1 ROLES and RESPONSIBILITIES in the FORMULATION of the TECHNICAL COOPERATION PROGRAMME 1 Role/Function Page MEMBER STATES Counterpart (CP) 2 National Liaison Officer (NLO) 2 National Coordinator of a Regional/Cooperative Agreement (NCR) 2 Designated Team Member (DTM) 3 Chairperson of a Regional/Cooperative Agreement 3 TC DEPARTMENT Programme Management Officer (PMO) 3 TC Section Head (TC-SH) 4 TC regional Director 4 Director, Division of Planning and Coordination (DIR-TCPC) 5 Deputy Director General, Department of Technical Cooperation (DDG-TC) 5 TECHNICAL DEPARTMENTS Technical Officer (TO) 5 Field of Activity (FoA) Leader 5 Section Head of Technical Division (TD-SH) 6 Field of Activity (FoA) Focal Point 6 Technical Cooperation Liaison Officer (TCLO) 6 Director of Technical Division (TD-DIR) 7 Safety Reviewer 7 Radiation Safety Regulator 7 Procurement Reviewer 8 Safeguards Reviewer 8 COMMITTEES AND GOVERNING BODIES Technical Cooperation and Technical Departments (TC/TD) Group 8 TCP Committee 8 Technical Assistance and Cooperation Committee (TACC) / Board of Governors (BoG) 9 1 The present document covers mainly the project concept and design phases. Information on the subsequent phases of the TC cycle will be added in due time Page 1 of 9

2 MEMBER STATES Counterpart (CP) The national official in a Member State who is designated as responsible for the overall design, management and direction of a TC project in the country, and as such: 1. Actively participates in the CPF process and in the in-depth dialogue and strategic thinking among all stakeholders during the concept phase to identify concrete areas where a TC project can contribute effectively; 2. Prepares the project concept and submits it to the NLO; 3. Leads the project design team (CP, PMO, TO) when the project implementation strategy, budgets and work plans are defined and workable indicators for project monitoring, achievement of expected results and sustainability of outcomes are determined and potential partnerships are sought; 4. Provides complementary information on the local situation and ensures availability of local capacities and essential resources for implementing activities foreseen in the project, during project design; 5. Prepares the project document and submits it to the NLO. National Liaison Officer (NLO) The official in a Member State who is designated to coordinate the TC programme within his/her country and therefore is the focal person vis-à-vis the Secretariat, and as such: 1. Leads the CPF process and the in-depth dialogue and strategic thinking among stakeholders during the concept phase to identify concrete areas where a TC project can contribute effectively; 2. Ensures coordination among all national stakeholders during the preparation of the CPN 2 and submits it to the Secretariat via the PCMF IT platform; 3. Verifies with the responsible national nuclear and/or radiation safety regulatory authority that the project concepts submitted will be provided with the necessary safety infrastructure and support to ensure their safe implementation and operation; 4. Confirms availability of local capacities and essential resources for implementing activities foreseen in the project, during project design; 5. Interacts with CPs and the Secretariat during project design, reconfirms availability of local capacities and essential resources for implementation; 6. Submits the project documents to the Secretariat via the PCMF IT platform. National Coordinator of a Regional/Cooperative Agreement (NCR) The official in a Member State who is designated as national focal person for activities related to Regional/Cooperative Agreement projects, and as such: 1. Monitors the participation of national CPs in the preparation of Regional/Cooperative Agreement concepts/projects in accordance with the respective Agreement s specific formulation and design procedures. 2 The Country Programme Note (CPN) contains an overview of the proposed country programme, together with the proposed national and regional project concepts Page 2 of 9

3 Designated Team Member (DTM) Also known as Lead Country Coordinator or National Technical Project Coordinator. The DTM is the lead counterpart of a regional or interregional project and coordinates with the project counterparts in other Member States to facilitate the development of the project, and as such: 1. Leads the preparation of regional project concepts submitted by Member States; In the case of Regional/Cooperative Agreement concepts, which are based on the upstream work of the respective Regional/Cooperative Agreement, the DTM sends them to the Agreement Chair for submission to the Secretariat; 2. Interacts with the Secretariat, counterparts and the Chairperson of the Agreement, as applicable, during project design; 3. Prepares the project workplan and provides complementary information on the local situation in the participating countries, including confirmation from the latter of the availability of local capacities for implementing activities foreseen in the project, during project design; 4. Proposes potential partners for funding and/or joint implementation; 5. Submits the project document to the Secretariat. Chairperson of a Regional/Cooperative Agreement The Chairperson of a Regional/Cooperative Agreement is elected by the national coordinators/representatives of the Agreement Member States every year. S/he coordinates the TC programme within the Agreement and is the focal person, therefore, vis-à-vis the Secretariat, and as such: 1. Interacts with and ensures coordination among DTMs and national coordinators/representatives during preparation and prioritization of project concepts and during project design; 2. Submits the Regional/Cooperative Agreement project concepts to the Secretariat via the PCMF IT platform. 3. Participates in the design phase of the Regional/Cooperative Agreement projects and clear the Regional/Cooperative Agreement programme. TC DEPARTMENT Programme Management Officer (PMO) A professional staff member in one of the TC regional Divisions responsible for the management of the TC programme in one or more countries of that region, and as such: 1. Actively supports the CP during the concept phase to identify concrete areas where a TC project can contribute effectively; 2. Liaises with the TO to ensure the technical feasibility of proposed projects; 3. Leads the process of appraising the concepts against established quality criteria and reviews implementation arrangements, workflow and procurement issues; 4. Consolidates the feedback note; 5. Leads the project design team (CP, PMO, TO) when the project implementation strategy, budgets and work plans are defined and workable indicators for project monitoring, achievement of expected results and sustainability of outcomes are determined and potential partnerships are sought; Page 3 of 9

