2 IESO I&TS: Presentation Agenda Group Overview Roles and responsibilities Informational statistics 2015 Initiatives Project Management 2
3 IESO I&TS Group Overview Overall Responsibilities: Development, management, and ongoing support for all application software, operating software, and underlying infrastructure Smart Metering Entity and operation of the Meter Data Management Repository (MDM/R) Vendor management Business analysis and process documentation Compliance with NERC Critical Infrastructure Protection standards Project Management Office Cyber and Physical Security Information Management Facilities 3
4 IESO I&TS Group Overview A Few Statistics: Total # of employees 160 Support over 150 different applications 30,000 points of real-time data collected every 2 4 seconds from approximately 200 different locations Wholesale operations collects meter data from 5,000 meters daily, representing approximately 1.4M pieces of interval data SME collects approximately 100M pieces of interval data daily from 4M meters to support Time-of-Use billing IT Operations desk fields about 25,000 service requests per annum 830 servers, 1,050 laptops/desktops, and over 300 databases 4
5 IESO I&TS 2015 Initiatives 2015 Initiatives can be broken down into 4 large buckets Merger integration initiatives NERC CIP v5 compliance System Refreshes Business initiatives 5
6 Project Management at IESO PPM Process Project Prioritization vs Project Management Project Prioritization Change Initiative Process Project Management PM Process 6
7 Project Prioritization vs Project Management Prioritize Process Do Right Projects Prioritize Resource Meet Corporate Strategic Priorities Project Management Process Do Projects Right Governance & Controls Meet Business Objectives 7
8 IESO Prioritize Project Process Ideas / Business Needs Project Proposal Validation Alignment with corporate strategic priorities Prioritization PPMT members meet Quarterly / Adhoc basis to review and prioritize projects Prioritized Project list Enterprise Change Initiative Life Cycle 8
9 Change Initiative Process Visioning Define Problem /Needs and Business Objectives (BOs) to be achieved High Level Scope, Time & Cost Stakeholdering Roadmap Analyse & Design (ADB, ADS & ADT) ADB Analyse & Design Business ADS Analyse & Design Solutions ADT Analyse & Design Technology Stakeholdering Refine BOs, Scope, Time & Cost Implement Change Implement Solution(s) Stakeholdering A Change Initiative changes the IESO s design including its processes, organizational structure, job roles, information, information technology, facilities and market design. A change initiative an IT initiative, changes to information technology are a subset We do not talk about IT initiatives and business initiatives all change initiatives are IESO change initiatives 9
10 IESO Project Management Process Project Management scales up in effort and complexity as projects increase in complexity, variability and size A simple, small project may require nothing more than a deliverables list with name of person responsible and due date A complex, large project will require a detailed project plan which includes, risk log, deliverables list, acceptance criteria, communication plan, cost details etc. 10
11 Project Management Establish SMART business objectives Establish funding and scheduling parameters Capital costs Non-capital costs Timeline to implementation All projects have a Project Sponsor Establish Project Steering Committee In certain instances establish an Executive Steering Committee 11
12 Project Management Project Steering Committee (PSC) meets monthly Information includes: Previous meeting minutes Items for decision or information Activities both planned and completed Project risks PSC supported by Project Management Office, project manager, and project staff 12
13 Project Management The person (or body) that approved the project must approve The removal of any business objective A request for any additional funding A request for additional time to complete the project This is done via an Exception Report Objective is to ensure the original approving authority is aware of, and agrees with, any significant changes to the project 13
14 Project Management In addition to detailed reporting for each project I&TS produces a dashboard on a monthly basis showing the status of all projects in the implementation phase Dashboard uses green, yellow, red methodology tracking Cost status Schedule status Achievement of business objectives Adherence to the project management process 14
15 Project Portfolio Dashboard Report Note: The numbers inside the icons represent the number of time the Project Exception Report has been approved to re-baseline projects. 15
16 Questions and Thank You? 16
Why are PMO s are Needed on Large Projects?
Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects
More informationCreating a project management office (PMO)
Executive summary The project management was initially developed to define and maintain standards for project management in the organisation. In many organisations, the PMO has developed a strategic role
More informationEXTERNAL REPORT. Smart Metering Entity (SME) MDM/R Report 3 rd Quarter 2014. July to September. Issue 5.0 - October 29, 2014
REPORT EXTERNAL, Smart Metering Entity (SME) MDM/R Report 3 rd Quarter 2014 July to September Issue 5.0 - October 29, 2014 Table of Contents 1. Introduction... 2 1.1 Purpose... 2 1.2 How to Use this Document...
More informationInformation Technology Governance: Key Success Factors
Information Technology Governance: Key Success Factors Tim Brooks VP & CIO Saint Louis University AITP September 22, 2011 Tim Brooks - Saint Louis University 1 Discussion Points What is IT Governance?
More information2012 National BDPA Technology Conference. Defining Project and PMO Metrics
2012 National BDPA Technology Conference Defining Project and PMO Metrics Betty Hutchins, MBA, PMP August 1 4, 2012 Baltimore, MD Presentation Objectives Project Performance Determine the Process Defining
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationAn Introduction to the Information Security Program Model (ISPM)
SECURELY ENABLING BUSINESS An Introduction to the Information Security Program Model (ISPM) Presented by: Nick Puetz VP of Strategic Services, FishNet Security David Robinson CIO, Lockton Companies AGENDA
More informationITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
More informationManaging Projects with ServiceNow at the University of San Francisco
Managing Projects with ServiceNow at the University of San Francisco PMI Methodology PMO website includes overview of methodology and links to the various SNC forms I ll be showing. o www.usfca.edu/its/projects/process
More informationPROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
More informationFrank P.Saladis PMP, PMI Fellow
Frank P.Saladis PMP, PMI Fellow Success factors for Project Portfolio Management The Purpose of Portfolio Management Organizational Assessment Planning a Portfolio Management Strategy The Portfolio Management
More informationTALES FROM ESTABLISHING A PORTFOLIO AND PROJECT GOVERNANCE POLICIES. Chao-Yee Watson October 6, 2014
TALES FROM ESTABLISHING A PORTFOLIO AND PROJECT GOVERNANCE POLICIES Chao-Yee Watson October 6, 2014 Agenda Introduction Speaker Biography 2012: Disorganized Labor 2013: Laying the Foundations 2014: Execution
More informationProcess or Technology? Which comes first when implementing Project Portfolio Management?
Come see us at Booth #229 at ProjectWorld! Process or Technology? Which comes first when implementing Project Portfolio Management? Kiron D. Bondale Solution Q Inc. kbondale@solutionq.com Agenda Project
More informationProject Communication Plan Template
by: Michael B. Bender Contact Information: Michael B. Bender Ally Business Developers 23W236 Kimberwick Lane Naperville, IL 60540 Phone: 630/548-0399 e-mail: MBender@AllyBusiness.com (c) 2005 Allibus Corp.
More informationCentral Agency for Information Technology
Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management
More informationInformation Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
More informationCOMPANY LOGO. Project Charter Project Charter
Project Name Project Number The is created in the Initiating Process Group. Typically, a Project Manager, external to the project, writes the as an objective assessment. It formally authorizes the project
More informationEstablishing Enterprise Portfolio and Project Management in a Shared Service Environment
Establishing Enterprise Portfolio and Project Management Author: Lynn Tyndall Date: October 14, 2008 Version: 1.0 1 of 8 Document Revision History Revision # Date Change Authorization Document Approval(s)
More information2014 Only Influencers Email Marketing Salary Guide
2014 Only Influencers Email Marketing Salary Guide by Bill McCloskey, Only Influencers EMAIL MARKETING SALARIES (ALL)... 2 EMAIL MARKETING SALARIES BROKEN OUT BY SEX... 3 (ALL RESULTS MALE ONLY)... 3 (ALL
More informationAudit of the Management of Projects within Employment and Social Development Canada
Unclassified Internal Audit Services Branch Audit of the Management of Projects within Employment and Social Development Canada February 2014 SP-607-03-14E Internal Audit Services Branch (IASB) You can
More informationDriving PPM Adoption Through Effective Change Management
Driving PPM Adoption Through Effective Change Management Presenters: David Boghossian, Founder, PowerSteering Software Jay Hoskins, PowerSteering Business PPM Consultant Welcome! Thank you for joining
More informationIT UNIFICATION Vision, Impact & Strategy. May 2015
IT UNIFICATION Vision, Impact & Strategy May 2015 Presentation Agenda Why Unification Embracing Business Drivers UC San Diego Strategic Plan IT Unification Vision Campus Impact What s in it for campus?
