1 INL/CON PREPRINT Use of Collaborative Software to Improve Nuclear Power Plant Outage Management 9th International Conference on Nuclear Plant Instrumentation, Control and Human Machine Interface Technologies Shawn St. Germain February 2015 This is a preprint of a paper intended for publication in a journal or proceedings. Since changes may be made before publication, this preprint should not be cited or reproduced without permission of the author. This document was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party s use, or the results of such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights. The views expressed in this paper are not necessarily those of the United States Government or the sponsoring agency.

2 1

3 Use of Collaborative Software to Improve Nuclear Power Plant Outage Management Shawn St. Germain Idaho National Laboratory P.O. Box 1625, Idaho Falls, ID ABSTRACT Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators, however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on-site or off. Key Words: Outage Control Center 1 INTRODUCTION Nuclear power plant (NPP) refueling outages are some of the most challenging periods that utilities face, in both tracking and coordinating thousands of activities in a short span of time, usually between twenty to thirty days. Outage work requires a large supplemental workforce, including hundreds of contract personnel, which increases the complexity of communication and information flow. Other challenges, including work sequencing, work group coordination, nuclear safety concerns arising from atypical system configurations, and resource allocation issues, can create delays and schedule overruns, driving up outage costs. The current technologies employed at most NPPs to communicate critical information are slow, inaccurate at times, and rely upon the physical presence of outage staff and key personnel to obtain and validate critical system and work progress status information. Today, the majority of outage communication is done using processes and technologies that do not take advantage of advances in modern communication technology. Some of the common practices include: runners that deliver paperbased requests for approval, radios, landline telephones, , desktop computers, daily printouts of the schedule, and static whiteboards that are used to display information. The outage control center (OCC) is

4 the central information gathering and decision making hub during a refueling outage. There are large amounts of static information that are displayed and require regular evaluation to determine its validity. These current processes for controlling information are also labor intensive, and as NPPs attempt to reduce staff, these manual and disconnected processes have the potential to become more difficult to manage. The current methods of displaying and tracking information will likely be inadequate to process the increased use of real-time information that will be available with the growing use of handheld technology, automated work packages (AWPs), computer-based procedures (CBPs), or computer programs that passively track work completion and readiness. In general, the commercial nuclear industry has not yet taken full advantage of advancements in modern mobile technologies that enable communication, collaboration, real-time data streaming, and information sharing to and from the field. Many gains have been made to reduce the challenges facing outage coordinators, however, new opportunities can be realized by utilizing modern technological advancements in communication and collaboration hardware and software tools that can enhance the collective situational awareness of plant personnel, leading to improved decision-making. Use of modern technology will enable outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on or offsite. The general study of the application of technology to work is called Computer Supported Cooperative Work (CSCW). The concept of CSCW is not new, but is has not been extensively applied to NPP outages to this point. The concepts presented in this paper are straight forward and quickly adopted by utilities when put into practice. Rather than rely on each facility trying to imagine how to apply these tools, several example applications that have been proven useful at commercial NPPs are presented. 2.1 Status Displays 2 TYPICAL USE OF TECHNOLOGY IN THE OCC Maintaining outage status is an important function of the OCC. Typically OCC staff are monitoring the progress of critical path jobs and several other important pathways such as major turbine generator work, significant engineering projects, or plant modifications. Additionally, outage staff need to monitor the progress in completing "bulk work" as delays and a buildup of non-critical path work can create situation where not enough resources are available to complete the bulk work and it becomes the critical path. Schedule status is usually maintained by printing out portions of the work schedule and hanging them on the wall. This paper schedule is then typically marked up by hand throughout the day as status is reported to the OCC. The scheduling software is updated by staff as the work completion is reported. The working schedule is typically updated once or twice per day and new paper copies are printed and posted. There is often a chain of communication that occurs where status is communicated from the worker completing the work to their shop supervisor, who often updates an outage maintenance coordinator who then updates the OCC outage maintenance manager who then updates the paper copy of the schedule. The delays in this reporting chain typically prohibits using the scheduling software directly to coordinate work throughout the day as work is completed well before it is reported as complete in the scheduling software. Managing this delay is necessary to ensure that critical hand-offs occur expeditiously. Additional status displays in the OCC track schedule milestones, such as owners group window completion. Outage risk level, time to boil, and protected train information is typically displayed in the OCC and throughout the plant. Outage priorities and significant evolutions planned for the day may also be displayed in the OCC. Unfortunately, many of the status displays and schedules in the OCC can only be viewed or updated by physically going to the OCC or contacting someone who is in the OCC. Additionally, copies of this information may be distributed throughout the plant and have the potential to get out of alignment with the true status if not carefully controlled and updated. Figure 1 shows a typical OCC layout and use of status boards and schedules.

5 Figure 1. Typical OCC Status Displays. 2.2 Action Item Lists Action item lists are commonly used to track emergent issues that could potentially cause schedule delays if not properly managed. Usually an action item list is maintained for each major outage support organization. Action item lists in current typical OCCs are maintained on dry erase boards or possibly as a spreadsheet on some form of electronic display. Completed action items are often erased from list and no history is typically maintained. To update or view an action item list usually requires physically visiting the OCC or calling someone in the OCC, such as the department representative. More significant emergent issues, especially those that require more than one organization to resolve are typically assigned to a small team for resolution. This team is often referred to as an issues response team, emergent issues team, or emergent issues expeditors. These more significant emergent issues require significantly more supporting information than can be displayed on a simple action item list. 2.3 Information Inflow Information is currently provided to the OCC through various communication channels. The primary communication methods typically relied upon are face to face, telephone, radios, and . Face to face communication occurs through either routine briefings held in the OCC or staff travelling to the OCC to physically provide information. Face to face communication requires people to pause their work at their work location and physically walk to the OCC, which can result in significant lost productivity. Use of telephone calls to either provide or request information is not always effective for complex issues and can disrupt the concentration of the recipient. Radio communication is useful since you can usually reach the intended recipient regardless of their location. The problem with radio communication, however, is there are a limited number of frequencies or channels available and the volume of radio traffic can be quite large. Additionally, radios volumes must be kept loud enough to be heard by the intended recipient, causing users and anyone near the user to be subjected to increased background noise and distraction. provides the capability to include rich data such as photos and diagrams, but is typically only sent to a limited number of recipients. The limited list of recipients results in groups of individuals with more information than others and increases the need to evaluate how to further share the information.

