2 Overview Ensuring Commitment for a long-term digital census mapping program Conducting a comprehensive needs assessment Tailor-made methodology of integration A Permanent unit for Cartography/GIS within the NSO Partnership and cooperation Capacity Building for sustaining the census mapping program
3 Ensuring Commitment for a long-term digital census mapping program Defined long-term funding plan including cost recovery and data pricing strategies Inclusion of accurate estimates for maintenance and associated costs Frequent milestones and delivery of output products to encourage adherence to pre-set time frames Use of clear protocols, for example with GPS for the collection and processing of data Adherence to geographic standards
4 Conducting a comprehensive needs assessment Completion of a user needs assessment and a priori definition of output products, with a clear implementation schedule What are the costs for Upgrades of hardware or/and existing software? Is a LAN configuration needed? What are the staff training needs/ Is the existing workforce adequate? What is the ease and difficulty as far as installation of hardware/software as well as maintenance? What infrastructure documentation, manuals, Help-line, and vendor support (patches etc.)?
5 Conducting a comprehensive needs assessment (cont.) Initial cost Upgrades LAN configuration Training needs/workforce Ease of installation Maintenance Documentation and manuals Help-line and vendor support Means of making patches for support
6 Conducting a comprehensive needs assessment (cont.) Conduct an inventory of the census data requirements and sources of relational information. Widespread availability of digital data on the Internet, many GIS projects do not ensure efficient data collection, input, and integration. Check for data that are already in digital format. Examine the requirements for census data conversion (scan paper maps. input data from statistical yearbooks etc.)
7 Tailor-made methodology of integration Use of data integration methodologies; Well-established quality control /quality assurance procedures Constructing a logical spatial analysis flow chart that details the project steps will make the success of the census more likely What types of collection (enumeration process), processing (pre & post enumeration) and analyses (data dissemination) is needed and what will be performed? Tailor-made methodology of the spatial analysis methodology The spatial analysis flow diagram should include: An outline of the procedures required for the collection of data and integration of possible existing data A logical sequence of census mapping procedures to be performed A list of all the existing data & needed data required for each step
8 A Permanent unit for Cartography/GIS within the NSO The decision to invest in geospatial technology is needbased and problem-driven Cannot be technology-driven or as an independent add-on Technology is treated as an integral part of the overall management strategy Detailed strategic, operational and managerial planning based on a realistic assessment of costs and effort involved, with clear goals and objectives defined for geospatial operations
9 Partnership and cooperation; Solid development of cooperative agreements with other interested parties Fostering of spatial data infrastructure arrangements to expand partnerships and cooperation Facilitation of data sharing through detailed documentation and metadata across user networks
10 Capacity Building for sustaining the census mapping program A champion or key person(s) to promote geospatial development within the organization, and high-level management support In terms of human resources, ability to provide training and support for relevant employees and management Staffing needs met, including the ability to retain skilled staff and hire contractors where appropriate Well-defined written contracts with vendors, consultants, partners and clients within and outside the government
11 Thank You
C I T Y O F W E S T L I N N
C I T Y O F W E S T L I N N JOB DESCRIPTION Job Title: NETWORK AND COMPUTER SYSTEMS ADMINISTRATOR GENERAL FUNCTION: Position has direct responsibility for the administration of the City s entire network
More informationGIS Support RFP Questions and Answers
GIS Support RFP Questions and Answers 4.6 Vendor Support/Training reference to standard support offerings, which is more appropriate for a software vendor than for a services provider ANSWER: This is a
More informationSENIOR SYSTEMS ANALYST
CITY OF MONTEBELLO 109 DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and
More informationOCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Geographic Information Systems CLASS FAMILY DESCRIPTION:
OCCUPATIONAL GROUP: Information Technology CLASS FAMILY: Geographic Information Systems CLASS FAMILY DESCRIPTION: This family of positions is a blend which includes those at a Computer Technology level
More informationAPPENDIX 8 TO SCHEDULE 3.3
EHIBIT Q to Amendment No. 60 - APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT EHIBIT Q to Amendment No.
