Country Operations Business Plan. Kazakhstan December 2014

Size: px
Start display at page:

Download "Country Operations Business Plan. Kazakhstan 2015 2017. December 2014"

Transcription

1 Country Operations Business Plan December 2014 Kazakhstan This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.

2 CURRENCY EQUIVALENTS (as of 26 November 2014) Currency unit tenge (T) T1.00 = $ $1.00 = T ABBREVIATIONS ADB COBP CPS GDP MFF OCR SMEs TA Asian Development Bank country operations business plan country partnership strategy gross domestic product multitranche financing facility ordinary capital resources small and medium-sized enterprises technical assistance NOTE In this report, $ refers to US dollars. Vice-President W. Zhang, Operations 1 Director General K. Gerhaeusser, Central and West Asia Department (CWRD) Director J. Yang, Country Director, Kazakhstan Resident Mission, CWRD Team leader A. Chyngysheva, Portfolio Management Specialist, CWRD Team members A. Chakenova, Associate Project Officer (Infrastructure), CWRD C. Espina, Senior Economics Officer, CWRD A. Galiev, Senior Public Private Specialist, CWRD B. Goalou, Urban Development Specialist, CWRD I. Martinez, Private Sector Development Specialist, CWRD M. Nurseitova, Economics Officer, CWRD L. Omarova, Senior Operations Assistant, CWRD K. Rosbach, Economist, CWRD C. Tiangco, Energy Specialist, CWRD M. Westfall, Advisor, CWRD Z. Wu, Transport Specialist, CWRD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 CONTENTS Page I. CONSISTENCY OF THE BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1 II. INDICATIVE RESOURCE PARAMETERS 1 III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 2 APPENDIXES 1. Updated Country Partnership Strategy Results Framework 3 2. Indicative Assistance Pipeline 6 3. Assistance Program for Current Year 9

4 I. CONSISTENCY OF THE BUSINESS PLAN WITH THE COUNTRY PARTNERSHIP STRATEGY 1. The proposed country operations business plan (COBP) to guide Asian Development Bank (ADB) operations in Kazakhstan during is consistent with ADB s country partnership strategy (CPS), for Kazakhstan. 1 The COBP supports the CPS s strategic directions of (i) economic development and diversification through infrastructure modernization, and (ii) finance sector development, including improved access to finance for small and mediumsized enterprises (SMEs). The main cross-cutting CPS strategic priorities of regional cooperation, private sector development, knowledge solutions, environmental sustainability, governance, and institutional strengthening are also promoted under this COBP. Planned investments are aimed to improve transport infrastructure, energy efficiency, results orientation, and access to finance and financial services. A highlight of the COBP, with significant implications for inclusive growth, is the addition of a multitranche financing facility (MFF) that will support financial market development, contribute to stronger macroeconomic performance, mitigate macro-financial vulnerabilities, and accelerate information and knowledge sharing for growth. The inclusion of technical assistance (TA) for the knowledge and experience exchange program reflects ADB s emphasis on promoting knowledge solutions and global best practices. 2. The CPS has adopted a flexible approach to resource planning, premised on the government wanting ADB to be ready to provide assistance on demand. Since one project has been postponed to 2015, the demand for resources in subsequent years will be much higher than the country ceilings. The Government of Kazakhstan and ADB signed a partnership framework arrangement during the 47 th ADB Annual Meeting of the Board of Governors in Astana in May 2014 to support the government s development strategies for accelerating the diversification of the economy and increasing its competitiveness to achieve and sustain inclusive growth. Through this arrangement, ADB will assist the government in implementing its development program by providing effective stewardship of resources drawn from the country s sovereign wealth fund. This is reflected in the increased government s funding share in this COBP. II. INDICATIVE RESOURCE PARAMETERS 3. Kazakhstan is only eligible for financing from ADB s ordinary capital resources (OCR). The indicative resources available during for sovereign operations amount to $940 million, while the proposed firm lending program amounts to $1.5 billion. 2 Several projects have been included in the indicative pipeline as standby projects, although they can be reclassified as firm if additional funding becomes available. The pipeline also includes nine TA projects for $7.1 million. The COBP will help mobilize public private partnerships and promote partnerships with other development partners. The COBP will also mobilize nonsovereign financing to support private sector projects. 4. The lending program of the COBP focuses on modernizing transport infrastructure, improving energy efficiency, improving access to finance for SMEs, deepening the finance sector, and enhancing information and communication technology. The lending program is contingent on the government s continued commitment to borrow and on the availability of OCR funds. The program has been agreed with the government, which consents to annual reviews of the lending program to remain consistent with emerging government priorities. 1 ADB Country Partnership Strategy: Kazakhstan, Manila. 2 The actual pipeline can deviate from the indicative resource allocation due to possible reallocation of OCR within ADB s Central and West Asia Department. Also, cofinancing will be actively explored, in consultation with the government, to fill the financing gap, if any.

5 2 5. The lending program is complemented by a nonlending products and services program that includes project preparation support, capacity development, and a joint government ADB knowledge and experience exchange program. 3 The nonlending products and services program will be supported through TA, knowledge products, policy dialogue, and transaction advisory services for public private partnerships to promote economic diversification and private sector development. The indicative funding pipeline for TA during averages about $2.4 million per year. 6. In addition to public sector assistance, ADB s private sector operations will focus on trade finance, transport, energy, and agribusiness, and will explore new investments into selected financings to banks, investment funds, and value-added manufacturing. III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 7. The COBP, retains the focus on the core areas and cross-cutting strategic priorities of the CPS (para. 1). The changes in the pipeline indicated below are within the strategic priorities of the CPS and have resulted from a focus on project readiness and responsiveness to inclusive growth needs. 8. Energy. The Energy Efficiency Project (Karaganda District Heating Network Rehabilitation Project), originally programmed for 2014, was moved to 2015 to allow adaptation of the feasibility study to national requirements. Its second phase is planned as firm in Transport. The MFF Central Asia Regional Economic Cooperation Corridor 2 (Mangystau) (tranche 3) scheduled for 2015 was dropped at the request of the government. Two new road projects Road Rehabilitation Project (Aktobe Atyrau Astrakhan) and Performance- Based Road Maintenance Project were added for 2016, and a new MFF Center West Transport Corridor (Astana Beineu) Investment Program was added for The Astana Sustainable Urban Transport Project (Astana Bus Rapid Transport) was rescheduled from 2015 to standby in Finance. The budget for the MFF Small and Medium Enterprise Investment Program (tranche 3) increased from $200 million to $225 million as a result of the variations in exchange rate. To expand SMEs access to medium-term credit on a sustainable basis, a new MFF Micro, Small, and Medium Enterprise Investment Program was included with two consecutive tranches in 2016 and Also, a new MFF Financial Sector and Information and Communication Technology Enhancement Program was included with three tranches to be processed in 2015, 2016, and Water and other urban infrastructure and services. The Urban Services Development Project was removed from the lending program. 12. Nonlending program. The nonlending program is aligned with the lending program and focuses on supporting project preparation and providing advisory support to implement related reforms. The nonlending program also includes increased knowledge support under the joint ADB Government Knowledge and Experience Exchange Program. 3 The TA will be processed under the reimbursable modality, through which ADB will finance the whole TA amount and the government will reimburse 50% of the total cost to ADB.

