1 7 MASTERPLAN Introduction 7.1 This chapter presents the key components of the masterplan. It explains the rationale behind the masterplan for the site. 7.2 The masterplan has emerged from an understanding and appraisal of the site issues, constraints and opportunities which have been presented in earlier chapters. 7.3 The masterplan for London Road North has three core components. These are: A movement framework which is based on a coherent urban structure, street hierarchy and the delivery of sustainable transport options; The creation of specific character areas which relate to development frontage locations within the street hierarchy. Character areas provide a framework for the location of different employment activities and land uses within the LDO area; and The creation of development parcels which relate to different land ownership holdings. Why have a masterplan? 7.4 The government attaches great important to the design of the built environment. National planning policy in the form of the National Planning Policy Framework (NPPF) recognises that high quality design is indivisible from good planning and is an integral aspect of sustainable development. 7.5 Often business parks are developed in an insular and isolated manner which rarely responds to the surrounding context or results in the creation of particularly well-connected or accessible development. 7.6 This form of development is often described as pod development. It is usually characterised by a large site having a single access to the strategic road network with curvilinear feeder roads providing a looped access to isolated development parcels Typical pod like development Enterprise West Harlow London Road North Masterplan 26

2 7 MASTERPLAN Deficiencies of pod like development 7.7 The problem with the form of development described above is that it significantly reduces the connectivity, permeability, legibility and accessibility of a development. Individual buildings tend to be positioned in a way which encourages the use of private vehicles and dis-incentivises walking and cycling. 7.8 Often these types of environments are characterised by being hard to navigate and move through. Businesses premises are often located far away from the street with development frontages dominated by large car parks and poorly used landscaping areas. 7.9 It is comparatively much harder to secure efficient bus provision for sites like these, as bus providers are forced to dip in and out of culde-sac development forms, rather than following more linear, direct and continuous, strategic routes which connect a number of urban areas. Creating an integrated development 7.10 The aim of this masterplan is to significantly raise the quality and sustainability of development by ensuring the delivery of a fully integrated, permeable and connected development This is achieved through a movement framework which provides continuous movement routes for various modes of transport. The movement framework aims to fully integrate the site with its surrounding urban context and ensure development plugs into the existing and planned movement and public transport network. Creating an integrated development Enterprise West Harlow London Road North Masterplan 27

3 7 MASTERPLAN The movement framework 7.12 The basis of the masterplan is the movement framework. Key features of the movement framework and masterplan are described below: Enterprise West Harlow London Road North Masterplan 28

4 7 MASTERPLAN Rationale behind the movement framework 7.13 The basis of the masterplan is the movement framework. This has been devised in light of the following priorities and drivers: To release well-connected development parcels which reflect the different land ownership areas within the site. To ensure strong connections are made to the strategic road network in order to create an attractive business park environment. To provide legible, attractive and well-connected movement routes fronted by development which are easy to navigate and move through. To optimise the potential for modes of sustainable transport, particularly for bus, cycle and pedestrian movement by: o o o maximising the opportunities for bus service providers to deliver viable long-term bus routes to serve the development; plugging the main movement routes through the site into the existing bus network serving key movement generators such as Harlow Town Centre, Harlow Train Station and Harlow Mill Station and the intended bus network extensions planned for Newhall Phase 2; and plugging walking and cycle routes into the surrounding network. Illustration of how the development site could plug into Harlow s existing and future cycle network. Illustration of how the development site could plug into Harlow s existing and future bus network. Enterprise West Harlow London Road North Masterplan 29

5 7 MASTERPLAN Development Parcels 7.14 The masterplan and movement framework broadly accords with different landownership holdings and site constraints identified (for example landscaping areas and public rights of way) The development parcels presented are not rigidly defined but are set within a fluid framework which is held together by the principal movement routes. Whilst there is flexibility as to the precise placement of these key movement routes; they are fixed elements of the masterplan and must be provided in their entirety This ensures that the masterplan is sufficiently responsive to change and so that developers have enough room for manoeuvre when delivering development on the ground This means that the precise coverage of development parcels could change in dimension or ownership. However, the critical movement and frontage design components of the masterplan will still be delivered. Enterprise West Harlow London Road North Masterplan 30

6 7 MASTERPLAN Street Hierarchy 7.18 The movement framework creates a logical urban hierarchy. Individual movement routes and development frontages can be easily defined by their location within this overall urban hierarchy. Illustrative Masterplan 7.19 An illustrative masterplan has been prepared to visualise the optimum development potential of the site and to demonstrate how development parcels could be developed. Enterprise West Harlow London Road North Masterplan 31

7 7 MASTERPLAN Flexibility and Fluidity 7.20 The masterplan is not a rigid blue print for development. It fixes certain key, fundamental elements which are required of the development; but it does not dictate a particular development outcome. Sufficient scope and flexibility has been designed into the masterplan and design code parameters to enable a multitude of different development outcomes to come forward. process in order to deliver this broad vision and ensure development achieves high quality design. Character Areas 7.21 Three readily identifiable character areas are created in the masterplan. These character areas are defined by: their proximity to different movement routes within the urban hierarchy; the specific context for development in these areas; the likely form, layout and character of development, land uses and employment activities which these areas are expected to house The character areas created by the masterplan are: Enterprise Zone Gateway; Newhall Approach; and Main Employment Avenue and Fringe The three character areas are summarised in more detail in summary sheets provided in the London Road North Masterplan. Purpose of character areas 7.24 Character areas do not dictate the form of development which can take place in different locations within the LDO area. The purpose of their indication is to illustrate the most appropriate areas which certain uses, activities, building typologies and development forms are likely to locate. The design code enables and coordinates this Enterprise West Harlow London Road North Masterplan 32

