1 Energomontaż Południe S.A. Meeting with Investors Development of the Energomontaż Południe S.A. Capital Group Warsaw, 18 March 2010
2 /COMPANY PROFILE/COMPANY MANAGEMENT BOARD/ Andrzej HOŁDA President of the Management Board Managing Director Alina SOWA Vice President of the Management Board Financial Director Jacek FYDRYCH Member of the Management Board Director of Trade Dariusz KOWZAN Member of the Management Board Director of Contract Implementation and Development 2
3 /COMPANY PROFILE/OPERATIONS Energomontaż Południe SA specialises in the assembly, modernisation and repair of equipment and installations for professional and industrial electric power plants and hydroelectric power plants, as well as the construction of new,complete power facilities. It also assembles and installs industrial equipment for coking plants, cement plants, chemical plants and refineries. Its long experience, highly qualified management team and cooperation with reputable companies allows it to implement the latest assembly technologies for power industry equipment. 3
4 /COMPANY PROFILE/ SCOPE OF OPERATIONS/ Cooling installations 2. Turbine set 3. Carbonising system 4. Water and steam pipelines 5. Combustion system 6. Pressure element 7. Coal bunkers 8. Coal pulverizers 9. Deslagging system 10. Ventilators 11. Air heaters 12. Electrostatic precipitator 13. Flues 4
5 CURRENT POTENTIAL OF THE COMPANY 5
6 COMPANY POTENTIAL IMPORTANT CONTRACTS GERMANY RDK8 POWER PLANT KARLSRUHE value of the work approx. PLN 120 million Assembly of pressure elements pertaining to vertical walls, heating surfaces, collectors and pipelines for the new 910 MW power unit. Hamm WESTFALLEN POWER PLANT value of the work approx. PLN 100 million Pre fabrication, delivery and assembly of exhaust and air flues (approx tonnes) for two newly constructed power units of 800 MW each. Karlsruhe 6
7 COMPANY POTENTIAL IMPORTANT CONTRACTS The NETHERLANDS EEMSHAVEN POWER PLANT value of the work approx. PLN 30 million Pre fabrication and supply of exhaust and air flues (about 2600 tonnes) for two newly constructed power units of 800 MW each. Eemshaven MAASVLAKTE POWER PLANT value of the work approx. PLN 13 million Assembly of the vertical walls, boiler suspension system and heating surfaces for the pressure element of a newlyconstructed 1100 MW power unit. Maasvlakte 7
8 COMPANY POTENTIAL IMPORTANT CONTRACTS POLAND BEŁCHATÓW POWER PLANT value of the work approx. PLN 190 million Assembly of pressure elements, steam and water pipelines, exhaust and air flues, as well as auxiliary systems. Gdańsk FOOTBALL STADIUM IN GDAŃSK LETNICA value of the work approx. PLN 85 million Pre fabrication, supply and construction assembly of a steel roof for the football stadium in Gdańsk Letnicy (approx tonnes). Bełchatów 8
9 COMPANY POTENTIAL CONTRACTING The Company's current portfolio of orders is PLN 479,464,000. PORTFOLIO OF ORDERS 2010 [PLN 'ooo' ooo] 2011 [PLN 'ooo' ooo] 1 Assembly Production Lüdenscheid Technical Office Industrial Production Large Projects and General Contracting Developer Other 928 Total Including exports
10 COMPANY PROFILE SUPPLEMENTARY ACTIVITIES DEVELOPER OPERATIONS KSIĄŻĘCE ESTATE Planned completion of construction of the Investment: April 2010 Residential part: 220 apartments of a total usable Area of: 13,820 m 2 Planned revenue from the sale of units: approx. PLN 80 million The next stage of implementation will be the construction of a commercial complex 10
11 COMPANY PROFILE SUPPLEMENTARY ACTIVITIES DEVELOPER OPERATIONS LEGNICKA PARK POPOWICE Usable office area 7,868.4 m 2 Commercialisation rate 96% Planned revenue from rentals PLN 5,400,000 Planned profit PLN 1,400,000 In 2010, one offarrangementcosts are planned for PLN 600,000 11
12 COMPANY PROFILE SUPPLEMENTARY ACTIVITIES TRAINING ACTIVITIES The Company's Training Centre offers courses in basic and advanced welding, copper soldering, oxygen and plasma cutting, plastics welding and courses for operators of covered arc welding equipment. STEEL MATERIALS WHOLESALE The unit conducts trade activities for steel materials. The warehouse conducts sales externally and at the same time supplies the Company's production units. The technical equipment it possesses allows it to provide a wide range of supplementary services, such as high precision sheet cutting and producing assembly ready elements from sheeting. 12
13 COMPANY PROFILE SUPPLEMENTARY ACTIVITIES The Laboratory Research Centre is highly experienced in studying the newest generation destructive and non destructive materials used in the power industry and other industries where steel structures of high technical parameters are employed. 13
14 COMPANY POTENTIAL INVESTMENT OUTLAYS IN THE COMPANY [PLN million] * *Outlays planned for
15 COMPANY POTENTIAL INVESTMENT OUTLAYS IN THE COMPANY 2009 Grupa GUS Name Outlays [PLN 'ooo' ooo] 1 and 2 Buildings and construction and 4 General purpose boilers, machines and equipment Technical equipment Means of transport Other fixed assets Intangible assets TOTAL Units Łaziska Assembly Production Plant Łagisza Industrial Production Plant Laboratory Research Centre Outlays [PLN 'ooo' ooo] Training Centre Integrated intangible assets Other TOTAL
16 COMPANY POTENTIAL PLANNED COMPANY INVESTMENT OUTLAYS FOR 2010 Grupa GUS Name Outlays [PLN 'ooo' ooo] Units Outlays [PLN 'ooo' ooo] 1 and 2 Buildings and construction and 4 General purpose boilers, machines and equipment Technical equipment Łaziska Assembly Production Plant Łagisza Industrial Production Plant Means of transport Other fixed assets Integrated intangible assets Intangible assets TOTAL Laboratory Research Centre Integrated intangible assets Other TOTAL
17 COMPANY POTENTIAL / EMPLOYMENT IN THE CAPITAL GROUP Blue collar workers White collar workers 17
