Prequalification Supplement for First Tier Subcontractors under CM at Risk Wake Technical Community College Early Site North Campus Project
|
|
- Chad Lamb
- 7 years ago
- Views:
Transcription
1 NC General Statue c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publically advertise as prescribed in G.S ; and shall prequalify and accept bids from first tier subcontractors for all construction work under this section. The construction manager at risk shall use the prequalification process determined by the public entity in accordance with G.S , provided that the public entity and the construction manager at risk shall jointly develop the assessment tool and criteria for that specific project, which must include the prequalification scoring values and minimum required score for prequalification on that project. The public entity shall require the construction manager at risk to submit its plan for compliance with G.S for approval by the public entity prior to soliciting bids for the project(s) first tier subcontractors. A construction manager at risk and first tier subcontractors shall make a good faith effort to comply with the G.S , G.S , and to recruit and select small business entities. Explanation of Pre-Qualification Selections: Should a subcontractor want an explanation of their submittal s non-prequalified status on an individual project, they should contact the CM at Risk in writing ( is sufficient) for an explanation within 3 business days of notification of the prequalified subcontractor s list. PREQUALIFICATION DUE DATE: November 1, 2014 Submitted to: Patrick McHugh Contact Name Clancy & Theys/Balfour Beatty- Wake Tech, a Joint Venture R Firm 5420 Wade Park Blvd. Suite 200 Address Raleigh, NC City/State Zip Code Office Phone number 272 Contact Person Ext. patrickmchugh@clancytheys.com Contact Person address Sub Prequalification_Form_ Page 1 of 10
2 Project: Wake Technical Community College North Wake Campus The Trustees of Wake Technical Community College Project Owner O Brien/Atkins Associates, PA Project Architect Early Site December 20, 2014 Project Phase Project Start Date (Approx.) 22 Months November 20, 2014 Project/Phase Duration Anticipated Bid Date 38.5 Million 4 Million Total Project Budget Phase Budget Insurance Program: OCIP N/A CCIP _ N/A Subcontractor Bonding: Payment/Performance Bond SubGuard X (Bonding Threshold is required for all Bids over $300,000) None Bid Bond Required: All bids $300,000 or higher need a bid bond, or cashier s check Project Description: Early Site Package consists of Earthwork, UG Utilities, Paving, Misc. Metal / Fencing and General Trades. The overall project includes multiple buildings (Central Utility Plant, Gym / Multipurpose Center & Skilled Trades Building) along with a comprehensive site package. The expected start date is November 2014 with an estimated duration time of 26 months. The exterior of the buildings are comprised of metal panels, brick, glass & glazing. The Skilled Trades Building and Multipurpose building are erected from structural steel; the Central Utility Plant is comprised of CMU. Interior finishes including terrazzo, overhead doors, millwork, flooring, paint and tile along with the MEP trades are all required for this project. If your firm is interested in prequalifying for this project/phase, please check the box for your trade(s). This is a preliminary list of Bid Packages and may change based on response and qualified bidders. Preliminary Check Box if Scope of Work Budget Prequalifying Bid Package BP 2A Earthwork Early Site Earthwork, Site Utilities, Paving $ 3,000, BP 2B UG Electrical Early Site Underground Electrical $ 500, BP 2C Misc. Metal Early Site Misc. Metal & Fencing $ 50, BP 2D General Trades Early Site General Trades / Cleanup $ 120, Sub Prequalification_Form_ Page 2 of 10
3 List three (3) current or completed projects of similar type, size, and duration of proposed project. #1 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/ Architect Name/Representative Architect Address/Phone #/ Contract Dollar Value Percentage Complete Current Anticipated Completion Date #2 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/ Architect Name/Representative Architect Address/Phone #/ Contract Dollar Value Percentage Complete Current Anticipated Completion Date #3 Similar - Project Name Description of Work Performed Contract Delivery Method (CM/GC)? Owner Name/ Representative Owner Address/Phone #/ Architect Name/Representative Sub Prequalification_Form_ Page 3 of 10
