1 Coordinated Transaction Scheduling (CTS) between NYISO & PJM - Fourth Joint Meeting Joint NYISO-PJM Meeting June 25, 2013 Hosted by PJM

2 Agenda Final Proposal Benefits Assessment Look Ahead Prices Fees and Transmission Charges Bid Guarantees and Make Whole Payments Expected Credit Requirements Expected Tariff Updates Next Steps and Proposed Timeline Q&A on proposal 2

3 PROPOSAL 3

4 CTS Background The objective of CTS is to improve interchange scheduling efficiency. This presentation provides more information about the market design for CTS between the PJM and NYISO market. The proposal is to add options for transactions: Market Participants would have the option to use either the existing economic evaluation process (LBMP Bid/Offer) or CTS (CTS Interface Bid/Offers). Both scheduling mechanisms (LBMP Bid/Offers and CTS Interface Bids) would coexist. All intra-hour scheduling of external transactions will be accelerated by 15-minutes The plan is to implement in

5 Flows between NY and PJM 5

6 Opportunity-PJM-NY Interface 2012 The percentage of inefficient schedules is generally around 33% 6

7 Opportunity in the Prices This chart shows the difference between the expected price differences (NY RTC- PJM IT SCED) and the actual price difference (NY RTD PJM RT LMP)* It shows that the expected price difference is generally consistent with the actual price difference. This indicates that there is opportunity for CTS transactions. The predicted price spread is in the right direction 73% of the time. *The NY Keystone price and the PJM NYIS price were used. August 2012 through February More analysis is presented in the Look Ahead Price section. 7

8 Opportunity Provide additional scheduling options for market participants in addition to options available today Increase price transparency The forward prices used in the evaluation are currently available from the NYISO and would now be made available from PJM. Increase market efficiency Scheduling transactions involves more than just the availability of the interface but providing an additional scheduling option will help marketers arbitrage the price differences between the two control areas. There are significant opportunities for increased efficiency: 31% of the time there is more than a $10 price difference between NY and PJM. There are efficiency gains to be had by stopping counter-intuitive flows (flows that go from the high priced control area to the low priced control area). Even when the flows are in the right direction there is usually space remaining on the interface. 8

9 Proposal Summary Bidding: Multiple bidding/scheduling options: Hourly evaluations of traditional wheel-through transactions (existing) Intra-hour evaluations of traditional LBMP Bid/Offers (existing) Intra-hour evaluations of CTS Interface Bid/Offers (new). Bidding: Intra-hour LBMP Bids and Intra-hour CTS Interface Bids may have up to four distinct bid $/MW pairs, one for each 15-minute scheduling interval of the hour. Scheduling: Intra-hour schedules established 15- minutes sooner than current intra-hour scheduling process. Scheduling: CTS Interface bids will be scheduled based on the projected price difference between PJM and NYISO at the interface. 9

10 Bidding Current: Import/export LBMP Bid: hourly Import/export LBMP Bid: 15 minute using second time step Wheel Bids : hourly Proposed: Import/export LBMP Bid: 15 minute using first time step Import/export CTS Interface Bid: 15 minute using first time step Wheel Bids: hourly With CTS we will be able to offer an earlier evaluation of LBMP Bids because we will use the first time step rather than the second time step of the NYISO RTC CTS interface bids/offers allow schedules to be based on the price differences projected by PJM and NYISO instead of relying on the marketer s assumptions about market conditions in the neighboring control area to provide an LBMP bid/offer. 10

11 Incorporate PJM s Supply Curve In Real Time, NYISO will use the real-time and lookahead prices resulting from PJM s existing SCED processes as the basis for determining which CTS Interface bids should be scheduled. The NYISO economic evaluation would schedule CTS Interface bids/offers that would be in the money given the projected prices at the interface. In practice, that means that each CTS Interface bidder identifies the price difference between PJM and NYISO s projected prices above which the transaction is willing to flow. To accomplish this evaluation, the CTS Interface bid/offer will be converted into a traditional LBMP bid (by adding/subtracting the CTS Interface bid/offer to PJM s projected proxy bus price) for consideration in NYISO s current economic scheduling software along with other, non-cts Interface bids 11

12 Scheduling Process The scheduling process will leverage PJM s existing Intermediate Term Security Constrained Economic Dispatch (IT SCED) that has a 2 hour look-ahead capability. The most recently available information on prices from IT SCED will be used by the Real Time Commitment (RTC) in the first time step as well as in the advisory schedules. Each RTC will also provide information on expected schedules to PJM and that information will be used in subsequent IT SCED runs. Appendix 4A provides an example of multiple marginal bids. 12

13 How it will work IT SCED (PJM) PJM Prices NYISO Schedules RTC (NYISO) In Real Time, NYISO will incorporate PJM s forward looking prices into its existing scheduling process for the purpose of evaluating CTS bids. PJM will incorporate advisory schedules from NYISO s scheduling process for the purpose of determining its forward-looking prices. 13

14 BENEFITS ASSESSMENT 14

15 Benefits of CTS CTS will provide an additional mechanism to bring prices in closer alignment in NY and PJM. To show how the mechanism results in increased efficiency, PJM and NYISO performed a first phase analysis three hours when there were price differences between PJM and New York and calculated the increased flow necessary to (approximately) equalize prices between PJM and New York. The three hours (in black) were chosen based on hourly real time prices differences between NY and PJM at the interface. RTD and SCED were rerun to determine what the change in schedule would be that would approximately equalize the prices in NY and PJM. 1/3/2013 HB19: An increase of 350MW of flow from NY to PJM 1/20/2013 HB 11: An increase of 440MW of flow from NY to PJM 2/18/2013 HB 12: An increase of 400MW of flow from PJM to NY Benefits are achieved with relatively small changes in interchange 15

16 Benefits of CTS Original Prices Revised Prices LOCALHOUR NY PJM NY-PJM Change in MW NY PJM 1/3/ : /3/ : MW NY to PJM /3/ : /3/ : /20/ : /20/ : MW NY to PJM /20/ : /20/ : /18/ : /18/ : MW PJM to NY /18/ : /18/ : PJM and the NYISO are working on an additional benefits assessment. The process has proved somewhat more lengthy than expected and a joint teleconference meeting will be scheduled in July to review the results with stakeholders. 16

17 LOOK AHEAD PRICES 17

18 Look-Ahead Prices In New York look-ahead prices are posted on the NYISO Website and are overwritten as new prices are produced. The prices are also available in the NYISO Decision Support System (DSS) public market data. PJM s IT SCED Application provides four look ahead solution intervals over a two hour period PJM is supportive of publishing Look-Ahead prices from IT SCED Currently evaluating the specifics of what will be published What solution interval? What pricing locations? Targeting summer 2014 implementation 18

19 Opportunity in the Prices This chart shows the difference between the expected price differences (NY RTC- PJM IT SCED) and the actual price difference (NY RTD PJM RT LMP)* It shows that the expected price difference is generally consistent with the actual price difference. This indicates that there is opportunity for CTS transactions. The table provides the summary statistics for both the expected and actual price differences as well as the difference between the expected and actual price differences. More information is included in Appendix 1. Expected Price Difference Actual Price Difference NY RTC - PJM IT SCED NY RTD - PJM LMP Average Mean Max Min SD Difference between the expected Price Difference and the Actual Price Difference (NY RTC - PJM IT SCED) - (NY RTD - PJM LMP) Average 2.08 Mean 0.45 Max Min SD *The NY Keystone price and the PJM NYIS price were used. August 2012 through February

20 Improving Predicted Price Differences Both NYISO and PJM have planned improvements in RTC & IT SCED (see next two slides) To illustrate the impact of improving look ahead prices, we show the impact of a 20% improvement in RTC and IT SCED. Note that the distribution becomes higher in the middle and lower on the tails Difference between the expected Price Difference and the Actual Price Difference (NY RTC - PJM IT SCED) - (NY RTD - PJM LMP) Average 2.08 Mean 0.45 Max Min SD Difference between the expected Price Difference and the Actual Price Difference with a 20% improvement in IT SCED and RTC (Improved NY RTC - Improved PJM IT SCED) - (NY RTD - PJM LMP)