More informationSix Sigma Leadership Guide for Program Success: S-SLEF Framework
Six Sigma Leadership Guide for Program Success: S-SLEF Framework Governance Sandy L. Furterer, PhD, MBA ASQ Certified Six Sigma Black Belt, ASQ Certified Quality Engineer, ASQ Fellow, Harrington Institute
More informationAgenda. Project Management Pain Points. Solution Option Highlights. The Dark Side. Discussion. Identify your business needs / requirements
Agenda Project Management Pain Points Identify your business needs / requirements Solution Option Highlights Review of some SharePoint Solutions (OTB / Third Party / Combo) The Dark Side Are you prepared/disciplined
More informationENTREPRENEURS TOOLKIT
Blueprint for success for entrepreneurial businesses ENTREPRENEURS TOOLKIT SOFTOOLS ENTREPRENEURS TOOLKIT PROVIDES A SUITE OF 8 INTEGRATED APPLICATIONS THAT WILL DRAMATICALLY ACCELERATE THE GROWTH OF ENTREPRENEURIAL
More informationEnterprise Release Management
Enterprise Release Management Plutora helps organizations manage complex IT Feature Pipeline, IT Releases and IT Test Environments in a simple and transparent manner. Enterprise Releases Transparency and
More informationThe Future of Census Bureau Operations
The Future of Census Bureau Operations Version 1.0 April 25, 2013 The Future of Census Bureau Operations Page ii [This page intentionally left blank] The Future of Census Bureau Operations Page iii Document
More informationThe Manager s Guide to Avoiding 7 Project Portfolio Pitfalls
The Manager s Guide to Avoiding 7 Project Portfolio Pitfalls In today s management by projects mindset, portfolio managers and PMO directors are challenged with ensuring successful delivery in addition
More informationManage projects effectively
Business white paper Manage projects effectively HP Project and Portfolio Management Center and HP Agile Manager Table of contents 3 Executive summary 3 The HP Solution Invest in what matters most then
More informationHow To Implement Itil V3
2009 NMCI Conference: Implementing ITIL Session 1: ITSM Process ITSM COE Agenda Background ITSM Overview ITIL and Service Delivery Adopting ITIL to NGEN SE&I Activities 2 Background Develop Government
More informationwww.pwc.com Leveraging Continuous Auditing / Continuous Monitoring in internal audit April 10, 2012
www.pwc.com Leveraging Continuous Auditing / Continuous Monitoring in internal audit April 10, 2012 Agenda 1. Introductions to DA, CA & CM [] 2. Inventory management continuous monitoring [The Gap] 3.