More informationDisaster Recovery Plan Documentation for Agencies Instructions
California Office of Information Security Disaster Recovery Plan Documentation for Agencies Instructions () November 2009 SCOPE AND PURPOSE The requirements included in this document are applicable to
More informationManaging the Challenges of R12: Strategies for Upgrades and Ongoing Change Management
Managing the Challenges of R12: Strategies for Upgrades and Ongoing Change Management Alan Shook Senior Solution Architect Quest Software 2009 Quest Software, Inc. ALL RIGHTS RESERVED Agenda Why upgrade
More informationSTATE OF NEVADA Department of Administration Division of Human Resource Management CLASS SPECIFICATION
STATE OF NEVADA Department of Administration Division of Human Resource Management LASS SPEIFIATION TITLE GRADE EEO-4 ODE IT TEHNIIAN SUPERVISOR 37 7.927 SERIES ONEPT Information Technology (IT) Technicians
More informationDESIGNATED CONTRACT MARKET OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE
DESIGNATED CONTRACT MARKET OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE Please provide all relevant documents responsive to the information requests listed within each area below. In addition to the
More informationLEHMAN COLLEGE: DEPARTMENTAL RETENTION SCHEDULE 8/7/2014 INFORMATION TECHNOLOGY (IT)
IT-1 Contracts/ Software Licenses/ Use Agreements Legal agreements, including contracts, legal releases, software licenses, and use agreements involving the College or the University 6 years after expiration
More informationPosition Summary Goals and Worker Activities 40% A. Manage the Data Center Planning and Operations Section.
Position Description Department of Administration, Division of Enterprise Technology Management Information Chief - 13530 Data Center Planning and Operations Section Chief Bureau of Infrastructure Support
More informationInformation Technology Engineers Examination. Network Specialist Examination. (Level 4) Syllabus. Details of Knowledge and Skills Required for
Information Technology Engineers Examination Network Specialist Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination Version 2.0
More informationModule: Sharepoint Administrator
Module: Sharepoint Administrator Mode: Classroom Duration: 40 hours This course teaches IT Professionals to design and deploy Microsoft SharePoint 2010. Course Outline: Module 1: Designing a Logical Architecture
More informationBENCHMARK EVALUATION. Highways and Public Works Information and Communications Technology
Identification Section BENCHMARK EVALUATION Position Title: Supervisor s Title: Department: Branch/Unit: Network Solutions Specialist Network Solutions Architect Highways and Public Works Information and
More informationCUNY SCHOOL OF PROFESSIONAL STUDIES: DEPARTMENTAL RETENTION SCHEDULE 4/7/2014 OFFICE OF INFORMATION TECHNOLOGY
IT-1 Contracts/ Software Licenses/ Use Agreements General 6[6] IT-2 CUNY SCHOOL OF PROFESSIONAL STUDIES: DEPARTMENTAL RETENTION SCHEDULE 4/7/2014 CUNY-CIS Information Security Procedures Attestation Forms
More informationperforms a variety of complicated tasks, may lead and direct the work of others, may report directly to a project
State of Iowa-IT Services-Position Descriptions Levels of Experience The following levels of experience apply to all job categories unless a job category details other requirements (example Data Entry).
More informationOPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE
OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE Please provide all relevant documents responsive to the information requests listed within each area below. In addition to the specific documents requested,
More informationAPPENDIX 8 TO SCHEDULE 3.3
APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE AGREEMENT APPENDI 8 TO SCHEDULE 3.3 TO THE COMPREHENSIVE INFRASTRUCTURE
More informationGENERAL RECORDS SCHEDULE 3.1: General Technology Management Records
GENERAL RECORDS SCHEDULE 3.1: General Technology Management Records This schedule covers records created and maintained by Federal agencies related to the general management of technology. It includes
More informationCHAPTER 2: Staffing ROLES OF STAFF. Roles Required to Provide Tech Support
Roles Required to Provide Tech Support The type and number of staff required to meet a district s technical support needs will vary widely based on the size of the district and the quality and quantity
More informationINFORMATION SYSTEMS (IS) DATA SERVICES JOB TITLES CANNOT USE FOR VACANCIES
Effective Date: July 1, 2015 INFORMATION SYSTEMS (IS) DATA SERVICES JOB TITLES CANNOT USE FOR VACANCIES I. DEFINITIONS A. Identifying the Correct Job Family This section defines duties performed by positions
More informationHealth IT Workforce Roles and Competencies Categories of Health IT Workforce Roles Requiring Short-Term Training
Health IT Workforce Roles and Categories of Health IT Workforce Roles Requiring Short-Term Training Mobile Adoption Support Positions These members of the workforce will support implementation at specific
More informationIBM Implementation Services for Power Systems IBM Systems Director
Sample Statement of Work for Services This an example and your Statement of Work may vary given your specific requirements and the related IBM engagement. IBM Implementation Services for Power Systems
More informationGIS DESIGN AND IMPLEMENTATION SERVICES
22-1 21 24 23 22 30 32 25 33 29 34 28 35 28 GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry
More informationGIS ANALYST I GIS ANALYST II
GIS ANALYST I GIS ANALYST II Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties
More informationCDC UNIFIED PROCESS JOB AID
CDC UNIFIED PROCESS JOB AID Independent Verification & Validation Activities Document Purpose This Job Aid is a brief document listing the items to be noted, checked, remembered, and delivered when completing
More informationChapter 14 COORDINATING CENTER PROCEDURES
Chapter 14 COORDINATING CENTER PROCEDURES 14.1 STAFFING AND ORGANIZATION The Coordinating Center for AREDS is located at The EMMES Corporation in Potomac, Maryland. The staff at the Coordinating Center
More informationTechnology Recovery Plan Instructions
State of California California Information Security Office Technology Recovery Plan Instructions SIMM 5325-A (Formerly SIMM 65A) September 2013 REVISION HISTORY REVISION DATE OF RELEASE OWNER SUMMARY OF
More informationSAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT
Applications Development Project Sample WBS Management and support Provide project management Provide quality control Conduct meetings and reviews Materials and supplies Travel and living costs Miscellaneous
More informationUniversity of Central Florida Class Specification Administrative and Professional. Director Systems and Operations
Director Systems and Operations Job Code: 2519 Report to the university Chief Technology Officer. Serve as the top technical administrator for enterprise systems and operations. Direct the functional areas
More informationOhio Supercomputer Center
Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original
More informationWhat methods are used to conduct testing?
What is testing? Testing is the practice of making objective judgments regarding the extent to which the system (device) meets, exceeds or fails to meet stated objectives What the purpose of testing? There
More informationRequest for Proposal Autodesk CAD Support
Request for Proposal Autodesk CAD Support Introduction Denver Water is inviting your firm to submit a proposal to provide Autodesk product-based services and support to meet the requirements of Denver
More informationNETWORKING ENTERPRISE SPECIALIST VoIP Project (New position)
Edmonton Catholic Schools is now accepting applications for the position of NETWORKING ENTERPRISE SPECIALIST VoIP Project (New position) Edmonton Catholic Schools is a large urban school district whose
More informationर य स द र स व दन क / NATIONAL REMOTE SENSING CENTRE
भ रत सरक र / GOVERNMENT OF INDIA अ तर वभ ग / DEPARTMENT OF SPACE र य स द र स व दन क / NATIONAL REMOTE SENSING CENTRE ब ल नगर, ह दर ब द / BALANAGAR, HYDERABAD-500037 एनआरएसस /य/ईओआई/2/NRSC/PUR/EOI/2/PT-148
More informationPM Planning Configuration Management
: a Project Support Function As stated throughout the Project Planning section, there are fundamental components that are started during the pre-performance stage of the project management life cycle in
More informationAssistant Information Technology Specialist. X X X software related to database development and administration Computer platforms and