4 Architect Address/Phone #/ Contract Dollar Value Percentage Complete Current Anticipated Completion Date Section 1. GENERAL REQUIREMENTS 1. a. General Company Information Name of Subcontractor: Contact Person: Contact Person: phone, and Did you complete the BB/CT online Prequalification Form prior to submitting this form Yes No Are you registered with the State of North Carolina Secretary of State Yes No 1. b. Type of Work Performed on a regular basis Primary Scope of Work: Secondary Scope of Work: Other Scope of Work: Insurance 1. c. Insurance The minimum requirements of coverage are indicated in ATTACHMENT A to prequalification. Firms must indicate that they can provide evidence of insurance coverage, should they be the successful bidder by attaching a copy of their insurance certificate by checking the box: Yes No ; if no, you need to attach your company s insurance certificate highlighting the differences to attachment A for BB/CT approval. 1. d. Minority Information This Project has a minority participation goal of _15_% (i) Indicate your NC HUB Certification: B HA AA AI W SE D See website link for more information: Sub Prequalification_Form_ Page 4 of 10
5 (ii) Does the company currently have a documented plan for engaging subcontractor participation from Historically Underutilized Businesses? Yes No If yes, please attach your company s HUB plan. (iii) What has been your company s average percentage level of Historically Underutilized Business participation for projects in North Carolina for the past 5 years: % (iv) List the HUB participation you provided in the three similar projects listed above Project Name HUB % Owner s Rep Contact Phone # (v) How can you provide HUB participation on this project? Sub Prequalification_Form_ Page 5 of 10
6 Attachment A Project Specific Insurance Certificate SUBCONTRACT INSURANCE CERTIFICATE HERE Sub Prequalification_Form_ Page 6 of 10
7 Sub Prequalification_Form_ Page 7 of 10
8 Attachment B Prequalification Scoring Sheet (FOR REFERENCE ONLY) Sub Prequalification_Form_ Page 8 of 10
9 Attachment C EMR Safety Report Sub Prequalification_Form_ Page 9 of 10
10 Attachment D List Previous Projects with Design Team (O Brien Atkins/Kimley-Horn) Sub Prequalification_Form_ Page 10 of 10
State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk
NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143 129; and
More informationState of North Carolina Prequalification Form for Prime Contractor
Pursuant to the statute, this form gathers information about the contractors seeking to qualify for the work and provides a general format for the prequalification criteria. Completing this questionnaire
More informationWake County Public School System Rogers Lane Elementary School (E40) Raleigh, North Carolina INSTRUCTIONS TO BIDDERS
Wake County Public School System Rogers Lane Elementary School (E40) Raleigh, North Carolina INSTRUCTIONS TO BIDDERS General Information: The work includes the construction of a new three story elementary
More informationColorado Mesa University CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION
CMU 2489 REQUEST FOR QUALIFICATIONS SMALL BUSINESS GENERAL CONTRACTOR PREQUALIFICATION BACKGROUND, OVERVIEW AND GOALS Colorado Mesa University is soliciting the submittal of qualifications from General
More informationClancy & Theys Construction Company/Holt Brothers Construction Prequalification Form for First-Tier Subcontractors under CM at Risk
Pursuant to the NC Statute GS143-128.1, 143-135.8 and Wake Technical Community College Policy for Prequalification of Bidders for Construction Projects, this form gathers information about the Subcontractor
More informationNOTICE TO CONTRACTORS
NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification
More informationThe University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects
The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects May 2002 1 of 15 The University of North Carolina Office of The President
More informationPASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List
PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List At their Board meeting of August 21, 2013, the Trustees of the
More informationCollege of the Siskiyous Insurance Requirements
College of the Siskiyous Insurance Requirements Minimum Insurance Coverages for 2016 Pre-Qualification Contractor Insurance. The Contractor shall obtain and maintain the following insurance coverages with
More informationKIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General
More informationGUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS
GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES FOR PARTICIPATION IN STATE CONSTRUCTION CONTRACTS In accordance with G.S. 143-128.2 (effective January 1, 2002) these guidelines establish
More informationT34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A
T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A PANELISTS: Deborah Anderson, Esq. Office of the Attorney General Laura Wernick, FAIA, REFP, LEED AP HMFH Architects, Inc.
More informationADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*
ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C22 or B, with ASB & HAZ Certification Bid
More informationPRE BID MEETING AGENDA
PRE BID MEETING AGENDA Project Name: UCHC Academic Bldg. Addition & Renovation Meeting Location: UCHC, Farmington, CT Campus Project #: 901729 Meeting Date: December 10, 2014 1. Team Introductions: Construction
More informationINFORMAL BIDDING APPLICATION FOR REGISTRATION November 2015 October 2016
INFORMAL BIDDING APPLICATION FOR REGISTRATION General Instructions: Bidders must complete the entire Application. If the requested information does not apply please indicate by N/A. If there is not enough
More informationCULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015
I. BACKGROUND AND OVERVIEW PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS May 21, 2015 The Culver City Unified School District ( District ), is prequalifying contractors to perform construction
More informationDENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN URBAN REDEVELOPMENT PROJECTS.
DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN Policy Statement URBAN REDEVELOPMENT PROJECTS November 2014 The Denver Urban Renewal Authority ("DURA") has determined
More informationHamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
More informationANNUAL PREQUALIFACTION APPLICATION. Interested Subcontractor:
ANNUAL PREQUALIFACTION APPLICATION Interested Subcontractor: Each Frank L. Blum Construction subcontractor that has the potential of having a contract greater than $50,000 must submit a completed Subcontractor
More information1. PROJECT DESCRIPTIONS.
SAN ELIZARIO INDEPENDENT SCHOOL DISTRICT REQUEST FOR PROPOSALS FOR FOR CONSTRUCTION MANAGER AT RISK FOR NEW FIELDHOUSE AND STEM BUILDING ADDITION AT SAN ELIZARIO HIGH SCHOOL AND NEW SUPPORT SERVICES BUILDING
More informationAPPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS AND PRIME CONTRACTORS. (for construction projects valued at more than $250,000) for
Palomar Community College District Business & Contract Services, Room A-10 1140 W. Mission Rd. San Marcos, CA 92069-1487 Phone: (760) 744-1150 x 2129 FAX: (760) 761-3548 APPLICATION FOR PRE-QUALIFICATION
More informationNOW, THEREFORE, THE BOARD OF COMMISSIONER FOR THE COUNTY OF ALAMANCE DOTH ORDAIN:
ORDINANCE FOR THE ESTABLISHMENT OF ALAMANCE COUNTY MINORITY BUSINESS ENTERPRISE (MBE) OUTREACH PLAN AND GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES WHEREAS, the Board of Commissioners
More informationSUBCONTRACTOR PRE-QUALIFICATION APPLICATION
APPLICATION SUBCONTRACTOR IDENTITY Date Submitted Company Name Complete Address Phone Number Contact Name Federal Tax ID # DUNS # Fax Number Email Address NAICS Code States Registered to do Business Include
More informationMULTI- PURPOSE HALL. College Station, Texas January 17, 2015
BID SOLICITATION FOR CONSTRUCTION PROJECT MANAGEMENT MULTI- PURPOSE HALL College Station, Texas January 17, 2015 A. PURPOSE Islamic Community of Bryan- College Sation, Texas (ICBCS) solicits bids for Project
More informationPre-qualification in 2014. The Original Law PCC 20111.5 Still Valid