6 Appendix 1 3 Country Development Goals UPDATED COUNTRY PARTNERSHIP STRATEGY RESULTS FRAMEWORK (Board endorsement of the CPS: 2012; COBP December 2014) 1. Steady and balanced growth of the economy through diversification and increased competitive ability. GDP in 2015 will have increased by 50% in nominal terms and 15% in real terms over 2008 levels (from T16 trillion to T23 trillion in nominal terms). 2. Productivity of the labor force will increase 1.5 times by 2015 over the 2008 level of $22,600 per person on a purchasing power parity basis. 3. Share of the manufacturing industry in GDP rises to 12.5% by 2015 from 11.3% in Sectors Selected by ADB a Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators 1. Transport (Core Area 1: Infrastructure, Core Area 3: Regional integration) Develop an efficient transport and logistics system that is integrated and on par with the international system Outcome: Increased and more efficient movement of people and goods to domestic and international markets Indicator 1: Transport cost in the final cost of goods reduced Baseline: 10% (2011) Target: 5% (2016) Current value: 9% (2014) Indicator 2: Traffic volume increased on Mangystau Oblast section of Central Asian Regional Economic Cooperation Corridor 2 Baseline: 1,000 vehicles per day (2009) Target: 3,500 vehicles per day (2016) Current value: 2,287 vehicles per day (2014) Indicator 3: Travel time between Aktau and Beineu reduced ADB Areas of Intervention National roads and improvement of crossborder infrastructure Logistics improvement Sector-wide institutional and governance reforms Public private partnerships Knowledge support, capacity development, and policy dialogue Public transport ADB Indicative Resource Allocation in the Next Pipeline and Strategic Priorities $703 million for (year 2017 is outside current CPS period), 33% of total CPS envelope, b of which: ESG 21% RCI 100% $497 million approved from , 23% of total CPS envelope, of which: IEG 100% RCI 100% Changes from CPS or Last COBP None Changes from CPS or Last COBP Key sector outcomes have been added with urban transport. The indicators have been reviewed and updated. The last indicator was an outcome related to urban transport, which was included in the previous COBP results framework as multisector. Baseline: 12 hours (2009) Target: 4 hours (2016) Current value: 7 hours (2014) Indicator 4: An increased percentage of Astana s population is served by the new rapid transit system Baseline: 0% (2014) Target: 25% (2020)

7 4 Appendix 1 Sectors Selected by ADB a Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators ADB Areas of Intervention ADB Indicative Resource Allocation in the Next Pipeline and Strategic Priorities Changes from CPS or Last COBP 2. Energy (Core Area 1: Infrastructure, Core Area 2: Environment) Modernize energy infrastructure and systems, and develop renewable energy to achieve higher energy efficiency, reduced energy intensity, and lower greenhouse gas emissions Outcome: Efficient use of energy and reduced energy intensity Indicator 1: Energy intensity of GDP decreased Baseline: 0.56 terawatt-hours per $1 billion GDP on a purchasing power parity basis (2008) Target: 0.50 terawatt-hours per $1 billion GDP on a purchasing power parity basis (2016) Indicator 2: Average thermal power generation efficiency improved Baseline: 31% (2009) Target: 34% (2016) Energy efficiency Electrical power transmission Emissions reduction Private sector operations and public private partnerships Knowledge support, capacity development, and policy dialogue $192 million for , 9% of total CPS envelope, and additional $50 million cofinancing, of which: ESG 100% $1.6 million approved from in technical assistance. Key sector outcomes have not changed significantly. The indicators have been reviewed and updated. Indicator 3: Carbon intensity of GDP reduced Baseline: 5.41 kgco 2e/$ (2008) c Target: 10% decrease (2016) 3. Finance (Core Area 4: Finance sector development) Strengthen access to finance for SMEs, trade, and investment in infrastructure Outcome: Greater access of SMEs to financial services, and increased infrastructure investments by private sector Indicator 1: Share of bank loans to SMEs increases as share of GDP Baseline: 15% (2011) Target: 20% (2017) Current value: 13% (2014) Indicator 2: Proportion of loans going to women entrepreneurs under DAMU programs increases Access to finance for SMEs Capital markets development Local currency finance $631 million for , 29% of total CPS envelope, of which: GEM 70% PSD 100% $126 million approved from , 6% of total CPS envelope, of which: IEG 100% GEM 100% Key sector outcomes have not changed significantly. The indicators have been reviewed and updated. Baseline: 16% (2009) Target: 24% (2017) Current value: 23% (2014)

8 Appendix 1 5 Sectors Selected by ADB a Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators Indicator 3: Overall bank loans increase as share of GDP Baseline: 32% (2011) Target: 40% (2017) Current value: 33% (2013) Indicator 4: Number of SMEs receiving medium-term financing under DAMU programs on a cumulative basis increases Baseline: 8,766 (2009) Target: 25,000 (2017) Current value: 18,400 (2013) ADB Areas of Intervention ADB Indicative Resource Allocation in the Next Pipeline and Strategic Priorities Changes from CPS or Last COBP ADB = Asian Development Bank, COBP = country operations business plan, CPS = country partnership strategy, DAMU = DAMU Entrepreneurship Development Fund, ENV = environmental sustainability, ESG = environmentally sustainable growth, GDP = gross domestic product, GEM = gender equity and mainstreaming, IEG = inclusive economic growth, kgco 2e = kilograms of carbon dioxide equivalent, PSD = private sector development, RCI = regional cooperation and integration, SMEs = small and medium-sized enterprises. a The urban projects have been reorganized with the urban transport project now under the transport sector. This has left just one technical assistance project in the water sector; therefore, the water sector has been taken out as a stand-alone sector from the results framework. b Amounts are inclusive of technical assistance projects. c Carbon intensity is defined as kilograms of carbon dioxide equivalent emission per unit of GDP in 2000 prices. Source: Asian Development Bank estimates.

