1 Concept Note on Business Operations Strategy (BoS) Operations Management Team (OMT) December 2012 UN General Assembly as well as Economic and Social Council (ECOSOC) resolutions have consistently called for the UN system to harmonize business operations, with the aim of reducing operational transaction costs and duplication of the operational support to programme delivery. In this context, the UN Development Group (UNDG) has been working with UNCTs to improve programme and business operations. Moreover, the Secretary-General has recently launched a report focusing on the need to enhance strategic planning and analytical processes, in particular to strengthen strategic thinking and prioritization of harmonization efforts with a concentration on the highest value added. Furthermore, the report also mentions the need to improve monitoring and evaluation and reporting mechanisms to demonstrate results achieved in the area of business operations harmonization. The new Business Operations Strategy (BoS) is the UN Development Group (UNDG) response to these requests. BoS is a voluntary framework focusing on joint business operations developed in close cooperation with UNCTs, allowing them to take a strategic and results-oriented approach to planning, management and implementation of harmonized business operations in the country. BoS is a flexible and strategic tool, allowing for UNCTs to focus on contextual and specific programmatic needs, while providing an easy-to-use monitoring, evaluation and reporting system to manage joint operations. As BoS is a part of the UNDG framework focused on enhancing functioning of the UN system at the country level, it is an essential tool to strengthen the linkages between business operations and programme delivery, particularly within the context of a Delivering as One (DaO) country such as Ethiopia. 1. Principles of BoS The Business Operations Strategy is based on the following principles: BoS is a voluntary instrument, which can be used in full or in parts, allowing for better linkages with UNDAF, BoS only covers joint business operations initiatives, BoS provides strategic and medium-term (UNDAF cycle) focus and prioritization based on quantitative and qualitative cost and benefit analysis, BoS provides the basis for monitoring and reporting on progress and results of business operations, BoS provides the basis for resource management and mobilization at country level. 2. Why BoS? The development of the Business Operations Strategy supports the development of harmonised business operations to achieve the following results: Enhanced linkages between programmes and operations: By analyzing the programme strategy through an operational lens and identifying the operations required to deliver the programme, the linkages between programme and operations are established. As both UNDAF and BoS are on the same cycle, it enhances the linkages between the UNDAF and UN operations support to that programme strategy. Reduced costs: BoS provides a strategic focus on operational support services and initiatives aimed at harmonizing and/or simplifying business operations. It allows for multi-year planning of operations and facilitates strategic planning of the operational effort. It also facilitates monitoring and evaluation of the operational effort at the country level. It focuses on reduced lead times to execute processes through streamlining operational process, and reduced direct monetary cost for example by leveraging UN System wide bargaining position when procuring goods and services. Harmonized work processes, elimination of the duplication of business initiatives, and reduced transactions costs for the UN and its partners are some of the few benefits of BoS implementation. Enhanced quality: By jointly procuring services in larger volumes, the UN increases it bargaining power with the service provider and enhances its ability to monitor and evaluate overall quality of service delivery of providers. 1 P a g e

2 Enhanced operational focus and prioritization: Instruments like cost benefit analysis, transaction cost analysis and business process analysis provide light, easy to use tools to identify and prioritize high impact harmonization initiatives and facilitating monitoring and evaluation of harmonization initiatives against pre-established baselines. 3. What is BoS? The Business Operations Strategy has three components: Business Operations Results Framework, reflecting medium-term outcomes and outputs in line with the UNDAF cycle, Monitoring and Evaluation Framework, reflecting outcome and output level indicators allowing for progress monitoring and evaluation of impact of business operations, Management Arrangements of UN Business Operations outlining the way the UN organizes itself in order to deliver cost effective operational support that meets UN Programme requirements. The following graph provides an overview of BoS processes: Moreover, a typical BoS includes the following chapters: Chapter 1: Introduction: Sets the context of BoS. Chapter 2: Operations Analysis: Defines the results focus and prioritizes the results areas according to the outcome of costs and benefits for each suggested business solution. o Includes Baseline Analysis, Needs Analysis, Requirements Analysis, Cost Benefit Analysis, Prioritization. Chapter 3: Business Operations Results Framework (with narratives): Translates the business solutions in specific result statements (outcomes, outputs) and adds a short narrative for each results area. It also adds a required budget per outcome/output. Chapter 4: Business Operations Monitoring, Evaluation and reporting: Defines outcome and output level indicators, targets and baselines. Chapter 5: Business Operations Governance Mechanisms. 2 P a g e

3 Chapter 6: Business Operations Budgetary Framework: Describes the resource requirements, including a resource map of existing resources, the resource gap and a resource mobilization strategy. Chapter 7: Operationalizing the Business Operations Strategy: Outlines the implementation of BoS through work planning, including the concepts of integrated (OMT) work plan and the use of the standardized MoU for Common Services. BoS aims to assign an outcome for each operational activity/area such as common procurement, human resources, information and communication technologies, and security. Each outcome is later split into a few outputs with clear indicators and targets. Here is a template for a BoS matrix for common procurement: Sample BoS Outcome 1: By 2015, the UN in Utopia has realized a reduction of UN Operating Costs by an average of 5% per year. Sample BoS Output 1: By 2015, the UN System in Utopia has reduced cost of procurement by 4% through the development and implementation of Common Procurement initiatives. Annual Deliverable 2012: In year 1, cost reduced by 2% of baseline year 2012 through the establishment of three additional LTAs (established baseline Jan 2012: 5 LTAs in place, target Dec 2012: 8 LTAs in place) Annual Deliverable 2013: In year 2, cost reduced by 1% of baseline year 2012 through the establishment of seven additional LTA s (established baseline Jan 2012: 5 LTAs in place, target Dec 2013: 12 LTAs in place) Sample BoS Output 2: By 2015, the UN System in Utopia has reduced operating cost by 2% through the development and implementation of VoIP. Annual Deliverable 1: Annual Deliverable 2: 3 P a g e

