transitway Plan 10

11 An Overview downtown cordon volumes of up to 125,000 persons ample capacity for the vast majority of the nation s cores. Moreover, as bus technology improves and electronic bus train operation becomes a reality, substantially greater capacities would be achieved. Thus, ultimately, differences between rail and bus transit could become minimal. The Potential for Bus Rapid Transit. This 1970 study indicated that freeway systems are potentially usable by express buses and, with modification, for exclusive bus lanes or busways (Wilbur Smith and Associates 1970). Key factors in evaluating the potential benefits of BRT include: (1) capital costs, (2) operating costs, (3) route configuration, and (4) distribution in the city center and other major activity centers. NCHRP Reports 143 and 155 (1973, 1975) on Bus Use of Highways. These reports provided a comprehensive review of the state of the art and set forth planning and design guidelines (Levinson et al. 1973, 1975). Using the goal of minimizing total-person delay as a guide, these reports suggested ranges in peakhour bus volumes for bus priority facilities. The guidelines, shown in Table 1, were based on design year peak-hour bus volumes. Figure 6 shows the range in BRT service concepts set forth in Report 155 that are still relevant today. Bus Rapid Transit Options for Densely Developed Areas. This 1975 study (Wilbur Smith and Associates 1975) described and evaluated the cost, service, and environmental implications of bus lanes, bus streets, and busways. The report showed how various bus priority facilities would be coordinated in the central area (Figure 7) and suggested a multidoor articulated bus for BRT operations. Most of these concept studies focused on the facility aspects of BRT, often as an adjacent to urban freeways. Little attention was given to the service and amenity/identify aspects of BRT. Countervailing Trends In the late 1970s, the emphasis in transit planning shifted from bus use of highways and BRT to HOV lanes and LRT. HOV lanes were perceived as having widespread application as an environmentally positive way of expanding 11

12 Journal of Public Transportation, Vol. 5, No. 2, 2002 Figure 5. Configuration of hypothetical BRT systems These schematic systems show how a relatively small mileage of special bus rights-of way can provide areawide rapid transit by utilizing freeway systems as an integral part of their operation. Radial freeways could provide amply wide medians to permit extension of buslanes (or rights-of-way) as required by future growth. Off-street bus-ways penetrate the heart of downtown and (where feasible) high-density areas. In some cases, metering of freeway traffic might serve as an alternative to exclusive lanes. 12

13 An Overview Table 1 Suggested Ranges in Peak-Hour (One-Way) Bus Volumes for Bus Priority Facilities Type of Treatment No. of Design-Year Buses a Freeway-related: Busway b Contra-flow bus lane c Bus bypass lane at metered ramp Arterial-related: d Bus streets e CBD curb lanes, main street e Curb lanes Median bus lanes Contra-flow bus lanes, extended Contra-flow bus lanes, short segments a. Existing conditions should meet 75 percent of these volumes. b. Busway installation should generally be contingent on a CBD employment of at least 50,000, 20 million square feet of floor space downtown, and a metropolitan population of at least 750,000. c. Contra-flow bus lanes are contingent on directional imbalances in traffic volumes. d. Where arterial bus volumes are less than 60 per hour, taxis may use bus lanes. e. Environmental considerations may influence bus lane and bus street installation. road capacity while reducing single-occupant vehicle (SOV) use. LRT lines were increasingly popular, in part, because they were perceived to have performance, quality, image, and service attractiveness that were unattainable by bus transit. While a few communities built busways and operated successful BRT lines over them (e.g., Ottawa and Pittsburgh), LRT was the favored mode, often to the exclusion of serious, objective consideration of BRT or other types of significant bus improvements in federally required planning processes. 13

14 Journal of Public Transportation, Vol. 5, No. 2, 2002 Source: NCHRP 155. Figure 6. BRT operating concepts 14

15 An Overview Figure 7. Illustrative coordination of bus priority facilities Recent Initiatives The federal BRT initiative is a major attempt to redress this balance. Initially using Curitiba s successful BRT system as a model, the FTA sponsored a BRT conference in 1998, published major documents highlighting BRT (Federal Transit Administration 1987, 1990), established a BRT Consortium (1999) with 17 supporting cities, and launched a BRT demonstration program. 15

16 Journal of Public Transportation, Vol. 5, No. 2, 2002 Concurrently, TCRP A-23 project Implementation Guidelines for Bus Rapid Transit was launched by the TCRP. Current Status of BRT Implementation BRT systems now operate in major cities throughout North America, Europe, Latin America, Australia, and New Zealand. United States and Canada About 20 BRT systems are in service, under construction, or in planning in the United States and Canada (Figure 8). These systems vary widely in extent, components, design and operating features, usage, costs, and benefits. Ottawa and Pittsburgh have the most extensive and heavily utilized busway systems that provide service through the city center. Both operate express and all-stop services, and both have experienced development along the busways. The following sections provide a summary of the most advanced BRT projects in the United States and Canada. Ottawa. The Ottawa transitway system was implemented in phases since It includes 15.5 miles of exclusive busway, 7.5 miles of lanes on roadway, and 2 miles of downtown bus-only lanes. Twenty-two stations are located along the transitway; and park-and-ride lots at the ends of the facility contain approximately 2,200 spaces. A variety of transit services are operated on the Ottawa transitway. An allstops, local bus route operates exclusively on the transitway, much like a rail system. Other routes start in neighborhood areas and then access the facility for an express run for a major portion of their trip. Approximately 50 routes provide residents with peak-period, transfer-free express service; off-peak many of these routes operate as feeders to all-stop local routes. The transitway carries approximately 200,000 riders daily, about 10,000 one-way in the A.M. peak hour at the maximum load point. Pittsburgh. This City has three busways in operation. The South Busway, opened in 1977, is approximately 4 miles in length and includes nine stations. Buses share a right-of-way through the Mount Washington Tunnel in the Palm Garden Station area with light-rail vehicles. The 6.8-mile Martin Luther King East Busway, opened in 1983, is located on an existing right-of-way and 16

