1 use of OpenBIM Hospitals in Denmark Norway and Espoo Hospital in Finland

2 Agenda Introduction to speakers Introduction to hospital projects Reasons for using BIM Processes Break Organization Implementation Summary

3 Stig Brinck, NIRAS Expertise Director ICT and process development, NIRAS A/S Drive the BIM development and implementation in NIRAS Client consult: DNU, Nyt OUH, Rigshospitalet, Process, contracts, workflow and technical setup Chairman buildingsmart, Denmark Contribute to open collaboration and information sharing

4 Steen Sunesen buildingsmart Norway Architect/Project manager C.F. Møller Architects Norway Worked with IFC-BIM projects since 2003 Manager of buildingsmart Norway

5 Tomi Henttinen, Gravicon Oy M.Sc. (Archit.) SAFA, CEO buildingsmart Finland Chair Gravicon Oy, Virtual Project Manager 100% Focus on use of BIM in projects Partner solutions and inhouse development Our clients are building owners and big consulting companies Currently consulting several big clients in the public sector Working together with several top architect offices in Finland Offices in Finland and Denmark Tomi Henttinen Architect, CEO/Partner in Gravicon 10 years of experience in BIM projects Also worked as a software developer Applications for the architectural design Web -based SaaS solutions

6 Brief presentation of the hospital projects Knowledge Center Trondheim m2 ( m2) Children Hospital BAAS Ålesund m2 (part of major hospital) New Ahus Lørenskog m2 1 bn Østfold Hospital Vestfold Hospital Two new major hospitals using open BIM

7 Norway New Ahus Courtesy C.F. Møller Architects New Akershus University Hospital - New Ahus m 2 1 billion (2003 price index) Design and construction time Use of IFC-BIM in entire project for room- and equipment check Use of IFC-BIM in entrance building also for Clash Det. and Cost Est.

8 Norway BAAS Courtesy C.F. Møller Architects Children Hospital Alesund Hospital BAAS m 2 Design and construction time Use of IFC-BIM for room- and equipment check, Visualization, Clash Detection and Cost Estimate, Tendering, Construction Planning, FM

9 Norway Knowledge Centre Courtesy Narud-Stokke-Wiig Architects and Planners Knowledge Centre, Trondheim m 2 - Part of a m 2 hospital project Design and construction time Use of IFC-BIM for room- and equipment check, Visualization, Clash Det. and Cost Est.

10 Brief presentation of the hospital projects DNU, Århus New hospital/extension m2 900 mill euro Design Big alteration Nyt OUH New hospital m2 800 mill euro Copatition Rigshospitalet Extension m2 210 mill euro Herlev, 2000 m2 Ålborg, app m2 Køge, app m2 Hillerød, app m2 Gødtrup, app m2

11 Hospital Projects in the Capital City area in Finland Malmi Largest Hospital Renovation At the Moment Meilahti Total renovation of the 11 storey inpatient section Will be the next big project In the area Puolarmetsä sqm Hospital and Centre for Senior Citizens Budget 200 M,

12 Espoo Hospital and Centre for Senior Citizens Partly renovation, mostly new m 2, 200 M New concept Contemporary architecture Facades are mainly glass Round shapes set challenges to structural and mechanical design BIM has a major focus Client has generated complete requirements for the design phase All design parties are committed to extensive use of BIM Real BIM based design process has been adapted from the beginning

13 Reasons for using BIM in Hospital projects Big projects Needs every QA tool available. Complexity in inter spatial functionality Operation of hospital is costly (2-3 years of operation equals project cost). Amount of rooms, technical installations and equipment Many user groups that (in Scandinavia) are heavily involved in planning. BIM is a powerful tool to visualize decisions Robust elasticity rebuilding before end of construction It makes sense to invest.

14 Reasons for using BIM in Hospital projects The context - Building industry today Planning, designing and building is distinguished from other production industry by: Low level of industrialization. Low level of technical knowhow. Low level of client/designer control over project. Example (Norwegian survey) - Planning and building a normal family house involves more than 120 independent actors who will influence decisions (the contractor, subcontractors, craftsmen, product vendors, the bank, legislative authorities, neighbours...) Hospitals are far more complex and expensive.

15 Process overview Information follows project for entire building lifecycle Room and equipment database Organization Visualization Documentation Tendering and procurement Lifecycle cost Clash detection Construction Facility Management

16 Class detection The challenge: To many errors on site Uncoordinated design Late decisions Field rework causes a cascade of errors Solution: All parties combine there 3D models Access to models in early draft

17 Luft Varme Køling Vand Afløb Anlæg Fundament Vent Råhus El

18 Clash detection - NovoZymes

19 Clash detection as a part of the process

20 Visualization Helsinki Music Centre, LPR Architects Technical Visualization Way to communicate To identify potential design problems Format is BIM Renderings Photo like images More end-user friendly Format is image, movie or interactive 3D

21 Room and Equipment database Accessibility of information Requirement database, all information, always updated, in one place, accessible for all disciplines. A hospital is a huge machine. Enormous amount of equipment. Managing equipment in the BIM. Reads IFC, Digital QA of model Technology reduced one full-time job Visualizing solutions for entire project team

22

23 Big project alteration Efficiency and Quality Assurance Objects remain all individual information. Even during large alteration. Heavily improves efficiency and quality Example Norway New Ahus Intl. competition - First Prize 2000 Conceptual Design, Dec Rev. Conceptual Design, Oct Reduced m 2 Pilot project, Oct Rev. Pilot project, May 2003 Reduced m 2 Detailed project, Sept. 2003

24 Big project alteration Cost estimation Experiences from New Ahus and BAAS Object based from IFC BIM. Skepticism to method. Parallel to traditional Cost Estimates. The IFC BIM CE was by far the best estimate in each project.

