Huldra PP&A project. - from five to one double barrier. Audun Golberg / Jan Reidar Johnsen

Size: px
Start display at page:

Download "Huldra PP&A project. - from five to one double barrier. Audun Golberg / Jan Reidar Johnsen"

Transcription

1 Huldra PP&A project - from five to one double barrier Audun Golberg / Jan Reidar Johnsen PAF Seminar, Stavanger Classification: Internal

2 The Huldra Field Huldra is a gas/condensate field Top reservoir: 3500m TVD. Reservoir pressure: Initially: 675 bar Today: bar (3-400 bar on A-11) Overburden gas pressures above normal (charged formations) Production start: 2001 Production end: wells to be permanently plugged and abandoned. PP&A start: License participants % Statoil (operator) 19,87 Petoro 31,95 Total E&P Norge 24,33 ConocoPhilips 23,33 Repsol 0,49 2 Classification: Internal

3 Pore pressures and formation strengths Predicted matrix pore pressure from logs Pore pressure in gas charged layers 3 Classification: Internal

4 Traditional approach The Huldra motivation Motivations for fewer barriers on Huldra Gas that migrates along the annulus will expand into the formation and loose pressure accordinggly. Good caprock and buffer sands above the overburden gas No leaks observed from old exploration wells Low gas rates observed at B-annulus 4 Classification: Internal

5 The other motivation Huge cost savings -for the license, but even more for the society. 5 Classification: Internal

6 Huldra PP&A subsurface studies Basis for establishing a safe and cost efficient PP&A solution for Huldra Outline Challenges Subsurface evaluation Main Conclusions Recommendation 6 Classification: Internal

7 Schematic illustration of Huldra P&A challenges 7 Classification: Internal

8 Gas chimney Clue to the Huldra pressure system and overburden gas fill mechanism Balder/Lista 8 Classification: Internal Shetland Shows gas leakage mechanism from chimney into Balder/Lista and partly into Shetland Balder/Lista keeps gas volumes in place below the Green Clay caprock, and has large storage capacity compared to gas vol in Shetland More limited (discontinuous) gas volumes available in Shetland compared to upper Rogaland.

9 Huldra Pressure system - post PP&A a 1. Competent natural formation barrier Dual Plug holds Balder/Lista pressure 3+5 Lower PP 3. Most leak-off Isolated PP Closed fractures in Brent caprock. Natural geological hydraulic leakage terminated due to depletion 4 4 Higher PP 3. Probably weak pressure depletion unless reservoir fill system is reestablished over geological time. 3. Less leak-off Brent reservoir isolated by plug, casing and cement 1. Future Partly reestablishing of Brent pressure: Pressure buildup from compaction, acquifer influx/expansion and continued very slow gas migration into depleted Brent reservoir P&A - cross flow process in well analogue to geological cross flow process in chimney 9 Classification: Internal

10 Overburden dynamics B-annulus pressure buildups in the Huldra wells Pressure buildup comparison Historical pressure buildups A-9 A-9 Lista Lista Other wells-shetland Historical pressure buildups A-5 Shetland 10 Classification: Internal

11 Inflow measurements Lista (A-9) A-9 flow data, 2011 Initial rate 500 Sm3/hr 26th March 2015 Initial rate 372 Sm3/hr 4th April 2015 Duration: 3 hrs 15 mins 13 hrs 15 mins 4,15 Sm3 Core from Balder confirms permeability in tuff layers (< 1-3 md) Adding inflow & x-flow capacity into Rogaland 11 Classification: Internal

12 Inflow potential Shetland (examplified by Well A-5) Inflow tests show: Very limited inflow capacities, declining with time after a limited gas expansion from a minor volume Reflects very low permeability, and loss of energy with time Duration: Average for 5 wells ca. 2 hrs Effective X-flow from Shetland to Rogaland: 0,002-0,007 m3/hr 12 Classification: Internal

13 Capacity of Green Clay caprock to withstand pressures from below Static concept A: Dynamic concept Geological cross-flow process Traditional way of static column thinking: - Barrier may break gas B: Dynamic concept: - Pressure release (leak-off) - Barrier will hold The dynamic concept applies the same mechanism that has naturally been ongoing in the gas chimney. Stimplan simulation of 1000 downhole m3/d injected in Kyrre predicts efficient leak-off below top Rogaland with only 1mD in upper layer and 0 perm. in layers between 1000 m3/d is almost 6000 times larger than highest rate expected from Shetland No fracture growth through the Green Clay 13 Classification: Internal