4 4. BoS for DaO in Ethiopia BoS is a perfect match for Ethiopia, as UN Ethiopia has already committed to DaO principles. Since DaO pays particular importance to reducing costs and harmonizing business activities through joint business initiatives, BoS would serve as an easy-to-use framework to better synchronize, monitor and manage UN s joint business activities. It would also allow the OMT (and the UNCT) to improve monitoring, management and implementation of joint business initiatives in the mediumterm and in a coherent way by establishing clear linkages with UNDAF. By focusing on and synchronizing with the UNDAF cycle, BoS will allow OMT to plan ahead for the medium-term needs, detailed at a later stage by annual work plans for each area of work. The following figure summarizes the linkages between BoS and UNDAF: BoS applies results-based project management principles to OMT and other business/operations-related activities. Therefore, it will simplify and quantify management and monitoring of business initiatives, leading to improvements in existing services and establishment of new ones. In other words, implementing BoS in Ethiopia would better the working methods of the OMT and its working groups. 5. Implementation Roadmap UNDG reported that BoS will be piloted in a few countries, including Ethiopia, from Within the framework of DaO, OMT Ethiopia has committed to adopting and implementing BoS to address increasing requests from the UNCT to provide results-based and measurable results for planned and ongoing common operations activities. UNDG will provide Ethiopia and other pilot countries with technical support and capacity development. UNDG reports that the average time needed to adopt BoS is 6 to 8 weeks. Considering the large number of agencies working in Ethiopia, it is estimated that all the operational analyses should be completed by end of March 2013, and BoS should be finalized by the end of April The BoS operational analyses to be conducted include prioritization of potential areas of collaboration in terms of operations through baseline, needs, requirements and cost-benefit analysis. Given the number of UN entities present in Ethiopia, OMT Ethiopia will use the light version of BoS operational analyses with estimates to ease the implementation process. 4 P a g e

5 A consultant was hired in early December 2012 to work with OMT on common procurement. Although her primary assignment is to create a common procurement framework, she will also prepare for BoS adoption and implementation by conducting the necessary preparatory work, including completing the necessary BoS operational analyses in the field of common procurement. All OMT member agencies were informed of this activity, and asked to share copies of their LTAs in selected areas of common procurement with the consultant by end of December The following areas of common procurement were declared by OMT as priority: Fuel, travel services, hotel and lodging, vehicle maintenance, customs clearance, paper and stationary, IT equipment and disposal, cleaning services, communications (including mobile communication costs), printing, postal and courier services, office equipment, and security services. The consultant will work with Chairpersons of the OMT Working Group on Procurement to coordinate this activity, create a repository of suppliers to facilitate the creation of an inter-agency vendor database, and submit the results of this activity to OMT at the OMT Retreat in late January This will allow OMT to discuss and decide on priority areas for BoS, particularly in the field of common procurement. A Common Operations Management Skills Training will be organized in Ethiopia with the UN Staff College in January 2013 during the OMT Retreat to enhance the capacities of the relevant operations staff to implement BoS, by focusing on issues such as common procurement (including the HLCM Guidelines), results-based management, and common operations planning and management skills. Another consultancy will be initiated in January 2013 for 3 months to work exclusively on BoS adoption and implementation. This consultant will finalize the operational analyses held for common procurement as well as the common procurement framework, including an implementation strategy and budget, and template Memoranda for Understanding (MoU) for selected priority field of common procurement. Moreover, the consultant will also work with Chairpersons of other OMT Working Groups to conduct and finalize the relevant BoS operational analyses for each OMT Working Group. The OMT will seek the support of the UNCT Technical Working Group on Monitoring and Evaluation, who provide technical expertise to create and monitor UNDAF, in creating, monitoring and implementing the BoS. Meanwhile, all OMT Working Groups will spend January 2013 with coming up with an annual work plan, budget and activity schedule. These will be submitted to Heads of Agencies during the UNCT Retreat in early February 2013 for their review and endorsement. As these will later need to be linked to the BoS Results Framework, the consultant will assist the OMT Working Groups with this task. Moreover, the consultant will provide UNCT with a review of the BoS adoption and implementation process. The consultant will finalize all required operational analyses, and submit their results to OMT together with a draft BoS, including the draft BoS Results and Monitoring Framework, to OMT by the end of March The draft Results Framework will reflect the mandate and work of all OMT Working Groups, and include both qualitative and quantitative outcomes and outputs, as appropriate. Furthermore, based on these, the consultant will also help each OMT Working Group with linking the UNCT-approved annual work plans, budgets and activity schedules up with the BoS Results and Monitoring Framework. Last but not least, the consultant will also finalize the common procurement framework, including the implementation plan and template MoU for proposed common services, and provide the OMT with them by end of March The OMT will hold a BoS Retreat in early April 2013 to review the draft BoS, and finalize the BoS Results Framework. UNDG/DOCO will be asked to provide strategic planning support during this meeting through a mission. The consultant will finalize the BoS after this meeting, and it will be submitted to UNCT to be signed into effect. 5 P a g e