18 / COMPANY POTENTIAL / COOPERATION ,600 1, ,200 1,168 1, ,000 1, I II III IV V VI VII VIII IX X XI XII Employment in Capital Group Cooperation 18
19 FINANCIAL DATA 19
20 FINANCIAL DATA REVENUES [PLN million] * Energomontaż Południe SA EP Capital Group *based on Q Report 20
21 [PLN million] / FINANCIAL DATA / SEGMENTATION NON CONSOLIDATED REVENUES BY SECTOR / * including developer *based on Q Report 21
22 [PLN million] / FINANCIAL DATA / SEGMENTATION CONSOLIDATED REVENUES BY SECTOR / including developer * *based on Q Report 22
23 / FINANCIAL DATA / PROFITABILITY OF GROSS PROFIT FROM SALES / [PLN million] % 14.3% 15.5% 13.6% 7.6% 7.7% 4.7% 5.0% * Energomontaż Południe SA EP Capital Group *based on Q Report 23
24 / FINANCIAL DATA / SEGMENT GROSS RESULT FROM SALES AND NET RESULT/ [PLN million] * Net profit Gross profit from sales *based on Q Report 24
25 / FINANCIAL DATA / CONSOLIDATED GROSS RESULTS FROM SALES AND NET RESULT / [PLN million] * Net profit Gross profit from sales *based on Q Report 25
26 No. COMPANY RESULT SELECTED BALANCE SHEET ITEMSI ASSETS 2009* [EP] 2009* [CG] I. Non current assets II. Current assets, including: Inventories Current receivables including receivables from issues Total assets No. LIABILITIES 2009* [EP] 2009* [CG] I. Equity, including: Capital reserves including capital from issues II. Non current liabilities Financial liabilities including bank credits and loans III. Current liabilities Financial liabilities including bank credits and loans Total liabilities *based on Q Report
27 / FINANCIAL DATA/ VALUE OF CONSOLIDATED INVENTORIES / [PLN million] * Development Value of material inventories *BASED ON Q result 27
28 BUILDING THE POTENTIAL OF THE CAPITAL GROUP 28
29 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Vision: On the basis of the experience and resources of Energomontaż Południe, to create an important engineering concern in the region specialising in the general contracting of installations and the assembly of power and industrial equipment. Strategic goals: 1. Growth through strategic alliances 2. Making use of synergies within the Capital Group 3. Reinforcing the financial strengths of the Company 4. Growth through mergers and acquisitions 5. Restructuring employment in the direction of highly qualified engineering personnel 6. Maximising the use of company assets beyond basic operations (inc. developer activities) 7. Inwestments in the production and assembly base 29
30 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Capital alliances: Thanks to an issue of series E shares, the Company joined the PBG Capital Group Effects: EP S.A. is described as the leader of the "Power group of companies in the PBG Group, operating in the area of contracting for the power industry Access to PBG Group know how Expanding potential markets to include those sectors in which the PBG Group operates Access to the financial potential of PBG 30
31 / SYNERGY IN THE CAPITAL GROUP / Revenue synergies Packaging of offers cooperating with entities in the capital group on making joint offers on high value tenders An effect of revenue synergy is the cooperation of Companies in the construction investment for MW power units in the Opole Power Plant, where: PBG is responsible for guaranteeing the investment financing, coordinating the project, and Energomontaż Południe is responsible for providing comprehensive assembly services and the pre fabricationand delivery of steel elements supporting the General Contractor in managing projects 31
32 / SYNERGY IN THE CAPITAL GROUP / Cost synergies Economies of scale the possibility of obtaining greater price reductions at the Group scale Reductioninsalescosts by using group contacts with strategic customers 32
33 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Reinforcing the financial strengths of the Company Number of shares in the series E issue: 22,582,001 Unit issue price per series E share: PLN 3.45 Proceeds from the issue: PLN 77,907, Thanks to the funds obtained from the issue, the company increased its capability of implementing large projects, and now has the financial strength to carry out mergers and acquisitions. 33
34 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Current shareholding structure Other shareholders per cent PBG S.A. 25 per cent + 1 share Renata Gasinowicz per cent Stanisław Gasinowicz 6.81 per cent Andrzej Hołda 6.96 per cent 34
35 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / The Company plans to designate the proceeds from the share issue for: PLN 50 million Acquisition of companies in the power industry PLN 12 million Working capital PLN 15 million Investments in fixed assets 35
36 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / GROWTH THROUGH MERGERS AND ACQUISITIONS / Mergers and acquisitions Entities with significant construction and design know-how resources Entities with high contracting and technological potential Basic criteria for the selection of M&A targets Complementary operational profile Entities which have a solid position in the industry Building value for EP shareholders by searching for attractively-priced entities Sound financial condition (we do not rule out acquiring entities which meet the above criteria but whose financial standing is in jeopardy, if they are obtainable at a bargain price) 36
37 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Restructuring employment As at The Company's goals are: to increase its engineering potential, to participate in investments at the design stage, to develop and launch new technologies, and it aims to achieve these by: doubling its engineering staff by 2012, 983 by: Engineering staff Others ongoing hiring within the Company, acquisitions of engineering firms operating in the power industry. 37