14 Huldra reservoir pressure prognosis Introduction This work is based on Statoils internal guidelines for determining reservoir pressure in foreseeable time after PP&A The main process ongoing is pressure equilibration between higher pressured Oseberg Formation and Brent in the A-11 area. Also considered: Water influx from chemical compaction in drainage area, Cross flow from Shetland/Rogaland into Brent within the wells Both have only insignificant influence 14 Classification: Internal

15 Historical vs. Future Pressure Development in Huldra Historical pressure data: Future in a 500 years perspective: Pressure buildup to max. 150 bar predicted in reservoir within a 500 years perspective. - This implies that in 5 wells, only one dual barrier plug above gas bearing formations in overburden is needed. The reservoir dual plug is then combined with the overburden dual plug. Due to higher pressure in the A-11 (Oseberg Fm.) an additional dual barrier plug above reservoir is planned for 15 Classification: Internal

16 Subsurface evaluation of the Huldra PP&A solution Main conclusions Detailed cross-disciplinary studies of all relevant data supports: Sealing capacity of Green Clay (caprock) Pressure buildup to above formation integrity of Green Clay will, due to cross flow, not occur Brent reservoir pressure will not exceed 150 bars (initial 675 bars) within foreseeable time (500 years) One dual barrier plug at top Rogaland does not increase the leakage risk compared to a solution with larger number of plugs. An additional dual plug above reservoir in A-11 is planned for as precaution for higher reservoir pressure (Oseberg Fm.) in that well. 16 Classification: Internal

17 Recommended solution based on subsurface studies The 1 dual barrier plug solution has been chosen as both a safe and cost efficient concept for PP&A on Huldra Future Brent pressures (500 years) will not exceed 150 bar Dual plug at top Rogaland will withstand 320 bar, equivalent to a Brent pressure of 330 bar 17 Classification: Internal

18 Recommendation based on Huldra PP&A Subsurface Studies In future P&A barrier concepts - it is important to include dynamic subsurface relationships (cross flow conditions) as part of the barrier integrity evaluations (new concept) It is recommended that the PP&A concept from Huldra also can be used in other areas with comparable geological conditions. However, this recommendation must be based on a thorough field specific subsurface evaluation of both the reservoir and the overburden. 18 Classification: Internal

19 Presentation title Presenters name Audun Golberg, Jan R. Johnsen Presenters title address Tel: Classification: Restricted

Irresponsible of Statoil

Irresponsible of Statoil Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was

More information

NORSOK Standard D-010 Rev. 4, August 2012

NORSOK Standard D-010 Rev. 4, August 2012 Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment

More information

A new approach for dynamic optimization of water flooding problems

A new approach for dynamic optimization of water flooding problems A new approach for dynamic optimization of water flooding problems Rolf J. Lorentzen Aina M. Berg Geir Nævdal Erlend H. Vefring IRIS International Research Institute of Stavanger (formerly Rogaland Research)

More information

Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites

Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites Eva Halland Norwegian Petroleum Directorate Trondheim CCS Conference June 14-16, 2011 1 29.06.2011 Storing of CO 2 offshore

More information

Focused Seismic Monitoring (FSM) on Snorre

Focused Seismic Monitoring (FSM) on Snorre Classification: Statoil Internal Status: Draft Focused Seismic Monitoring (FSM) on Snorre The fourteenth SPE Bergen One Day seminar 18th April 2007 Mona Andersen 2 Outline Introduction to the Snorre Field

More information

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions PETE201 Introduction to Petroleum Engineering (Core) (1-0-1) The course's main goal is to provide the student with an overview of

More information

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS AGH DRILLING, OIL, GAS Vol. 30 No. 1 2013 http://dx.doi.org/10.7494/drill.2013.30.1.221 Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS 1. INTRODUCTION At the same time with

More information

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2 Introduction Canadian Oilwell Systems Company and it s subsidiaries are suppliers of oil well Electric Submersible Pumping systems (ESPs). Such pumps are used to lift oil from oil wells so that the oil

More information

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated:

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated: RESERVOIR EVALUATION The volume of hydrocarbons in a reservoir can be calculated: 1. directly by volumetric methods 2. indirectly by material balance methods Volumetrics provide a static measure of oil