6 Support Required from UNDG For BoS adoption and implementation, OMT will seek the support of UNDG/DOCO, in particular: Technical support over the internet during the whole activity to help with BoS operational analyses, and facilitate the finalization of BoS, including the Results and Monitoring Framework. Provision of relevant common procurement and BoS-related documents and best practices, including existing common procurement frameworks and template MoU of other DaO countries, standard business process maps (of UNDP) for select field for which BoS operational analyses will be conducted, and any other BoS-related document. Organization of a capacity development session with the UN Staff College during the OMT Retreat in late January 2013 for relevant operations staff members, covering issues such as results-based management, common procurement, and skills for planning and managing common operations and services. Provision of contact details for relevant UNDG, UN Staff College and HLCM staff members and consultant to facilitate BoS implementation and creation of the common procurement framework. Provide relevant OMT staff members and consultants with access to the UN Global Market Place (UNGM) to facilitate BoS adoption and implementation, and creation of the common procurement framework. Quality assurance support over the internet to help finalize BoS, including the Results and Monitoring Framework and annual work plans. Proposed Timeline Date Milestone Ongoing UNDG provides continuous technical support for BoS adoption and implementation via the internet OMT staff members and consultants share all relevant documents, reports and analyses with UNDG on a rolling basis. December 10, 2012 Consultant hired to work on common procurement and conduct preparatory work for BoS adoption and implementation. UNDG s online support to facilitate BoS adoption and implementation begins. December 18, 2012 The consultant presents the roadmap for the creation of a common procurement framework, and BoS adoption and implementation to OMT. OMT approves the priority areas for common procurement, as per the recommendation of the Chairpersons of the OMT Working Group on Procurement and the consultant. December 21, 2012 The consultant works with OMT member agencies to gather a list of suppliers and the existing long-term agreements (LTAs) of agencies in the OMT-approved priority areas for common procurement. The consultant will work with Chairpersons of OMT Working Group on Procurement to conduct BoS operational analyses (baseline, needs, requirements and cost-benefit analysis) for common procurement, including security, ICT equipment and banking. 6 P a g e

7 Late December 2012 UNDG provides OMT with relevant common procurement and best practice documents such as common procurement frameworks and template MoU of other DaO countries, business process maps for relevant fields, etc. UNDG facilitates the access of relevant OMT staff members and consultants to UNGM. January 11, 2013 The consultant finalizes BoS operational analyses for common procurement, and submits the findings to OMT together with the draft common procurement framework. This includes a repository of reliable suppliers and existing agency LTAs. Through support provided by the consultant, OMT Working Groups begin creating their annual work plans, budgets and activity schedules for Mid-January 2013 January 24-25, 2013 Meeting held with UNCT Technical Working Group on M&E to seek their support for BoS adoption, implementation and monitoring. OMT Retreat: OMT reviews the draft common procurement framework and BoS operational analyses for common procurement, and finalizes priorities in this field to be reflected in the BoS Results Framework. Capacity development session held for OMT members in Ethiopia. Late January 2013 Consultancy on BoS adoption and implementation begins. The consultant starts working with Chairpersons of OMT Working Groups to conduct the relevant operational analyses for each field of work, and create the associated outcomes, outputs and indicators for the BoS Results Framework. The consultant provides support to OMT Working Groups in finalizing their annual work plans, budgets and activity schedules for February 13 14, 2013 UNCT Retreat: Finalized annual work plans, budgets and activity schedules of OMT Working Groups shared with UNCT for approval. UNCT briefed on ongoing and planned BoS-related activities. Late March 2013 The consultant finalizes all required operational analyses, and submits their results to OMT together with a draft BoS, including the draft BoS Results and Monitoring Framework, to OMT. The consultant finalizes and provides OMT with the common procurement framework, including implementation plan and template MoU. The consultant will help each OMT Working Group with linking the UNCTapproved annual work plans, budgets and activity schedules up with the BoS Results and Monitoring Framework. 7 P a g e

8 Early April 2013 OMT BoS Retreat: OMT reviews and comments on draft BoS, including the Results and Monitoring Framework. UNDG will hold a mission to provide strategic planning support during this meeting. April 2013 Late April 2013 The consultant works to finalize BoS based on OMT feedback. Finalized BoS submitted to UNCT for review, approval and signage. 8 P a g e

Guidance note on developing the UN Business Operations Strategy

Guidance note on developing the UN Business Operations Strategy Guidance note on developing the UN Business Operations Strategy The Business Operations Strategy (BoS) aims to enhance the cost effectiveness and quality of operations back office processes such as procurement,

More information

TERMS OF REFERENCE. National Business Operations Strategy (BoS) Consultant. PROCUREMENT NOTICE No. UNDP/IC/2013/008

TERMS OF REFERENCE. National Business Operations Strategy (BoS) Consultant. PROCUREMENT NOTICE No. UNDP/IC/2013/008 TERMS OF REFERENCE National Business Operations Strategy (BoS) Consultant PROCUREMENT NOTICE No. UNDP/IC/2013/008 Country: Monrovia, Liberia with travel to UN joint field offices at the county level where

More information

United Nations in Lesotho. UN Business Operations Strategy 2014-2016

United Nations in Lesotho. UN Business Operations Strategy 2014-2016 United Nations in Lesotho UN Business Operations Strategy 2014-2016 The BoS provides a strategic focus on operational support services and initiatives aimed at reinforcing linkages between UN Programmes

More information

Joint Operations Facility Brazil

Joint Operations Facility Brazil Joint Operations Facility Brazil Advisory Report United Nations Development Group/High-Level Committee on Management March 2014 Table of Contents Executive Summary... 2 Summary of the cost and benefits...