21 Continued Improvements PJM IT SCED Current Functions Commits CTs for energy and constraint control Performs the Three Pivotal Supplier Test Commits Demand Resources for energy Provides Intra hour commitment recommendations for Regulation and Reserve resources Opportunities for Improvements Evaluating accuracy of input data Enhanced Operator training Increased functionality 21

22 Continued Improvements NY RTC Current Functions Economic commitment of CTs and eligible Combine Cycle CTs Economic scheduling of interchange transactions Performs Automated Mitigation Processes (AMP) Opportunities for Improvements* More efficient RTD/RTC Coordination Continued Improvements to Load Forecasts * All projects subject to project prioritization. 22

23 FEES AND TRANSMISSION CHARGES 23

24 Fees and charges There was a request to report on the fees faced by transactions in both PJM and NYIOS. At the April 2 joint stakeholder meeting PJM and NY reviewed the different fee and charges that imports/exports and wheels are subject to and reported the approximate annual charges for each of those fees. Stakeholders requested that these fees be reported in $/MWh. Historical charges in NY and PJM from November 2012 through April 2013 are included the following slides. Appendix 6 also includes the month by month in the same format. 24

25 Fees and charges The fees and charges are grouped by type Administrative Charges Ancillary Services Other RS 1 Charges (NYISO only) Guarantee and Make Whole Payments Transmission service And are reported separately for Exports and Imports for November 2012 through January Additional data is reported in Appendix 6. 25

26 EXPORTS NYISO NYISO PJM PJM FEE CATEGORY* Nov2012 Rate ($/MWh) Nov2012 Settlement ($) Nov2012 Rate ($/MWh) Nov2012 Settlement ($) ADMINISRATIVE CHARGES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.64) ($109,354) ($0.27) ($137,112) ANCILLARY SERVICES Voltage Support Service (RS2 NYISO and PJM) ($0.37) ($63,220) ($0.18) ($131,029) Operating Reserves (RS5 NYISO) ($0.36) ($61,511) n/a n/a Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) ($46,422) Schedule 6A - Black Start (PJM) n/a n/a ($0.02) ($11,819) OTHER RS1 CHARGES (NYISO) Ramapo PAR Operation ($0.02) ($3,417) n/a n/a Station 80 Operation ($0.00) ($283) n/a n/a DAM Energy Residual ($1.01) ($172,574) n/a n/a DAM Loss Residual $1.57 $268,258 n/a n/a RT Energy Residual $0.08 $13,669 n/a n/a RT Loss Residual $0.03 $5,126 n/a n/a RT Congestion Residual $0.03 $5,126 n/a n/a Financial Impact Charge Credit $0.00 $399 n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS Import Supplier Guarantee (NYISO) ($0.00) ($442) n/a n/a DAMAP (NYISO) ($0.08) ($13,669) n/a n/a DAM PS BPCG (NYISO) ($0.12) ($20,504) n/a n/a RT PS BPCG (NYISO) ($0.78) ($133,275) n/a n/a DAM TRANS BPCG (NYISO) ($0.00) ($12) n/a n/a RT TRANS BPCG (NYISO) ($0.02) ($2,929) n/a n/a Supplemental Event Credit (NYISO) ($0.00) ($540) n/a n/a Operating Reserve (PJM) n/a n/a ($1.99) ($206,895) TRANSMISSION SERVICE NTAC(NYISO) ($0.79) ($134,983) n/a n/a Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) ($5.03) ($859,451) ($0.67) ($670,208) TOTAL FEES ($7.51) ($1,283,587) ($1,203,485) Total Export MWh 170,865 *The Fees do not include charges for Energy, Losses and Congestion 26

27 EXPORTS NYISO NYISO PJM PJM FEE CATEGORY* Dec2012 Rate ($/MWh) Dec 2012 Settlement ($) Dec2012 Rate ($/MWh) Dec 2012 Settlement ($) ADMINISRATIVE CHARGES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.64) ($77,253) ($0.26) ($233,601) ANCILLARY SERVICES Voltage Support Service (RS2 NYISO and PJM) ($0.37) ($44,662) ($0.18) ($200,394) Operating Reserves (RS5 NYISO) ($0.22) ($26,556) n/a n/a Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) ($81,023) Schedule 6A - Black Start (PJM) n/a n/a ($0.09) ($101,257) OTHER RS1 CHARGES (NYISO) Ramapo PAR Operation ($0.02) ($2,414) n/a n/a Station 80 Operation ($0.00) ($200) n/a n/a DAM Energy Residual ($0.79) ($95,359) n/a n/a DAM Loss Residual $1.29 $155,713 n/a n/a RT Energy Residual $0.07 $8,450 n/a n/a RT Loss Residual $0.07 $8,450 n/a n/a RT Congestion Residual $0.14 $16,899 n/a n/a Financial Impact Charge Credit $0.00 $282 n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS Import Supplier Guarantee (NYISO) ($0.00) ($312) n/a n/a DAMAP (NYISO) ($0.05) ($6,035) n/a n/a DAM PS BPCG (NYISO) ($0.09) ($10,864) n/a n/a RT PS BPCG (NYISO) ($0.20) ($24,142) n/a n/a DAM TRANS BPCG (NYISO) ($0.00) ($9) n/a n/a RT TRANS BPCG (NYISO) ($0.02) ($2,069) n/a n/a Supplemental Event Credit (NYISO) ($0.00) ($382) n/a n/a Operating Reserve (PJM) n/a n/a ($2.74) ($129,589) TRANSMISSION SERVICE NTAC(NYISO) ($0.88) ($106,484) n/a n/a Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) ($5.01) ($604,747) ($0.67) ($1,209,637) TOTAL FEES ($6.72) ($811,696) ($1,955,501) Total Export MWh 120,708 *The Fees do not include charges for Energy, Losses and Congestion 27

28 EXPORTS NYISO NYISO PJM PJM FEE CATEGORY* Jan2013 Rate ($/MWh) Jan2013 Settlement ($) Jan2013 Rate ($/MWh) Jan2013 Settlement ($) ADMINISRATIVE CHARGES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.69) ($106,576) ($0.30) ($267,770) ANCILLARY SERVICES Voltage Support Service (RS2 NYISO and PJM) ($0.36) ($55,605) ($0.18) ($256,436) Operating Reserves (RS5 NYISO) ($0.40) ($61,783) n/a n/a Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) ($2,188) Schedule 6A - Black Start (PJM) n/a n/a ($0.09) ($130,273) OTHER RS1 CHARGES (NYISO) Ramapo PAR Operation ($0.02) ($3,089) n/a n/a Station 80 Operation ($0.00) ($256) n/a n/a DAM Energy Residual ($1.61) ($248,677) n/a n/a DAM Loss Residual $2.50 $386,145 n/a n/a RT Energy Residual $0.24 $37,070 n/a n/a RT Loss Residual $0.14 $21,624 n/a n/a RT Congestion Residual $0.25 $38,615 n/a n/a Financial Impact Charge Credit $0.00 $360 n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS Import Supplier Guarantee (NYISO) ($0.00) ($400) n/a n/a DAMAP (NYISO) ($0.14) ($21,624) n/a n/a DAM PS BPCG (NYISO) ($0.44) ($67,962) n/a n/a RT PS BPCG (NYISO) ($0.81) ($125,111) n/a n/a DAM TRANS BPCG (NYISO) ($0.00) ($11) n/a n/a RT TRANS BPCG (NYISO) ($0.02) ($2,648) n/a n/a Supplemental Event Credit (NYISO) ($0.00) ($488) n/a n/a Operating Reserve (PJM) n/a n/a ($7.10) ($1,253,714) TRANSMISSION SERVICE NTAC(NYISO) ($0.84) ($129,745) n/a n/a Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) ($4.97) ($767,656) ($2.16) ($1,685,109) TOTAL FEES ($7.17) ($1,107,818) ($3,595,490) Total Export MWh 154,458 *The Fees do not include charges for Energy, Losses and Congestion 28