More information

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia

4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia 4D reservoir simulation workflow for optimizing inflow control device design a case study from a carbonate reservoir in Saudi Arabia O. Ogunsanwo, 1* B. Lee, 2 H. Wahyu, 2 E. Leung, 1 V. Gottumukkala 1

More information

Fracture Technologies 9. Frac Candidate Selection

Fracture Technologies 9. Frac Candidate Selection 9. Frac Candidate Selection Tight Gas 19 th Sept 06 Sami Haidar Fracture Technologies Ltd. Hydraulic Fracturing History in Brief Hydraulic fracturing was implemented in the USA as early as the 1940 s without

More information

Monitoring of the Ekofisk field with 4D seismic data from a permanently installed seafloor system. Per Gunnar Folstad, ConocoPhillips

Monitoring of the Ekofisk field with 4D seismic data from a permanently installed seafloor system. Per Gunnar Folstad, ConocoPhillips Monitoring of the Ekofisk field with 4D seismic data from a permanently installed seafloor system Per Gunnar Folstad, ConocoPhillips april 28, 2016 Cau$onary Statement The following presentabon includes forward-

More information

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND

More information

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea Classification: Internal Status: Draft Peon discovery Unlocking unconventional resources in the North Sea 2 Agenda Introduction to Peon Geology Peon reservoir properties Drainage strategy Technical challenges

More information

Plug and Abandonment Forum

Plug and Abandonment Forum Plug and Abandonment Forum Developments in Non-Traditional Plug and Abandonment Methods Thomas Ferg ConocoPhillips Norway June 13, 2013 Efficient P&A Thoughts - Do as Much as Possible Without a Rig Remove

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

Geomechanical Effects of Waterflooding

Geomechanical Effects of Waterflooding Geomechanical Effects of Waterflooding II INTERNATIONAL SEMINAR ON OILFIELD WATER MANAGEMENT OCTOBER 16 19, 2007 Dale Walters A. (Tony) Settari Taurus Reservoir Solutions General Outline Characteristics

More information

Graduate Courses in Petroleum Engineering

Graduate Courses in Petroleum Engineering Graduate Courses in Petroleum Engineering PEEG 510 ADVANCED WELL TEST ANALYSIS This course will review the fundamentals of fluid flow through porous media and then cover flow and build up test analysis

More information

How to find field candidates for enhanced recovery by water additives on the NCS

How to find field candidates for enhanced recovery by water additives on the NCS How to find field candidates for enhanced recovery by water additives on the NCS Enhanced Recovery by water additives FORCE Seminar 8. 2. 27 Jan Bygdevoll, Principal Engineer, NPD Why is a field a candidate

More information

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process The following guideline describes the process of evaluating a proposed training course for consideration by the

More information

Monitoring strategies for CO 2. Nick Riley Jonathan Pearce. Storage

Monitoring strategies for CO 2. Nick Riley Jonathan Pearce. Storage Monitoring strategies for CO 2 storage Nick Riley Jonathan Pearce Outline of talk Why do we need to monitor CO 2? How & what do we monitor? Monitoring strategies Summary EU CCS Directive Overriding consideration

More information

The ever increasing importance of reservoir geomechanics

The ever increasing importance of reservoir geomechanics SPE special Interest Reservoir Group, Calgary March 26, 2014 The ever increasing importance of reservoir geomechanics Antonin (Tony) Settari TAURUS Reservoir Solutions Ltd., Calgary Professor Emeritus,

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink

ADX ENERGY. Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012. Wolfgang Zimmer, Paul Fink ADX ENERGY Sidi Dhaher Well test Briefing Live Webcast, 4 July 2012 Wolfgang Zimmer, Paul Fink Decision to test ASX announcement, 3 October 2011 2 Decision to test: First Evidence Wellsite geologists (highly

More information

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE

Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE 1 Step Rate Testing: Determining Fracture Pressure for Injection Wells 2016 UNDERGROUND INJECTION CONTROL CONFERENCE DENVER, CO LEWIS WANDKE, PE AND KEN COOPER, PE PETROTEK ENGINEERING CORPORATION Overview

More information

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer

Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer Evaluering av risiko forbundet med løftegass i ringrom og forskellige gassløft barrierer ESRA seminar, September 3, 2014, Stavanger Per Holand, ExproSoft Ivar Aasen Operator; Det Norske Production start;