More information

Assessing the Cost and Benefits of Simplifying and Harmonizing Business Practices of UN Entities at the Country Level

Assessing the Cost and Benefits of Simplifying and Harmonizing Business Practices of UN Entities at the Country Level Assessing the Cost and Benefits of Simplifying and Harmonizing Business Practices of UN Entities at the Country Level Preparation for the 2012 Quadrennial Comprehensive Policy Review of Operational Activities

More information

Definition, Identification and Measurement of In-country Transaction Costs in the Context of Delivering as One Pilot Countries

Definition, Identification and Measurement of In-country Transaction Costs in the Context of Delivering as One Pilot Countries Definition, Identification and Measurement of In-country Transaction Costs in the Context of Delivering as One Pilot Countries 3 October 2010 This Report has been prepared in response to the request by

More information

Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly

Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly Terms of Reference Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly Study on Results-Based Management Office for ECOSOC Support and Coordination Department for Economic

More information

TOWARDS UNITY IN ACTION UNITED NATIONS REPUBLIC OF MOLDOVA PARTNERSHIP FRAMEWORK 2013 2017 BUSINESS OPERATIONS STRATEGY

TOWARDS UNITY IN ACTION UNITED NATIONS REPUBLIC OF MOLDOVA PARTNERSHIP FRAMEWORK 2013 2017 BUSINESS OPERATIONS STRATEGY TOWARDS UNITY IN ACTION UNITED NATIONS REPUBLIC OF MOLDOVA PARTNERSHIP FRAMEWORK 2013 2017 BUSINESS OPERATIONS STRATEGY Foreword As the UN in Moldova moves towards Delivering as One, the realization of

More information

ONE UN RWANDA BUSINESS OPERATIONS STRATEGY 2013-2018.

ONE UN RWANDA BUSINESS OPERATIONS STRATEGY 2013-2018. ONE UN RWANDA BUSINESS OPERATIONS STRATEGY 2013-2018. 1 Executive Summary The One UN Rwanda BoS 2013-2018 is a medium-term strategic plan that focus on One UN support services to the One UN UNDAP and on

More information

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2 ADDENDUM june 2011 evaluation Updated guidance on EvalUAtion in the Handbook on Planning, Monitoring and EvalUAting for Development Results(2009) Table of Contents 1. Background and Overview 1 1.1 Why

More information

Standard Operating Procedures for Countries Wishing to Adopt the Delivering as one Approach

Standard Operating Procedures for Countries Wishing to Adopt the Delivering as one Approach Standard Operating Procedures for Countries Wishing to Adopt the Delivering as one Approach Prepared by the UNDG High Level Group 22 March 2013 Page 1 of 48 Contents Page 1. Introduction 3 2. One Programme

More information

Legal Annex to UNDAFs. Supplement to the Guidance Notes How to Prepare an UNDAF

Legal Annex to UNDAFs. Supplement to the Guidance Notes How to Prepare an UNDAF Legal Annex to UNDAFs Supplement to the Guidance Notes How to Prepare an UNDAF February 2015 1 2 Background The Quadrennial Comprehensive Policy Review (QCPR) reinforces the need for simplified, inclusive,

More information

STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF. January 2010

STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF. January 2010 STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF January 2010 STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF January 2010 28 January 2010 UNDG Working

More information

Economic and Social Council

Economic and Social Council United Nations E/ICEF/2010/13 Economic and Social Council Distr.: General 5 April 2010 Original: English For information United Nations Children s Fund Executive Board Annual session 2010 1-4 June 2010

More information

UNITED NATIONS Business Operations Strategy

UNITED NATIONS Business Operations Strategy UNITED NATIONS Business Operations Strategy Version: December 2013 Introduction 1.1 Background The UN Country Team is committed to the use of UN resources in a manner that ensures that the organisation

More information

Malawi Business Operations Strategy RCO Malawi, October 2013

Malawi Business Operations Strategy RCO Malawi, October 2013 Malawi Business Operations Strategy RCO Malawi, October 2013-1 - 1. Introduction Following the High Level Panel Recommendations on System wide Coherence in 2007, Malawi became a self starter country for

More information

Streamlined Integrated Results and Resources Framework (IRRF)

Streamlined Integrated Results and Resources Framework (IRRF) UNDP Strategic Plan 2014-2017 Streamlined Integrated Results and Resources Framework (IRRF) Executive Board Informal Consultation, 30 January 2015 Bureau for Policy and Programme Support (BPPS) Development

More information

Joint Informal Consultation on the Simplification and Harmonization of Business Practices

Joint Informal Consultation on the Simplification and Harmonization of Business Practices Joint Informal Consultation on the Simplification and Harmonization of Business Practices Presentation on behalf of UNDP, UNFPA, UNICEF, UNOPS, UN Women and WFP 7 January 2015 Overview Introduction Objectives

More information

Information Sharing Lessons Learned from Gateway Reviews: Gate 3 Investment Decision Review

Information Sharing Lessons Learned from Gateway Reviews: Gate 3 Investment Decision Review Information Sharing Lessons Learned from Gateway Reviews: Gate 3 Investment Decision Review October 2013 The purpose of this document is to share lessons learned to support agencies to better identify

More information

UNDAF ACTION PLAN GUIDANCE NOTE

UNDAF ACTION PLAN GUIDANCE NOTE UNDAF ACTION PLAN GUIDANCE NOTE Annex 2 UNDAF Action Plan Template January 2010 (Updated in October 2010) UNDAF ACTION PLAN (Year-Year) United Nations System in (country name) and Government of (country

More information

PERFORMANCE-BASED ALLOCATION CRITERIA FOR ONE FUNDS

PERFORMANCE-BASED ALLOCATION CRITERIA FOR ONE FUNDS STANDARD OPERATING PROCEDURES for COUNTRIES ADOPTING the DELIVERING AS ONE APPROACH August 2014 ONE UN FUND PERFORMANCE-BASED ALLOCATION CRITERIA FOR ONE FUNDS The One Fund (optional) provides performance-based

More information

Common UN Procurement at the Country Level

Common UN Procurement at the Country Level Harmonizing UN Procurement Common UN Procurement at the Country Level High-Level Committee on Management Procurement Network in collaboration with the United Nations Development Group May 2013, version

More information

UNOPS International Public Sector Accounting Standards (IPSAS) Implementation Programme

UNOPS International Public Sector Accounting Standards (IPSAS) Implementation Programme UNOPS International Public Sector Accounting Standards (IPSAS) Implementation Programme This IPSAS briefing document provides an overview of why IPSAS is being implemented at UNOPS, how this process is