29 IMPORTS NYISO NYISO PJM PJM Fee Category Nov2012 Rate ($/MWh) Nov 2012 Settlement ($) Nov2012 Rate ($/MWh) Nov 2012 Settlement ($) ADMINISRATIVE FEES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.26) ($258,662) ($0.27) ($6,887) ANCILLARY SERVICES Voltage Support Service (RS2 PJM) n/a n/a ($0.18) ($291) Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) ($3) Schedule 6A - Black Start (PJM) n/a n/a ($0.02) ($26) GUARANTEE/ "MAKE WHOLE" PAYMENTS Operating Reserve (PJM) n/a n/a ($1.97) ($203,413.06) TRANSMISSION SERVICE Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) n/a n/a ($2.16) ($1,072.67) TOTAL FEES ($0.26) ($258,662) ($4.69) ($211,693.59) Total Import MWh 997,064 29

30 IMPORTS NYISO NYISO PJM PJM Fee Category Dec2012 Rate ($/MWh) Dec 2012 Rate ($) Dec2012 Rate ($/MWh) Dec 2012 Rate ($) ADMINISRATIVE FEES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.26) ($346,592.76) ($0.26) ($4,638.95) ANCILLARY SERVICES Voltage Support Service (RS2 PJM) n/a n/a ($0.18) ($131.82) Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) ($13.68) Schedule 6A - Black Start (PJM) n/a n/a ($0.09) ($66.61) GUARANTEE/ "MAKE WHOLE" PAYMENTS Operating Reserve (PJM) n/a n/a ($2.68) ($13,064.09) TRANSMISSION SERVICE Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) n/a n/a ($2.16) ($502.50) TOTAL FEES ($0.26) ($346,592.76) ($5.46) ($18,417.64) Total Import MWh 1,341,894 30

31 IMPORTS NYISO NYISO PJM PJM Fee Category Jan2013 Rate ($/MWh) Jan 2013 Rate ($) Jan2013 Rate ($/MWh) Jan 2013 Rate ($) ADMINISRATIVE FEES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.28) ($333,577) ($0.30) ($7,096.20) ANCILLARY SERVICES Voltage Support Service (RS2 PJM) n/a n/a ($0.18) ($18.25) Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a ($0.09) $0.00 Schedule 6A - Black Start (PJM) n/a n/a ($0.09) ($9.27) GUARANTEE/ "MAKE WHOLE" PAYMENTS Operating Reserve (PJM) n/a n/a ($6.86) ($611,252.69) TRANSMISSION SERVICE Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) n/a n/a ($2.16) ($67.00) TOTAL FEES ($0.28) ($333,577) ($9.69) ($618,443.42) Total Import MWh 1,199,497 31

32 Cross-Border Transaction Fees The Coordinated Transaction Scheduling (CTS) project did not initially include the elimination of fees allocated to external transactions. Stakeholders asked PJM and NYISO to revisit this issue. PJM currently does not support the elimination of Schedule 7 and 8 Fees (i.e. Regional Through and Out Rates) until NYISO and PJM reach additional agreements on Interregional Planning and Regional Transmission Enhancement Cost Allocation Maintains the realization of benefits from transmission system upgrades by the RTO funding the upgrades PJM and NYISO are continuing discussions but no date certain at this point on when an agreement may be reached PJM does propose the exemption of BOR charges for CTS transactions. 32

33 Cross-Border Transaction Fees (2) The PJM proposal for the exemption of BOR charges for CTS transactions includes: CTS transactions economically benefit both NYISO and PJM CTS transactions are cleared and scheduled in response to near-term projected operating conditions in NYISO and PJM BOR charges remain as they are today for traditional transactions BOR charges will also be applied in the instance of a day ahead schedule being served via a CTS transaction that is not dispatched in real time 33

34 Cross-Border Transaction Fees (3) The NYISO supports the reciprocal elimination fees allocated to external transactions. Given PJM s proposal, we consider the equivalent fees in NY to be the BPCG/Make Whole fees paid by CTS transactions. The NYISO is proposing to eliminate the following fees for exports and wheels: Import Supplier Guarantee, DAMAP, DAM PS BPCG, RT PS BPCG, DAM TRANS BPCG, RT TRANS BPCG, and Supplemental Event Credit for CTS transactions. 34

35 BID GUARANTEES/MAKE WHOLE PAYMENTS 35

36 Bid Guarantees/Make Whole Payments PJM and NY will both change their Make Whole Payments for external transactions: PJM will not provide make whole payments for CTS transactions. NYISO will not provide make whole payments for CTS transactions or LMBP transactions with PJM. CTS Transaction imports bids will not be protected from the latency between the scheduling (RTC) and settlement prices (RTD) and will also not be eligible for Import Curtailment Guarantees. RT LBMP bids are moving from second time step to the first time step in the NY market, and Because it would also not be appropriate to protect some RTC scheduled 15 minute transaction from latency and not others, The proposal eliminates real-time Bid Production Cost Guarantees (BPCG) and eligibility for Import Curtailment Guarantees for RT LBMP bids. It is not readily apparent what bid guarantees/make whole payments should apply for CTS Transactions: For example, the marketer agrees to flow for a $5 price difference. PJM IT SCED projects $17/MWh and NY RTC projects $23/MWh. The transaction is scheduled. The final settlement prices are $20/MWh in PJM and $24/MWh in NY (a $4/MWh difference). What could be due the marketer and which loads should pay? 36

37 Bid Guarantees/Make Whole Payments (2) Currently, in NY, only 15 minute scheduled transactions with PJM are eligible for BPCGs and Import Curtailment Guarantees. Summary of NY BPCG and Import Curtailment Guarantees: RT BPCGs at the PJM interface (Keystone, Neptune and Linden) 2012 Total $952, Billing Organizations received payments Average $35,265 to billing organizations receiving RT BPCGs for transactions through April: Total $43, January through April: Total $ 306, Billing Organizations received payments Average $3,612 to billing organizations receiving RT BPCGs for transactions. Import Curtailment Guarantees at the PJM interface (Keystone, Neptune and Linden) 2012 Total $172,030 5 Billing Organizations received payments Average $34,406 to billing organizations receiving Import Curtailment Guarantees through May: Total $113, January through April: Total $47,272 4 Billing Organizations received payments Average payout: $28,395 to billing organizations receiving Import Curtailment Guarantees. 37

38 EXPECTED CHANGES TO CREDIT REQUIREMENTS WITH CTS 38

39 Credit Requirement Changes At the last February meeting a stakeholder requested that information be provided on credit requirements for CTS transactions. PJM and NYISO will continue to maintain separate credit requirements. Discussion of NYISO s Credit Requirement changes has begun in the NYISO Credit Policy Working Group. The next meeting is scheduled for July 12 th. PJM is discussing Credit Requirement changes in the Credit Subcommittee and the Market Implementation Committee 39

40 Credit Requirement Changes No changes expected to Day-Ahead Scheduling so there are no changes expected to credit requirements for Day-Ahead Imports, Exports or Wheel Through transactions in either PJM or NYISO. In Real-time, CTS Transaction Bids will likely impact Export credit requirements in PJM and the NYISO including: the way in which the credit coverage per megawatt is determined, the megawatt amount for which credit coverage would be required, and the timing of credit coverage adjustments. The credit requirements for Real-time Imports and Wheels Through are not expected to change. 40

41 PJM Settlements PJM supports changing the settlement time frame for all interchange transactions from hourly settlement currently to 15 minute settlements to align with interchange scheduling time frames Will require discussion and approval within the PJM stakeholder process Implementation timing to be determined 41

42 EXPECTED TARIFF CHANGES 42

43 Tariff Changes Each ISO/RTO will pursue tariff changes, as needed, with their stakeholders. Expected process and timeline: NYISO: MIWG Review of tariff changes (June/July) Approval by the Business Issues Committee (BIC) (August) Approval by the Management Committee (MC) (August) PJM: MIC Review of tariff changes (June/July) MRC Review of tariff changes (July/August) Approval by Members Committee (MC) (August) 43

44 PJM Tariff and OA Changes CTS will require changes to the PJM Tariff and Operating Agreement with respect to: Definitions; Look-ahead price concept; Bid/offer requirements and mechanisms; Credit requirements and mechanisms; Clearing mechanisms; Settlement mechanisms; Fees, charges, and uplift mechanisms, as applicable; Various carve-outs that reflect the different treatment of CTS transactions as compared to other types of transactions 44