More informationICT Strategy 2 0 1 4-2 0 1 6
2 0 1 4-2 0 1 6 Document revision history Date Version Revision Comment Author / Editor 0 1 Initial draft Gregory Peacock 04/07/2014 0 2 General revision Alan Hough 10/7/2014 0 3 Minor additions Gregory
More information2015 PROJECT ROADMAP. Bill Pettitt. April 16, 2015. Manager, Business Solutions, IESO
2015 PROJECT ROADMAP Bill Pettitt Manager, Business Solutions, IESO April 16, 2015 Roadmap 2 Meter Data Management Replacement Replace the current Wholesale Meter Data Management application Participants
More informationOntario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead
Ontario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead Edward Arlitt Senior Business Analyst Independent Electricity System Operator (IESO) The Smart
More informationFOUNDATION WORKING GROUP SESSION #1
FOUNDATION WORKING GROUP SESSION #1 Overview of the meter data management and repository (MDM/R) System April 22, 2015 Smart Metering System Meters Advanced Metering Infrastructure (AMI) Local Area Networ
More informationProject initiation - 5 Mistakes Portfolio Managers Make
WHITE PAPER The Manager s Guide to Avoiding 7 Project Portfolio Pitfalls EXECUTIVE SUMMARY In today s management by projects mindset, portfolio managers and PMO directors are challenged with ensuring successful
More informationCA Clarity Integration
CA Clarity Integration Delivering Complete Cost, Resource and Change Visibility for IT Management CA has led the industry in providing integrated solutions. Enterprise IT Management (EITM) is CA s vision
More informationBuilding a CA PPM Roadmap
www.regouniversity.com Building a CA PPM Roadmap Presented by: Jacob Cancelliere Date prepared: April, 2015 Agenda Approach Assess Entry Points Planning Detailing and Building the Roadmap 2 Open Mic: How
More informationITIL and IT Operations Optimization
ITIL and IT Operations Optimization Ed Holub, Research VP 17 June 2009 Gartner Webinar Notes accompany this presentation. Please select Notes Page view. These materials can be reproduced only with written
More informationThe ITS Project Management Framework
The ITS Project Management Framework Information Technology Services Project Management Framework v1.0 1 Table of Contents Introduction 3 Why Create a Project Management Framework? 4 Projects versus Operational
More informationSession 0905 ASUG SBOUC Align your Business and IT with a Solid BI Strategy. Deepa Sankar Pat Saporito
Session 0905 ASUG SBOUC Align your Business and IT with a Solid BI Strategy Deepa Sankar Pat Saporito Agenda Business Challenges The Importance of a BI Strategy How SAP Can Help in Defining Your BI Strategy
More informationOffice of the Chief Information Officer
Office of the Chief Information Officer Business Plan: 2012 2015 Department / Ministère: Executive Council Date: November 15, 2012 1 P a g e This Page Left Intentionally Blank 2 P a g e Contents The Business
More informationThe way we used to solve problems in the past is not the way that we will solve in the future Albert Einstein
The way we used to solve problems in the past is not the way that we will solve in the future Albert Einstein Anton Nekic 0412 469 882 Value Chain - http://vc3p.bizcard.mobi/. 1 Setting the scene Is PPM
More informationAngelo State University
Angelo State University Campus-wide Project Management Software Business Justification Project Name: Project Management Software Implementation Proposed By: Jackie Droll & John Russell Department Head/Director/Dean:
More informationNERC Cyber Security. Compliance Consulting. Services. HCL Governance, Risk & Compliance Practice
NERC Cyber Security Compliance Consulting Services HCL Governance, Risk & Compliance Practice Overview The North American Electric Reliability Corporation (NERC) is a nonprofit corporation designed to
More informationOlav Mo, Cyber Security Manager Oil, Gas & Chemicals, 28.09.2015 CASE: Implementation of Cyber Security for Yara Glomfjord
Olav Mo, Cyber Security Manager Oil, Gas & Chemicals, 28.09.2015 CASE: Implementation of Cyber Security for Yara Glomfjord Implementation of Cyber Security for Yara Glomfjord Speaker profile Olav Mo ABB
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationDepartment of Technology Services
Department of Technology Services 2016-2019 Strategic Plan DTS Dept. of Technology Services Utah Code 63F- 1-203 explicitly requires the Chief Information Officer (CIO) to prepare an executive branch strategic
More informationINFORMATION TECHNOLOGY STANDARD
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF PUBLIC WELFARE INFORMATION TECHNOLOGY STANDARD Name Of Standard: IS Measures of Performance Domain: Security Date Issued: 11/13/2013 Date Revised: Number: STD-ENSS036
More informationProject Governance - An Independent Perspective. Presented By The Tallahassee Chapter of The Project Management Institute January 7 th, 2009
Project Governance - An Independent Perspective Presented By The Tallahassee Chapter of The Project Management Institute January 7 th, 2009 Agenda Introductions Objective Assumptions Key Questions and
More informationIEEE-Northwest Energy Systems Symposium (NWESS)
IEEE-Northwest Energy Systems Symposium (NWESS) Paul Skare Energy & Environment Directorate Cybersecurity Program Manager Philip Craig Jr National Security Directorate Sr. Cyber Research Engineer The Pacific
More informationHow To Manage Data In Real Time
Microsoft IT Data Management Maturity Data to match the business velocity and accelerate the organization s evolution towards Real-Time Enterprise! Luisa Recalcati Enterprise Architect 9/4/2013 Agenda