9 6 Appendix 2 Project/Program Name 2015 Firm Energy Efficiency Project (Karaganda District Heating Network Rehabilitation Project) MFF Small and Medium Enterprise Investment Program (tranche 3) MFF Inclusive Economic Growth through Financial Sector and Information and Communication Technology Enhancement Program (tranche 1) a Sector Poverty Targeting INDICATIVE ASSISTANCE PIPELINE Table A2.1: Lending Products, Strategic Agendas and Drivers of Change ENE GI IEG, ESG, GCD FIN GI IEG, EGM, GCD, PSD FIN GI IEG, PSD, GCD, SGE, KNS, PAR Division Year of PPTA/ PDA Total OCR Cost ($ million) ADB ADF Loans Grants Total Gov t Cofinance CWEN (CTF) CWPF CWPF Total Standby Performance-Based Road Maintenance Project 2016 Firm Performance-Based Road Maintenance Project Western Kazakhstan Transport Corridor (Aktobe Atyrau Astrakhan) TRA GI IEG, RCI, TRA GI IEG, RCI, TRA GI IEG, RCI, MFF Micro, Small, and Medium Enterprise FIN GI IEG, EGM, Investment Program (tranche 1) b GSD, PSD MFF Inclusive Economic Growth through Financial Sector and Information and Communication Technology Enhancement Program (tranche 2) FIN GI IEG, PSD, GCD, SGE, KNS, PAR CWTC CWTC CWTC CWPF CWPF Total

10 Appendix 2 7 Project/Program Name 2016 Standby MFF Center West Transport Corridor (Astana Beuneu) Investment Program (tranche 1) c Sector Poverty Targeting Strategic Agendas and Drivers of Change TRA GI IEG, RCI, Energy Efficiency Project (phase 2) ENE GI IEG, ESG, Division Year of PPTA/ PDA Total OCR Cost ($ million) ADB ADF Loans Grants Total Gov t Cofinance CWTC CWEN Firm MFF Center West Transport Corridor (Astana-Beuneu) Investment Program (tranche 1) TRA GI IEG, RCI, Energy Efficiency Project (phase 2) ENE GI IEG, ESG, MFF Micro, Small, and Medium Enterprise Investment Program (tranche 2) MFF Inclusive Economic Growth through Financial Sector and Information and Communication Technology Enhancement Program (tranche 3) FIN GI IEG, EGM, GCD, PSD FIN GI IEG, PSD, GCD, SGE, KNS, PAR CWTC CWEN CWPF CWPF Total Standby Power Rehabilitation and Transmission Project Astana Sustainable Urban Transport Project (Astana Bus Rapid Transport) ENE GI IEG, ESG, GCD TRA GI IEG, ESG, EGM, PSD, GCD, KNS, PAR CWEN CWUW (EBRD/ AFD) ADB = Asian Development Bank; ADF = Asian Development Fund; CTF = Clean Technology Fund; CWEN = Energy Division; CWPF = Public Management, Financial Sector and Trade Division; CWTC = Transport Division; CWUW = Urban Development and Water Division; EGM = effective gender mainstreaming; ENE = energy; ESG = environmentally sustainable growth; FIN = finance; GCD = governance and capacity development; GI = general intervention; Gov t = government; IEG = inclusive economic growth; KNS = knowledge solutions; MFF = multitranche financing facility; OCR = ordinary capital resources; PAR = partnerships; PDA = project design advance; PPTA = project preparatory technical assistance; PSD = private sector development; RCI = regional cooperation and integration; SGE = some gender elements; TRA = transport. a MFF of $205 million is programmed for MFF Inclusive Economic Growth through Financial Sector and Information and Communication Technology Enhancement Program. b MFF of $200 million is programmed for MFF Micro, Small, and Medium Enterprise Investment Program. c MFF of $800 million is programmed for MFF Center West Transport Corridor (Astana-Beuneu) Investment Program. Source: Asian Development Bank estimates.

11 8 Appendix 2 Assistance Name 2015 Firm Table A2.2: Nonlending Products and Services, Sector Division Assistance Type Sources of Funding ADB Others Amount Source ($'000) Source Amount ($'000) Kazakhstan Road Connectivity Project TRA CWTC PPTA TASF 1,500 GOK 100 1,600 Preparation a Joint Government of Kazakhstan ADB Knowledge and Experience Exchange Program (cluster, phase 1) Economic Growth though Financial Sector and Information and Communication Technology Enhancement Micro, Small, and Medium-Sized Enterprise Development Total ($'000) PSM KARM C-PATA TASF 500 GOK 500 1,000 FIN CWPF PPTA TASF 760 GOK 1,240 2,000 FIN CWPF PPTA TASF 240 GOK 760 1,000 Energy Efficiency Project (phase 2) ENE CWEN PPTA CEFPF 1, , Firm Total 4,000 2,600 6,600 Astana Sustainable Urban Transport Project (Astana Bus Rapid Transport) TRA CWUW PPTA TASF 800 GOK 200 1,000 Center West Transport Corridor (Astana- TRA CWTC PPTA TASF 800 GOK Beuneu) Total 1, , Firm Joint Government of Kazakhstan ADB Knowledge and Experience Exchange Program (cluster, phase 2) PSM KARM C-PATA TASF 500 GOK 500 1,000 Power Rehabilitation or Transmission Project ENE CWEN PPTA TASF 1, ,000 Total 1, ,000 ADB = Asian Development Bank; CDTA = capacity development technical assistance; CEFPF = clean energy financing partnership facility; C-PATA = cluster policy and advisory technical assistance; CWEN = Energy Division; CWPF = Public Management, Financial Sector and Trade Division; CWTC = Transport and Communications Division; CWUW = Urban Development and Water Division; ENE = energy; FIN = finance; GOK = Government of Kazakhstan; KARM = Kazakhstan Resident Mission; PATA = policy and advisory technical assistance; PPTA = project preparatory technical assistance; PSM = public sector management; TASF = Technical Assistance Special Fund; TRA = transport. a The PPTA will cover the preparation of the Western Kazakhstan Transport Corridor (Aktobe Atyrau Astrakhan) and Performance-Based Road Maintenance projects. Source: Asian Development Bank estimates.