25 Huge amount of documentation Using BIM to generate drawings increase efficiency and improves QA heavily. AHUS example: 4000 unique rooms (5.500 rooms in total) are drawn in plan and elevation (4 drawings),12 to 24 revisions. Average drawings. Object libraries for QA of equipment Used for coordinating 50 architects. New ways of working In Espoo Hospital the design group decided (and the client accepted) that there will be no 2D drawing circulation regarding the holes for ducts and other mechanical equipment in structures Hundreds of drawings will be replaced by the BIM Collaboration and coordination will be carried out thru BIM

26 Documentation from BIM Norway - New Ahus - Generate drawings from model unique rooms. 3 design phases revisions pr. phase Plan + 4 elevations pr. room

27 Documentation from BIM Norway - New Ahus - Generate drawings from model Nearly room drawings. Generated from model Object modeling = only one presence of each information in project. Reduces errors

28 Process overview Experiences focus on early phases Room and equipment database Organization Visualization Documentation Tendering and procurement Lifecycle cost Clash detection Construction Facility Management

29 10 minutes break use of OpenBIM Hospitals in Denmark Norway and Espoo Hospital in Finland

30 Experiences Build New Ahus: Documentation, Class detection, Room/EQ Skt Olav: Documentation, Class detection, Room/EQ Novozymes: Class detection, Organization, Visualization, 4D In design DNU Århus: Documentation, Class detection, Room/Eq Espoo Finland: Clash detection, Visualization, Room/EQ, simulations. In competition Nyt OUH: Competition, Sketchup, IFC -> BIM Room/Eq In program Rigshospitalet: Room/Eq?

31 Technical Perspectives and experiences We have looked at technical BIM in early phases Class detection Visualization Room/Eq Documentation - Cost The potential is present in all phases Sustanibility Simulation Construction phases FM and Operating Total lifecycle But don t forget implementation, organisation and culture

32 Organization culture, Open project information New technologi causes new hapits New hapits causes change in culture

33 Balanced approaches to the process Controls and rules Written agreements Terms and condition Laws and Regulation Explicit interfaces Protecting rights Withstanding arbitration Flow Shared intention Mutual understanding Win Win Focus on momentum Adjusting the rules Flexibility Open communication Shared information Open mind

34 Organisation and key driver Consultant, contractor or client driven? Contractor driven - Increase efficiency in pricing, planning and communicating. Consultant driven Increase quality in co-operation of design team.

35 Organisation and key driver Information life cycle Building projects are fragmented in disciplines and phases. Only the client can require that all disciplines contributes to a common BIM in the entire project life cycle

36 Organisation and key driver Information quality Efficient use of data in building lifecycle requires consistency in data. BIM projects is more sensitive to interdisciplinary irregularities in quality and format of information. Only the client can make a unison requirement in order to make all disciplines deliver consistent, relevant data.

37 Organisation and key driver A Business Model Total project cost is the sum of many activities. The biggest is by far construction. Total Building Cost Construction Financing Public Duties and taxes Design fees

38 Organisation and key driver A Business Model Total project cost is the sum of many activities. The biggest is by far construction. Using a few percent more on the consultants fees and gain a much greater profit from construction quality and cost. Total Building Cost Construction Financing Public Duties and taxes Design fees

39 Organisation and key driver Business model To profit from open BIM in one phase may require an effort by another discipline. I.e. Clash detection. Only the client can adjust fees between disciplines according to effort, risk and created value. Client Share risk / Share profit Scope Design Tendering Construction FM Design team Contractor End User Creates value with open BIM Profit/Risk

40 Organisation and key driver Example 1 An electro engineer doesn t model the downlights. 2D circles under the ceiling All other components are modeled and coordinated. RFI was about a downlight colliding with another object. Shows the strength of clash detection since there where little other clashes. Shows the weakness. The BIM is only as good as the worst domain model.

41 Organisation and key driver Example 2 Information lifecycle and quality In this case the BIM is used for production of drawings (graphic documentation) and FM reports (text documentation). Both documentations are enhanced after exports from model. When making the final FM documents there s no longer consistency between drawings and reports (or the BIM). The lifecycle and interoperability of the information is broken. It demonstrates the importance of focusing on information lifecycle. Information is not meant for single process use in a BIM project.

42 Organisation and key driver Experiences - Strategic focus The client has to understand the potential and challenges in using open BIM in order to define the strategic goals of the specific project. The client has to be determinate on using open BIM. If open BIM requirements weakens at the first sign of challenges in project it can jeopardize efficiency and profit for all disciplines. The client should be willing to adjust traditional processes and requirements to improving efficiency with the new technologies.