6 2.4 Turnover Logs Refueling outages are worked continuously from start to finish, typically through two shifts of twelve hours. Turnover logs are an important tool for each shift to communicate with the next to ensure important commitments are not missed. Turnover logs are typically maintained by each department using a variety of methods, often not standardized or shared between the departments. It is difficult to summarize an entire shift worth of work and set up the oncoming staff while still completing the required work for the current shift. 2.5 Remote Video Cameras Video cameras are an extremely useful method of monitoring critical path work without requiring workers to provide constant status reports. Video cameras are typically placed inside containment, on the refuel floor, and on the turbine deck. These cameras may be permanently mounted or installed at the beginning of the outage. Permanently mounted cameras located inside containment need to be radiation hardened. 3 OVERVIEW OF COLLABORATION SOFTWARE 3.1 Computer-Supported Cooperative Work Collaboration software is sometimes thought of as tool within a larger concept called computersupported cooperative work (CSCW). A detailed analysis or description of CSCW is beyond the scope of this paper, but a brief introduction of the concept is warranted. The term was first used in 1984 at a workshop for individuals looking into how to use technology to support people in their work [1]. One description of CSCW is that it addresses "how collaborative activities and their coordination can be supported by means of computer systems" [2]. The study of CSCW involves not only the application of software, but also a deeper understanding of how work is accomplished in groups. It is not as easy as selecting a new software application and giving it to some group and expect that it will significantly improve their productivity. The nature of the group's work needs to be understood and various technology applications evaluated as compared to the needs of the tasks performed by the groups. A useful representation of how to think about where collaboration software, sometimes also referred to as groupware, might be applied is the CSCW Matrix shown in Figure 2. Versions of the CSCW matrix have been used by several authors in discussing CSCW, this matrix is attributed to Johansen [3]. The CSCW matrix divides interactions by how the groups involved in the activity may be separated by place or time. For NPP outages, the time distinction can be applied in that the outage organization is divided by time in that there are different shifts working on the same tasks. NPP outage tasks may also be separated by location. Often support or oversight is provided by remotely located corporate resources or vendors may provide support from remote locations. Additionally, outage support groups may be separated in place at the site and travel to the OCC to allow same time/same place interactions. Given the limitations in the currently used technology, many outage tasks are forced into face to face interactions when in reality remote interactions may be more productive.

7 Figure 2. CSCW Matrix (Johansen, 1988). Before any decisions are made about the application of technology to support group work, the nature of the group's work should be characterized to support such decisions. One useful tool to characterizing a groups work is a function and task analysis. The overall functions that must be accomplished are documented as well as the specific tasks that support the functions. Then, technology can be evaluated to determine if the functions could be better performed by reallocating some of the tasks to the technology. The CSCW matrix can be useful in determining what sort of technology might be applied in function or task reallocation. Some of the typical outage activities are assigned to the various quadrants of the CSCW matrix: Same time/same place - This quadrant represents face to face interactions and describe most of the activity in the OCC. The OCC uses co-located staff supported by various wall displays to support decision making. Same time/different place - This quadrant represents remote interactions. Remote interactions in an outage environment could include corporate oversight, vendor support or information provided by staff on site but remote from the OCC. Currently, remote interactions are supported by , telephone, or possibly video conferencing in limited situations. Different time/same place - This quadrant represents continuous tasks. Continuous tasks include all the information that needs to be maintained to support several shifts of staff working on issues through the duration of the outage. The OCC and all the wall displays and turnover logs support the time distribution of the staff. Different time/different place - This quadrant represents communication with coordination. NPP outage activities that may fall into this group include use of operating experience to support decision making that either came from an earlier outage or even from another utility. The quality of the operating

8 experience to support decision making is going to depend upon the capability of the knowledge management system supporting the operating experience. 3.2 Collaboration Software Collaboration software, also known as groupware, can be thought of as any software application used to support a group or team in achieving a common goal. Collaboration software needs to support users separated by place or time in contributing to the common solution of a problem. Collaboration software should support sharing rich data to enable more effective team communication, collaboration, and problem solving. Some examples of collaboration software include video conferencing, , web conferencing, application sharing, electronic calendars, workflow systems, websites, and many others. There are numerous software vendors providing collaboration software applications; it is beyond the scope of this paper to describe each of them, and they are constantly evolving and any description would be immediately out of date. Each of these various types of software have a specific function and have particular limitations. There is not a single software application that is likely going to be adequate to support a task as complex as a NPP outage. There is, however, an opportunity to improve NPP outage coordination by better taking advantage of what collaboration software has to offer. To fully take advantage of the capabilities of these software applications, the various outage processes need to be evaluated and matched to the appropriate application and supported by the required technology infrastructure. This matching can be supported by the CSCW concepts described above. 4 COLLABORATION SOFTWARE APPLIED TO OUTAGE TASKS Matching a particular collaboration software application to a NPP outage process should be evaluated individually, but a few examples are provided here to illustrate some of the potential benefits of such an application. Applications will be related to the typical currently used processes described in Section 2. The general goal of using collaboration software is to make information available and updatable from any location. Additionally, collaboration software will allow increased use of rich data; such as photos, videos, and diagrams rather than relying on text and voice communication methods. Knowledge management is also enhanced since all the information tracked and communicated during a refueling outage can be archived for future reference, something not practical if statically displayed information is relied upon. All of the concepts below have been demonstrated at Palo Verde Nuclear Generating Station and Plant Farley and have been shown to improve collective situational awareness and reduce the number of phone calls to the OCC and the amount of printed paper used. 4.1 Status Displays Use of collaboration software to support the various status displays in the OCC is one of the more useful applications for NPP outages. Collaboration software allows all the displays in the OCC to be viewed and updated from any computer connected to the network supporting these displays. Rather than requiring staff to travel to the OCC or contact someone in the OCC to obtain or provide information, it is available anywhere with computer access. If plant wide wireless networks are available, then this information can be updated and viewed through mobile devices such as tablet computers as well. Additionally, through remote log-in applications, staff may be able to access and update information from home or any remote work location with internet access. Collaboration software used for this application should support the number of users expected to simultaneously interact with this information, likely several hundred at a time. In addition to the collaboration software, high-quality displays will replace printed copies of schedules and dry erase boards typically used to track this information. For sites that are part of a fleet and are required to provide status information to corporate management, these status displays can be shared with them to reduce the amount of information that needs to be collected and provided. Figure 3 shows OCC status displays using collaboration software.