17 An Overview Eugene Figure 8. U.S. and Canadian BRT systems includes six stations. The 5-mile West Busway, opened in September 2000, is also located on a former railroad right-of-way and has six stations. Approximately 2,800 additional parking spaces are provided in park-and-ride lots, including four near the busway. The East and West Busways operate both express and all-stop local services. Weekday ridership averages 28,600 on the East Busway, about 15,000 on the South Busway, and 8,000 trips on the West Busway (expected to rise substantially when 2,000 parking spaces, currently under construction, open). Miami. Miami has a busway (South Dade) along an abandoned rail line that connects with the Metro rail line and carries about 14,000 weekday riders. Both express and local services are provided along the busway. Montreal. This City has a feeder BRT line (via a reversible arterial bus lane) that connects to the Pie IX Metro rapid transit station. Houston. An extensive system of commuter express service operates via bus/hov lanes with special dedicated T access ramps connecting to park-andride lots. Downtown distribution is via curb-bus lanes. Los Angeles. This City operates the MetroRapid Bus service on Wilshire Whittier and Ventura Boulevards. Both routes are easily identifiable 17

18 Journal of Public Transportation, Vol. 5, No. 2, 2002 with red-colored low-flow, low-pollution buses running limited-stop service from farside stations (local route use nearside stops) (Figure 9). MetroRapid buses serve as extensions of the Red Line subway both to the San Fernando Valley (via Ventura Boulevard from the Universal City Metrorail Station) and west on Wilshire Boulevard from the Vermont station. Buses can extend or advance the green time at selected traffic signals. Operating speeds have increased about 29 percent in the Wilshire Whittier corridor and ridership has increased by 33 percent. In the Ventura Boulevard corridor, operating speeds increased by 23 percent and ridership grew by roughly 26 percent. One-third to one-half of the increased ridership comes from riders new to transit (Metropolitan Transportation Authority 2000). Two-thirds of the travel time savings result from the wider stop spacing. Vancouver. The 98-B Line BRT between downtown Vancouver and Richmond uses multidoor, low-floor articulated buses. The BRT lines operate with limited stops, feature attractively designed stations, and use a bus-only street in Richmond (Figure 10). Vancouver s 99-B line provides a similar crosstown service from east to west. Seattle. A bus-only subway runs through Seattle s CBD. Dual-mode articulated buses provide local and express service in outlying areas via freeways and HOV lanes. Some buses run on express service via I-5 to the north and then connect to a short busway running south. Boston. Boston s Silver Line South Piers Transitway, which is currently under construction, will include both curb bus lanes and a bus subway. Viewed as a fifth rapid transit line using special dual-mode (electric trolley and fullpower diesel) articulated multidoor vehicle, it will link the South Station (Red Line Subway, commuter rail, Amtrak, and intercity bus) and Financial District with the South Piers and Dudley Square on the MBTA s Orange Subway Line. BRT express service will also extend over the existing Ted Williams Tunnel to Logan International Airport (Figure 11). Overseas Experience A broad range of BRT systems and features are found in South America, Europe, and Australia. 18

19 An Overview. Figure 9. Bus stop, MetroRapid, Los Angeles Figure 10. Vancouver s BRT lines operate with limited stops, feature attractive stations, and use a bus-only street in Richmond. 19

20 Journal of Public Transportation, Vol. 5, No. 2, 2002 Figure 11. Boston s BRT express service will extend over the existing Ted Williams Tunnel to Logan National Airport. South America. Major BRT systems have been implemented in Belo Horizonte, Curitiba, and São Paulo, Brazil; Quito, Ecuador; and Bogotá, Colombia. These systems typically use physically separated median lanes along wide multilane arterial roadways. Stations are typically spaced 1,200 to 1,500 feet between major intersections, with provisions for overtaking on some systems via passing lanes at stations. Multidoor articulated (18 meter) and biarticulated (24.5 meter) diesel and trolley buses are used, depending on the system, and several systems offer off-vehicle fare collection. Peak-hour, peak-direction passenger flows range from 10,000 to 20,000 persons per hour (Gordon, Cornwell, and Cracknell 1991). Of these systems, the Curitiba operation is perhaps the best known. Curitiba s BRT system is an integral part of the City s development strategy, and it is carefully integrated with adjacent development. Biarticulated buses operate in a median busway that is flanked by local service streets. In addition, express buses run on two parallel high-capacity one-way streets. 20

