1 of Access and Connection to Underground Natural Gas Storage Facility Láb 4 and Rules of Operation Thereof POZAGAS, a. s. Malé námestie Malacky Slovak Republic Organisation Identification Code (IČO): entered in Commercial Registry of District Court Bratislava I, section Sa, insert No. 1271/B

2 LIST OF CONTENTS Article 1 Preamble 2 Article 2 General Provisions 2 Article 3 Definition of Terms 2 SECTION 2 TECHNICAL CONDITIONS OF ACCESS TO STORAGE FACILITY 4 Article 4 Required Gas Pressure at the Entry Points to Storage Facility 4 Article 5 Gas Pressure Provided at the Exit Points from Storage Facility 4 Article 6 Quality Parameters of Gas 5 Article 7 Technical and Communication Criteria 6 SECTION 3 TECHNICAL CONDITIONS OF CONNECTION TO STORAGE FACILITY 6 Article 8 Required Pressure Level of Connected Equipment 7 Article 9 Method of Specifying the Point of Connection and the Measurement Point by POZAGAS 7 Article 10 Technical Requirements for Connected Gas Equipment 7 Article 11 Application for Connection to Storage Facility 8 SECTION 4 TECHNICAL CONDITIONS FOR DISCONNECTION FROM STORAGE FACILITY 10 Article 12 Reasons for Disconnection from Storage Facility from Technical, Operating or Safety Point of View 10 Article 13 Technical Procedure for Disconnection of Equipment Connected to Storage Facility 11 SECTION 5 TECHNICAL CONDITIONS FOR OPERATION OF STORAGE FACILITY 11 Article 14 Technical Conditions for Gas Measurement Basic Measurement Rules 11 Article 15 Operation and Checks of Measurement Equipment 12 Article 16 Principles of Procedure Following Failures and Damages to Measuring Equipment 13 Article 17 Principles of Storage Facility Operation and Management 13 Article 18 Description of Available Connection to Storage Facility 14 Article 19 Technical and Operational Limitations on Storage Facility 15 SECTION 6 TECHNICAL CONDITIONS OF GAS STORAGE INTERRUPTION 15 Article 20 Reasons for Interruption or Limitation of Gas Storage due from the Technical Point of View 15 Article 21 Procedural Principles of Planning and Implementation of Gas Equipment Reconstruction and Repair 17 Article 22 Procedural Principles during Accidents, Breakdowns, and Elimination of Consequences Thereof 18 SECTION 7 TECHNICAL CONDITIONS FOR MANAGEMENT OF STORAGE FACILITY 19 Article 23 Duties of Dispatching Control 19 Article 25 Technical Tools of Dispatching Control 22 Article 26 Principles of Co-operation Between POZAGAS and Connected Network Operators 22 Article 27 Principles of Storage Facility Management during Accidents and Emergency Situations 23 SECTION 8 TECHNICAL CONDITIONS OF TECHNICAL CO-OPERATION BETWEEN THE STORAGE FACILITY AND NETWORKS 24 Article 28 Technical Conditions of Interoperability of Storage Facility and Networks 24 at Points of Interconnection and Connection 24 Article 29 Description of Points of Interconnection 24 Article 30 Application for Interconnection 25 SECTION 9 TECHNICAL CONDITIONS FOR PROVISION OF OPERATING SAFETY AND RELIABILITY OF CONNECTIONS AND INTERCONNECTIONS 25 OF STORAGE FACILITY AND NETWORKS 25 Article 31 Procedure of Checking Technical Condition of Gas Equipment 25 at Points of Connection and Points of Interconnection 25 Article 32 Technical Conditions Applicable to Reconstruction of Gas Equipment 26 at Points of Connection and Points of Interconnection 26 SECTION 10 FINAL PROVISIONS 26 Article 34 Final Provisions 26 1

3 SECTION 1 GENERAL PROVISIONS Article 1 Preamble (1.1) POZAGAS, a. s., with its registered office at Malé námestie 1, Malacky, Slovak Republic, Organisation identification code: , registered in Commercial Registry of District Court Bratislava I, section Sa, insert No. 1271/B (hereinafter referred to as POZAGAS ), is the owner and operator of Underground Natural Gas Storage Facility Láb 4 (hereinafter also referred to as UNGSF Láb 4 ). (1.2) POZAGAS is required to provide reliable, safe and efficient operation of the UNGSF Láb 4 with due consideration of development of the storage facility and is required to provide transparent and non-discrimination access of gas market participants to the services provided by POZAGAS in line with the conditions set for in the Rules of Operation. (1.3) POZAGAS has elaborated this document under the title Technical Terms and Conditions of Access and Connection to Underground Natural Gas Storage Facility Láb 4 and of Operation Thereof (hereinafter referred to as the Technical Terms and Conditions ) because applicable laws impose such obligation on POZAGAS. Article 2 General Provisions (2.1) The Technical Terms and Conditions constitute conditions under which POZAGAS enables access to Underground Natural Gas Storage Facility Láb 4 and provides Gas storage services defined in the Rules of Operation. (2.2) Provisions of these Technical Terms and Conditions shall be binding upon POZAGAS and all of the Gas market participants. (2.3) Technical Terms and Conditions represents inseparable part of the Gas Storage Contract concluded in line with the Rules of Operation as well as Contract on Network Interconnection and Contract on Connection. Article 3 Definition of Terms (3.1) Capitalized terms used in these Technical Terms and Conditions, application for connection, application for interconnection, Contract on Connection, Contract on Network Interconnection, in correspondence and during communication with an applicant, a Customer and a Connected Network Operator, which were not defined in the Rules of Operation shall have the meaning assigned to them herein below: 1. Storage Facility Dispatching Centre the workplace of POZAGAS, where POZAGAS authorized personnel perform their continuous dispatching service, in which they implement a Customer s requests for injection, and/or withdrawal of gas to/from the Storage Facility and the requests for operations related thereto. This workplace is equipped with technical and communication means necessary for provision of dispatching service in accordance with these Technical Terms and 2

4 Conditions, as well as Gas Storage Contracts and Contracts on Network Interconnection. 2. Dispatching Centre of Connected Network the workplace of the Connected Network Operator, where the Connected Network Operator s authorized personnel perform their continuous dispatching service. This workplace is equipped with technical and communication means necessary for provision, in particular, for management of connected network and for exchange of the data necessary. 3. Measurement Point the point, where the measurements of specified Gas parameters (in particular the flow rate, pressure, temperature, composition, dew points) are carried out for purposes of commercial reconciliation between POZAGAS, Customers and/or the relevant Connected Network Operator, which use such measurement point. 4. Point of Connection the point, where the Connected Network Operator s equipment is physically connected to the Storage Facility equipment, and/or where such networks are interconnected. 5. MPa a multiple of basic pressure unit, i.e. 1,000,000 Pa. Such designated pressure shall mean overpressure, i.e. absolute pressure reduced by barometric pressure. 6. MPa abs. - a multiple of basic pressure unit, i.e. 1,000,000 Pa. Such designated pressure shall mean absolute pressure, i.e. overpressure increased by barometric pressure. 7. Gas Equipment equipment necessary to provide access to and operation of networks. 8. Rules of Operation shall mean the valid document Rules of Operation of POZAGAS, laying down commercial terms and conditions for access to and use of the services of the Storage Facility. 9. Contract on Network Interconnection a contract entered into by and between POZAGAS and the Connected Network Operator, with which the Storage Facility is physically interconnected. The subject-matter of the Contract on Network Interconnection shall be, in particular, ensuring operability of interconnected networks, management of Gas flow, specification of rules for measurement of Gas volume and quality, specification of rules for allocation of volumes at the relevant Entry-Exit (Handing-Over Acceptance) Point, exchange of information on the condition of interconnected networks. 10. Contract on Connection a contract entered into by and between POZAGAS and the Applicant for Connection to the Storage Facility, and the subject matter of which are mainly the terms and conditions and provision for a connection to the Storage Facility. 3

5 11. Applicant for Interconnection a natural person or a legal person requesting POZAGAS by way of a written application for interconnection pursuant to these Technical Terms and Conditions. 12. Applicant for Connection a natural person or a legal person requesting POZAGAS by way of a written application for connection pursuant to these Technical Terms and Conditions. SECTION 2 TECHNICAL CONDITIONS OF ACCESS TO STORAGE FACILITY Access to the Storage Facility the provision of Gas storage services defined in the Rules of Operation is possible only pursuant to provisions of the Rules of Operation and of these Technical Terms and Conditions. Article 4 Required Gas Pressure at the Entry Points to Storage Facility (4.1) The value of Gas pressure at the entry at the Entry-Exit (Handing-over - Acceptance) Points A and C shall be such that following its drop after transportation from the entry point to the Measurement Point its value at the Measurement Point would be equal or higher in each individual point than the following: a) at the Entry - Exit (Handing-over and Acceptance) Point A MPa b) at the Entry - Exit (Handing-over and Acceptance) Point C MPa abs. Article 5 Gas Pressure Provided at the Exit Points from Storage Facility (5.1) Gas pressure at the exit points reaches a value reduced by pressure losses during transportation of Gas from a pressure Measurement Point to the appropriate exit point, provided the pressure Measurement Point is situated before the exit point. If the pressure Measurement Point is situated after the exit point, the pressure of Gas at the exit point achieves a value increased by pressure losses during transportation of Gas from an exit point to the appropriate pressure Measurement Point. (5.2) Values of pressure, which are provided by POZAGAS at the Gas pressure Measurement Points are as follows: a) in case of withdrawal through the Entry-Exit (Handing-over and Acceptance) Point A for the following systems: A 1) Bratislava West...max. 3.9 MPa A 2) International pipeline...max. 5.2 MPa A 3) Transit system...max. 5.5 MPa b) in case of withdrawal through the Exit (Handing-over - Acceptance) Point B...max. 3.8 MPa 4