38 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Optimising Company assets beyond basic operations The Company owns land designated for the following investments: Katowice Ligota theksiążęce Estate Consecutive stages are under construction, covering commercial and residential sections 31,400 m 2 Katowice Piotrowice Land being developed as an estate, not far from the city centre m 2 Opole The Company owns land in Wójtowa Wieś of an area of 80,000 m 2 38
39 / BUILDING THE POTENTIAL OF THE CAPITAL GROUP / Inwestments in the production and assembly base Planned average yearly outlays in future years PLN million Growth in the production base by: direct outlays on fixed assets, the acquisition of companies with welldeveloped technical support. 39
40 / MARKET NEEDS / TENDERS / Investor Facility Subject of the tender ZEPAK PKE SA PKE SA Synthos Dwory Sp.z o.o. PGE SA Jastrzębska Spółka Węglowa SA PGE SA Elektrownia Konin Elektrownia Jaworzno III Elektrownia Łaziska Zakłady Chemiczne Dwory Dolna Odra Power Plant KWK Krupiński Bełchatów Power Plant Turnkey construction of a biomass storage and transport installation Adaptation of the OP 650k boiler on units No. 1, 2, 3, 4, 5, and 6 to reduce NOx emissions Adaptation of the OP 650k boiler on units No. 9, 10, 11 and 12 to reduce NOx emissions Construction of cogeneration sets based on gas powered engines Adding an installation for co combustion of biomass without the use of coal pulverizers in power unit No. 8 Construction of a cogeneration system with a 4 MWe generator powered by gas from mine demethanization Modernisation and renovation of the combustion system together with the boiler pressure elements of units No The current value of Company's offer shares, excluding construction of new power units, for the period , amounts to approx. PLN 1.3 billion. 40
41 / MARKET NEEDS / PLANNED INVESTMENTS / PGE [to 2025] Tauron [to 2020] Energa [to 2015] Enea [to 2020] [PLN billion] PGE: Construction of new power units: 2x 800 MW in Elektrownia Opole, 460MW in Elektrownia Turów Construction of a 1700 MW power plant in Lublin Complete modernisation of 6 power units in the Bełchatów Power Plant Tauron: Construction of a new biomass power unit in the Jaworzno Power Plant Construction of new power units in the Stalowa Wola, Blachownia and Halemba Power Plants Energa Construction of power units in the Ostrołeka Power Plant and the Elbląg Heat and Power Plant Enea Construction of a 100 MW power unit in the Kozienice Power Plant RWE Construction of a coal fired power plant in Wola (Silesia Province) ` 41
42 THANK YOUR FOR YOUR ATTENTION! Contact with investors: Alina Sowa - Vice President of the Management Board sowa@energomontaz.pl Katowice; ul. Mickiewicza 15 Tel.: ; Fax: info@energomontaz.pl; sekretariat@energomontaz.pl
REPORT of Energomontaż Południe S.A. Supervisory Board
REPORT of Energomontaż Południe S.A. Supervisory Board 1. Report on the operations of the Supervisory Board of Energomontaż Południe S.A. in 2009 including the Supervisory Board s self-evaluation. In 2009
More informationPBG Capital Group s Financial Results HI2010
PBG Capital Group s Financial Results HI21 Presentation: Jerzy Wiśniewski, CEO Przemysław Szkudlarczyk, CFO Warsaw, August 25th, 21 r. The most important events in the PBG CG in 2Q 21 MONTH EVENT slajd
More informationClean Coal Seminar 2014
Clean Coal Seminar 2014 Using lignite in the modern low-emission power plants Waldemar Szulc Vice President of the Board PGE GiEK S.A. Warsaw, 2 June 2014 Agenda Organisational structure Basic information
More informationPresentation of the Polimex-Mostostal Group April 2012
Presentation of the Polimex-Mostostal Group April 2012 Table of contents Activity of the Polimex Mostostal Group Portfolio of orders Accomplishments and development directions Financial results 3 14 17
More informationMERGER PLAN. of Energomontaż-Południe S.A. with its registered office in Katowice (KRS 0000080906) and
MERGER PLAN of Energomontaż-Południe S.A. with its registered office in Katowice (KRS 0000080906) and EP Hotele i Nieruchomości Spółka z ograniczoną odpowiedzialnością with its registered office in Katowice
More informationPGE - Polish Energy Group. Nuclear power development in Poland - we need decision today. Organisation of the Polish Power Sector After Consolidation
Nuclear power development in Poland - we need decision today Hanna Trojanowska Director of International Affairs and New Technologies Department PGE Polska Grupa Energetyczna S.A. Organisation of the Polish
More informationAdditional information to the extended consolidated report of TAURON Group for the First Quarter of 2013
Additional information to the extended consolidated report of TAURON Group for the First Quarter of 2013 9 May 2013 Table of Contents 1. Organisation of TAURON Capital Group 3 1.1. Basic Information on
More informationPRE-QUALIFICATION ANNOUNCEMENT
Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl
More informationDear Sir or Madam, President of the Management Board of Polimex-Mostostal SA. Konrad Jaskóła
Dear Sir or Madam, We concluded the year 2011 with sales results better than those generated in 2010. Given the market reality so difficult for the building engineering, the net result appeared to be on
More informationFinancial results of 2013 Outlook 2014+ 12 March 2014
Financial results of 2013 Outlook 2014+ 12 March 2014 DUON benefits from liberalisation of electric energy and gas markets: summary of 2013 +56% increase of revenues to almost PLN 400 m +54% increase of
More informationI. Consolidated Balance Sheet
I. Consolidated Balance Sheet Note At 30 2013 At 31 December ASSETS Non-current assets Property, plant and equipment 3.2 361 738 357 715 Goodwill 3.3 44 061 44 061 Other intangible assets 3.4 82 472 96
More informationREFERENCE LIST OF LARGE TRANSLATION PROJECTS FOR POWER, GAS AND ENVIRONMENTAL SECTOR CARRIED OUT BY BIRETA S.C.