43 Big Room Knowledge Centre Working interdisciplinary parallel on the same subjects

44 How to make it happen in the projects To identify the benefits of BIM Modeling should be beneficial to all parties in the project Setting up goals The goals for the usage of BIM in each project should be high enough that they generate clear benefits but at the same time realistic. Coordination of BIM There must be somebody managing the BIM work and collaboration Achievements of the goals should be monitored during the project Common learning All parties have gaps in knowledge - make sure that there are enough resources for the learning process The most important thing is to succeed

45 Summary and key findings Why? High complexity - Cost, time and quality critical Need for all available QA tools How? Using shared and open information models (BIM) Awareness of new organization and new cultures Who? All parties must gain for the modeling Client must take leadership New role as BIM coordinator When? All project phases from program to operation Starting now and use our common experiences

46 Summary and key findings Why? High complexity - Cost, time and quality critical Need for all available QA tools How? Using shared and open information models (BIM) Awareness of new organization and new cultures Who? All parties must gain for the modeling Client must take leadership New role as BIM coordinator? When? All project phases from program to operation Starting now and use our common experiences

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND BIM in Finland today TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair GRAVICON BIM SERVICES BIM Manager Specifications and Supervision for BIM projects BIMwise WEB-Based

More information

COBIM. Series 8. Use of models for visualization. Common BIM Requirements 2012. v 1.0

COBIM. Series 8. Use of models for visualization. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 8 Use of models for visualization Foreword The publication series Common BIM Requirements 2012 is the result of a broadbased development project entitled

More information

EDUCATIONAL SYSTEM - buildingsmart NORWAY PROCESS ROOM TOKYO 16.10.2012 STEEN SUNESEN

EDUCATIONAL SYSTEM - buildingsmart NORWAY PROCESS ROOM TOKYO 16.10.2012 STEEN SUNESEN NATIONAL openbim REQUIRES EDUCATION 1. openbim is a project requirement in more and more Norwegian projects. 2. Move from pilot projects to broad national use. 3. Establish a low-threshold information/requirement

More information

New Business Models in Construction

New Business Models in Construction New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director

More information

BUILDING A STRATEGY FOR BIM

BUILDING A STRATEGY FOR BIM BUILDING A STRATEGY FOR BIM A Roadmap for Clients Graham Jones Chair, Davis Langdon BIM Steering Group Building a Strategy for BIM: A roadmap for Clients Introduction Conditions for Success Why? What How?

More information

Tekla Structures More than a detailing tool. Precast concrete

Tekla Structures More than a detailing tool. Precast concrete Tekla Structures More than a detailing tool Precast concrete Much more Than a detailing tool a Tekla Structures is much more than design and detailing software: it is the most accurate and comprehensive

More information

A strategy for use of BIM during the assets life cycle & case study from the New Østfold Hospital

A strategy for use of BIM during the assets life cycle & case study from the New Østfold Hospital A strategy for use of BIM during the assets life cycle & case study from the New Østfold Hospital EuHPN Seminar - Building Information Modelling (BIM) for Healthcare TNO, Leiden (NL), 17.04.2014 Birger

More information

How To Design A Bim Project

How To Design A Bim Project BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)

More information

COBIM. Series 1. General part. Common BIM Requirements 2012. v 1.0

COBIM. Series 1. General part. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 1 General part Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based development project entitled COBIM. The need for

More information

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project Series 12 author Insinööritoimisto Olof Granlund Oy: Markku Jokela, Tuomas Laine, Reijo Hänninen Foreword The publication series Common BIM 2012 is the result of a broadbased development project entitled

More information

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow

More information

BIM-Guide for Germany

BIM-Guide for Germany BIM-Guide for Germany Information und guidebook Abstract Research program ZukunftBAU, A research program of the Federal Ministry for Transport, Building and Urban Affairs (BMVBS), Federal Republic of Germany

More information

Nokia Siemens Networks Service Operations and Management Solution

Nokia Siemens Networks Service Operations and Management Solution Nokia Siemens Networks Service Operations and Management Solution Delightful service experience that boosts operators bottom lines Executive Summary 2/6 Service Operations and Management Solution When

More information

Mari Karttunen, NCC Housing Property Development Manager, Architecture. 7.10.2014 NCC-yhtiöt 1

Mari Karttunen, NCC Housing Property Development Manager, Architecture. 7.10.2014 NCC-yhtiöt 1 Mari Karttunen, NCC Housing Property Development Manager, Architecture 7.10.2014 NCC-yhtiöt 1 1. NCC 2. VDC in NCC 3. Positive experience 1. NOVO, Denmark 2. KVÆSTHUSBROEN, Denmark 4. Savings 1. Renovation

More information

BIM Pilot Getting Started Guide. For Construction Professionals. next

BIM Pilot Getting Started Guide. For Construction Professionals. next BIM Pilot Getting Started Guide For Construction Professionals Moving to BIM can seem like a daunting task. This guide provides a simple framework that helps you get started putting BIM into practice in

More information

CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN

CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-09-16 Version: Draft #7 Page: 1 EXECUTIVE SUMMARY Business Environment [to

More information

Building Information Modelling and collaborative construction

Building Information Modelling and collaborative construction Building Information Modelling and collaborative construction How technology is transforming construction For today s CEO in the construction industry, the drive for faster, more efficient delivery of

More information

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016)

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) Dnro 7202/804/2008 Unofficial translation Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) 1 The starting points and grounds for the agreement