More informationLeveraging SharePoint for Project, Program, and Portfolio Management
Leveraging SharePoint for Project, Program, and Portfolio Management Addressing the Challenges of Communicating, Coordinating, Controlling, and Complying Delivered by Dean W. Farmer, MMS, PMP at the SIUE
More informationMINNESOTA STATE POLICY
Version: 2.00 Approved Date: 02/24/2012 Approval: Signature on file MINNESOTA STATE POLICY From the Office of Carolyn Parnell Chief Information Officer, State of Minnesota IT Project Portfolio Data Management
More informationIT Strategic Plan and Roadmap Governance and PMO Recommendations
Appendix M IT Strategic Plan and Roadmap Governance and PMO Recommendations City of Virginia Beach ComIT Master Technology Plan (Appendix M) 1 IT Strategic Plan and Roadmap IT Governance and PMO Recommendations
More informationINFORMATION & DATA WHAT THIS MAP IS:
INFORMATION & DATA EdFuel s Blueprint for Success initiative aims to address a looming talent deficit in the education field, developing many more highly effective K-12 system leaders capable of managing
More informationEU CIP Project DENSEK. Joining forces against cyber threats on European level
EU CIP Project DENSEK Joining forces against cyber threats on European level DENSEK EU CIP Objectives Improving the resilience of the energy infrastructure i.e. improving the security of the Smart Energy
More informationDISCIPLINE DATA GOVERNANCE GOVERN PLAN IMPLEMENT
DATA GOVERNANCE DISCIPLINE Whenever the people are well-informed, they can be trusted with their own government. Thomas Jefferson PLAN GOVERN IMPLEMENT 1 DATA GOVERNANCE Plan Strategy & Approach Data Ownership
More informationPortfolio Management and Strategic Planning - Paper by STM
Project Portfolio Management Montreal Approach Francine Belzile Société de Transport de Montréal Montréal,, Canada ABSTRACT This paper describes how Project Portfolio Management (PPM) is related to strategic
More informationPORTFOLIO & PROJECT MANAGEMENT
PORTFOLIO & PROJECT MANAGEMENT Webinar & Demonstration Session March 6, 2015 vestapartners.com USA CANADA EUROPE AUSTRALIA SOUTHEAST ASIA +1 203 517 0400 +1 289 337 1793 +31 0 70 220 9720 +61 3 8676 0672
More informationITIL V3 AND THE SERVICE LIFECYCLE PART I THE MISSING COMPONENT
ITIL V3 AND THE SERVICE LIFECYCLE PART I THE MISSING COMPONENT PLANVIEW INC. BACKGROUND IT departments continually have tremendous demands placed on them to manage new initiatives, projects, incidents,
More informationThe Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02
The Standard for Portfolio Management Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 Purpose of this Presentation To provide information about The Standard for Portfolio Management Agenda Background
More informationLow Risk Implementation. Part of the Insurance series: Benefits of a New Policy Administration System: Why Going Live is Not Enough
Low Risk Implementation Part of the Insurance series: Benefits of a New Policy Administration System: Why Going Live is Not Enough Abstract Insurance carriers are well versed in the risks associated with
More informationSession Objectives: National Consortium for Continuous Improvement in Higher Education
KISS: Learning to Simplify Session Objectives: Change Leadership at Cornell The challenge of leading college and administration realignment at a university What are the complexities of leading change for
More informationOrganizational Change Management Methodology. Tools and Techniques to aid Project Implementation
Organizational Change Management Methodology Tools and Techniques to aid Project Implementation Today s Objectives Discuss the Organizational Change Management team and explore ways Organizational Change
More informationTRANSITION PLAN TEMPLATE
TRANSITION PLAN TEMPLATE In this template, instructions are included in italics. When you have completed the template and no longer need the instructions, delete them. Provide a brief overview of the transition
More informationFinding The PPM Sweet Spot
Finding The PPM Sweet Spot How the Cloud and a Top Down Approach Can Help Drive Project Portfolio Value Featured Presenter: Daniel Stang Research Director Welcome! Thank you for joining us. A few things
More informationBusiness Intelligence Competency Centers People + Information = Intelligence. Timo Elliott
Business Intelligence Competency Centers People + Information = Intelligence Timo Elliott 1.Why have a BI Competency Center 2.BICC Organization and Staffing 3.BICC Functional areas and Key Tasks 4.Creating
More informationBusiness Intelligence Project Management 101
Business Intelligence Project Management 101 Managing BI Projects within the PMI Process Groups Too many times, Business Intelligence (BI) and Data Warehousing project managers are ill-equipped to handle
More informationESKISP6046.02 Direct security architecture development
Overview This standard covers the competencies concerned with directing security architecture activities. It includes setting the strategy and policies for security architecture, and being fully accountable
More informationPosition Description: Chief Information Officer Department: Information Technology Information Technology FLSA Status: Exempt. Revised: October, 2014
Position Description: Chief Information Officer Department: Information Technology Division: Information Technology FLSA Status: Exempt Location: Griffiss Revised: October, 2014 PURPOSE: I. Assure the
More information--Identifies and supports the training requirements for business areas around PMO tools and methodologies, including training new users.