ABENER ENERGÍA SA ALSTOM POWER ALSTOM Carbon Capture GmbH ALSTOM (Switzerland) Ltd ANDRITZ ENERGY & ENVIRONMENT GmbH ANSALDO ENERGIA S.p.A ARCTIC PAPER KOSTRZYN SA BUDIMEX SA / GAMA / TECNICAS REUNIDAS,
More informationza okres 12 miesięcy 2010 roku
EXTENDED CONSOLIDATED INTERIM REPORT for the fourth quarter of 2009 Q4/2009 MANAGEMENT BOARD REPORT ON THE OPERATIONS ENERGOMONTAŻ-POŁUDNIE S.A. FOR THE 12-MONTH PERIOD ENDING ON 31 DECEMBER 2010 za okres
More informationProgress on High Efficiency Coal Power Plants
CoalFleet for Tomorrow Progress on High Efficiency Coal Power Plants Dr. Jeff Phillips Sr. Program Manager, Generation McIlvaine Webcast March 1, 2012 CoalFleet for Tomorrow is a registered service mark
More informationPOLISH INFORMATION AND FOREIGN INVESTMENT AGENCY. Energy sector in Poland. Marta Kokoszka Manufacturing Team Foreign Investment Department
POLISH INFORMATION AND FOREIGN INVESTMENT AGENCY Energy sector in Poland Marta Kokoszka Manufacturing Team Foreign Investment Department EU climate and energy policy - targets for 2030 Raising the share
More informationPKN ORLEN Capital Group. February 2013
PKN ORLEN Capital Group February 2013 1 Agenda PKN ORLEN history and growth strategy Refining / Petrochemical / Retail core business Upstream / Energy growth segments Summary 2 From domestic leader to
More informationPOSSIBILITIES OF DH SECTOR INVESTMENTS IN POLAND
DBDH ANNUAL MEETING 27TH NOV 2014 POSSIBILITIES OF DH SECTOR INVESTMENTS IN POLAND WHAT, WHY, HOW AND WHERE RAMBOLL POLSKA SP. Z O.O. SEATED IN WARSAW In operation on Polish market since 1990 Previous
More informationCAPITAL GROUP CENTRUM NOWOCZESNYCH TECHNOLOGII SPÓŁKA AKCYJNA
CAPITAL GROUP CENTRUM NOWOCZESNYCH TECHNOLOGII SPÓŁKA AKCYJNA MID-YEAR CONDENSED CONSOLIDATED FINANCIAL STATEMENT OF THE CAPITAL GROUP CNT S.A. AND MID-YEAR CONDENSED SEPARATE FINANCIAL STATEMENT OF CNT
More informationEnergy Sector in Poland
Energy Sector in Poland Sector profile Polish Information and Foreign Investment Agency 2013 Financed by the Ministry of the Economy ISBN 978-83-63371-13-5 Table of content Energy sector in the world 3
More informationCURRICULUM VITAE. married (wife: Danuta, sons: Michał and Tomasz) I. Krzysztof Brejdak Usługi Zarządcze (30.04.2014 till now)
CURRICULUM VITAE PERSONAL DATA: Name: Krzysztof BREJDAK Date of birth: 29 March 1957 Domiciled: ul. Kosmiczna 45 43-310 Bielsko-Biała Mobile: 0048 605 195 703 E-mail: kbrejdak@wp.eu Marital status: married
More informationINTEC Engineering GmbH Heating Solutions for the Marine Industry
INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a
More informationIntegrated. for Steam Power Plants
Integrated Service Solutions for Steam Power Plants Services for thermal power plants Alstom is dedicated to keeping thermal power plants competitive. Thanks to our OEM expertise and involvement in around
More information2. Description of the ENEA Capital Group's operations...6 2.1. Generation... 6
Table of Contents: 1. Description of the organisation of the ENEA Capital Group...5 1.1. Description of changes made within the organisation of the Group... 5 1.2. Description of capital investments within
More informationREPORT OF THE MANAGEMENT BOARD. of Dom Maklerski mbanku S.A. with its registered seat in Warsaw. justifying the division of. Dom Maklerski mbanku S.A.