More information

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines

More information

7 Periodical meeting CO2Monitor. Synthetic seismograms from the Sleipner injection site

7 Periodical meeting CO2Monitor. Synthetic seismograms from the Sleipner injection site 7 Periodical meeting CO2Monitor Synthetic seismograms from the Sleipner injection site Davide Gei, Stefano Picotti, Jose Carcione Objective Modelling of the Sleipner overburden to study the sensitivity

More information

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of

More information

Improving pre-operational production efficiency estimates

Improving pre-operational production efficiency estimates Improving pre-operational production efficiency estimates ESRA seminar 28 th January 2015 Classification: Internal Production efficiency (PE) 100% Estimated production loss PE Production efficiency (PE)

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 2 HYDRAULIC AND PNEUMATIC CYLINDERS The material needed for outcome 2 is very extensive

More information

Susceptibility of Your Drinking Water Source to Contamination

Susceptibility of Your Drinking Water Source to Contamination Susceptibility of Your Drinking Water Source to Contamination The aquifer that supplies drinking water to ICASI Culinary School has a moderate susceptibility because of the following reasons: < Available

More information

Decommissioning and P&A in the Future

Decommissioning and P&A in the Future Decommissioning and P&A in the Future Tim Croucher Decommissioning and Abandonment Manager ConocoPhillips Norway Cautionary Statement The following presentation includes forward-looking statements. These

More information

Search and Discovery Article #40256 (2007) Posted September 5, 2007. Abstract

Search and Discovery Article #40256 (2007) Posted September 5, 2007. Abstract Evaluating Water-Flooding Incremental Oil Recovery Using Experimental Design, Middle Miocene to Paleocene Reservoirs, Deep-Water Gulf of Mexico* By Richard Dessenberger 1, Kenneth McMillen 2, and Joseph

More information

Reservoir Characterization of Gandhar Pay Sands by integrating NMR log data with conventional open hole logs A Case Study.

Reservoir Characterization of Gandhar Pay Sands by integrating NMR log data with conventional open hole logs A Case Study. Reservoir Characterization of Gandhar Pay Sands by integrating NMR log data with conventional open hole logs A Case Study. Summary S.K.Dhar* Well Logging Services, Ankleshwar Asset, ONGC Email ID: samirdhar@spemail.org

More information

Certificate Programs in. Program Requirements

Certificate Programs in. Program Requirements IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

FIBER-OPTIC SENSING TECHNOLOGIES

FIBER-OPTIC SENSING TECHNOLOGIES PRODUCTION ENHANCEMENT FIBER-OPTIC SENSING TECHNOLOGIES FOR WELL MONITORING TO RESERVOIR MANAGEMENT Solving challenges. A H A L L I B U R T O N S E R V I C E Fiber-Optic Sensing Technologies CUTTING-EDGE

More information

On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing

On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing California State University Fullerton, September 23, 2014 Steve Bohlen, Senior Scientist, Lawrence Berkeley National

More information

PUMP AND MOTOR DIVISION

PUMP AND MOTOR DIVISION INSTALLATION MANUAL SERIES P2 and P3 MOBILE PISTON PUMP 1 Check model code / compare with your paper work Nameplate of the pump Ordering / Sales Acknowledgement 2 Check rotation of the pump Clockwise rotation

More information

ECONOMIC COMMENTARIES

ECONOMIC COMMENTARIES ECONOMIC COMMENTARIES The petroleum fund mechanism and associated foreign exchange transactions by Norges Bank NO. 2 2014 AUTHOR: ELLEN AAMODT The views expressed are those of the author and do not necessarily

More information

Drilling Problems. pull

Drilling Problems. pull Drilling Problems Pipe Sticking Lost Circulation Hole Deviation Pipe Failures Borehole Instability Mud Contamination Formation Damage Hole Cleaning H S General Equipment & Personnel Pipe Sticking Can not

More information

Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs

Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs BABAK AMINSHAHIDY 1, MEHDI FOROOZANFAR 2 1 Department of Petroleum Engineering,University

More information

Rogaland på Børs August 30 th 2010

Rogaland på Børs August 30 th 2010 BADGER EXPLORER ASA Rig-less Exploration - A Game Changer Rogaland på Børs August 30 th 2010 Kjell Erik Drevdal, CEO, ked@bxpl.com, +47 916 43 552 www.bxpl.com 1 Badger Explorer ASAs History Company established