H22141, page 1 Nothing in this job description restricts management's right to assign or reassign duties and responsibilities to this job at any time. DUTIES This is a non-career term job with the Metropolitan
More informationPPM Maturity Value Assessment for Your Company
PPM Maturity Value Assessment for Your Company Date Sponsored by: Prepared For: Valued Customer Name Third party model, methodology and data provided by: Disclaimer: NOTICE - THIS INFORMATION IS PROVIDED
More informationEMC PERSPECTIVE. Information Management Shared Services Framework
EMC PERSPECTIVE Information Management Shared Services Framework Reader ROI Information management shared services can benefit life sciences businesses by improving decision making by increasing organizational
More informationWe have enabled our project managers to produce real-time resource capacity reports while eliminating the manual status tracking process.
Microsoft Office System Customer Solution Case Study Global Pharmaceutical Company Expects to Save $2M Annually with Automated Reports Overview Country or Region: United States Industry: Pharmaceuticals
More informationCollaboration: A Foundation for Building the IT Project Management Framework
EDUCAUSE MARC 2008 Innovative Planning for the 21st-Century Academy: Creating Reality Through Technology, Collaboration, and Best Practices Collaboration: A Foundation for Building the IT Project Management
More informationBusiness Analyst Work Plan. Presented by: Billie Johnson, CBAP CSM
Business Analyst Work Plan Presented by: Billie Johnson, CBAP CSM Agenda Topic Introduction Overview of a Business Analysis Work Plan Initiating a Business Analysis Effort Components of the Business Analysis
More informationIs PPM Enough? A white paper from Digité, Inc. om Digite, Inc. Lessons from Discussions and Deliberations with Digité customers and partners
A white paper from Digité, Inc. Is PPM Enough? om Digite, Inc. Lessons from Discussions and Deliberations with Digité customers and partners Author: Mahesh Singh, Co-founder, Sr. Vice President Product
More informationProject Management Using Microsoft Project Plan - Basic
Project Management Using Microsoft Project Plan Basic V2.0 Project Management Using Microsoft Project Plan - Basic Version 2.0, February, 2011 Illume-Tech Solutions & Services COPYRIGHT 2011 ILLUME-TECH
More informationFederal CIO: Cloud Selection Toolkit. Georgetown University: Chris Radich Dana Christiansen Doyle Zhang India Donald
Federal CIO: Cloud Selection Toolkit Georgetown University: Chris Radich Dana Christiansen Doyle Zhang India Donald Agenda Project Introduction Agency Cloud Challenges Toolkit Solution Overview Step 1:
More informationHow To Manage Project And Portfolio Management In Microsoft Office 2010
Enterprise Project Management SOLUTIONS THAT LAST Challenges in PPM What is a Project? Why Project Management? Challenges in Project and Portfolio Management (PPM) Problems for PM and PPM Leaders Presentation
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
More informationIntroduction to Business Intelligence
IBM Software Group Introduction to Business Intelligence Vince Leat ASEAN SW Group 2007 IBM Corporation Discussion IBM Software Group What is Business Intelligence BI Vision Evolution Business Intelligence
More informationBI Strategy: Getting to Where You Want to Go with a Business-Driven Strategy
BI Strategy: Getting to Where You Want to Go with a Business-Driven Strategy ASUG IL Chicago Chapter Meeting, Nov. 1, 2013 Pat Saporito, Global Center of Excellence Agenda Business Challenges Importance
More informationAdopt a Combination and Enhancement Approach to Deliver a World Class PPM Solution
Adopt a Combination and Enhancement Approach to Deliver a World Class PPM Solution Keith Wallis Head of Solution Strategy & Development Who Remembers? When we went to work to: Enjoy SAP or use mysap About
More informationFY15 UW-Parkside Institutional IT Plan Report
FY15 UW-Parkside Institutional IT Plan Report A. Information Technology & University Strategic Objectives [1-2 pages] 1. How was the plan developed? The plan is a compilation of input received from a wide
More informationProject Management Office Best Practices
Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation
More informationAssessing Your Information Technology Organization
Assessing Your Information Technology Organization Are you running it like a business? By: James Murray, Partner Trey Robinson, Director Copyright 2009 by ScottMadden, Inc. All rights reserved. Assessing
More informationProgram Management: Opportunity or CLM?