15 December 2015 REPORT OF THE MANAGEMENT BOARD of Dom Maklerski mbanku S.A. with its registered seat in Warsaw justifying the division of Dom Maklerski mbanku S.A. On 15 December 2015, the management
More informationInvestments in the development of renewable energy sources and cogeneration sources are key directions of the Capital Group investments.
3 ENVIRONMENT 3.1 Goals and priorities 3.2 Energy 3.3 Emissions 3.4 Renewable energy sources 3.5 Water and raw materials Key issues ENEA Capital Group's activities affect the environment. The most important
More informationChina Energy efficiency report
China Energy efficiency report Objective: 16% reduction in primary energy intensity by 215 Overview 211-211 (%/year) Primary intensity (EU=1)¹ 222 -- -2.8% ++ CO 2 intensity (EU=1) 294 -- -2.5% + CO 2
More informationREPORT OF THE MANAGEMENT BOARD ON OPERATIONS OF TAURON POLSKA ENERGIA S.A. FOR THE FINANCIAL YEAR 2014
REPORT OF THE MANAGEMENT BOARD ON OPERATIONS OF TAURON POLSKA ENERGIA S.A. FOR THE FINANCIAL YEAR 2014 MARCH 2015 TABLE OF CONTENTS 1. TAURON POLSKA ENERGIA S.A..........................................
More informationCondensed Quarterly Consolidated Financial Statements. for the Third Quarter of 2014 as at and for the period ended on 30 September 2014
The Lubelski Węgiel BOGDANKA Group Condensed Quarterly Consolidated Financial Statements for the Third Quarter of 2014 as at and for the period ended on 30 September 2014 Financial Statements prepared
More informationApril 2014. PKN ORLEN Capital Group
April 2014 PKN ORLEN Capital Group Agenda PKN ORLEN today & in the future Downstream core business Upstream & Energy growth segments Summary 2 Integrated oil&gas company with energy assets REFINING Strategic
More informationAviva Powszechne Towarzystwo Emerytalne Warszawa, 5 March 2010 Aviva BZ WBK S.A. ul. Prosta 70 00-838 Warszawa
Aviva Powszechne Towarzystwo Emerytalne Warszawa, 5 March 2010 Aviva BZ WBK S.A. ul. Prosta 70 00-838 Warszawa PGE Polska Grupa Energetyczna S.A. ul. Mysia 2 00-496 Warszawa In reference to the current
More informationThe following report presents financial data only. The full and binding version is available in Polish. K2 INTERNET S.A.
The following report presents financial data only. The full and binding version is available in Polish. K2 INTERNET S.A. Annual Financial Statement of K2 Internet S.A. for the twelve-month period ended
More informationCarbon Market Data publishes key figures on the European emissions trading scheme for the year 2010
PRESS RELEASE Carbon Market Data publishes key figures on the European emissions trading scheme for the year 2010 London, 4 April 2011 - Carbon Market Data, a European company providing carbon market research
More informationThe following report presents financial data only. The full and binding version is available in Polish. K2 INTERNET S.A.
The following report presents financial data only. The full and binding version is available in Polish. K2 INTERNET S.A. Annual Financial Statement of K2 Internet S.A. for the twelve-month period ended
More informationIt is worth investing here 2015-03-29 17:51:30
It is worth investing here 2015-03-29 17:51:30 2 In the Łódź voivodeship there are a lot of institutions supporting domestic and foreign investors. Among others, they include: the Regional Investors and
More informationUniversity of Iowa Power Plant
University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...
More informationPresentation of the Polimex-Mostostal Group November 2011
Presentation of the Polimex-Mostostal Group November 2011 Table of contents Activity of the Polimex Mostostal Group Portfolio of orders Accomplishments and development directions Financial results 3 19
More informationEnclosure no. 1 to the announcement about convening the Ordinary General Meeting of PGE Polska Grupa Energetyczna S.A.