21 An Overview The BRT stations in Curitiba are located in plastic tubes with high-level platforms that match the floor height of the BRT buses. The stations also feature off-vehicle fare collection at the ends of the tubes to expedite passenger flows and reduce dwell times. However, station and vehicle design limit bus operations to the median busways. The twelve key attributes of the Curitiba system include: 1. simple route structure, 2. frequent service at all times of day, 3. headway-based as opposed to time-point schedules, 4. less frequent stops, 5. level boarding and alighting, 6. color-coded buses and stations, 7. exclusive lanes, 8. higher-capacity buses, 9. multiple-door boarding and alighting, 10. off-vehicle fare payment, 11. feeder bus network, and 12. coordinated land-use planning. Curitiba s busways carry about 188,000 daily passengers in the north-south corridor, 80,000 in the Boqueirao corridor, 52,000 in the east corridor, and 19,000 in the west corridor. The highest, peak-hour, peak-direction ridership is approximately 11,000 in the north-south corridor. Europe. European BRT systems have several innovative features. Essen, Germany, and Leeds, England, have mechanically guided busways. Rouen, France, has an optically guided busway that uses the Irisbus Civis dual-mode diesel-electric bus (Figure 12). In Runcorn, England, the entire town is built around a largely grade-separated busway system. Australia. Brisbane s South East Busway s attractive stations have received architectural awards for their innovative design (Figure 13). Only two years after the first segment opened, the (US) $200 million 10.5-mile busway carries more 21

22 Journal of Public Transportation, Vol. 5, No. 2, Figure 12. Rouen s optically-guided busway uses the Irisbus Civis dual-mode diesel-electric bus. than 60,000 riders per day and has induced three major joint development projects (one already completed) as well as an increase in residential land values near stations 20 percent higher than similar areas not within walking distance of stations. Adelaide operates a mechanically guided busway that enabled an elevated transit structure to be built with minimum width and cost. The 7.4-mile guided Adelaide busway, opened in stages between 1986 and 1989, has three major stations, carries 20,000 daily riders, and planning is underway for its expansion. During peak periods, buses operate through suburban neighborhoods and then access the busway for a high-speed, express run to the urban core. During off-peak periods, some routes only provide feeder service to an on-line, all-stops local route. Lessons Learned Comparison of the examples described above demonstrates a number of similar attributes. Several lessons can be drawn from the case studies, many of which were conducted as part of the TCRP A-23 project on Planning and Implementation Guidelines for Bus Rapid Transit. The major lessons learned can be organized into the following categories:

23 An Overview planning and project development process, system concepts and packaging, running ways, stations, vehicles, system identity and image, service plan, ITS applications, and fare collection Many of the lessons learned apply to planning and implementation for any rapid transit mode even though they were derived from the synthesis of BRT experience. Planning and Project Development Process Early and continued community support for an open planning process that objectively considers BRT is essential, particularly from elected leaders. It is important that decision-makers and the general community understand the nature of BRT and its potential benefits during the planning process and not assume that BRT is just additional bus service. BRT s potential performance, customer and developer attractiveness, operating flexibility, capacities, and costs should be clearly identified in alternatives analyses that objectively consider other alternatives as well. The key rapid transit planning issue in many urban environments is how best to match market needs with available rights-of-way, not necessarily what mode to use. Accordingly, BRT system development should be the outgrowth of a planning and project development process that stresses problem solving and addresses demonstrated needs, rather than advocating a particular solution. Successful BRT implementation usually requires participation of more than just transit operator/implementers. All prospective actors, especially highway implementer/operators should be a formal part of the planning process. For example, participants may include representatives of private sector transit operators as well as the police departments that may ultimately be responsible for 23

24 Journal of Public Transportation, Vol. 5, No. 2, 2002 Figure 13. BRT stations Brisbane: South East Busway enforcing exclusive transit running ways, as well as the safety and security of transit workers and customers. BRT and land-use planning for station areas should be integrated as early as possible. Ottawa, Pittsburgh, Brisbane, and Curitiba have demonstrated that BRT can have land-use benefits similar to those produced by rail rapid. Realizing these benefits requires close coordination of land-use and transport planning from the beginning. In many cases, it may be useful to identify a BRT segment for immediate, early implementation. This will demonstrate BRT s potential benefits as soon as possible at an affordable cost while enabling system expansion and upgrading (e.g., to more technologically advanced, dedicated BRT vehicles) at some future time. System Concepts and Packaging A successful BRT project that achieves its full potential calls for more than building or reserving a bus-only lane or even building a dedicated busway. The integration of the entire range of rapid transit elements, including stations, and development of a unique system image and identify are equally, if not more, important. 24