6 c) in case of withdrawal through the Entry-Exit (Handing-over - Acceptance) Point C,...max. 5.5 MPa abs. (6.1) Chemical composition of Gas Article 6 Quality Parameters of Gas methane CH4 minimum 85 mol% ethane C2H5 maximum 6 mol% propane C3H8 maximum 3 mol% butane C4H10 maximum 2 mol% heavier hydrocarbons C5 + maximum 1 mol% nitrogen N2 maximum 5 mol% carbon dioxide CO2 maximum 2 mol% oxygen O2 maximum 0.02mol% The parties hereto shall not change intentionally chemical composition of injected and withdrawn Gas. (6.2) Content of sulphuric components hydrogen sulphide H2S maximum 5.1 mg/sm 3 mercaptanes RSH maximum 15.3 mg/sm 3 total sulphur Stotal maximum mg/sm 3 (6.3) Combustion heat and Wobbe index Measured values refer to volume of Gas in Sm 3 and combustion temperature of 25 C a) Combustion heat: minimum MJ/Sm 3 maximum MJ/Sm 3 b) Wobbe index: minimum: MJ/Sm 3 maximum MJ/Sm 3 (6.4) Dew point of water in Gas intended for injection or withdrawal shall not be higher than minus eight C (-8 C), following conversion to the pressure of 4.0 MPa. If Gas Storage Contracts, which have been entered into prior to the effective date of these Technical Terms and Conditions, specify different values, the values agreed in such Gas Storage Contracts shall apply. (6.5) Dew point of hydrocarbons in Gas - no hydrocarbons may condense at the temperature of 0 C and higher and at the pressure ranging from 0.1 to 7.0 MPa. 5

7 (6.6) The temperature of the Gas to be handed-over and accepted shall be maximum plus fifty C (+ 50 C). (6.7) Gas, both injected and withdrawn, shall be ridded of solid and liquid contaminations and shall not be odorized. Article 7 Technical and Communication Criteria (7.1) A Customer as well as each Gas market participant that is connected or interconnected to the Storage Facility shall provide for the following functional means of technical and communication nature in continuous operation, intended for communication with the Storage Facility Dispatching Centre, related in particular to Nominations, Renominations, and management of a Gas physical flow: a) a device for sending out and receiving facsimile messages, with an activated fax line, to provide for written communication between the Parties (preferred system of written communication), or b) devices intended for phone connection by way of minimum two independent lines, where one shall be the main line, the other ones the reserve ones, c) access to the Internet with an active and secure box, after completing the Internet portal development. (7.2) Communication between the Storage Facility Dispatching Centre and a Customer by way of a phone connection shall be used if and when such communication is sufficient, or if connection by way of a facsimile line is not possible due to a failure. In such a case the Storage Facility Dispatching Centre and a Customer shall promptly confirm a telephone message in writing by using technical-communication means under item 7.1 (a) or (c) of these Technical Terms and Conditions. (7.3) The Parties shall inform each other forthwith on valid phone and facsimile numbers, addresses, authorized persons for communication pursuant to item 7.1 of these Technical Terms and Conditions. (7.4) POZAGAS reserves the right to change technical-communication means if technical development requires so. However, reasonable data transfer security must be ensured. SECTION 3 TECHNICAL CONDITIONS OF CONNECTION TO STORAGE FACILITY Connection to the Storage Facility is possible only provided the Applicant for Connection submits an application for connection, fulfils the Technical Terms and Conditions, and enters with POZAGAS into a Contract on Connection. A template of an application for connection is available on POZAGAS website. 6

8 Article 8 Required Pressure Level of Connected Equipment (8.1) The Applicant for Connection to the Storage Facility may request for connection of only such Gas Equipment whose pressure level is at least the same as the pressure level in equipment of the Storage Facility, to which it is going to be connected. (8.2) Equipment in the Storage Facility, to which other Gas Equipment may be connected, has the pressure levels PN 40, PN 75, and PN 100 according to the given Point of Connection, whereas PN shall designate the labeling of maximum operating pressure and number after the mark needs to be divided by 10, to get the pressure value expressed in MPa. Article 9 Method of Specifying the Point of Connection and the Measurement Point by POZAGAS (9.1) The Point of Connection of the Gas Equipment shall be specified by POZAGAS based on technical data included in an application for connection, in particular the maximum operating pressure, maximum injection flow rate, and maximum withdrawal flow rate, the purpose of the connected Gas Equipment, in a manner, which would allow POZAGAS to provide for safe operation and safe processes of Gas injection and withdrawal for all the Customers. (9.2) The Measurement Point shall be specified in the Contract on Connection in a manner, guaranteeing that the quantity of Gas and required measurement parameters of Gas are representative and unambiguous for purposes of compliance with commercial terms and conditions, and customary, to rule out any possibility of carrying out double measurements of the same quantity, or of its part only. Article 10 Technical Requirements for Connected Gas Equipment (10.1) The Gas Equipment to be connected shall be connected to the Storage Facility equipment as specified in the Contract on Connection, and in design documents elaborated by an authorized organization, and agreed upon by and between the Applicant for Connection and POZAGAS. Design documents shall be provided for by the Applicant for Connection at its own cost. (10.2) The period, over which the Applicant for Connection shall be obliged to implement the works at its own cost, shall be defined by POZAGAS in a manner, not limiting fulfillment and/or causing interruption of existing obligations of POZAGAS. The details concerning determination of the dates and the way of implementation shall be included in the Contract for Connection. (10.3) The connected Gas Equipment shall meet specifications stipulated in applicable standards and regulations for their manufacturing, installation and operation. 7

9 Article 11 Application for Connection to Storage Facility (11.1) An application for connection of the Gas Equipment to the Storage Facility shall include, in particular, the following: a) applicant s identification details (name and surname/business name, address/registered office, organization identification code, tax identification code, contact persons, phone, fax, ), b) definition of the Gas Equipment, which is to be connected to the Storage Facility based on given application, out of the following types: ba) transportation network, bb) distribution network, bc) storage facility, bd) withdrawal network, be) direct gas pipeline, c) the purpose, for which connected equipment shall be used, d) technical data of the connected Gas Equipment, in particular the following: da) required values of Gas flow rate, expressed in v Sm 3 per time unit, which shall be transported through the connected Gas Equipment to and from the Storage Facility, db) date of implementation of connection of the Gas Equipment, dc) commencement date of use of connected equipment, dd) termination date of use of connected equipment, de) termination date of connection of the Gas Equipment, df) dg) maximum operating pressure PN of connected equipment, proposal on measurement method of parameters of Gas, which will be flowing from the Gas Equipment into the Storage Facility, and/or in the opposite direction, namely the following: dg1) dg2) parameters to be measured using POZAGAS Measurement Points, or parameters to be measured on the connected Gas Equipment, stating the Measurement Points and description of technical specifications of measuring equipment. (11.2) The Applicant for Connection shall enclose to the application for connection the following documents: a) a certified copy of a trade certificate or an excerpt from commercial registry not older than thirty calendar days. Any legal person with registered office outside the territory of the Slovak Republic shall enclose a document equivalent to an excerpt from commercial registry, stating the persons authorized to act on behalf of the Applicant for Connection, as well as an excerpt from criminal registry of these officers, and/or a relevant document from the country of permanent residence of given person, b) an excerpt from criminal registry not older than 2 months, if the Applicant for Connection is a natural person, c) a licence for business operations in energy sector, d) original powers of attorney for each person, authorized by the Applicant for Connection to maintain communication with POZAGAS, stating his/her name, surname, position, 8

10 facsimile number and phone line numbers to be used for communication with given person, e) a declaration confirming binding nature of the data stated in an application for connection, which can not be changed or revoked prior to concluding the Contract on Connection, f) a proof showing that: fa) the Applicant for Connection is not being wound up, fb) the Applicant for Connection is not declared bankrupt, fc) no bankruptcy and/or composition proceedings were initiated against the property of the Applicant for Connection, fd) a proposal for bankruptcy proceedings against the property of the Applicant for Connection was not dismissed due to lack of property, fe) the Applicant for Connection has no tax arrears registered, ff) the Applicant for Connection has no unpaid obligations against POZAGAS, g) a declaration on following the Rules of Operation and of these Technical Terms and Conditions, h) a layout in cadastral map, showing in color the location of the required Point of Connection, including marked borders of the relevant land plot of public area. (11.3) The Applicant for Connection shall specify required data for each Point of Connection separately. (11.4) The application for connection shall be delivered in written form, however not in electronic format. (11.5) POZAGAS shall be entitled to require from the Applicant for Connection supplementary or additional information or documents, for the purpose of due and reliable assessment of the application for connection. (11.6) The application for connection and all the documents enclosed to it shall be in Slovak language or English language. (11.7) The obligation to submit an application for connection shall be required only for connection of gas equipment to the Storage Facility, which are to be connected after the date of effect of these Technical Terms and Conditions. (11.8) The application for connection represents a binding offer of the Applicant for Connection to enter into the Contract on Connection. (11.9) The application for connection, which shall be submitted by the Applicant for Connection to POZAGAS and all the documents submitted shall be duly and legibly completed and signed by authorized representatives of the Applicant for Connection. (11.10) The Applicant for Connection shall be obliged to deliver its application for connection, including any required annexes and documents at least one hundred and twenty business days prior to required date of commencement of works on implementation of connection of 9