Pre-qualification in 2014 Phil Henderson, Orbach Huff Suarez & Henderson, LLP Mayra Gonzalez, Santa Ana Unified School District Layne Arthur, Balfour Beatty Construction The Original Law PCC 20111.5 Still
More informationHow to do Business. with Charlotte-Mecklenburg Utilities. http://cmucontracts.charmeck.org
How to do Business with Charlotte-Mecklenburg Utilities http://cmucontracts.charmeck.org How Charlotte-Mecklenburg Utilities Purchases Products and Services 2 & 3 l About Water and Sewer Projects 4 & 5
More informationProject Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:
This bid form must be filled out but is for MPOWER processing purposes only. It does not replace the contractors bid. Your contractors bid should additionally be attached. Project Name: Project No.: CONTRACTOR
More informationRepair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
More informationKEEPING OUT THE RIFFRAFF: CITY OF RALEIGH BIENNIAL PIPELINE CONSTRUCTION PREQUALIFICATION
KEEPING OUT THE RIFFRAFF: CITY OF RALEIGH BIENNIAL PIPELINE CONSTRUCTION Aaron Brower, P.E., City of Raleigh Eileen Navarrete, P.E., City of Raleigh Taylor Barto, E.I., City of Raleigh ABSTRACT In an effort
More informationTRANSBAY JOINT POWERS AUTHORITY
STAFF REPORT FOR CALENDAR ITEM NO.: 14 FOR THE MEETING OF: November 13, 2014 BRIEF DESCRIPTION: TRANSBAY JOINT POWERS AUTHORITY Amending Contract No. 08-04-CMGC-000, authorizing Webcor/Obayashi Joint Venture
More informationSubcontractor Prequalification Statement
To: NUNN CONSTRUCTION, INC. 925 ELKTON DRIVE COLORADO SPRINGS, CO 80907 (719) 599-7710, FAX (719) 599-4744 From: Firm Name: GENERAL INFORMATION Subcontractor Prequalification Statement Company Name Address
More informationRICHARD B. HUDGENS ARCHITECT, INC.AIA
RICHARD B. HUDGENS ARCHITECT, INC.AIA 520 DALLAS AVENUE P.O. BOX 1467 SELMA, ALABAMA 36702 334-874-1335 PROJECT: RENOVATIONS AND ADDITIONS TO PEBBLE HILL (03-01-13) AU PROJECT NO. 06-176 LOCATION: OWNER:
More informationJuly 5, 2016 FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS MAY SUBJECT YOUR BID TO REJECTION ON THE AFFECTED ITEM(S):
STATE OF NORTH CAROLINA DEPARTMENT OF ADMINISTRATION OFFICE OF FISCAL MANAGEMENT IMPORTANT BID ADDENDUM July 5, 2016 FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS MAY SUBJECT YOUR
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874
ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial
More informationREQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER
RFP #2016-02 REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES FOR SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER RELEASE DATE: January 29, 2016 DUE DATE: February
More informationConstruction Management and project process
Construction Management and project process Presented by: Vourvoutsiotis Apostolos GSO University of Applied Science Nürnberg 06.04.2000 Table of Contents Construction Management and project process Construction
More informationCHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)
Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB
More informationAttachment A. Application for Prequalification. General Contractors, Trade Subcontractors and Related Construction Service Providers.