8 7 MASTERPLAN Land Uses 7.25 An overriding aim of the masterplan is to create a well-integrated and sustainable business park. Business parks are often designed as inward facing, single use enclaves which characteristically turn their backs on their surroundings. A common fault is that they rarely offer any social and commercial amenities within a close walking distance The absence of necessary supporting amenities reduces the sustainability of employment areas and makes them less attractive places to work for highly skilled employees. This inhibits their attractiveness to businesses and investors. Fundamental aims of the masterplan have therefore been: to fully integrate the site with its existing surroundings and connect it to the planned development taking place adjacent to it; and to encourage an appropriate range of commercial and social uses within walking distance from places of work The LDO provides for a limited range of mixed uses within a specified geographical location (see map right). Commercial and social uses identified in the LDO must be located on the ground floor of buildings fronting either the Urban Boulevard (east) and London Road. Units are limited by location and floorspace in order to avoid uses competing with existing centres The design intention is to draw some of the activity and vibrancy from the planned neighbourhood centre at Newhall into the enterprise zone. This will help to make the enterprise zone an attractive place to work and do business This location is considered to be more suitable than other areas in the zone as it is adjacent to and contiguous with the planned neighbourhood centre. Aligning these uses along the Urban Boulevard (east) - the main east-west movement route through east Harlow - means uses will be in suitably high profile, visible locations and therefore likely to experience high pedestrian footfall The map below also illustrates where office and research development may be most likely to locate (at the gateway to the enterprise zone). The expectation is that industrial businesses and smaller advanced manufacturing and engineering companies will be attracted to development parcels off the Main Employment Avenue. However, flexibility is encouraged. Enterprise West Harlow London Road North Masterplan 33

9 8 SPATIAL VISION 8.1 The masterplan sets out a bold and clear spatial vision to guide the future development of the London Road North area. The purpose of the spatial vision is to translate the aims and intentions of the original enterprise zone bid into a marketable and deliverable masterplan for the London Road North site which is sufficiently flexible to accommodate changing circumstances. What do we want to achieve? London Road North will be a distinctive, highly accessible and sustainable business park location. Enterprise zone development will provide an attractive range of high quality, well landscaped employment premises suitable for a range of small, medium and large businesses within the target Med-Tech, ICT and Advanced Manufacturing sectors. London Road North benefit from strong connections to the strategic road network. Development will be structured around an efficient and legible street network providing strong connections to the rest of Harlow by public transport, road, foot and bicycle. The design and layout of development will help to ensure the site is carefully integrated with its surrounding urban and landscape context. Alongside the development at Newhall, London Road North will comprise a sustainable and highly prestigious new addition to east Harlow. Together, the developments will provide the essential economic growth, jobs and housing the town needs in order to grow. The clustering and growth of target sectors within the zone will galvanise Harlow s existing strengths in the knowledge and high technology growth sectors generating spin-off effects to surrounding employment areas. Development of the site will put Harlow and West Essex firmly on the map an area driving economic growth in the South East Local Enterprise Partnership (LEP) and making a vital contribution to the economic recovery of the country as a whole. Illustrative Concept of Spatial Vision for London Road North How will this be delivered? 8.2 Enterprise zone development will be driven by private sector investment, growth and innovation. Public sector capital investment is forward funding major highways improvements on the A414 which are critical to unblocking road infrastructure constraints, helping to kick start development on the ground. 8.3 The London Road North LDO, Masterplan and Design Code provides a flexible framework for delivering sustainable, long term private sector led economic growth across the 15 hectare greenfield development site. Key elements of the spatial vision 8.4 Key elements of the spatial vision for London Road North are summarised below. This section effectively outlines the design rationale for the London Road Masterplan. Enterprise West Harlow London Road North Masterplan 34

10 8 SPATIAL VISION 8.5 These critical features can be considered a 19 point plan for optimising the development potential of the site and ensuring that it is sustainable. It is therefore vitally important that each feature is delivered. The London Road North Design Codes are intended to deliver these critical features of the overall Masterplan for the site. 1) A new junction on the A A new junction access on the A414 will create strong connections to the strategic road network. This will provide businesses within the site with rapid access to the M11 and to surrounding export and supply chain markets. It will also provide access to a wide pool of talent, knowledge and skills across the wider catchment area. 2 ) Highways improvement to strategic routes 8.7 Significant highways improvements along the A414 on the north and southbound approaches to this new junction will help mitigate potential congestion on this key strategic route running through Harlow to the M11. This will add to major capital enhancements already completed along the A414 approaches to the M11and at Southern Way roundabout. A strong frontage provided along the A414 to make the enterprise zone visible to passing traffic. 3 ) A new frontage on the A Development will create a new, high profile frontage on the A414. This will announce the presence of the zone to passing traffic flowing through Harlow. This will enhance the site and the town s reputation as a prominent location for economic growth, enterprise and innovation. 4) A gateway into the zone 8.9 Landmark buildings fronting corner locations at the A414 / Urban Boulevard junction will provide a gateway entrance into the Enterprise Zone site from the strategic road network. This important gateway will create a strong sense of arrival to this new area of Harlow and to the Newhall housing area beyond. Landmark buildings on corner sites on the A414 / Urban Boulevard junction to create a gateway into the site and through into the Newhall development beyond. Enterprise West Harlow London Road North Masterplan 35

11 8 SPATIAL VISION 5) A new Urban Boulevard 8.10 A new tree lined Urban Boulevard will provide an attractive, well landscaped route into the business park. This new street will link the A414 to the Enterprise Zone and flow through into neighbourhood centre and housing area at Newhall The gradual narrowing of the Urban Boulevard after the Main Employment Avenue junction and a subtle change or kink in its direction along with other traffic calming measures will help to prepare and slow down drivers entering the Newhall housing area. 6) Frontage buildings along the Urban Boulevard 8.12 Frontage development along the urban boulevard and street trees planted at regular spaces will provide a strong sense of place with buildings defining the street and enclosing the space and the entrances and frontages of office and research and development buildings providing natural surveillance and activity. 7) Moving the proposed Link Road further south 8.13 Critical to optimising the development potential of the site and avoiding significant constraints is the realignment of the proposed Link Road (Urban Boulevard). The Adopted Harlow Replacement Local Plan 2006 designated an area of land for the delineation of this road Bringing the road south is critical to ensuring that development frontages can be provided on both sides of the street. This would also help to create a development parcel to the north the Link Road which would be of sufficient depth to accommodate 3 to 4 storey office, R&D or light industrial frontage development of varying depths with associated parking Moving the road further south is also essential in order to avoid the water pumping station, allotment gardens and protected wildlife verge all significant constraints to the delivery of development. Frontage buildings and street trees to create a continuous Urban Boulevard into Newhall. Bringing the Link Road (Urban Boulevard) further south to create a development plot of sufficient depth which will be suitable for buildings in B1 (business) use with associated parking. Enterprise West Harlow London Road North Masterplan 36