FUNCTIONAL AREA 5 Database Administration (DBA) Incumbents in this functional area plan, design, develop, test, implement, secure, and administer database systems. Database Administration applies to all
More informationPierianDx - Clinical Genomicist Workstation Software as a Service FAQ s
PierianDx - Clinical Genomicist Workstation Software as a Service FAQ s Network Security Please describe the preferred connection method(s) between the PierianDx network and a healthcare organization s
More informationWashtenaw County Geographic Information System Strategic Plan
Washtenaw County Geographic Information System Strategic Plan April 1999 1 Table of Contents Vision, Goals, and Strategies. 3 GIS Timeline 1999-2002. 8 GIS Timeline 1999-2010. 9 Washtenaw County GIS Program
More informationIT Audits at Penn. IT Orientation
IT Audits at Penn IT Orientation Dan Hill Kevin Secrest April 22, 2015 Agenda (OACP) background Risk Management Process Strategic IT Auditing What to Expect During an IT Audit The Audit Process IT Audit
More informationCOUNTY OF LOS ANGELES CHIEF INFORMATION OFFICE 500 West Temple Street 493 Kenneth Hahn Hall of Administration Los Angeles, CA 90012
COUNTY OF LOS ANGELES CHIEF INFORMATION OFFICE 500 West Temple Street 493 Kenneth Hahn Hall of Administration Los Angeles, CA 90012 RICHARD SANCHEZ ACTING CHIEF INFORMATION OFFICER Telephone: (213) 974-2008
More informationJune 2008 Report No. 08-038. An Audit Report on The Department of Information Resources and the Consolidation of the State s Data Centers
John Keel, CPA State Auditor An Audit Report on The Department of Information Resources and the Consolidation of the State s Data Centers Report No. 08-038 An Audit Report on The Department of Information
More informationPOSITION QUALIFICATIONS. Minimum Experience (Yrs)
POSITION QUALIFICATIONS Core Labor Category Skill Minimum Education Minimum Experience (Yrs) Labor Category Description Technical Manager, Principal Bachelors Degree 12 Technical Manager, Senior Bachelors
More informationFunctional Area 3. Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011)
Functional Area 3 Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011) Description: Supervises activities of all applications systems analysis and programming
More informationGAO INFORMATION TECHNOLOGY MANAGEMENT. Small Business Administration Needs Policies and Procedures to Control Key IT Processes.
GAO United States General Accounting Office Testimony Before the Committee on Small Business, U.S. Senate For Release on Delivery Expected at 9:30 a.m. EDT Thursday, July 20, 2000 INFORMATION TECHNOLOGY
More informationAsset Register Asset Care Plan Developer On Key Analytics Maintenance Manager Planning and Scheduling On Key Interface Tool
Are you in the market for a new enterprise asset management system? If so, make sure that you consider a system that will not only help you deliver on your asset management strategy, but that will assist
More informationDesigning a Microsoft SharePoint 2010 Infrastructure
Designing a Microsoft SharePoint 2010 Infrastructure Course Details Course Code: Duration: Notes: 10231B 5 days This course syllabus should be used to determine whether the course is appropriate for the
More informationINFORMATION SYSTEMS SPECIALIST 8 1488
INFORMATION SYSTEMS SPECIALIST 8 1488 SERIES DESCRIPTION The INFORMATION SYSTEMS SPECIALIST (ISS) classification series has eight levels that describe technical and professional non-supervisory positions
More informationProject Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997
Why a Project Check List? A good way to ensure that all start-up tasks are completed prior to actually starting the project is to develop a start-up check list. The check list can be developed and then
More informationIT Service Management
RL Consulting IT Service Management Service Outsourcing Questionnaire Prepared by: Rick Leopoldi November 10, 2003 Copyright 2003 RL Information Consulting LLC. All rights reserved. Duplication of this
More informationDATABASE ANALYST I DATABASE ANALYST II
CITY OF ROSEVILLE DATABASE ANALYST I DATABASE ANALYST II DEFINITION To perform professional level work in designing, installing, managing, updating, and securing a variety of database systems, including
More informationHealth IT Workforce Roles and Competencies
Health IT Workforce Roles and Health IT Implementation Support Positions These members of the workforce will support implementation at specific locations for a period of time, and when their work is done,
More informationFinancial Systems Integration
Finance & Administration Committee Action Item III-A May 13, 2010 Financial Systems Integration Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
More informationMapping the Technical Dependencies of Information Assets
Mapping the Technical Dependencies of Information Assets This guidance relates to: Stage 1: Plan for action Stage 2: Define your digital continuity requirements Stage 3: Assess and manage risks to digital
More informationAbout this Course This 5 day ILT course teaches IT Professionals to design and deploy Microsoft SharePoint 2010.