25 An Overview BRT systems, like any rapid transit system, should be designed to be as costeffective as possible. However, transportation planners should not cut corners by eliminating key system elements and their integration merely because it would still be possible to attain minimal functionality of the bus system. This will greatly reduce potential benefits that can be achieved by a fully integrated BRT system. It is essential that BRT systems include all the elements of any high-quality, high-performance rapid transit system. These elements should be adapted to BRT s unique characteristics, especially its service and implementation flexibility. There is a need to focus on service, station, and vehicle features and amenities and integrated system and image benefits, rather than merely costs. Bus rapid transit should be rapid. This best can be achieved by operating on exclusive traffic-free rights-of-way wherever possible, maintaining wide spacings between stations, and by minimizing dwell times at stops. Running Ways Though it is possible for buses to operate successfully in mixed traffic and even desirable for them to operate in bus or in HOV facilities in some markets, the ideal BRT system will operate over exclusive bus facilities for enhanced speed, reliability, and safety, and often overlooked, identity. Railroad and freeway rights-of-way offer opportunities for relatively easy acquisition and low development costs. However, the availability of right-of-way should be balanced with its proximity and access to key transit markets. Where a BRT commuter express service operates on an HOV facility, it is imperative that it have its own access/egress ramps to reach off-line transit stations and/or do collection/distribution in other ways. Requiring BRT vehicles to weave across multiple lanes of general traffic to access median HOV lanes should be avoided. In identifying and designing BRT running ways, it is important to consider identity and image as well as speed and reliability. The positive aspects of curb bus lanes are good pedestrian access and more manageable integration with turns at intersections. The negative aspects are delays from right-turning vehicles and competing use of curb space by delivery and service vehicles. 25

26 Journal of Public Transportation, Vol. 5, No. 2, 2002 The positive aspects of median BRT facilities on arterial streets are identity, avoidance of interference with access to adjacent land uses, and minimum side impedance. Wide streets are needed to accommodate BRT service along with general vehicular traffic. The negative aspects are interference with left turns and potential pedestrian access problems, which sometimes may be alleviated by special traffic signal phasing sequences. Stations Stations are perhaps the most critical element in achieving system identity and image. Safe pedestrian and auto access to BRT stations is critical to achieving ridership objectives. Context-sensitive design and community involvement will both ease BRT implementation and induce transit-oriented land-use development. Off-vehicle fare collection and suitable passenger amenities are desirable at major boarding points. Vehicles Vehicles are an important element of conveying system identity and image. There is general recognition of the need for greater focus on vehicle quality and identity for BRT systems, especially in the United States. Several manufacturers, such as Irisbus, Bombardier, and Neoplan, are starting to recognize this need by producing special BRT vehicles. BRT vehicles should be configured to specific BRT applications as to number and width of doors, internal layout, etc. In the case of BRT systems, one size definitely does not fit all. Focus should be placed on customers, both on- and off-board, by designing for ease of passenger entry/egress, on-board comfort, and cleaner air and noise emissions. It is desirable to operate BRT systems with fleets of specially dedicated BRT vehicles. System Identity and Image System identity and image are important. As a minimum, they provide the customer with information on where to access the system and routing. Identity and image alone can increase ridership in a competitive, consumeroriented society. 26

27 An Overview Identity and image should be emphasized and be consistent in the design of all BRT system physical elements, including stations, vehicles, and running ways. Special graphics, livery, and construction materials can combine not only to convey useful information (e.g., where to catch a BRT service), but also to provide constant advertising exposure. Service Plan BRT service can extend beyond the limits of dedicated guideways where reliable, high-speed operations can be sustained. Outlying sections of BRT lines, and in some cases CBD distribution, can use existing roads and streets. These running ways should be modified to improve BRT efficiency, effectiveness, and identity through the use of graphics, signage, pavement markings, and appropriate traffic controls. A key feature of BRT systems is their ability to provide point-to-point oneseat rides because of the relatively small size of their basic service unit compared to train-based modes. This, however, must be balanced against the need for easyto-understand, high-frequency service patterns at all times of day. In most North American urban corridor applications, the BRT service pattern that appears to work best features all-stop LRT type service at all times of day, complemented by an overlaid integrated local/express services for specific markets during peak periods, such as express service between major park-andride stations and the CBD. During off-peak periods, integrated local/express routes are turned back at BRT stations, converting the local portion of the routes into more cost-effective feeders. Where transfers are necessary, they should take place in station facilities that are attractive, offer amenities, and are designed to minimize walking distances and level changes. ITS Applications ITS elements are critical to the success of BRT and can, at relatively modest cost, replace some of the functions provided by the physical infrastructure for other types of rapid transit. ITS elements can be used to convey passenger information in a variety of venues, monitor/control bus operations, provide priority at signalized intersections, enhance safety and security on board vehicles and at stations, and provide guidance for BRT vehicles. 27