12 Appendix 3 9 ASSISTANCE PROGRAM FOR CURRENT YEAR Table A3.1: Lending Products, 2014 Project/Program Name Sector Poverty Targeting Strategic Agendas and Drivers of Change Division Year of PPTA/ PDA Total OCR Cost ($ million) ADB ADF Loans Grants Total Gov t Cofinance None ADB = Asian Development Bank, ADF = Asian Development Fund, Gov t = government, OCR = ordinary capital resources, PDA = project design advance, PPTA = project preparatory technical assistance. Source: Asian Development Bank.

13 10 Appendix 3 Table A3.2: Nonlending Products and Services, 2014 Assistance Name 2014 Firm Sector Division Assistance Type Sources of Funding ADB Others Amount Source ($'000) Source Amount ($'000) Total ($'000) Karaganda District Heating (additional financing) Managing for Development Results in the Transport Sector ENE CWEN PPTA TASF 600 GOK TRA CWPF S-CDTA TASF 225 GOK Enhancing Insurance Market Efficiency and FIN CWPF PATA TASF 800 GOK Outreach and Disaster Risk Management Total 1, ,900 ADB = Asian Development Bank; CDTA = capacity development technical assistance; CWEN = Energy Division; CWPF = Public Management, Financial Sector and Trade Division; ENE = energy; FIN = finance; PATA = policy and advisory technical assistance; PPTA = project preparatory technical assistance; TASF = Technical Assistance Special Fund; TRA = transport. Source: Asian Development Bank estimates.

Country Operations Business Plan. Turkmenistan 2015 2016. December 2014

Country Operations Business Plan. Turkmenistan 2015 2016. December 2014 Country Operations Business Plan December 2014 Turkmenistan 2015 2016 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Project Number: 26194 August 2013. Samoa 2014 2016

Country Operations Business Plan. Project Number: 26194 August 2013. Samoa 2014 2016 Country Operations Business Plan Project Number: 26194 August 2013 Samoa 2014 2016 CURRENCY EQUIVALENTS (as of 11 August 2013) Currency Unit tala (ST) ST$1.00 = $0.4256 $1.00 = ST2.3496 ADB ADF GDP IMF

More information

Country Operations Business Plan. Project Number: 26194. September 2012. Bhutan 2013 2015

Country Operations Business Plan. Project Number: 26194. September 2012. Bhutan 2013 2015 Country Operations Business Plan Project Number: 26194 September 2012 Bhutan 2013 2015 CURRENCY EQUIVALENTS (as of 1 August 2012) Currency Unit ngultrum (Nu) Nu1.00 = $0.0180 $1.00 = Nu55.71 ABBREVIATIONS

More information

Country Operations Business Plan. September 2012. Maldives 2013 2015

Country Operations Business Plan. September 2012. Maldives 2013 2015 Country Operations Business Plan September 2012 Maldives 2013 2015 CURRENCY EQUIVALENTS (as of 31 August 2012) Currency unit rufiyaa (Rf) Rf1.00 = $0.064893 $1.00 = Rf15.4100 ABBREVIATIONS ADB Asian Development

More information

Country Operations Business Plan: Sri Lanka, 2016 2018

Country Operations Business Plan: Sri Lanka, 2016 2018 Board of Directors IN.276-15 21 August 2015 Country Operations Business Plan: Sri Lanka, 2016 2018 Attached for information is a paper on the above subject. For Inquiries: S. Widowati, Sri Lanka Resident

More information

Country Operations Business Plan. Viet Nam 2014 2016. Project Number: 26194s. December 2013

Country Operations Business Plan. Viet Nam 2014 2016. Project Number: 26194s. December 2013 Country Operations Business Plan Project Number: 26194s December 2013 Viet Nam 2014 2016 CURRENCY EQUIVALENTS (as of 12 November 2013) Currency unit dong (D) D1.00 = $0.000047 $1.00 = D21,085 ABBREVIATIONS

More information

Country Operations Business Plan. India 2016 2018. October 2015

Country Operations Business Plan. India 2016 2018. October 2015 Country Operations Business Plan October 2015 India 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as 24 September

More information

Regional Operations Business Plan. Project Number: 26194 October 2012. Pacific 2013 2015

Regional Operations Business Plan. Project Number: 26194 October 2012. Pacific 2013 2015 Regional Operations Business Plan Project Number: 26194 October 2012 Pacific 2013 2015 ABBREVIATIONS ADB Asian Development Bank DMC developing member country ICT information and communication technology

More information

Uzbekistan 2012 2016. Country Partnership Strategy. August 2012

Uzbekistan 2012 2016. Country Partnership Strategy. August 2012 Country Partnership Strategy August 2012 Uzbekistan 2012 2016 This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications Policy (2011). Subject

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 1. Sector Performance, Problems, and

More information

How To Help The Poor

How To Help The Poor ICT in ADB Operations April 30th, 2014 Claudia Buentjen Principal Public Management Specialist Regional and Sustainable Development Department Seok Yong Yoon Senior Public Management Specialist (E-Governance)

More information

Faster Approach to Small Nonsovereign Transactions

Faster Approach to Small Nonsovereign Transactions Policy Paper March 2015 Faster Approach to Small Nonsovereign Transactions Distribution of the attached document is restricted until it has been approved by the Board of Directors. Following such approval,

More information

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities Small Business and Entrepreneurship Development Project (RRP UZB 42007-014) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT 1 Sector Road Map 1. Sector Performance, Problems,

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): FINANCE 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The finance sector in Bangladesh is diverse,

More information

Supporting the Asian EXIM Banks Forum

Supporting the Asian EXIM Banks Forum Technical Assistance Report Project Number: 48430-001 Regional Capacity Development Technical Assistance (R-CDTA) October 2015 Supporting the Asian EXIM Banks Forum (Financed by the People s Republic of

More information

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed

More information

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT Women s Entrepreneurship Support Sector Development Program (RRP ARM 45230) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISE DEVELOPMENT A. Overview 1. Significance of micro, small,