Attachment A Application for Prequalification of General Contractors, Trade Subcontractors and Related Construction Service Providers Pre-Qualification Form 03.14.16 Page 1 of 15 Application for Pre-Qualification:
More informationCITY OF COMMERCE CITY BID BOND
BID BOND Know all men by these presents, that as principal, and, as Surety, are held and firmly bound unto the City of Commerce City, Colorado (hereinafter called City ), in the penal sum of dollars ($
More informationREQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request
More informationBOND MEASURE E CONTRACTOR OUTREACH
FREMONT UNIFIED SCHOOL DISTRICT BOND MEASURE E CONTRACTOR OUTREACH May 4, 2015 INTRODUCTIONS Therese Gain, Director of Facilities, Fremont Unified School District Carol Lemos, Administrative Assistant
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationMilestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION
Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /
More informationGENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES
REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building
More informationOakton Community College Business Services, Room 0710 1600 E. Golf Road, Des Plaines, IL 60016
Business Services, Room 0710 1600 E. Golf Road, Des Plaines, IL 60016 Today s Date: Friday, March 18, 2016 Submission Information Due: Thursday, April 21, 2016 by 5:00 pm Request for Pre-Qualification
More informationDelaware Community Schools
REQUEST FOR PROPOSALS GUARANTEED ENERGY SAVINGS and Facility Improvement Program November 4, 2009 Table of Contents I. Request For Proposal... 3 II. Time Line... 4 III. Proposal Content and Format... 5
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationBMIC S APPETITE GUIDE EFFECTIVE JUNE 2013
The following guide is a general list of Builders Mutual s appetite for business classes residential and commercial WorkSafe workers compensation and Builders Best general liability (including trade contractors),
More informationCONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning
CONSTRUCTION LAW I. Contractor Licensing 1. The Basic Rule: No person who is not certified or registered shall engage in the business of contracting in this state. FS 489.113. Pinellas County Code 22-14
More informationGUILFORD TECHNICAL COMMUNITY COLLEGE COLLEGE PLAN TO INCREASE PARTICIPATION BY
GUILFORD TECHNICAL COMMUNITY COLLEGE COLLEGE PLAN TO INCREASE PARTICIPATION BY HISTORICALLY UNDERUTILIZED BUSINESSES IN THE PROCUREMENT OF GOODS AND SERVICES --_ Revised February 2008 Approved: November
More informationGeneral Contractor Pre-qualification Requirements
General Contractor Pre-qualification Requirements Trevor Arnett / Clark Atlanta University Atlanta, Georgia Project Description Trevor Arnett is an existing historic building constructed in 1931 as a library
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationTD AMERITRADE Park Omaha
TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment
More informationNOTICE TO CM/GC Companies
NOTICE TO CM/GC Companies Facilities and Construction Management Jefferson County School District R-1 (Jeffco) is pre-qualifying Construction Manager/General Contractors for CM/GC services for a new K-6
More informationUnity Community Center Metal Roof Installation. Request for Bids
Unity Community Center Metal Roof Installation Unity Barn Raisers Request for Bids May 24, 2012 Town of Unity Communities for Maine s Future Bond funding Unity Barn Raisers PO Box 381 32 School Street
More informationTHE TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY Disabled Veteran Business Enterprise (DVBE) Participation Requirement
Disabled Veteran Business Enterprise (DVBE) Participation Requirement I. STATEMENT OF DVBE PARTICIPATION GOAL REQUIREMENT State law requires that state agencies make efforts to achieve a goal of three
More informationPITTSBURG UNIFIED SCHOOL DISTRICT
PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i
More informationSubguard Benefits and Insights
NORTHERN ALBERTA RISK & INSURANCE MANAGEMENT SOCIETY PRESENTS Subguard Benefits and Insights About Zurich Zurich Financial Services Through our offices in more than 50 countries, approximately 60,000 Zurich
More informationGetting Connected with the Colorado Department of Transportation (CDOT)
Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding
More informationVia Electronic Filing. February 16, 2010
Kimberly A. Curry Counsel 2 Center Plaza 110 W. Fayette Street Baltimore, Maryland 21201 410.470.1305 443.213.3206 Fax kimberly.a.curry@constellation.com Via Electronic Filing February 16, 2010 Terry J.