More information

How To Monitor Deep Co2

How To Monitor Deep Co2 International Monitoring Updates from IEAGHG Monitoring Network US DOE Carbon Storage R&D Project Review Meeting 12 th 14 th August 2014 Pittsburgh Panel Don White, Geological Survey of Canada, NRCAN Katherine

More information

Characterization of Internal erosion susceptibility in Sandstone Dam Foundations

Characterization of Internal erosion susceptibility in Sandstone Dam Foundations ICSE6-263 Characterization of Internal erosion susceptibility in Sandstone Dam Foundations Jean-Jacques FRY 1, Gabriel JORGE 2 1 EDF-CIH 73 373 Le Bourget du Lac Cedex France jean-jacques.fry@edf.fr 2

More information

How To Test For Drill Stem

How To Test For Drill Stem AGH DRILLING, OIL, GAS Vol. 30 No. 2 2013 http://dx.doi.org/10.7494/drill.2013.30.2.333 Stanisław Dubiel*, Mirosław Rzyczniak*, Anna Godula*, Michał Maruta* 12 ANALYSIS OF DRILL STEM TESTING TECHNOLOGY

More information

LECTURE 28 to 29 ACCUMULATORS FREQUENTLY ASKED QUESTIONS

LECTURE 28 to 29 ACCUMULATORS FREQUENTLY ASKED QUESTIONS LECTURE 28 to 29 ACCUMULATORS FREQUENTLY ASKED QUESTIONS 1. Define an accumulator and explain its function A hydraulic accumulator is a device that stores the potential energy of an incompressible fluid

More information

The Impact Of Cementing On Proper Well Control

The Impact Of Cementing On Proper Well Control The Impact Of Cementing On Proper Well Control Lee Dillenbeck Senior Advisor, Cementing Chevron ETC Drilling and Completions 2010 Chevron Learning Objectives Explain the main reasons for cementing wells

More information

DynaSlot System. 360 Certainty Well Abandonment

DynaSlot System. 360 Certainty Well Abandonment DynaSlot System 360 Certainty Well Abandonment SETTING THE STAGE FOR PERFECT ISOLATION The DynaSlot gun system presents a highly compelling alternative to traditional plug and abandonment and conventional

More information

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY 117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY No.: 117 Established: 01.10.08 Revision no: 4 Date revised: 06.06.2011 Page: 2 Preface This guideline is supported by Norwegian Oil and

More information

Petroleum Experts REVEAL PLATFORM FOR SPECIALISED RESERVOIR STUDIES

Petroleum Experts REVEAL PLATFORM FOR SPECIALISED RESERVOIR STUDIES Petroleum Experts REVEAL PLATFORM FOR SPECIALISED RESERVOIR STUDIES Copyright Notice The copyright in this manual are the property of Petroleum Experts Ltd. Petroleum Experts Ltd. All rights reserved.

More information

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons.

Oil and Gas Terms. Anticline: An arch of stratified rock layers that may form a trap for hydrocarbons. Oil and Gas Terms American Petroleum Institute (API): The API is the trade organization for the oil and gas industry, which establishes standards governing industry operations, safety and the manufacturing

More information

Assessment of dynamic barriers in oil/gas well operations

Assessment of dynamic barriers in oil/gas well operations Assessment of dynamic barriers in oil/gas well operations Vurdering av dynamiske barrierer i olje/gass brønner Jan Runar Tangstad Subsea Technology Submission date: September 2014 Supervisor: Marvin Rausand,

More information

Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields"

Riser less Light Well Intervention (RLWI) - A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields Classification: Internal Status: Draft Riser less Light Well Intervention (RLWI) - "A success for reducing OPEX - cost and increasing oil recovery for subsea completed fields" Underwater Technology Conference

More information

Monitoring of Tunnel End Plug Performance in ONKALO

Monitoring of Tunnel End Plug Performance in ONKALO Monitoring of Tunnel End Plug Performance in ONKALO Erika Holt, VTT Technical Research Centre of Finland Presentation at IGDTP-Geodisposal 2014 Manchester, UK, 24th to 26th of June 2014 Co-authors: I.