9 Figure 3. OCC Displays Using Collaboration Software. 4.2 Action Item Lists Action item lists are easily supported by collaboration software. Use of collaboration software allows these action item lists to be viewed and updated from any location. These action items lists that are displayed in the OCC can be remotely updated without needing to travel to the OCC or call someone in the OCC to update them. Having access to the action items list from any location increases the collective situational awareness of the entire organization and ensures greater access to important information. Allowing staff to provide status remotely saves time travelling to the OCC that can be used more constructively accomplishing work. 4.3 Information Inflow Use of collaboration software to manage OCC information will change the way that staff communicate with the OCC. Since information can be provided directly through the software applications, it is not be necessary to call the OCC as frequently or visit the OCC to conduct a face to face meetings as often. The reduced number of phone calls and traffic in the OCC will allow decision makers more time to evaluate information and coordinate activities with fewer distractions. 4.4 Turnover Logs Turnover logs for each of the various outage support organizations can be supported through the collaboration software. Use of collaboration software allows organizations to see each other's logs ensuring key information is not missed in any one turnover.

10 5 CONCLUSIONS In summary, nuclear power plant refueling outages are complex and require intensive coordination to complete efficiently. This intensive coordination requires effective communication and information transfer and processing. Currently, outage management relies primarily on traditional methods of information transfer. The typical methods of communicating status currently involve radio messages, phone calls, and face to face conversation. Information that needs to be tracked in the OCC is currently maintained on dry erase boards, printed paper displays, or electronically on simple spreadsheets. The concepts of computer supported cooperative work can be readily applied to many of the outage communication processes using readily available, commercial off-the-shelf collaboration software applications. The use of collaboration software can improve access to important information increasing the collective situational awareness of the entire organization. Collaboration software allows multiple users to simultaneously view and update information, improving access to information and decision making resources. Additionally, the use of collaboration software will improve the capability for knowledge management by providing an electronic file of all significant activity and information for an outage. 6 REFERENCES 1. J. Grudin, "Computer-Supported Cooperative Work: History and Focus," Computer, 27, pp (1994). 2. P. H. Carstensen and K. Schmidt, "Computer Supported Cooperative Work: New challenges to systems design," In Itoh, Komatsubara and Kuwano (eds.): Handbook in Human Factors/Ergonomics (in Japanese), Asakura Publishing, pp (2003) 3. R. Johansen, Groupware: Computer Support for Business Teams, the Free Press, New York (1988).

Outage Scheduling Technologies and Solutions

Outage Scheduling Technologies and Solutions INL/EXT-14-33036 Light Water Reactor Sustainability Program Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project September 2014 U.S. Department of

More information

Office Of Nuclear Energy Sensors and Instrumentation Annual Review Meeting

Office Of Nuclear Energy Sensors and Instrumentation Annual Review Meeting Office Of Nuclear Energy Sensors and Instrumentation Annual Review Meeting Advanced Outage Control Center Shawn St. Germain Idaho National Laboratory September 16-18, 2014 Project Overview Goal, and Objectives

More information

Behaviors and Actions That Support Leadership and Team Effectiveness, by Organizational Level

Behaviors and Actions That Support Leadership and Team Effectiveness, by Organizational Level Good Practice INPO 15-012 October 2015 Behaviors and Actions That Support Leadership and Team Effectiveness, by Organizational Level Revision 0 OPEN DISTRIBUTION OPEN DISTRIBUTION: Copyright 2015 by the

More information

IT Service Management

IT Service Management IT Service Management Service Continuity Methods (Disaster Recovery Planning) White Paper Prepared by: Rick Leopoldi May 25, 2002 Copyright 2001. All rights reserved. Duplication of this document or extraction

More information

OPERATIONAL EXCELLENCE REDEFINED

OPERATIONAL EXCELLENCE REDEFINED OPERATIONAL EXCELLENCE REDEFINED SUPPORTING SAFE AND EFFICIENT DRILLING AND COMPLETIONS THROUGH: ORGANIZATIONAL ALIGNMENT AND OPERATIONAL EXCELLENCE ORCHESTRATED ACTIVITIES ACROSS THE DRILLING SUPPORT

More information

VeroTrack Automated Survey Tracking

VeroTrack Automated Survey Tracking VeroTrack Automated Survey Tracking Business Case for Full Implementation at Intermountain Gas Company Report Issued: November 30, 2011 Report Updated: April 1, 2012 Prepared For: Hart Gilchrist Manager