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section D14/BP Page 1 of 6 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction MULTITRANCHE FINANCING FACILITY

More information

Examples of Good Practice

Examples of Good Practice Examples of Good Practice Cost Estimates and Financing Plans February 2015 Financial Management Unit Operations Services and Financial Management Department 1 TABLE OF CONTENTS 1 Introduction... 3 2 Investment

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter

More information

Strengthening Project Preparation Capacity in Asia and the Pacific

Strengthening Project Preparation Capacity in Asia and the Pacific Technical Assistance Report Project Number: 49407-001 Cluster Capacity Development Technical Assistance (C-CDTA) January 2016 Strengthening Project Preparation Capacity in Asia and the Pacific Distribution

More information

Technical Assistance Report. Project Number: 42532 December 2008. Public Debt and Risk Management Forum

Technical Assistance Report. Project Number: 42532 December 2008. Public Debt and Risk Management Forum Technical Assistance Report Project Number: 42532 December 2008 Public Debt and Risk Management Forum ABBREVIATIONS ADB ADF Asian Development Bank Asian Development Fund DMC PDRM SDR developing member

More information

Business Opportunities Seminar

Business Opportunities Seminar Business Opportunities Seminar In Finland, Norway, Denmark, Ireland and The Netherlands (22 29 September 2015) Presented by: Rustam Abdukayumov Senior Procurement Specialist Operations Services and Financial

More information

FROM BILLIONS TO TRILLIONS:

FROM BILLIONS TO TRILLIONS: FROM BILLIONS TO TRILLIONS: MDB Contributions to Financing for Development In 2015, the international community is due to agree on a new set of comprehensive and universal sustainable development goals

More information

Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II

Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II Additional Financing Project Number: 42334-017 Loan Number: 3151-CAM November 2015 Proposed Administration of Loans and Grants Kingdom of Cambodia: Rural Roads Improvement Project II Distribution of this

More information

Measuring the Development Effectiveness of Private Sector Operations

Measuring the Development Effectiveness of Private Sector Operations Technical Assistance Report Project Number: 48909-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2014 Measuring the Development Effectiveness of Private Sector Operations This

More information

TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap

TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap TRANSPORT SECTOR ROADMAP AND THE INVESTMENT PROGRAM I. Roadmap 1. Launched in 2008, the government s Afghanistan National Strategy (ANDS) is a Millennium Goals (MDGs) based action plan and road map for

More information

Papua New Guinea: Supporting Public Financial Management, Phase 2

Papua New Guinea: Supporting Public Financial Management, Phase 2 Technical Assistance Report Project Number: 44379 012 Capacity Development Technical Assistance (CDTA) November 2012 Papua New Guinea: Supporting Public Financial Management, Phase 2 The views expressed

More information

How To Help The Republic Of The Maldives

How To Help The Republic Of The Maldives Technical Assistance Report Project Number: 47150 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Maldives: Enhancing Tax Administration Capacity (Financed by the Japan Fund

More information

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management Technical Assistance Report Project Number: 47225 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Union of Myanmar: Support for Strengthening Public Debt Management The views

More information

POLICY ON COAL-FIRED POWER GENERATION

POLICY ON COAL-FIRED POWER GENERATION POLICY ON COAL-FIRED POWER GENERATION January 2014 POLICY ON COAL-FIRED POWER GENERATION CDC s mission is to support the building of private sector businesses throughout Africa and South Asia, to create

More information

People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas

People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas Technical Assistance Report Project Number: 48022 Policy and Advisory Technical Assistance (PATA) August 2014 People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48281-001 November 2014 Proposed Loan China Gas Holdings Limited Natural Gas for Land and River Transportation Project

More information

PAI 5.08 Revised in June 2011 Page 2 of 8

PAI 5.08 Revised in June 2011 Page 2 of 8 Project Administration Instructions PAI 5.08 Page 1 of 8 PROJECT PERFORMANCE MONITORING A. Introduction 1. This project administration instruction (PAI) describes how the performance of ADB financed and

More information

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS

PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS PROCEDURES FOR ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING OF INVESTMENT PROJECTS Approved 10 July 2015 CONTENTS 1. INTRODUCTION 1 2. OVERVIEW OF THE ENVIRONMENTAL AND SOCIAL APPRAISAL AND MONITORING

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines

More information

Mobilizing Public Finance for Adaptation - Use of Policy-Based Loan in Trinidad and Tobago

Mobilizing Public Finance for Adaptation - Use of Policy-Based Loan in Trinidad and Tobago Mobilizing Public Finance for Adaptation - Use of Policy-Based Loan in Trinidad and Tobago Gerard Alleng, Climate Change Sr Specialist UNFCCC Second Forum of the Standing Committee on Finance Mobilizing

More information

SECTOR ASSESSMENT (SUMMARY): EDUCATION 1

SECTOR ASSESSMENT (SUMMARY): EDUCATION 1 Country Partnership Strategy: Bangladesh, 2011 2015 SECTOR ASSESSMENT (SUMMARY): EDUCATION 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh has made considerable progress

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47930 November 2013 Proposed Senior Loans XacBank and TenGer Financial Group Supporting Micro, Small, Medium-Sized Enterprises

More information

Having undertaken a general discussion on the basis of Report IV, Small and medium-sized enterprises and decent and productive employment creation,

Having undertaken a general discussion on the basis of Report IV, Small and medium-sized enterprises and decent and productive employment creation, International Labour Conference Provisional Record 104th Session, Geneva, June 2015 11-1 Fourth item on the agenda: Small and medium-sized enterprises and decent and productive employment creation Reports

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained

More information

Kyrgyz Republic: Women s Entrepreneurship Development Project

Kyrgyz Republic: Women s Entrepreneurship Development Project Kyrgyz Republic: Women s Entrepreneurship Development Project Project Name Project Number 46010-001 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount Women s Entrepreneurship

More information

(Cofinanced by the Government of Sweden and Credit Suisse AG)

(Cofinanced by the Government of Sweden and Credit Suisse AG) Technical Assistance Report Project Number: 46240 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Inclusive Business Support (Cofinanced by the Government of Sweden and Credit

More information

JOINT MDB CLIMATE FINANCE TRACKING

JOINT MDB CLIMATE FINANCE TRACKING JOINT MDB CLIMATE FINANCE TRACKING Jan-Willem van de Ven Senior Carbon Manager Consultation on Development and Climate Change OECD-CPI event, Warsaw, 19 November 2013 European Bank for Reconstruction and