4 6. After consultation with TO(s), ensures that financial planning is in line with project content; PMO plays a similar role for regional/interregional projects. TC Section Head (TC-SH) The TC-SH is responsible for the TC programme in several countries of that region, and as such: 1. Provides inputs to the TC regional Director on identification of regional priorities, funding estimates and potential partners; 2. Assigns, in consultation with the TC regional Director, regional project concepts to a PMO in his/her Section; 3. Ensures compliance with policy and standards for timeliness, completeness, implementability, efficiency and effectiveness of the use of resources during programme preparation; 4. Reviews MS programmes to confirm quality of projects in his/her countries of responsibility as well as the overall quality of the country programme in accordance with the relevant policy guiding documents, and submits them to the TC regional Director. TC regional Director The TC regional Director is responsible for the TC programme in that region, and as such: 1. Provides guidance on regional priorities and funding estimates to SHs in his/her Division; 2. Assigns regional project concepts to the Sections in his/her region; 3. Prepares the Regional Programme Note (RPN) 3 that includes selected regional project concepts submitted by a group of countries through their CPNs and those under a Regional/Cooperative Agreement that are considered as priorities following a process of dialogues and consultation with concerned member States; 4. Discusses national and regional programmes of the Division with the TC senior management to obtain feedback before finalizing the draft programme for his/her region; 5. Oversees trend analysis of the region s draft programme for discussion with TD-DIRs on technical resource requirements; 6. Assesses opportunities for further programme development, including partnerships and resource mobilization, to ensure sustainability and maximize programme impact; 7. Reviews the overall quality of the regional programme consisting of national and regional projects in accordance with the relevant policy guiding documents, and approves the regional programme, including funding allocations. Director, Division of Planning and Coordination (DIR-TCPC) The Director of the Division of Planning and Coordination is responsible for overall coordination and support to the TC programme, and as such: 1. Provides guidance for programme planning and finalization: IT development and modification and methodological framework for ensuring programme and project quality; 2. Initiates/supports partnership development and resource mobilization; 3. Has the overall coordination responsibility for the interregional TC programme and as such: 3 The Regional Programme Note (RPN) contains an overview of the proposed regional programme, together with the regional project concepts positively appraised by the IAEA Page 4 of 9

5 Prepares the Interregional Programme Note 4 ; Confirms the quality of the INT Project Documents based on INT quality criteria and other relevant policy guiding documents; 4. Prepares documentation on the TC programme for the governing bodies. Deputy Director General, Department of Technical Cooperation (DDG-TC) The Deputy Director General of the Department of Technical Cooperation is responsible for the overall management and delivery of outputs comprising the TC programme, and as such: 1. Provides guidance to TC Directors on global strategic and policy issues related to the development and management of the programme; 2. After consultation with TC Directors, assigns PMOs to INT projects; 3. Reviews programmes of the Divisions prior to their finalization; 4. Determines TCF allocations by TC Divisions. TECHNICAL DEPARTMENTS Technical Officer (TO) A professional staff member in a technical Department who is responsible for the technical integrity and quality of their input to technical cooperation projects, and as such: 1. Reviews project concepts and makes recommendations as technical input to the feedback notes after consultation with FoA Leader; 2. As member of the project design team (CP, PMO, TO), actively contributes to the Secretariat support provided during project design when the project implementation strategy, budgets and work plans are defined and workable indicators for project monitoring, achievement of expected results and sustainability of outcomes are determined and potential partnerships are sought; 3. Ensures the technical soundness of the proposed activities and inputs in the work plan and their contribution to achieving outputs and outcomes; 4. Advises PMO on the adequacy of financial planning in relation to the technical requirements of the work plan; 5. Confirms agreement with the technical content of the project document, ensures that the technical performance indicators are realistic and appropriate, and determines within her/his area of expertise whether the project has the technical integrity to proceed; 6. Provides an estimate of the regular budget resources required for adequate technical support to the proposed concepts/projects, specifying HR implications. Field of Activity (FoA) Leader For each FoA there are one or several FoA Leaders from different technical Divisions/Departments, each one representing his/her respective technical area. S/he works in close cooperation with the other FoA Leaders of that respective FoA. The FoA Leaders are generally Section Heads or Group Leaders in the technical Divisions unless the TD-DIR assumes that responsibility. The FoA Leader: 1. Assigns TO(s) to do preliminary reviews of the concepts submitted for his/her FoA; 4 The Interregional Programme Note (IPN) contains an overview of the proposed interregional programme, together with the interregional project concepts Page 5 of 9

6 2. Based on the TOs preliminary reviews, identifies promising concepts and estimates the workload they may create for relevant TDs; 3. Coordinates technical input from TOs and interacts with other FoA Leaders during the project design phase; 4. Works to enhance communication between TC programme planning and regular programme planning, and identifies adjustments in both planning processes to improve alignment. Section Head of Technical Division (TD-SH) 5 The Section Head in a technical Division is responsible for the regular programme in his/her specific technical area, and as such: 1. Serves as FoA Leader/Focal Point or as supervisor of a FoA Leader/Focal Point as linked to respective sub-programme/programme themes; 2. Conveys to his/her Division Director the relevant workload implications derived from the review of all proposed project concepts; 3. To the extent practicable, assesses resource implications, division of work and linkages with the sub-programme/programme s regular budget and provides inputs to TD-DIR for consideration under the regular budget; 4. Proposes to TD-DIR strategies for matching the expected demands of the TC programme with available regular budget resources (e.g. regional/interregional projects instead of national projects). Field of Activity (FoA) Focal Point For each FoA, one of the FoA Leaders is assigned as FoA Focal Point who liaises with the TC Department, and as such: 1. Receives the concepts from the PMO and verifies the PMO s classification within his/her FoA; 2. Adds FoA Leaders and TOs to the project team, as required; 3. Is responsible for the overall coordination of technical inputs/comments in his/her specific FoA and gives guidance to the TOs; 4. Ensures that interdepartmental technical consultations and clearances are completed in a timely manner; 5. Conveys to the PMO the joint technical assessment of all FoA Leaders for the concepts in their FoA; 6. Coordinates technical input of FoA Leaders and interacts with PMOs during project design. Technical Cooperation Liaison Officer (TCLO) The TCLO is nominated by his/her Deputy Director General and acts as a focal point for TC programme-related matters within his/her Division/Office, and as such: 1. Promotes coordination between the TC Department and his/her Division/Office; 2. Represents his/her Division/Office at meetings and discussions related to TC programme activities of a general nature; 3. Provides guidance on TC programme-related matters to the Technical Officers in his/her Division/Office; 6 5 In some specific cases Group Leaders perform the functions of SH-TDs Page 6 of 9