45 NY Expected Tariff Changes For the most part we can leverage all the drafting that was done for CTS with ISO NE so the changes are not expected to be extensive however the revisions will impact a number of sections. Revisions are expected to the following tariff sections: MST 2.2 Definitions - B MST 2.3 Definitions - C MST 4.4 Real-Time Markets and Schedules, MST 17.1 Pricing rules, MST 31 Need to clarify that this section applies to CTS with ISO NE only, OATT 1.3 the equivalent to MST 2.3, OATT 6.1,6.2, and 6.5 these are the sections that relate to fees and charges. We are still reviewing the NYISO Tariffs and Operating Agreements to evaluate if additional changes are needed. 45

46 NEXT STEPS 46

47 Proposed Timeline Final Joint Stakeholder Meeting Benefit Assessment Tele- Conference NYISO and PJM FERC Filing Independent NYISO Bidding Platform MP Sandbox Testing Implement PJM Stakeholder Process FERC approval Independent PJM Sandbox Testing NYISO Stakeholder Process 47

48 Proposed Next Steps Proposed Implementation Timeline EOY-2012: Introduce to Stakeholders Mid-2013: Market Design Approved Q4 2014: Implement A joint Benefits Assessment teleconference will be scheduled. Each ISO/RTO will pursue tariff changes, as needed, with their stakeholders. 48

49 APPENDIX 49

50 List of Appendices Appendix 1: Predicted & Actual Price Differences Appendix 2: CTS Timeline Appendix 3: Feedback Loop Appendix 4: Expanded Example with Timeline Appendix 4A: Example With Multiple Offers on the Margin Appendix 5: Look Ahead Price Analysis Appendix 6: Monthly Fees and Charges for November 2012 through April

51 APPENDIX 1: PREDICTED & ACTUAL PRICE DIFFERENCES 51

52 Predicted Price Difference & Actual Price Difference The predicted price spread is in the right direction 73% of the time (i.e., in the top right or bottom left quadrant) And the data is generally around the 45 degree diagonal. Perfectly predicted prices would be on the 45 degree diagonal. Points above/below the 45 degree line indicate that the predicted price difference is greater than/less than the real time price difference. 52

53 There is month to month variation January 2013 was more volatile than December

54 APPENDIX 2: CTS PROPOSAL SUMMARY 54

55 Proposal Summary Bidding: Multiple bidding/scheduling options: Hourly evaluations of traditional wheel-through transactions (existing) Intra-hour evaluations of traditional LBMP Bid/Offers (existing) Intra-hour evaluations of CTS Interface Bid/Offers (new). Bidding: Intra-hour LBMP Bids and Intra-hour CTS Interface Bids may have up to four distinct bid $/MW pairs, one for each 15-minute scheduling interval of the hour. Scheduling: Intra-hour schedules established 15- minutes sooner than current intra-hour scheduling process. Scheduling: CTS Interface bids will be scheduled based on the projected price difference between PJM and NYISO at the interface. 55

56 Bidding Current: Import/export LBMP Bid: hourly Import/export LBMP Bid: 15 minute using second time step Wheel Bids : hourly Proposed: Import/export LBMP Bid: 15 minute using first time step Import/export CTS Interface Bid: 15 minute using first time step Wheel Bids: hourly With CTS we will be able to offer an earlier evaluation of LBMP Bids because we will use the first time step rather than the second time step of the NYISO RTC CTS interface bids/offers allow schedules to be based on the price differences projected by PJM and NYISO instead of relying on the marketer s assumptions about market conditions in the neighboring control area to provide an LBMP bid/offer. 56

57 Bidding (2) All Bids/offers will continue to be provided no later than 75 minutes before the market hour. Intra-hour LBMP Bids and Intra-hour CTS Interface Bids may have up to four distinct bid curves (each with up to eleven $/MW pairs), one curve for each 15-minute scheduling interval of the market hour. Each bid curve must be submitted by 75-minutes prior to the scheduling hour. Participants who do not want to be price sensitive can use their bids/offers to make their transactions appear more like price takers. 57

58 Maintaining the Existing Bid Window CTS Interface bids allow schedules to be based on price differentials instead of relying on the Marketer s assumptions about market conditions in the neighboring control area to inform an LBMP bid/offer. CTS Interface bids will be evaluated 15 minutes in advance of the scheduling period. Participants may provide a distinct bid curve for each 15-minute scheduling interval. The 75 min bid window allows for the consolidated input of all relevant bid/offer information for the forward looking energy and ancillary service co-optimization. Developing schedules based on the cooptimized procurement of energy and ancillary services helps ensure a least-bid cost solution, as well as consistent schedules and prices, minimizes uplift, and provides time to implement needed market power & manipulation protections. 58

59 Maintaining the Existing Bid Window (2) The existence of uncertainty about market conditions in both control areas has led to concerns that the 75 minute ahead bid window is too far in advance of the economic evaluation. Interface bids allow schedules to depend on price differentials instead of relying on the Marketer s assumptions about market conditions in the neighboring control area to inform an LBMP bid/offer. Interface bids will be evaluated15 minutes in advance of the scheduling period. Participants may provide a distinct bid $/MW pair for each 15-minute scheduling interval. We believe this scheduling flexibility substantially addresses the impact of uncertainty and that there is little to be gained by a shorter bid window. The 75 min bid window allows for the consolidated input of all relevant bid/offer information for the forward looking energy and ancillary service cooptimization. This provides least-bid cost as well as consistent schedules and prices, and minimizes uplift and needed market power & manipulation protections. 59

60 Maintaining the Existing Bid Window (3) The NYISO has considered a rolling 75 minute close prior to each 15 minute scheduling period Unable to accommodate a rolling 75 minute close because it would need to apply to all types of customers (to efficiently schedule the look ahead there needs to be a variety of resources available and their nearterm offers need to be locked) There are also concerns of significant software performance degradation because it would be a four-fold increase in the number of bids/offers that need to be handled on a daily basis It is not apparent that there are meaningful incremental benefits to market efficiency with a rolling 75 minute close. Would also conflict with the NERC tagging requirement during Transmission Loading Relief (TLR) events when all next-hour information must be available by forty-minutes prior to the operating hour. Therefore, this proposal allows a distinct bid $/MW pair for each 15- minute scheduling interval but they will still be subject to the existing 75 minute ahead bidding window. 60

61 Bidding Time Line 61

62 PJM Transmission and Ramp Reservations Current PJM Timing Requirements (Transmission Service): Hourly Transmission Service Earliest Request 08:00 day-ahead (09:00 Spot-In) Latest Request 0 minutes ahead Provider Response within 15 minutes (automated done in seconds) Customer Confirmation within 15 minutes Automated Release or Annulment of Spot-In service (30 minutes after queued if no valid Tag) Assumes same day request. Day ahead requests annulled within 2 hours of queue Aligns with NAESB Wholesale Electric Quadrant (WEQ)

63 PJM Transmission and Ramp Reservations (2) Current PJM Timing Requirements (Ramp Reservations and Energy Scheduling): Ramp Reservations and Expirations Latest request 30 minutes ahead Pending status maintained 10 minutes if queued within 1 hour of start-time 15 minutes if 1 hour < queued < 4 hours Hourly Energy Scheduling No earliest submittal requirement Latest Schedule 20 minutes ahead Aligns with NAESB WEQ 004-D and NERC INT

64 Scheduling Real Time scheduling determination. Looking to maintain NYISO s economic schedule market design & potentially leverage existing NYISO software capabilities and look ahead features. Looking to maintain PJM s market evaluation, leverage PJM s existing software and minimize any build out of the software. No changes expected to Day Ahead Scheduling As the Real Time market outcomes change we expect existing/proposed arbitrage mechanisms to be effective in arbitraging the Day Ahead and Real Time markets. 64