12 8 SPATIAL VISION 8) A Main Employment Avenue running through the site 8.16 A new Main Employment Avenue will provide a strong structuring element running through the site. This new route will connect the Urban Boulevard (Link Road) to the north to a new access point to the south at London Road. This central spine road will be an attractive and well-landscaped multi-modal corridor providing efficient movement routes for employment traffic, buses, pedestrians and cyclists. It will provide access to individual development parcels serving a range of well designed and landscaped office, research and development, laboratory and industrial buildings of varying sizes. 9) Spaces for a variety of small, medium and large business within the target sectors 8.17 Analysis of profile and size of business within the Med- Tech, ICT and Advanced Manufacturing sectors confirms that SMEs comprise over 70% of these sectors. There is wide acceptance that SMEs are likely to be the main engine for growth in the UK economy. The preparation of the masterplan has been guided by the need to provide suitable spaces for a range of small and medium sized (SME) businesses The masterplan achieves this by creating a logical street hierarchy which will result in the creation of development parcels with frontages in different character areas. Character areas have been guided by an understanding of the separate landownership holdings within the LDO boundary and the surrounding context for development. Illustration of multi-modal, landscaped Main Employment Avenue running through the site. A range of small and medium size business premises to be provided in an attractive, well landscaped setting. Enterprise West Harlow London Road North Masterplan 37

13 8 SPATIAL VISION 8.21 Opportunities for connecting in to the existing First Avenue Multi-Modal Corridor and a potential park and ride scheme at the Junction 7 of the M11 will be optimised The provision of attractive walking and cycling routes along these two main movement routes running through the site, in addition to enhancements to the existing Public Right of Way running through the centre of the site, will deliver attractive walking and cycle connections which connect with the surrounding network and network Streets fronted by buildings will provide a highly legible and distinctive environment which is easy to navigate through and will generate a positive and memorable sense of place. Development parcels along the Main Employment Avenue provide opportunities to deliver high quality business spaces suitable for small and medium businesses and incubator units for start-up companies The Main Employment Avenue character area provides the logical setting for the clustering of targeted advanced manufacturing, engineering and design firms of varying sizes which have specific site layout and access requirements. 10) Making sustainable movement a viable alternative to the car 8.20 Delivery of the Urban Boulevard and the Main Employment Avenue will help to maximise the opportunities for bus service providers to deliver viable long-term bus routes to serve the development. The delineation of these main movement routes will enable the development to plug into the existing local bus network serving key movement generators such as Harlow Town Centre, Harlow Train Station and Harlow Mill Station. Streets fronted by buildings providing a legible and safe walking environment 8.24 These core urban design principles, in addition to travel planning measures, will help to enhance the sustainability of the zone and ensure more sustainable options of work based travel are a viable and attractive alternative to the private car for employees working in the zone. Enterprise West Harlow London Road North Masterplan 38

14 8 SPATIAL VISION 11) Sustainable Urban Drainage (SUDs) 8.25 Opportunities to incorporate Sustainable Urban Drainage systems into the overall street and frontage design will be maximised. Given the likely volume of building development and hard standing on the site is essential that measures to reduce surface water run-off are considered in the early masterplanning stages in order to ensure the development is sustainable This will be achieved through the provision of linear SUDs corridors along the two main movement routes running through the site. Linear SUDs corridors will contain grass verge soak-aways and attractive tree planting at regular spaces. The frontages of business premises will also incorporate SUDs features as integral features in the design of private set backs, parking slip roads and site boundaries. Further SUDs measures will be delivered on a site by site basis The provision of SUDs corridors with avenue tree planting as integrated features of street and frontage design will play a critical role in defining a green, well-landscaped and park-like environment This is likely to be attractive to the high value businesses within the target sectors. Incorporating landscape features into the design and layout of development is also a core principle of Harlow s original Gibberd Masterplan and will help to ensure development respects and embraces Harlow s distinctive New Town character. SUDs verge with avenue tree planting along Urban Boulevard and Main Employment Avenue SUDs corridors incorporated into street design will be a fundamental element of the surface water management strategy for the site and will play a key role in creating an attractive and sustainable business park environment. Enterprise West Harlow London Road North Masterplan 39

15 8 SPATIAL VISION 12) Adjoining residential properties 8.29 Adjoining residential dwellings have a close proximity to potential development within the site. These dwellings will be effectively screened by landscaping to ensure that they are not impacted negatively by the development or by ongoing employment activities. Chapter 11 of the design code has been dedicated to mitigating potential issues associated with this proximity. 13) Respecting the landscape 8.30 The surrounding landscape areas such as Markhall Wood Wildlife Site and the existing landscape corridors within and bounding the site will be respected and incorporated into the overall layout of the scheme as key structuring elements. An illustration of how potential impacts on adjoining residential properties could be mitigated through careful landscape screening and the location and orientation of development. A view of the enterprise zone from Newhall (facing west) showing retained landscape screening along the LDO boundary. This provides a very effective buffer shielding residential properties from industrial and business development within the zone. The masterplan draws on the site s landscape assets in order to create an attractive, well landscaped business park which is well-screened from adjacent resident areas. Enterprise West Harlow London Road North Masterplan 40

16 8 SPATIAL VISION 14) Integrating with Newhall 8.31 The opportunity to sensitively merge the enterprise zone development with the adjacent Newhall neighbourhood centre and housing area will be facilitated. Rather than turn its back on Newhall and create a segregated, single-use, car-dependent area, development will be encouraged to form an appropriate relationship with Newhall The Newhall Approach Character Area will provide a transition between the main employment uses within the site and the commercial and predominantly residential land uses provided at Newhall. This will be achieved through the provision of some mixed use buildings fronting the Urban Boulevard and London Road in this character area Mixed-use buildings will comprise office (B1a), research and development (B1b) buildings with a limited range of and education and training, conference centre, crèche / nursery (D1) uses, gymnasium (D2) facilities and walk-to retail (A1), service (A2), café/restaurant (A3) and hot food / takeaway (A5) uses along the ground floor of buildings. 15) Newhall public square 8.34 The transition between London Road North and Newhall will be complete where the Urban Boulevard flows through a new urban square at the Newhall neighbourhood centre. Newhall neighbourhood centre will be a lively mixed use area containing a shared public space, market stalls and a range of shops, cafes, restaurants and services In addition to Church Langely Neighbourhood Centre, Newhall will provide a major generator of day-to-day pedestrian movement for employees working in the enterprise zone during lunch breaks and after work. The close proximity of essential amenities within walking distance will help to make the site an attractive location for businesses and employees. Corner buildings on London Road play an important role in shaping Newhall public square and defining a new public space. Mixed use ground floor units along Newhall Approach Character Area helps to bridge the gap between the employment area and Newhall, helping to integrate the two areas. Enterprise West Harlow London Road North Masterplan 41