7 4. Enhances the effectiveness of technical input to TC projects, e.g. ensuring timely delivery of TD support to TC projects; 5. Regularly collects information and informs the TC Department on current or planned regular budget activities that may impact on the TC programme; 6. Acts as focal point for ad hoc requests from the TC Department, including requests under projects for which no TO has been assigned; 7. Takes on other duties in relation to the TC programme as delegated by his/her respective Deputy Director General. Director of Technical Division (TD-DIR) 7 The Director of a technical Division is responsible for the programme in his/her specific technical area, and as such: 1. Provides to TC regional Directors information on new technological trends in the respective technical areas that may have implications on the TC programme; 2. Collates and analyses the resource implications of the proposed TC programme, based on the information provided by the TD-SHs/FoA Leaders, as an input to the preparation of the regular programme budget and for the identification of the resource requirements to support the TC programme; 3. Discusses with TC regional Directors programmatic issues and resource requirements for the technical support of the proposed TC programme, in order to define common strategies for matching the expected demands of the TCP with available regular budget resources; 4. Provides input to the DDG-TD for the consideration of the TC programme. NUCLEAR SAFETY AND SECURITY REVIEW Safety and Security Reviewer The Safety and Security Reviewer coordinates the safety and security review of project concepts and project documents, and as such: 1. Liaises, as appropriate, with the four subject focal points (NSNI, NSRW, NSNS and NS- IEC); 2. Collates the safety and security review for submission to the PMO; 3. Reviews the project documents as required. Radiation Safety Regulator The Radiation Safety Regulator has the overall responsibility for regulating radiation safety in the Agency and for supervising the compliance of Agency users of radiation practices and sources with the applicable requirements in force, and as such: 1. Reviews and clears activities under the TC programme where potential radiation exposure exists for IAEA staff and experts; 2. If advice or support is required, sends the requests for TC programme activities to the Radiological Protection Service and to NSRW. 6 Functions 1, 2 & 3 are not applicable to NA, NE and NS as these technical Departments are represented in the TC-TD Group with similar responsibilities. 7 In some cases where the programmatic structure does not coincide with the organizational structure (e.g. PACT), the Programme Manager will assume the functions of TD-DIR Page 7 of 9

8 REVIEW BY THE OFFICE OF PROCUREMENT SERVICES Procurement Reviewer 1. Reviews concepts and identifies those that are of high risk, are likely to involve a single procurement case with a value of over or multiple related procurement cases from the same supplier with an aggregate total value of over , and for which difficulties are foreseen in the shipment to the requesting country; 2. Participates in the project design phase through analysing procurement options and providing budget estimates of requested procurement items. SAFEGUARDS REVIEW Safeguards Reviewer 1. Performs review of the proposed TC programme with TC IT support; 2. Prepares a report for the DG on the proposed TC programme. COMMITTEES and GOVERNING BODIES Technical Cooperation and Technical Departments (TC/TD) Group The objective of the Technical Cooperation and Technical Departments Group (TC/TD Group) is to enhance joint ownership of the Agency s TC programme between the Department of Technical Cooperation (TCD) and the Technical Departments (TDs), to oversee the effective implementation of the TC programme and to promote alignment between regular budget and TC programme activities by improving programmatic and project related coordination, and further promoting synergies among the TCD and the TDs. The TC/TD Group is composed of one Director, Section Head, or Group Leader from each of NA/NE/NS/SG/MT/TCD, a representative from DGOP, and the Programme Coordinators from NA/NE/NS/SG/TC. The TC/TD Group: 1. Agrees on roles and responsibilities in the formulation and delivery of the TC programme in line with existing Agency policy documents; 2. Facilitates the cooperation between TCD and the relevant TDs in the preparation and implementation of the TC programme; 3. Identifies mechanisms for alignment of regular budget and TC activities; 4. Identifies issues related to regular budget activities that impact on the TC programme; 5. Identifies issues related to the TC programme that impact on regular budget activities; 6. Defines mechanisms to properly address the identified issues; 7. Identifies ways to more effectively use existing mechanisms. Field Code Chan TCP Committee The TCP Committee is a standing interdepartmental committee established by the Director General according to SEC/NOT/1790 of 10 September 1999 and is chaired by DDG-TC. Its members are DDG-NA, DDG-NE and DDG-NS; a representative from the Office of the Director General may attend as an observer. 1. Ensures coordinated planning for the TC programme and the regular programme; 2. Discusses major issues identified by Departments during the formulation of the TC programme; Field Code Chan Page 8 of 9

9 3. Reviews the draft TC programme prior to submission of the regular budget in order to ensure adequate and appropriate technical resources will be available for programme delivery; 4. Endorses the proposed TC programme with funding for submission to TACC and the Board of Governors. Technical Assistance and Cooperation Committee (TACC) /Board of Governors (BoG) 1. TACC reviews the proposed TC programme for the cycle and recommends approval of the TC programme to the Board of Governors; 2. Board of Governors approves the TC programme for the biennium and the budget for one year based on the recommendation of TACC Page 9 of 9

Country Programme Framework (CPF) Roles and Responsibilities of the CPF Development Team

Country Programme Framework (CPF) Roles and Responsibilities of the CPF Development Team Country Programme Framework (CPF) Roles and Responsibilities of the CPF Development Team August 2006 International Atomic Energy Agency Department of Technical Cooperation Roles and Responsibilities of

More information

Terms of Reference - Board Risk Committee

Terms of Reference - Board Risk Committee Terms of Reference - Board Risk Committee The Board Risk Committee is authorised by the Board to oversee the Group s risk management arrangements. It ensures that the overarching risk appetite is appropriate

More information

Project Number: INT0085. Title: Sharing best practices for the design and management of technical cooperation projects. Classification: Ongoing