More information

Framework for Joint Internal Audits of United Nations Joint Activities

Framework for Joint Internal Audits of United Nations Joint Activities Framework for Joint Internal Audits of United Nations Joint Activities Endorsed Document United Nations: Representatives of Internal Audit Services September 2014 Framework for Joint Internal Audits of

More information

Operational Planning for HIV/AIDS: A Guidance Note Produced by the AIDS Strategy and Action Planning Service (ASAP)

Operational Planning for HIV/AIDS: A Guidance Note Produced by the AIDS Strategy and Action Planning Service (ASAP) Operational Planning for HIV/AIDS: A Guidance Note Produced by the AIDS Strategy and Action Planning Service (ASAP) DRAFT COMMENTS WELCOME May 2009 i Contents Acronyms... ii Purpose... 1 Process of Developing

More information

CONSULTANCY. Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project

CONSULTANCY. Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project CONSULTANCY Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project This consultancy is requested by: Unit: Outbreaks & Humanitarian Emergencies (OHE) Department:

More information

UNITED NATIONS POPULATION FUND THE UNFPA STRATEGIC PLAN, Annex 5 Alignment of the Strategic Plan with the QCPR

UNITED NATIONS POPULATION FUND THE UNFPA STRATEGIC PLAN, Annex 5 Alignment of the Strategic Plan with the QCPR UNITED NATIONS POPULATION FUND THE UNFPA STRATEGIC PLAN, 2014-2017 Annex 5 Alignment of the Strategic Plan with the QCPR The Quadrennial Comprehensive Policy Review of operational activities for development

More information

UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN

UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN 2010 UNITED NATIONS LIBERIA 1 UN LIBERIA JOINT COMMUNICATIONS STRATEGY AND WORKPLAN 2010 Communications Strategy and Workplan United Nations in Liberia 2010

More information

Governing Body 319th Session, Geneva, 16 31 October 2013

Governing Body 319th Session, Geneva, 16 31 October 2013 INTERNATIONAL LABOUR OFFICE Governing Body 319th Session, Geneva, 16 31 October 2013 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.319/PFA/2 PFA Date:

More information

Capnam, UNESS, GEQF: UNESCO tools to support education planning

Capnam, UNESS, GEQF: UNESCO tools to support education planning Capnam, UNESS, GEQF: UNESCO tools to support education planning The Paris declaration On 2 March 2005, a group of countries and multilateral organisations came together in Paris to declare that development

More information

BACKGROUND PAPER COUNTRY STRATEGIC PLANS

BACKGROUND PAPER COUNTRY STRATEGIC PLANS BACKGROUND PAPER COUNTRY STRATEGIC PLANS Informal Consultation 21 September 2015 World Food Programme Rome, Italy Introduction 1. This paper follows from the 29 June 2015 discussion of the Executive Board

More information

CHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015

CHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015 Mission and Background CHARTER Interagency Information Systems Working Group Timber Regulation and Forest Restoration Program June 23, 2015 The Mission of the Interagency Information Systems (IIS) Working

More information

UNITED NATIONS DEVELOPMENT PROGRAMME Special Assistant to Resident Coordinator (SARC) JOB DESCRIPTION

UNITED NATIONS DEVELOPMENT PROGRAMME Special Assistant to Resident Coordinator (SARC) JOB DESCRIPTION Please use this format to request a SARC for your office. The Job Description should be specific and comprehensive and UN/UNDP abbreviations should be spelled out in full. I. Position Information SARC

More information

Benchmarking Study of Administrative Services. An initiative of Organizational Excellence an institutional value and formal program

Benchmarking Study of Administrative Services. An initiative of Organizational Excellence an institutional value and formal program Benchmarking Study of Administrative Services An initiative of Organizational Excellence an institutional value and formal program ORGANIZATIONAL EXCELLENCE APPROACH In collaboration with faculty, staff,

More information

Transforming Ethiopia Together

Transforming Ethiopia Together Page 1 The One UN Communication Strategy 2012 2015 Transforming Ethiopia Together EXTERNAL VERSION Developed by the United Nations Communications Group (UNCG) on behalf of the United Nations Country Team

More information

4: Proposals for Best Practice Principles for GHP activities at country level

4: Proposals for Best Practice Principles for GHP activities at country level DOC 2.05-8.1 From: WORKING GROUP ON GLOBAL HEALTH PARTNERSHIPS: REPORT --- BEST PRACTICE PRINCIPLES FOR GLOBAL HEALTH PARTNERSHIP ACTIVITIES AT COUNTRY LEVEL (Oct. 2005) 4: Proposals for Best Practice

More information

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI 2: Corporate strategy and mandate KPI 3: Corporate focus on results KPI 4: Focus

More information

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

UN Country Team Concept Paper ONE UNITED NATIONS IN MOZAMBIQUE

UN Country Team Concept Paper ONE UNITED NATIONS IN MOZAMBIQUE UN Country Team Concept Paper ONE UNITED NATIONS IN MOZAMBIQUE December 2006 The overall goal of the One UN Initiative in Mozambique is to improve programme delivery and results through a more coherent,

More information

UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009

UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009 UNICEF International Public Sector Accounting Standards (IPSAS) Project Implementation Plan July 2009 I. Introduction The adoption of IPSAS by UNICEF represents major organisational change. This implementation

More information

GUIDELINES ON THE EMERGENCY FUND SPECIAL INITIATIVE

GUIDELINES ON THE EMERGENCY FUND SPECIAL INITIATIVE As of February 2016 GUIDELINES ON THE EMERGENCY FUND SPECIAL INITIATIVE 1. Purpose of the Guidelines 1.1 These Guidelines define the approach for operationalizing the Emergency Fund Special Initiative,

More information

DFID Multilateral Aid Review 2013 Update UNICEF Response and follow up

DFID Multilateral Aid Review 2013 Update UNICEF Response and follow up DFID Multilateral Aid Review 2013 Update UNICEF Response and follow up UNICEF welcomes the findings of the 2013 update of the UK s Multilateral Aid Review (MAR) and would like to thank DFID for the highly

More information

UN Tanzania. Business Operations Strategy

UN Tanzania. Business Operations Strategy UN Tanzania Business Operations Strategy FOREWORD First of all, on behalf of the UN Country Team, let me thank the UN Development Group for selecting Tanzania to pilot the Business Operations Strategy.

