1

2 Strategic Environmental Assessment for the Luton Local Flood Risk Management Strategy Environmental Report Client: Luton Borough Council Report No.: UE-0161 SEA- Luton LFRMS ER_3_ Version: 3 Status: Final Date: August 2015 Author: SP/NP Checked: SP Approved: NP Cover image: Wardown Park, Luton (Source: Anemone Projects via Flickr)

3 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Contents 0 Non-Technical Summary i 0.1 About Strategic Environmental Assessment i 0.2 About the Luton Local Flood Risk Management Strategy i 0.3 Purpose and Content of the Environmental Report i 0.4 The SEA Scoping Stage ii 0.5 Assessment of Reasonable Alternatives iii 0.6 Detailed Assessment and Recommended Mitigation iv 0.7 Monitoring vi 0.8 Next Steps vi 1 Introduction Purpose of this Report The Luton Local Flood Risk Management Strategy The Study Area Sustainable Development 2 2 Methodology Strategic Environmental Assessment Assessment Stages Approach to Assessing Significant Effects Limitations to the Strategic Environmental Assessment 8 3 Scoping Scoping Report Scoping Consultation Policy, Plan and Programme Review Baseline Data and Key Environmental Issues The SEA Framework Assessing the LFRMS Objectives against the SEA Framework 10 4 Assessing Reasonable Alternatives Responding to the Requirements of the SEA Directive 13

4 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ High Level Assessment Detailed Assessment Cumulative Effects Assessment 30 5 Monitoring Monitoring Framework 31 6 Summary and Consultation Arrangements Summary and Next Steps Consultation Arrangements 33 References and Bibliography 34 Appendix A: Annex 1 of the SEA Directive Appendix B: Consultation Analysis Appendix C: Policy, Plan & Programme Review Appendix D: Baseline Data & Key Issues Appendix E: SEA Framework Appendix F: High Level Assessment A C E G I K

5 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ List of Tables and Figures Table 2.1: SEA stages and those addressed in this report 5 Table 3.1: Strategic Environmental Assessment Objectives 11 Table 3.2: Assessment of compatibility between LFRMS and SEA Objectives 11 Table 4.1: Cumulative, synergistic and indirect effects 30 Table 5.1: Proposed monitoring framework 31 Figure 1.1: Five guiding principles of the UK Sustainable Development Strategy, Securing the Future (2005) 4 Figure 4.1: Critical Drainage Areas and potential improvement/alleviation schemes 18

6 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Abbreviations ALC AONB BMV CDA CWS DAM DWS FAS HER HLA LFRMS LLFA LNR SAM SEA SSSI SuDS Agricultural Land Classification Area of Outstanding Natural Beauty Best and Most Versatile Critical Drainage Area County Wildlife Site Detailed Assessment Matrix District Wildlife Site Flood Alleviation Scheme Historic Environment Record High Level Assessment Local Flood Risk Management Strategy Lead Local Flood Authority Local Nature Reserve Scheduled Ancient Monument Strategic Environmental Assessment Site of Special Scientific Interest Sustainable Drainage Systems

7 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ Non-Technical Summary 0.1 About Strategic Environmental Assessment A Strategic Environmental Assessment (SEA) is being carried out alongside the preparation of the Luton Local Flood Risk Management Strategy (LFRMS) Plan-making bodies use SEA to assess strategy documents against a set of environmental objectives developed in consultation with local stakeholders and communities. This assessment helps the plan-makers to identify the relative environmental performance of proposed Objectives, Policies and Actions, and to evaluate which of these may be more sustainable SEA is a statutory process incorporating the requirements of the European Union Strategic Environmental Assessment Directive. 0.2 About the Luton Local Flood Risk Management Strategy Luton Borough Council is a Lead Local Flood Authority and therefore has a duty to produce, maintain, implement and monitor a Local Flood Risk Management Strategy for its area. The Luton LFRMS will: Ensure a clear understanding of the risks of flooding locally, so that investment in risk management can be prioritised more effectively; Set out clear and consistent plans for risk management so that communities and businesses can make informed decisions about the management of the remaining risk; Manage flood risks in an appropriate way, taking account of the needs of communities and the environment; Ensure that emergency plans and responses to flood incidents are effective and that communities are able to respond effectively to flood forecasts, warnings and advice; and Help communities to recover more quickly and effectively after incidents. 0.3 Purpose and Content of the Environmental Report The purpose of this Environmental Report is to: Identify, describe and evaluate the likely significant effects of the LFRMS and its reasonable alternatives; and Provide an early and effective opportunity for statutory consultees, interested parties and the public to offer views on any aspect of the SEA process which has been carried out to date. i

8 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ The Environmental Report contains: An outline of the contents and main objectives of the LFRMS and its relationship with other plans, programmes and strategies; Relevant aspects of the current state of the environment and key sustainability issues for the borough; The SEA Framework of objectives and decision-making criteria against which the LFRMS has been assessed; The appraisal of alternative options for the LFRMS; The likely significant environmental effects of the LFRMS; The measures envisaged to prevent, reduce and as fully as possible offset any significant adverse effects which may arise as a result of the LFRMS; A description of the measures envisaged concerning monitoring; and The next steps for the SEA. 0.4 The SEA Scoping Stage The Scoping Report was published for consultation between 26 November 2014 and 14 January It set out the intended scope and level of detail to be included in the SEA and included a plan, programme and strategy review, an evidence base for the assessment, key issues and environmental challenges to address, and an SEA Framework of objectives against which the LFRMS can be assessed The SEA Framework is comprised of six SEA Objectives, listed below, which were developed for use in the appraisal. # SEA Objective Relationship to SEA Directive 1 To conserve and enhance biodiversity Biodiversity, flora and fauna 2 To promote adaptation to climate change Climatic factors; Material assets; Population; Human health 3 To conserve and enhance the historic environment, heritage assets and their settings Landscape; Historic environment 4 To conserve and enhance the character of the landscape Landscape; Historic environment 5 To protect water resources and minimise water pollution Water 6 To conserve and manage natural resources (land, minerals, agricultural land, materials) Material assets; Soil ii

9 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ Following consultation the information presented in the Scoping Report was updated to take account of the responses received. The revised scoping information is included in this Environmental Report. 0.5 Assessment of Reasonable Alternatives The purpose and content of the LFRMS is clearly defined by law which means that there is limited scope for the consideration of markedly different alternatives. However, at points during the development of the LFRMS certain decisions were made for which alternatives were available Following the conclusion of the scoping stage, the SEA team contributed to the development of options work carried out for the LFRMS via the High Level Assessment. The purpose of this interaction between the SEA and the LFRMS was to inform and influence the strategy s development and to provide an early and effective environmental input, and included suggestions for additional reasonable alternatives which could be considered alongside the Policies and Actions proposed for inclusion in the LFRMS. These can be summarised as: Policy 1: Thresholds for flood investigations; Alternative 1a: Set lower thresholds for initiating formal flood investigations (e.g. 5 or more adjacent dwellings and/or 1 or more business premises); CDA 1a: High priority Critical Drainage Areas (CDA) are high risk and have synergy with other projects; medium priority are those with < 25,000 cost per property mitigated; all others are low; CDA 1b: Alternative - Different approach to prioritisation of CDAs (e.g. medium priority are those with < 30,000 cost per property mitigated; all others are low); Policy 2: Sand bags; Alternative 2a: Supply sand bags to selected groups of residents in chosen locations; Action 6.1: Water efficiency (retrofitting); and Action 6.1a: Alternative - Water Efficiency (retrofitting) - higher target e.g. 60% of existing housing stock Overall the High Level Assessment found the Luton LFRMS to be a broadly sustainable strategy with a wide range of positive effects and few negative environmental effects. However, a number of Flood Alleviation Scheme (FAS) proposals for certain Critical Drainage Areas were flagged as leading to uncertain or mixed environmental effects the nature of which would largely depend on their means of implementation. Further discussion with the Council confirmed that a secondary level of options generation had taken place for reducing flood risk in CDAs. These options do not strictly form part of the LFRMS as they are subject to funding and final scheme design, however, it was decided that they would form the most appropriate basis for detailed assessment. iii

10 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ Detailed Assessment and Recommended Mitigation Four CDA proposals were assessed in greater detail. A summary of assessment findings and recommendations for each CDA is presented below. Barton Road / Great Bramingham High Priority CDA Summary of predicted environmental effects: Temporary loss of semi-natural habitats/species resulting from the route of the culvert and swales in Icknield Park. Minor temporary negative effects are predicted at a local scale over the short term. Temporary or permanent loss of protected habitats would result in minor to major negative effects at a local to national scale, and could also lead to impacts on protected species, depending on the location of flood storage bunds near Turnpike Drive and Burford Close. Minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term, although creating swales in Icknield Park could adversely affect its use as a playing field, resulting in a functional loss of green infrastructure and minor indirect effects on human health. Earthworks required for the construction of swales or installation of a larger culvert could result in the disturbance or destruction of archaeological remains, resulting in permanent minor to moderate impacts at a local to regional scale. Loss of protected heritage features would result in major negative effects at a national scale depending on the location of flood storage bunds near Turnpike Drive and Burford Close. New permanent flood storage areas could result in minor to moderate negative effects on a nationally important protected landscape over the long term. Short term minor negative impacts to water quality during construction are predicted at a local scale due to introduction of sediments to the water course. Permanent loss of agricultural land would result in minor to moderate negative effects at a local scale over the long term, depending on the location of flood storage bunds near Turnpike Drive and Burford Close. Summary of recommended mitigation: Loss of protected habitats should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Functional loss of playing fields would need to be replaced on a like-for-like basis to ensure community accessibility to these facilities is maintained. Loss of protected heritage features should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required. It should be possible to reduce negative landscape effects via a high quality design which responds to landscape constraints and uses an appropriate selection of materials. Standard site procedures as recommended by the Environment Agency will be required to ensure that no contaminants or effluent are released into aquatic environments during construction. iv