Project Number: INT0085. Title: Sharing best practices for the design and management of technical cooperation projects. Classification: Ongoing Project Number: INT0085 Title: Sharing best practices for the design and management of technical cooperation projects Classification: Ongoing FOA: 0I - Education, Training and Nuclear Knowledge Management

More information

Guidelines for Civil Society participation in FAO Regional Conferences

Guidelines for Civil Society participation in FAO Regional Conferences Viale delle Terme di Caracalla, 00153 Rome, Italy Fax: +39 0657053152 Tel: +39 0657051 www.fao.org Guidelines for Civil Society participation in FAO Regional Conferences 1. Intro: Civil Society participation

More information

28 April 2008 MANAGEMENT VIEWS

28 April 2008 MANAGEMENT VIEWS 28 April 2008 MANAGEMENT VIEWS IEE Recommendation 5.4 (see also 8.19) Partnerships with the Rome-Based Agencies - Further develop collaboration with the three Rome-based agencies a) The three Rome-based

More information

Options for creating working groups, task forces and editorial boards to facilitate the implementation of the work plan. Note by the secretariat

Options for creating working groups, task forces and editorial boards to facilitate the implementation of the work plan. Note by the secretariat Conference Room Paper 1 13 October 2014 ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ECONOMIC COOPERATION AND INTEGRATION Team of Specialists on Innovation and Competitiveness Policies Seventh session Geneva,

More information

Regional Project Concept Template (Category A)

Regional Project Concept Template (Category A) Regional Project Concept Template (Category A) The information contained in this template should be uploaded to the PCMF IT platform by the Chair of the relevant regional cooperative agreement or the NLO

More information

WOMEN S HEALTH VICTORIA POSITION DESCRIPTION

WOMEN S HEALTH VICTORIA POSITION DESCRIPTION WOMEN S HEALTH VICTORIA POSITION DESCRIPTION Title Classification Team Work location Employment type Policy and Health Promotion Manager WHV Enterprise Agreement 2013 Level 5 Classification Policy and

More information

Ninth session. Intergovernmental Council for the Information for All Programme

Ninth session. Intergovernmental Council for the Information for All Programme IFAP-2016/COUNCIL.IX/Inf 7 Paris, 4 April 2016 Original : English Distribution limited Ninth session Intergovernmental Council for the Information for All Programme 30-31 May 2016 UNESCO House, Paris (Fontenoy

More information

The Structure of the Quality Assurance System

The Structure of the Quality Assurance System CHAPTER 2 The Structure of the Quality Assurance System 1. Development of the Quality Assurance System To facilitate the smooth functioning of quality assurance activities, HKU SPACE has developed and

More information

UNEDITED ADVANCE COPY. Decisions of the Plenary of the Platform adopted at its second session

UNEDITED ADVANCE COPY. Decisions of the Plenary of the Platform adopted at its second session UNEDITED ADVANCE COPY (Annex I to the report of the Plenary at its second session) Decisions of the Plenary of the Platform adopted at its second session IPBES-2/1: IPBES-2/2: IPBES-2/3: IPBES-2/4: Amendments

More information

Institute of Public Administration University College Dublin (IPA-UCD) Academic Programme Board Terms of Reference

Institute of Public Administration University College Dublin (IPA-UCD) Academic Programme Board Terms of Reference Institute of Public Administration University College Dublin (IPA-UCD) Academic Programme Board Terms of Reference 1. and function of the Board 1.1. The IPA-UCD Academic Programme Board is responsible

More information

BANK OF PAPUA NEW GUINEA POSITION DESCRIPTION MANAGER LIBRARY UNIT, ECONOMICS DEPARTMENT

BANK OF PAPUA NEW GUINEA POSITION DESCRIPTION MANAGER LIBRARY UNIT, ECONOMICS DEPARTMENT BANK OF PAPUA NEW GUINEA POSITION DESCRIPTION MANAGER LIBRARY UNIT, ECONOMICS DEPARTMENT This Position Description outlines the role, skills, relationships, authorities and accountabilities. The position

More information

Information and Communications Technology (ICT) Steering Committee - Information Sheet

Information and Communications Technology (ICT) Steering Committee - Information Sheet Information and Communications Technology (ICT) Steering Committee - Information Sheet Version 2.2 Thursday, June 30, 2011 Document Ownership Information Document Owner M Livesley Document Preparation

More information

I.A.E.A. Responsible Parties

I.A.E.A. Responsible Parties I.A.E.A. Responsible Parties The principal parties having the main responsibilities for the application of these Regulations shall be: (a) those authorized by registration or license; and (b) employers

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 12 December 2006 16694/06 PESC 1278 CONOP 74 CODUN 38

COUNCIL OF THE EUROPEAN UNION. Brussels, 12 December 2006 16694/06 PESC 1278 CONOP 74 CODUN 38 COUNCIL OF THE EUROPEAN UNION Brussels, 12 December 2006 16694/06 PESC 1278 CONOP 74 CODUN 38 COVER NOTE from : General Secretariat to : Delegations Subject : EU Strategy against the proliferation of WMD:

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29 OCTOBER TO 10 NOVEMBER 2001 Addendum

REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29 OCTOBER TO 10 NOVEMBER 2001 Addendum UNITED NATIONS Distr. GENERAL FCCC/CP/2001/13/Add.1 21 January 2002 Original: ENGLISH CONFERENCE OF THE PARTIES REPORT OF THE CONFERENCE OF THE PARTIES ON ITS SEVENTH SESSION, HELD AT MARRAKESH FROM 29

More information

Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda

Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Job Profile Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Reference number: DK-00237-2016/UGA.01-W 1. Preliminary 1.1. Short background: In 2011, eight

More information

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme

More information

16207/14 AD/cs 1 DGG 2B

16207/14 AD/cs 1 DGG 2B Council of the European Union Brussels, 28 November 2014 (OR. en) 16207/14 NOTE From: To: General Secretariat of the Council Delegations No. prev. doc.: 10154/14, 13374/14 No. Cion doc.: COM(2014) 284

More information

Institute of Banking University College Dublin (IOB-UCD) Academic Programme Board Terms of Reference

Institute of Banking University College Dublin (IOB-UCD) Academic Programme Board Terms of Reference Institute of Banking University College Dublin (IOB-UCD) Academic Programme Board Terms of Reference 1. Purpose and function of the Board 1.1. The IOB-UCD Academic Programme Board is responsible to the

More information

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF.