11 the Gas Equipment to the Storage Facility, by mail or physical delivery to filing office of POZAGAS. (11.11) In case the Application for Connection does not include all the required requisites and if information provided in the Application for Connection is incomplete in view of due appraisal of the application, POZAGAS shall invite the applicant to complement those. The Application for Connection will not be taken into consideration by POZAGAS until the necessary data and/or missing documents are provided. If the applicant fails to complement the application within an appropriate period specified by POZAGAS, POZAGAS shall reject this application. (11.12) POZAGAS shall be entitled to reject the Application for Connection if the latter fails to meet all the requisites pursuant to these Technical Terms and Conditions. Rejected Applications for Connection shall not be assessed further by POZAGAS. SECTION 4 TECHNICAL CONDITIONS FOR DISCONNECTION FROM STORAGE FACILITY Article 12 Reasons for Disconnection from Storage Facility from Technical, Operating or Safety Point of View (12.1) POZAGAS shall be entitled to disconnect the connected Gas Equipment from the Storage Facility based on preceding announcement in particular for the following reasons: a) service life of the connected Gas Equipment or the Storage Facility equipment, specified in project design documents or an appraisal elaborated by an authorized organization, which has established the service life, has expired, b) the operator of the connected Gas Equipment has not been or is not observing these Technical Terms and Conditions and/or safety of operation of the Gas Equipment operated by them, c) technical condition or operation of the Gas Equipment connected to the Storage Facility reduces safety level of the Storage Facility operation or its technical, operating or economical development, d) the Contract on Network Interconnection was not entered into within two years from completion of the connection to the Storage Facility, pursuant to these Technical Terms and Conditions. (12.2) Operator of the connected Gas Equipment shall be entitled to disconnect its equipment from the Storage Facility only subject to prior consent from POZAGAS, under the following conditions: a) availability and safety of the Storage Facility is not endangered, b) disconnection will not have any negative impact on the rights and obligations of POZAGAS and/or its contractual partners. 10

12 Article 13 Technical Procedure for Disconnection of Equipment Connected to Storage Facility (13.1) The operator of the connected Gas Equipment shall be obliged, following a receipt of a call for disconnection from the Storage Facility delivered by POZAGAS, to provide for, at its own cost: a) consents from affected parties to disconnection of equipment from the Storage Facility, b) project design documents or technological procedures for the purpose of efficient and safe disconnection of the connected Gas Equipment from the Storage Facility, and to deliver them to POZAGAS for approval. (13.2) POZAGAS shall determine the date when the works for the purpose of disconnection of the connected Gas Equipment may be implemented, whereas such works may not limit or discontinue provision of contractually agreed services to other contractual partners. (13.3) The operator of the connected Gas Equipment shall be obliged to provide for disconnection of the connected Gas Equipment from the Storage Facility at its own cost on the date specified by POZAGAS. If the operator of the connected Gas Equipment fails to disconnect such equipment due to reasons on the part of the operator of the connected Gas Equipment by the specified date, POZAGAS shall be then entitled to provide for disconnection of the gas equipment at the cost of the operator of the connected Gas Equipment, whereas POZAGAS claims for damages shall remain unaffected. SECTION 5 TECHNICAL CONDITIONS FOR OPERATION OF STORAGE FACILITY Article 14 Technical Conditions for Gas Measurement Basic Measurement Rules (14.1) POZAGAS or the Connected Network Operator (in case measurement system of the Connected Network Operator shall be used) shall perform the following types of measurements: a) measurement of Gas volume in Sm 3 and/or energy in MJ (MWh), including measurements of Gas temperature and Gas pressure, b) measurement of Gas quality, c) measurement of the dew point of water in Gas and the dew point of hydrocarbons in Gas. To avoid any doubt with respect to measurement of Gas temperature and Gas pressure for a withdrawal through the Entry-Exit (Handing-over - Acceptance) Point C, the measurement by the Connected Network Operator at the Measurement Point in Baumgarten shall be used. (14.2) For the Entry-Exit (Handing-over and Acceptance) Point A and the Exit (Handing-over and Acceptance) Point B the measurement of Gas volume is performed on orifice metering trains pursuant to standard STN ISO and AGA NX 19. For the Entry-Exit (Handing-over and Acceptance) Point C the measurement of Gas volume shall be performed by turbine flow-meters pursuant to standards STN , OIML R6, 11

13 OIML R32 and ISO 9951, in accordance with the methodology of the company INSTROMET for given measurement equipment and AGA NX 19 and/or ZGERG 88. (14.3) Gas quality determination comprises determination of chemical composition of Gas, contents of sulphur components, combustion heat and Wobbe index. For the Entry-Exit (Handing-over and Acceptance) Points, Gas quality determination shall be performed continually using process chromatographs and/or, in case of a failure of process chromatograph, using laboratory chromatographs. (14.4) Measurements of the dew point of water in Gas for the Entry-Exit (Handing-over and Acceptance) Points are performed using continuous measurement equipment and, in case of a failure of continuous measurement equipment by discontinuous measurements. (14.5) Measurements of the dew point of hydrocarbons for the Entry-Exit (Handing-over and Acceptance) Points are performed using discontinuous measurements. Article 15 Operation and Checks of Measurement Equipment (15.1) Operation of measurement equipment shall comply with applicable laws, in particular the valid Act on Metrology. (15.2) The following rules apply for the Entry-Exit (Handing-over and Acceptance) Point A and the Exit (Handing-over and Acceptance) Point B: a) technical condition of metering trains and the appropriate orifices shall be checked in semi-annual periodicity, b) Gas quantity and volume counters shall be checked at least once in three months, c) Gas pressure and temperature transducers shall be checked at least once in three months, d) calibration of process chromatographs shall be performed in daily intervals, e) calibration of a laboratory instrument to determine sulphur components in gas shall be performed each time before an analysis of samples, f) calibration of a laboratory chromatograph shall be performed each time before an analysis of samples. In case of any doubts concerning correctness of measurements, the check of measurement systems shall be performed without undue delay. (15.3) For the Entry - Exit (Handing-over - Acceptance) Point C: a) precision of measurements by turbine gas meter shall be checked in monthly intervals, b) the low-pressure and high-pressure calibration of the turbine gas meter shall be performed in five-year intervals, c) the counters of Gas volume shall be checked in monthly intervals, d) Gas pressure and temperature transducers for injection and withdrawal shall be checked at least once in three months, 12

14 e) calibration of process chromatographs shall be performed in daily intervals, f) calibration of sulphur process chromatographs shall be performed in weekly intervals, g) calibration of a laboratory chromatograph shall be performed each time before an analysis of samples. In case of any doubts concerning correctness of measurements, the check of measurement systems shall be performed without undue delay. Article 16 Principles of Procedure Following Failures and Damages to Measuring Equipment (16.1) If any failure and/or damage to/of any of the measuring equipment is detected, an alternative measurement available to POZAGAS shall be used. (16.2) POZAGAS shall be obliged to provide, following detection of a failure and/or damage of/to the measuring equipment, without undue delay, for repair and/or replacement thereof. (16.3) POZAGAS shall invite the respective Connected Network Operator to participate in commissioning of repaired measuring equipment, and/or new measuring equipment. Article 17 Principles of Storage Facility Operation and Management (17.1) The purpose of the Storage Facility management is to provide for distribution of Gas flows taking into consideration geological and reservoir characteristics of the Storage Facility in such a way that Gas is stored in required gas volume at given time up to the sum of all required Working Gas Volumes, allocated by POZAGAS to individual Customers according to the Rules of Operation and the Gas Storage Contracts. (17.2) A Nomination from a Customer refers to required level of Injection Flow Rate, and/or Withdrawal Flow Rate, and the specification of the Entry-Exit (Handing-over and Acceptance) Point. A Customer using the Entry-Exit (Handing-over and Acceptance) Point C may request, in case it has activated the service of rebalancing Gas quality and pressure, for Gas processing also at pressure levels other than those set forth in items 4.1 and 5.2 of these Technical Terms and Conditions. (17.3) If the resulting request of all Customers for injection and/or withdrawal through the same Entry-Exit (Handing-over and Acceptance) Point causes the Gas flow rates at withdrawal to be lower than 20,000 Sm 3 /hour, or lower than 40,000 Sm 3 /hour at injection, POZAGAS shall be then entitled to propose to the affected Customers a program that would be closest to Customers Nominations and which would provide for flow rates higher than the minimum specified for given point. An affected Customer shall be obliged to give its statement to such proposed program within one (1) hour. If the affected Customer fails to give its statement within such period, POZAGAS shall understand that the affected Customer agrees with the proposed program. 13

15 (17.4) If the resulting request of all Customers for injection and withdrawal through the same Entry-Exit (Handing-over and Acceptance) Point leads to a physical change in Gas flow through this particular point, i.e. a change from injection to withdrawal or vice versa, POZAGAS shall be entitled to implement a change in flow only after two hours, when the flow-rate may be zero, based on the presumptions that a Customer announced regime change within the time specified in item 17.5 of these Technical Terms and Conditions. (17.5) If a Customer is entitled under the Gas Storage Contract to request for Gas injection or Gas withdrawal at any time throughout a given contractual year, in such a case the Customer may request POZAGAS for Gas withdrawal in the Gas injection period, or for Gas injection in the Gas withdrawal period no less than 24 hours prior to beginning of a given Gas Day. (17.6) If there is a need for a physical change in Gas flow through a given Entry-Exit (Handingover and Acceptance) Point during a given day, POZAGAS shall be entitled to implement a change in flow only after at least two hours, when the flow-rate may be zero. In such a case POZAGAS shall be entitled to propose an alternative program for all affected Customers in such way the alternative program is closest to an original program of all affected Customers for the given Gas Day. Specification of the alternative program cannot be deemed to be a breach of POZAGAS obligations from the Gas Storage Contract. An affected Customer shall be obliged to give its statement to such proposed program within one (1) hour. If the affected Customer fails to give its statement within such period, POZAGAS shall understand that the affected Customer agrees with the proposed program. (17.7) In case of an emergency caused by a Customer, which results in a change of flow rate of requirements of affected Customers, POZAGAS shall be entitled to propose an alternative program for all affected Customers in such way it is closest to an original program of all affected Customers for the given Gas Day. Specification of the alternative program cannot be deemed to be a breach of POZAGAS obligations from the Gas Storage Contract. An affected Customer shall be obliged to give its statement to such proposed program within one (1) hour. If the affected Customer fails to give its statement within such period, POZAGAS shall understand that the affected Customer agrees with the proposed program. Article 18 Description of Available Connection to Storage Facility (18.1) The following are connected, as of the date of publication of these Technical Terms and Conditions, by way of the Entry-Exit (Handing-over and Acceptance) Points pursuant to the Rules of Operation, including provision of commercial measurements: a) Connected Storage b) a distribution network on the territory of Slovak Republic c) transmission pipeline MAB on the territory of Austria 14