11 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ Mitigation for the loss of agricultural land is not feasible, however, losses should be avoided or minimised through site selection, layout and design, while measures should be taken to ensure that good quality top soil is either re-used on site or put to productive use off site. Chapel Street / Arndale Centre High Priority CDA Summary of predicted environmental effects: Temporary loss of semi-natural habitats/species resulting from the route of the new drainage pipe from George Street to Manor Road Park. Minor temporary negative effects are predicted at a local scale over the short term. Minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term, although the new pipe could also increase the extent and depth of flooding at Manor Road Park. Engineering works could negatively affect the character of the Town Centre and Luton South Conservation Areas), resulting in temporary minor impacts at a local scale. Short term minor negative impacts to water quality during construction are predicted at a local scale due to introduction of sediments to the water course. Summary of recommended mitigation: Loss of protected habitats should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Loss of protected heritage features should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required. Standard site procedures as recommended by the Environment Agency will be required to ensure that no contaminants or effluent are released into aquatic environments during construction. Barnfield West Academy / Poynters Road High Priority CDA Summary of predicted environmental effects: No strategically significant effects predicted. Summary of recommended mitigation: No mitigation required at the strategic level, however, further investigations (e.g. ecological survey) may be necessary at the detailed project proposal stage. Vauxhall Way High Priority CDA Summary of predicted environmental effects: Minor temporary negative effects are predicted at a local scale over the short term resulting from a temporary loss of semi-natural habitats/species, depending on the route of the proposed thrust pipe or open cut, and design and location of flood storage areas between Eaton Valley Road and Vauxhall Way and to the east of Parkway Road. Minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term. Minor to moderate negative effects to a nationally important heritage feature are possible over the long term depending on the location, route and design of engineering works. Short term minor negative impacts to water quality during construction are predicted at a local v

12 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 Executive Summary UE-0161 SEA- Luton LFRMS ER_3_ scale due to introduction of sediments to the water course. Summary of recommended mitigation: Loss of protected habitats should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Loss of protected heritage features should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required. Standard site procedures as recommended by the Environment Agency will be required to ensure that no contaminants or effluent are released into aquatic environments during construction. 0.7 Monitoring Chapter 5 of the Environmental Report contains proposals for a monitoring programme to measure the significant environmental effects of implementing the Luton LFRMS. Monitoring for the SEA will be aligned with or incorporated within monitoring that is scheduled for the LFRMS itself, both to avoid duplication and ensure that appropriate remedial action can be taken. 0.8 Next Steps The LFRMS and its SEA will be published for a period of representations. Comments received on both documents will be considered by the Council prior to finalising and adopting the strategy. Any significant changes to the strategy which arise as a result of consultation will need to be assessed as part of the SEA process, which may lead to a further edition of, or addendum to the Environmental Report An Environmental Statement will be published with the adopted LFRMS. The purpose of the Environmental Statement is to outline how the SEA process has informed and influenced the planning process and demonstrate how consultation on the SEA was taken into account This Environmental Report is available online or in hard copy to view at the following addresses: Luton Borough Council, Town Hall, George Street, Luton LU1 2BQ The consultation period runs from 10 August to 7 September Responses should be submitted via the Luton Borough Council consultation portal or to the following addresses: flooding@luton.gov.uk Flood Risk Management, Luton Borough Council, Town Hall, George Street, Luton LU1 2BQ vi

13 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Introduction 1.1 Purpose of this Report This Environmental Report has been prepared for Luton Borough Council as part of the Strategic Environmental Assessment (SEA) for the Luton Local Flood Risk Management Strategy (LFRMS) The Environmental Report has been produced in compliance with the Environmental Assessment of Plans and Programmes Regulations It incorporates the information which is required in accordance with EU Directive 2001/42/EC on Environmental Assessment of Plans and Programmes (the SEA Directive). The report represents the latest stage in the SEA and forms part of the evidence base upon which the LFRMS is based. 1.2 The Luton Local Flood Risk Management Strategy Luton Borough Council is a Lead Local Flood Authority (LLFA) under the Flood Risk Regulations (2009) and the Flood and Water Management Act (2010). The legislation created a duty for LLFAs to produce, maintain, implement and monitor Local Flood Risk Management Strategies for their area. The LFRMS must be consistent with the Environment Agency s National Flood Risk Management Strategy The Luton LFRMS will: Ensure a clear understanding of the risks of flooding locally, so that investment in risk management can be prioritised more effectively; Set out clear and consistent plans for risk management so that communities and businesses can make informed decisions about the management of the remaining risk; Manage flood risks in an appropriate way, taking account of the needs of communities and the environment; Ensure that emergency plans and responses to flood incidents are effective and that communities are able to respond effectively to flood forecasts, warnings and advice; and Help communities to recover more quickly and effectively after incidents Box 1 sets out the key facts relating to the Luton Local Flood Risk Management Strategy. 1.3 The Study Area Luton is a densely populated town with a rich cultural diversity. Surrounded by Green Belt and situated within the Chilterns Area of Outstanding Natural Beauty, the town benefits from easy access to high quality landscapes, wildlife areas, parks and other sub-regional leisure 1

14 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ attractions, such as Luton Hoo, Dunstable Downs, and Woburn Abbey. At the same time the town benefits from good strategic north-south access to the midlands and to Greater London via the M1 and Midland Mainline Railway. It is also served by London Luton Airport which is growing and plays an important role in the economy of the town. Box 1: Key facts about the Luton Local Flood Risk Management Strategy Name of Responsible Authority: Title of plan: What prompted the plan (e.g. legislative, regulatory or administrative provision): Subject (e.g. transport): Luton Borough Council. Period covered: 2015 to Luton Local Flood Risk Management Strategy. The Council has a statutory duty as Lead Local Flood Authority to prepare an LFRMS under the Flood Risk Regulations (2009) and the Flood and Water Management Act (2010). Flood risk management strategy. Frequency of updates: Area covered: Purpose and scope of the plan: Contact point: Action Plan reviewed annually. The Borough of Luton. See paragraph Flood Risk Management, Luton Borough Council, Town Hall, George Street, Luton LU1 2BQ. Tel: ; flooding@luton.gov.uk Despite the underlying permeable geology, Luton has a history of surface water flooding. This is due to rapid development of the town without corresponding upgrade of the local surface water drains. Also, the River Lea and its tributaries in Luton, Houghton Brook, Lewsey Brook, Cat Brook and Riddy Brook, are partially fed by surface water drains and hence have developed flashy responses during heavy rainfall events. Infrastructure and properties within the River Lea corridor are also at risk from groundwater flooding, especially downstream of the town centre. A small area in the most north-eastern part of the borough is at risk of flooding in case of the Sundon reservoir failure Flood mitigation works have been carried out across many locations in the borough, including upgrades to and redevelopments of the highway drains, culvert repairs, improving conveyance of the natural channels and removal of silt. However, extensive infill development in the town centre and projected changes to rainfall could add to pressure on the sewer network and watercourses in the Luton catchment. 1.4 Sustainable Development The UK s sustainable development agenda is shaped by the Sustainable Development Strategy, Securing the Future (2005) and in planning terms by the National Planning Policy Framework (NPPF), which replaced previous national planning policy (Planning Policy Statements and Planning Policy Guidance notes) in March The NPPF includes a presumption in favour of sustainable development, which it goes on to interpret in a planning context with reference to the Sustainable Development Strategy. 2

15 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ The UK Sustainable Development Strategy Securing the Future (2005) suggests that for a policy to be sustainable, it must respect all five of the principles set out in Figure 1.1. The strategy also recognises that some policies, while underpinned by all five principles, will place more emphasis on certain principles than others. The strategy states that we want to achieve our goals of living within environmental limits and a just society, and we will do it by means of a sustainable economy, good governance, and sound science (Securing the Future, 2005) The strategy states that the five guiding principles are promoted through four shared priorities: Sustainable Consumption and Production Sustainable consumption and production is about achieving more with less. This means not only looking at how goods and services are produced, but also the impacts of products and materials across their whole lifecycle and building on people s awareness of social and environmental concerns. This includes reducing the inefficient use of resources which are a drag on the economy, so helping boost business competitiveness and to break the link between economic growth and environmental degradation. Climate Change and Energy The effects of a changing climate can already be seen. Temperatures and sea levels are rising, ice and snow cover are declining, and the consequences could be catastrophic for the natural world and society. Scientific evidence points to the release of greenhouse gases, such as carbon dioxide and methane, into the atmosphere by human activity as the primary cause of climatic change. We will seek to secure a profound change in the way we generate and use energy, and in other activities that release these gases. At the same time we must prepare for the climate change that cannot now be avoided. We must set a good example and will encourage others to follow it. Natural Resource Protection and Environmental Enhancement Natural resources are vital to our existence and that of communities throughout the world. We need a better understanding of environmental limits, environmental enhancement and recovery where the environment is most degraded to ensure a decent environment for everyone, and a more integrated policy framework. Sustainable Communities Our aim is to create sustainable communities that embody the principles of sustainable development at the local level. This will involve working to give communities more power in the decisions that affect them and working in partnership at the right level to get things done. The UK uses the same principles of engagement, partnership, and programmes of aid in order to tackle poverty and environmental degradation and to ensure good governance in overseas communities. These priorities for action within the UK will also help to shape the way the UK works internationally, in ensuring that our objectives and activities are aligned with international goals The SEA for the LFRMS will incorporate these key principles at the heart of the assessment process. 3

16 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Figure 1.1: Five guiding principles of the UK Sustainable Development Strategy, Securing the Future (2005) 4