More information

Business Process Evaluation and Improvement Tool for Inspection Systems. A Partnership for Food Protection Resource Document

Business Process Evaluation and Improvement Tool for Inspection Systems. A Partnership for Food Protection Resource Document Business Process Evaluation and Improvement Tool for Inspection Systems A Partnership for Food Protection Resource Document Produced by: the Partnership for Food Protection May 2014 This tool was created

More information

User s Guide for Polycom CX7000 Systems

User s Guide for Polycom CX7000 Systems User s Guide for Polycom CX7000 Systems 1.1 August 2012 3725-63878-001/C Trademark Information Polycom, the Polycom Triangles logo, and the names and marks associated with Polycom s products are trademarks

More information

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK MAXIMIZE PERFORMANCE AND REDUCE RISK 1 BROCHURE COMPLEXITIES IN MISSION CRITICAL SYSTEMS CONTINUE TO INCREASE Mission critical communications systems have become increasingly complex as more features and

More information

IBM Implementation Services for Power Systems IBM Systems Director

IBM Implementation Services for Power Systems IBM Systems Director Sample Statement of Work for Services This an example and your Statement of Work may vary given your specific requirements and the related IBM engagement. IBM Implementation Services for Power Systems

More information

Accelerating Lean Productivity with Immersive Collaboration

Accelerating Lean Productivity with Immersive Collaboration Accelerating Lean Productivity with Immersive Collaboration By Kevin Sullivan, Director, and Craig Hartman, Senior Director, Cisco IBSG Industrial Practice Multinational corporations must act fast to solve

More information

NEXT GENERATION MOBILITY IN MANUFACTURING

NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING NEXT GENERATION MOBILITY IN MANUFACTURING KEEPING PACE WITH DEMANDS The manufacturing sector is a demanding business. Globalisation has increased competition exponentially.

More information

ivms-4200 Intelligent Video Management System Quick Start Guide

ivms-4200 Intelligent Video Management System Quick Start Guide ivms-4200 Intelligent Video Management System Quick Start Guide Notices The information in this documentation is subject to change without notice and does not represent any commitment on behalf of HIKVISION.

More information

A shift in responsibility. More parties involved Integration with other systems. 2

A shift in responsibility. More parties involved Integration with other systems. 2 EFFECTIVE SERVICE RELATIONSHIP MANAGEMENT ALSO INCLUES THE FOLLOWING ACTIVITIES: Today, organizations frequently elect to have certain services be provided by service vendors, also referred to as service

More information

Manufacturing Analytics: Uncovering Secrets on Your Factory Floor

Manufacturing Analytics: Uncovering Secrets on Your Factory Floor SIGHT MACHINE WHITE PAPER Manufacturing Analytics: Uncovering Secrets on Your Factory Floor Quick Take For manufacturers, operational insight is often masked by mountains of process and part data flowing

More information

Enhance Production in 6 Steps Using Preventive Maintenance

Enhance Production in 6 Steps Using Preventive Maintenance Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using

More information

Electronic Logbook. Hedgehog-2. version 2.7. Quick Start. Revision 1.3 of 10/31/2012

Electronic Logbook. Hedgehog-2. version 2.7. Quick Start. Revision 1.3 of 10/31/2012 Electronic Logbook Hedgehog-2 version 2.7 Quick Start Revision 1.3 of 10/31/2012 Monitor Electric, 2012 2 CONTENTS Introduction 3 Entry List 4 Event Entry 4 Filtering and Sorting 6 Chaining 7 Attachments,

More information

The Complete Guide to CUSTOM FIELD SERVICE APPLICATIONS

The Complete Guide to CUSTOM FIELD SERVICE APPLICATIONS The Complete Guide to CUSTOM FIELD SERVICE APPLICATIONS Copyright 2014 Published by Art & Logic All rights reserved. Except as permitted under U.S. Copyright Act of 1976, no part of this publication may

More information

Customer Onboarding Guide. How to successfully set up your service 2-9 users

Customer Onboarding Guide. How to successfully set up your service 2-9 users Customer Onboarding Guide How to successfully set up your service 2-9 users 1 Overview Welcome Thank you for choosing RingCentral as your phone system provider. This guide is designed to give you the information

More information

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344 Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 3 TITLES... 6 EVALUATING

More information

RingCentral for Desktop. UK User Guide

RingCentral for Desktop. UK User Guide RingCentral for Desktop UK User Guide RingCentral for Desktop Table of Contents Table of Contents 3 Welcome 4 Download and install the app 5 Log in to RingCentral for Desktop 6 Getting Familiar with RingCentral

More information

Avaya one-x Mobile User Guide for iphone

Avaya one-x Mobile User Guide for iphone Avaya one-x Mobile User Guide for iphone 18-602788 Issue 1 February 2008 2008 Avaya Inc. All Rights Reserved. Notice While reasonable efforts were made to ensure that the information in this document was

More information

Construction Firm Integrates Business Systems with Comprehensive Solution

Construction Firm Integrates Business Systems with Comprehensive Solution case study: microsoft dynamics sl Construction Firm Integrates Business Systems with Comprehensive Solution Microsoft Corporation Microsoft Dynamics Customer Solution Case Study Construction Firm Integrates

More information

15 Digital Photo Frame Instructional Manual

15 Digital Photo Frame Instructional Manual 15 Digital Photo Frame Instructional Manual aluratek.com mnl M10054 ADMPF315F Copyright 2011 Aluratek, Inc. All Rights Reserved. Table of Contents Frame Close-up... Remote Control Close-up... Package Contents...