Enclosure no. 1 to the announcement about convening the Ordinary General Meeting of PGE Polska Grupa Energetyczna S.A. for 27 June 2013 Information concerning proposed changes in the Company Statutes Below
More informationFact Sheet on China s energy sector and Danish solutions
Fact Sheet on China s energy sector and Danish solutions 1. EXPANSION WITH RENEWABLE ENERGY: China focuses on a massive expansion with non fossil energy that is renewable energy and nuclear energy. The
More informationThe ING Foundation for Polish Arts
ING COMMERCIAL FINANCE POLAND ANNUAL REPORT 2012 The ING Foundation for Polish Arts All images presented in the Annual Report belong to The ING Foundation for Polish Arts. The ING Foundation for Polish
More informationHigh-performance steam boiler and hot water boiler plants for industry
High-performance steam boiler and hot water boiler plants for industry Information 2/3 HKB leading manufacturer of industrial boiler plants in Europe and Asia Steam boilers with outputs up to 120 t/h and
More informationYour partner of choice for integrated energy solutions
E.ON Connecting Energies Your partner of choice for integrated energy solutions Would you like to reduce your company s energy costs? Do you have ambitious environmental objectives? Are you concerned about
More informationReport of the Supervisory Board of Echo Investment S.A. on the results of:
Report of the Supervisory Board of Echo Investment S.A. on the results of: -assessment of the separate financial statements of Echo Investment S.A. and the consolidated financial statements of Echo Investment
More informationCAPITAL MARKETS DAY 2014. Heusenstamm, Germany 26 November 2014
CAPITAL MARKETS DAY 2014 Heusenstamm, Germany 26 November 2014 Braas Monier More than a macro call Pepyn Dinandt, Group CEO First nine months 2014 at a glance Page 2 European recovery still expected to
More informationAdditional information to the extended consolidated financial report of the TAURON Group for the third quarter of 2011
Additional information to the extended consolidated financial report of the TAURON Group for the third quarter of 2011 9 November 2011 Table of Contents 1. Organisation of the TAURON Capital Group...4
More informationCompany Presentation Conference Call Q1 2005, May 13 REpower Systems AG
Company Presentation Conference Call Q1 2005, May 13 REpower Systems AG Speakers today Prof. Dr. Fritz Vahrenholt Pieter Wasmuth CEO & Corporate Strategy Finance & Personnel Former member of the board
More informationBoiler Tune-up Guide
Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ
More informationMillennium investment banking. June 2015
Millennium investment banking June 2015 Millennium investment banking Products and Services offered by Millennium investment banking Product Units Millennium investment banking offers a wide range of products
More informationConsolidated balance sheet
Consolidated balance sheet Non current assets 31/12/2009 31/12/2008 (*) 01/01/2008 (*) Property, plant and equipment 1,352 1,350 1,144 Investment property 7 11 11 Fixed assets held under concessions 13,089
More informationFinal report SA-R of the AB S.A. company for the financial year 2009/2010. covering the period from 01-07-2009 to 30-06-2010
Final report SA-R of the AB S.A. company for the financial year 2009/2010 covering the period from 01-07-2009 to 30-06-2010 Selected financial data translated into euro SELECTED FINANCIAL DATA in thous.
More informationThe development of gas cogeneration
The development of gas cogeneration PGNiG Capital Group Strategy PGNiG Capital Group is a leader in the Polish market of natural gas. Within its strategy, the Company aims to transform into a modern, integrated
More information: 1 : Time allowed : 3 hours Maximum marks : 100. Total number of questions : 6 Total number of printed pages : 7
Roll No : 1 : NEW SYLLABUS Time allowed : 3 hours Maximum marks : 100 Total number of questions : 6 Total number of printed pages : 7 NOTE : 1. Answer ALL Questions. 2. All working notes should be shown
More informationRenewable energy in hospitals. www.inergis.pl
Renewable energy in hospitals Company history Wachelka INERGIS S.A. specialises in a range of renewable energy sources: geothermal energy passive cold from heat pumps solar energy biomass energy cogeneration
More informationTable of Contents Introduction...5 The organisation of the ENEA Capital Group... 13 Description of the ENEA Capital Group's operations...
1 2 Table of Contents 1. Introduction...5 1.1. Letter of the President of the Management Board... 5 1.2. Selected financial data... 7 1.2.1. Selected consolidated financial data of the ENEA Capital Group...
More informationArgentina Energy efficiency report
Argentina Energy efficiency report Objectives: o 5.4% energy savings in industry in 216 o 6% electricity savings in 216 Overview 2- (%/year) Primary intensity (EU=1)¹ 16 - -2.3% + CO 2 intensity (EU=1)
More informationWhite Rose Carbon Capture and Storage (CCS) Project
White Rose Carbon Capture and Storage (CCS) Project Land adjacent to and within the Drax Power Station site, Drax, near Selby, North Yorkshire Environmental Permit Chapter III Site Layout Plan Applicant:
More informationCAPITAL GROUP POLSKI HOLDING NIERUCHOMOŚCI SPÓŁKA AKCYJNA
CAPITAL GROUP POLSKI HOLDING NIERUCHOMOŚCI SPÓŁKA AKCYJNA Consolidated report for the first half of 2015 POLSKI HOLDING NIERUCHOMOŚCI S.A. Consolidated report for the first half of 2015 (All amounts are
More informationSTIFEL 2015 INDUSTRIALS CONFERENCE 06.16.15. Stifel Nicolaus 2015 Industrials Conference June 16, 2015
1 STIFEL 2015 INDUSTRIALS CONFERENCE 06.16.15 Stifel Nicolaus 2015 Industrials Conference June 16, 2015 Forward-Looking Statements This material and related presentation may contain certain forward-looking
More informationGermany Energy efficiency report
Germany Energy efficiency report Objectives: 231 TWh of end-user energy savings by 216 Overview 29 2-29 (% / year) Primary intensity (EU=1) 1 99 + -1.3% - CO 2 intensity (EU=1) 16 - -1.6% - CO 2 emissions
More informationOptions and Possible Solutions: Gas. Power Ring Conference, 2008 9 December 2008, Warsaw
Options and Possible Solutions: Gas Power Ring Conference, 2008 9 December 2008, Warsaw Demand for electricity in Poland grows faster than availability of new production capacities GW Possibility of a
More informationRESULTS of LIBET S.A. FOR 2013 26 MARCH 2014
RESULTS of LIBET S.A. FOR 2013 26 MARCH 2014 Efficient management Thomas Lehmann President of the Board Managing Director of Libet S.A. Share in the market Ireneusz Gronostaj Member of the Board Financial
More informationProspects for a better linkage of the Polish market with the surrounding national electricity markets
Prospects for a better linkage of the Polish market with the surrounding national electricity markets Electricity Trading in CEE Region Session Zbigniew Olszewski Member of Management Board, TOE CEO, EGL
More informationSchneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, 2013. p i.