17 8 SPATIAL VISION 16) A new frontage on London Road 8.36 A new frontage will be created on London Road at the junction of the urban boulevard. Buildings on corner plots will wrap round the junction and turn the corner by providing building facades on both sides of the street The frontages facing London Road will help to enclose the space within a new public square at Newhall Neighbourhood Centre and will provide natural surveillance and activity at street level, helping to animate the space. 17) A new landmark 8.38 A new landmark building will be provided at the corner plot of parcel B (see development parcel map in chapter 6). This building will play an important role in creating a highly legible and distinctive character for enterprise zone When viewed from Newhall Neighbourhood Centre, the building will terminate westbound views and highlight the main entrance to the enterprise zone site from the east. Views along the Urban Boulevard from Newhall Neighbourhood Centre New frontage on London Road buildings turning the corner to face a new public square. Enterprise West Harlow London Road North Masterplan 42

18 8 SPATIAL VISION 18) An enhanced Public Right of Way 8.40 The Public Right of Way (PROW) running through the site will be upgraded and incorporated into the overall movement framework for the site. This route will provide an attractive tree-lined pedestrian and cycle path into the zone from London Road helping to connect the site to existing walking and cycling network To the east of the Main Employment Avenue the PROW will be upgraded to shared pedestrian cycle standard To the west of the Main Employment Avenue, it is expected that the PROW will be incorporated within a new Access Road. This will provide vehicular access to development parcels B and D and a 2m footway on each side of the street Frontages along the public right of way will provide natural surveillance and overlooking, although the orientation of buildings adjacent with residential properties on London Road will need to be carefully considered with respect to overlooking and privacy. Illustration of PROW upgraded to shared pedestrian / cycle route between London Road and the Main Employment Avenue Illustration showing the existing PROW upgraded along the central corridor of the site to form a new landscaped entrance for walking and cycling and an important Access Road to fringe sites towards the western boundary of the site. Illustration of public right of way upgraded to Access Road standard between the Main Employment Avenue and Markhall Wood Enterprise West Harlow London Road North Masterplan 43

19 8 SPATIAL VISION 19) Pedestrian and cycle connection to London Road South LDO area 8.44 A new link will be opened up providing pedestrian and cycle connectivity to the London Road South redevelopment site. This is essential to ensure the sustainability of the London Road South site and ensure employees there can access the bus and cycle network to be delivered on the London Road North site. Illustrative concept of a shared pedestrian and cycle access to the London Road South redevelopment area from the Main Employment Avenue in London Road North LDO site. Enterprise West Harlow London Road North Masterplan 44

20 9 CHARACTER AREAS Introduction 9.1 Three readily identifiable character areas are created in the masterplan. These character areas are defined by: their proximity to different movement routes within the urban hierarchy; the specific context for development in these areas; the likely form, layout and character of development and the employment activities which these areas are expected to house. 9.2 The character areas created by the masterplan are: Enterprise Zone Gateway; Newhall Approach; and Main Employment Avenue and Fringe. 9.3 The following three character area summary sheets provide a description of the key attributes of each character area. Purpose of character areas 9.4 Character areas do not dictate the form of development which can take place in different locations within the LDO area. The purpose of their indication is to illustrate the most appropriate areas which certain uses, activities, building typologies and development forms are likely to locate. The design code enables and coordinates this process in order to deliver this broad vision and ensure development achieves high quality design. Enterprise West Harlow London Road North Masterplan 45

21 9 ENTERPRISE ZONE GATEWAY CHARACTER AREA Table 9a Enterprise Zone Character Area Summary A414 Frontage Development Urban Boulevard Entrance 9.5 Geographical Area The Enterprise Zone Gateway Character Areas comprises frontage development within indicative development parcels A and B adjacent to: the A414; the Urban Boulevard (Link Road) up to the junction with the Main Employment Avenue (Feeder Road); the two corner sites on the A414 / Urban Boulevard (Link Road) junction; and the corner site on the Urban Boulevard (Link Road) / Main Employment Avenue (Feeder Road) junction. 9.6 Key Features of Character Area a) A strong frontage onto A414. b) Landmark buildings on corner plots at A414 / Urban Boulevard junction to define a high profile recognisable gateway entrance into the zone. c) A landmark building on the corner of the Urban Boulevard/ Main Employment Avenue to act as a key focal point helping to define the urban form and draw views into the enterprise zone and provide legibility. d) Well-landscaped frontage and boundary treatments along A414. e) Existing tree line and hedgerow incorporated into frontage / boundary design or replaced with similar landscape features. f) Tree lined Urban Boulevard comprising SUDs verge and regular street trees to create an attractive avenue. g) Continuous 3 to 4 storey frontage buildings to define Urban Boulevard and provide a strong sense of enclosure. h) Majority of staff parking provided behind buildings. i) Limited staff parking provided in private slip roads along frontage. Parking integrated with SUDs measures and screened by landscaping. 9.7 Street Character and Public Realm a) The character area contains two very different streets types with different functions and characters. i. The A414 is a Strategic Route linking Harlow and other centres to the Trunk Road Network (M11). Walking and cycling routes adjacent to this route are limited. Opportunities to enhance the pedestrian experience on the A414 are limited. Setting frontage buildings back behind well landscaped, tree lined slip roads may enhance the public realm here within a plot boundary. Enterprise West Harlow London Road North Masterplan 46

22 9 ENTERPRISE ZONE GATEWAY CHARACTER AREA ii. The Urban Boulevard will need to be constructed to Link Road standard and comprise four to five lanes. Continuous SUDs verges, tree planting and frontage development will help to soften the impact of the road and create a tree lined Urban Boulevard. Buildings fronting the Urban Boulevard should be orientated to face the street with entrancing fronting public areas and buildings defining and enclosing the space and providing natural surveillance. 9.8 Likely Land Uses Development parcels likely to be attractive to office (B1a), research and development (B1b) and light industrial uses (B1c). 9.9 Likely Business Activities and Development Opportunities Medium and large sized firms engaged in laboratory / pharmaceutical research and development, natural sciences, biotechnology, engineering and design, ICT, telecommunications activities, software development, head office activities. Buildings defining the street along the Urban Boulevard and providing a strong urban character Likely Building Types Office, laboratory, research and development buildings. Light industrial buildings of a high standard of architectural and design quality. Building entrances and facades to fronting the street along the Urban Boulevard will provide natural surveillance and character. Street trees within SUD corridor. High tech laboratory, research and development an engineering buildings Enterprise West Harlow London Road North Masterplan 47