More information

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland openbim building project: SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND Skanska Finland 1 Contents t Skanska k Who are we? BIM Implementation in Skanska Globally openbim in Finland Example Skanska House,

More information

BIM Essential Guide. For BIM Adoption in an Organization

BIM Essential Guide. For BIM Adoption in an Organization BIM Essential Guide For BIM Adoption in an Organization BCA acknowledges the leadership provided by the BIM Steering Committee in support of the production of the BIM Essential Guides The BIM Essential

More information

Business opportunities for the IT industry with LSP solutions The IT industry perspective

Business opportunities for the IT industry with LSP solutions The IT industry perspective Business opportunities for the IT industry with LSP solutions The IT industry perspective IBM Point of View - Niels Pagh-Rasmussen, Executive Architect IBM - Antonio Pelliccia, European Union core team

More information

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BIM for plumbing design The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BY JUNCHENG (JAMES) YANG, PE, CPD, LEED

More information

User Group Meeting, Copenhagen, Wednesday 8 September 2010 IDM introduction, status and plan Jan Karlshøj IDM Coordinator

User Group Meeting, Copenhagen, Wednesday 8 September 2010 IDM introduction, status and plan Jan Karlshøj IDM Coordinator User Group Meeting, Copenhagen, Wednesday 8 September 2010 IDM introduction, status and plan Jan Karlshøj IDM Coordinator Introduction Information Delivery Manual (IDM) Information needed in specific business

More information

End-to-End Innovation Solutions. for Telehealth and Remote Patient Monitoring

End-to-End Innovation Solutions. for Telehealth and Remote Patient Monitoring End-to-End Innovation Solutions for Telehealth and Remote Patient Monitoring S3 Group is a global provider of telehealth solution consultancy to medical device vendors and healthcare providers. S3 Group

More information

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 3 Architectural design Series 3 Author Gravicon Oy Tomi Henttinen Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based

More information

Paule André Annika Koivu Gustavo Lopez Markku Suominen

Paule André Annika Koivu Gustavo Lopez Markku Suominen 19.12.2002 Paule André Annika Koivu Gustavo Lopez Markku Suominen Version 2.5 Company description Red Sun Consulting is a consulting and software development company based in Brussels We provide innovative

More information

HOW TO HIRE AN ARCHITECT

HOW TO HIRE AN ARCHITECT HOW TO HIRE AN ARCHITECT Welcome. We prepared this guide after seeing so many people struggle with understanding the design and construction process. This process can seem like a complex and frightening

More information

Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC

Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC 2013 Many building owners and facility managers lack good documentation for their automation control

More information

Common InfraBIM requirements YIV2015

Common InfraBIM requirements YIV2015 Common InfraBIM requirements YIV2015 Vol 1.0 MANAGING MODEL BASED PROJECT Quality control Interaction and collaboration Supervision and coordination Infra modeling Coordination of disciplines Gathering

More information

Singapore, 31 July 2013 The Building and Construction Authority (BCA) has organised a new competition to encourage more innovative ideas on mobile

Singapore, 31 July 2013 The Building and Construction Authority (BCA) has organised a new competition to encourage more innovative ideas on mobile MEDIA RELEASE BIM TECHNOLOGY PAVES THE WAY FOR GREATER INDUSTRY COLLABORATION - Inaugural BIM Mobile Apps Competition draws creative solutions for construction site management - Multi-disciplinary category

More information

Industry Foundation Classes (IFC)

Industry Foundation Classes (IFC) Industry Foundation Classes (IFC) BIM Interoperability Through a Vendor-Independent File Format A Bentley White Paper Volker Thein IFC Product Manager September 2011 Executive Overview buildingsmart International,

More information

Monte Carlo analysis used for Contingency estimating.

Monte Carlo analysis used for Contingency estimating. Monte Carlo analysis used for Contingency estimating. Author s identification number: Date of authorship: July 24, 2007 Page: 1 of 15 TABLE OF CONTENTS: LIST OF TABLES:...3 LIST OF FIGURES:...3 ABSTRACT:...4

More information

Building flexibility management

Building flexibility management Building flexibility management Arto SAARI Dr Tech Helsinki University of Technology, Laboratory of Construction Economics and Management Espoo, Finland arto.saari@hut.fi Pekka HEIKKILÄ M Sc AIR-IX Talotekniikka

More information

Challenges and opportunities. Mikael Söderström Department of Informatics micke@informatik.umu.se

Challenges and opportunities. Mikael Söderström Department of Informatics micke@informatik.umu.se Challenges and opportunities Department of Informatics micke@informatik.umu.se Outline Introduction The growing IT dependency Mobility Openness Outsourcing (sourcing) The web as a platform Organizing the

More information

Practical Strategy and Workflow for Large Projects: A Realistic Solution

Practical Strategy and Workflow for Large Projects: A Realistic Solution Practical Strategy and Workflow for Large Projects: A Realistic Solution Marco Brasiel/Diego Faria Frazillio & Ferroni SE3193 This class presents a strategy for development of structural projects using

More information

BuildingSMART International Infrastructure Room Work Plan 2015 Summary

BuildingSMART International Infrastructure Room Work Plan 2015 Summary BuildingSMART International Infrastructure Room Work Plan 2015 Background There is a critical need for a comprehensive neutral data model capable of representing both semantic and geometric aspects of