More information

Evaluation of an Electronic Charting System in the BCIT Nursing Simulation Lab

Evaluation of an Electronic Charting System in the BCIT Nursing Simulation Lab Evaluation of an Electronic Charting System in the BCIT Nursing Simulation Lab Prepared by: Johanne Mattie Research Associate, Technology and Product Evaluation Group As part of the Stage 3 ehealth Go

More information

Contents. Expertise in access control. SaaS Software as a Service, a comprehensive solution. Megaflex Officeflow

Contents. Expertise in access control. SaaS Software as a Service, a comprehensive solution. Megaflex Officeflow Contents Expertise in access control 3 SaaS Software as a Service, a comprehensive solution 4 Megaflex Officeflow 6 Megaflex control is always secure anytime, anywhere 8 Benefits of using Megaflex 9 Greenbox

More information

secure Agent Secure Enterprise Solutions Remote Recovery from a Data Center Outage SecureAgent Software www.secureagent.com

secure Agent Secure Enterprise Solutions Remote Recovery from a Data Center Outage SecureAgent Software www.secureagent.com secure Agent Secure Enterprise Solutions SecureAgent Software Disaster Recovery Remote Recovery from a Data Center Outage SecureAgent Software 2448 E. 81 st St., Ste. 2000 Tulsa OK 74137-4271 USA Tel:

More information

10 Reasons Why Project Managers Need Project Portfolio Management (PPM)

10 Reasons Why Project Managers Need Project Portfolio Management (PPM) 10 Reasons Why Project Managers Need Project Portfolio Management (PPM) Introduction Many project managers might think they are doing just fine with spreadsheets or basic project management software and

More information

NetIQ Consulting Custom Developer Customer Handbook

NetIQ Consulting Custom Developer Customer Handbook Handbook www.netiq.com NetIQ Consulting Custom Developer Customer Handbook Global Guide Preface This handbook is intended as a practical guide to using, and getting the most from, the NetIQ Consulting

More information

AP IR Remote Control Installation & Operation Manual

AP IR Remote Control Installation & Operation Manual AP IR Remote Control Installation & Operation Manual ClearOne Communications, Inc. ~ 1825 Research Way, Salt Lake City, UT 84119 ~ tel 1-800-945-7730 ~ fax 1-800-933-5107 ii Table of Contents 1 Table of

More information

elearning Course Catalog

elearning Course Catalog Training on Camstar Products ANYTIME ANYWHERE elearning Course Catalog July 9 2015 Notices 2015 Siemens Product Lifecycle Management Software Inc. This documentation and all materials related to the software

More information

Mail Hosting Services Terms and Conditions

Mail Hosting Services Terms and Conditions MAIL HOSTING SERVICES TERMS AND CONDITIONS In addition to the General, your use of the Mail Services is subject to the following additional terms and conditions: 1. ADDITIONAL DEFINED TERMS Some words

More information

Select the right configuration management database to establish a platform for effective service management.

Select the right configuration management database to establish a platform for effective service management. Service management solutions Buyer s guide: purchasing criteria Select the right configuration management database to establish a platform for effective service management. All business activities rely

More information

Oracle Utilities Customer Care and Billing

Oracle Utilities Customer Care and Billing Customer Care and Billing Utilities are faced with a rapidly changing industry and increasing expectations from their customers. Adapting to these factors with existing customer information systems likely

More information

ORACLE PROJECT PLANNING AND CONTROL

ORACLE PROJECT PLANNING AND CONTROL ORACLE PROJECT PLANNING AND CONTROL (Formerly Oracle Project Management) KEY FEATURES COLLABORATIVE PROJECT PLANNING Define a project work breakdown structure to align plans to execution Coordinate financial

More information

The new edge of the network: Preparing your network for the consumerization of IT. Geoff Mattie Global Solutions Architect Dell Inc.

The new edge of the network: Preparing your network for the consumerization of IT. Geoff Mattie Global Solutions Architect Dell Inc. The new edge of the network: Preparing your network for the consumerization of IT Geoff Mattie Global Solutions Architect Dell Inc. The edge of your network is expanding, and your work force expects the

More information

Effective complaint handling

Effective complaint handling This guide sets out key information for state sector agencies about developing and operating an effective complaints process. It also provides information about the Ombudsman s role, as an independent,

More information

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. for. Requirements Development for Remote Participation Services

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. for. Requirements Development for Remote Participation Services The Internet Society on behalf of The IETF Administrative Oversight Committee REQUEST FOR PROPOSALS for Requirements Development for Remote Participation Services Date of Issuance: October 19, 2011 Proposal

More information

Cisco Business Video Solutions Visual Communications Increase Collaboration Effectiveness and Reduce Cost

Cisco Business Video Solutions Visual Communications Increase Collaboration Effectiveness and Reduce Cost Cisco Business Video Solutions Visual Communications Increase Collaboration Effectiveness and Reduce Cost Unlock Business Value with Immediacy and Impact Executive Summary Video is the fastest-growing

More information

Electronic Funds Transfer, Internet and Mobile Banking Agreement and Disclosure For Personal Accounts

Electronic Funds Transfer, Internet and Mobile Banking Agreement and Disclosure For Personal Accounts Electronic Funds Transfer, Internet and Mobile Banking Agreement and Disclosure For Personal Accounts First State Bank Central Texas offers the highest quality banking products and services available.