28 Journal of Public Transportation, Vol. 5, No. 2, 2002 In places where ITS elements have been applied most successfully to BRT, they have been applied as part of an integrated regional transportation system, as in Los Angeles. Fare Collection Off-board fare collection is desirable because it is more convenient for customers. It permits multiple-door boarding, thereby reducing station dwell times, passenger travel times, and bus operating costs. Some on-board fare collection mechanisms can support multiple-door boarding, but they must be carefully selected. ITS or smart card technology applied at multiple doors may be the key to allowing simultaneous on-board fare payment and multiple-door boarding without increasing revenue shrinkage. Significance and Extension BRT does work! Recent developments around the world have shown that BRT systems can provide high-quality, high-performance, attractive rapid transit in a variety of settings. A growing number of cost-effective systems demonstrate the potential to produce significant service, ridership, and development benefits at relatively modest initial implementation and operating costs. Looking ahead, there will be a growing number of fully integrated BRT applications, and even more use of selected elements. The recent introduction of attractive, flexible, rubber-tired, dual-mode purpose-built BRT vehicles into revenue service is likely to have a profound effect on accelerating the acceptance of BRT as a true rapid transit mode in a number of ways. First, these vehicles overcome the image and identity problems BRT has had because of its link to conventional local bus services, especially in North America. Second, with true dual-mode (steered like a bus or guided like a train) capabilities, they can deliver the real, substantive benefits of both buses and rail transit, especially when running way and service plan improvements are also made. The resulting flexibility makes BRT a candidate for consideration in many rapid transit applications. The flexibility is especially important in North America with its wide diversity of urban land development patterns and modest capacity requirements. At the same time, all communities may not have sufficient ridership markets or have financial or physical limitations that prevent implementation of a 28

29 An Overview fully integrated BRT system. In those cases, many of the lessons learned concerning the individual components can be adopted by existing bus systems to improve their overall attractiveness and cost effectiveness. References BRT Bus Rapid Transit Why more communities are choosing Bus Rapid Transit Washington, DC: Transportation Research Board, National Research Council. Federal Transit Administration Issues in Bus Rapid Transit. Federal Transit Administration Bus Rapid Transit demonstration program. Gordon, G., P. K. Cornwell, and J. A. Cracknell The performance of busway transit in developing countries, Crowthorne, UK: Transport and Road Research Laboratory. Harrington, P., R. F. Kelker, and C. E. DeLeuw A comprehensive local transportation plan for the City of Chicago. Levinson, H. S., et al. 1973, NCHRP Reports 143 and 155. Bus Use of Highways. Washington, DC: Highway Research Board, National Research Council. Mass transportation survey National capital region, civil engineering report DeLeuw Cather & Co. (January). Metropolitan Transportation Authority Final report. Los Angeles Metro Rapid Demonstration Program. Milwaukee area transit plan: A mass transit technical study Barton- Aschman Associates (June). Thomas, E Presentation at Institute of Transportation Engineers meeting, Chicago (August). W. C. Gilman and Co St. Louis metropolitan area transportation study. Prepared for the City of St. Louis and St. Louis County (August). Wilbur Smith and Associates Transportation and parking for tomorrow s cities. Wilbur Smith and Associates The potential for Bus Rapid Transit. Wilbur Smith and Associates Bus Rapid Transit options for densely developed areas. 29

30 Journal of Public Transportation, Vol. 5, No. 2, 2002 About the Authors HERBERT S. LEVINSON is a transportation consultant who has worked for public agencies in the United States and abroad. He has written extensively on public transport, covering topics such as bus rapid transit, bus use of highways, transit operations, and transit capacity. Mr. Levinson is the coprincipal investigator for the TRB TCRP A-23 project on Planning and Implementation Guidelines for Bus Rapid Transit Systems. He is a member of the National Academy of Engineering and an Urban Transportation Research Center mentor at City College, New York. He has a BS degree in civil engineering from Illinois Institute of Technology, and a certificate in highway traffic from Yale University. SAMUEL ZIMMERMAN (sam.zimmerman@dmjmharris.com) is the principal for transportation planning for DMJM+Harris. Mr. Zimmerman is the coprincipal investigator for the TRB TCRP A-23 project. He is also the former director of planning for the Federal Transit Administration and has a career spanning 34 years in which his major interests have included travel demand forecasting, transit economics, and systems analysis. He has BCE and MCE degrees from Cornell University. G. SCOTT RUTHERFORD (scottrut@u.washington.edu) is director of the transportation program and chairman of the civil engineering department at the University of Washington, where he has taught for more than 21 years. He received a Ph.D. in transportation from Northwestern University and has been a transportation planning consultant on numerous major transit projects. His specialties are travel demand forecasting, transit and traffic operations, and major transportation investment planning. Dr. Rutherford is a member of the TCRP A- 23 project team. JENNIFER CLINGER (jennifer.clinger@dmjmharris.com) is a senior transportation planner with DMJM+Harris, where she consults in the areas of transportation planning, economics, and finance. She is a member of the TCRP A-23 project team. Ms. Clinger holds a master s degree in regional planning from the University of North Carolina and a bachelor s degree in city planning from the University of Virginia. 30

IMPLICATIONS AND LESSONS LEARNED

IMPLICATIONS AND LESSONS LEARNED 26 CHAPTER 3 IMPLICATIONS AND LESSONS LEARNED The last several decades have seen a transition from bus lanes and prioritization treatments to full-featured BRT. Thirty years ago the emphasis was on curb

More information

JOURNAL OF. Characteristics of Bus Rapid Transit Projects: Bus Rapid Transit: A Viable Alternative? Applicability of BRT to Corridors

JOURNAL OF. Characteristics of Bus Rapid Transit Projects: Bus Rapid Transit: A Viable Alternative? Applicability of BRT to Corridors Volume 5, No. 2 2002 JOURNAL OF Herbert S. Levinson Samuel Zimmerman Jennifer Clinger Scott C. Rutherford James T. Jarzab James Lightbody Eugene Maeda Steven E. Polzin Michael R. Baltes Vukan R. Vuchic