More information

Cloud and Mobile Services as strategic IT components for ROI increase

Cloud and Mobile Services as strategic IT components for ROI increase Cloud and Mobile Services as strategic IT components for ROI increase Dipl.-Ing. Reiner A. Meyer-Rössl ENI Sales Development, O&G Plant AutoCAD is well known 1982... but what about Autodesk? Digital Prototyping

More information

Top 10 Revit Tools for Project Management & Panel Discussion. Dat Lien, Donald Franklin, Steve Wilkerson Houston Area Revit Users Group April 2012

Top 10 Revit Tools for Project Management & Panel Discussion. Dat Lien, Donald Franklin, Steve Wilkerson Houston Area Revit Users Group April 2012 Top 10 Revit Tools for Project Management & Panel Discussion Dat Lien, Donald Franklin, Steve Wilkerson Houston Area Revit Users Group April 2012 Houston-Area Revit User Group Online Follow HARUG Online!

More information

ARCHITECTURAL DESIGN SOFTWARE SOLUTION

ARCHITECTURAL DESIGN SOFTWARE SOLUTION www.visionrez.com www.itwbcg.com ARCHITECTURAL DESIGN SOFTWARE SOLUTION A multibillion dollar company with nearly 100 years of history, ITW today designs and manufactures fasteners and components, equipment

More information

Financial Management Software as a Service

Financial Management Software as a Service White Paper Financial Management Software as a Service Overview 3 Financial Management Software as a Service 5 What to Look for? 7 Conclusions and Summary 9 About Efima 10 Overview Technology continues

More information

BIM to Sim. Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc.

BIM to Sim. Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc. BIM to Sim (How do I get that rich data into my simulations without re-entering?) Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc. Building Energy Simulation Forum 18 December 2013

More information

HOW TO HIRE AN ARCHITECT. office. Level 3, 272 Parnell Rd Auckland. web. www.myarchitects.co.nz email.home@myarchitects.co.nz phone.

HOW TO HIRE AN ARCHITECT. office. Level 3, 272 Parnell Rd Auckland. web. www.myarchitects.co.nz email.home@myarchitects.co.nz phone. HOW TO HIRE AN ARCHITECT introduction Nothing is more exciting than starting a building project, and nothing will affect the success of your project more than hiring the right architect. An architect not

More information

Built Environment Process Reengineering (PRE): Infra FINBIM

Built Environment Process Reengineering (PRE): Infra FINBIM RAKENNETTU YMPÄRISTÖ Tarvitaanko tätä palkkia? (PRE): Infra FINBIM buildingsmart and Infra FINBIM - Nordic Workshop in Helsinki November 30th 2011 30.11.2011 Built Built Environment Process Innovations

More information

Building an Effective Business Architecture & Metrics Capability

Building an Effective Business Architecture & Metrics Capability Building an Effective Business Architecture & Metrics Capability Building an effective business architecture capability is fundamentally about organisational change management. A siloed business architecture

More information

Getting Started with BIM (Building Information Modeling)

Getting Started with BIM (Building Information Modeling) Getting Started with BIM (Building Information Modeling) Curt Egli Synergis Building Solutions Engineer Session Summary This session will walk you through issues you should consider when strategizing,

More information

BIM An Introduction. 16 th April 2012 Engineers Ireland

BIM An Introduction. 16 th April 2012 Engineers Ireland BIM An Introduction 16 th April 2012 Engineers Ireland Agenda Brian Lahiff - Introduction James Duggan - Civil John Casey - Structural Michael Downey - MEP BIM An Introduction Brian Lahiff Thomas Garland

More information

Collaboration is Key for the Future of Architecture

Collaboration is Key for the Future of Architecture Collaboration is Key for the Future of Architecture MBMO Architects Case Study Sydney Adventist Hospital (San), Wahroonga MBMO Architects www.mbmo.com.au MBMO Architects, one of Sydney s leading studios,

More information

UNDERGRADUATE CIVIL-ENGINEERING TRAINING REQUIREMENTS TO FACILIATE INTEGRATED PROJECT DELIVERY (IPD) Andrew Whyte, Curtin University, Australia

UNDERGRADUATE CIVIL-ENGINEERING TRAINING REQUIREMENTS TO FACILIATE INTEGRATED PROJECT DELIVERY (IPD) Andrew Whyte, Curtin University, Australia UNDERGRADUATE CIVIL-ENGINEERING TRAINING REQUIREMENTS TO FACILIATE INTEGRATED PROJECT DELIVERY (IPD) Andrew Whyte, Curtin University, Australia Abstract The Australian Government Department of Innovation,

More information

Transition to 3D Fabrication Workflows

Transition to 3D Fabrication Workflows Autodesk Autodesk Fabrication Solutions Transition to 3D Fabrication Workflows Autodesk is committed to the use of Building Information Modeling (BIM) to drive integrated and connected data across the

More information

Using BIM In HVAC Design

Using BIM In HVAC Design This article was published in ASHRAE Journal, June 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be

More information

Results of a survey of the Europe 2020 Monitoring Platform on the Flagship Initiative `Digital Agenda for Europe`