16 Article 19 Technical and Operational Limitations on Storage Facility (19.1) Technical limitations on the Storage Facility at the relevant Measurement Point are the following: a) for the Entry Exit (Handing-over and Acceptance) Point A the maximum operating pressure value is 5.5 MPa b) for the Exit (Handing-over and Acceptance) Point B the maximum operating pressure value is 3.8 MPa c) for the Entry-Exit (Handing over and Acceptance) Point C the minimum operating pressure value is 4.6 MPa abs. and the maximum operating pressure value is 7.2 MPa abs. (19.2) Pressure of Gas coming from connected networks at the Points of Connection shall not exceed the lower of the values of maximum operating pressure of interconnected networks equipment. (19.3) Gas quantities passing through the Entry-Exit (Handing-over and Acceptance) Points shall not be less than the following technical minimum limit: Sm3/hour at injection, or Sm3/hour at withdrawal. (19.4) Further limiting conditions, if any, shall be agreed by and between contractual partners in the Contract on Connection, the Contract on Network Interconnection, and the Gas Storage Contract. (19.5) The minimum operating pressures, maximum operating pressures and quantities of Gas for particular units of equipment shall be specified by POZAGAS based on the relevant technical possibilities determined by an authorized manufacturer of equipment, and the applicable regulations and standards effective in the Slovak Republic, and geological and operating potential of the Storage Facility. (19.6) Other operating limitations are defined in the Rules of Operation. SECTION 6 TECHNICAL CONDITIONS OF GAS STORAGE INTERRUPTION Article 20 Reasons for Interruption or Limitation of Gas Storage due from the Technical Point of View (20.1) Technical reasons for interruption or limitation of Gas storage are based on the Rules of Operation, hereinafter there are additional technical reasons, for which unscheduled interruption or limitation of storage shall be possible. (20.2) POZAGAS shall have the right of interrupting or limiting storage for an affected Customer, if these Technical Terms and Conditions, the Rules of Operation, Gas Storage Contract or Contract on Network Interconnection are not adhered to by the Customer or by an operator of connected gas equipment or the Connected Network Operator. 15

17 (20.3) If storage must be interrupted or limited, POZAGAS shall preferentially limit or interrupt provision of interruptible flow rates. If even a complete interruption of provision of interruptible flow rates is not sufficient with respect to overall potential of the Storage Facility, POZAGAS shall limit or interrupt provision of fixed flow rates to a necessary extent. (20.4) If Gas pressure at entry to the Storage Facility at the Measurement Point is lower than stated under 4.1 of these Technical Terms and Conditions or in the Gas Storage Contract and/or the Contract on Network Interconnection, POZAGAS shall have the right of limiting the Injection Flow Rate for an affected Customer to an extent leading to an increase in Gas pressure up to the level required. If the level required has not been achieved, POZAGAS shall be entitled to limit also the Injection Flow Rate of affected Customers whose Gas is injected through given point into the Storage Facility. POZAGAS shall limit storage proportionally to Nominations from those affected Customers whose quantities are being measured at a shared Measurement Point. (20.5) If Gas pressure at the exit from the Storage Facility at the Measurement Point is higher than stated under 5.2 of the Technical Terms and Conditions or in the Gas Storage Contract and/or the Contract on Network Interconnection, POZAGAS shall have the right of limiting the Withdrawal Flow Rate for an affected Customer up to an extent leading to a drop in Gas pressure up to the maximum level provided. If the maximum level provided is exceeded, POZAGAS shall be entitled to limit also the Withdrawal Flow Rate of affected Customers in a given day, whose Gas is withdrawn through given point from the Storage Facility. POZAGAS shall limit the withdrawal proportionally to Nominations from those affected Customers whose quantities are being measured at a shared Measurement Point. (20.6) If a reduction and/or interruption of operation had taken place due to technical reasons on the part of operators of connected Gas Equipment or of the Connected Network Operators at the Entry-Exit (Handing-over and Acceptance) Points, POZAGAS shall have the right of interrupting the storage or to limit the latter up to the degree necessary, proportionally to Nominations from affected Customers whose Gas is being transported by the equipment in question. (20.7) If the terms and conditions of interoperability of gas equipment at the Entry-Exit (Handingover and Acceptance) Points are not adhered to, POZAGAS shall have the right of interrupting or limiting injection or withdrawal at given point within the scope necessary, proportionally to Nominations from affected Customers whose Gas is being transported by the equipment in question. (20.8) If the quality parameters of Gas being injected are not in compliance with Article 6 of these Technical Terms and Conditions, and /or of the Contract on Storage, POZAGAS shall have the right of interrupting or limiting, to a necessary extent, storage up to the moment when Gas quality parameters are compliant with the Technical Terms and Conditions, proportionally to Nominations from affected Customers whose Gas is being transported by the equipment in question. 16

18 (20.9) If the quality parameters of Gas being withdrawn are not compliant with Article 6 of these Technical Terms and Conditions, and if these would become the reason for rejection of Gas transportation by a Customer, the operator of connected gas equipment, and/or the Connected Network Operator within their own network, POZAGAS shall interrupt or limit the withdrawal, up to an extent necessary and proportionally to Nominations from affected Customers whose Gas is being transported by the equipment in question. (20.10) Proportionate limitations related to individual Customers set forth in items through 20.8 shall apply only if a Customer fails to comply with contractual terms. (20.11) If any failure is identified on the Storage Facility Equipment, for remedy of which it would be necessary to shut-down a part or the whole Storage Facility (such a failure shall be understood, including but not limited to, Gas leakages identified at main pipelines, failures of measuring equipment, long-term interruption of electric power supply to the Storage Facility, serious failure of the Storage Facility control system (or any part thereof), POZAGAS shall interrupt or limit the storage, within the scope necessary: a) proportionally to Nominations from affected Customers, provided the failure has emerged in course of the given Gas Day, b) proportionally to current rights of affected Customers, provided the failure has emerged prior to the beginning of the given Gas Day, whereas POZAGAS shall interrupt or limit as first the storage on an interruptible basis and if it is still necessary, then also the storage on a fixed basis. (20.12) If an accident has happened at the Storage Facility, POZAGAS shall have the right of interrupting or limiting the storage, within the scope necessary over the period of liquidation of the accident and the consequences thereof: a) proportionally to Nominations from affected Customers, provided the failure has emerged in course of the given Gas Day, b) proportionally to rights of affected Customers, provided the failure has emerged prior to the beginning of the given Gas Day. Article 21 Procedural Principles of Planning and Implementation of Gas Equipment Reconstruction and Repair (21.1) During planned repairs and reconstructions of the Storage Facility equipment POZAGAS shall proceed in a fashion, where the works, which would have, as a consequence, limitation or interruption of storage, if possible, at the time of scheduled Shut-Downs. (21.2) If POZAGAS plans to perform reconstruction or repair at a Point of Connection, it shall send to the Connected Network Operator concerned an appropriate part of documents describing project design or technological procedure, based on which the reconstruction or repair is to be carried out not later than thirty calendar days prior to planned commencement of works. 17

19 (21.3) POZAGAS shall include in project collection documents or in technological procedure of reconstruction or repairs the measures aimed at elimination or reduction of risk, if requested to do so by the Connected Network Operator concerned. (21.4) POZAGAS shall allow the Connected Network Operator concerned to perform technical supervision at this Operator s own cost, at the Point of Connection during preparation and implementation of reconstruction or repairs, if the Connected Network Operator concerned assesses the works as posing risk for its equipment and if asks to have the possibility of performing technical supervision. (21.5) If the reconstruction or repair at the point of connection cannot be implemented according to the documents describing project design or technological procedure, and if it is not possible to interrupt the reconstruction or repair until these documents are modified, POZAGAS shall propose to the Connected Network Operator concerned an alternative procedure, which shall not be refused by technical supervision staff of the Connected Network Operator concerned or by its authorized representative, without any reasons. (21.6) POZAGAS shall notify the Connected Network Operators concerned of the commencement and completion of reconstruction works or repairs at the Point of Connection. (21.7) If reconstruction works, repairs or maintenance works (e.g. gas pipeline cleaning, internal pipeline inspection, etc.), which may affect the continuity of Gas injection and/or withdrawal into the Storage Facility, must be performed on the Storage Facility equipment in the period off the Shut-Downs, POZAGAS must notify the Customers concerned of such works and exert maximum efforts to minimize such influence. Article 22 Procedural Principles during Accidents, Breakdowns, and Elimination of Consequences Thereof (22.1) While identifying and eliminating any breakdowns, POZAGAS shall proceed in accordance with internal bylaws and the applicable legislation in effect in the Slovak Republic. Elimination of breakdowns shall be implemented, as a matter of priority, in a way not limiting and/or interrupting the storage. (22.2) In case the elimination of a breakdown would require limitation or interruption of storage, POZAGAS shall proceed pursuant to these Technical Terms and Conditions and the Rules of Operation. (22.3) During accidents and elimination of consequences thereof POZAGAS shall proceed in line with its emergency plans and other applicable legal regulations in effect in the Slovak Republic. If the situation requires limitation or interruption of storage, POZAGAS shall proceed pursuant to these Technical Terms and Conditions and the Rules of Operation. (22.4) If the emergency situation might endanger any of the Points of Connection, POZAGAS shall separate forthwith the Storage Facility equipment from the equipment of the Connected Network Operators concerned. 18