More information

Rapid Transit Backgrounder

Rapid Transit Backgrounder Rapid Transit Backgrounder Moving Forward On Rapid Transit The concept of a Rapid Transit System for Winnipeg has been debated for over 30 years. City Council and the Province of Manitoba have demonstrated

More information

Transitways and the RouteAhead for Calgary Transit

Transitways and the RouteAhead for Calgary Transit Transitways and the RouteAhead for Calgary Transit Chris Jordan, P.Eng., M.Sc., Manager, Strategic Planning, Calgary Transit, Transportation, City of Calgary Jen Malzer, P.Eng., M.Sc., Senior Transit Planner,

More information

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida National Bus Rapid Transit Institute (NBRTI) At the University of South Florida History of the NBRTI In January 2001, the National BRT Institute was created at USF s Center for Urban Transportation Research

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4 4-34 SEE FIGURE 4-22 N 14TH ST ROOSEVELT WAY N 130th Street N 130TH ST NE NORTHGATE WAY N 0 1/4 Miles Elevated Light Rail At-Grade Light Rail Elevated Light Rail Station At-Grade Light Rail Station Figure

More information

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

Median Bus Lane Design in Vancouver, BC: The #98 B-Line Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway

More information

Transportation Alternatives

Transportation Alternatives 1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the

More information

Research Results Digest 352

Research Results Digest 352 April 2011 NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM Responsible Senior Program Officer: Gwen Chisholm-Smith Research Results Digest 352 COST/BENEFIT ANALYSIS OF CONVERTING A LANE FOR BUS RAPID TRANSIT

More information

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Bus Priority Measures in Calgary: Past, Present and Future Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Nora Kajdy, P.Eng., Transit Priority Engineer, Calgary Transit

More information

GTA Cordon Count Program

GTA Cordon Count Program Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

a GAO-01-984 GAO MASS TRANSIT Bus Rapid Transit Shows Promise Report to Congressional Requesters United States General Accounting Office

a GAO-01-984 GAO MASS TRANSIT Bus Rapid Transit Shows Promise Report to Congressional Requesters United States General Accounting Office GAO United States General Accounting Office Report to Congressional Requesters September 2001 MASS TRANSIT Bus Rapid Transit Shows Promise a GAO-01-984 Contents Letter 1 Results in Brief 2 Background

More information

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: wellington@livingstreets.org.nz Phone: 021 1067139 Date: 30 September 2013 About

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

Growth of Addis Ababa

Growth of Addis Ababa Growth of Addis Ababa Founded in 1887, and has expanded rapidly Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would reach to eight million.

More information

Bus Rapid Transit Service Design

Bus Rapid Transit Service Design APTA STANDARDS DEVELOPMENT PROGRAM RECOMMENDED PRACTICE American Public Transportation Association 1666 K Street, NW, Washington, DC, 20006-1215 APTA BTS-BRT-RP-004-10 Approved October, 2010 APTA Bus Rapid

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations Part 2: Station Typology and Mode of Access Planning Tool Jamie Parks, AICP Kittelson & Associates, Inc. Acknowledgements

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Welcome to the LRT Overview Open House

Welcome to the LRT Overview Open House Welcome to the LRT Overview Open House Please sign-in so that we may provide you with updates on future events. TORONTO LRT OVERVIEW Importance of Transit to Cities Increase City s competitiveness (World

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1 1. Report No. FHWA/TX-13/0-6737-1 4. Title and Subtitle EXECUTIVE REPORT: TOLL ROADS, TOLL RATES, AND DRIVER BEHAVIOR 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

Light Rail Transit in Calgary The First 25 Years

Light Rail Transit in Calgary The First 25 Years Light Rail Transit in Calgary The First 25 Years By John Hubbell Director, Calgary Transit and Dave Colquhoun Manager, Transit Planning Calgary Transit Presented at the 2006 Joint International Light Rail

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP Today s s Discussion The Basics HOV Lanes Pricing Darren Henderson, AICP PB, Houston, TX Active Traffic Management The Latest Projects

More information

INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT

INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT MARK BRUSSEL CONTENTS Examples of integration from the Netherlands Rationale and principles of integration

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

PART 2 BUS TRANSIT CAPACITY CONTENTS

PART 2 BUS TRANSIT CAPACITY CONTENTS PART 2 BUS TRANSIT CAPACITY CONTENTS 1. BUS CAPACITY BASICS... 2-1 Overview... 2-1 Definitions... 2-1 Types of Bus Facilities and Service... 2-3 Factors Influencing Bus Capacity... 2-5 Vehicle Capacity...