New York, NY, USA: Basic Books, 2013. p i. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=2 New York, NY, USA: Basic Books, 2013. p ii. http://site.ebrary.com/lib/mcgill/doc?id=10665296&ppg=3 New
More informationERK Eckrohrkessel GmbH (2016) 1. Powerful First-Class Boiler and Combustion Systems & Complete Engineering Services
ERK Eckrohrkessel GmbH (2016) 1 Powerful First-Class Boiler and Combustion Systems & Complete Engineering Services Background Eckrohrkessel History Eckrohr (corner tube) boiler technology was developed
More informationProud to be here, since 1853
Company Profile Proud to be here, since 1853 Ansaldo Energia is Italy s largest supplier, installer and service provider for power generation plants and components and one of the world s leading players
More informationBusiness Policy of CEZ Group and ČEZ, a. s.
Business Policy of CEZ Group and ČEZ, a. s. Contents: Introduction 1. CEZ Group mission and vision 2. Scope of business of CEZ Group 3. Business concept Guiding principles Trade Generation Electricity
More informationArcelorMittal Poland 03.06.2014
ArcelorMittal Poland 03.06.2014 ArcelorMittal Poland 6 locations 5 steel plants and the largest coke plant in Europe located in Zdzieszowice 70 per cent of Polish steel market potential Over 11.000 employees,
More information16 Cheung Kong Infrastructure Holdings Limited
CKI holds a 38.87% interest in Hongkong Electric, the sole electricity supplier for over 550,000 customers on Hong Kong Island and Lamma Island. Generating a stable cash income year after year, Hongkong
More informationHungary Energy efficiency report
Hungary Energy efficiency report Objectives: o 1.4 Mtoe of end-user energy savings by 216, including 312 ktoe in industry o 1.9 Mtoe of primary energy savings by 23, including around 4% in the power sector
More informationALCOA OF AUSTRALIA POSITION DESCRIPTION. Principal Electrical Engineer WAO Powerhouse Operations & Power Distribution
ALCOA OF AUSTRALIA POSITION DESCRIPTION Position: Manager: Principal Electrical Engineer WAO Powerhouse Operations & Power Distribution WAO Powerhouse Operations Manager Accountability Objective Accountability
More informationAPPENDIX 3B Financial Criteria for Retention on the Specialist List and Requirements for Acceptance of a Tender
APPENDIX 3B Financial Criteria for Retention on the Specialist List and Requirements for Acceptance of a Tender Introduction 1. The financial criteria for retention on the List of Approved Suppliers of
More informationOpinion on the audited financial statements of B3System S.A. for the period from January 1, 2009 to December 31, 2009 SPIS TREŚCI
SPIS TREŚCI I. GENERAL PART OF THE REPORT... 2 1. Identification data of the unit... 2 2. Information on the financial statements for the previous year... 7 3. Identification data of the entity authorized
More informationApplication of the Biomass, OxyFuel, and Flameless Combustion for the utilisation of pulverised coals for electricity generation
Application of the Biomass, OxyFuel, and Flameless Combustion for the utilisation of pulverised coals for electricity generation Acronym : BOFCom Research Area: Coal Type of project: Research Project duration:
More informationPGE Polska Grupa Energetyczna S.A. Consolidated financial statements For the year 2014
PGE Polska Grupa Energetyczna S.A. Consolidated financial statements For the year 2014 ended in accordance with IFRS EU (in PLN million) zakończony dnia 31 marca 2014 roku zgodne z MSSF (w tysiącach złotych)
More informationOpinion and Report of the Independent Auditor
Nordea Bank Polska S.A. Opinion and Report of the Independent Auditor Financial Year ended 31 December 2008 KPMG Audyt Sp. z o.o. The opinion contains 2 pages The report supplementing the auditor s opinion
More informationReport of the Management Board on the operations of ENEA S.A. in 2010
Report of the Management Board on the operations of ENEA S.A. in 2010 Report of the Management Board on the operations of ENEA S.A. in 2010 Poznan, 12 April 2011 Report of the Management Board on the operations
More informationConsolidated Annual Report of the AB Capital Group for the financial year 2008/2009. covering the period from July 1, 2008 to June 30, 2009
Consolidated Annual Report of the AB Capital Group for the financial year 2008/2009 covering the period from July 1, 2008 to June 30, 2009 Selected financial data converted to EUR SELECTED FINANCIAL DATA
More informationPresentation of Grupo ACS. September 2009
Presentation of Grupo ACS September 2009 Strategic vision A global leader in infrastructure development In the fields of civil and industrial engineering activities With sustainable and profitable growing
More informationACCOUNTING FOR NON-ACCOUNTANTS
Deutsch and Chikarovski's ACCOUNTING FOR NON-ACCOUNTANTS A Question and Answer Handbook Robert Deutsch and Kris Chikarovski THE FEDERATION PRESS 2012 Preface - x Who is this book for? x What is in this
More informationPressure Equipment Certification. Ensure the Conformity and Quality of Your Pressure Equipment. Worldwide. www.tuv.com/asme
INDUSTRIAL SERVICES PRESSURE EQUIPMENT CERTIFICATION Pressure Equipment Certification. Ensure the Conformity and Quality of Your Pressure Equipment. Worldwide. www.tuv.com/asme Worldwide Compliance of
More informationAbstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995)
Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995) This report updates the utilities costs previously developed in PEP Report 136, also titled Plant Utilities Costs (September
More informationConsolidated Statement of Profit or Loss (in million Euro)
Consolidated Statement of Profit or Loss (in million Euro) Q3 2013 Q3 2014 % change 9m 2013 9m 2014 % change Revenue 689 636-7.7% 2,126 1,909-10.2% Cost of sales (497) (440) -11.5% (1,520) (1,324) -12.9%
More information2011 Business and Financial Performance
211 Business and Financial Performance March 27, 212 1 Content 1. Introduction 2. Business overview 3. Financials 4. Divestitures and Internal Reorganization 5. 212 outlook 6. Q&A 2 Section 1 Introduction
More informationAnnual report of. for the year 2011
Annual report of TAURON Polska Energia S.A. for the year 2011 19 March 2012 Letter of the President of the Management Board of TAURON Polska Energia S.A. Ladies and Gentlemen, For the second time, as the
More informationManagement Board s report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period
Management Board s report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 3-month period ended March 31, 2014 Contents 1 General information about the PGE Capital Group
More information3. CONSOLIDATED QUARTERLY FINANCIAL STATEMENTS
3. CONSOLIDATED QUARTERLY FINANCIAL STATEMENTS (1) Consolidated Quarterly Balance Sheets September 30, 2014 and March 31, 2014 Supplementary Information 2Q FY March 2015 March 31, 2014 September 30, 2014
More informationAalberts Industries realises strong growth in revenue (15%) and earnings per share (24%)
date 23 February 2012 more information e-mail Jan Aalberts / John Eijgendaal info@aalberts.nl phone +31 (0)343 565 080 Press Release Aalberts Industries realises strong growth in revenue (15%) and earnings
More informationCITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER
CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER This information is being given to you to describe potential opportunities as a Helper. The career ladders that Helpers
More informationNXP Semiconductors Reports Third Quarter 2015 Results
Q3 Revenue $1,522 million GAAP Gross margin 48.6% GAAP Operating margin 24.6% GAAP Diluted earnings per share $1.49 Non-GAAP Gross margin 49.1% Non-GAAP Operating margin 29.5% Non-GAAP Diluted earnings
More informationThe resolution becomes effective as at the time of its adoption.
RESOLUTION NO. 1 concerning the election of Chairperson of the Extraordinary General Meeting The Extraordinary General Meeting of "PGE Polska Grupa Energetyczna Spółka Akcyjna" with the registered office
More informationSelected consolidated financial data of PGE Polska Grupa Energetyczna S.A. Capital Group
1 Consolidated quarterly report for the first quarter of year 2011 Selected consolidated financial data of PGE Polska Grupa Energetyczna S.A. Capital Group Period ended March 31, 2011 (not audited) Period
More informationPOLISH INFORMATION AND FOREIGN INVESTMENT AGENCY R&D SECTOR IN POLAND
POLISH INFORMATION AND FOREIGN INVESTMENT AGENCY Foto: AA+W Fotolia.com R&D SECTOR IN POLAND The R&D sector in Poland characteristics and possibilities of support Characteristics of the Polish economy
More informationTake out an interest-free loan of 1,000 to 100,000
Energy Saving Scotland Small Business Loans Helping Scottish businesses reduce their energy costs Save some money Make some energy efficiency changes Who are we? The Energy Saving Scotland small business
More informationThe Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario
The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary
More informationOpportunities for Low Carbon Growth in South East Melbourne
Opportunities for Low Carbon Growth in South East Melbourne 2012 South East Melbourne is an industrial and commercial hub that has the potential to reduce emissions and reap the financial benefits. South
More informationCredit Opinion: PGE Polska Grupa Energetyczna S.A.
Credit Opinion: PGE Polska Grupa Energetyczna S.A. Global Credit Research - 02 Jun 2015 Warsaw, Poland Ratings Category Outlook Issuer Rating PGE Sweden AB (publ) Outlook Bkd Senior Unsecured Moody's Rating
More informationBiocoal for Renewable. Copyright Bepex International 2011 All Rights Reserved
RD3-4 Biocoal for Renewable Biomass Power Generation Acknowledgement Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund. Why Biocoal? Coal is the largest
More informationConsolidated Statement of Profit or Loss (in million Euro)
Consolidated Statement of Profit or Loss (in million Euro) Q3 2014 Q3 2015 % change 9m 2014 9m 2015 % change Revenue 636 661 3.9% 1,909 1,974 3.4% Cost of sales (440) (453) 3.0% (1,324) (1,340) 1.2% Gross
More informationGlobal City Holdings N.V. Interim Financial Report as at 30 June 2015
Interim Financial Report as at 30 June 2015 Interim Financial Report for the six months ended 30 June 2015 CONTENTS Page Directors' report 1 Interim Condensed Consolidated Financial Statements as at 30
More information