17 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Methodology 2.1 Strategic Environmental Assessment Strategic Environmental Assessment is a systematic process for evaluating the environmental consequences of proposed plans or programmes to ensure environmental issues are fully integrated and addressed at the earliest appropriate stage of decision making. SEA was introduced to the UK through the EU Directive 2001/42/EC. In England this Directive has been transposed via the Environmental Assessment of Plans and Programmes Regulations The Luton LFRMS has been screened as a plan or programme which is likely to have significant environmental effects and which is being prepared for water management; it therefore requires an SEA under the Directive The SEA is based upon the following principles: SEA Objectives are used for appraising the potential impacts of objectives, policies and actions proposed for inclusion in the LFRMS, on the various environmental receptors; Baseline and spatial environmental information is collected and collated. Predicted effects of policies and proposals are evaluated against the baseline and likely evolution thereof in the absence of the strategy; Alternative options and preferred options for the strategy are appraised using an SEA Framework, combined with careful consideration of baseline conditions; and Decision-making criteria are devised for all SEA Objectives to assist in monitoring delivery of the plan and any significant effects thereof. 2.2 Assessment Stages Table 2.1 provides a summary of the procedural steps for the assessment, based on both the National Planning Practice Guidance (DCLG, 2014) and A Practical Guide to the SEA Directive (ODPM, 2005a). The steps shaded in green are the stages addressed in this report. The second column indicates where information about each respective stage can be found (see also Appendix A). Table 2.1: SEA stages and those addressed in this report Stage A: Setting the context & objectives, establishing the baseline and deciding on the scope Location in this report 1. Identify other relevant policies, plans, programmes, & sustainability objectives Section Collect baseline information Section Identify environmental issues and challenges Section Develop the Strategic Environmental Assessment Framework Section Consult on the scope of the Environmental Report Section 3.2 5

18 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Stage B: Developing and refining alternatives and assessing effects 1. Test the Plan objectives against the SEA Framework Section Develop the Plan options including reasonable alternatives Chapter 4 3. Evaluate the likely effects of the Plan and alternatives Chapter 4 4. Consider ways of mitigating adverse, and maximising beneficial effects Chapter 5 5. Propose measures to monitor the significant effects of implementing the Plan Chapter 5 Stage C: Prepare the Environmental Report Including all requirements of the SEA Directive Stage D: Publish & consult on the Environmental Report & Plan 1. Consult the consultation bodies and public on the draft Plan and Environmental Report 2. Appraise significant changes resulting from representations, and amend the Plan Stage E: Post-adoption reporting and monitoring 1. Prepare and publish the post-adoption Environmental Statement n/a 2. Monitor SEA indicators during Plan implementation n/a 3. Respond to adverse effects n/a Whole Document Chapter 6 n/a 2.3 Approach to Assessing Significant Effects The proposed Objectives, Policies and Actions to be considered for inclusion in the LFRMS are assessed against the baseline and SEA Framework using a three-stage process. An important aspect of this process is selecting the preferred options from a range of reasonable alternatives, and justifying these decisions in light of assessment conclusions. High level assessments The appraisal of options engages a strategic High Level Assessment (HLA) technique which uses the SEA Framework to evaluate the likely environmental performance of each option. The SEA Framework was developed through the scoping process (see Chapter 3) and consists of six SEA Objectives with corresponding decision-making criteria, which are derived from the review of plans, programmes and policies and baseline data For each option, with reference to onsite or nearby environmental constraints where relevant, the impact of the proposal on the SEA Objectives is assessed (from Strong Positive, Positive or Neutral, to Negative, Strong Negative or Mixed/Uncertain). The main function of the high level assessment is to identify whether or not the proposals are likely to bring positive, negative or uncertain effects in relation to the SEA Objectives. A benefit of this approach is that a range of options may be assessed, which can then be scrutinised in further detail if a significant number of uncertainties or potential negative effects arise Within this SEA, options which are taken forward for detailed assessment are those which are appraised as having greater negative than positive effects overall, or those with one or more 6

19 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ strong negative impacts on at least one SEA Objective, or those which are likely to significantly affect sites designated pursuant to the Habitats 1 or Birds Directives 2 (i.e. European sites). Detailed assessments Where potential negative effects or uncertainties are identified through the high level assessment in association with a particular option, a secondary level of assessment takes place to examine the proposal in more detail. At the scoping stage it was envisaged that this stage would use Detailed Assessment Matrices to address the range of criteria identified in Annex II of the SEA Directive for determining the likely (positive or negative) significance of effects (Box 2). However, where physical changes are discussed within the LFRMS their precise location and extent is not certain, their delivery is subject to further design and funding, and often several options for implementation still remain As a result it was decided that the methodology should be adjusted to suit the level of detail available for assessment. The detailed assessments presented in Chapter 3 instead focus on known environmental constraints within and close to the areas proposed for flood mitigation work, before presenting an assessment against these constraints in the context of the SEA Framework. Where significant effects are predicted or uncertain, a range of mitigation measures is recommended. Box 2: Criteria for the assessment of significant effects Criteria for determining the likely significance of effects referred to in Article 3(5) of the SEA Directive The characteristics of plans and programmes, having regard, in particular, to a. the degree to which the plan or programme sets a framework for projects and other activities, either with regard to the location, nature, size and operating conditions or by allocating resources; b. the degree to which the plan or programme influences other plans and programmes including those in a hierarchy; c. the relevance of the plan or programme for the integration of environmental considerations in particular with a view to promoting sustainable development; d. environmental problems relevant to the plan or programme; e. the relevance of the plan or programme for the implementation of Community legislation on the environment (e.g. plans and programmes linked to waste management or water protection). Characteristics of the effects and of the area likely to be affected, having regard, in particular, to a. the probability, duration, frequency and reversibility of the effects; b. the cumulative nature of the effects; c. the trans boundary nature of the effects; d. the risks to human health or the environment (e.g. due to accidents); e. the magnitude and spatial extent of the effects (geographical area and size of the population likely to be affected); f. the value and vulnerability of the area likely to be affected due to: special natural characteristics or cultural heritage; 1 European Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora 2 European Council Directive 2009/147/EC on the conservation of wild birds 7

20 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ exceeded environmental quality standards or limit values; intensive land-use; the effects on areas or landscapes which have a recognised national, Community or international protection status. Cumulative effects assessment As required by the SEA Regulations, cumulative, synergistic and indirect effects are identified and evaluated during the assessment. An explanation of these is as follows: Indirect effects are effects that are not a direct result of the plan, but occur away from the original effect or as a result of a complex pathway; Cumulative effects arise where several developments each have insignificant effects but together have a significant effect, or where several individual effects of the plan have a combined effect; Synergistic effects interact to produce a total effect greater than the sum of the individual effects. 2.4 Limitations to the Strategic Environmental Assessment It is acknowledged that there are a number of limitations and difficulties surrounding the SEA process which stem largely from the nature of strategic assessment at the plan level, using secondary data. In many cases assessment has been undertaken for proposals which do not lead to physical changes on the ground (e.g. engineering works or flood risk mitigation) or without data on environmental limits. Where physical changes are discussed within the LFRMS their precise location and extent is not certain, and their delivery is subject to further design and funding. In these circumstances the appraisals have erred on the side of caution. To address these issues, monitoring proposals should seek to monitor the effects of the plan as it is implemented as well as addressing data gaps. 8

21 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Scoping 3.1 Scoping Report The first phase of the SEA was the scoping stage. Scoping is the process of deciding the scope and level of detail of an SEA, including the environmental effects to be considered, the assessment methods to be used, and the structure and contents of the SEA Report. The purpose of the Scoping Report (UEEC, 2014) is to set the criteria for assessment (including the SEA objectives), and establish the baseline data and other information, including a review of relevant policies, programmes and plans The Scoping Report presents information in relation to the following tasks: Identifying other relevant policies, plans and programmes, and sustainability objectives; Collecting baseline information; Identifying sustainability opportunities and challenges; and Developing the SEA Framework. 3.2 Scoping Consultation The Scoping Report was published for consultation between 26 November 2014 and 14 January Responses were received from the three Consultation Bodies (English Heritage, Environment Agency and Natural England) and LBC Officers. Appendix B contains an analysis of scoping consultation responses including a description of how the comments have been taken into account. Following receipt of responses, the SEA information, including the baseline and policy and plan review, was updated. The updated SEA information is included in this Environmental Report. 3.3 Policy, Plan and Programme Review The LFRMS may be influenced in various ways by other policies, plans or programmes (PPPs), or by external environmental objectives such as those put forward in other strategies or initiatives. The SEA process takes advantage of potential synergies between these PPPs and addresses any inconsistencies or constraints The Scoping Report presented an evaluation of the key PPPs that are likely to be relevant to the SEA process and LFRMS. Each PPP is discussed on the basis of how its objectives and environmental requirements affect, or are affected by, the LFRMS. The list was updated following scoping consultation and the revised PPP review can be viewed at Appendix C. 9

22 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Baseline Data and Key Environmental Issues A key part of the scoping process is the collection of baseline data. The purpose of the exercise is to help identify key opportunities and challenges facing the area which might influence the LFRMS, and to provide an evidence base from which to make the assessment. The baseline sections in the Scoping Report review the social, economic and environmental conditions affecting the borough. One of the purposes of consultation on the Scoping Report was to seek views on whether the data selected was appropriate. Comments were received from a range of stakeholders and in some cases new sources of baseline information were provided or suggested The revised baseline data and its likely evolution in the absence of the LFRMS can be viewed at Appendix D, together with a summary of the key environmental issues facing the strategy. 3.5 The SEA Framework The purpose of the SEA Framework is to provide a means of ensuring that the LFRMS considers the environmental effects of selecting and implementing strategic options. It enables the significant effects of the strategy to be consistently described, analysed and compared The SEA Framework consists of objectives which, where practicable, can be expressed in the form of targets, the achievement of which is measurable using indicators. There is no statutory basis for setting objectives but they are a recognised way of considering the environmental effects of a plan and comparing alternatives, and as such provide the basis from which effects of the plan can be tested. The SEA Objectives were derived through consideration of the PPP review, the baseline data collection, and the key sustainability issues identified for the borough. They seek to reflect each of these influences to ensure the assessment process is robust, balanced and comprehensive Annex I(f) of the SEA Directive (see Appendix A) contains a list of environmental receptors which require consideration, including biodiversity, flora and fauna, population, human health, soil, water, air, climatic factors, material assets, cultural heritage (including architectural and archaeological heritage), landscape and the inter-relationship between these factors. However, not all of these receptors are likely to be significantly affected by the LFRMS, and some were thus scoped out of the SEA at the scoping stage (see Chapter 3 of the Scoping Report) Following the receipt of consultation responses on the Scoping Report, the SEA Framework was updated to address the comments received. The updated SEA Framework is presented at Appendix E while Table 3.1 lists the SEA Objectives and their relationship to the SEA Directive requirements. 3.6 Assessing the LFRMS Objectives against the SEA Framework Table 3.2 presents a compatibility appraisal of the LFRMS objectives against the SEA objectives. The assessment shows that the strategy objectives broadly support the full range of SEA objectives and that there is a good degree of compatibility (or neutrality) between the two sets 10