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

7.0 Transportation Management

7.0 Transportation Management 7.0 Transportation Management I. Introduction The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As

More information

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

2012 King County Metro Transit Peer Agency Comparison on Performance Measures 2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro

More information

STOP CONSOLIDATION TRANSIT STRATEGIES

STOP CONSOLIDATION TRANSIT STRATEGIES TRANSIT STRATEGIES STOP CONSOLIDATION Transit stops are the places where people access transit service, and greatly impact many elements of passengers transit experiences. They are typically thought of

More information

BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES

BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES TABLE OF CONTENTS 1. Vision Statement...1 2. Modal Overview...1 3. Planning and Implementation Process...4 4. BRT Policies...4 4.1 BRT System Performance

More information

Mount Royal College Transit Service Plan

Mount Royal College Transit Service Plan Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back

More information

Metro Rail Gating Study

Metro Rail Gating Study Executive Management & Audit Committee Item # 27 Operations Committee Item # 43 FINAL DRAFT Metro Rail Gating Study Los Angeles, California November 15, 2007 Filename/RPS Number 1 Briefing Contents Executive

More information

Overview of the Travel Demand Forecasting Methodology

Overview of the Travel Demand Forecasting Methodology Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW

More information

Best Practice For Selecting Bus Stop Locations

Best Practice For Selecting Bus Stop Locations Best Practice For Selecting Bus Stop Locations There is no perfect school bus stop, because it is impossible to eliminate all potential hazards, but guidelines and training are still necessary to ensure

More information

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

2012 Saskatoon Transit Services Annual Report

2012 Saskatoon Transit Services Annual Report 2012 Annual Report Saskatoon Transit provides a high quality of service for all citizens in our community, and is undertaking initiatives focused on building its ridership. Like most North American cities,

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Abstract. As California cities move into the second decade of the 21st

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Cost Reduction Opportunities

Cost Reduction Opportunities Cost Reduction Opportunities 9 December 2015 Presentation to MassDOT Board of Directors & MBTA Fiscal and Management Control Board Arup 2 A global, integrated, multidisciplinary firm of professionals 13,000

More information

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a Transit [take transit: We live in the City, people. We can t expect to have parking. ] The ability of people to travel by transit is not only an equity issue, it is a matter of economic vitality for the

More information

SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO. The Parking Industry Labor Management Committee (PILMC)

SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO. The Parking Industry Labor Management Committee (PILMC) SUMMARY OF GROWTH & DEVELOPMENT TRENDS For THE CENTRAL AREA OF CHICAGO Prepared for The Parking Industry Labor Management Committee (PILMC) August 7, 2003 Prepared by Metro Transportation Group, Inc. 70

More information

Tripp Umbach developed a detailed survey with input from the PDP and distributed the survey to six Downtown Pittsburgh market segments:

Tripp Umbach developed a detailed survey with input from the PDP and distributed the survey to six Downtown Pittsburgh market segments: I. INTRODUCTION In June 2005, the Pittsburgh Downtown Partnership (PDP) retained the consulting firm, Tripp Umbach & Associates (TUA), to complete a comprehensive study of Downtown Pittsburgh transit and

More information

GOALS, OBJECTIVES, AND EVALUATION MEASURES

GOALS, OBJECTIVES, AND EVALUATION MEASURES GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities

More information

Development of Bus Rapid Transit Information Clearinghouse

Development of Bus Rapid Transit Information Clearinghouse CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Development of Bus Rapid Transit Information Clearinghouse Mark A. Miller, Graham Carey, Ian McNamara, Sam

More information

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

6 REGIONAL COMMUTE PATTERNS

6 REGIONAL COMMUTE PATTERNS 6 REGIONAL COMMUTE PATTERNS INTRODUCTION One of the challenges for this study, which has a primary goal of looking at commute opportunities in MnDOT District 3, is that in some portions of the study area,

More information

Best Practices in Transit Service Planning

Best Practices in Transit Service Planning Project #BD549 38 FINAL REPORT Prepared for the Florida Department of Transportation Research Center Prepared by the Center for Urban Transportation Research University of South Florida March 2009 Disclaimer

More information

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat Sustainable urban mobility: visions beyond Europe 2 nd October 2013 Brest Udo Mbeche, UN-Habitat The Global Report for Human Settlements Published every two years under a UN General Assembly mandate. Aims

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index

More information

Journal of Environmental Protection and Ecology 13, No 2, 611 619 (2012)

Journal of Environmental Protection and Ecology 13, No 2, 611 619 (2012) Journal of Environmental Protection and Ecology 13, No 2, 611 619 (2012) Environmental protection and sustainable development Bus Rapid Transit as a Contribution to Sustainable Transportation. The Case

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

A Bicycle Accident Study Using GIS Mapping and Analysis

A Bicycle Accident Study Using GIS Mapping and Analysis A Bicycle Accident Study Using GIS Mapping and Analysis Petra Staats, Graduate Assistant, Transportation Policy Institute, Rutgers University, New Brunswick, NJ, USA pstaats@eden.rutgers.edu Summary Surveys

More information

Miami-Dade Transit Service Standards

Miami-Dade Transit Service Standards Miami-Dade Transit Service Standards Presentation to RTC November 10, 2005 Roosevelt Bradley 1 MDT Service Standards Primer Background Standards: Old & New Best Practices: Comparison Denver RTD ChicagoCTA

More information

Proposed Service Design Guidelines

Proposed Service Design Guidelines Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project

More information

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)

More information

Managing the Transit Network A Primer on Key Concepts

Managing the Transit Network A Primer on Key Concepts Managing the Transit Network A Primer on Key Concepts translink.ca Introduction As the integrated, multi-modal transportation authority for Metro Vancouver, TransLink plans and delivers the transit network

More information

Guidelines for Attractive Public Transport with a Focus on BRT

Guidelines for Attractive Public Transport with a Focus on BRT Guidelines for Attractive Public Transport with a Focus on BRT Advanced BRT systems have provided many developing country cities public transport with rail-like capacities and speed. BRT Guidelines adapted

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

We would be pleased to discuss these issues with you at your convenience.