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF. Office of Internal Audit and Investigations (OIAI) Report 2012/27 Report on an Audit of the Budgeting Process in UNICEF October 2012 Report on an Audit of the Budgeting Process in UNICEF (2012/27) 1 Executive

More information

TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS

TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS Job Classification Manual Page 1 of 60 TIER II STANDARD FOR FINANCIAL MANAGEMENT SPECIALISTS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier I) to

More information

Status Report on the Operations Manual and Appraisal Toolkit

Status Report on the Operations Manual and Appraisal Toolkit Status Report on the Operations Manual and Appraisal Toolkit GCF/BM-2015/Inf.06 5 May 2015 For information between meetings Page 1 I. Introduction Status Report on the Operations Manual and Appraisal Toolkit

More information

5. GUIDELINES FOR PREPARING JOB DESCRIPTIONS

5. GUIDELINES FOR PREPARING JOB DESCRIPTIONS 5. GUIDELINES FOR PREPARING JOB DESCRIPTIONS 5-1 5. GUIDELINES FOR PREPARING JOB DESCRIPTIONS Introduction 1. This section provides information related to the preparation of job descriptions. It includes

More information

Basel Committee on Banking Supervision. Charter

Basel Committee on Banking Supervision. Charter Basel Committee on Banking Supervision Charter January 2013 This publication is available on the BIS website (www.bis.org). Bank for International Settlements 2013. All rights reserved. Brief excerpts

More information

i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company )

i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company ) 1 Membership i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company ) TERMS OF REFERENCE OF THE AUDIT COMMITTEE (AMENDED AND ADOPTED BY THE

More information

Why are PMO s are Needed on Large Projects?

Why are PMO s are Needed on Large Projects? Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects

More information

LEARNING, TRAINING & DEVELOPMENT POLICY

LEARNING, TRAINING & DEVELOPMENT POLICY LEARNING, TRAINING AND DEVELOPMENT POLICY & PROCEDURES DESCRIPTION TITLE: POLICY NUMBER : COMPILED BY: LEARNING, TRAINING & DEVELOPMENT POLICY HRE/11/08/CO DIVISION OF HUMAN RESOURCES AND EQUITY EFFECTIVE

More information

DEPARTMENT OF HIGHER EDUCATION AND TRAINING. 04 JULY 2014, applications received after the closing date or faxed. applications will not be considered.

DEPARTMENT OF HIGHER EDUCATION AND TRAINING. 04 JULY 2014, applications received after the closing date or faxed. applications will not be considered. DEPARTMENT OF HIGHER EDUCATION AND TRAINING APPLICATIONS: Please Forward Your Application, Quoting The Reference Number To: The Director-General, Department Of Higher Education And Training, Private Bag

More information

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 The Standard for Portfolio Management Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 Purpose of this Presentation To provide information about The Standard for Portfolio Management Agenda Background

More information

Meeting Professionals International (MPI) June 2006, www.mpiweb.org

Meeting Professionals International (MPI) June 2006, www.mpiweb.org 1 360º of Teamwork: How Meetings and Travel Professionals Can Build Strategic Synergies to Drive Results A Position Paper from Meeting Professionals International s Global Corporate Circle of Excellence

More information

Draft conclusions proposed by the Chair. Recommendation of the Subsidiary Body for Implementation

Draft conclusions proposed by the Chair. Recommendation of the Subsidiary Body for Implementation United Nations FCCC/SBI/2012/L.47 Distr.: Limited 1 December 2012 Original: English Subsidiary Body for Implementation Thirty-seventh session Doha, 26 November to 1 December 2012 Agenda item 14 Article

More information

The Compliance Universe

The Compliance Universe The Compliance Universe Principle 6.1 The board should ensure that the company complies with applicable laws and considers adherence to non-binding rules, codes and standards This practice note is intended

More information

Performance Appraisal Process for the CEO 1

Performance Appraisal Process for the CEO 1 www.simonejoyaux.com Simone P. Joyaux, ACFRE Performance Appraisal Process for the CEO 1 Note: This process and appraisal tool along with Joyaux CEO job description applies, in general to any organization.

More information

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska REGULAR BOARD OF DIRECTORS MEETING AGENDA ITEM SUMMARY. July 23, 2009

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska REGULAR BOARD OF DIRECTORS MEETING AGENDA ITEM SUMMARY. July 23, 2009 CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska REGULAR BOARD OF DIRECTORS MEETING AGENDA ITEM SUMMARY July 23, 2009 ACTION REQUIRED AGENDA ITEM NO. XI.A. X Information Only Motion Resolution Executive

More information

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa INTERNAL AUDIT DIVISION REPORT 2016/066 Audit of management of technical cooperation projects in the Economic Commission for Africa Overall results relating to the effective management of technical cooperation

More information

HEAD OF POLICY AND ADVOCACY

HEAD OF POLICY AND ADVOCACY JOB DESCRIPTION JOB TITLE: DEPARTEMENT: LOCATION: REPORTING TO: COUNTRY REPRESENTATIVE - SENEGAL PAN- AFRICAN PROGRAMME DAKAR, SENEGAL HEAD OF POLICY AND ADVOCACY BACKGROUND & ORGANISATIONAL CONTEXT ACORD

More information

Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing

Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the

More information

PRESENTATION OF THE SPI ALBANIA MODERNIZATION PLATFORM. SPI Albania Secretariat European University of Tirana January 15, 2009

PRESENTATION OF THE SPI ALBANIA MODERNIZATION PLATFORM. SPI Albania Secretariat European University of Tirana January 15, 2009 PRESENTATION OF THE SPI ALBANIA MODERNIZATION PLATFORM SPI Albania Secretariat European University of Tirana January 15, 2009 Agenda I. SPI Albania Structure and Project Management II. SPI Albania Projects