23 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ of objectives. Some potential for conflict exists between the strategy objective for Flood Risk Mitigation, and SEA objectives which seek protection for Biodiversity, Landscape and Cultural Heritage, but these largely depend on the how the objective would be implemented by Policies and Actions within the LFRMS. Table 3.1: Strategic Environmental Assessment Objectives # SEA Objective Relationship to SEA Directive 1 To conserve and enhance biodiversity Biodiversity, flora and fauna 2 To promote adaptation to climate change Climatic factors; Material assets; Population; Human health 3 To conserve and enhance the historic environment, heritage assets and their settings Landscape; Historic environment 4 To conserve and enhance the character of the landscape Landscape; Historic environment 5 To protect water resources and minimise water pollution Water 6 To conserve and manage natural resources (land, minerals, agricultural land, materials) Material assets; Soil Table 3.2: Assessment of compatibility between LFRMS and SEA Objectives Luton Local Flood Risk Management Plan Objectives Compatibility Assessment No LFRMS Objective SEA Objectives SEA1 SEA2 SEA3 SEA4 SEA5 SEA6 1 Improve the Understanding of Flood Risk in Luton 0 P Flood Risk in Planning and Development Control P P P P P P 3 Emergency Planning, Response and Resilience 0 P Flood Risk Mitigation? P?? P P 5 Partnership Working 0 P Wider Environmental Benefits P 0 0 P P 0 7 Economics 0 P SEA1 SEA2 SEA3 SEA4 SEA5 SEA6 Key to the Compatibility Assessment Matrix P Compatible? Potentially incompatible O Incompatible 0 No link 11

24 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. 12

25 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Assessing Reasonable Alternatives 4.1 Responding to the Requirements of the SEA Directive The SEA Directive requires that the Environmental Report should consider: Reasonable alternatives taking into account the objectives and the geographical scope of the plan or programme and give an outline of the reasons for selecting the alternatives dealt with (Article 5.1 and Annex I (h)) The purpose and content of the LFRMS is clearly defined by the 2009 Regulations and 2010 Act which means that there is limited scope for the consideration of markedly different alternatives. However, at points during the development of the LFRMS certain decisions were made for which alternatives were available Following the conclusion of the scoping stage, the SEA team contributed to the development of options work carried out for the LFRMS via the High Level Assessment. The purpose of this interaction between the SEA and the LFRMS was to inform and influence the strategy s development and to provide an early and effective environmental input, and included suggestions for additional reasonable alternatives which could be considered alongside the Policies and Actions proposed for inclusion in the LFRMS. These can be summarised as: Policy 1: Thresholds for flood investigations; Alternative 1a: Set lower thresholds for initiating formal flood investigations (e.g. 5 or more adjacent dwellings and/or 1 or more business premises); CDA 1a: High priority Critical Drainage Areas (CDA) are high risk and have synergy with other projects; medium priority are those with < 25,000 cost per property mitigated; all others are low; CDA 1b: Alternative - Different approach to prioritisation of CDAs (e.g. medium priority are those with < 30,000 cost per property mitigated; all others are low); Policy 2: Sand bags; Alternative 2a: Supply sand bags to selected groups of residents in chosen locations; Action 6.1: Water efficiency (retrofitting); and Action 6.1a: Alternative - Water Efficiency (retrofitting) - higher target e.g. 60% of existing housing stock Checks were made during the High Level Assessment to ensure that the preferred alternative does not lead to significant negative effects on the SEA objectives. The findings of the High Level Assessment, which are described in detail in section 4.2 below, concluded that none of the proposed Objectives, Policies or Actions were predicted to result in (a) greater negative than positive effects overall, (b) one or more strong negative impacts on at least one SEA 13

26 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Objective, or (c) likely significantly effects on European sites. As result, none required detailed further assessment However, a number of Flood Alleviation Scheme (FAS) proposals for certain Critical Drainage Areas were flagged as leading to uncertain or mixed environmental effects the nature of which would largely depend on their means of implementation. Further discussion with the Council confirmed that a secondary level of options generation had taken place for reducing flood risk in CDAs. These options do not strictly form part of the LFRMS as they are subject to funding and final scheme design, however, it was decided that they would form the most appropriate basis for detailed assessment at the current stage. 4.2 High Level Assessment The findings of the HLA are summarised in matrix format which illustrates the impact of each proposal on each of the SEA Objectives and can be viewed at Appendix F. This is accompanied below by a commentary discussing and comparing the options environmental performance in relation to the SEA Objectives. The commentary is structured according to each of the LFRMS Objectives under which Policies and Actions are proposed. LFRMS Objective 1: Improve the Understanding of Flood Risk in Luton This objective has few direct links with the SEA Objectives, as illustrated at Table 3.2. However, it is compatible with SEA Objective 2 (To promote adaptation to climate change) One Policy is proposed under the objective, which sets thresholds for the circumstances under which a formal investigation of a flooding incident would be initiated by the Council as LLFA. The thresholds are based on flood characteristics and significance criteria which strike an appropriate balance between recording and investigating the causes and consequences of flooding, and the cost and resources required to undertake an investigation. The thresholds address human health, economic activity and environment (although there is no direct reference to biodiversity) and so are predicted to positively affect SEA Objectives 2 to 6, as is its corresponding Action in the Action Plan Two alternatives to this proposed Policy were considered: to set higher thresholds which would result in fewer formal investigations, or to set lower thresholds which would result in a greater quantity of information being collected on the causes and consequences of flooding. Setting higher thresholds was rejected as not being a reasonable alternative because the preferred thresholds are already higher than national thresholds. The preferred thresholds are considered by the Council to be justified because of the densely populated nature of Luton which means that a given flooding event typically results in a greater number of properties being affected than would be the case in a less densely populated area experiencing the same volume of rainfall Setting lower thresholds is predicted to lead to greater positive effects on SEA Objectives 2 to 6 than the Policy as proposed, because formal investigations would be initiated more frequently. However, the cost of undertaking formal investigations is not insignificant and may not be the best use of limited resources. The Council may still investigate flooding below the 14

27 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ preferred thresholds, but would do so at the Council s discretion, not necessarily following the prescribed process under the legislation Although not specifically encapsulated in its Policy or Action Plan, this section of the LFRMS also considers how to prioritise implementation of flood risk solutions in Critical Drainage Areas (CDA). High priority CDAs are based on overall verified risk and potential synergy with other projects, using sound engineering judgement, as recommended by the Surface Water Management Plan 3. Medium priority CDAs are those with a cost per property mitigated of less than 25,000, with all other CDAs being low priority. This is considered to be a reasonable approach to prioritisation based on risk and evidence which seeks to achieve an acceptable balance between costs and benefits, and predicted to positively affect all six of the SEA Objectives However, it was also considered reasonable to exame an alternative approach to prioritisation whereby medium priority CDAs would be all those with a cost per property mitigated of less than 30,000. This would have the effect of promoting the three CDAs which are currently proposed to be low priority to medium priority and result in flood risk solutions being developed to protect a further 50 dwellings at risk from a 0.5m flood depth under the 1in100yr rainfall event. This is predicted to have greater positive effects on SEA Objectives 1 to 6 in comparison to the currently proposed approach to prioritisation, however, there would clearly be a significant cost in selecting this as the preferred approach Fourteen Actions are proposed under LFRMS Objective 1 within the Action Plan, all of which are predicted to positively affect SEA Objective 2 (climate change adaptation). The majority of Actions are predicted to be neutral with regard to the other SEA Objectives. However, to Produce riparian advice/guidance is predicted to positively affect SEA1 (biodiversity), SEA3 (heritage), SEA5 (water quality) and SEA6 (natural resources). Similarly Groundwater study/investigation is predicted to positively affect SEA3, SEA5 and SEA6. LFRMS Objective 2: Flood Risk in Planning and Development Control This objective is assessed as broadly compatible with all the SEA Objectives. Similarly, each of its nine Actions is predicted to result in positive or neutral effects on the SEA Objectives. Floodplain protection is predicted to positively affect SEA1 (biodiversity), SEA3 (heritage), SEA4 (landscape), SEA5 (water quality) and SEA6 (land and natural resources) by promoting the restoration of natural river forms and floodplains as areas of biodiversity and improved amenity value. Development and flood risk is assessed in a similar light because it seeks to prevent development in areas of high flood risk, recreate river corridors in urban areas and provide space for water, wildlife and recreation Assessment of Sustainable Drainage Systems (SuDS) applications and SuDS retrofitting for reducing runoff are expected to result in positive effects for biodiversity (SEA3) and landscape because they often include areas of wetland habitat and semi-natural vegetation with amenity 3 Capita Symonds (2012): Luton Surface Water Management Plan Final Draft [Updated September 2013]. Accessed online at [October 2014]: %20V1%207.pdf