Course 10231B: Designing a Microsoft SharePoint 2010 Infrastructure OVERVIEW About this Course This 5 day ILT course teaches IT Professionals to design and deploy Microsoft SharePoint 2010. Audience Profile
More informationCapability Statement
Capability Statement Contact: Isabel Chancellor 405-636-1802 Isabel.chancellor@ingenuite.com IngenuitE, Inc. 7701 S. Western, Suite 204 Oklahoma City, OK 73139-2410 http://www.ingenuite.com Company Overview
More informationTelecommunications Network Technician III (This is a career ladder position) OPENING DATE: March 16, 2016 CLOSING DATE: March 31, 2016
CLASS TITLE: LOCATION: Telecommunications Network Technician III (This is a career ladder position) Headquarters, Dover, DE SALARY: PG 15 - $48,646 OPENING DATE: March 16, 2016 CLOSING DATE: March 31,
More informationCHAPTER 6 DATABASE MANAGEMENT SYSTEMS. Learning Objectives
CHAPTER 6 DATABASE MANAGEMENT SYSTEMS Management Information Systems, 10 th edition, By Raymond McLeod, Jr. and George P. Schell 2007, Prentice Hall, Inc. 1 Learning Objectives Understand the hierarchy
More informationGeneral IT Controls Audit Program
Contributed February 5, 2002 by Paul P Shotter General IT Controls Audit Program Purpose / Scope Perform a General Controls review of Information Technology (IT). The reviews
More informationSWAP EXECUTION FACILITY OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE
SWAP EXECUTION FACILITY OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE Please provide all relevant documents responsive to the information requests listed within each area below. In addition to the specific
More informationArcGIS Workflow Manager: An Overview
Federal GIS Conference February 9 10, 2015 Washington, DC ArcGIS Workflow Manager: An Overview Heather Murnane & Elizabeth Wilcox Session Topics Overview Key Features Notification & Reporting Overview
More informationSACWIS PLANNING FOR DEPARTMENT OF HUMAN SERVICES DRAFT - STRATEGIC IMPLEMENTATION PLAN: MILESTONES & TIMELINES FOR A FULL IMPLEMENTATION
STATE OF MICHIGAN SACWIS PLANNING FOR DEPARTMENT OF HUMAN SERVICES DRAFT - STRATEGIC IMPLEMENTATION PLAN: MILESTONES & TIMELINES FOR A FULL IMPLEMENTATION September 13, 2010 DRAFT -Strategic Plan: Key
More informationValidating Cloud. June 2012 Merry Danley
Validating Cloud June 2012 Merry Danley Agenda Validation of Cloud Introduction Environments Definitions Manage Risk by Designation of Systems Why Go Cloud Success Dependencies Validation Personal Experience
More informationInternal Control Evaluation Progress Report for Frisco Independent School District. March 7, 2011
Internal Control Evaluation Progress Report for Frisco Independent School District March 7, 2011 Topics 2010 Internal Control Evaluation Activities - Phases III and IV 2010 Actual Hours and Fees Phases
More informationThe Project Management Plan will be used to guide, communicate and coordinate project efforts.