More information

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005 1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

UNOCHA MYANMAR - VACANCY ANNOUNCEMENT

UNOCHA MYANMAR - VACANCY ANNOUNCEMENT United Nations B U R E A U D E L A C O O R D I N AT I O N D E S A F FA I R E S H U M A N I T A I R E S Nations Unies O F F I C E F O R T H E C O O R D I N AT I O N O F H U M A N I TA R I A N A F FA I R

More information

Project no and Title:

Project no and Title: International Atomic Energy Agency Master s Degree Programme in Nuclear Engineering KEPCO International Nuclear Graduate School (KINGS) Republic of Korea PROSPECTUS Project no and Title: Date: Deadline

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2A Action Planning Networks Table of contents Fact Sheet 2A 1. Main objectives and expected results... 1 2. Network s development... 2 3. Partnership... 3 4. Activities

More information

Revised Performance Appraisal Tool for Resident Coordinators and UN Country Teams: Assessment of Results and Competencies (ARC)

Revised Performance Appraisal Tool for Resident Coordinators and UN Country Teams: Assessment of Results and Competencies (ARC) ANNEX I Conceptual Design Revised Performance Appraisal Tool for Resident Coordinators and UN Country Teams: Assessment of Results and Competencies (ARC) I. From One80 to the ARC: Background and Key Changes

More information

PROJECT MANAGEMENT AND COORDINATION

PROJECT MANAGEMENT AND COORDINATION PROJECT MANAGEMENT AND COORDINATION a) MANAGEMENT Owing to the sheer magnitude of surveys/censuses and administrative data operations involved in this project, various committees have been constituted

More information

Job Profile. Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda

Job Profile. Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda Job Profile Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda Reference number: DK-00247-2016/UGA.02 1. Preliminary 1.1. Short background: In

More information

What are job descriptions for nonprofit board members?

What are job descriptions for nonprofit board members? What are job descriptions for nonprofit board members? Summary: Suggestions for duties and responsibilities for board members and officers. This item contains suggestions from several sources and indicates

More information

SMARTONE TELECOMMUNICATIONS HOLDINGS LIMITED

SMARTONE TELECOMMUNICATIONS HOLDINGS LIMITED Audit Committee Terms of reference Constitution 1. The Board hereby resolves to establish a Committee of the Board to be known as the Audit Committee. Membership 2. The Committee shall be appointed by

More information

TIER II STANDARD FOR AUDITORS

TIER II STANDARD FOR AUDITORS Job Classification Manual Page 1 of 37 TIER II STANDARD FOR AUDITORS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier I) to a specific field of work

More information

TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS

TERMS OF REFERENCE OF THE AUDIT COMMITTEE OF THE BOARD OF DIRECTORS CHINA COMMUNICATIONS CONSTRUCTION COMPANY LIMITED (A joint stock limited company incorporated in the People s Republic of China with limited liability) (Stock Code: 1800) TERMS OF REFERENCE OF THE AUDIT

More information

Validation, Monitoring & Review

Validation, Monitoring & Review Academic Code of Practice: No.2 Validation, Monitoring & Review As agreed by the Academic Council on 4 October 2013 and by the Governing Body on 17 October 2013 www.gmit.ie Academic Code of Practice: No.2

More information

IAEA Action Plan on Nuclear Safety 1

IAEA Action Plan on Nuclear Safety 1 IAEA Action Plan on Nuclear Safety 1 In June 2011 a Ministerial Conference on Nuclear Safety was convened to direct, under the leading role of the IAEA, the process of learning and acting upon lessons

More information

Terms of Reference of the Audit Committee of the Board of Directors. (revised with effect from 1 January 2016)

Terms of Reference of the Audit Committee of the Board of Directors. (revised with effect from 1 January 2016) 上 海 大 生 農 業 金 融 股 份 有 限 公 司 SHANGHAI DASHENG AGRICULTURE FINANCE TECHNOLOGY CO., LTD.* (a joint stock company incorporated in the People s Republic of China with limited liability) (Stock code: 1103) Terms

More information

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,

More information

Nuclear Security Plan 2014 2017

Nuclear Security Plan 2014 2017 Atoms for Peace Board of Governors General Conference GOV/2013/42-GC(57)/19 Date: 2 August 2013 For official use only Item 4(b) of the Board s provisional agenda (GOV/2013/37) Item 16 of the Conference's

More information

Twenty-Second Board Meeting Lausanne/Geneva, Switzerland 16 18 May 2012. Decision Points Adopted

Twenty-Second Board Meeting Lausanne/Geneva, Switzerland 16 18 May 2012. Decision Points Adopted Decision Points Adopted 1 Adoption of the Agenda Decision Point RBM/BOM.22/DP.1 The agenda for the Twenty-Second Board Meeting is approved with the modification for having Finance and Performance Committee

More information

United Nations Educational, Scientific and Cultural Organization Executive Board

United Nations Educational, Scientific and Cultural Organization Executive Board ex United Nations Educational, Scientific and Cultural Organization Executive Board Hundred and fifty-fourth Session 154 EX/9 PARIS, 6 March 1998 Original: English Item 3.4.1 of the provisional agenda

More information

NCR Corporation Board of Directors Corporate Governance Guidelines Revised January 20, 2016

NCR Corporation Board of Directors Corporate Governance Guidelines Revised January 20, 2016 NCR Corporation Board of Directors Corporate Governance Guidelines Revised January 20, 2016 NCR s Board of Directors is elected by the stockholders to govern the affairs of the Company. The Board selects

More information

JOB DESCRIPTION. Executive Assistant to Director of Operations

JOB DESCRIPTION. Executive Assistant to Director of Operations JOB DESCRIPTION JOB TITLE: JOB HOLDER: DEPARTMENT: Executive Assistant to Director of vacant DIRECTORATE/NATIONAL OFFICE MSNC LOCATION: MANAGER S NAME: MANAGER S JOB TITLE: NW London Naudette Harvey Administration

More information

DIRECTIVE TRANSMITTAL

DIRECTIVE TRANSMITTAL U.S. NUCLEAR REGULATORY COMMISSION DIRECTIVE TRANSMITTAL TN: DT-04-10 To: Subject: NRC Management Directives Custodians Transmittal of Management Directive 9.25, Organization and Functions, Purpose: Directive

More information

Audit of Financial Management Governance. Audit Report

Audit of Financial Management Governance. Audit Report Audit of Financial Management Governance Audit Report March 2015 TABLE OF CONTENTS Executive Summary... 2 What we examined... 2 Why it is important... 2 What we found... 2 Background... 4 Objective...