65 Scheduling Process Proposing to set schedules every 15 minutes for the period of time 30 to 45 minutes out from when the system information is gathered by the dispatch software ( initialization ). This is referred to as First Time Step The current intra-hour scheduling of LBMP bids/offers with PJM sets schedules 45 to 60 minutes from initialization ( Second Time Step ). Implications Wheel-though transactions will continue to only be scheduled hourly (They will be the only transactions with hourly scheduling at the NYISO/PJM interfaces) 65

66 Scheduling Process (2) The scheduling process will leverage PJM s existing Intermediate Term Security Constrained Economic Dispatch (IT SCED) that has a 2 hour look-ahead capability. The most recently available information on prices from IT SCED will be used by the Real Time Commitment (RTC) in the first time step as well as in the advisory schedules. Each RTC will also provide information on expected schedules to PJM and that information will be used in subsequent IT SCED runs. 66

67 Incorporate PJM s Supply Curve In Real Time, NYISO will use the PJM s proxy bus process and resulting real-time and look-ahead prices to determine which CTS Interface bids should be scheduled. The NYISO economic evaluation would schedule CTS Interface bids/offers that would be in the money given the projected prices at the interface. In practice, that means that each CTS Interface bidder identifies the price difference between PJM and NYISO s projected prices above which the transaction is willing to flow. To accomplish this evaluation, the CTS Interface bid/offer will be converted into a traditional LBMP bid (by adding/subtracting the CTS Interface bid/offer to PJM s projected proxy bus price) for consideration in NYISO s current economic scheduling software along with other, non-cts Interface bids 67

68 How it will work IT SCED (PJM) PJM Prices NYISO Schedules RTC (NYISO) In Real Time, NYISO will incorporate PJM s forward looking prices into its existing scheduling process for the purpose of evaluating CTS bids. PJM will incorporate advisory schedules from NYISO s scheduling process for the purpose of determining its forward-looking prices. 68

69 APPENDIX 3: FEEDBACK LOOP 69

70 Feedback loop The next slide shows a single loop from IT SCED to RTC and back again to IT SCED. The following slide shows the interaction of multiple loops. 70

71 Information flow from PJM s IT SCED to NYISO s RTC to PJM s IT SCED 71

72 72

73 APPENDIX 4: EXPANDED EXAMPLE WITH TIMELINE 73

74 Example with Timeline At the February meeting there was a request to add a timeline to an example. This is an expansion of the first example presented at the that joint Stakeholder meeting and it was presented at the April joint Stakeholder meeting. This example includes the following simplifying assumptions: The marketer is assumed to be purchasing in PJM at the PJM price, importing energy from PJM into NY and selling the energy in NY at the NY price. Note that in this example we are no longer assuming that the settlement price in NYISO is equal to the scheduling (RTC) price This example (in purple) focuses on scheduling a single 15 minute interval from T to T+15 Every 15 minutes the NYISO provides RTC advisory schedules to PJM which are incorporated into the PJM ramp calculation and every 15 minutes RTC incorporates the expected prices from IT SCED. The example only includes time steps relevant to scheduling a transactions for the interval from T to T

75 Example with Timeline (2) Before T-75: Marketer requests transmission, and ramp from PJM, PJM approves transmission reservation, ramp and etags In the NYISO MIS the marketer enters an import (from PJM to NY) CTS Transaction bid of $5/MWh for the first fifteen minutes of hour T, The marketer also enters import CTS Transaction bids for the other three intervals in hour T 75

76 Example with Timeline (3) T-75: NYISO locks bids, removes bids with no etags and curtails to zero etags with no bids Marketers etags requests after this point for hour T will not be approved. T-60: RTC sends schedules to IT SCED T-40: IT SCED sends prices for T to RTC: IT SCED projects an Interval 2 price of $17/MWh 76

77 Example with Timeline (4) T-30 to T-15: Rolling RTC evaluates and posts, CTS schedules are established for first fifteen minutes of hour T, The RTC projects prices of $23/MWh for the first interval of hour T. Since PJM s IT SCED price projection was $17/MWh and RTC s projected price is $23/MWh, the CTS Transaction is scheduled ($17/MWh+$5/MWh= $22/MWH< $23/MWh). etags updated with the RTC schedules RTC sends look-ahead schedules for the PJM interfaces to IT SCED 77

78 Example with Timeline (5) T-10 to T-5: Rolling RTD evaluates and posts for T-5 to T. T-5 NYISO Interchange Ramp Begins for T. T-5 to T: T: Rolling RTD post and sets first 5 minute NYISO settlement price of $24/MWh. PJM first 5 minute RT LMP price of $15/MWh. 78

79 Example with Timeline (6) T to T+5: Rolling RTD posts second 5 minute NYISO settlement price for t+5 to t+10 of $19/MWh T+5: PJM second 5 minute RT LMP of $20/MWh T+5 to T+10: Rolling RTD post third 5 minute NYISO settlement price for t+10 to t+15 of $29/MWh T+10 NYISO Interchange Ramp Begins for T+15 T+10: PJM third 5 minute RT LMP of $25/MWh. 79

80 Example with Timeline (7) Balance sheet: The CTS Transaction purchased energy at an average of $20/MWh in PJM. PJM first 5 minute RT LMP price of $15/MWh. PJM second 5 minute RT LMP of $20/MWh PJM third 5 minute RT LMP of $25/MWh. Average PJM price: ($15+$20+$25)/3= $20 80

81 Example with Timeline (8) Balance sheet (continued): The CTS Transaction was paid an average of $24/MWh in NY. NYISO first 5 minute settlement price of $24/MWh. NYISO second 5 minute settlement price for t+5 to t+10 of $19/MWh. NYISO third 5 minute settlement price for t+10 to t+15 of $29/MWh. Average NY price: ($24+$19+$29)/3=$24 The final price difference was $4/MWh. PJM Final Price= $20 NY Final Price= $24 81

82 APPENDIX 4A: EXAMPLE WITH MULTIPLE OFFERS ON THE MARGIN 82

83 Example with Timeline Before T-75: Marketers requests transmission, and ramp from PJM, PJM approves transmission reservation, ramp and etags In the NYISO MIS one marketer enters a 100MW import (from PJM to NY) CTS Transaction bid of $6/MWh for the first fifteen minutes of hour T, Another marketer enters a 100MW import (from PJM to NY) LBMP Transaction bid of $23/MWh for the first fifteen minutes of hour T The marketers also enter import CTS and LBMP Transaction bids for the other three intervals in hour T, respectively 83

84 Example with Timeline (2) T-75: NYISO locks bids, removes bids with no etags and curtails to zero etags with no bids Marketers etags requests after this point for hour T will not be approved. T-60: RTC sends schedules to IT SCED T-40: IT SCED sends prices for T to RTC: IT SCED projects an Interval 2 price of $17/MWh 84

85 Example with Timeline (3) T-30 to T-15: Rolling RTC evaluates and posts, CTS and LBMP import schedules are established for first fifteen minutes of hour T, The RTC projects prices of $23/MWh for the first interval of hour T, based on needing 140MW of PJM to NY imports to economically meet its load. 100MW LBMP OFFER 140MWs Needed 100MW CTS OFFER 85

86 Example with Timeline T-30 to T-15: Since PJM s IT SCED price projection was $17/MWh and RTC s projected price is $23/MWh, the CTS Transaction is marginally scheduled to 70MW ($17/MWh+$6/MWh= $23/MWH= $23/MWh). Since RTC s projected price is $23/MWh, the LBMP Transaction is also marginally scheduled to 70MW CTS Schedule = 70MWs LBMP Schedule = 70MWs 140MWs Needed 86

87 APPENDIX 5 LOOK AHEAD PRICE ANALYSIS 87

88 NYISO Look-Ahead Prices The following analysis covers the first interval of the RTC and compares those prices to the average RTD prices for that same time period. The first interval is the interval that CTS will be using along with the PJM IT SCED prices. Data covers two time periods: August 2012 to February Minute Scheduling was activated in August January 2013 to February 2013 this analysis provides information on the winter peak. Pricing point used is the PJM Keystone (the PJM reference bus) The presentation of this data at the February stakeholder meeting incorrectly labeled the data as First Interval when it was Second Interval. The results have been relabeled correctly and the results for the First Interval added to the August 2012-February 2013 slide. 88