More informationCharlotte-Mecklenburg Schools Capital Program Services. Request for Qualifications Construction Management at Risk Services
Charlotte-Mecklenburg Schools Capital Program Services Request for Qualifications Construction Management at Risk Services May, 2016 Table of Contents Section 1 - ADVERTISEMENT...3 Section 2 - INTRODUCTION
More informationShook Subcontractor Prequalification Form
Email info@shookconstruction.com with any questions. The undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. Section 1 -
More informationEastern Sign Tech, LLC. SUBCONTRACTOR QUALIFICATION QUESTIONAIRE
Company Name: Date: DBA: Website: Mailing Address: Main Office Main Contact: A/P Contact: Emergency Contact: Cell: Type of Licenses Held: Area Licensed: SERVICE / INSTALLATION CAPABILITIES: # Service /
More informationN O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE
N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE The City of Frisco is seeking qualification statements from experienced engineering, architecture, and
More informationVDOT Prequalification. Suzanne Lucas Construction Division
VDOT Prequalification Suzanne Lucas Construction Division VDOT Prequalification for Highway Contractors in the Commonwealth of Virginia 2 What is Prequalification? AASHTO defines a prequalification system
More informationCONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE
CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE SANTEE SCHOOL DISTRICT 1 .......... 2 1. Effective January 1 st, 2014,
More informationCity of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise Program
City of Greenville/Greenville Utilities Commission Minority and Women Business Enterprise Program City of Greenville MWBE Guidelines for Professional Service Contracts $50,000 and above These instructions
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction and/or Maintenance Projects 1. Districts are responsible for reviewing their work program and identifying candidate projects for the Business Development Initiative (BDI) Program. This review
More informationTLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za
TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION PRESENTED BY: BAKANG MOENG info@tlhamatsi.co.za CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process Contractual arrangement
More informationMechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11.
Mechanical Contractor Pre-Qualification Packet SPSC N180 Computer Data Room Phase II Project No. CP 159313 Notice No. Notice 13-11 Issued by Department of Facilities Management Delivery address: Research
More informationDOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle
DOCUMENT 009113 - ADDENDA ADDENDUM NUMBER ONE (1) 1.1 PROJECT INFORMATION A. Project Name: BHFC 16-001 New Single Family Dwelling Unit 1. 7264 Dahlia Circle B. Owner: Brownsville Housing Finance Corporation.
More informationRequest for Qualifications IDIQ PUBLIC ART PROJECT MANAGEMENT SERVICES RFQ769-16-866ER
Request for Qualifications IDIQ PUBLIC ART PROJECT MANAGEMENT SERVICES RFQ769-16-866ER DOCUMENT 001100 RFQ769-16-866ER NOTICE TO DESIGN PROFESSIONALS The (UNTS) subsequently referred to as the Owner, requests
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationÉCOLE TACHÉ DAYCARE and ADDITION Winnipeg, MB Division Scolaire Franco-Manitobaine
I N V I T A T I O N T O P R E Q U A L I F Y MASONRY SUB-CONTRACTORS ÉCOLE TACHÉ DAYCARE and ADDITION Winnipeg, MB Division Scolaire Franco-Manitobaine The Division Scolaire Franco-Manitobaine invites Masonry
More informationHunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:
Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR: San Diego State University Basketball Practice Facility Project Number: 03400200 October 2013 San
More informationSUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM
SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM BRIEF This Supplier Pre Qualification Questionnaire is provided for the following project types of ALARGAN PROJECTS: 1) Supply of Construction Materials 2)
More informationOn behalf of the Sussex Development Team, thank you for your interest in doing business with us. We look forward to learning more about your company.