28 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ value (SEA4), and can improve water quality (SEA5) by removing pollutants. All of the Actions under this objective are predicted have positive or strong positive effects on SEA2 (climate change adaptation) The safeguarding of land from development in the Upper Lea Catchment near Lewsey Farm, Houghton Brook and Limbury is considered to have strong positive effects because of the presence of environmental assets in these areas, including River Lea County Wildlife Site (CWS), Leagrave Common CWS, River Lea District Wildlife Site (DWS), Lewsey Park DWS, Waulud s Bank Scheduled Ancient Monument (SAM) and archaeological areas on the Historic Environment Record (HER15812, HER820 and HER115). LFRMS Objective 3: Emergency Planning, Response and Resilience This objective has few direct links with the SEA Objectives, however, it is compatible with SEA2 (climate change adaptation). The two Actions proposed under this objective are assessed in a similar way because they focus on procedure and planning rather than on-the-ground activities One policy is proposed under this objective, which makes it clear that the Council does not provide sand bags to the general public for use during flood events, instead using its limited supply to protect highways and public buildings. The policy is broadly neutral with respect to the SEA Objectives, with minor positive effects on SEA3 (heritage) because some public buildings are listed. An alternative approach could be to reverse this policy so that the Council does provide sand bags, or provides sand bags to selected groups of residents in chosen locations. This would lead to minor positive effects on SEA2 (climate change adaptation) but may not be an efficient use of resources and does not address the stated limitations of sand bags as a flood protection measure. LFRMS Objective 4: Flood Risk Mitigation This objective is compatible with SEA2 (climate change adaptation), SEA5 (water quality) and SEA6 (land and natural resources) but potentially incompatible with SEA1 (biodiversity), SEA3 (heritage) and SEA4 (landscape) depending on where and how mitigation is implemented In total, 40 Actions are proposed under this objective, the majority of which involve studies, consultation and data gathering to investigate which solutions may be effective and acceptable, or inspection, maintenance and use of powers. Furthermore, while most of the Actions target flood risk mitigation in a broad area, they are not sufficiently spatially specific to enable assessment of potential environmental effects other than in the broadest terms. All of these Actions (Act4.7 to Act4.40 in Appendix F) are predicted to lead to at least minor positive effects on SEA2 (climate change adaptation), and a handful may also have beneficial effects on water quality (SEA5) However, two Flood Alleviation Schemes (FAS) and projects proposed under the four high priority CDAs are further developed and can be assessed to a slightly finer level of detail at this stage. Each of these is predicted to have strong beneficial effects for climate change adaptation (SEA2) but mixed or uncertain effects on at least one other SEA Objective. 16

29 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ The Houghton Regis FAS (Act4.1 in Appendix F) aims to reduce flood risk in the Upper Lea around Houghton Brook, Lewsey Brook and Limbury, and could involve construction of a flood storage area on the Houghton Brook between the M1 and Houghton Regis (see Figure 4.1, map reference 01). This is a greenfield site just outside of the borough boundary and currently in arable use (Agricultural Land Classification (ALC) Grade 2). The proposal could negatively affect an Iron Age or Roman settlement (HER15812) which underlies the western part of the site, depending on the final layout and design. It would also result in a loss of best and most versatile (BMV) agricultural land and could negatively affect landscape character, however, it is expected to deliver significant flood risk benefits to properties in parts of the Lewsey Farm, Parkside up to Marsh Farm and Limbury areas. No further details were available for appraisal and it is recommended that the scope for significant environmental effects is assessed at the project proposal stage The Icknield Way FAS (Act4.2, map reference 02) aims to utilise SuDS (e.g. swale and sewer upgrades) to alleviate surface water system surcharges at Icknield Way. The site is within the urban area but could negatively affect Limbury/Biscot Roman settlement (HER115), an extensive area of Roman occupation indicative of a large village, which underlies the southern part of the site, depending on the final layout and design. However, positive effects would be expected for climate change adaptation and water quality (as a result of SuDS proposals). No further details were available for appraisal and it is recommended that the scope for significant environmental effects is assessed at the project proposal stage Potential capital solutions in the Barton Road / Great Bramingham CDA (Act4.3) include flood storage areas to the north. Environmental constraints in the vicinity include Dray's Ditches SAM, the line of a route-way known as the Theedway (HER 10843) which may have prehistoric origins, the Chilterns Area of Outstanding Natural Beauty (AONB), Galley & Warden Hills Local Nature Reserve (LNR), and Grade 2 agricultural land. Consequently, the proposal could negatively affect biodiversity, heritage features, landscape character and BMV agricultural land, depending on the final layout and design. However, positive effects would be expected for climate change adaptation and water quality (as a result of SuDS proposals) Potential capital solutions in the Chapel Street / Arndale Centre CDA (Act4.4) include installation of a new culvert from the corner of Chapel Street and George Street to Manor Road Park. Environmental constraints in the vicinity include Luton medieval town (HER16993), the Town Centre Conservation Area, and a number of listed buildings. Consequently, the proposal could negatively affect heritage features, depending on the final layout and design. However, positive effects would be expected for climate change adaptation and water quality (as a result of SuDS proposals) Potential capital solutions in the Barnfield West Academy / Poynters Road CDA (Act4.5) include removal of silt from Lewsey Brook to restore flow capacity and provide in-bank flood storage. This could result in negative effects on the River Lea CWS, River Lea DWS, Lewsey Park DWS depending on the final extent and methods proposed; it could also result in long-term benefits to biodiversity and water quality if a sensitive river restoration design is adopted. Positive effects would be expected for climate change adaptation. 17

30 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Figure 4.1: Critical Drainage Areas and potential improvement/alleviation schemes 18

31 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Potential capital solutions in the Vauxhall Way CDA (Act4.6) include: flood storage areas along Vauxhall Way; increased conveyance from Airport Way underpass; and creation of a storage area or wetland in the vacant lot adjacent to Parkway Road and associated pipe work to route excess flow under Parkway Road and the A505 into the River Lea. Environmental constraints in the vicinity include The Chase CWS, Luton Hoo Park CWS, River Lea CWS, and Luton Parkway Verges DWS. Depending on the layout and final design proposals, the works could negatively affect any of these assets with consequent impacts on ecological receptors. However, certain parts of the proposal could result in long-term positive effects, including water quality improvements in the River Lea and creation of new wetland habitats. Positive effects would be expected for climate change adaptation. LFRMS Objective 5: Partnership Working This objective has few direct links with the SEA Objectives, however, it is compatible with SEA2 (climate change adaptation). The three Actions proposed under this objective are assessed in a similar way because they focus on stakeholder engagement, cooperation, data sharing and partnership working, rather than on-the-ground activities which could result in environmental effects. LFRMS Objective 6: Wider Environmental Benefits This is the only objective that is not directly related to SEA2 (climate change adaptation), although it is compatible with SEA1 (biodiversity), SEA4 (landscape) and SEA5 (water quality). However, the Actions proposed under this objective are predicted to positively affect SEA2 (climate change adaptation) and SEA5 (water quality) because they promote water efficiency and SuDS retrofitting. Act6.3 has additional positive effects on biodiversity (SEA1), landscape (SEA4) and the sustainable use of land (SEA6) because it promotes the creation and enhancement of wetland habitats and green infrastructure One reasonable alternative was considered in relation to Act6.1 Water Efficiency (retrofitting) whereby a higher target could be set for the installation of easy-fit water saving devices, aiming for 60% of the existing housing stock instead of 20%. This is predicted to have greater positive effects on SEA2 and SEA5 by comparison but would also require a higher level of investment. Furthermore, as the Action Plan is to be reviewed on a regular basis there is nothing to prevent this target being aspired to over the longer term as the LFRMS is implemented. LFRMS Objective 7: Economics This objective has few direct links with the SEA Objectives, however, it is compatible with SEA2 (climate change adaptation). The six Actions proposed under this objective are assessed in a similar way because they focus on funding opportunities, partnership schemes and insurance, rather than on-the-ground activities which could result in environmental effects. Conclusions Overall the High Level Assessment has found the Luton LFRMS to be a broadly sustainable strategy with a wide range of positive effects and few negative environmental effects. Using the summary matrix from the HLA of the proposed Policies and Actions, the options with the most 19

32 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ adverse impact(s) on the SEA Objectives can be identified. These options are summarised below: Action 4.1: Capital Improvement Project Houghton Regis Flood Alleviation Scheme Action 4.2: Capital Improvement Project Icknield Way Flood Alleviation Scheme Action 4.3: Capital Improvement Project Barton Road / Great Bramingham High Priority CDA (BRGB) Flood Alleviation Scheme Action 4.4: Capital Improvement Project Chapel Street / Arndale Centre High Priority CDA (CHAST) Flood Alleviation Scheme Action 4.5: Capital Improvement Project Barnfield West Academy / Poynters Road High Priority CDA (BWPR) Flood Alleviation Scheme Action 4.6: Capital Improvement Project Vauxhall Way High Priority CDA (VAUX) Flood Alleviation Scheme Whilst none of these Capital Improvement Projects meet the criteria for further assessment set out in paragraph 2.3.4, a further stage of options generation has taken place for Actions 4.3 to 4.6 and these are taken forward for detailed assessment. 4.3 Detailed Assessment The following sections present a detailed assessment of the likely significant effects of currently preferred options for the four Capital Improvement Projects (BRGB, CHAST, BWPR, VAUX). 20