20 (22.5) If any handling is necessary with equipment at the Points of Connection, the Storage Facility Dispatching Centre shall invite the Dispatching Centre of Connected Network to provide the necessary assistance. (22.6) If such assistance cannot be provided and if the situation requires, POZAGAS shall be entitled to close its shutdown valves and to report this fact to the Connected Network Operator concerned. (22.7) In case any breakdown or emergency occurs on equipment of the operator of connected Gas Equipment or of the Connected Network Operator, POZAGAS shall provide the necessary assistance, in the range of its possibilities, to the operator concerned. After such an event is reported, the Storage Facility Dispatching Centre shall provide for implementation of the steps necessary, as a matter of rule for separation of a part of equipment of the operator concerned from the Storage Facility equipment, re-routing of Gas flows, adjustment of the flow rate or pressure, provided the Storage Facility equipment allows to do so. (22.8) If the operator concerned has closed its shut down valves at the Point of Connection or Interconnection without assistance of POZAGAS, such operator shall notify the Storage Facility Dispatching Centre of this fact. SECTION 7 TECHNICAL CONDITIONS FOR MANAGEMENT OF STORAGE FACILITY Article 23 Duties of Dispatching Control (23.1) The Storage Facility Dispatching Centre shall fulfill, in particular, the following duties: a) provision for continuous supervision of the Storage Facility operation, b) management of Gas flows, including proposing an alternative program of fulfillment of Customers requirements, in case of need, c) reception of Nominations and Renominations for Gas injection and withdrawal, d) check of compliance of Nominations and Renominations with provisions of Gas Storage Contracts, the Rules of Operation, Technical Terms and Conditions and Contract on Network Interconnection, e) communication with the Dispatching Centre of Connected Network and with Customers, for the purpose of safe operation of connected network and fulfillment of requirements from Customers, f) operational management of any situations, including non-standard situations within the Storage Facility, either directly or through a contractual partner, each time in cooperation with Dispatching Centres of Connected Networks (e.g. gas pipeline cleaning, internal gas pipeline inspection), g) reports on breakdowns of the Storage Facility equipment, h) alerting operational personnel at the workplaces of POZAGAS on the announced regulation levels of Gas or electric power consumption, i) duties following from internal safety regulations and guidelines of POZAGAS, 19

21 j) calling up for help and employees concerned, as stated in emergency plan of POZAGAS. Article 24 Dispatching Control of Gas Storage in Storage Facility (24.1) POZAGAS and a Customer shall directly exchange with each other necessary information, documents and instructions in connection with injection and withdrawal and the copies thereof shall be forwarded to the Connected Network Operator. (24.2) A Customer shall be obliged to send to the Storage Facility Dispatching Centre its weekly Nomination for injection and/or withdrawal of Gas for the next week, starting on Monday at 8:00, not later than by 13:00 on Friday immediately preceding the Monday concerned, when the Customer s requirements under the submitted Nominations start to be performed, specifically in a daily breakdown of both daily and hourly flow rates, if the Gas Storage Contract allows so, specifying whether it is a fixed service or an interruptible service. If the Gas Storage Contract does not allow so, POZAGAS shall allocate to a Nomination an hourly flow rate specified as the quotient of daily flow rate divided by 24 hours. (24.3) A Customer shall be entitled to nominate a variable hourly flow rate during a Gas Day if the Gas Storage Contract allows so, whereas such hourly flow rate may not exceed the maximum hourly flow rate for the given Gas Day specified as the maximum daily flow rate for the given Gas Day/24. POZAGAS shall be entitled to suggest to a Customer an alternative program if, as a result of reviewing requirements from all the Customers for a given Gas Day, an hourly flow rate for a certain hour is lower than the technical minimum specified in item 19.3 of these Technical Terms and Conditions. (24.4) A Customer shall be entitled, no later by within 12:00 p.m. of a current Gas Day, if the Gas Storage Contract allows so, to request for a change in fixed nominated hourly flow rates for the remaining part of the given Gas Day: a) at least two hours before the required change of hourly flow rate, b) if the required hourly flow rate does not exceed the maximum hourly flow rate specified in the Gas Storage Contract or specified as the quotient of the maximum daily flow rate for a given Gas Day/24. POZAGAS shall confirm such change of hourly flow rates provided that such change does not affect fulfillment of all already confirmed flow rates of the other Customers. (24.5) A Customer shall be entitled, if the Gas Storage Contract allows so, to change its Nominations based on Renominations sent to POZAGAS not less than four (4) hours prior to commencement of the given Gas Day. POZAGAS shall be entitled to reject a Nomination and/or Renomination delivered by a Customer to the Storage Facility Dispatching Centre after expiration of time periods specified for delivery of Nominations and/or Renominations. 20

THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP

THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP THE MINISTRY OF THE ECONOMY, LABOUR AND ENTREPRENEURSHIP 1174 Pursuant to Article 3, point 5 of the Gas Market Act (Official Gazette 40/2007, 152/08), the Minister of the Economy, Labour and Entrepreneurship

More information

OPERATIONAL ORDER. of eustream, a.s. as a transmission system operator

OPERATIONAL ORDER. of eustream, a.s. as a transmission system operator OPERATIONAL ORDER of eustream, a.s. as a transmission system operator laying down commercial conditions for access to the transmission network and gas transmission and for connection to the transmission

More information

SEASONAL CONTRACT ON USING AND PROVIDING BUNDLED NATURAL GAS STORAGE SERVICE

SEASONAL CONTRACT ON USING AND PROVIDING BUNDLED NATURAL GAS STORAGE SERVICE SEASONAL CONTRACT ON USING AND PROVIDING BUNDLED NATURAL GAS STORAGE SERVICE concluded by and between seat: mailing address: account keeping bank: bank account No.: invoicing address: tax No.: court of

More information

Fiscal Measurement Natural Gas

Fiscal Measurement Natural Gas White Paper FSG-WP-0012 February 2014 Fiscal Measurement Natural Gas Fiscal Measurement How much? Fiscal Measurement must not be confused with Custody Transfer; in fact, fiscal measurement is a more general

More information

on Electronic Signature and change to some other laws (Electronic Signature Act) The Parliament has hereby agreed on this Act of the Czech Republic:

on Electronic Signature and change to some other laws (Electronic Signature Act) The Parliament has hereby agreed on this Act of the Czech Republic: 227/2000 Coll. ACT of 29 th June 2000 on Electronic Signature and change to some other laws (Electronic Signature Act) Amendment: 226/2002 Coll. Amendment: 517/2002 Coll. Amendment :440/2004 Coll. Amendment:

More information

FRAMEWORK CONTRACT ON USING AND PROVIDING DAILY PEAK PLUS NATURAL GAS WITHDRAWAL SERVICE

FRAMEWORK CONTRACT ON USING AND PROVIDING DAILY PEAK PLUS NATURAL GAS WITHDRAWAL SERVICE FRAMEWORK CONTRACT ON USING AND PROVIDING DAILY PEAK PLUS NATURAL GAS WITHDRAWAL SERVICE concluded by and between seat: mailing address: account keeping bank: bank account No: invoicing address: tax No.:

More information

Act on Insurance Mediation and Reinsurance Mediation

Act on Insurance Mediation and Reinsurance Mediation Act on Insurance Mediation and Reinsurance Mediation The full wording of Act No. 340/2005 Coll. dated 23 June 2005 on insurance mediation and resinsurance mediation and on amendments to certain laws, as

More information

Act on Insurance. The National Council of the Slovak Republic has adopted the following Act: SECTION I PART ONE GENERAL PROVISIONS

Act on Insurance. The National Council of the Slovak Republic has adopted the following Act: SECTION I PART ONE GENERAL PROVISIONS Act on Insurance Full wording of Act No 8/2008 Coll. of 28 November 2007 on Insurance and on amendments and supplements to certain laws, as amended by Act No 270/2008 Coll., Act No 552/2008 Coll., Act

More information

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model as amended in 2016 (2016 Gas Market Model Amendment Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz

More information

GENERAL TRADING TERMS AND CONDITIONS

GENERAL TRADING TERMS AND CONDITIONS GENERAL TRADING TERMS AND CONDITIONS 1. General provisions 1.1. These General Trading Terms and Conditions (hereinafter referred to as GTC ) adjust the rights and obligations of SLOVARM, a.s. company (hereinafter

More information

State of Illinois Vendor Payment Program. Program Terms December 13, 2012

State of Illinois Vendor Payment Program. Program Terms December 13, 2012 State of Illinois Vendor Payment Program Program Terms December 13, 2012 Background: As a result of the current cash flow deficit, the State of Illinois (the State ) has been forced to delay payment to

More information

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S

ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S Hamdi Mramori Street, No 1 Prishtina 10000 Kosovo Tel: +381 (0) 38 247 615 ext. 103 Fax: +381 (0) 38 247 620 e-mail: info@ero-ks.org www.ero-ks.org ELECTRICITY SUPPLY/ TRADE LICENSE GRANTED TO: KORLEA

More information

Performance Bond. Business):

Performance Bond. Business): Performance Bond CONTRACTOR (Name and Address): (Name and Address of Principal Place of Business): OWNER (Name and Address): City of Cedar Rapids City Clerk, 101 First Street SE Cedar Rapids, IA 52401

More information

Act of Law 424/1991 Coll., on association in political parties and political movements

Act of Law 424/1991 Coll., on association in political parties and political movements Source: http://www.psp.cz/docs/laws/1991/en/424.html (accessed: April 2009) Act of Law 424/1991 Coll., on association in political parties and political movements Act of Law No. 424/1991 Coll., of October

More information

General Terms and Conditions Regarding Accepting Ticket solutions for Meal and/or Sports and Cultural Services

General Terms and Conditions Regarding Accepting Ticket solutions for Meal and/or Sports and Cultural Services General Terms and Conditions Regarding Accepting Ticket solutions for Meal and/or Sports and Cultural Services 1. Purpose and Scope 1.1 The General Terms and Conditions shall be applicable to a contractual

More information

FOR INFORMATION PURPOSES ONLY

FOR INFORMATION PURPOSES ONLY On December 23, 2013, the debtor Metropolitní spořitelní družstvo v likvidaci, having its registered office at Balbínova 404/22, Prague 2, Postal Code 120 00, Identification Number: 255 71 150, registered