More information

PARIS, 20 February 2009 Original: English BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO DECENTRALIZED BODIES SUMMARY

PARIS, 20 February 2009 Original: English BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO DECENTRALIZED BODIES SUMMARY Executive Board Hundred and eighty-first session 181 EX/20 PARIS, 20 February 2009 Original: English Item 20 of the provisional agenda BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO

More information

Background. Objective

Background. Objective UNDEF EVALUATION Consultancy Terms of Reference Background 1. UNDEF was established by the UN Secretary-General in 2005 as a United Nations General Trust Fund to support democratization efforts around

More information

Communicating as One: Supporting UNCTs in developing a One UN identity at country level

Communicating as One: Supporting UNCTs in developing a One UN identity at country level TERMS OF REFERENCE Graphic Design Company: Visual identity project Knowledge and Innovation Team ORGANIZATIONAL CONTEXT The United Nations Development Group (UNDG) unites the UN funds, programmes, specialized

More information

Terms of Reference. One UN/UNDP Website Hosting Services for the One UN in Rwanda

Terms of Reference. One UN/UNDP Website Hosting Services for the One UN in Rwanda Terms of Reference One UN/UNDP Website Hosting Services for the One UN in Rwanda 1.0 Introduction As part of the overall UN reform process, the Delivering as One (DaO) in Rwanda was launched at the beginning

More information

Organization : United Nations Entity for Gender Equality and the Empowerment of Women (UN Women)

Organization : United Nations Entity for Gender Equality and the Empowerment of Women (UN Women) UNITED NATIONS ENTITY FOR GENDER EQUALITY AND THE EMPOWERMENT OF WOMEN JOB DESCRIPTION RE-ADVERTISEMENT OF VACANCY ANNOUNCEMENT NO: UN WOMEN/MCO/FTA/2016/002 Date of Issue: 11 Nov. 2016 Closing Date: 30

More information

INDIVIDUAL CONSULTANCY

INDIVIDUAL CONSULTANCY INDIVIDUAL CONSULTANCY ARCHITECTURAL CONSULTANT SERVICE TO DEVELOP A CONCEPT DESIGN AND UPDATE THE BUILDING SPECIFICATIONS FOR THE ONE UN HOUSE IN RWANDA TERMS OF REFERENCE 1. Background and Project Description

More information

ISACA and IIA of Orange County

ISACA and IIA of Orange County ISACA and IIA of Orange County Present The Balanced Scorecard December 3 rd, 2013 Objectives By the end of today s training you will be able to answer the following questions: Where is my department based

More information

Ref: 044-2015/JF/pj New York, 14 July 2015

Ref: 044-2015/JF/pj New York, 14 July 2015 Ref: 044-2015/JF/pj New York, 14 July 2015 Subject: UNDG LAC Support to UNDAF Dear Jorge, As you advance on the important exercise of formulating a new United Nations Development Assistant Framework (UNDAF)

More information

2008 NASCIO Recognition Awards Nomination Commonwealth of Virginia

2008 NASCIO Recognition Awards Nomination Commonwealth of Virginia 2008 NASCIO Recognition Awards Nomination Commonwealth of Virginia Nomination Category: Data, Information and Knowledge Management Title of Nomination: Commonwealth of Virginia Knowledge Center (COVKC)

More information

Consolidated Annual Financial Report of the Administrative Agent of the PNG UN Country Fund

Consolidated Annual Financial Report of the Administrative Agent of the PNG UN Country Fund Consolidated Annual Financial Report of the Administrative Agent of the PNG UN Country Fund for the period 1 January to 31 December 2013 Multi-Partner Trust Fund Office Bureau of Management United Nations

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information

Managing for Results: Monitoring and Evaluation in UNDP

Managing for Results: Monitoring and Evaluation in UNDP . Evaluation Office Managing for Results: Monitoring and Evaluation in UNDP.......... A Results-Oriented Framework 16 November 2001 Introduction This paper presents the key changes to the UNDP monitoring

More information

Guidance for the development of gender responsive Joint Programmes. MDG Achievement Fund

Guidance for the development of gender responsive Joint Programmes. MDG Achievement Fund Guidance for the development of gender responsive Joint Programmes MDG Achievement Fund This guidance is elaborated to provide practical recommendations on how to incorporate the gender perspective when

More information

ICT Strategy for the Secretariat

ICT Strategy for the Secretariat ICT Strategy for the Secretariat Stronger ICT for a Better United Nations Briefing for the UN Reform Series organized jointly by UNITAR and the Permanent Mission of Switzerland to the United Nations 4

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES Headquarters, Copenhagen O.D. No. 33 16 April 2010 ORGANIZATIONAL DIRECTIVE No. 33 UNOPS Strategic Risk Management Planning Framework 1. Introduction 1.1.

More information

2013 INS OPERATIONAL PLAN

2013 INS OPERATIONAL PLAN 2013 INS OPERATIONAL PLAN Planning Context and Key Priorities Our Mission Information Services enables the creation, synthesis and dissemination of knowledge within a global information environment. Our

More information

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

PHASE 9: OPERATIONS AND MAINTENANCE PHASE PHASE 9: OPERATIONS AND MAINTENANCE PHASE During the Operations and Maintenance Phase, the information system s availability and performance in executing the work for which it was designed is maintained.