33 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Action 4.3: Capital Improvement Project Barton Road / Great Bramingham High Priority CDA (BRGB) Flood Alleviation Scheme Environmental Constraints Data Environmental constraints within the area: 13 national priority habitats which include deciduous woodland, lowland calcareous grassland and lowland fens. Two archaeological sites: Dray's Ditches SAM, the line of a route-way known as the Theedway (HER 10843) which may have prehistoric origins. Little Bramingham Farmhouse is a listed building. There are 29 greenspace areas which include 26 amenity greenspaces and three natural and semi-natural greenspace. Four areas marked as fluvial flood zone 3. One CWS; Bramingham Woods. Two DWS; Turnpike Drive and Whitehorse Vale. Environmental constraints within 250m: 44 national priority habitats which include deciduous woodland, lowland calcareous grassland, lowland fens and lowland meadow. Source protection zones 2 and 3. Agricultural land: Grade 2, Grade 3, Grade 4. 5 archaeological sites, which include Dray s Ditches prehistoric boundary at Luton/Streatley and Roman settlement at Limbury/Biscot, Luton. The one listed building is Little Bramingham Farmhouse. One ancient monument, which has been amended to include the eastern extent of Dray s Ditches. There are 51 greenspace sites all of which are amenity greenspace, allotment and leisure gardens or natural and semi-natural greenspaces. Chilterns ANOB. Greenbelt. 22 areas marked as fluvial flood zone 2, and 9 areas marked as fluvial flood zone 3. One Site of Special Scientific Interest (SSSI) at Galley and Warden Hills. One LNR at the Galley and Warden Hills SSSI. There are 11 CWS. Four DWS which are Great Bramingham Park, the River Lea, Turnpike Drive and Whitehorse Vale. 21

34 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Preferred Options Increasing conveyance capacity by enlarging the pipe diameter of the culvert buried beneath Icknield Park playing field Constructing swales within Icknield Park playing field to create a preferential overland flow route connecting Catsbrook with the River Lea Creating above-ground flood storage areas by constructing bunds to create detention basins near Turnpike Drive, Burford Close and further upstream in the rural area Increasing community resilience by installing temporary or permanent flood gates to protect properties affected by flood depths up to 600mm Installing permeable paving, water butts and other SuDS measures to improve source control and attenuation Likely Significant Effects on SEA Objectives 1 The route of the culvert and swales in Icknield Park would pass through and into the River Lea CWS and DWS and installation would result in at least a temporary loss of semi-natural habitats resulting in impacts on protected species which may be present, including for example badger, bats (if tree roosts are affected), nesting birds, great crested newt, reptiles and water vole (otter is not thought to be present on the River Lea 4 ). Minor temporary negative effects are predicted at a local scale over the short term. In the long term swales could increase biodiversity within Icknield Park by creating additional wetland habitats, resulting in minor permanent positive effects at the local scale. Although the location of flood storage bunds near Turnpike Drive and Burford Close is not specified the scope for negative effects is significant. This area of north Luton features the Galley & Warden Hills SSSI/LNR/CWS, Sunshine Riding Stables CWS, Great Bramingham Park DWS and Turnpike Drive DWS, together with 11 areas mapped nationally as priority habitat (deciduous woodland and lowland calcareous grassland). Temporary or permanent loss of these features would result in minor to major negative effects at a local to national scale, and could also lead to impacts on protected species. 2 Overall minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term. However, some measures (e.g. flood gates) could result in a minor increase in flood risk to properties in adjacent areas downstream. Creating swales in Icknield Park could adversely affect its use as a playing field, resulting in a functional loss of green infrastructure and minor indirect effects on human health. 3 Icknield Park lies within Limbury/Biscot Roman settlement (HER115: Extensive area of Roman occupation: indicative of large village). Earthworks required for the construction of swales or installation of a larger culvert could result in the disturbance or destruction of archaeological remains, resulting in permanent minor to moderate impacts at a local to regional scale. Although the location of flood storage bunds near Turnpike Drive and Burford Close is not specified the scope for negative effects is significant. This area of north Luton features Dray s Ditches SAM (HER113/HER10843: Triple-ditched boundary: Bronze Age in origin: enlarged and strengthened in the Iron Age. Crosses Icknield Way). Temporary or permanent loss of these features would result in major negative effects at a national scale, while the setting of these 4 BedsLife (2009): Bedfordshire & Luton Species Action Plan: European Otter. Last updated September Accessed online [May 2015]: 22

35 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ features is also at risk over the long term. 4 Although the location of flood storage bunds near Turnpike Drive and Burford Close is not specified, the area is within the Green Belt and within or adjacent to the Chilterns AONB. New permanent flood storage areas could result in minor to moderate negative effects on a nationally important feature over the long term. 5 Short term minor negative impacts to water quality during construction of the culvert and swales in Icknield Park are predicted at a local scale due to introduction of sediments to the water course. 6 Although the location of flood storage bunds near Turnpike Drive and Burford Close is not specified, the area features extensive tracts of BMV (Grade 2) agricultural. New permanent flood storage areas could result in minor to moderate negative effects at a local scale over the long term. Recommended Mitigation Temporary or permanent loss of features within designated sites (including SSSI/LNR/CWS/DWS) should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated via habitat restoration, creation or compensation, and species translocation. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Functional loss of playing fields would need to be replaced on a like-for-like basis to ensure community accessibility to these facilities is maintained. Temporary or permanent loss of features associated with Dray Ditches SAM and/or Limbury/Biscot Roman settlement should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required (e.g. investigative trenching, watching brief, recovery and interpretation of remains). It should be possible to reduce negative landscape effects via a high quality design which responds to landscape constraints and uses an appropriate selection of materials. Development should be supported by an LVIA. The existing structural framework of hedgerow/mature trees should be adequately conserved, with gapping-up of hedgerows where appropriate. Standard site procedures as recommended by the Environment Agency (such as Pollution Prevention Guidelines 5 Works and Maintenance in or Near Water) will be required to ensure that no contaminants or effluent (e.g. oil, fuel or chemical spills) are released into aquatic environments during construction. Construction methodologies should contain specific measures to protect the water courses from changes in morphology, turbidity or flow regime. Mitigation for the loss of agricultural land is not feasible, however, losses should be avoided or minimised through site selection, layout and design, while measures should be taken to ensure that good quality top soil is either re-used on site or put to productive use off site. 23

36 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Action 4.4: Capital Improvement Project Chapel Street / Arndale Centre High Priority CDA (CHAST) Flood Alleviation Scheme Environmental Constraints Data Environmental constraints within the area: There are five national priority habitats, all of which are deciduous woodland. Two archaeological sites, both of which are Luton medieval town. Four conservation areas: Plaiters Lea, Rothesay, Town Centre and Luton South. There are 54 listed buildings. There are five green spaces, four are amenity greenspaces and the other is a churchyard and cemetery. Four areas marked as fluvial flood zone 2 and four areas marked as fluvial flood zone 3. One public water supply borehole. Environmental constraints within 250m: There are 21 national priority habitats, including deciduous woodland and lowland calcareous grassland. Source protection zones 1, 2 and 3. Three archaeological areas have been highlighted near this CDA, all are Luton medieval town. There are five conservation areas; Rothesay, Town Centre, High Town, Plaiters Lea and Luton South. 58 listed buildings. 16 greenspaces have been highlighted; seven amenity greenspace, three churchyards and cemeteries, two allotment and leisure gardens, two urban parks and gardens, one major sports and leisure site and one natural and semi-natural greenspace. 11 areas marked as flood zone 2, 8 areas marked as flood zone 3. There are three CWS at church cemetery, Luton, Dallow Down and the River Lea. Two DWS, one is the River Lea and the other at Stockwood Park. Two public water supply boreholes. Preferred Options Increasing conveyance capacity along London Rd/Castle St & Chapel Street to reduce flooding around the Arndale Shopping Centre Increasing community resilience by installing temporary or permanent flood gates to protect properties affected by flood depths up to 600mm Installing a new 1.5m diameter pipe from George Street to Manor Road Park to create a preferential flow route connecting to the River Lea 24

37 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Installing additional gullies along London Rd/Castle St & Chapel Street to increase conveyance Likely Significant Effects on SEA Objectives 1 The route of the new 1.5m diameter pipe from George Street to Manor Road Park would pass close to and/or into the River Lea CWS and DWS and installation would result in at least a temporary loss of semi-natural habitats resulting in impacts on protected species which may be present in Manor Road Park, including for example badger, bats (if tree roosts are affected), nesting birds, great crested newt, reptiles and water vole. Minor temporary negative effects are predicted at a local scale over the short term. 2 Overall minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term. However, some measures (e.g. flood gates) could result in a minor increase in flood risk to properties in adjacent areas downstream. Installing a new 1.5m diameter pipe from George Street to Manor Road Park could also increase the extent and depth of flooding at Manor Road Park. 3 Increasing conveyance capacity along London Rd/Castle St & Chapel Street could negatively affect the character and setting of the Town Centre and Luton South Conservation Areas and their various listed buildings/structures, as well as Luton medieval town (HER16993), resulting in temporary minor impacts at a local scale. Installing a new 1.5m diameter pipe from George Street to Manor Road Park could negatively affect the character and setting of the Town Centre Conservation Area and its various listed buildings/structures, as well as Luton medieval town (HER16993), resulting in temporary minor impacts at a local scale. 4 No strategically significant effects predicted. 5 Short term minor negative impacts to water quality during construction of the new 1.5m diameter pipe from George Street to Manor Road Park are predicted at a local scale due to introduction of sediments to the water course. 6 No strategically significant effects predicted. Recommended Mitigation Temporary or permanent loss of features within designated sites (including CWS/DWS) should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated via habitat restoration, creation or compensation, and species translocation. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Temporary or permanent loss of features associated with the Town Centre and Luton South Conservation Areas, their various listed buildings/structures, and Luton medieval town should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required (e.g. investigative trenching, watching brief, recovery and interpretation of remains). 25