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

Well Testing. Buildup Tests Drill Stem Test Production History and Decline Analysis

Well Testing. Buildup Tests Drill Stem Test Production History and Decline Analysis Well Testing Buildup Tests Drill Stem Test Production History and Decline Analysis Well Testing What Can it Tell You? Both drawdown and buildup tests are useful. Drawdown Well tests combined with production

More information

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION GAS WELL/WATER WELL SUBSURFACE CONTAMINATION Rick Railsback Professional Geoscientist CURA Environmental & Emergency Services rick@curaes.com And ye shall know the truth and the truth shall make you free.

More information

Diagnostic Fracture Injection Test (DFIT ) Analysis

Diagnostic Fracture Injection Test (DFIT ) Analysis Diagnostic Fracture Injection Test (DFIT ) Analysis Over the past few years at Halliburton we have seen a marked increase in the number of diagnostic fracture injection tests (DFIT ) performed along with

More information

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals

More information

Force workshop 6-7 Nov 2013. Field development projects The gain of applying polymer technology EOR qualification steps

Force workshop 6-7 Nov 2013. Field development projects The gain of applying polymer technology EOR qualification steps Polymer Flooding Field Development Projects in Statoil 6th. November 2013 Dag Chun Standnes Leading advisor Advanced Recovery Methods Classification: Internal 2013-10-31 Outline Field development projects

More information

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application g Digital Energy ITI Instrument Transformer Basic Technical Information and Application Table of Contents DEFINITIONS AND FUNCTIONS CONSTRUCTION FEATURES MAGNETIC CIRCUITS RATING AND RATIO CURRENT TRANSFORMER

More information

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices Schedule No. 2 Payment Schedule Task number according to Schedule No. 1 Scope of task Lists of estimated quantities to be performed and prices Estimated quantities to be performed Prices Date of execution

More information

OF EOR CHEMICALS. Ying Guo, Total E&P. Presented at FORCE - EOR Competence Building Workshop 6. November 2013

OF EOR CHEMICALS. Ying Guo, Total E&P. Presented at FORCE - EOR Competence Building Workshop 6. November 2013 3 1 0 2 v o N 7 6 p o h s k r o w e c r o F ENVIRONMENTAL ASPECT OF EOR CHEMICALS Ying Guo, Total E&P Presented at FORCE - EOR Competence Building Workshop 6. November 2013 PRESENTATION OUTLINE Problems

More information

Deep Geothermal energy and groundwater in

Deep Geothermal energy and groundwater in Deep Geothermal energy and groundwater in the UK Jon Busby Deep Geothermal energy and groundwater in the UK Outline 1. UK geothermal 2. Deep saline aquifers 3. Engineered geothermal systems 4. Fractured

More information

Introduction to Subsea Production System

Introduction to Subsea Production System Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types

More information

Energize your mind. www.halliburton.com April 2007. Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones

Energize your mind. www.halliburton.com April 2007. Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones Energize your mind. www.halliburton.com April 2007 Lightweight Cement Meets Challenges of Weak Formations and Depleted Zones Today, operators are forced to drill in increasingly challenging environments

More information

Diagnostic Fracture Injection Tests (DFIT ) in Ultra Low Permeability Formations

Diagnostic Fracture Injection Tests (DFIT ) in Ultra Low Permeability Formations Diagnostic Fracture Injection Tests (DFIT ) in Ultra Low Permeability Formations Pressure transient testing has been the standard method over the years to obtain important well information such as reservoir

More information

Groundwater flow systems theory: an unexpected outcome of

Groundwater flow systems theory: an unexpected outcome of Groundwater flow systems theory: an unexpected outcome of early cable tool drilling in the Turner Valley oil field K. Udo Weyer WDA Consultants Inc. weyer@wda-consultants.com Introduction The Theory of

More information

CCS Risk Analysis. Vanessa Nuñez Lopez. CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012

CCS Risk Analysis. Vanessa Nuñez Lopez. CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012 CCS Risk Analysis Vanessa Nuñez Lopez CEPAC - CSLF Capacity Building Workshop Porto Alegre, Brazil July 30 Aug 3, 2012 Leucadia Lake Charles Hastings Field Air Products Port Arthur West Hastings MVA area

More information

Search and Discovery Article #40356 (2008) Posted October 24, 2008. Abstract

Search and Discovery Article #40356 (2008) Posted October 24, 2008. Abstract Quantifying Heterogeneities and Their Impact from Fluid Flow in Fluvial-Deltaic Reservoirs: Lessons Learned from the Ferron Sandstone Outcrop Analogue* Peter E. Deveugle 1, Matthew D. Jackson 1, Gary J.