More information

ASIAN DEVELOPMENT BANK COUNTRY STRATEGY AND PROGRAM UPDATE (2001-2004) AZERBAIJAN

ASIAN DEVELOPMENT BANK COUNTRY STRATEGY AND PROGRAM UPDATE (2001-2004) AZERBAIJAN ASIAN DEVELOPMENT BANK COUNTRY STRATEGY AND PROGRAM UPDATE (2001-2004) AZERBAIJAN July 2001 CURRENCY EQUIVALENTS (as of 30 June 2001) Currency Unit Manat Manat1.00 = $0.00022 $1.00 = Manat 4,644 ABBREVIATIONS

More information

TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project)

TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) A. Methodology and Key Activities 1. The Asian Development Bank (ADB) will engage a qualified team of consultants in

More information

Memorandum Independent Evaluation Department Independent Evaluation Division 1

Memorandum Independent Evaluation Department Independent Evaluation Division 1 Memorandum Independent Department Independent Division 1 Approach Project Performance Report of Railway Rehabilitation and Railway Modernization in Uzbekistan February 2010 Team Leader: David Dole, Senior

More information

Session 2 Aid Modality and Aid Effectiveness Herath Gunatilake Economics and Research Department

Session 2 Aid Modality and Aid Effectiveness Herath Gunatilake Economics and Research Department Session 2 Aid Modality and Aid Effectiveness Herath Gunatilake Economics and Research Department Introductory Course on Economic Analysis of Policy-Based Lending Operations 5 June 2007 Overview A successful

More information

Mongolia: Strengthening the Capacity of Judicial Training

Mongolia: Strengthening the Capacity of Judicial Training Technical Assistance Report Project Number: 49189-001 Capacity Development Technical Assistance (CDTA) November 2015 Mongolia: Strengthening the Capacity of Judicial Training This document is being disclosed

More information

Grant Assistance Kyrgyz Republic: Women s Entrepreneurship Development Project

Grant Assistance Kyrgyz Republic: Women s Entrepreneurship Development Project Grant Assistance Report Project Number: 46010-01 January 2013 Grant Assistance Kyrgyz Republic: Women s Entrepreneurship Development Project (Financed by the Japan Fund for Poverty Reduction) CURRENCY

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1 A. Sector Performance, Problems, and Opportunities 1. Sector importance and growth

More information

SECTOR ASSESSMENT (SUMMARY): BRICK 1

SECTOR ASSESSMENT (SUMMARY): BRICK 1 Financing Brick Kiln Efficiency Improvement Project (RRP BAN 45273) SECTOR ASSESSMENT (SUMMARY): BRICK 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The brick sector in Bangladesh

More information

Independent State of Samoa: Ports Development Master Plan

Independent State of Samoa: Ports Development Master Plan Technical Assistance Report Project Number: 47358-001 Policy and Advisory Technical Assistance (PATA) April 2015 Independent State of Samoa: Ports Development Master Plan The views expressed herein are

More information

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK Annex C PROGRESS REPORT ON MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK PREPARED FOR THE SECOND INTERNATIONAL ROUNDTABLE ON MANAGING FOR DEVELOPMENT RESULTS FEBRUARY 2004 Annex C CONTENTS

More information

The Bank needs to keep its portfolio of operations under close scrutiny to ensure they perform well and to

The Bank needs to keep its portfolio of operations under close scrutiny to ensure they perform well and to Chapter 6 Quality of Bank operations The Bank needs to keep its portfolio of operations under close scrutiny to ensure they perform well and to maximise development outcomes and returns on investments.

More information

How To Speed Up Loan Processing At The Asian Development Bank

How To Speed Up Loan Processing At The Asian Development Bank November 2009 Better and Faster Loan Delivery Report of the Loan Delivery Working Group ABBREVIATIONS ADB Asian Development Bank BTOR back-to-office report DMC developing member country EA executing agency

More information

LINKED DOCUMENT E: LOAN COVENANTS

LINKED DOCUMENT E: LOAN COVENANTS Project Performance Evaluation Report on FSM: Private Sector Development Program LINKED DOCUMENT E: LOAN COVENANTS Table E.1: Loan 1873-FSM(SF): Private Sector Development Program Covenant 1 Carry out

More information

Republic of Indonesia: Tax Revenue Administration Modernization and Policy Improvement in Local Governments

Republic of Indonesia: Tax Revenue Administration Modernization and Policy Improvement in Local Governments Technical Assistance Report Project Number: 48294-001 Capacity Development Technical Assistance (CDTA) January 2015 Republic of Indonesia: Tax Revenue Administration Modernization and Policy Improvement

More information

Annex 8: SDG Indicator Mapping

Annex 8: SDG Indicator Mapping Annex 8 SDG Indicator Mapping 1. Annex 8 responds to Executive Board decision below, regarding the refinement of indicators and targets of the Strategic Plan Integrated Results and Resources Framework

More information

How To Improve Office Space At The Asian Development Bank

How To Improve Office Space At The Asian Development Bank May 2013 Special Capital Expenditure Budget Proposal: Improving Office Facilities of Selected Resident Missions ABBREVIATIONS ADB Asian Development Bank BPBM BPMSD OAS OIST Budget and Management Services

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Microfinance Expansion Project (RRP PNG 44304) Sector Road Map SECTOR ASSESSMENT (SUMMARY): FINANCE 1. Sector Performance, Problems, and Opportunities 1. During 2000 2006, the growth in population in Papua

More information

3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary)

3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary) 3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary) Keywords Budapest, sustainable energy, CO2 emission reduction, climate protection, action plan Name and location Budapest

More information

Papua New Guinea: Microfinance and Employment Project

Papua New Guinea: Microfinance and Employment Project Validation Report Reference Number: PVR 211 Project Number: 32472 Loan Number: 1768 December 2012 Papua New Guinea: Microfinance and Employment Project Independent Evaluation Department ABBREVIATIONS AusAID

More information

MEMORANDUM OF UNDERSTANDING THE EUROPEAN COMMISSION, THE EUROPEAN INVESTMENT BANK together with the EUROPEAN INVESTMENT FUND,