More information

Microsoft Lync: Getting Started

Microsoft Lync: Getting Started Quick Glance: Lync is a text, voice, and video conference application. Lync is free on Mac, Windows, ios, and Android devices for current staff, faculty, and students of Ithaca College. Lync uses your

More information

HELP DESK MANAGEMENT PLAN

HELP DESK MANAGEMENT PLAN AT&T Help Desk Overview: DIR Platinum Customer Status AT&T is committed to continuous process improvement to meet DIR requirements and expectations, and to improve the end user experience. Today s process

More information

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1 www.artoflean.com

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1 www.artoflean.com STANDARDIZED WORK 2ND SESSION 1 STANDARDIZED WORK AND WORK STANDARDS - SESSION 2 AIM (1) Understand the Importance of Standardization in TPS (2) Introduce Various Standards Sheets and Basics of Creation

More information

Objective Oriented Planning Module 1. Stakeholder Analysis

Objective Oriented Planning Module 1. Stakeholder Analysis III. Stakeholder Analysis Stakeholders are people, groups, or institutions, which are likely to be affected by a proposed project (either negatively or positively), or those which can affect the outcome

More information

WHITE PAPER: How to get more out of your. telepresence installation with unified interoperable video conferencing technology

WHITE PAPER: How to get more out of your. telepresence installation with unified interoperable video conferencing technology WHITE PAPER: How to get more out of your telepresence installation with unified interoperable video conferencing technology INTRODUCTION From the time it was introduced, corporate telepresence had enabled

More information

SPRINT NEXTEL HOSTED CONTACT CENTER PRODUCT ANNEX

SPRINT NEXTEL HOSTED CONTACT CENTER PRODUCT ANNEX SPRINT NEXTEL HOSTED CONTACT CENTER PRODUCT ANNEX 1. The following terms and conditions in this Sprint Hosted Contact Center Product Annex ( Annex ), together with the Sprint Standard Terms and Conditions

More information

The Shift to Wireless Data Communication

The Shift to Wireless Data Communication The Shift to Wireless Data Communication Choosing a Cellular Solution for Connecting Devices to a WWAN Dana Lee, Senior Product Manager dana.lee@moxa.com Recent developments in the wireless and industrial

More information

WHITE PAPER. The Lean Workforce. Applying Lean principles to improve workforce management

WHITE PAPER. The Lean Workforce. Applying Lean principles to improve workforce management WHITE PAPER The Lean Workforce Applying Lean principles to improve workforce management Lean Enterprise A business system for organizing and managing product development, operations, suppliers, and customer

More information

Best Practices For Assigning First Call Responsibilities For Healthcare Networking Issues

Best Practices For Assigning First Call Responsibilities For Healthcare Networking Issues Best Practices For Assigning First Call Responsibilities For Healthcare Networking Issues Background In recent years, medical devices have become increasingly more computerized. As part of this trend,

More information

Siemens HiPath ProCenter Multimedia

Siemens HiPath ProCenter Multimedia Siemens HiPath ProCenter Multimedia Today s business climate is tougher than ever, and chances are your competitors are no longer just a local concern. All this means finding ways of improving customer

More information

Community Development and Training Centre Semester 2 2006 IT 245 Management Information Systems Chapter 3 Internetwork E-Business Electronic Business

Community Development and Training Centre Semester 2 2006 IT 245 Management Information Systems Chapter 3 Internetwork E-Business Electronic Business Community Development and Training Centre Semester 2 2006 IT 245 Management Information Systems Chapter 3 Internetwork E-Business Electronic Business Applications. Internetworked E-business enterprises

More information

Fostering Strong Interactions Between Industry and Academia

Fostering Strong Interactions Between Industry and Academia Sesssion 0575 Fostering Strong Interactions Between Industry and Academia T.R. Kurfess, M.L. Nagurka Georgia Institute of Technology / Marquette University Session 0575 ABSTRACT This paper highlights a

More information

ODU WebEx: Frequently Asked Questions

ODU WebEx: Frequently Asked Questions ODU WebEx: Frequently Asked Questions 1. What is WebEx? 2. How do students/participants access WebEx? 3. When should I log in to attend the event? 4. What is the meeting number? 5. Where do I find the

More information

QUICK REFERENCE GUIDE MOBILE HUMAN MACHINE INTERFACE (HMI): INNOVATION THAT EMPOWERS THE MOBILE OPERATOR

QUICK REFERENCE GUIDE MOBILE HUMAN MACHINE INTERFACE (HMI): INNOVATION THAT EMPOWERS THE MOBILE OPERATOR MOBILE HUMAN MACHINE INTERFACE (HMI): INNOVATION THAT EMPOWERS THE MOBILE OPERATOR Mobile operators are critical to ensuring the overall efficiency and uptime of the production line and play a critical

More information

Contact person: Chris Martin Phone number: 304 414 5420 Email address: cmartin@lawv.net

Contact person: Chris Martin Phone number: 304 414 5420 Email address: cmartin@lawv.net Legal Services Corporation Technology Initiative Grant (TIG) Program Final Grant Report Grantee name: Legal Aid of West Virginia TIG Grant number: 10008 Submission date: February 23, 2012 Approval Date:

More information

Windows Server 2003 migration: Your three-phase action plan to reach the finish line

Windows Server 2003 migration: Your three-phase action plan to reach the finish line WHITE PAPER Windows Server 2003 migration: Your three-phase action plan to reach the finish line Table of contents Executive summary...2 Windows Server 2003 and the big migration question...3 If only migration

More information

Retention & Destruction

Retention & Destruction Last Updated: March 28, 2014 This document sets forth the security policies and procedures for WealthEngine, Inc. ( WealthEngine or the Company ). A. Retention & Destruction Retention & Destruction of

More information

Digital Advisory Services Professional Service Description Network Assessment

Digital Advisory Services Professional Service Description Network Assessment Digital Advisory Services Professional Service Description Network Assessment 1. Description of Services. 1.1. Network Assessment. Verizon will perform Network Assessment services for the Customer Network,

More information

TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER. Real-Time Test Management

TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER. Real-Time Test Management TEST MANAGEMENT SOLUTION Buyer s Guide WHITEPAPER Real-Time Test Management How to Select the Best Test Management Vendor? The implementation of a Test Management system to automate business processes

More information

How to Build a Service Management Hub for Digital Service Innovation

How to Build a Service Management Hub for Digital Service Innovation solution white paper How to Build a Service Management Hub for Digital Service Innovation Empower IT and business agility by taking ITSM to the cloud Table of Contents 1 EXECUTIVE SUMMARY The Mission:

More information

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

Networked. Field Services

Networked. Field Services Networked Field Services Table of Contents Overview.............................................3 Visibility and Enterprise Mobility.............................3 The New Networked Organization............................4

More information

Intel Active Management Technology with System Defense Feature Quick Start Guide

Intel Active Management Technology with System Defense Feature Quick Start Guide Intel Active Management Technology with System Defense Feature Quick Start Guide Introduction...3 Basic Functions... 3 System Requirements... 3 Configuring the Client System...4 Intel Management Engine

More information

Enterprise IT Solutions (Hardware, Software, Services) Shared Services and Outsourcing Technology Products Distribution and Trading

Enterprise IT Solutions (Hardware, Software, Services) Shared Services and Outsourcing Technology Products Distribution and Trading Enterprise IT Solutions (Hardware, Software, Services) Shared Services and Outsourcing Technology Products Distribution and Trading Enterprise Solution Professionals on Information and Network E-SPIN carry

More information

Customer Agreement. Description of services

Customer Agreement. Description of services KlantenScoren.nl, 247leadgeneration, 247accountmanager.nl, 247drip.com, ContentMarketingWizard.com; Content Marketing Wizard.com; Content Marketing Wizard.nl; ContentMarketingWizard.nl; AudienceCircle.com;

More information

Avaya one-x Mobile User Guide for iphone

Avaya one-x Mobile User Guide for iphone Avaya one-x Mobile User Guide for iphone Release 5.2 January 2010 0.3 2009 Avaya Inc. All Rights Reserved. Notice While reasonable efforts were made to ensure that the information in this document was

More information

Revolutionizing Site Monitoring and Maintenance

Revolutionizing Site Monitoring and Maintenance HazardMon.com Revolutionizing Site Monitoring and Maintenance Introduction It is well known that transporting certain dry dusty materials can create explosive atmospheres. Five conditions, known as the

More information

BUYER S GUIDE. The Unified Communications Buyer s Guide to Picking the Right Cloud Telephony Solution

BUYER S GUIDE. The Unified Communications Buyer s Guide to Picking the Right Cloud Telephony Solution BUYER S GUIDE The Unified Communications Buyer s Guide to Picking the Right Cloud Telephony Solution There s no better time for a business to embrace unified communications solutions. Actually, that s

More information

GE Capital Engaging employees: Using internal communications to drive success

GE Capital Engaging employees: Using internal communications to drive success GE Capital Engaging employees: Using internal communications to drive success viewpoint GE Capital Today s workforce is more distributed than ever. It s no longer unusual for organizations to position

More information

SIP BASED CONFERENCING MEET-ME CONFERENCING. Conferencing Defined:

SIP BASED CONFERENCING MEET-ME CONFERENCING. Conferencing Defined: SIP BASED CONFERENCING Conferencing Defined: Programs and meetings which may be for the purpose of presenting and exchanging information, comparing views, learning, planning and decision-making. www.dtic.mil/ieb_cctwg/contrib-docs/vtc001/sect3.htm

More information

QUICK FACTS. Facilitating Application Packaging on Behalf of a Global Professional Services Company

QUICK FACTS. Facilitating Application Packaging on Behalf of a Global Professional Services Company [ Professional Services, Technology Deployment ] TEKsystems Global Services Customer Success Stories Client Profile Industry: Professional Services Revenue: Over $13 billion Employees: Over 250,000 Geographic

More information

Configuration Management One Bite At A Time

Configuration Management One Bite At A Time Configuration Management One Bite At A Time By Kai Holthaus, ITIL v3 Expert and Director for Third Sky, Inc. Implementing Configuration Management can be a daunting challenge. While the potential payback

More information

www.cathaybank.com Cathay Business Online Banking Quick Guide

www.cathaybank.com Cathay Business Online Banking Quick Guide www.cathaybank.com Cathay Business Online Banking Quick Guide Effective 06/2016 Disclaimer: The information and materials in these pages, including text, graphics, links, or other items are provided as

More information

Gatekeeper Systems. NaviGate AVL (Automatic Vehicle Location) Software Product Description. Product Summary. Description.

Gatekeeper Systems. NaviGate AVL (Automatic Vehicle Location) Software Product Description. Product Summary. Description. NaviGate AVL (Automatic Vehicle Location) Software Product Description Product Summary The NaviGate AVL (Automatic Vehicle Location) Module provides for the display and management of wireless-connected

More information

Kentucky IT Infrastructure Library (ITIL) Program

Kentucky IT Infrastructure Library (ITIL) Program 2006 NASCIO Recognition Awards Nomination Category: Enterprise IT Management Initiatives Kentucky IT Infrastructure Library (ITIL) Program Commonwealth Office of Technology. KentuckyUnbridledSpirit.com

More information

Unifying IT How Dell Is Using BMC

Unifying IT How Dell Is Using BMC Unifying IT Management: How Dell Is Using BMC Software to Implement ITIL ABSTRACT Companies are looking for ways to maximize the efficiency with which they plan, deliver, and manage technology services.

More information

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers INL/EXT-12-27094 Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers Ronald K. Farris Heather Medema September 2012 The INL is a U.S. Department of Energy National Laboratory

More information

Benefits of an Electronic Validation Lifecycle Management System in the Corporate Validation Process Validation Cycle Time and Cost Perspective

Benefits of an Electronic Validation Lifecycle Management System in the Corporate Validation Process Validation Cycle Time and Cost Perspective Benefits of an Electronic Validation Lifecycle Management System in the Corporate Validation Process Validation Cycle Time and Cost Perspective PDA awarded ValGenesis the New Innovative Technology award

More information

When to Leverage Video as a Platform A Guide to Optimizing the Retail Environment

When to Leverage Video as a Platform A Guide to Optimizing the Retail Environment When to Leverage Video as a Platform A Guide to Optimizing the Retail Environment Contents S1 An Industry in Transition Over the past few years, retail has seen seismic changes in how the customer shops.