More information

Guidelines for produced water injection

Guidelines for produced water injection Guidelines for produced water injection Report No. 2.80/302 January 2000 P ublications Global experience The International Association of Oil & Gas Producers (formerly the E&P Forum) has access to a wealth

More information

10 Wireline operations

10 Wireline operations 10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...

More information

TBM CROSSING OF STATIONS

TBM CROSSING OF STATIONS TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important

More information

Is Practical Reservoir Simulation an Oxymoron?

Is Practical Reservoir Simulation an Oxymoron? Provided by Discovery Capital, L.L.C. 453 S. Webb Rd. Suite 100 Wichita, Kansas 67207 (316) 681-2542 (316) 681-1190 fax www.wellevaluations.com bill@wellevaluations.com May 26, 2004 Is Practical Reservoir

More information

Assured capacity and safe geological storage of CO 2

Assured capacity and safe geological storage of CO 2 Assured capacity and safe geological storage of CO 2 Ceri J Vincent CO 2 GeoNet Executive Committee Chair and British Geological Survey, UK email: info@co2geonet.com website: www.co2geonet.eu Assured storage

More information

Introduction: Basic Well Completion Concepts

Introduction: Basic Well Completion Concepts Introduction: Basic Well Completion Concepts Porosity Porosity is the fraction of the total volume of the rock that is pore (non rock) space or void and not made of solid pieces of the formation. It will

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

APPENDIX D RISK ASSESSMENT METHODOLOGY

APPENDIX D RISK ASSESSMENT METHODOLOGY APPENDIX D RISK ASSESSMENT METHODOLOGY There are numerous human-health and ecological issues associated with the construction and operation of any large coal-fueled electric power generation facility.

More information

Nautilus Global Schedule 2016

Nautilus Global Schedule 2016 Geophysics N004a The Essentials of Rock Physics and Seismic Amplitude Interpretation 18-21 Apr Houston, US N049a Seismic Attributes for Exploration and Reservoir Characterisation 25-29 Apr Houston, US

More information

Nexus. Reservoir Simulation Software DATA SHEET

Nexus. Reservoir Simulation Software DATA SHEET DATA SHEET Nexus Reservoir Simulation Software OVERVIEW KEY VALUE Compute surface and subsurface fluid flow simultaneously for increased accuracy and stability Build multi-reservoir models by combining

More information

EVALUATION OF WELL TESTS USING RADIAL COMPOSITE MODEL AND DIETZ SHAPE FACTOR FOR IRREGULAR DRAINAGE AREA. Hana Baarová 1

EVALUATION OF WELL TESTS USING RADIAL COMPOSITE MODEL AND DIETZ SHAPE FACTOR FOR IRREGULAR DRAINAGE AREA. Hana Baarová 1 The International Journal of TRANSPORT & LOGISTICS Medzinárodný časopis DOPRAVA A LOGISTIKA Mimoriadne číslo 8/2010 ISSN 1451 107X EVALUATION OF WELL TESTS USING RADIAL COMPOSITE MODEL AND DIETZ SHAPE

More information

ThermoSorb Desiccant Dryers

ThermoSorb Desiccant Dryers ThermoSorb Desiccant Dryers Sierra Why dry compressed air? Contamination reduces efficiency The air we breathe contains contamination in the form of water vapour and airborne particles. During the compression

More information

Packing and gaskets Page 029 of 040

Packing and gaskets Page 029 of 040 Packing and gaskets Page 029 of 040 7.3 Packing and gaskets The chemical industry has carried out cadastral surveys for many years. These surveys provide valuable information regarding environmental pollution

More information

PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA

PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA Tom Tomastik, Geologist, ODNR, Division of Oil and Gas Resources Management PURPOSE AND

More information

Oil and gas fields in norway Industrial Heritage plan

Oil and gas fields in norway Industrial Heritage plan survey of all the areas, fields and installations on the Norwegian continental shelf. It also describes developments in these waters since the 1960s, including why Norway was able to become an oil nation,

More information

Understanding Hydraulic Fracturing

Understanding Hydraulic Fracturing Understanding Hydraulic Fracturing Natural gas is a safe, abundant and economical source of energy for the planet. North America has relied on natural gas for heating homes and buildings, as a fuel source