38 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Standard site procedures as recommended by the Environment Agency (such as Pollution Prevention Guidelines 5 Works and Maintenance in or Near Water) will be required to ensure that no contaminants or effluent (e.g. oil, fuel or chemical spills) are released into aquatic environments during construction. Construction methodologies should contain specific measures to protect the water courses from changes in morphology, turbidity or flow regime. Action 4.5: Capital Improvement Project Barnfield West Academy / Poynters Road High Priority CDA (BWPR) Flood Alleviation Scheme Environmental Constraints Data Environmental constraints within the area: Four amenity green spaces at Browning Road, Byron Road, Poets Green and Poynters Road. Environmental constraints within 250m: Source protection zones 2 and 3. Agricultural land: Grade 2. There are seven greenspaces, six being amenity greenspace and one an urban park and garden. Four areas marked as flood zone 2. Two CWS, one at Dunstable to Luton disused railway, and the other is the River Lea. One DWS, River Lea. Preferred Options Increasing conveyance capacity by increasing pipe sizes along Ridge Way Avenue, Goldstone Crescent & Jillifer Road Creating below-ground flood storage in the back gardens of properties near the east side of Poynters Road to reduce ponding and attenuate runoff into the Lewsey Farm area Installing SuDS measures in private properties to improve source control and attenuation Installing additional gullies to increase conveyance and entry capacity in the local road network to pick up overland flows Likely Significant Effects on SEA Objectives 1 No strategically significant effects predicted. 2 No strategically significant effects predicted. 3 No strategically significant effects predicted. 4 No strategically significant effects predicted. 26

39 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ No strategically significant effects predicted. 6 No strategically significant effects predicted. Recommended Mitigation No mitigation required at the strategic level, however, further investigations (e.g. ecological survey) may be necessary at the detailed project proposal stage. Action 4.6: Capital Improvement Project Vauxhall Way High Priority CDA (VAUX) Flood Alleviation Scheme Environmental Constraints Data Environmental constraints within the area: There are two national priority habitats, both are lowland calcareous grassland. One listed building on the south side of Kimpton Road Office Block, Vauxhall Motors. Eight amenity green spaces. The Chase CWS, and Mixes Hill DWS and Dairyborn Scarp DWS. Environmental constraints within 250m: 21 national priority habitats including deciduous woodland and lowland calcareous grassland. Source protection zones 1, 2 and 3. Agricultural land: Grade 3. There are three archaeological sites; Stopsley medieval settlement, Luton; Round Green medieval settlement, Luton; Crawley Green medieval settlement, Luton. Two listed buildings; one building on the south side of Kimpton Road Office Block, Vauxhall Motors, the other is Stockingstone Road Round Green St Cristopher s Church. There are 25 green spaces: 20 amenity greenspaces, four natural and semi-natural greenspaces and one churchyard and cemetery. Green belt. Three areas marked as flood zone 2, three areas marked as flood zone 3. Five CWS s have been identified; church cemetery, Luton; Honeygate and Crick Hills; Luton Hoo Park; River Lea and The Chase. There are three DWS s; Dairyborn Scarp; Luton Parkway Verges and Mixes Hill. 27

40 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Preferred Options Increasing conveyance capacity near the Kimpton Road / Airport Way roundabout - either via a thrust pipe under Airport Way to the south, or via open cut towards Vauxhall Road (then piped under Parkway Road to an overland flow route towards the River Lea Creating a series of above-ground flood storage areas to the east of Parkway Road and in the open space area between Eaton Valley Road and Vauxhall Way Increasing community resilience by installing temporary or permanent flood gates for the industrial yard near Vauxhall Way to protect properties affected by flood depths up to 600mm Installing permeable paving and other SuDS measures to improve source control and attenuation Installing additional gullies at 25m intervals to increase conveyance and entry capacity in the local road network to pick up overland flows Likely Significant Effects on SEA Objectives 1 The route of the thrust pipe or open cut is not final but together with flood storage areas to the east of Parkway Road could take land from within or close to the River Lea CWS, Dairyborn Scarp DWS and Luton Parkway Verges DWS, while there are many areas mapped nationally as priority habitats (primarily deciduous woodland and lowland calcareous grassland). Installation would result in at least a temporary loss of semi-natural habitats resulting in impacts on protected species which may be present, including for example badger, bats (if tree roosts are affected), nesting birds, great crested newt, reptiles and water vole. Minor temporary negative effects are predicted at a local scale over the short term. In the long term an open cut could increase biodiversity by creating additional wetland habitats, resulting in minor permanent positive effects at the local scale. There are no ecological designations or nationally mapped priority habitats in the open space between Eaton Valley Road and Vauxhall Way, but the area features a number of mature trees and grassland. Creation of flood storage areas here would result in at least a temporary loss of semi-natural habitats resulting in impacts on protected species which may be present, including for example badger, bats (if tree roosts are affected), nesting birds and reptiles. Minor temporary negative effects are predicted at a local scale over the short term. In the long term an above-ground flood storage area could increase biodiversity by creating additional wetland habitats, resulting in minor permanent positive effects at the local scale. 2 Overall minor positive effects are predicted at a local scale as a result of the reduction in flood risk over the long term. However, some measures (e.g. flood gates) could result in a minor increase in flood risk to properties in adjacent areas or downstream. 3 Although the location/route of the thrust pipe / open cut and flood storage areas to the east of Parkway Road are not final they could alter the setting of Kimpton Road Office Block Listed Building and/or Someries Castle Scheduled Monument, resulting in minor to moderate negative effects to a nationally important feature over the long term. There are no known heritage features in the open space between Eaton Valley Road and Vauxhall Way. 4 Although the route of the thrust pipe or open cut could run through Green Belt, the proposal would not be likely to detract from its primary purpose and no strategically significant effects are predicted. 28

41 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ There are no designated landscape features in the open space between Eaton Valley Road and Vauxhall Way. 5 Short term minor negative impacts to water quality during construction of the thrust pipe / open cut and flood storage areas are predicted at a local scale due to introduction of sediments to the water course. 6 Although the route of the thrust pipe or open cut could run through BMV (Grade 3) agricultural land, any losses are likely to small scale and no strategically significant effects are predicted. Recommended Mitigation Temporary or permanent loss of features within designated sites (including CWS/DWS) should be avoided or minimised through site selection, layout and design. Impacts to habitats and species may be avoidable through final scheme design, or otherwise mitigated via habitat restoration, creation or compensation, and species translocation. Ecological surveys and assessment will be required to establish which (if any) protected species may be using the site and to design a suitable mitigation strategy. Habitats of greatest interest should be retained where possible. Temporary or permanent loss of features associated with Kimpton Road Office Block Listed Building and/or Someries Castle should be avoided or minimised through site selection, layout and design, while measures should be taken to protect the setting of these features. Heritage Statements should be prepared and, where evidence points to potential presence of remains, mitigation will be required (e.g. investigative trenching, watching brief, recovery and interpretation of remains). Standard site procedures as recommended by the Environment Agency (such as Pollution Prevention Guidelines 5 Works and Maintenance in or Near Water) will be required to ensure that no contaminants or effluent (e.g. oil, fuel or chemical spills) are released into aquatic environments during construction. Construction methodologies should contain specific measures to protect the water courses from changes in morphology, turbidity or flow regime. 29

42 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Cumulative Effects Assessment This section considers the cumulative, synergistic and secondary effects of the LFRMS taken as whole. The results of the cumulative effects assessment are presented in Table 4.1. Table 4.1: Cumulative, synergistic and indirect effects SEA Objective To conserve and enhance biodiversity To promote adaptation to climate change To conserve and enhance the historic environment, heritage assets and their settings To conserve and enhance the character of the landscape To protect water resources and minimise water pollution To conserve and manage natural resources (land, minerals, agricultural land, materials) Cumulative effects assessment The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. However, Actions 4.3, 4.4 and 4.6 are predicted to lead to direct or secondary negative effects, which may act cumulatively and synergistically resulting in a magnified overall effect in combination unless recommended mitigation measures are applied. The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. Actions 4.3, 4.4 and 4.6 are predicted to lead to direct or secondary negative effects, which may act cumulatively and synergistically, however, these are generally outweighed by the overall positive effects. The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. However, Actions 4.3, 4.4 and 4.6 are predicted to lead to direct or secondary negative effects, which may act cumulatively and synergistically resulting in a magnified overall effect in combination unless recommended mitigation measures are applied. The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. Negative effects are only predicted as a result of Action 4.3, and are not expected to act cumulatively or synergistically. The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. However, Actions 4.3, 4.4 and 4.6 are predicted to lead to direct or secondary negative effects, which may act cumulatively and synergistically resulting in a magnified overall effect in combination unless recommended mitigation measures are applied. The majority of Objectives, Policies and Actions proposed within the LFRMS will have positive or neutral effects on this objective. Negative effects are only predicted as a result of Action 4.3, and are not expected to act cumulatively or synergistically. 30

43 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Monitoring 5.1 Monitoring Framework Table 5.1 provides proposals for a programme of monitoring to measure the strategy s performance in relation to the SEA Objectives against which significant effects were identified. The monitoring programme may still be adjusted in response to representations on the LFRMS and its SEA. The final monitoring programme will be included in the Post Adoption Statement. Consultees are invited to suggest any further indicators that they feel are necessary or suitable for inclusion in the monitoring programme. Table 5.1: Proposed monitoring framework Receptor Monitoring data Biodiversity Land (ha) take for Luton flood risk management measures within designated sites (including outside of the borough boundary) Re-instatement of habitats which are temporarily affected and successful implementation of mitigation strategies Climate change Increased risk of flooding in areas downstream of flood risk management measures Loss (ha) of public open space for Luton flood risk management measures within designated sites (including outside of the borough boundary) Heritage Number of heritage assets at risk of flooding Proportion of conservation area ground at risk from flooding Number of flood risk management measures implemented that conserve and enhance heritage assets Number of designated and non-designated heritage assets harmed by flood risk management measures, including impacts on their settings Landscape Land take (ha) for Luton flood risk management measures within Chilterns AONB (including outside of the borough boundary) Waterbodies Reported pollution incidents in waterbodies resulting from Luton flood risk management measures (including outside of the borough boundary) Natural resources Loss (ha) of BMV agricultural land for Luton flood risk management measures within Chilterns AONB (including outside of the borough boundary) 31