Results of a survey of the Europe 2020 Monitoring Platform on the Flagship Initiative `Digital Agenda for Europe` Results of a survey of the Europe 2020 Monitoring Platform on the Flagship Initiative `Digital Agenda for Europe` Presentation by Markku Markkula, Member of the Espoo City Council, Finland, member of the

More information

The Norwegian healthcare system and Market. 26.11.2014 Jørn Dreyer

The Norwegian healthcare system and Market. 26.11.2014 Jørn Dreyer The Norwegian healthcare system and Market 26.11.2014 Jørn Dreyer Todays presenter Jørn Dreyer Financial auditor from the University in Bodø 19 years experience within healthcare to Hospitals and primary

More information

Citizen Engagement Platform

Citizen Engagement Platform 2012 Citizen Engagement Platform Kristin Russell, Secretary of Technology and Chief Information Officer and Sherri Hammons, Chief Technology Officer Office of Information Technology, State of Colorado

More information

Design without compromise. Autodesk Revit. Architecture 2010

Design without compromise. Autodesk Revit. Architecture 2010 Design without compromise. Autodesk Revit Architecture 2010 BIM Simply a Better Way of Working Deliver projects faster, more economically, and with enhanced potential for reduced environmental impact.

More information

THE NATIONAL LIBRARY of Finland Bulletin 2014

THE NATIONAL LIBRARY of Finland Bulletin 2014 THE NATIONAL LIBRARY of Finland Bulletin 2014 The renovation of the National Library of Finland respects Engel's architecture Dorrit Gustafsson Completed in 1845, the main building of the National Library

More information

The Building Process - challenges in a changing environment

The Building Process - challenges in a changing environment The Building Process - challenges in a changing environment Introduction Tore I Haugen, professor BEAM - Building Economics and Architectural Management Norwegian University of Science and Technology The

More information

Green Prefab: Civil Engineering Hub in Microsoft Windows Azure

Green Prefab: Civil Engineering Hub in Microsoft Windows Azure Green Prefab: Civil Engineering Hub in Microsoft Windows Azure MICROSOFT CLOUD FUTURES 2012 May 7, 2012, Berkeley, USA Furio Barzon co-founder & CEO Partners: Emerging market in the World green buildings

More information

How To Get The Construction Industry To Adopt Building Information Modelling

How To Get The Construction Industry To Adopt Building Information Modelling The future of construction contract management in the digital age Abstract This essay will discuss the future of construction management in the digital age. Building Information Management (BIM) will form

More information

You ve never seen anything like it

You ve never seen anything like it GH3 You ve never seen anything like it We wanted to rethink everything so we could give our customers more time to care. This meant taking a long, hard look at exactly what users really want and need to

More information

T7.3 National Seminars: Finland

T7.3 National Seminars: Finland T7.3 National Seminars: Finland Simon le Roux Aalto University School of Arts, Design and Architecture Department of Architecture, Chair of Wood Construction 24/04/2014 E2ReBuild T7.3 national seminar

More information

new services: the next step the group strategy is about new usages explosion of volumes and new usages emerging

new services: the next step the group strategy is about new usages explosion of volumes and new usages emerging new services: the next step Thierry ZYLBERBERG executive VP strategic marketing the group strategy is about new usages explosion of volumes and new usages emerging administration transport education citizen

More information

InfraBIM Tiina Perttula 19.11.2013

InfraBIM Tiina Perttula 19.11.2013 InfraBIM Tiina Perttula 19.11.2013 The Finnish Transport Agency FTA Is a multidisciplinary expert organisation specialising in transport Responsible for the Finnish transport infrastructure and the overall

More information

Aalto University masters change and meets its vision with QPR EnterpriseArchitect

Aalto University masters change and meets its vision with QPR EnterpriseArchitect (Picture courtesy of Aalto University) Aalto University masters change and meets its vision with QPR EnterpriseArchitect When you have achieved consensus on how the elephant looks, you can start discussing

More information

Managing Open Source Code Best Practices

Managing Open Source Code Best Practices Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate

More information

Human Resource Information System Contributes to the Management of Competence and Knowledge

Human Resource Information System Contributes to the Management of Competence and Knowledge 11th International Conference on Human Resource Development Research and Practice across Europe, June 2 4, 2010, Pecs, Hungary Human Resource Information System Contributes to the Management of Competence

More information

Governing the implementation of BIM A construction client perspective Master of Science Thesis

Governing the implementation of BIM A construction client perspective Master of Science Thesis Governing the implementation of BIM A construction client perspective Master of Science Thesis GEORGIOS KARATHODOROS ÓLAFUR RAFN BRYNJÓLFSSON Department of Civil and Environmental Engineering Division

More information

SAMPLE INVITATION TO TENDER ADVERTISEMENT (CONTRACT)

SAMPLE INVITATION TO TENDER ADVERTISEMENT (CONTRACT) SAMPLE INVITATION TO TENDER ADVERTISEMENT (CONTRACT) Invitation to Tender [Insert brief description of project/consultancy E.g. provision of legal services for X native title claim ]. [Name of Representative

More information

SAP Preventive Maintenance The Core and More. Len Harms - Vesta

SAP Preventive Maintenance The Core and More. Len Harms - Vesta SAP Preventive Maintenance The Core and More Len Harms - Vesta Agenda The Core Preventive Maintenance The Core Light CBM and More The Core PM Preventive Maintenance: Forms Preventive maintenance Time-based