More information

ACT ON COLLECTIVE INVESTMENT

ACT ON COLLECTIVE INVESTMENT ACT ON COLLECTIVE INVESTMENT The full wording of Act No. 594/2003 Coll. on collective investment, as amended by Act No. 635/2003 Coll., Act No. 747/2004 Coll., Act No. 213/2006 Coll., Act No. 209/2007

More information

EXCHANGE RULES, SECTION XII. Conditions for Admission of Collective Investment Securities to Trading on the Regulated Market of the Exchange

EXCHANGE RULES, SECTION XII. Conditions for Admission of Collective Investment Securities to Trading on the Regulated Market of the Exchange EXCHANGE RULES, SECTION XII. Conditions for Admission of Collective Investment Securities to Trading on the Regulated Market of the Exchange PART I. GENERAL Article 1 Subject Matter and Definitions (1)

More information

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal

More information

GENERAL TERMS ANC CONDITIONS OF BROKERAGE SERVICES PROVIDED BY BZ WBK BROKERAGE S.A. (UNIFORM TEXT)

GENERAL TERMS ANC CONDITIONS OF BROKERAGE SERVICES PROVIDED BY BZ WBK BROKERAGE S.A. (UNIFORM TEXT) Appendix to the Resolution No. 17/2011 of the Management Board of BZ WBK Brokerage S.A. dated 25 February 2011 concerning adoption of the amended General Terms and Conditions of Brokerage Services Provided

More information

POWER PURCHASE AND SALE AGREEMENT [NON-INCENTIVE]

POWER PURCHASE AND SALE AGREEMENT [NON-INCENTIVE] POWER PURCHASE AND SALE AGREEMENT [NON-INCENTIVE] This POWER PURCHASE AND SALE AGREEMENT (this Agreement ) is entered into effective as of, 20 (the Effective Date ), by and between ( Seller ), and Salt

More information

AGCS Gas Clearing and Settlement AG

AGCS Gas Clearing and Settlement AG Annex to the General Terms and Conditions of the Balance Group Coordinator (GTC BGC) Balancing energy management in the Eastern distribution area V 5.0 Annex Balancing energy management Version 5.0 Page

More information

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) *

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * The Executive Board of the Benelux Trademark Office and the Executive Board of the Benelux Designs

More information

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT Customer-Owned Electric Generating Systems of 25kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Provo City -

More information

Unofficial translation. The Electricity (Capacity) Market Rules

Unofficial translation. The Electricity (Capacity) Market Rules Chapter I General Provisions Article 1. Scope of Activity Unofficial translation The Electricity (Capacity) Market Rules These Rules regulate: a) Functioning of Electricity and Guaranteed Capacity Market

More information

THE STOCK EXCHANGE ACT

THE STOCK EXCHANGE ACT THE STOCK EXCHANGE ACT Complete wording of the Act on the Stock Exchange of 18 June 2002 No 429/2002 Coll. as results from amendments made by Act No 594/2003 Coll., Act No 635/2004 Coll., Act No 43/2004

More information

TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING

TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING 1. TERMS AND DEFINITIONS 1.1. Authorisation is a query to check Card validity and availability of corresponding funds on the Card s account. 1.2. Card means

More information

Home Savings Act. The Slovak National Council has approved the following Act: P A R T O N E. Basic Provisions. Article 1

Home Savings Act. The Slovak National Council has approved the following Act: P A R T O N E. Basic Provisions. Article 1 Home Savings Act The full wording of Act of the National Council of the Slovak Republic No. 310/1992 Coll. of 6 May 1991, Home Savings Act, as amended by Act of the National Council of the Slovak Republic

More information

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL 29.3.2014 Official Journal of the European Union L 96/149 DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating

More information

Natural gas storage contract. General Terms & Conditions

Natural gas storage contract. General Terms & Conditions Natural gas storage contract General Terms & Conditions Version of 1st April 2015 CONTENTS CHAPTER 1: PRELIMINARY PROVISIONS... 3 ARTICLE 1. Definitions... 3 ARTICLE 2. Scope and Applicability of General

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA DC Electric Supplier--P.S.C. of D.C. No. 1 ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA Date of Issue: May 2, 2014 Date Effective: June 1, 2014 DC Electric Supplier--P.S.C. of D.C.

More information

Contract for Capital Purchase N [reference of the COMPANY]

Contract for Capital Purchase N [reference of the COMPANY] Contract for Capital Purchase N [reference of the COMPANY] Between [ ].... represented by the duly authorized persons designated on the signature page of the present CONTRACT, hereinafter referred to in

More information

Terms & Conditions. Terms & Conditions. For Business Electricity Customers

Terms & Conditions. Terms & Conditions. For Business Electricity Customers Terms & Conditions Page No. 1. OUR OBLIGATION TO EACH OTHER 3 2. START OF SUPPLY & DURATION 3 3. ACCESS TO PREMISES AND METERS 3-4 4. PRICES & PRICE CHANGES 4-5 5. BILLING & PAYMENT 5-6 6. SECURITY FOR

More information

DRAFT VEHICLE MAINTENANCE AGREEMENT BETWEEN THE COUNTY OF SANTA CLARA AND OUTREACH

DRAFT VEHICLE MAINTENANCE AGREEMENT BETWEEN THE COUNTY OF SANTA CLARA AND OUTREACH DRAFT VEHICLE MAINTENANCE AGREEMENT BETWEEN THE COUNTY OF SANTA CLARA AND This agreement is made by and between the County of Santa Clara, a political subdivision of the state of California, hereinafter

More information

424/1991 Official Gazette. THE LAW on association within political parties and political movements of October 2 nd 1991

424/1991 Official Gazette. THE LAW on association within political parties and political movements of October 2 nd 1991 Copyrighted translation. Please cite: www.partylaw.leidenuniv.nl Source: http://www.nssoud.cz/zakony/424_1991.pdf (Accessed: August 2012) ASPI System status on 22.01.2012 up to chapter 8/2012 of the Official

More information

ALTERNATIVE TRADING SYSTEM RULES

ALTERNATIVE TRADING SYSTEM RULES ALTERNATIVE TRADING SYSTEM RULES (text according to legal condition at 20 June 2012) 1 NOTE: Only the Polish version of this document is legally binding. This translation is provided for information only.

More information

Open Invitation to Tender

Open Invitation to Tender NAFTA a. s., Votrubova 1, 820 09 Bratislava Open Invitation to Tender (Bidding Terms and Conditions) This invitation to tender is being published under Section 281 et seq. of Act No 513/1991, the Commercial

More information

THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers

THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers The delivery of electricity shall be in accordance with the provisions of law, regulation and these Terms

More information

CONTENT OF THE AUDIT LAW

CONTENT OF THE AUDIT LAW CONTENT OF THE AUDIT LAW I. GENERAL PROVISIONS Article 1 This Law shall regulate the conditions for conducting an audit of legal entities which perform activities, seated in the Republic of Macedonia.

More information

GENERAL TERMS AND CONDITIONS FOR ADVERTISING AND SPONSORSHIP AGREEMENTS ON TV AND ONLINE

GENERAL TERMS AND CONDITIONS FOR ADVERTISING AND SPONSORSHIP AGREEMENTS ON TV AND ONLINE GENERAL TERMS AND CONDITIONS FOR ADVERTISING AND SPONSORSHIP AGREEMENTS ON TV AND ONLINE 1. INTRODUCTORY PROVISIONS 1.1 These general terms and conditions govern agreements entered into between the Advertiser

More information

GENERAL TERMS AND CONDITIONS FOR SUBSCRIBERS AND USERS OF MOBILE TELECOMMUNICATION NETWORK OF VIP MOBILE DOO

GENERAL TERMS AND CONDITIONS FOR SUBSCRIBERS AND USERS OF MOBILE TELECOMMUNICATION NETWORK OF VIP MOBILE DOO GENERAL TERMS AND CONDITIONS FOR SUBSCRIBERS AND USERS OF MOBILE TELECOMMUNICATION NETWORK OF VIP MOBILE DOO (hereinafter referred to as: General Terms and Conditions) Article 1 Application 1.1. These

More information

SWEDBANK AS TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING Valid from 01.12.2014

SWEDBANK AS TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING Valid from 01.12.2014 SWEDBANK AS TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING Valid from 01.12.2014 1. TERMS AND DEFINITIONS 1.1 Account is a current account of the Merchant specified in the Agreement. 1.2 Agreement is

More information

STANDARD VIRTUAL REVERSE FLOW TRANSMISSION AGREEMENT

STANDARD VIRTUAL REVERSE FLOW TRANSMISSION AGREEMENT STANDARD VIRTUAL REVERSE FLOW TRANSMISSION AGREEMENT 1/21 CONTENTS Article 1. Scope... 3 Article 2. Agreement s Duration... 3 Article 3. Obligations of the Contracting Parties... 4 Article 4. Tariffs and

More information

Information on the New Royalty Framework

Information on the New Royalty Framework Alberta Department Energy Information on the New Royalty Framework For the October 30/31, 2008 Training Sessions Gas Royalty Calculation Unit 10/17/2008 1 TABLE OF CONTENTS Section 1 - Summary... 5 Section

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA DC Electric Supplier--P.S.C. of D.C. No. 1 ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA Date of Issue: December 30, 2015 Date Effective: December 25, 2015 DC Electric Supplier--P.S.C.