We would be pleased to discuss these issues with you at your convenience. Public Transport Users Association Inc. Ross House, 247 Flinders Lane Melbourne 3000 Reg. No. A-6256L Email: office@ptua.org.au Dear Councillor Queen Victoria Market Redevelopment Project The Public Transport

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

Examples of Transportation Plan Goals, Objectives and Performance Measures

Examples of Transportation Plan Goals, Objectives and Performance Measures Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.

More information

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP This chapter

More information

time and thought that the buses had a higher on-time arrival rate than the actual on-time arrival rate. 2

time and thought that the buses had a higher on-time arrival rate than the actual on-time arrival rate. 2 TriMet Transit Tracker Implementation Summary Transit Tracker is a real-time bus arrival prediction system that provides information to riders at bus stops and light rail stations with a count down in

More information

Chapter 9: Transportation

Chapter 9: Transportation Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation

More information

Metropolitan Setting l

Metropolitan Setting l Metropolitan Setting l GENERAL CHARACTERISTICS Los Angeles lies at the heart of one of the most complex metropolitan regions in the United States. As a major center of commerce, finance, and industry in

More information

APPENDIX J TRAFFIC STUDY

APPENDIX J TRAFFIC STUDY APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,

More information

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects MAKING TRACKS A Primer for Implementing Transit Fixed Guideway Projects Introduction Demand for new fixed guideway projects is strong nationwide. Each year hundreds of new fixed guideway projects across

More information

ROUTE 178 CORRIDOR STUDY. Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD

ROUTE 178 CORRIDOR STUDY. Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD ROUTE 178 CORRIDOR STUDY Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD Prepared By: Barton-Aschman Associates, Inc. December 1986 TABLE OF CONTENTS 1. INTRODUCTION 1 Study Background 1 Study Purpose

More information

Frequently Asked Questions (FAQs) about DART

Frequently Asked Questions (FAQs) about DART Frequently Asked Questions (FAQs) about DART What is DART? Where can I take the bus? Where can I take the train? How much does it cost to park at a station? Can I take a train to American Airlines Center?

More information

System Access Issue Paper (Draft)

System Access Issue Paper (Draft) Regional Transit Long-Range Plan Update System Access Issue Paper (Draft) 401 South Jackson Street Seattle, WA 98104-2826 October, 2014 Sys tem Acc ess Iss ue Pape r (Dra ft) Contents 1 Executive Summary

More information

BUS RAPID TRANSIT for Decision-Making

BUS RAPID TRANSIT for Decision-Making United States Department of Transportation Federal Transit Administration Office of Research, Demonstration and Innovation Characteristics of BUS RAPID TRANSIT for Decision-Making Project No. FTA-FL-26-7109.2009.1

More information

What is Smart Growth and the New Urbanism??? Smart Growth and Sustainable Cities:

What is Smart Growth and the New Urbanism??? Smart Growth and Sustainable Cities: Smart Growth and Sustainable Cities: 1) New Urbanism: Anti-car, Anti- Suburbia Planning for the US; 2) Sustainable Europe; 3) The New Asian City Dick G. Winchell, Ph.D., FAICP, Professor of Urban Planning,

More information

State of Good Repair Roundtable Chicago, Illinois. Asset Management Systems MBTA Approach and Lessons Learned

State of Good Repair Roundtable Chicago, Illinois. Asset Management Systems MBTA Approach and Lessons Learned State of Good Repair Roundtable Chicago, Illinois Asset Management Systems MBTA Approach and Lessons Learned Eric R. Waaramaa Deputy Director of Financial Planning July 23, 2010 MBTA Profile 5 th largest

More information

Framework for Bus Rapid Transit Development and Deployment Planning

Framework for Bus Rapid Transit Development and Deployment Planning CALIFORNIA PATH PROGRAM INSTITUTE OF TRANSPORTATION STUDIES UNIVERSITY OF CALIFORNIA, BERKELEY Framework for Bus Rapid Transit Development and Deployment Planning Mark A. Miller, Yafeng Yin, Tunde Balvanyos,

More information

DURING THE NEXT HOUR, about three hundred

DURING THE NEXT HOUR, about three hundred BRAZIL S BUSES: SIMPLY SUCCESSFUL BY AARON GOLUB DURING THE NEXT HOUR, about three hundred buses will come screaming down the avenue below my apartment here in the Copacabana district of Rio de Janeiro.

More information

01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20

01LG Corp. Overview. Korea Employee 125,000 Plants 40 R&D Center 70. Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20 01LG Corp. Overview Korea Employee 125,000 Plants 40 R&D Center 70 Overseas Employees 88,000 Local subsidiaries 200 - Plants : 50 -R&D: 20 01LG Corp. Business Area z 12 14 31 02LG CNS Overview LG N-Sys

More information