More information

PLANNING AND BUILDING OF A NEW HOSPITAL FROM VISIONS TO REALITIES - EXPERIENCES FROM ST. OLAVS HOSPITAL IN TRONDHEIM

PLANNING AND BUILDING OF A NEW HOSPITAL FROM VISIONS TO REALITIES - EXPERIENCES FROM ST. OLAVS HOSPITAL IN TRONDHEIM PLANNING AND BUILDING OF A NEW HOSPITAL FROM VISIONS TO REALITIES - EXPERIENCES FROM ST. OLAVS HOSPITAL IN TRONDHEIM Arne Nesje, SINTEF Building and Infrastructure, Norway arne.nesje@sintef.no ABSTRACT

More information

Winshuttle Presentation. Jan Mattsson

Winshuttle Presentation. Jan Mattsson Winshuttle Presentation Jan Mattsson Agenda ADSOTECH presentation Who we are and what we do Winshuttle presentation - Who they are Winshuttle products Functionality and Usage areas MDM and Data Cleansing

More information

How To Develop A Landxml For A City Planning Project

How To Develop A Landxml For A City Planning Project buildingsmart and Infra FINBIM Nordic Workshop, Helsinki, 30.11.2011 Report Kalle Serén, Eurostep Oy 1.12.2011 buildingsmart / InfraFINBIM Nordic Workshop Participants from Nordic Countries + some other

More information

Research Investments in Large Indian Software Companies

Research Investments in Large Indian Software Companies Research Investments in Large Indian Software Companies Pankaj Jalote Professor, Department of Computer Science and Engineering Indian Institute of Technology Kanpur, India 208016 jalote@iitk.ac.in, www.cse.iitk.ac.in/users/jalote

More information

Cloud Computing. The impact for IT departments and the IT professional. by Maurice van der Woude

Cloud Computing. The impact for IT departments and the IT professional. by Maurice van der Woude Cloud Computing The impact for IT departments and the IT professional by Maurice van der Woude Cloud Computing The impact for IT departments and the IT professional Preface 3 Organizational changes 4 Moving

More information

Company Presentation Nemetschek Group

Company Presentation Nemetschek Group Company Presentation Nemetschek Group January 15, 2014 Who we are History Company foundation: 50 years ago by Prof. Georg Nemetschek Innovation: Computer Aided Design (CAD) software replaced drawing board

More information

PS.12. 4D Scheduling A Case Study

PS.12. 4D Scheduling A Case Study PS.12 4D Scheduling A Case Study Mr. Abhimanyu Basu PE PSP A 4D schedule is a 3 dimensional CAD model How long would it take. attached to the fourth dimension of time via a schedule. The concept of 4D

More information

Reference Process for Enterprise Architecture enabled ICT Planning

Reference Process for Enterprise Architecture enabled ICT Planning Reference Process for Enterprise Architecture enabled ICT Planning NSW GEA Toolkit R1 April 2015 Contact ea@finance.gov.nsw Strategic Policy Department of Finance, Services & Innovation 1 Table of Contents

More information

Measuring Benefits from BIM across Whole-of-life Asset Management

Measuring Benefits from BIM across Whole-of-life Asset Management Measuring Benefits from BIM across Whole-of-life Asset Management 1 Research Team Adriana Sanchez Research Associate Sustainable Built Environment National Research Centre (SBEnrc)/ Curtin University Keith

More information

Using the Cloud for Business Resilience

Using the Cloud for Business Resilience Allen Downs IBM Business Continuity and Resiliency Services Using the Cloud for Business Resilience June 20, 2011 1 Agenda Why resiliency matters A successful cloud-based approach to resiliency Moving

More information

Navigating through the cloud: A case study in opportunities & risks

Navigating through the cloud: A case study in opportunities & risks Navigating through the cloud: A case study in opportunities & risks September 2015 Part of the IT Applications Now and in the Future Theme ACS Conference Canberra 2015 Major Trends Mobility Consumer Creation

More information

Semantic and Organisational Interoperability Issues in Public Sector in Norway

Semantic and Organisational Interoperability Issues in Public Sector in Norway Semicolon Semantic and Organisational Interoperability Issues in Public Sector in Norway Terje Grimstad, project leader, Semicolon 1 Introduction Full electronic interoperability between public and private

More information

INTEGRATION - THE KEY TO VALUE MANAGEMENT. Martin Robinson, Principal Consultant, WS Atkins Management Consultants

INTEGRATION - THE KEY TO VALUE MANAGEMENT. Martin Robinson, Principal Consultant, WS Atkins Management Consultants Introduction INTEGRATION - THE KEY TO VALUE MANAGEMENT Martin Robinson, Principal Consultant, WS Atkins Management Consultants The focus of the AGILE construction initiative is to identify ways that may

More information

The AEC Professional s Guide to Outsourcing BIM Management

The AEC Professional s Guide to Outsourcing BIM Management The AEC Professional s Guide to Outsourcing BIM Management A good BIM manager is vital to an AEC firm s success. But what constitutes good BIM management? What does it mean to outsource BIM management,