More information

PROPOSED MANDATE FOR THE GLOBAL PARTNERSHIP FOR EFFECTIVE DEVELOPMENT CO-OPERATION

PROPOSED MANDATE FOR THE GLOBAL PARTNERSHIP FOR EFFECTIVE DEVELOPMENT CO-OPERATION PROPOSED MANDATE FOR THE GLOBAL PARTNERSHIP FOR EFFECTIVE DEVELOPMENT CO-OPERATION This document sets out the proposed mandate of the Global Partnership for Effective Development Co-operation. It was discussed

More information

Joint Declaration. On the Establishment of the Regional Co-operation Council (RCC)

Joint Declaration. On the Establishment of the Regional Co-operation Council (RCC) Joint Declaration On the Establishment of the Regional Co-operation Council (RCC) Representatives of the Participating States of the South East European Co-operation Process (SEECP), the United Nations

More information

Government of Trinidad and Tobago

Government of Trinidad and Tobago Ref #: A007 Government of Trinidad and Tobago JOB DESCRIPTION CONTRACTUAL POSITION JOB TITLE: HEAD HUMAN RESOURCE JOB SUMMARY: The incumbent is required to provide overall management and coordination of

More information

Communications Policy

Communications Policy [insert organisation name/logo] Communications Policy Document Status: Draft or Final Date Issued: [date] Lead Author: [name and position] Approved by: [insert organisation name] Board of Directors on

More information

Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership. Office of the Commissioner - Corporate Affairs

Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership. Office of the Commissioner - Corporate Affairs Manager, Corporate Planning & Reporting BC Oil & Gas Commission, Victoria Applied Leadership Office of the Commissioner - Corporate Affairs The Manager, Corporate Planning & Reporting is responsible for

More information

TIANGONG INTERNATIONAL COMPANY LIMITED (the Company ) TERMS OF REFERENCE OF AUDIT COMMITTEE

TIANGONG INTERNATIONAL COMPANY LIMITED (the Company ) TERMS OF REFERENCE OF AUDIT COMMITTEE TIANGONG INTERNATIONAL COMPANY LIMITED (the Company ) TERMS OF REFERENCE OF AUDIT COMMITTEE Membership 1. The audit committee (the Committee ) shall consist of not less than three members appointed by

More information

C. NPPD Management Directive 064-01.. Training and Learning Board.''

C. NPPD Management Directive 064-01.. Training and Learning Board.'' Department of Homeland Security National Protection and Program Directorate Directive Number: NPPD 064-02 Revision Number: 00 Issue Date: 05/04/11 Advanced External Training Opportunities I. Purpose This

More information

Job Classification Manual Page 1 of 42 Vol. II

Job Classification Manual Page 1 of 42 Vol. II Job Classification Manual Page 1 of 42 TIER II STANDARD FOR JURISTS INTRODUCTION 1. This grade level standard illustrates the application of the ICSC Master Standard (Tier I) to a specific field of work

More information

EXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME UPDATE ON THE CHANGE MANAGEMENT PROCESS

EXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME UPDATE ON THE CHANGE MANAGEMENT PROCESS EXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME Dist. RESTRICTED EC/49/SC/CRP.19 4 June 1999 STANDING COMMITTEE 15th meeting Original: ENGLISH UPDATE ON THE CHANGE MANAGEMENT PROCESS 1. At its

More information

DATA QUALITY STRATEGY

DATA QUALITY STRATEGY DATA QUALITY STRATEGY If you or anybody you know requires this or any other council information in another language, please contact us and we will do our best to provide this for you. Braille, Audio tape

More information

JOB DESCRIPTION. DIRECTORATE: Communications, Information and Education. Part 1: JOB PROFILE

JOB DESCRIPTION. DIRECTORATE: Communications, Information and Education. Part 1: JOB PROFILE JOB DESCRIPTION JOB TITLE: Internal Communications Manager JOB HOLDER: Vacant DEPARTMENT: Communications DIRECTORATE: Communications, Information and Education LOCATION: MSNC, London MANAGER S NAME: Ian

More information

Appendix 4 - Statutory Officers Protocol

Appendix 4 - Statutory Officers Protocol Appendix 4 - Statutory Officers Protocol Accountability Protocol for role of Director of Children s Services within the London Borough of Barnet Introduction In September 2014, the Chief Executive of the

More information

Regulatory Information and Data Quality Assurance Policy

Regulatory Information and Data Quality Assurance Policy ISSUE 1.0 Page 1 of 7 Regulatory Information and Data Quality Assurance Policy Contents Policy Scope Responsibility for Data Quality and Assurance Reference Documents The Data Quality Assurance Process

More information

Guidelines on Appointments to State Boards Department of Public Expenditure and Reform, November 2014

Guidelines on Appointments to State Boards Department of Public Expenditure and Reform, November 2014 Guidelines on Appointments to State Boards Department of Public Expenditure and Reform, November 2014 Introduction and Context 1. Background 1.1 In 2011 the Government introduced new arrangements for appointments

More information

DEFENSE TRAVEL MANAGEMENT OFFICE. Defense Travel Management Office FY 2012 FY 2016 Strategic Plan

DEFENSE TRAVEL MANAGEMENT OFFICE. Defense Travel Management Office FY 2012 FY 2016 Strategic Plan DEFENSE TRAVEL MANAGEMENT OFFICE Defense Travel Management Office FY 2012 FY 2016 Strategic Plan December 2011 Table of Contents 1. Introduction... 1 2. DTMO Overview... 1 3. DTMO Strategy... 6 4. Measuring