23 9 NEW HALL APPROACH CHARACTER AREA Table 9b - Newhall Approach Character Area Summary 9.12 Key Features of Character Area a) Development to draw activity and mixed uses from Newhall Neighbourhood into the employment area. b) Buildings aligned closely to the pavement to form a more intimate and enclosed urban character. c) Building facades and entrances orientated to face the street. d) Buildings to turn street corners and provide active frontages wrapping round corner plots. e) Avenue street trees planted at regular spaces to create a boulevard effect. f) Active frontages and natural surveillance at street level. Urban Boulevard, New Hall Approach Character Area 9.11 Geographical Area Defined as any frontage development within indicative development parcels A and B adjacent to the Urban Boulevard (Link Road) East between the junction with the Main Employment Avenue (Feeder Road) London Road. It also comprises a new frontages on London Road facing Newhall neighbourhood centre. g) Traffic calming measures to reduce vehicle speeds entering Newhall neighbourhood centre and homezone area. h) Shared space public square and potential market stalls provided at the entrance to Newhall off London Road. i) Parallel parking potentially incorporated into street design subject to highways authority consent. j) Staff parking provided to the rear of buildings. k) Mixed land uses (A and D class uses) provided along ground floor units of buildings, with B1 employment uses provided above ground floor. l) Ground floor A and D class uses to serve employment development rather than a wider catchment and consequently limited by individual and cumulative floorspace Enterprise West Harlow London Road North Masterplan 48

24 9 NEW HALL APPROACH CHARACTER AREA thresholds (see LDO class 2, Schedule A) Street Character and Public Realm a) Gradual narrowing of the Urban Boulevard to 6.75m carriageway similar to Newhall Primary Road network. b) A subtle kink in the road alignment along with other traffic calming measures will help to slow down vehicle speeds and prepare traffic entering the Newhall neighbourhood centre and housing area. c) Avenue tree planting at regular spacing and on-street parking bays indented into SUDs corridor to provide a continuation of the Urban Boulevard approach into Newhall Neighbourhood Centre. d) High quality public realm and footway design with cycle way on south section of the highway. e) Buildings arranged closer to the street to create a more intimate sense of enclosure Likely Land Uses a) Mixed of uses comprising: i. Office, research and development and light industrial uses; ii. small-scale A1 shop uses eg convenience goods, sandwich bar, internet café and dry cleaners; iii. small-scale A3 café / restaurant and A5 hot food / takeway uses; iv. D1 nursery / crèche, education and training and D2 gymnasium and swimming pool uses; b) A1, A3, A5 uses all limited to the ground floor of mixed use buildings and tied to specific thresholds in size (sqm) so as not to compete with surrounding commercial centres Likely Business Activities and Development Opportunities a) Small and medium sized firms engaged in ICT, telecommunications activities, software development, computer programming, research and development, engineering and design. b) Head office activities of various sizes of business. c) Small, medium and large sized companies engaged in laboratory / pharmaceutical research and development, natural sciences, biotechnology. d) Education and training providers, conference centre facilities, gymnasium providers and range of small-scale nursery, café/ restaurant, dry cleaners, convenience retail, sandwich bar, dry cleaning businesses Likely Building Types a) Mixed use buildings comprising A1, A3, A5, D1, D2 uses on ground floor and B1 uses on first, second and third floors. b) Stand alone office, laboratory, research and development buildings. c) Light industrial buildings of a high standard of architectural and design quality. Corner buildings & mixed uses Continuous development frontages Enterprise West Harlow London Road North Masterplan 49

25 9 MAIN EMPLOYMENT AVENUE & FRINGE CHARACTER AREA Table 9c - Main Employment Avenue Character Area Summary walking and cycling. e) Range of small and medium sized advanced manufacturing, engineering, research and development and laboratory buildings. f) Some internalised development parcels providing incubator spaces (100 sqm to 500 sqm) for clustering of SMEs Street Character and Public Realm a) High quality business park setting. b) Achieved by SUDs verge and avenue planting and welllandscaped development frontages. c) Shared pedestrian and cycle route connections. d) 6.75m to 7.3m carriageway to industrial road specification. Main Employment Avenue and Fringe 9.17 Geographical Area Defined as: any development within indicative development parcels D, E, F, G and H; and any development within indicative development parcels B and C which does not front the Urban Boulevard (Link Road) Character Area Summary a) SUDs verge and tree planting corridor continued to create a park-like setting. b) Existing landscape features retained and enhanced. c) Well landscaped frontages and boundaries containing SUDs measures and limited frontage parking. d) Main movement route through the site for bus transport, Main Employment Avenue Street Character 9.20 Likely Land Uses a) B1b (research and development) uses likely to be attracted to well-landscaped, business park setting. b) Development parcels likely to be attractive for B1c light Enterprise West Harlow London Road North Masterplan 50

26 9 MAIN EMPLOYMENT AVENUE & FRINGE CHARACTER AREA industrial and B2 general industrial uses. c) Access, screening and setting provide opportunities for internalised developments highly suitable for small and medium sized B1c light industrial and B2 general industrial uses. contained within a courtyard, fronted by business premises. b) Two to three storey laboratory / research and development buildings with associated parking and landscaping. c) Medium to large advanced manufacturing firms covering a single development site with individual road access. Adaptable spaces for small and medium sized engineering and advanced manufacturing companies 9.21 Likely Business Activities and Development Opportunities a) Adaptable spaces will be attractive to small and medium sized advanced manufacturing and engineering companies (requiring spaces between 100 sqm and 500 sqm). b) Medium to large sized firms engaged in pharmaceutical research and development, natural sciences and biotechnology. c) Small business start ups associated with health and allied industries, life sciences and research and development requiring flexible laboratory and research and development space. d) Suitable location for flexible, short-tenancy incubator units to facilitate business start-ups, SME growth and innovation and the clustering of target sectors Likely Building Types a) Small and medium sized light industrial / industrial units likely to be arranged in an internalised or parallel layout with a single shared access, shared loading and turning areas Mixture of plots suitable for medium sized engineering and laboratory businesses or multiple small and medium sized business units. Multiple R&D, engineering buildings - Advanced Manufacturing Park, Rotherham Enterprise West Harlow London Road North Masterplan 51