F.1 General Implementation Contractor Deliverables include critical system planning and development components. Sufficient deliverables have been identified at key steps in the project to guide the project
More informationCNE Network Assessment
+ CNE Network Assessment Overview The purpose of the network assessment is to measure, analyze, and document network functionality and performance. Areas of assessment include: Local Area Network (wired
More informationSample Career Ladder/Lattice for Information Technology
Click on a job title to see examples of descriptive information about the job. Click on a link between job titles to see the critical development experiences needed to move to that job on the pathway.
More informationIS Supervisor 2 Career Executive: Technical Support Services
Under general supervision, this position is responsible for: participation in the development of short and long range information technology (IT) objectives consistent with department and bureau guidelines;
More informationOutage Management System Implementation. Status Report
OVERVIEW Fitchburg Gas and Electric Light Company d/b/a Unitil ( Unitil or the Company ) is submitting this status report to the Massachusetts Department of Public Utilities ( DPU ) on its progress regarding
More informationNATIONAL REMOTE SENSNG CENTRE (ISRO, Department of Space, Govt. of India) nrsc
nrsc NATIONAL REMOTE SENSNG CENTRE (ISRO, Department of Space, Govt. of India) Balanagar, Hyderabad 500 037 Expression of Interest (EOI) for Engaging reputed geospatial industry on preparation of Large
More informationEngineering Procedure
Engineering Procedure Common Owner: Approved by: EPD 0017 DESIGN DOCUMENTATION AND RECORDS Version 2.1 Issued September 2012 Manager Engineering Standards and Configuration Neville Chen Authorised Natalie
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationSolutions. An introduction to the science & art of system architecture engineering
Solutions Architecture 101 An introduction to the science & art of system architecture engineering » Architecture roles Architecture roles Defining the different types of architect Architecture Roles 2
More informationITS Projects Systems Engineering Process Compliance Checklist
ITS Projects Systems Engineering Process Compliance Checklist FHWA Final Rule (23 CFR 940) This checklist is to be completed by the MDOT or LPA Project Management Staff. Please refer to the accompanying
More informationSoftware Project Management Plan (SPMP)
Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.
More informationPrinciples of Information Security, Fourth Edition. Chapter 12 Information Security Maintenance
Principles of Information Security, Fourth Edition Chapter 12 Information Security Maintenance Learning Objectives Upon completion of this material, you should be able to: Discuss the need for ongoing
More informationHow To Be A Database Administrator
Office of Human Resources Database Administrator III Page 1 of 6 GENERAL STATEMENT OF CLASS DUTIES Performs advanced level professional information technology work installing, configuring, and upgrading
More informationTHE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
More informationDistrict/School Technology Plan Template Your Blueprint for Success
District/School Technology Plan Template Your Blueprint for Success Table of Contents Goals and Objectives... 1 Budget... 1 Existing Resources and Equipment... 3 New Software... 3 New Hardware... 4 Professional
More informationGuidelines on Information Deliverables for Research Projects in Grand Canyon National Park
INTRODUCTION Science is playing an increasing role in guiding National Park Service (NPS) management activities. The NPS is charged with protecting and maintaining data and associated information that
More informationSTATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK. System Center Configuration Manager.
STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK System Center Configuration Manager Statement of Work June 19, 2015 1.0 INTRODUCTION The purpose of this document is to
More informationOIG Security Audit: What You Need To Know
Watch the Replay on YouTube OIG Security Audit: What You Need To Know Executive Series Webinar July 23rd, 2015 Today s Speakers Elana R. Zana Attorney & Author Ogden Murphy Wallace P.L.L.C. ezana@omwlaw.com
More information28400 POLICY IT SECURITY MANAGEMENT
Version: 2.2 Last Updated: 30/01/14 Review Date: 27/01/17 ECHR Potential Equality Impact Assessment: Low 1. About This Policy 1.1. The objective of this policy is to provide direction and support for IT
More informationHHSN316201200042W 1 QSSI - Quality Software Services, Inc
ARTICLE C.1. STATEMENT OF WORK This contract is designed to permit the Institutes and Centers (ICs) of NIH, the Department of Health and Human Services (DHHS), and all other federal agencies to acquire
More informationAppendix 2-A. Application and System Development Requirements
Appendix 2-A. Application and System Development Requirements Introduction AHRQ has set up a Distributed Systems Engineering Lab (DSEL) to support all internal development efforts and provide a facility
More informationOutsourced Infrastructure Management
MindLance, Inc., established in 1999, is a leading provider of consulting, outsourcing and staffing services to Fortune 1000 and middle-market clients. A workforce of nearly 400 professionals are constantly
More informationRoad to 10: The Small Physician s Route to ICD-10. Implementation Guide
Road to 10: The Small Physician s Route to ICD-10 Implementation Guide ICD-10 Implementation Guide for Small and Medium Practices 1 Version 2.0 18 August 2014 Table of Contents 1. Introduction... 2 Introduction
More informationFor <Project> Version 1.0
Oklahoma Department of Human Services Data Services Division Enterprise Single Sign-On System Implementation Plan For Version 1.0 Enterprise Single Sign-On System Implementation
More informationYear 2000 Contingency Planning and Certification Reporting
United States Risk Stop 0801 Department of Management 1400 Independence Avenue, SW Agriculture Agency Washington, DC 20250-0801 BULLETIN NO.: MGR-98-023 TO: FROM: SUBJECT: All Reinsured Companies Kenneth
More informationstate of south dakota Bureau of Information & Telecommunications Provide a Reliable, Secure & Modern Infrastructure services well-designed innovative
Strategic Plan 2015-2017 state of south dakota Bureau of Information & Telecommunications 1GOAL ONE: Provide a Reliable, Secure & Modern Infrastructure services security technology assets well-designed
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationVector GIS Map Layers Metadata. Orthoimagery Site Photos, Forms, And Documents
GIS DESIGN AND IMPLEMENTATION SERVICES Croswell-Schulte provides a full range of services for GIS design and implementation support. We are active in GIS industry research and standards initiatives, maintain
More informationHow To Use A Court Record Electronically In Idaho
Idaho Judicial Branch Scanning and Imaging Guidelines DRAFT - October 25, 2013 A. Introduction Many of Idaho s courts have considered or implemented the use of digital imaging systems to scan court documents
More informationLAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL. for INFORMATION RESOURCES
LAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL for INFORMATION RESOURCES Updated: June 2007 Information Resources Security Manual 1. Purpose of Security Manual 2. Audience 3. Acceptable
More informationInformation Technology Strategic Plan 2014-2017
Information Technology Strategic Plan 2014-2017 Leveraging information technology to create a competitive advantage for UW-Green Bay Approved December 2013 (Effective January 2014 December 2017) Contents
More informationPHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
More informationRanch Networks for Hosted Data Centers
Ranch Networks for Hosted Data Centers Internet Zone RN20 Server Farm DNS Zone DNS Server Farm FTP Zone FTP Server Farm Customer 1 Customer 2 L2 Switch Customer 3 Customer 4 Customer 5 Customer 6 Ranch
More informationCommunity Client Health Profile (CCHP) Program
DEPARTMENT of HEALTH and HUMAN SERVICES CCHP PROGRAM, INFORMATION SERVICES Community Client Health Profile (CCHP) Program Governance Structure Version: 1.0 3 July 2006 Contents 1. Governance structure...
More informationCisco Disaster Recovery: Best Practices White Paper
Table of Contents Disaster Recovery: Best Practices White Paper...1 Introduction...1 Performance Indicators for Disaster Recovery...1 High Level Process Flow for Disaster Recovery...2 Management Awareness...2
More informationSharePoint Implementation Planning Document 1 Template
Suite 3, Level 7, 16 Wentworth Street, Parramatta NSW 2150 Tel: 1300 797 838 - Fax: 1300 797 848 URL: www.empowercs.com.au SharePoint Implementation Planning Document 1 Template Attention: Prepared by:
More information