Subj: Prequalification Application Dear Future Team Member: On behalf of the Sussex Development Team, thank you for your interest in doing business with us. We look forward to learning more about your
More informationCERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY
Exhibit 1 CERTIFICATION OF COMPLIANCE WITH SMALL, DISADVANTAGED, MINORITY, WOMEN OWNED, AND HISTORICALLY UNDERUTILIZED BUSINESS POLICY The undersigned certifies on behalf of the Contractor or Subcontractor
More informationDenver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS
RFQ Term: 9/29/2015 12/1/2019 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated
More informationOutline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011
Building the Case for Construction Management Dick Hierstein, IaCMA and Larry Gleason, CPMI Handouts and presentation are available Iowa League of online Cities // 2011 at www.iowaleague.org Outline Owner
More informationProject Management Division
CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins
More informationST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Shideler Hall Renovation Response Deadline 12/20/13
More informationATTACHMENT B PROPOSAL SUBMITTAL FORMS. For WEB FILTER REPORTING TOOL RFP #0413-242
ATTACHMENT B PROPOSAL SUBMITTAL FORMS For WEB FILTER REPORTING TOOL RFP #0413-242 FORM NAME Page General Company Information Form.. 2 Proposal Cost Summary Form.. 3 Signature Page Form... 4 Buy Local Packet
More informationDAKOTA COUNTY TRANSPORTATION DEPARTMENT GUIDE TO BIDDING TRANSPORTATION PROJECTS
DAKOTA COUNTY TRANSPORTATION DEPARTMENT GUIDE TO BIDDING TRANSPORTATION PROJECTS It is Dakota County s policy to provide all contractors and subcontractors, with equal access to procurement opportunities.
More informationREQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES. PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No.
REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES PASSENGER SCREENING CHECKPOINT CONSOLIDATION PROJECT PROJECT No. FY15-805-67 Manchester-Boston Regional Airport is soliciting Proposals from qualified
More informationTABLE OF CONTENTS OBJECTIVES, SCOPE, AND METHODOLOGY... 1 BACKGROUND... 2. Project Delivery Methodology... 2. Section I Funding Sources...
TABLE OF CONTENTS Page OBJECTIVES, SCOPE, AND METHODOLOGY... 1 BACKGROUND... 2 Project Delivery Methodology... 2 FINDINGS AND RECOMMENDATIONS Section I Funding Sources... 3 Section II Construction Costs...
More informationFundamentals of a Construction Audit. August 7, 2014
Fundamentals of a Construction Audit August 7, 2014 Agenda Definitions Risk Based Approach What Determines Risk Fraud Construction Risks What to Audit Red Flags Why Audit Prevention Wrap-up 1 Definitions
More informationBUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
More informationCITY OF HIGH POINT. Minority-owned, Woman-owned, Disadvantaged-owned Outreach Plan and Guidelines
CITY OF HIGH POINT Minority-owned, Woman-owned, Disadvantaged-owned Outreach Plan and Guidelines Municipal Office Building 211 South Hamilton Street High Point, North Carolina OUTREACH PLAN AND GUIDELINES
More informationSchool Construction Projects
The process of educating young people seems to be continually developing. New insights regarding how students most effectively receive retain and gain understanding of information and principles affect
More informationAGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK
AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK MD ANDERSON AGREEMENT No. This Agreement is made as of, 20xx (the Effective Date ), by and between The Owner: M D Anderson Cancer Center c/o Sourcing
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)
REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES) Return Completed Qualifications To: Twin Falls School District No. 411 Administrative Office 201 Main Avenue West Twin
More informationProject Description Description of project/scope of work. This Project is located at: Project location auto populated from UpsideProject Form
University of Illinois at Campus Bid #BAproject number Invitation for Construction Bid: Project Title First published month date, year Project Description Description of project/scope of work. This Project
More informationNebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property
Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property 73-101. Public lettings; how conducted. Whenever the State of Nebraska, or any department or any agency thereof,
More informationCITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES
REQUEST FOR QUALIFICATIONS Project Number 105A, 106A City College of San Francisco DSA - Inspector of Record Services for: Balboa Reservoir Development Site Work Academic Joint Use Facility (Revised 5/12/08)
More informationOAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS
OAKLAND UNIFIED SCHOOL DISTRICT FOR LOCAL FIRST TIER SUBCONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS THIS QUESTIONNAIRE MUST BE PRINTED ON BLUE PAPER OAKLAND UNIFIED SCHOOL DISTRICT
More informationATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects
Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical
More information