27 10 PHASING 10.1 The London Road North Masterplan provides a coordinating framework for development within the enterprise zone. This chapter outlines the likely phasing of development within the enterprise zone. It highlights how development parcels are likely to be brought forward to take account of: the forward funding of critical highways infrastructure on the A414 and Urban Boulevard (West); the phasing and delivery of highways infrastructure and site access arrangement required; and the resolution of other site constraints and landownership constraints An indicative phasing plan is shown on the map to the right, which should be read in conjunction with Table 10A and the remainder of this chapter. Table 10A - Phasing Periods Phase Development Locations Phase 1 Development frontages on the A414 and Urban Boulevard (West) within development parcels A and B (EZ Gateway Character Area). Phase 2 Development parcel B adjacent to the Main Employment Avenue and Access Road (Main Employment Avenue and Fringe Character Area). Phase 3 Frontages on Urban Boulevard (East) and London Road within development parcels A and C (Newhall Approach Character Area). Phase 4 Development parcel C adjacent to the Main Employment Avenue (Main Employment Avenue and Fringe Character Area). Phase 5 Development parcels F, G and H (Main Employment Avenue and Fringe Character Area). Phase 6 Development parcels D and E (Main Employment Avenue and Fringe Character Area) It should be noted that the London Road North Local Development Order has a lifetime of 10 years With the forward funding of a new junction access on the A414 through Harlow s successful Growing Places Bid, it is expected that phases 1 and 2 should be implemented by Phases 3 to 5 are expected to be implemented between 2014 and 2019, with phase 6 likely to be implemented between 2019 and Enterprise West Harlow London Road North Masterplan 53

28 10 PHASING 10.5 The phasing plans shown in this chapter are indicative and not mandatory. Their purpose is merely to illustrate the likely sequencing of development in the zone. The masterplan, design codes and LDO are sufficiently robust to enable development to be phased in a different way and access to be initiated from a different access point if this was required during the course of time. The need for phasing requirements 10.6 Phasing requirements in the LDO are necessary in order to orchestrate the delivery and implementation of new site access, necessary highways infrastructure and the relocation of existing playing fields within the LDO area Development within the enterprise zone must also be phased to take account of the Transport Assessment and engagement between the Local Planning Authority and the local highways authority (Essex County Council) and the Highways Agency who manage the strategic highways network (motorways). This is explained in more detail in paragraphs to LDO phasing conditions 10.8 Phasing requirements for development are set out in conditions contained within the LDO and are described below. Relocation of playing fields 10.9 General conditions G6 and G7 ensure the relocation of the Maypole playing fields and sports club building prior to development being commenced. Conditions provide for playing fields to be relocated to development parcels D and E in the interim, before being permanently relocated to new facilities south of Gilden Way, as part of the Newhall Phase 2 development. Necessary safeguards are placed on development parcels A, B, D, D and E to coordinate and manage this process. This is illustrated to the below. Relocation of Maypole playing fields to playingfields south of Gilden Way as part of the Newhall Phase 2 masterplan. Interim relocation of Maypole playing fields to development parcels D and E. Enterprise West Harlow London Road North Masterplan 54

29 10 PHASING The delivery of highways infrastructure Phasing and delivery of highways infrastructure conditions PDH1 to PDH10 of the LDO serve two specific purposes: First, they ensure the delivery and implementation of new highways infrastructure required to develop and access the site in a sustainable manner as set out in the masterplan and design code. This is achieved by wording conditions such that buildings within specific areas cannot be occupied until certain highways works have been fully implemented. Second, the conditions are designed to avoid circumstances in which land owners are held to ransom by adjoining owners in the process of constructing highways access and thereby delayed or prevented from developing their land parcel until an adjoining landowner constructs a highways access up to their land. This potential issue is addressed by requiring routes to be constructed up to and immediately adjoining the next landowner. Road infrastructure permitted under Schedule C of the LDO Enterprise West Harlow London Road North Masterplan 55

30 10 PHASING Mitigating impacts on junction 7 on the M11 motorway Phasing condition PDH11 takes account of the findings of the Transport Assessment and the assessed impact of the enterprise zone development proposal on the strategic road network specifically the M11 and junction 7 - in terms of modelled vehicle traffic movements and congestion The transport assessment demonstrates the quantum of enterprise zone development and associated jobs and traffic movements which can be accommodated within Harlow before junction 7 fails at which point significant mitigation measures will need to be implemented to enable further growth Whilst the majority of enterprise zone development and jobs growth may be accommodated within the existing highways network, not all of the development can be accommodated. Enterprise zone development therefore has to be capped at a certain point to prevent the junction failing during the course of development. However, further development may be unlocked providing necessary highways mitigation measures are delivered. Condition PDH11 and junction 7a Consequently, condition PDH11 of the LDO restricts development on development parcels D an E until a new junction (junction 7a) has been provided on the M Informative INF6 of the LDO advises landowners and developers of three potential instances in which the Local Planning Authority may consider varying condition PDH11. These are: a) Where the motoring of enterprise zone development demonstrates that the net transport impact of development is lower than the 5,899 net jobs originally anticipated to the extent that sufficient highways capacity exists at junction 7 such that development can proceed on parcels D and E; and/ or b) Where travel planning measures in the enterprise zone or across Harlow demonstrates that sufficient highways capacity exists at junction 7 such that development can proceed on parcels D and E; and/ or c) Where an alternative scheme of highways works has been undertaken to junction 7 which has provided sufficient highways capacity exists at junction 7 such that development can proceed on parcels D and E The precise wording of condition PDH11 and informative INF6 have resulted from detailed engagement between the Local Planning Authority and the highways authority and highways agency who manage the local and strategic road network respectively. Enterprise West Harlow London Road North Masterplan 56