More information

GENERAL TERMS & CONDITIONS

GENERAL TERMS & CONDITIONS GENERAL COMMERCIAL TERMS & CONDITIONS in case of deliveries in the non-eu 1 GENERAL TERMS & CONDITIONS The Order Confirmation and the General Terms & Conditions (GCT&C) regulate the relationship of the

More information

Bylaw last revised: Nov. 26, 2012 Sheet 1-5613 Effective January 1, 2013 B/L 5786

Bylaw last revised: Nov. 26, 2012 Sheet 1-5613 Effective January 1, 2013 B/L 5786 1 Bylaw last revised: Nov. 26, 2012 Sheet 1-5613 Effective January 1, 2013 B/L 5786 A CONSOLIDATION OF A BYLAW OF THE CITY OF LETHBRIDGE TO PROVIDE FOR THE REGULATION OF THE ELECTRIC SYSTEM WITHIN THE

More information

Town of Front Royal Finance Department 102 E. Main St Front Royal VA 22630 Phone: 540.635.7799 Fax: 540.635.2298

Town of Front Royal Finance Department 102 E. Main St Front Royal VA 22630 Phone: 540.635.7799 Fax: 540.635.2298 Town of Front Royal Finance Department 102 E. Main St Front Royal VA 22630 Phone: 540.635.7799 Fax: 540.635.2298 Enclosed is an application for utility service connection or disconnection. Please complete

More information

(insert name and address)

(insert name and address) Lease Agreement for Plant and Machinery LESSOR; LESSEE; DATE: (insert name and address) (insert name and address) 1. LEASE: The lessor hereby agrees to lease to Lessee and the Lessee hereby agrees to take

More information

Decree No. 18/2009 (VIII. 6.) MNB of the Governor of the National Bank of Hungary. on Payment Services Activities CHAPTER I GENERAL PROVISIONS.

Decree No. 18/2009 (VIII. 6.) MNB of the Governor of the National Bank of Hungary. on Payment Services Activities CHAPTER I GENERAL PROVISIONS. Decree No. 18/2009 (VIII. 6.) MNB of the Governor of the National Bank of Hungary on Payment Services Activities Pursuant to the authorization conferred under Paragraph a) of Subsection (2) of Section

More information

SCHEDULE OF RULES AND REGULATIONS

SCHEDULE OF RULES AND REGULATIONS Lewisburg Electric System (LES) SCHEDULE OF RULES AND REGULATIONS 1. Application for Service: Each prospective Customer desiring electric service will be required to sign Lewisburg Electric System s standard

More information

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006 THE GAS SAFETY CERTIFICATION FOR GAS APPLIANCES AND COMPONENTS PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006 MKP220.01 Issue Date: 2007-Oct-09 SAI Global Limited Copyright 2007 - ABN 67

More information

General Terms & Conditions. for Access to the Gas Storage Facility. Trianel Gasspeicher Epe GmbH & Co.

General Terms & Conditions. for Access to the Gas Storage Facility. Trianel Gasspeicher Epe GmbH & Co. This is an English courtesy translation of the original documentation prepared in German language. Please consider that only the original version in German language is legally binding and prevails. General

More information

ALL AMERICAN TRUCKING CO. LLC Carrier Sign on Checklist

ALL AMERICAN TRUCKING CO. LLC Carrier Sign on Checklist ALL AMERICAN TRUCKING CO. LLC Carrier Sign on Checklist Carrier Name: Signed Transportation Agreement between ALL AMERICAN TRUCKING CO. LLC and Carrier Copy of Carrier s PUCO Operating Authority Signed

More information

Regulations Closed Cash Withdrawals

Regulations Closed Cash Withdrawals Regulations Closed Cash Withdrawals Warsaw, November 2013 mbank.pl Table of Contents 1. General Provisions...3 2. Withdrawals Made at the Bank s Cash Desks...4 3. Withdrawals Made through a Transport Company...4

More information

Swedbank, AB payment services provision conditions

Swedbank, AB payment services provision conditions Swedbank, AB payment services provision conditions 1. TERMS 1.1. Terms used in these Swedbank, AB Payment Services Provision Regulations have the following meanings: 1.1.1. Personal Data means any information

More information

THESE FORMS ARE NOT A SUBSTITUTE FOR LEGAL ADVICE.

THESE FORMS ARE NOT A SUBSTITUTE FOR LEGAL ADVICE. DISCLAIMER The forms provided on our site were drafted by lawyers with knowledge of equine and contractual matters. However, the forms are not State specific. THESE FORMS ARE NOT A SUBSTITUTE FOR LEGAL

More information

Standard conditions of the Electricity Distribution Licence

Standard conditions of the Electricity Distribution Licence Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Statutory Consultation: 29 April 2008 SECTION A: STANDARD CONDITIONS FOR ALL ELECTRICITY

More information

CALL FOR SUBMISSION OF PROJECTS IN OP RDI Strengthening Research Capacities of R&D Centres

CALL FOR SUBMISSION OF PROJECTS IN OP RDI Strengthening Research Capacities of R&D Centres Ministry of Education, Youth and Sports Managing Authority OP RDI CALL FOR SUBMISSION OF PROJECTS IN OP RDI Strengthening Research Capacities of R&D Centres Call Identification Priority Axis Call Number

More information

1 TABLE OF CONTENTS... 1 2 DEFINITIONS AND UNITS... 4. 2.1 Definitions... 4. 2.2 Units applied... 7 3 GENERAL PROVISIONS... 8. 3.1 Introduction...

1 TABLE OF CONTENTS... 1 2 DEFINITIONS AND UNITS... 4. 2.1 Definitions... 4. 2.2 Units applied... 7 3 GENERAL PROVISIONS... 8. 3.1 Introduction... 1 TABLE OF CONTENTS 1 TABLE OF CONTENTS... 1 2 DEFINITIONS AND UNITS... 4 2.1 Definitions... 4 2.2 Units applied... 7 3 GENERAL PROVISIONS... 8 3.1 Introduction... 8 3.2 Rights and obligations of the Operator...

More information

AGREEMENT CONCERNING THE ESTABLISHMENT OF THE INTERNATIONAL VISEGRAD FUND

AGREEMENT CONCERNING THE ESTABLISHMENT OF THE INTERNATIONAL VISEGRAD FUND AGREEMENT CONCERNING THE ESTABLISHMENT OF THE INTERNATIONAL VISEGRAD FUND The Government of the Czech Republic, the Government of the Republic of Hungary, the Government of the Republic of Poland and the

More information

Towarowa Giełda Energii S.A. Statute unified text

Towarowa Giełda Energii S.A. Statute unified text Towarowa Giełda Energii S.A. Statute unified text 1 1. The Company s name shall be Towarowa Giełda Energii Spółka Akcyjna. The Company may use an abbreviated name Towarowa Giełda Energii S.A. 1 and counterparts

More information

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

THE CORPORATION OF THE CITY OF BURLINGTON D1 - AGREEMENT

THE CORPORATION OF THE CITY OF BURLINGTON D1 - AGREEMENT Agreement 2006 Page 1 THE CORPORATION OF THE CITY OF BURLINGTON D1 - AGREEMENT THIS AGREEMENT made in triplicate this day of 20 THE CORPORATION OF THE CITY OF BURLINGTON (hereinafter called "the City")

More information

AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder

AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AGREEMENT made as of the day of in the year of (In words, indicate day, month and year) BETWEEN the Owner: (Name,

More information

Article 2 Definition of Basic Terms

Article 2 Definition of Basic Terms GENERAL BUSINESS TERMS AND CONDITIONS FOR PERFORMACE OF BANKING DEALS PART ONE GENERAL PROVISIONS Article 1 Initial Provisions 1. The present General Business Terms and Conditions for Performance of Banking

More information

Services Agreement Instruction Sheet

Services Agreement Instruction Sheet Delta-T Group POB 884 Bryn Mawr, PA 19010 Phone: 800-251-8501 FAX: 610-527-9547 www.delta-tgroup.com Services Agreement Instruction Sheet We thank you for your interest in Delta-T Group. Below please find

More information

GAS SUPPLY CODE. Energy Market Authority Of Singapore

GAS SUPPLY CODE. Energy Market Authority Of Singapore GAS SUPPLY CODE Energy Market Authority Of Singapore February 2008 TABLE OF CONTENTS 1 INTRODUCTION...1 1.1 THE PURPOSE OF THIS CODE...1 1.2 TO WHOM THIS CODE APPLIES...1 1.3 DEFINITIONS...1 1.4 INTERPRETATION...2

More information

TENANTS IN COMMON AGREEMENT

TENANTS IN COMMON AGREEMENT TENANTS IN COMMON AGREEMENT This Tenants in Common Agreement is entered into this day of, 20 by and between ( herein) and herein); collectively referred to as Owners and individually as Owner or or and,

More information

Terms and Conditions for the Delivery and Maintenance of Software Products

Terms and Conditions for the Delivery and Maintenance of Software Products 1 Terms and Conditions for the Delivery and Maintenance of Software Products I. Delivery of Software Products 1 Scope of Contract 1.1 The software products (hereinafter referred to as the programs ) shall

More information

DOCUMENTATION FOR QUALIFICATION SYSTEM

DOCUMENTATION FOR QUALIFICATION SYSTEM DOCUMENTATION FOR QUALIFICATION SYSTEM MATERIAL GROUP: PRESSURE EQUIPMENT MAINTENANCE, REPAIR INTERNAL CODE OF MATERIAL GROUP: MM10300 New code according the registration on myhome: MMGV03 CPV CODE: 45259000-7,

More information

Advertising Services on the rozklad-pkp.pl Website provided by PKP S.A. in Warsaw Terms of Service I. Definitions

Advertising Services on the rozklad-pkp.pl Website provided by PKP S.A. in Warsaw Terms of Service I. Definitions Advertising Services on the rozklad-pkp.pl Website provided by PKP S.A. in Warsaw Terms of Service I. Definitions The terms listed below shall mean as follows: 1. Price List the price list of advertising

More information

SALES REPRESENTATIVE AGREEMENT

SALES REPRESENTATIVE AGREEMENT SALES REPRESENTATIVE AGREEMENT THIS AGREEMENT is made on this day of, 200, by and between Blinc Inc., a Delaware corporation, with its primary mailing address at 1141 South Rogers Circle, Suite 9, Boca

More information

ACT ON PAYMENT SERVICES

ACT ON PAYMENT SERVICES 492 ACT ON PAYMENT SERVICES The full text of Act No 492/2009 Coll. on payment services and on amendments to certain laws, as amended by Act No 130/2011 Coll., Act No 394/2011 Coll., Act No 520/2011 Coll.,