More information

Finding the Right People for Your Program Evaluation Team: Evaluator and Planning Team Job Descriptions

Finding the Right People for Your Program Evaluation Team: Evaluator and Planning Team Job Descriptions : Evaluator and Planning Team Job Descriptions I. Overview II. Sample Evaluator Job Description III. Evaluator Competencies IV. Recruiting members of your strategic evaluation planning team V. Recruiting

More information

2008-2009 Unified Budget and Workplan. Performance Monitoring and Evaluation Framework

2008-2009 Unified Budget and Workplan. Performance Monitoring and Evaluation Framework 2008-2009 Unified Budget and Workplan Performance Monitoring and Evaluation Framework Secretariat UNAIDS UNHCR UNICEF WORLD BANK WFP UNDP WHO UNFPA UNESCO ILO UNODC 2 2008-2009 UBW Performance Monitoring

More information

NOTE ON JOINT PROGRAMMES

NOTE ON JOINT PROGRAMMES STANDARD OPERATING PROCEDURES for COUNTRIES ADOPTING the DELIVERING AS ONE APPROACH August 2014 GUIDANCE NOTE ON JOINT PROGRAMMES The Common Budgetary Framework, with all planned and costed UN programme

More information

GENDER MAINSTREAMING

GENDER MAINSTREAMING GENDER MAINSTREAMING Extract from REPORT OF THE ECONOMIC AND SOCIAL COUNCIL FOR 1997 (A/52/3, 18 September 1997) Chapter IV COORDINATION SEGMENT COORDINATION OF THE POLICIES AND ACTIVITIES OF THE SPECIALIZED

More information

4 MEAL planning and budgeting

4 MEAL planning and budgeting Monitoring, Evaluation, Accountability and Learning (MEAL) Keywords: Monitoring, evaluation, accountability, learning, plan, budget Introduction In this session on MEAL Planning and Budgeting, you will

More information

BIG DATA KICK START. Troy Christensen December 2013

BIG DATA KICK START. Troy Christensen December 2013 BIG DATA KICK START Troy Christensen December 2013 Big Data Roadmap 1 Define the Target Operating Model 2 Develop Implementation Scope and Approach 3 Progress Key Data Management Capabilities 4 Transition

More information

UNDG Strategy for the Deployment of Human Rights Advisers to Resident Coordinators and UN Country Teams

UNDG Strategy for the Deployment of Human Rights Advisers to Resident Coordinators and UN Country Teams UNDG Strategy for the Deployment of Human Rights Advisers to Resident Coordinators and UN Country Teams UNDG Human Rights Mainstreaming Mechanism January 2012 Endorsed by UNDG on 3 February 2012 A. Background

More information

Positive Train Control (PTC) Program Management Plan

Positive Train Control (PTC) Program Management Plan Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information

More information

Crosswalk: Core Competencies for Public Health Professionals & the Essential Public Health Services

Crosswalk: Core Competencies for Public Health Professionals & the Essential Public Health Services Crosswalk: Core Competencies for Public Health Professionals & the Essential Public Health Services Introduction View crosswalks of the Tier, Tier and Tier Core Competencies for Public Health Professionals

More information

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF.

Office of Internal Audit and Investigations (OIAI) Report 2012/27. Report on an Audit of the Budgeting Process in UNICEF. Office of Internal Audit and Investigations (OIAI) Report 2012/27 Report on an Audit of the Budgeting Process in UNICEF October 2012 Report on an Audit of the Budgeting Process in UNICEF (2012/27) 1 Executive

More information

WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS

WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS WHITE PAPER: ANALYSIS OF SUCCESSFUL SUPPLY CHAIN ORGANIZATION MODELS Enporion, Inc. March, 2009 www.enporion.com SUPPLY CHAIN ORGANIZATION MODELS THAT DRIVE SUCCESS To ensure success in your supply chain

More information

GLOSSARY OF EVALUATION AND RESULTS BASED MANAGEMENT (RBM) TERMS

GLOSSARY OF EVALUATION AND RESULTS BASED MANAGEMENT (RBM) TERMS For Official Use DCD/DAC/EV(2000)6 DCD/DAC/EV(2000)6 English text only For Official Use Organisation de Coopération et de Développement Economiques OLIS : 25-Oct-2000 Organisation for Economic Co-operation

More information

IT Services Management Service Brief

IT Services Management Service Brief IT Services Management Service Brief Release Management Prepared by: Rick Leopoldi May 25, 2002 Copyright 2002. All rights reserved. Duplication of this document or extraction of content is strictly forbidden.

More information

United Nations Industrial Development Organization

United Nations Industrial Development Organization - United Nations Industrial Development Organization Distr.: General 9 July 2010 Original: English Industrial Development Board Thirty-eighth session Vienna, 24-26 November 2010 Item 2 (c) of the provisional

More information

AUDIT REPORT. Audit of the use of consultants at United Nations Headquarters FINAL OVERALL RATING: PARTIALLY SATISFACTORY

AUDIT REPORT. Audit of the use of consultants at United Nations Headquarters FINAL OVERALL RATING: PARTIALLY SATISFACTORY INTERNAL AUDIT DIVISION AUDIT REPORT Audit of the use of consultants at United Nations Headquarters Overall results relating to effective and efficient hiring and use of consultants were partially. Implementation

More information

RESEARCH CAPACITY STRENGTHENING AND KNOWLEDGE MANAGEMENT STRATEGY

RESEARCH CAPACITY STRENGTHENING AND KNOWLEDGE MANAGEMENT STRATEGY RESEARCH CAPACITY STRENGTHENING AND KNOWLEDGE MANAGEMENT STRATEGY IMPROVING THE IMPACT OF HEALTH RESEARCH Good health is an essential foundation for social and economic sustainable development. Knowledge

More information

Centralized Application and Management System. Category: Data, Information and Knowledge Management. Initiation date: June 2011

Centralized Application and Management System. Category: Data, Information and Knowledge Management. Initiation date: June 2011 Centralized Application and Management System Category: Data, Information and Knowledge Management Initiation date: June 2011 Completion date: November 2012 Nomination submitted by: Samuel A. Nixon Jr.