31 10 PHASING Why development parcels D and E? There is a robust rationale for development to be restricted on development parcels D and E until junction 7a has been delivered (or approved alternative mitigation measures). Three main factors have guided this process of selection: a) Development parcels D and E will be safeguarded to provide interim replacement playing fields for the Maypole Sports Club, until permanent replacement playing fields are provided as part of the Newhall Phase 2 development. Consequently, development on parcels D and E will be delayed until this process has been fully implemented and approved by the Local Planning Authority following consultation with Sports England. b) Development parcels D and E are land locked by other development parcels so other development parcels and highways access will need to be delivered before these plots can be accessed and development commenced. c) It is important for the masterplan and LDO to manage the phasing of development in a fair and equitable manner and ensure each landowner is treated equally. Safeguarding parcels D and E until junction 7a has been delivered is the fairest solution as it ensures each of the three landowners within the site can develop areas of their landholdings without restriction The revised Transport Assessment assumes that development parcels D and E could provide a maximum potential employment density of 16,300 sqm of B1a (office) floorspace and 860 jobs. Landownership Map 2012 Enterprise West Harlow London Road North Masterplan 57

8 DELIVERING THE MOVEMENT FRAMEWORK

8 DELIVERING THE MOVEMENT FRAMEWORK 8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition Welcome to this public exhibition for Cherry Park, Westfield, Stratford. This exhibition has been organised to update residents on Cherry Park, the next phase of development in

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Downtown Core Sub-district

Downtown Core Sub-district 3-10 Land Use Downtown Core Sub-district District development will be most intense and most urban in character in the Downtown Core. The objective is to establish this area as a citywide and regional retail

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

www.thefurlongphase2.co.uk

www.thefurlongphase2.co.uk Welcome Thank you for coming along today to view our plans for Phase 2 of The Furlong Shopping Centre. We are undertaking a consultation programme that will run up to and beyond submission of the planning

More information

OVERARCHING SPATIAL POLICIES

OVERARCHING SPATIAL POLICIES 3 OVERARCHING SPATIAL POLICIES 29 Overarching Spatial Policies 3.1 This chapter contains policies addressing the following policy themes: OSP 1: Optimising growth OSP 2: Land use OSP 3: Connections and

More information

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T "Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre

More information

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.

Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two. Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

Shaping Whanganui. Have your say, korero mai

Shaping Whanganui. Have your say, korero mai Shaping Whanganui Have your say, korero mai Outer Commercial Design Guidelines Discussion Document Background The Outer Commercial zone of the District Plan sits on the outside of the central shopping

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE

ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE ACHIEVING GOOD URBAN DESIGN - RAINBOW ESTATE 1.1 The National Planning Policy Framework sets out what good design should aim to achieve, in a set of six statements that are complementary to policies contained

More information

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR) HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS

More information

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers

More information

RICHARD REID & ASSOCIATES LTD CITYMAKERS

RICHARD REID & ASSOCIATES LTD CITYMAKERS RICHARD REID & ASSOCIATES LTD CITYMAKERS 3/9 Tudor Street Devonport Auckland 0624 NEW ZEALAND T: (09) 445 3289 M: (027) 640 8367 F: (09) 445 4307 richard@richardreid.co.nz www.richardreid.co.nz 2 December

More information

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN 6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

Development Brief Erskine Lodge Site, Great Whelnetham

Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities

More information

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North

STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Questions: QEa: Are there any other employment policy themes that you think OPDC s Local Plan should be addressing?

Questions: QEa: Are there any other employment policy themes that you think OPDC s Local Plan should be addressing? 8 EMPLOYMENT 185 Employment This chapter contains policies addressing the following policy themes: E1: Strategic Policy for employment E2: Old Oak E3: Park Royal E4: Open workspaces E5: Local access to

More information

Promote sustainable development and energy conservation. Facilitate the operation and use of public transport.

Promote sustainable development and energy conservation. Facilitate the operation and use of public transport. Sedgefield Borough Local Plan Page 1 TRANSPORT Plan Strategy The transport policies of the Local Plan are concerned with how people move about in connection with their work, shopping, educational and leisure

More information

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790 74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development

More information

Major Improvement Schemes in Basingstoke

Major Improvement Schemes in Basingstoke Major Improvement Schemes in Basingstoke 1. Welcome Welcome to this exhibition, which provides information about the planned highway improvements being delivered in Basingstoke from 2015 2018. A30 Winchester

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

WEST OF WATERLOOVILLE FORUM. 10 April 2006. Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain)

WEST OF WATERLOOVILLE FORUM. 10 April 2006. Councillors: Winchester City Council. Councillor Clohosey (Standing Deputy for Councillor Chamberlain) 1 WEST OF WATERLOOVILLE FORUM 10 April 2006 Attendance: Chamberlain Cooper Hiscock (P) Deputy Members: Councillors: Winchester City Council Collin (Chairman) (P) Rees Stallard (P) Councillor Clohosey (Standing

More information

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE

PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE APPENDIX F PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE Table of Contents The Setting Background Planning Objectives Neighborhood Protection The Concept Plan Exhibits Cottonwood Mall Site 1

More information

DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE. SIte Aerial view courtesy of Bing Maps

DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE. SIte Aerial view courtesy of Bing Maps DRAYCOT ROAD RED LION ROAD MAYROYD AVENUE KINGSMEAD AVENUE HAMILTON AVENUE SIte Aerial view courtesy of Bing Maps South West London and St. George s Mental Health NHS Trust Tolworth Hospital - Landscape

More information

LAND-USE ZONING OBJECTIVES

LAND-USE ZONING OBJECTIVES LAND-USE ZONING OBJECTIVES 1 5 1 LAND-USE 5 ZONING OBJECTIVES Introduction 15.1 The purpose of land use zoning is to indicate the land use planning objectives of the City Council for all lands in its administrative

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

Strategic Design Guidance

Strategic Design Guidance 34 7 Strategic Design Guidance 7.1 Introduction 7.1.1 The Transforming Trowbridge UDF identifies a number of key aims regarding appropriate design for the corridor. This will ensure that the character

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

2015/0332 Reg Date 13/04/2015 Bagshot

2015/0332 Reg Date 13/04/2015 Bagshot 2015/0332 Reg Date 13/04/2015 Bagshot LOCATION: PROPOSAL: TYPE: APPLICANT: OFFICER: NOTCUTTS GARDEN CENTRE, 150-152 LONDON ROAD, BAGSHOT, GU19 5DG Variation of Condition 3 and 10 of planning permission

More information

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION 1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)

More information

A number of key guiding principals underline the approach to transportation within the plan area. These include:

A number of key guiding principals underline the approach to transportation within the plan area. These include: Transportation The principal form of transportation infrastructure will be vehicular roads augmented by a network of pedestrian and cycle routes. Transport infrastructure development will be commensurate

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

urban living and contributes positively to the character of

urban living and contributes positively to the character of chapter six objective four Recognise the varied character of Hounslow s districts and seek to protect and improve their special qualities, heritage assets and overall townscape quality and appearance.