More information

DS NVR Prospective Network Configurations

DS NVR Prospective Network Configurations DS NVR Prospective Network Configurations 1. Introduction 1.1 Purpose This document discusses options for using dual network cards in a DS NVR system. 1.2 Definitions, acronyms, and abbreviations 1.2.1

More information

Intrusion Detection and Cyber Security Monitoring of SCADA and DCS Networks

Intrusion Detection and Cyber Security Monitoring of SCADA and DCS Networks Intrusion Detection and Cyber Security Monitoring of SCADA and DCS Networks Dale Peterson Director, Network Security Practice Digital Bond, Inc. 1580 Sawgrass Corporate Parkway, Suite 130 Sunrise, FL 33323

More information

Please contact a member of our sales team on 0845 055 8555

Please contact a member of our sales team on 0845 055 8555 Ctrack is a division of DigiCore Holdings, one of the world s largest vehicle tracking companies Established in 1985, Ctrack supports in excess of 750,000 systems across 56 countries on five continents

More information

SPPA-T3000 Control System The Benchmark in Controls

SPPA-T3000 Control System The Benchmark in Controls Instrumentation, Controls & Electrical SPPA-T3000 Control System The Benchmark in Controls Siemens Power & Process Automation Answers for energy. The benchmark for Distributed Control Systems Developed

More information

CA VM:Operator r3. Product Overview. Business Value. Delivery Approach

CA VM:Operator r3. Product Overview. Business Value. Delivery Approach PRODUCT SHEET: CA VM:OPERATOR CA VM:Operator r3 CA VM:Operator is an automated console message management system for z/vm and mainframe Linux environments. It allows you to minimize human intervention

More information

Group Support Systems

Group Support Systems Group Support Systems Dr Sherif Kamel Department of Management School of Business, Economics and Communication Collaborative Work (Groupware) Collaboration and communication Members can be located in different

More information

A&E Specifications RoadRunner HD High Definition Mobile Recording System

A&E Specifications RoadRunner HD High Definition Mobile Recording System RoadRunner HD High Definition Mobile Recording System Version 1.4 A. Recorder: 1. The system shall be provided in compatible and interchangeable formats that support simultaneous recording of up to four

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

Project 2013 Customer Solution Case Study

Project 2013 Customer Solution Case Study Project 2013 Customer Solution Case Study n Case Study Georgia School District Runs More Smoothly with Better Project Management Overview Company: Gwinnett County Public Schools Company Website: www.gwinnett.k12.ga.us

More information

Texas State Library and Archives Commission. Information Technology Detail. August 26, 2010

Texas State Library and Archives Commission. Information Technology Detail. August 26, 2010 Texas State Library and Archives Commission Information Technology Detail 82 th Regular Session, Agency Submission, Version 1 August 26, 2010 PAGE: 1 of 6 5005 ACQUISITN INFO RES TECH 4 Computer Resources/Network

More information

CYBER SECURITY POLICY For Managers of Drinking Water Systems

CYBER SECURITY POLICY For Managers of Drinking Water Systems CYBER SECURITY POLICY For Managers of Drinking Water Systems Excerpt from Cyber Security Assessment and Recommended Approach, Final Report STATE OF DELAWARE DRINKING WATER SYSTEMS February 206 Kash Srinivasan

More information

ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING

ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING KEY FEATURES MATERIAL PLANNING FOR PROCESS INCLUDES: Material and rough cut capacity planning Multi-level graphical pegging Advanced sourcing

More information

ASAP, Inc. 2003 13101 W. Washington Bl. Los Angeles, CA. 90066 www.asapla.com 800-401-1739

ASAP, Inc. 2003 13101 W. Washington Bl. Los Angeles, CA. 90066 www.asapla.com 800-401-1739 Mobile Computing ADC ERP Abstract A swirl of buzz words, technical terms and acronyms often confounds a clear perception of Mobile Computing and Automated Data Capture. This set of charts and definitions

More information

Classroom Management, part of Intel Education User Manual

Classroom Management, part of Intel Education User Manual Classroom Management, part of Intel Education User Manual Disclaimer INFORMATION IN THIS DOCUMENT IS PROVIDED IN CONNECTION WITH INTEL PRODUCTS. EXCEPT AS PROVIDED IN INTEL'S TERMS AND CONDITIONS OF SALE

More information

customer care solutions

customer care solutions customer care solutions from Nuance white paper :: A Guide to Successful Intelligent Virtual Assistants Why Best-in-Class Technology Alone Is Not Enough NUANCE :: customer care solutions More than ever

More information

TOTAL DEFENSE MOBILE SECURITY USER S GUIDE

TOTAL DEFENSE MOBILE SECURITY USER S GUIDE TOTAL DEFENSE MOBILE SECURITY USER S GUIDE Publication date 2015.04.09 Copyright 2015 Total Defense Mobile Security LEGAL NOTICE All rights reserved. No part of this book may be reproduced or transmitted

More information

138 Configuration Wizards

138 Configuration Wizards 9 Configuration Wizards 9.1 Introduction to Wizards ACP ThinManager uses wizards for configuration. Wizards take two forms. List Wizards associate Terminal Servers and ThinManager Servers with their IP

More information

Case Study: Vitamix. Improving strategic business integration using IT service management practices and technology

Case Study: Vitamix. Improving strategic business integration using IT service management practices and technology Improving strategic business integration using IT service management practices and technology Publication Date: 17 Sep 2014 Product code: IT0022-000180 Adam Holtby Summary Catalyst For Vitamix, a key driver

More information