More information

WHEREAS, Replacement Customer has requested that Operator provide certain natural gas services for Replacement Customer; and

WHEREAS, Replacement Customer has requested that Operator provide certain natural gas services for Replacement Customer; and FORM OF SERVICE AGREEMENT FOR CAPACITY RELEASE UMBRELLA AGREEMENT UNDER RATE SCHEDULE FSS and FWS Service Agreement No. This UMBRELLA SERVICE AGREEMENT, made and entered into this day of by and between

More information

StormSource Software, Inc. Online Software Systems Commissioned Affiliate Agreement

StormSource Software, Inc. Online Software Systems Commissioned Affiliate Agreement These Terms and Conditions explain the contractual Agreement (the Agreement ) between, the Affiliate Applicant (hereinafter referred to as Affiliate ), and StormSource Software, Inc. ( StormSource ). This

More information

Consolidated implied terms in park home pitch agreements

Consolidated implied terms in park home pitch agreements Park homes factsheet Consolidated implied terms in park home pitch agreements Implied terms are contractual terms which are implied by statute into the pitch agreement between a resident and a park owner

More information

STOCK OPTIONS REGULATION

STOCK OPTIONS REGULATION STOCK OPTIONS REGULATION 1. Definitions For the purposes of this Regulation, unless the context otherwise requires, the capitalized terms shall have the respective following meanings. All terms defined

More information

THE AUTHORITY S BOARD OF DIRECTORS DECISION NO. (25/R) OF 2008 CONCERNING MARGIN TRADING

THE AUTHORITY S BOARD OF DIRECTORS DECISION NO. (25/R) OF 2008 CONCERNING MARGIN TRADING THE AUTHORITY S BOARD OF DIRECTORS DECISION NO. (25/R) OF 2008 CONCERNING MARGIN TRADING The President of the Board of Directors of the Emirates Securities and Commodities Authority, Having considered

More information

BUSINESS TERMS AND CONDITIONS FOR PROVISION OF ELECTRONIC BANKING SERVICES FOR INDIVIDUALS

BUSINESS TERMS AND CONDITIONS FOR PROVISION OF ELECTRONIC BANKING SERVICES FOR INDIVIDUALS BUSINESS TERMS AND CONDITIONS FOR PROVISION OF ELECTRONIC BANKING SERVICES FOR INDIVIDUALS UniCredit Bank Czech Republic and Slovakia, a.s., Želetavská 1525/1, 140 92 Prague 4 Michle, Company Registration

More information

BUSINESS TERMS AND CONDITIONS FOR THE PROVISION OF LOANS SECURED BY REAL ESTATE TO NATURAL PERSONS NON-ENTREPRENEURS. Article 1 Basic Provisions

BUSINESS TERMS AND CONDITIONS FOR THE PROVISION OF LOANS SECURED BY REAL ESTATE TO NATURAL PERSONS NON-ENTREPRENEURS. Article 1 Basic Provisions BUSINESS TERMS AND CONDITIONS FOR THE PROVISION OF LOANS SECURED BY REAL ESTATE TO NATURAL PERSONS NON-ENTREPRENEURS Article 1 Basic Provisions 1. These Business Terms and Conditions for the Provision

More information

NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES

NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES TABLE OF CONTENTS DEFINITIONS... D-1 SECTION 1. GENERAL PROVISIONS 1.01. Purpose... 1-1 1.02. Other Provisions... 1-1 SECTION 2. NET METERING REQUIREMENTS

More information

FERC Gas Tariff. Original Volume No. 1 RYCKMAN CREEK RESOURCES, LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION

FERC Gas Tariff. Original Volume No. 1 RYCKMAN CREEK RESOURCES, LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION FERC Gas Tariff Original Volume No. 1 Of RYCKMAN CREEK RESOURCES, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications covering this tariff should be addressed to: Jeff Foutch, Managing

More information

ACT. of 15 March 2002

ACT. of 15 March 2002 215 ACT of 15 March 2002 on electronic signature and on the amendment and supplementing of certain acts as amended by Act No. 679/2004 Coll., Act No. 25/2006 Coll., Act No. 275/2006 Coll., Act No. 214/2008

More information

CHAPTER 1. 1. Verification of non-existence of the grounds for exclusion. Article 1

CHAPTER 1. 1. Verification of non-existence of the grounds for exclusion. Article 1 Government Decree 310/2011 (23 December) on the way of certification of suitability and verification of the non-existence of the grounds for exclusion as well as the definition of public procurement technical

More information

THE RULES ON THE SECURITIES SETTLEMENT SYSTEM OF THE CENTRAL SECURITIES DEPOSITORY OF LITHUANIA I. GENERAL PROVISIONS

THE RULES ON THE SECURITIES SETTLEMENT SYSTEM OF THE CENTRAL SECURITIES DEPOSITORY OF LITHUANIA I. GENERAL PROVISIONS APPROVED BY the CSDL Board meeting on October 19, 2007 Minutes No. 4 THE RULES ON THE SECURITIES SETTLEMENT SYSTEM OF THE CENTRAL SECURITIES DEPOSITORY OF LITHUANIA I. GENERAL PROVISIONS 1. The Rules on

More information

STUDENT LOAN INFORMATION

STUDENT LOAN INFORMATION STUDENT LOAN INFORMATION 1. Data of the creditor Creditor Address Activity licence Telephone number E-mail Fax number Web address Membership in associations Supervisory authority Swedbank AS, registered

More information

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) This Agreement for Net Metering and Interconnection Services ( Agreement ) is made and entered into this day of

More information

BUSINESS TERMS AND CONDITIONS FOR USE OF MONKEYDATA SERVICE

BUSINESS TERMS AND CONDITIONS FOR USE OF MONKEYDATA SERVICE BUSINESS TERMS AND CONDITIONS FOR USE OF MONKEYDATA SERVICE 1. CONTRACTING PARTIES 1.1. Provider: (hereinafter "BTC ) MonkeyData s.r.o. Business ID: 02731452, Tax Identification Number: CZ2731452 Registered

More information

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 TERMS & CONDITIONS NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 Purchase of Electric Generation Service Constellation NewEnergy, Inc. ("Constellation") agrees to sell, and you agree to buy,

More information

Ministry of Labour and Social Policy LAW ON VOLUNTARY FULLY FUNDED PENSION INSURANCE (189347.11)

Ministry of Labour and Social Policy LAW ON VOLUNTARY FULLY FUNDED PENSION INSURANCE (189347.11) Ministry of Labour and Social Policy LAW ON VOLUNTARY FULLY FUNDED PENSION INSURANCE 1 Table of Contents CHAPTER 1 GENERAL PROVISIONS... 3 CHAPTER 2 VOLUNTARY PENSION FUNDS... 7 CHAPTER 3 PENSION COMPANIES

More information

LAW OF THE REPUBLIC OF TAJIKISTAN ON LIMITED LIABILITY COMPANIES

LAW OF THE REPUBLIC OF TAJIKISTAN ON LIMITED LIABILITY COMPANIES LAW OF THE REPUBLIC OF TAJIKISTAN ON LIMITED LIABILITY COMPANIES CHAPTER 1. GENERAL PROVISIONS CHAPTER 2. FOUNDATION OF LIMITED LIABLITY COMPANY CHAPTER 3.AUTHORIZED CAPITAL OF A COMPANY CHAPTER 4. PROPERTY

More information

RULES. The Central Securities Depository of Poland (KDPW) CHAPTER I GENERAL PROVISIONS

RULES. The Central Securities Depository of Poland (KDPW) CHAPTER I GENERAL PROVISIONS rules_ of The Central Securities Depository of Poland (KDPW) Valid as of 3 February, 2014 RULES Of The Central Securities Depository of Poland (KDPW) CHAPTER I GENERAL PROVISIONS 1 1. The Rules of the

More information

STORAGE SERVICE AGREEMENT. This agreement is made as of the day of, 20

STORAGE SERVICE AGREEMENT. This agreement is made as of the day of, 20 STORAGE SERVICE AGREEMENT This agreement is made as of the day of, 20 BETWEEN: Sarnia Airport Storage Pool Limited Partnership, by its general partner Sarnia Airport Storage Pool Management Inc., a limited

More information

ENFONIC LTD TERMS AND CONDITIONS OF HIRE

ENFONIC LTD TERMS AND CONDITIONS OF HIRE ENFONIC LTD TERMS AND CONDITIONS OF HIRE Herein The Customer is the person named in the Schedule as Customer. The Owner is Enfonic Ltd (Registration No. 360524) whose Registered address is at: 38 Main

More information

The National Council of the Slovak Republic has adopted the following Act: Article I. 1 Scope of the act

The National Council of the Slovak Republic has adopted the following Act: Article I. 1 Scope of the act Slovak Investment and Trade Development Agency Address: Trnavská cesta 100, 821 01 Bratislava, Slovak Republic Tel.: +421 2 58 260 100, Fax: +421 2 58 260 109, E-mail: invest@sario.sk, www.sario.sk Act

More information

Payment Service Rules of AB DNB Bankas

Payment Service Rules of AB DNB Bankas Payment Service Rules of AB DNB Bankas The present Payment Service Rules were approved on 11 th February 2010 by Order No. 3 of the President of the Bank. The Payment Service Rules came into effect on

More information

STOCK OPTIONS REGULATION

STOCK OPTIONS REGULATION STOCK OPTIONS REGULATION 1. Definitions For the purposes of this Regulation, unless the context otherwise requires, the capitalized terms shall have the respective following meanings. All terms defined

More information

MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED

MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED MEASUREMENT OF THE LNG DELIVERED AND THE GAS REDELIVERED 1) INTRODUCTION... 2 2) MEASUREMENT OF THE LNG DELIVERED... 2 2.1) DETERMINING THE AMOUNT OF LNG DELIVERED... 2 2.2) MEASUREMENT SYSTEM FOR THE