More information

CONSULTATION PAPER CP 41 CORPORATE GOVERNANCE REQUIREMENTS FOR CREDIT INSTITUTIONS AND INSURANCE UNDERTAKINGS

CONSULTATION PAPER CP 41 CORPORATE GOVERNANCE REQUIREMENTS FOR CREDIT INSTITUTIONS AND INSURANCE UNDERTAKINGS CONSULTATION PAPER CP 41 CORPORATE GOVERNANCE REQUIREMENTS FOR CREDIT INSTITUTIONS AND INSURANCE UNDERTAKINGS 2 PROPOSAL 1.1 It is now widely recognised that one of the causes of the international financial

More information

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR) Counterpart: Ministry of Economy 18 to 22 March 2013 Warsaw, Poland CONTENTS 1. EXECUTIVE SUMMARY... 3 2. INTRODUCTION... 5 3. OBJECTIVES

More information

Draft IAEA Action Plan on Nuclear Safety

Draft IAEA Action Plan on Nuclear Safety Atoms for Peace Board of Governors General Conference GOV/2011/59-GC(55)/14 Date: 5 September 2011 For official use only Item 3(b) of the Board's provisional agenda (GOV/2011/46) Item 14(b) of the Conference's

More information

Official Journal of the European Union

Official Journal of the European Union L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an

More information

Status Report on the Operations Manual and Appraisal Toolkit

Status Report on the Operations Manual and Appraisal Toolkit Status Report on the Operations Manual and Appraisal Toolkit GCF/B.09/Inf.06 26 February 2015 Meeting of the Board 24-26 March 2015 Songdo, Republic of Korea Agenda item 17 Page 1 I. Introduction Status

More information

LafargeHolcim Ltd. Finance & Audit Committee Charter Review date: July 28, 2015

LafargeHolcim Ltd. Finance & Audit Committee Charter Review date: July 28, 2015 LafargeHolcim Ltd Finance & Audit Committee Charter Review date: July 28, 2015 1. Purpose 1.1 Mission The Finance & Audit Committee ( FAC ) is an expert committee formally appointed by the Board of Directors

More information

ON BEHALF OF THE CENTRE FOR COORDINATION OF AGRICULTURAL RESEARCH AND DEVELOPMENT FOR SOUTHERN AFRICA (CCARDESA)

ON BEHALF OF THE CENTRE FOR COORDINATION OF AGRICULTURAL RESEARCH AND DEVELOPMENT FOR SOUTHERN AFRICA (CCARDESA) The Forum for Agricultural Research in Africa ON BEHALF OF THE CENTRE FOR COORDINATION OF AGRICULTURAL RESEARCH AND DEVELOPMENT FOR SOUTHERN AFRICA (CCARDESA) VACANCY Announcements BACKGROUND The Centre

More information

MERCK & CO., INC. POLICIES OF THE BOARD. Specifically, the Board, as a body or through its committees or members, should

MERCK & CO., INC. POLICIES OF THE BOARD. Specifically, the Board, as a body or through its committees or members, should MERCK & CO., INC. POLICIES OF THE BOARD (1) Philosophy and functions of the Board The primary mission of the Board is to represent and protect the interests of the Company s shareholders. In so doing,

More information

Documents and Policies Pertaining to Corporate Governance

Documents and Policies Pertaining to Corporate Governance Documents and Policies Pertaining to Corporate Governance 3.1 Charter of the Board of Directors IMPORTANT NOTE Chapter 1, Dream, Mission, Vision and Values of the CGI Group Inc. Fundamental Texts constitutes

More information

Evaluation. Evaluation Document 2006, No. 1. Office GLOBAL ENVIRONMENT FACILITY. The GEF Monitoring and. Evaluation. Policy

Evaluation. Evaluation Document 2006, No. 1. Office GLOBAL ENVIRONMENT FACILITY. The GEF Monitoring and. Evaluation. Policy Evaluation Office GLOBAL ENVIRONMENT FACILITY Evaluation Document 2006, No. 1 The GEF Monitoring and Evaluation Policy Global Environment Facility Evaluation Office The GEF Monitoring and Evaluation Policy

More information

AUDIT COMMITTEE TERMS OF REFERENCE

AUDIT COMMITTEE TERMS OF REFERENCE AUDIT COMMITTEE TERMS OF REFERENCE 1. Purpose The Audit Committee will assist the Board of Directors (the "Board") in fulfilling its oversight responsibilities. The Audit Committee will review the financial

More information

Improving international and European healthcare standardization to meet global safety, regulatory and market needs

Improving international and European healthcare standardization to meet global safety, regulatory and market needs Improving international and European healthcare standardization to meet global safety, regulatory and market needs A discussion paper from EUCOMED Executive Summary This paper has been produced in order

More information

Concept of Operations for Line of Business Initiatives

Concept of Operations for Line of Business Initiatives Concept of Operations for Line of Business Initiatives Version 1.0 Office of E-Gov and IT, OMB March 2006 Table of Contents FOREWORD...2 1 OBJECTIVES OF THE LINES OF BUSINESS CONCEPT OF OPERATIONS...3

More information

A career with AlSafwa. Your. Questions

A career with AlSafwa. Your. Questions A career with AlSafwa Your Questions 1 Summary Be proactive [1-4 ] 6 7 8 9 What does AlSafwa expect of me as an employee? What can I expect of AlSafwa? Who is involved in my development at AlSafwa? How

More information

2. To support the Management Team through the assessment of learners work and assist in moderation where required.

2. To support the Management Team through the assessment of learners work and assist in moderation where required. Job Description Job Title: Lecturer Location: Sutton College Group: People s Directorate / Sutton College Post Number: S314655 Grade: Lect Mgt Spine 7 15 Department: Curriculum Responsible To: Assistant

More information

Supervision policy for Postgraduate Research Degrees

Supervision policy for Postgraduate Research Degrees f Supervision policy for Postgraduate Research Degrees Research Office Graduate Education Team 1 CONTENTS 1. Introduction 2. Supervisory Teams 3. Appointment of Supervisors 3.1. Criteria for the Selection

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

Title: Rio Tinto management system

Title: Rio Tinto management system Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information