More information

Construction automation and productivity - Industry perspective

Construction automation and productivity - Industry perspective Construction automation and productivity - Industry perspective Vice President R&D, Ilkka Romo Skanska Oy 22.1.2013 1 22.1.2013 Ilkka Romo Skanska in short One of the world s leading companies in construction

More information

IT support of contract and contracting

IT support of contract and contracting IT support of contract and contracting Carolyn Paris presented at e-stockholm 08 Proactive Law & IT Who am I? Former lawyer, corporate finance partner, Davis Polk & Wardwell NYC 1978-1999 Experience in

More information

FABRICATION DRAWINGS A Paradigm Shift

FABRICATION DRAWINGS A Paradigm Shift INNOVATIVE DIMENSIONS Presented by Fitzpatrick Engineering Group March 2013 2012 Finalist Innovation in Structural Engineering DRAWINGS A Paradigm Shift 19520 Catawba Avenue, Ste 311 Cornelius, NC 28031-3711

More information

SOLUTIONS FROM VIANOVA SYSTEMS

SOLUTIONS FROM VIANOVA SYSTEMS NovapointDCM & QuadriDCM Sydhavna, Oslo - Statens vegvesen/vianova SOLUTIONS FROM VIANOVA SYSTEMS The transport infrastructure industry worldwide is restructuring to meet increasing demands for shorter

More information

Henrik Blomé. 12 March 2014

Henrik Blomé. 12 March 2014 Henrik Blomé March 2014 1 HENT in brief Norwegian construction company Established in 1980 named HENT in 2007 National market coverage 500+ employees Strong historic growth Turnover (NOKm) 4,000 3,500

More information

Strategic Choices and Key Success Factors for Law Firms June, 2010. Alan Hodgart

Strategic Choices and Key Success Factors for Law Firms June, 2010. Alan Hodgart Strategic Choices and Key Success Factors for Law Firms June, 2010 Alan Hodgart The Association of Danish Law Firms 1 Huron Consulting Group Inc. All rights reserved. Huron is a management consulting firm

More information

PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT

PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT Anoop Sattenini, Salman Azhar*, and Joseph Thuston McWhorter School of Building Science, Auburn University, Auburn, Alabama,

More information

European Network of Construction Companies for Research and Development

European Network of Construction Companies for Research and Development ECTP Conference 2011 Progress in BIM: ENCORD VCP & 5Di 4-5 October 2011 Warsaw, Poland Menno de Jonge Ballast Nedam Director of Innovation Menno de Jonge ENCORD Vice President Content Introduction to ENCORD

More information

BIM Strategy for NHSScotland

BIM Strategy for NHSScotland BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership

More information

The Scottish Wide Area Network Programme

The Scottish Wide Area Network Programme The Scottish Wide Area Network Release: Issued Version: 1.0 Date: 16/03/2015 Author: Andy Williamson Manager Owner: Anne Moises SRO Client: Board Version: Issued 1.0 Page 1 of 8 16/04/2015 Document Location

More information

A Construction-Oriented, 5D BIM Environment

A Construction-Oriented, 5D BIM Environment Vico Office Suite A Construction-Oriented, 5D BIM Environment The Vico Office Suite is purpose-built for building construction planning and management. Using The Vico Office Suite, builders can collaborate

More information

CPIx - IT ASSESSMENT FORM

CPIx - IT ASSESSMENT FORM CPIx - IT ASSESSMENT FORM Part 1 - General Information and Company Policies on Information Exchange Part 1 of this questionnaire covers general policy issues on the exchange of electronic information within

More information

BIM. Building Intelligent Models For Better Information Management. By: Sean Arbic

BIM. Building Intelligent Models For Better Information Management. By: Sean Arbic BIM Building Intelligent Models For Better Information Management By: Sean Arbic Many people, from various design disciplines, call CAD Masters everyday regarding BIM. What is BIM? Why is BIM so important?

More information

RoadBIM Seminar 11.09.2013 Tallinn

RoadBIM Seminar 11.09.2013 Tallinn RoadBIM Seminar 11.09.2013 Tallinn Ongoing Finnish InfraBIM Activities and the Finnish Inframodel Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 3 Background Building Information

More information

GIS DESIGN AND IMPLEMENTATION SERVICES

GIS DESIGN AND IMPLEMENTATION SERVICES 22-1 21 24 23 22 30 32 25 33 29 34 28 35 28 GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry

More information

Building next generation consortium services. Part 3: The National Metadata Repository, Discovery Service Finna, and the New Library System

Building next generation consortium services. Part 3: The National Metadata Repository, Discovery Service Finna, and the New Library System Building next generation consortium services Part 3: The National Metadata Repository, Discovery Service Finna, and the New Library System Kristiina Hormia-Poutanen, Director of Library Network Services

More information

GPS Machine Control Grading & BIM (Building Information Modeling)

GPS Machine Control Grading & BIM (Building Information Modeling) GPS Machine Control Grading & BIM (Building Information Modeling) Shawn Herring ProSoft Civil Applications Engineer Training & Support Manager Follow us on any of these media sites Facebook ProSoft Twitter

More information

The changing role of the IT department in a cloud-based world. Vodafone Power to you

The changing role of the IT department in a cloud-based world. Vodafone Power to you The changing role of the IT department in a cloud-based world Vodafone Power to you 02 Introduction With competitive pressures intensifying and the pace of innovation accelerating, recognising key trends,

More information