Program Management: Opportunity or CLM? Agenda It s a game do you know the rules? So who wants to be a Program Manager? Definitions Check list for what it REALLY takes Questions 2 It s a game do you know
More informationState of Tennessee Division of Health Care Finance and Administration. Tennessee Technical Advisory Services (TN TAS)
State of Tennessee Division of Health Care Finance and Administration Tennessee Technical Advisory Services (TN TAS) Deliverable Document Deliverable A.46 Organizational Change Management and Training
More informationU.S. Postal Service s DRIVE 25 Improve Customer Experience
U.S. Postal Service s DRIVE 25 Improve Customer Experience Audit Report Report Number MI-AR-16-001 November 16, 2015 DRIVE Initiative 25 is suppose to increase customer satisfaction with how complaints
More informationDan T. Stathos, CPA* Associate Director
Dan T. Stathos, CPA* dstathos@navigant.com Austin, Texas Direct: 512.493.5415 Professional Summary Dan Stathos, an in NCI s Austin, Texas office, has been involved with electric, gas, water and telephone
More informationA New Framework for Administrative Applications Governance
A New Framework for Administrative Applications Governance IT Task Force September 26, 2008 Michael Krugman, Interim VP IST Rafael Reisz, RAFINCO Why are we here? Describe the origin of ERGO framework
More informationSoftware Defined Hybrid IT. Execute your 2020 plan
Software Defined Hybrid IT Execute your 2020 plan Disruptive Change Changing IT Service Delivery Cloud Computing Social Computing Big Data Mobility Cyber Security 2015 Unisys Corporation. All rights reserved.
More informationProject Governance. Version: June 3, 2010 By: Dr Ralf Müller PM Concepts AB www.pm-concepts.com ralf.mueller@pm-concepts.com
Project Governance Dr Ralf Müller Managing Director, PM Concepts AB, Sweden Adjunct / Associate Professor, SKEMA Business School, France, Norwegian School of Management BI, Umeå University, Sweden Version:
More informationSetting up and operationalisation of Enterprise PMOs
Setting up and operationalisation of Enterprise PMOs A. Why an EPMO? Entities in private and non-profit/ governmental sectors need to constantly address change due to external and internal forces. These
More informationDIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan
DEPARTMENT OF CORRECTION SUPPORT Management Services DIRECTIVE NUMBER: SUBJECT: Correctional Integration Systems Change PAGE NUMBER: 1 of 10 Adopted: 12-15-03 01.00.00. POLICY OF THE DEPARTMENT It is the
More informationApplication Development and Support
Service Description The Application Development & Support (AD&S) service provides high-end design and the latest Web technologies to North Carolina government at the lowest possible rates. The service
More informationProject Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
More informationEMA Service Catalog Assessment Service
MORE INFORMATION: To learn more about the EMA Service Catalog, please contact the EMA Business Development team at +1.303.543.9500 or enterpriseit@enterprisemanagement.com The IT Service Catalog Aligning
More information