89 NYISO Look-Ahead Price Analysis: August 2012-February 2013 The price difference between the RTC LBMP and the average of the three RTD LBMPs $ Difference % Occurrence First Interval Second Interval > RTC Interval First Interval Second Interval Mean (RTC- RTD) Median (RTC- RTD) Mean Squared Error to to to to to <

90 NYISO Look-Ahead Price Analysis: January 2013-February 2013 The price difference between the RTC LBMP and the average of the three RTD LBMPs % Occurrence $ Difference Second Interval > to 20 5 RTC Interval Mean Median Second Interval Mean Squared Error to to to to <

91 PJM Look-Ahead Price Analysis PJM s IT SCED Application provides four look ahead solution intervals over a two hour period Analysis was performed to compare the accuracy of the IT SCED forecasted LMPs to the Real Time (RT) LMP Data referenced from January and February 2013 Pricing point representative of the NYISO Interface price 91

92 PJM Look-Ahead Price Analysis IT SCED Interval Mean Median Standard Deviation The 2 nd Interval is the solution data that will be used in the CTS process % Occurrence by Interval $ Difference > to to to to to <

93 APPENDIX 6: MONTHLY FEES AND CHARGES ( NOVEMBER 2012 THROUGH APRIL 2013). 93

94 EXPORTS NYISO NYISO PJM PJM FEE CATEGORY* Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) ADMINISRATIVE CHARGES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.68) ($718,017) Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) ANCILLARY SERVICES Voltage Support Service (RS2 NYISO and PJM) ($0.36) ($385,218) Operating Reserves (RS5 NYISO) ($0.36) ($382,262) n/a n/a Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a Schedule 6A - Black Start (PJM) n/a n/a OTHER RS1 CHARGES (NYISO) Ramapo PAR Operation ($0.02) ($19,632) n/a n/a Station 80 Operation ($0.00) ($1,758) n/a n/a DAM Energy Residual ($1.18) ($1,246,787) n/a n/a DAM Loss Residual $1.82 $1,934,479 n/a n/a RT Energy Residual $0.13 $139,052 n/a n/a RT Loss Residual $0.06 $60,862 n/a n/a RT Congestion Residual $0.22 $230,705 n/a n/a Financial Impact Charge Credit $0.00 $2,474 n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS Import Supplier Guarantee (NYISO) ($0.0026) ($2,746) n/a n/a DAMAP (NYISO) ($0.0921) ($97,683) n/a n/a DAM PS BPCG (NYISO) ($0.2569) ($272,513) n/a n/a RT PS BPCG (NYISO) ($0.3478) ($369,024) n/a n/a DAM TRANS BPCG (NYISO) ($0.0001) ($77) n/a n/a RT TRANS BPCG (NYISO) ($0.0171) ($18,186) n/a n/a Supplemental Event Credit (NYISO) ($0.0032) ($3,354) n/a n/a Operating Reserve (PJM) n/a n/a TRANSMISSION SERVICE NTAC(NYISO) ($0.88) ($935,865.86) n/a n/a Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) ($4.49) ($4,761,170.20) TOTAL FEES ($6.45) ($6,846,722) Total Export MWh 1,060,873 *The Fees do not include charges for Energy, Losses and Congestion 94

95 WHEELS NYISO NYISO PJM PJM Fee Category* Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) ADMINISRATIVE FEES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.68) ($58,064) ANCILLARY SERVICES Voltage Support Service (RS2 NYISO and PJM) ($0.36) ($31,151) Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a Schedule 6A - Black Start (PJM) n/a n/a Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) OTHER RS1 CHARGES (NYISO) Ramapo PAR Operation ($0.02) ($1,588) n/a n/a Station 80 Operation ($0.00) ($142) n/a n/a DAM Energy Residual ($1.18) ($100,823) n/a n/a DAM Loss Residual $1.82 $156,434 n/a n/a RT Energy Residual $0.13 $11,245 n/a n/a RT Loss Residual $0.06 $4,922 n/a n/a RT Congestion Residual $0.22 $18,656 n/a n/a Financial Impact Charge Credit $0.00 $200 n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS GUARANTEE/ "MAKE WHOLE" PAYMENTS ($0.00) ($222.08) n/a n/a DAMAP (NYISO) ($0.09) ($7,899.29) n/a n/a DAM PS BPCG (NYISO) ($0.26) ($22,037.17) n/a n/a RT PS BPCG (NYISO) ($0.35) ($29,841.66) n/a n/a DAM TRANS BPCG (NYISO) ($0.00) ($6.24) n/a n/a RT TRANS BPCG (NYISO) ($0.02) ($1,470.62) n/a n/a Supplemental Event Credit (NYISO) ($0.00) ($271.23) n/a n/a TRANSMISSION SERVICE NTAC(NYISO) ($0.88) ($75,680) Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) ($4.49) ($385,019) TOTAL FEES ($6.09) ($522,758) Total Wheel MWh 85,789 *The Fees do not include charges for Losses and Congestion 95

96 IMPORTS NYISO NYISO PJM PJM Fee Category Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) ADMINISRATIVE FEES Schedule 1 (NYISO)/Schedule 9 (PJM) ($0.26) ($1,735,042) ANCILLARY SERVICES Voltage Support Service (RS2 PJM) n/a n/a Schedule 1A - Transmission Owner Scheduling, System Control and Dispatch Service (PJM) n/a n/a Schedule 6A - Black Start (PJM) n/a n/a GUARANTEE/ "MAKE WHOLE" PAYMENTS Operating Reserve (PJM) n/a n/a TRANSMISSION SERVICE Transmission Service Charge(NYISO)/ Schedule 7 or 8 (PJM) n/a n/a TOTAL FEES ($0.26) ($1,735,042) Total Import MWh 6,552,976 Nov2012 through April13 Rate ($/MWh) Nov 2012 through April2013 Settlement ($) 96

97 The New York Independent System Operator (NYISO) is a not-for-profit corporation responsible for operating the state s bulk electricity grid, administering New York s competitive wholesale electricity markets, conducting comprehensive long-term planning for the state s electric power system, and advancing the technological infrastructure of the electric system serving the Empire State. 97

Market Solutions to Loop Flow

Market Solutions to Loop Flow Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution

More information

Automation of ROS DAM

Automation of ROS DAM Automation of ROS DAM BPCG Mitigation Presenter MaryHelen Donnelly Operations and Reliability Products New York Independent System Operator Market Issues Working Group KCC May 15, 2012 Agenda Background

More information

New York State of the Market System - NYISO Success Project

New York State of the Market System - NYISO Success Project Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Market Operation s Report

Market Operation s Report Market Operation s Report Business Issues Committee Meeting December 14, 2011 Agenda #3 Report Items Market Performance Highlights Market Performance Highlights for November 2011 PRELIMINARY DATA (Most

More information

Accounting and Billing Manual

Accounting and Billing Manual MANUAL 14 Accounting and Billing Manual December 2014 Version: 3.3 Effective Date: 12/29/2014 Committee Acceptance: BIC 12/10/2014 This document was prepared by: NYISO Customer Settlements New York Independent

More information

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy Power Supplier Statement - Billing Date Energy(MWh) 3 Forward Energy 33 Balancing Energy Energy Settlement ($) 31 Forward Energy 34 Balancing Energy 314 ELR DAM Contract Balancing Payment $ 32 DAM Bid

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products Business Intelligence Products etariff Public Website Module This project will add the etariff Public Website module to www.nyiso.com. This is a small effort with new enhancements for the MPs. It allows

More information

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Performance Metrics. For Independent System Operators And Regional Transmission Organizations Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April

More information

Interjurisdictional Energy Trading. IESO Training

Interjurisdictional Energy Trading. IESO Training Interjurisdictional Energy Trading IESO Training Revised: January, 2014 Introduction to Interjurisdictional Energy Trading AN IESO TRAINING PUBLICATION This document has been prepared to assist in the

More information

Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT

Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT FERC Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved

More information

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

Demand Response Programs: Lessons from the Northeast

Demand Response Programs: Lessons from the Northeast Demand Response Programs: Lessons from the Northeast Charles Goldman E. O. Lawrence Berkeley National Laboratory CAGoldman@lbl.gov Mid Atlantic Demand Response Initiative Meeting Baltimore MD December

More information

TRANSMISSION SERVICES MANUAL

TRANSMISSION SERVICES MANUAL TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014

ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 Grid Operations & Planning Summary March 2014 Operations The peak demand of 54,549 MW on March 3 rd was greater than the mid-term

More information

Energy Imbalance Market

Energy Imbalance Market Energy Imbalance Market Tariff Framework September 10, 2013 CAIS[Type text] [Type text] [Type text] Table of Contents 1. Introduction... 1 2. Guiding Objectives for the Tariff Framework... 2 3. Tariff

More information

Consistency of Energy-Related Opportunity Cost Calculations

Consistency of Energy-Related Opportunity Cost Calculations Consistency of Energy-Related Opportunity Cost Calculations Bhavana Keshavamurthy Market Implementation Committee 03/14/2012 PJM 2012 www.pjm.com 1 P a g e This page is intentionally left blank. PJM 2012

More information

Workshop B. 11:15 a.m. to 12:30 p.m.