More information

Introducing OXAND. ~ 850 projects > 1,250bn OF CAPEX CAPITALISED IN SIMEO TM

Introducing OXAND. ~ 850 projects > 1,250bn OF CAPEX CAPITALISED IN SIMEO TM Introducing OXAND Independent international engineering consultancy firm specialised in industrial life cycle asset management 5 Business Units (Europe, North America), +120 consultants to support investors,

More information

Implementation of Directive 2009/31/EC on the Geological Storage of Carbon Dioxide

Implementation of Directive 2009/31/EC on the Geological Storage of Carbon Dioxide Implementation of Directive 2009/31/EC on the Geological Storage of Carbon Dioxide Guidance Document 2 Characterisation of the Storage Complex, CO 2 Stream Composition, Monitoring and Corrective Measures

More information

FAULT SEAL ANALYSIS: Mapping & modelling. EARS5136 slide 1

FAULT SEAL ANALYSIS: Mapping & modelling. EARS5136 slide 1 FAULT SEAL ANALYSIS: Mapping & modelling EARS5136 slide 1 Hydrocarbon field structure Compartments 1 km Depth ~2.5km How to produce field? EARS5136 slide 2 Predict flow patterns and communication Fault

More information

Application for Monitoring and Analysis of real-time drilling data PFAS from ITC a.s

Application for Monitoring and Analysis of real-time drilling data PFAS from ITC a.s Application for Monitoring and Analysis of real-time drilling data PFAS from ITC a.s ITC a.s Stalsbergveien 7 3115 Tønsberg Phone: 33 32 29 80, web: www.itcas.no Management note PFAS has been developed

More information

Setting a Global Standard. www.dril-quip.com. SingleBore Subsea Completion System

Setting a Global Standard. www.dril-quip.com. SingleBore Subsea Completion System Setting a Global Standard www.dril-quip.com SingleBore Subsea Completion System Dril-quip s Vertical Tree Surface Tree Tubing or Drill Pipe Running String Offshore, Time is Money. Dril-quip s SingleBore

More information

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS WIERTNICTWO NAFTA GAZ TOM 28 ZESZYT 1 2 2011 Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS 1. INTRODUCTION While gas consumption in Slovakia is increasing, domestic gas production

More information

RESERVOIR GEOSCIENCE AND ENGINEERING

RESERVOIR GEOSCIENCE AND ENGINEERING RESERVOIR GEOSCIENCE AND ENGINEERING APPLIED GRADUATE STUDIES at IFP School from September to December RGE01 Fundamentals of Geoscience I Introduction to Petroleum Geosciences, Sedimentology RGE02 Fundamentals

More information

Goliat Produced Water Management

Goliat Produced Water Management Goliat Produced Water Management Hans Tore Nordbø, Process Engineer, Eni Norge AS Tekna Produced Water Management, 21.01.10-22.01.10, Clarion Hotel Stavanger www.eninorge.no PL229 Goliat location, ownership

More information

Consultants, Inc. Independent Petroleum Engineers

Consultants, Inc. Independent Petroleum Engineers Link to Long Consultants Web Home Page Consultants, Inc. Independent Petroleum Engineers 13231 Champion Forest Drive, Suite 220 Houston, Texas 77069 tel: 281-397-8500 fax: 281-397-8506 longconsultants.com

More information

COMPLETION SOLUTIONS 1

COMPLETION SOLUTIONS 1 COMPLETION SOLUTIONS 1 LOWER COST, REDUCED CAPEX, HIGHER PRODUCTION ABSOLUTELY. TRANSFORM YOUR WELL FLEX-WELL At Welltec s Transformation Center, based in Denmark s energy capital, Esbjerg, we have the

More information

ASSET INTEGRITY MANAGEMENT FOR UNDERGROUND NATURAL GAS STORAGE FACILITIES

ASSET INTEGRITY MANAGEMENT FOR UNDERGROUND NATURAL GAS STORAGE FACILITIES ASSET INTEGRITY MANAGEMENT FOR UNDERGROUND NATURAL GAS STORAGE FACILITIES Authors: Nicolas Bonnier, Jacques Grappe (Géostock, France); Klaus Peter Rehmer (UGS Mittenwalde GmbH, Germany) 1 Table of Contents

More information

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well

Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Modelling and Simulation Multi-stage Fracturing Propagation in Tight Reservoir through Horizontal Well Smail ALIOUI (1) (1) Sonatrach First Calgary Petroleums, Association Division, Hassi Messaoud, 30500,

More information