MEMORANDUM OF UNDERSTANDING THE EUROPEAN COMMISSION, THE EUROPEAN INVESTMENT BANK together with the EUROPEAN INVESTMENT FUND, MEMORANDUM OF UNDERSTANDING between THE EUROPEAN COMMISSION, THE EUROPEAN INVESTMENT BANK together with the EUROPEAN INVESTMENT FUND, and THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT in respect

More information

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES. 1. Sector Performance, Problems, and Opportunities Inclusive Micro, Small, and Medium-Sized Enterprises Development Project (RRP MLD 43566) SECTOR ASSESSMENT (SUMMARY): MICRO, SMALL, AND MEDIUM-SIZED ENTERPRISES Sector Road Map 1. Sector Performance, Problems,

More information

India: Equity Investment in and Loan to Infrastructure Development Finance Company

India: Equity Investment in and Loan to Infrastructure Development Finance Company Validation Report Reference Number: VR-22 Project Numbers: 31901 and 38926 Investment Numbers: 7138 and 7211 December 2013 India: Equity Investment in and Loan to Infrastructure Development Finance Company

More information

CASE STORY ON GENDER DIMENSION OF AID FOR TRADE. Banking on Women Pays Off: Creating Opportunities for Women Entrepreneurs

CASE STORY ON GENDER DIMENSION OF AID FOR TRADE. Banking on Women Pays Off: Creating Opportunities for Women Entrepreneurs CASE STORY ON GENDER DIMENSION OF AID FOR TRADE Banking on Women Pays Off: Creating Opportunities for Women Entrepreneurs Banking on Women Pays Off Creating Opportunities for Women Entrepreneurs International

More information

Asia Pacific Public Electronic Procurement Network

Asia Pacific Public Electronic Procurement Network Technical Assistance Report Project Number: 47192-001 Regional Capacity Development Technical Assistance (R-CDTA) December 2013 Asia Pacific Public Electronic Procurement Network (Cofinanced by the Republic

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46062 November 2014 Proposed Loan People s Republic of China: Gansu Baiyin Integrated Urban Development Project Distribution

More information

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation Technical Assistance Report Project Number: 46231 Policy and Advisory Technical Assistance (PATA) December 2012 Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation (Financed

More information

How To Write A Loan To A Small And Medium Sized Enterprise In Sri Lanka

How To Write A Loan To A Small And Medium Sized Enterprise In Sri Lanka Report and Recommendation of the President to the Board of Directors Project Number: 46924 January 2013 Proposed Senior Unsecured Loan Nations Trust Bank Small and Medium-Sized Enterprises Finance Project

More information

SIERRA LEONE UPDATES FROM THE INSTANBUL PRIORITY AREAS OF ACTION

SIERRA LEONE UPDATES FROM THE INSTANBUL PRIORITY AREAS OF ACTION SIERRA LEONE UPDATES FROM THE INSTANBUL PRIORITY AREAS OF ACTION 1 OUTLINE OF PRESENTATION Recent Developments Istanbul Priority Areas of Action Poverty Levels Agenda for Prosperity Challenges Conclusion

More information

May 28, 2009 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

May 28, 2009 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS May 28, 2009 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS 1 Introduction 1. Among the functions of the Clean Technology Fund (CTF) Trust Fund Committee

More information

Proposed Loan and Administration of Technical Assistance Grant Small and Medium-Sized Enterprises Line of Credit Project (Sri Lanka)

Proposed Loan and Administration of Technical Assistance Grant Small and Medium-Sized Enterprises Line of Credit Project (Sri Lanka) SUMMARY PROCEDURE FOR OFFICIAL USE ONLY R9-16 25 January 2016 Proposed Loan and Administration of Technical Assistance Grant Small and Medium-Sized Enterprises Line of Credit Project (Sri Lanka) 1. The

More information

Preliminary Consultation on a Dedicated SME Sub- Fund and Policy Support Facility

Preliminary Consultation on a Dedicated SME Sub- Fund and Policy Support Facility 015/SMEWG0/018 Agenda Item: 1 Preliminary Consultation on a Dedicated SME Sub- Fund and Policy Support Facility Purpose: Information Submitted by: Canada 0 th Small and Medium Enterprises Working Group

More information

PPC Arrangements since Belgrade conference. Clean Technology Fund. Sustainable Energy Action Plan. Municipal and Environmental Infrastructure

PPC Arrangements since Belgrade conference. Clean Technology Fund. Sustainable Energy Action Plan. Municipal and Environmental Infrastructure Annual Meeting of the EAP Task Force in Astana 23 24 October 2008 EBRD PPC activities and Environmental Initiatives in Kazakhstan Ulf Hindström Senior Banker, Astana Resident Office Agenda PPC Arrangements

More information

FINANCIAL ANALYSIS. A. Introduction and Methodology

FINANCIAL ANALYSIS. A. Introduction and Methodology Coastal Towns Environmental Infrastructure Project (RRP BAN 44212) FINANCIAL ANALYSIS A. Introduction and Methodology 1. The Coastal Towns Environmental Infrastructure project finances basic urban service

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47037 June 2014 Proposed Multitranche Financing Facility Democratic Socialist Republic of Sri Lanka: Green

More information

Black Sea Trade and Development Bank. Romania March 2011

Black Sea Trade and Development Bank. Romania March 2011 Black Sea Trade and Development Bank Romania March 2011 BSTDB Target Clients Project Finance Corporate Finance 1. Corporates in general industries, shipping, telecom and energy 2. BOT projects 3. Regional

More information

Five-Year Evaluation Plan 2014 19

Five-Year Evaluation Plan 2014 19 WESTERN ECONOMIC DIVERSIFICATION CANADA Policy and Strategic Direction May 2014 Table of Contents 1.0 INTRODUCTION 2 2.0 EVALUATION IN THE GOVERNMENT OF CANADA 2 3.0 PLANNING CONTET 2 3.1 Objective and

More information

Facilitating Remittances to Help Families and Small Businesses

Facilitating Remittances to Help Families and Small Businesses G8 ACTION PLAN: APPLYING THE POWER OF ENTREPRENEURSHIP TO THE ERADICATION OF POVERTY The UN Commission on the Private Sector and Development has stressed that poverty alleviation requires a strong private