Workshop B. 11:15 a.m. to 12:30 p.m. Workshop B Advanced Energy Management Tools: Benefitting from the Competitive Electricity Marketplace Beyond the Fixed Rate & Key Issues to Understand when Comparing Electricity Quotes 11:15 a.m. to 12:30

More information

Priority Project Description Status and Milestone Deliverables

Priority Project Description Status and Milestone Deliverables 0 Billing System Corrections (Baseline) Status: Billing system problem resolution continues on a regular basis by a dedicated team of development staff. Once identified, billing issues are reviewed, solutions

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

Preliminary Project Description

Preliminary Project Description Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS Presentation by George Gross University of Illinois at Urbana-Champaign Modernizing the National Electric Power Grid NSF Workshop November 18-19,

More information

Introduction to the Integrated Marketplace

Introduction to the Integrated Marketplace The information, practices, processes and procedures outlined and contained in this publication are the intellectual property of Southwest Power Pool, Inc. and are protected by law. This publication or

More information

2010 STATE OF THE MARKET REPORT

2010 STATE OF THE MARKET REPORT 2010 STATE OF THE MARKET REPORT FOR THE ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market August 2011 TABLE OF CONTENTS Executive Summary...

More information

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad

More information

Operator Initiated Commitments in RTO and ISO Markets

Operator Initiated Commitments in RTO and ISO Markets Price Formation in Organized Wholesale Electricity Markets Docket No. AD14-14-000 Staff Analysis of Operator Initiated Commitments in RTO and ISO Markets December 2014 For further information, please contact:

More information

NYISO Demand Response Programs: Enrollment

NYISO Demand Response Programs: Enrollment NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent

More information

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market?

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Regulation and Operating Reserves 33 rd Eastern Conference Center for Research in Regulated Industry Romkaew P.

More information

Release User Group Agenda

Release User Group Agenda Release User Group Agenda September 20, 2011 10:00 a.m. 10:55 a.m. (Pacific Time) Web Conference Information URL: https://www.connectmeeting.att.com Meeting Number: 8665282256 Access Code: 4914267 Conference

More information

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement Asanga Perera Market-to-Market Lead Market Implementation Committee August 12, 2015 Purpose Overview This presentation provides

More information

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button. ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Closing the Gap Between Wholesale and Retail

Closing the Gap Between Wholesale and Retail Closing the Gap Between Wholesale and Retail Transactive Energy Workshop March 28-29 Robert B. Burke GWAC MEMBER & PRINCIPAL ANALYST ISO NEW ENGLAND INC. Disclaimer This presentation represents the thoughts

More information

State Of California's Energy Bill

State Of California's Energy Bill 2750 Monroe Boulevard Valley Forge Corporate Center Audubon, PA 19403 James M. Burlew Counsel Telephone: (610) 666-4345 Fax (610) 666-8211 Email Address: james.burlew@pjm.com December 15, 2015 The Honorable

More information

NYISO DECISION SUPPORT SYSTEM

NYISO DECISION SUPPORT SYSTEM NYISO DECISION SUPPORT SYSTEM INTRODUCTION TRAINING COURSE Presented by Jack Valentine JValentine@nyiso.com 518 356 6220 If possible, please put your phone on mute. Please do not use the hold button. Webex

More information

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. ) ) ) ) ) ) Docket No. EL14- -000 COMPLAINT AND MOTION TO CONSOLIDATE

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

Virtual Transactions in the PJM Energy Markets

Virtual Transactions in the PJM Energy Markets PJM Interconnection October 12, 2015 This page is intentionally left blank. PJM 2015 www.pjm.com i P age Table of Contents Executive Summary... 1 Background... 3 Synopsis of the Virtual Transactions...

More information

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez Monthly Report March 2014 Rick Gonzales Rana Mukerji Robert Fernandez TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Project Status Report Regulatory Filings

More information

Natural Gas Pipeline Penalty Recovery Issue Paper

Natural Gas Pipeline Penalty Recovery Issue Paper Natural Gas Pipeline Penalty Recovery Issue Paper September 16, 2014 Table of Contents I. Introduction and Background... 3 II. Scope of Initiative and Plan for Stakeholder Engagement... 4 III. The Approved

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Price Formation in Energy and ) Docket No. AD14-14-000 Ancillary Services Markets Operated ) By Regional Transmission Organizations

More information

Day- Ahead Congestion and Real-Time Commodity Markets in East York

Day- Ahead Congestion and Real-Time Commodity Markets in East York 2013 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2014 2013 State of the

More information

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009 An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for

More information

Winter Impacts of Energy Efficiency In New England

Winter Impacts of Energy Efficiency In New England Winter Impacts of Energy Efficiency In New England April 2015 Investments in electric efficiency since 2000 reduced electric demand in New England by over 2 gigawatts. 1 These savings provide significant

More information

Transactive Energy Framework for Bilateral Energy Imbalance Management

Transactive Energy Framework for Bilateral Energy Imbalance Management Transactive Energy Framework for Bilateral Energy Imbalance Management Farrokh Rahimi, Ph.D. Vice President Market Design and Consulting GridWise Architectural Council Meeting Westminster, CA December

More information

Overview of Reliability Demand Response Resource

Overview of Reliability Demand Response Resource Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration

More information

Transmission Service Reference Manual. April 29, 2015

Transmission Service Reference Manual. April 29, 2015 Transmission Service Reference Manual April 29, 2015 Revision History Revision History Date or Version Number April 29, 2015 Version 1.0 Author Shari Brown Change Description Initial creation of draft

More information

Electricity Exchanges in South Asia The Indian Energy Exchange Model

Electricity Exchanges in South Asia The Indian Energy Exchange Model Electricity Exchanges in South Asia The Indian Energy Exchange Model 18 Mar 14 Rajesh K Mediratta Director (BD) rajesh.mediratta@iexindia.com www.iexindia.com In this presentation Overview - Indian Market

More information

New York Independent System Operator (NYISO)

New York Independent System Operator (NYISO) New York Independent System Operator (NYISO) 2010 ISO/RTO Metrics Report 196 Section 5 NYISO Performance Metrics and Other Information The New York Independent System Operator ( NYISO ) is a not-for-profit

More information

Transmission Pricing. Donald Hertzmark July 2008

Transmission Pricing. Donald Hertzmark July 2008 Transmission Pricing Donald Hertzmark July 2008 Topics 1. Key Issues in Transmission Pricing 2. Experiences in Other Systems 3. Pricing Alternatives 4. Electricity Market Structure and Transmission Services

More information

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. Why not use the Web to buy and sell transmission rights at prices derived from bids

More information

Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges

Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges Real-time Security-Constrained Economic Dispatch and Commitment in the PJM : Experiences and Challenges Simon Tam Manager, Markets Coordination PJM Interconnection June 29, 2011 1 Real Time and Day Ahead

More information

2009 Product Enhancements

2009 Product Enhancements Energy Marketplace Product Enhancements Comprehensive Bid Management System Phase 4 & 5 The Comprehensive Bid Management System project will address the pressing need to stabilize and modernize NYISO's