More information

Local Area Plans. Ver.1.2 Paradise Point 1 of 16

Local Area Plans. Ver.1.2 Paradise Point 1 of 16 Part 6 Division 2 Chapter 20 Local Area Plans Local Area Plans Paradise Point 1.0 Intent To provide detailed planning and development of the local centre at Paradise Point, for the effective delivery of

More information

4.6. ECOCITY Tübingen - Derendingen

4.6. ECOCITY Tübingen - Derendingen 4.6. ECOCITY Tübingen - Derendingen 4.6.1 General information The attractive university town of Tübingen is located in south-western Germany and faces a high demand for housing, especially to keep young

More information

Alternatives and Design Evolution: Planning Application 1 - RBKC

Alternatives and Design Evolution: Planning Application 1 - RBKC 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

DRAFT Policy to Guide Discretion on Proposed Relaxations to Minimum Parking Requirements in Commercial Districts City-Wide 2014 June 05

DRAFT Policy to Guide Discretion on Proposed Relaxations to Minimum Parking Requirements in Commercial Districts City-Wide 2014 June 05 PARKING INITIATIVES Attachment I Corridor Program Descriptions Corridor Program Pilot Though the Corridor Program will officially launch in the fall, this summer, The City will pilot the first phase of

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Major and Minor Schemes

Major and Minor Schemes 1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment

More information

21.04 LAND USE. Managing amenity through land use strategies

21.04 LAND USE. Managing amenity through land use strategies 21.04 LAND USE This section contains objectives and strategies for land use, under the themes of: Housing and community Retail, entertainment and the arts Office and commercial use Industry Education and

More information

Shannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP

Shannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP Shannon Corner Service Centre, 08-1 Burlington Road, New Malden, KT NP S1 Total site area (ha) 0.05ha Current MOT Car Repair Undeveloped land (ha) 0 Number of units 1 Grid reference TQ 680 Sequential status

More information

Site No 17 Former Weston Vinyls Site, Frome Location

Site No 17 Former Weston Vinyls Site, Frome Location Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis

More information

Opal Service District Plan

Opal Service District Plan 8 The Opal Service District includes a variety of planned land uses including commercial, mixed-use, flex office, industrial, and hospitality. This Plan seeks to simplify the land use categories to allow

More information

Amex Site Residential Development, Tarneit

Amex Site Residential Development, Tarneit Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP

FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP FOR SALE / TO LET ASTON HOUSE SCHOOL, 10 MONTPELIER ROAD, EALING, LONDON W5 2QP LOCATION Ealing is an affluent, attractive and vibrant West London suburb approximately 8 miles to the west of Central London,

More information

New Waterloo. Transforming the Elizabeth House site

New Waterloo. Transforming the Elizabeth House site New Waterloo Transforming the Elizabeth House site 02 Transforming Elizabeth House 03 Transforming Elizabeth House Transforming Elizabeth House This booklet has been produced by Chelsfield and London &

More information

Technical Advice Note: Retail Impact Assessments

Technical Advice Note: Retail Impact Assessments Technical Advice Note: Retail Impact Assessments 1 A GUIDE FOR RETAIL IMPACT ASSESSMENTS INTRODUCTION This Technical Advice Note (TAN) has been prepared to assist applicants seeking planning permission

More information

Parkway Forest Context Plan

Parkway Forest Context Plan Parkway Forest Context Plan City of Toronto June 11, 2007 Final WZMH Architects Table of Contents: 1.0 Introduction and Background 1.1 Location 1.2 Context Plan Area 1.3 Surrounding Features 1.4 Existing

More information

The Places THE PLACES

The Places THE PLACES 4 THE PLACES 51 The Places Key Issues 1. OPDC s draft Local Plan includes thematic policies. These policies will be applied to any site across the OPDC area but would not, by themselves, result in distinctive

More information

LONDON ROAD SEVENOAKS

LONDON ROAD SEVENOAKS WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission

More information

CONTENTS. Page. Reading The Vision 2. 1. Introduction and Objectives of the Development Brief 3. 2. Information on the Briefing Process 5

CONTENTS. Page. Reading The Vision 2. 1. Introduction and Objectives of the Development Brief 3. 2. Information on the Briefing Process 5 CONTENTS Page Reading The Vision 2 1. Introduction and Objectives of the Development Brief 3 This development brief has been written in accordance with the DETR s Planning and Development Briefs A Guide

More information

Design for Independent Schools

Design for Independent Schools Design for Independent Schools Developing Your School Re-Format is an award-winning architecture and design studio which has been specialising in buildings for the education sector for twenty years. We

More information

Neighbourhood Plan for Medstead and Four Marks

Neighbourhood Plan for Medstead and Four Marks Neighbourhood Plan for Medstead and Four Marks Monday, February 23, 2015 1198 Total Responses Date Created: Saturday, December 06, 2014 Complete Responses: 1161 Word Cloud of Q2 The size of text indicates

More information

Date: 13 March 2013. Chief Executive

Date: 13 March 2013. Chief Executive Item No. Classification: Open Date: 13 March 2013 Decision Taker: Cabinet Member for Regeneration and Corporate Strategy Report title: Wards affected: From: Application to apply for exemptions from the

More information

Wakefield Council Street Design Guide

Wakefield Council Street Design Guide A new vision for developing Wakefield District Wakefield Council Street Design Guide A guide for residential, commercial and mixed use development in Wakefield district. www.wakefield.gov.uk Information

More information

How To Develop The Kingsgate Business Centre

How To Develop The Kingsgate Business Centre Kingsgate Business Centre Employment Report Introduction The subject property comprises serviced offices arranged over two floors within a building in the north side of Kingsgate Road. It is served by

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

4.4 ECOCITY Tampere - Vuores

4.4 ECOCITY Tampere - Vuores 4.4 ECOCITY Tampere - Vuores Figure 4.4.1 Location of the Vuores area 4.4.1 General information The Vuores case area is a typical greenfield development in a woodland area to the south of the city of Tampere.

More information