More information

I. 2030 CLIMATE AD EERGY POLICY FRAMEWORK

I. 2030 CLIMATE AD EERGY POLICY FRAMEWORK uropean Council Brussels, 23 October 2014 (OR. en) SN 79/14 NOT Subject: uropean Council (23 and 24 October 2014) Conclusions on 2030 Climate and nergy Policy Framework I. 2030 CLIMAT AD RGY POLICY FRAMWORK

More information

Greater Mekong Subregion Phnom Penh Plan for Development Management V

Greater Mekong Subregion Phnom Penh Plan for Development Management V Technical Assistance Report Project Number: 46232-001 Regional Capacity Development Technical Assistance (R-CDTA) November 2012 Greater Mekong Subregion Phnom Penh Plan for Development Management V (Cofinanced

More information

WORLD BANK CORPORATE SCORECARD SEPTEMBER 2013. Integrated Results and Performance Framework

WORLD BANK CORPORATE SCORECARD SEPTEMBER 2013. Integrated Results and Performance Framework WORLD BANK CORPORATE SCORECARD SEPTEMBER 2013 Integrated Results and Performance Framework What is the World Bank Corporate Scorecard? Two ambitious goals guide World Bank Group actions: (i) ending extreme

More information

Samoa: Small Business Development Project

Samoa: Small Business Development Project Validation Report Reference Number: PCV: SAM 2011-01 Project Number: 33167 Loan Number: 1785-SAM(SF) January 2011 Samoa: Small Business Development Project Independent Evaluation Department ABBREVIATIONS

More information

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) UNITED REPUBLIC OF TANZANIA INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) 1. Introduction The United Republic of Tanzania, which comprises of Tanzania Mainland and Zanzibar, brings forth her Intended

More information

This chapter assesses how efficient we are as a development institution. The 15 indicators show the

This chapter assesses how efficient we are as a development institution. The 15 indicators show the Chapter 7 The organisation s efficiency This chapter assesses how efficient we are as a development institution. The 15 indicators show the progress we have made in reforming and strengthening our structures

More information

G20 LABOUR AND EMPLOYMENT MINISTERIAL DECLARATION MELBOURNE, 10-11 SEPTEMBER 2014

G20 LABOUR AND EMPLOYMENT MINISTERIAL DECLARATION MELBOURNE, 10-11 SEPTEMBER 2014 Introduction G20 LABOUR AND EMPLOYMENT MINISTERIAL DECLARATION MELBOURNE, 10-11 SEPTEMBER 2014 Preventing structural unemployment, creating better jobs and boosting participation 1. We, the Ministers of

More information

EU Cohesion Policy 2014 2020

EU Cohesion Policy 2014 2020 EU Cohesion Policy 2014 2020 Proposals from the European Commission Johannes Hahn, Commissioner for Regional Policy László Andor, Commissioner for Employment, Social Affairs and Inclusion Cohesion Policy

More information

Mr. Chairman, Mr. President, distinguished Governors, ladies and gentlemen,

Mr. Chairman, Mr. President, distinguished Governors, ladies and gentlemen, Statement by Mr. Jun AZUMI, Minister of Finance of Japan, at the Forty-Fifth Annual Meeting of the Board of Governors of the Asian Development Bank (Manila, Philippines, May 4, 2012) 1. Introduction Mr.

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and

More information

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES

RULES AND REGULATIONS FOR FINANCING PROJECTS AND COMMERCIAL ACTIVITIES Page 1 of 8 Section 1. Purpose These Rules and Regulations are adopted by the Board of Governors pursuant to Article 13.3. of the Agreement Establishing the Black Sea Trade and Development Bank (Establishing

More information

Handbook on Social Analysis. A Working Document

Handbook on Social Analysis. A Working Document Handbook on Social Analysis A Working Document Executive summary Handbook on Social Analysis A WORKING DOCUMENT ii HanDbook on social analysis 2007 Asian Development Bank All rights reserved. Published

More information

AFD AND FINANCIAL INNOVATIONS FOR DEVELOPMENT

AFD AND FINANCIAL INNOVATIONS FOR DEVELOPMENT AFD AND FINANCIAL INNOVATIONS FOR DEVELOPMENT AFD Photo agence Solutions tailored to new challenges AFD Yves Terracol 4&5 MARS 2010 CITÉ DES SCIENCES ET DE L'INDUSTRIE PARIS - PARC DE LA VILLETTE +CONNECTING

More information

Expected Duration of Assignment : Final product to be submitted by March 18, 2016

Expected Duration of Assignment : Final product to be submitted by March 18, 2016 Consultancy to prepare a Funding Proposal for the Project Using natural ecosystems to help communities better mitigate and adapt to Climate Change in Cambodia. for the Green Climate Fund Location : Phnom

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC MANAGEMENT INVESTMENT CLIMATE

SECTOR ASSESSMENT (SUMMARY): PUBLIC MANAGEMENT INVESTMENT CLIMATE A. INTRODUCTION Increasing Competitiveness for Inclusive Growth Program, Subprogram 2 (RRP PHI P43396) SECTOR ASSESSMENT (SUMMARY): PUBLIC MANAGEMENT INVESTMENT CLIMATE 1. This updated assessment provides

More information

Third Quarterly Report 2006.

Third Quarterly Report 2006. Third Quarterly Report 2006. KFW BANKENGRUPPE. Development of operations. In the first three quarters of 2006 the total financing volume of KfW Bankengruppe rose to EUR 51.8 billion, up by more than a

More information

Promoting Economic and Social Cohesion in Europe

Promoting Economic and Social Cohesion in Europe Promoting Economic and Social Cohesion in Europe The EIB helps to deliver growth, jobs and cohesion in Europe by supporting the implementation of EU regional policy. Through a mixture of loans and advisory

More information

Mainstreaming Road Safety in ADB Operations: Draft Action Plan

Mainstreaming Road Safety in ADB Operations: Draft Action Plan Mainstreaming Road Safety in ADB Operations: Draft Action Plan Oleg Tonkonojenkov South Asia Department Asian Development Bank Road Safety Problem Road traffic crashes will become the fifth leading cause

More information

2011 Asian Development Bank. All rights reserved. Published in 2011. Printed in the Philippines.

2011 Asian Development Bank. All rights reserved. Published in 2011. Printed in the Philippines. 2011 Asian Development Bank All rights reserved. Published in 2011. Printed in the Philippines. ISBN 978-92-9092-483-8 Publication Stock No. RPT114096 Cataloging-In-Publication Data Asian Development Bank.

More information