More information

Convergence Bidding Stakeholder Conference Call

Convergence Bidding Stakeholder Conference Call Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder

More information

California Independent System Operator Corporation - A Case Study

California Independent System Operator Corporation - A Case Study UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Nora Mead Brownell, and Suedeen G. Kelly. California Independent System Operator Corporation

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

NYISO DECISION SUPPORT SYSTEM INTERMEDIATE TRAINING COURSE

NYISO DECISION SUPPORT SYSTEM INTERMEDIATE TRAINING COURSE NYISO DECISION SUPPORT SYSTEM INTERMEDIATE TRAINING COURSE Elisabeth Steele and Michele Goyette August 2004 2 Agenda Objectives Review of Introductory Topics Course Background Review of Introductory Topics

More information

Ms. Rae McQuade President & COO, North American Energy Standards Board

Ms. Rae McQuade President & COO, North American Energy Standards Board NORTH AMERICAN ENERGY STANDARDS BOARD 801 Travis, Suite 1675 Houston, Texas 77002 Phone: (713) 356-0060 Fax: (713) 356-0067 email: naesb@naesb.org Web Site Address: www.naesb.org The Honorable Kimberly

More information

The Importance of Marginal Loss Pricing in an RTO Environment

The Importance of Marginal Loss Pricing in an RTO Environment The Importance of Marginal Loss Pricing in an RTO Environment Leslie Liu, Tabors Caramanis & Associates Assef Zobian, Cambridge Energy Solutions 50 Church Street Cambridge, MA 02138 Abstract This paper

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) ) Docket No. ER12-1179-000 MOTION FOR LEAVE TO INTERVENE AND PROTEST OF THE ELECTRIC POWER SUPPLY ASSOCIATION

More information

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market Settling the Day-Ahead Market Charge Codes included in this training: 6011, 6800, 6700, 6301. EXTERNAL Customer Services Page 1 of 45 Disclaimer All information contained in this document is provided for

More information

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery The CAISO is requesting written comments to presentations and documents discussed at the October 16 th Convergence Bidding

More information

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS 2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2015 2014 State of the

More information

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations Presented at the Energy Central Webinar May 12, 2015 Copyright 2015 Newton Energy Group LLC Welcome and Introduction

More information

Market Participants User s Guide

Market Participants User s Guide GUIDE 01 Market Participants User s Guide December 2015 Version: 9.1 Effective Date: 12/16/2015 This document was prepared by: NYISO Stakeholder Services New York Independent System Operator 10 Krey Boulevard

More information

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Technical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

Overview and Comparison of Demand Response Programs in North American Electricity Markets

Overview and Comparison of Demand Response Programs in North American Electricity Markets , pp.22-29 http://dx.doi.org/10.14257/astl.205.97.04 Overview and Comparison of Demand Response Programs in North American Electricity Markets Pedro Faria 1, Zita Vale 1 1 GECAD Knowledge Engineering and

More information

Item 8.1: Third Quarter 2013KPIs Update

Item 8.1: Third Quarter 2013KPIs Update Item 8.1: Third Quarter 2013KPIs Update Paula Feuerbacher Strategic Projects Senior Advisor Human Resources and Governance Committee ERCOT Public November 18, 2013 2013 3rd Quarter Reporting Period YTD

More information

2015 Project Schedule Milestone Update

2015 Project Schedule Milestone Update 2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator

More information

Operations Performance Metrics Monthly Report

Operations Performance Metrics Monthly Report Operations Performance Metrics Monthly Report June 2013 Report Operations & Reliability Department New York Independent System Operator Prepared by NYISO Operations Analysis and Services, based on settlements

More information

Preliminary Results of Analysis of the Broader Regional Markets Initiatives

Preliminary Results of Analysis of the Broader Regional Markets Initiatives Preliminary Results of Analysis of the Broader Regional Markets Initiatives Presented to: NYISO Management Committee David B. Patton, Ph.D. Potomac Economics April 21, 2010 1 Introduction This presentation

More information

Aliso Canyon Gas-Electric Coordination. Issue Paper

Aliso Canyon Gas-Electric Coordination. Issue Paper Aliso Canyon Gas-Electric Coordination March 17, 2016 Table of Contents 1. Executive Summary... 3 2. Plan for Stakeholder Engagement... 4 3. Background... 5 3.1. Aliso Canyon Impact... 5 3.2. FERC Order

More information

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operations Revision: 33 Effective Date: December 22, 2015 Prepared by Operations Support Division Generation Department PJM 2015 i Table of Contents PJM Manual 10: Pre-Scheduling

More information

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic California ISO Straw Proposal Ancillary Services Procurement in HASP and Dispatch Logic August 5, 2009 Ancillary Services Procurement in HASP and Dispatch Logic Prepared for Discussion on a Stakeholder

More information

How To Understand The Benefits Of The French Power Market Plan

How To Understand The Benefits Of The French Power Market Plan Why Did the US (Mostly) Go With LMP? Benefits of Flow Based Allocation Benjamin F. Hobbs EPRG, University of Cambridge, UK DoGEE, Johns Hopkins University, USA Market Surveillance Committee, California

More information

Texas transformed. Achieving significant savings through a new electricity market management system

Texas transformed. Achieving significant savings through a new electricity market management system Texas transformed Achieving significant savings through a new electricity market management system KHOSROW MOSLEHI The state of Texas has long been the center of energy activities in the United States,

More information

Generator Optional. Timeline including the next steps. A practical example. Potential benefits of OFA? Key implications. How might OFA work?

Generator Optional. Timeline including the next steps. A practical example. Potential benefits of OFA? Key implications. How might OFA work? Generator Optional Firm Access Rights Australian Energy Market Commission announces terms of reference for detailed design work On the 6 March 2014, the Australian Energy Market Commission (AEMC) released

More information

Deliverability Testing

Deliverability Testing Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition

More information

Introduction to Ontario's Physical Markets

Introduction to Ontario's Physical Markets Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market

More information

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44.

PROCEDURE. Part 4.3: Real-Time Scheduling of the Physical Markets PUBLIC. Market Manual 4: Market Operations. Issue 44. PUBLIC IMP_PRO_0034 PROCEDURE Market Manual 4: Market Operations Part 4.3: Real-Time Scheduling of the Physical Markets Issue 44.0 This procedure provides guidance to Market Participants on the Real-time

More information

From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer

From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer Date: September

More information

What is hourly pricing and what does it mean for you? Customer Meetings May 2006

What is hourly pricing and what does it mean for you? Customer Meetings May 2006 What is hourly pricing and what does it mean for you? Customer Meetings May 2006 Catherine McDonough Project Manager 1 (315) 428-5641 Background In 1998, National Grid (NG) extended hourly pricing to our

More information

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013 ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices Version 10.0 April 17, 2013 ISO-NE Transmission, Markets and Services Tariff Cross Sound Cable Business Practices Version

More information

2013 Ventyx, an ABB company

2013 Ventyx, an ABB company Co-optimization of Congestion Revenue Rights in ERCOT Day-Ahead Market Chien-Ning Yu, Vladimir Brandwajn, Show Chang ABB/Ventyx Sainath M. Moorty ERCOT FERC Conference on increasing real-time and day-ahead

More information

NYISO 2004 Projects Summary

NYISO 2004 Projects Summary NYISO Projects Summary Budget, Standards & Performance subcommittee meeting October 10, 2003 Table of Contents Project Number A541 A543 A556 A559 A564 A573 A574 A577 A600 A619 A620 A625 A630 A636 A647

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000]

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000] 152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 35 [Docket No. RM15-24-000] Settlement Intervals and Shortage Pricing in Markets Operated by Regional Transmission

More information

PRICE FORMATION IN ISOs AND RTOs PRINCIPLES AND IMPROVEMENTS

PRICE FORMATION IN ISOs AND RTOs PRINCIPLES AND IMPROVEMENTS Economic Consulting PRICE FORMATION IN ISOs AND RTOs PRINCIPLES AND IMPROVEMENTS SUSAN L. POPE 1 October 2014 Executive Summary Assessment of concerns about price formation and prompt action to address

More information