More information

Governing Body 320th Session, Geneva, March 2014

Governing Body 320th Session, Geneva, March 2014 INTERNATIONAL LABOUR OFFICE Governing Body 320th Session, Geneva, 13 27 March 2014 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.320/PFA/4 PFA Date:

More information

FY 2010 Annual Action Plan

FY 2010 Annual Action Plan Focus Area: Develop a workforce that allows the City to meet strategic initiatives and run its business. Detail Objective Increase employee participation in the City training opportunities. Implement a

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015 EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015 Item 3, Report No. 5, of the Finance, Administration and Audit Committee, which was adopted without amendment by the Council of the City of Vaughan

More information

Technical Support Facility for West and Central Africa. Regional Training on Strategic and Operational Planning in HIV and AIDS.

Technical Support Facility for West and Central Africa. Regional Training on Strategic and Operational Planning in HIV and AIDS. Technical Support Facility for West and Central Africa Regional Training on Strategic and Operational Planning in HIV and AIDS 6-9 April 2010 Accra, Ghana Background UNAIDS Technical Support Facility for

More information

A Guide to Project Management

A Guide to Project Management A Guide to Project Management The purpose of this website is to provide a job aid for project management procedures using the IPECC project management model. The information will be provided in a summarized

More information

Terms of Reference. Job Title: Lead Consultant and Agriculture Adaptation Planning Expert

Terms of Reference. Job Title: Lead Consultant and Agriculture Adaptation Planning Expert Terms of Reference Project Title: UNDP-FAO Collaborative Project on Supporting Nepal to integrate the agricultural sectors into National Adaptation Plans (NAPs)- UNFA/GLO/616/UND Job Title: Lead Consultant

More information

ERP Implementation Planning

ERP Implementation Planning ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing

More information

Project Management Plan Template

Project Management Plan Template Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION

More information

Development of a Country Compact:

Development of a Country Compact: INTERN A T I O N AL HEA L T H PA R TNER S HIP + R E L A TED IN I T I A T I V E S Development of a Country Compact: Guidance Note September 2013 Aligning for better results This IHP+ Guidance Note on the

More information

Table of Contents PERFORMANCE REVIEWS STRATEGIC REVIEWS

Table of Contents PERFORMANCE REVIEWS STRATEGIC REVIEWS SECTION 270 PERFORMANCE AND STRATEGIC REVIEWS Table of Contents 270.1 To which agencies does this section apply? 270.2 What is the purpose of this section? PERFORMANCE REVIEWS 270.3 What is the purpose

More information

Annex A: Administrative Agent Financial Report on One UN Coherence Fund for 2013

Annex A: Administrative Agent Financial Report on One UN Coherence Fund for 2013 Annex A: Administrative Agent Financial Report on One UN Coherence Fund for 2013 This chapter presents financial data and analysis of the Albania One UN Coherence Fund using the passthrough funding modality

More information

update on enterprise resource planning system

update on enterprise resource planning system 1. Introduction UNRWA is in the process of implementing a new Enterprise Resource Planning (ERP) system, to provide an integrated information system that will: fully support the growing needs of the Agency;

More information

Assessment of NCTD Program Management Framework for Positive Train Control Program

Assessment of NCTD Program Management Framework for Positive Train Control Program Assessment of NCTD Program Management Framework for Positive Train Control Program Subtask 2: Analysis Gap Analysis Prepared for: Brad Hansen, M.S., PMP Director, PMO Capital Projects May 2013 0 icfi.com/transportation

More information

USING THE EVALUABILITY ASSESSMENT TOOL

USING THE EVALUABILITY ASSESSMENT TOOL USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results

More information

Status Report on the Operations Manual and Appraisal Toolkit

Status Report on the Operations Manual and Appraisal Toolkit Status Report on the Operations Manual and Appraisal Toolkit GCF/BM-2015/Inf.06 5 May 2015 For information between meetings Page 1 I. Introduction Status Report on the Operations Manual and Appraisal Toolkit

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

Project Proposal. Virtual Statistical System

Project Proposal. Virtual Statistical System P21 SC1 08 VSS PARIS21 Steering Committee Meeting 6 June 2008 International Energy Agency Conference Center 9 rue de la Fédération, 75015 Paris Project Proposal Virtual Statistical System May 2008 Preface

More information

[ ] Integrating Umoja and UNGM. HLCM-PN Turin, March 2014

[ ] Integrating Umoja and UNGM. HLCM-PN Turin, March 2014 Integrating Umoja and UNGM HLCM-PN Turin, March 2014 Agenda Introduction - Overview of Umoja UN Vendor Database before and after Vendor Data Cleansing project Establishing an Interface between UNGM and

More information

LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN

LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN Version Number: 1.0 Version Date: October 1, 2014 VERSION HISTORY Version Number Implemented By Revision Date Approved By Approval Date 1.0

More information

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)

The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure

More information

Project Scorecard Template

Project Scorecard Template Project Scorecard Template 1. Identify criteria for success: Review the objectives and deliverables in the Project Definition, as well as any other existing information that is relevant to the project.

More information

United Nations Industrial Development Organization

United Nations Industrial Development Organization - United Nations Industrial Development Organization Distr.: General 18 March 2011 Original: English Industrial Development Board Thirty-ninth session Vienna, 22-24 June 2011 Item 4 (e) of the provisional

More information

19 April 2016. Excellency,

19 April 2016. Excellency, 8) ~ THE PRESIDENT OF THE GENERAL ASSEMBLY 19 April 2016 Excellency, Please find attached communication from Her Excellency Lois M. Young, Permanent Representative of Belize and His Excellency Ib Petersen,

More information