44 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. 32

45 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Summary and Consultation Arrangements 6.1 Summary and Next Steps The Environmental Report presents the findings of a Strategic Environmental Assessment for the Luton Local Flood Risk Management Strategy The report forms part of the evidence base upon which the strategy is based. It includes an assessment of the reasonable alternatives which were considered during preparation of the strategy, including alternative options for future flood risk management solutions, and makes a series of recommendations for mitigating and monitoring the strategy s significant effects The LFRMS and its SEA will be published for a period of representations. Comments received on both documents will be considered by the Council prior to finalising and adopting the strategy. Any significant changes to the strategy which arise as a result of consultation will need to be assessed as part of the SEA process, which may lead to a further edition of, or addendum to the Environmental Report SEA Regulations 16.3c)(iii) and 16.4 require that a statement be made available to accompany the strategy as soon as possible after its adoption. The purpose of the Environmental Statement is to outline how the SEA process has informed and influenced the planning process and demonstrate how consultation on the SEA was taken into account. The statement will contain the following information: The reasons for choosing the strategy as adopted in the light of other reasonable alternatives dealt with; How environmental considerations were integrated into the strategy; How consultation responses were taken into account; and Measures that are to be taken to monitor the significant effects of the strategy. 6.2 Consultation Arrangements This Environmental Report is available online or in hard copy to view at the following addresses: Luton Borough Council, Town Hall, George Street, Luton LU1 2BQ The consultation period runs from 10 August to 7 September Responses should be submitted via the Luton Borough Council consultation portal or to the following addresses: flooding@luton.gov.uk Flood Risk Management, Luton Borough Council, Town Hall, George Street, Luton LU1 2BQ 33

46 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ References and Bibliography Department for Communities and Local Government (DCLG; 2014): Planning Practice Guidance. Available online at: Department for Environment, Food and Rural Affairs (Defra; 2011): Soil Strategy for England. Environment Agency (2007), Pollution Prevention Guidelines 5 Works and Maintenance in or Near Water. Available online at: E.pdf Luton Borough Council (LBC; 2010): Luton Climate Change Adaptation Action Plan. Office of the Deputy Prime Minister (ODPM; 2005a): A Practical Guide to the SEA Directive. ODPM (2005b): Government Circular: Biodiversity and Geological Conservation Statutory Obligations and their Impact within the Planning System. Urban Edge Environmental Consulting (UEEC; 2014): Strategic Environmental Assessment for the Luton Local Flood Risk Management Strategy: Scoping Report. UEEC (2015): Strategic Environmental Assessment for the Luton Local Flood Risk Management Strategy: Options Assessment Report. 34

47 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Appendix A: Annex 1 of the SEA Directive Directive 2001/42/EC of the European Parliament and of the Council on the Assessment of the Effects of Certain Plans and Programmes on the Environment Annex 1: Information for Environmental Reports (referred to in Article 5(1)) Requirement a. An outline of the contents and main objectives of the plan or programme, and of its relationship with other relevant plans and programmes. b. The relevant aspects of the current state of the environment and the likely evolution thereof without implementation of the plan or programme. Location in this SEA Sections 1.2, 3.6, 3.3 and Appendix C Section 3.4 and Appendix D c. The environmental characteristics of areas likely to be significantly affected. Section 3.4 and Appendix D d. Any existing environmental problems which are relevant to the plan or programme including, in particular, those relating to any areas of a particular environmental importance, such as areas designated pursuant to Council Directive 79/409/EEC on the conservation of wild birds and the Council Directive 92/43/EEC on the conservation of habitats and species. e. The environmental protection objectives, established at international, Community or Member State level, which are relevant to the plan or programme and the way those objectives and any environmental considerations have been taken into account during its preparation. f. The likely significant effects on the environment, including short, medium and long-term effects, permanent and temporary effects, positive and negative effects, and secondary, cumulative and synergistic effects, on issues such as biodiversity, population, human health, flora, fauna, soil, water, air, climatic factors, material assets, cultural heritage including architectural and archaeological heritage, landscape and the inter-relationship between these factors. g. The measures envisaged to prevent, reduce and as fully as possible offset any significant adverse effects on the environment of implementing the plan or programme. h. An outline of the reasons for selecting the alternatives dealt with, and a description of how the assessment was undertaken including any difficulties (such as technical deficiencies or lack of know-how) encountered in compiling the required information. i. A description of the measures envisaged concerning monitoring in accordance with Article 10 (regulation 17). j. A non-technical summary of the information provided under paragraphs a to i. Section 3.4 and Appendix D Section 3.3 and Appendix C Chapter 4 and Appendix F Chapter 5 Chapter 4 and Section 2.4 Chapter 5 Non Technical Summary A

48 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. B

49 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Appendix B: Consultation Analysis Please see insert. C

50 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. D

51 Analysis of Consultation Responses Strategic Environmental Assessment of the Luton Local Flood Risk Management Strategy Organisation Date Comment ID Para Comments Document Summary of reaction, if any needed Natural England 07/01/ and 12.1 We welcome consideration of nationally designated nature conservation sites, i.e. nearby SSSIs, and the inclusion of Scoping Report Noted. protecting biodiversity within the SEA objectives The document identifies that there are no internationally designated sites within Luton Borough. Natural England would recommend that it also clarifies whether there are internationally designated sites further afield that could be affected by the strategy. This would be particularly useful if your authority decides to screen out the need for a Habitats Regulations Assessment of the strategy as the SEA screening report allows you to present the information to underpin your decision on the test of likely significant effects to European Sites. Scoping Report Amendments made to baseline; Scoping Report not re-issued and 12.1 We welcome consideration of designated landscapes, i.e. The Chilterns Area of Outstanding Natural Beauty, and the Scoping Report Noted. inclusion of landscape character within the SEA objectives and 12.1 We welcome consideration of Best and Most Versatile agricultural Land and the inclusion of agricultural land within the SEA objectives. Scoping Report Noted. Environment Agency 15/01/ Welcome the reference in the SEA, 4.5.1, acknowledging the River Lee is one of the borough s most extensive wildlife sites, and that measures to alleviate flood risk (whether promoted by the LFRMS or other flood risk management plan) should seek to avoid significant ecological impacts, recognising that the impact of specific proposals would need to be considered on a site by site basis and as part of the next stage of the SEA. Scoping Report Noted Paragraph states that The chemical status of the three surface water bodies in Luton does not require assessment - this is incorrect. For Cycle 2, from 2013, the chemical status has been assessed and the result is that the water body/bodies FAIL. This and associated information can be found in the open access Catchment Data Explorer at: Scoping Report Amendments made to baseline; Scoping Report not re-issued. English Heritage 14/01/ English Heritage recommends that our updated guidance (2013) on Strategic Environmental Assessment (SEA) / Scoping Report Noted. Sustainability Appraisal (SA) and the Historic Environment is used to inform the environmental assessment. 8 - English Heritage welcomes the opportunity to engage in the assessment and preparation of the strategy for the following reasons: The vulnerability of most heritage assets (designated and non-designated) to flooding, including occasional flooding, and the potential harm to or loss of their significance. The potential impact of flood risk management measures on heritage assets and their settings, including impacts on water-related or water-dependent heritage assets. The potential impact of changes in groundwater flows and chemistry on preserved organic and paleo-environmental remains. Where groundwater levels are lowered as a result of measures to reduce flood risk, this may result in the possible degradation of remains through de-watering, whilst increasing groundwater levels and the effects of rewetting could also be harmful. Scoping Report Noted. 8 - The potential impact on heritage assets of hydromorphological adaptations. This can include the modification/removal of historic in-channel structures, such as weirs, as well as physical changes to rivers with the potential to impact on archaeological and paleo-environmental remains. The potential implications of flood risk on securing a sustainable use for heritage assets, including their repair and maintenance. The opportunities for conserving and enhancing heritage assets as part of an integrated approach to flood risk management and catchment based initiatives, this including sustaining and enhancing the local character and distinctiveness of historic townscapes and landscapes. The opportunity for increasing public awareness and understanding of appropriate responses for heritage assets in dealing with the effects of flooding as well as the design of measures for managing flood risk and improving resilience. The opportunities for improving access, understanding or enjoyment of the historic environment and heritage assets as part of the design and implementation of flood risk management measures. Scoping Report Noted. UE-0161 Consultation Analysis_2_ Appendix B 1 / 4

52 Analysis of Consultation Responses Strategic Environmental Assessment of the Luton Local Flood Risk Management Strategy Organisation Date Comment ID Para Comments Document Summary of reaction, if any needed 9 - English Heritage advises that the relevant local authorities conservation and archaeological officers are involved Scoping Report Noted. throughout the preparation, assessment and implementation of the strategy, as they are often best placed to advise on: baseline information on the historic environment and heritage assets through the county-based Historic Environment Record (HER); the significance of designated and non-designated heritage assets; local historic environment issues and priorities, as for example heritage assets vulnerable to the effects flooding and or those that have been harmed by previous flooding events; how flood risk management measures can be tailored to avoid or minimise potential adverse impacts on the historic environment; the nature and design of any required mitigation measures; and opportunities for securing wider benefits for the future conservation, management and enjoyment of heritage assets, whether through the design and implementation of individual measures and schemes and wider catchment management proposals. 10 PPP Review English Heritage acknowledges that the current review will concentrate on those policies, plans, programmes that are most relevant to the flood risk management and to the implementation of the strategy. Relevant historic environment considerations, however, should still be fully taken into account in the review as for example: At national level: - The NPPF; Flood Risk Regulations 2009; Flood and Water Management Act 2010; National Flood and Coastal Erosion Risk Management Strategy. At local level: - Conservation area appraisals and accompanying management plans, particularly for conservation areas identified as at risk of flooding. 11 Baseline In accordance with our guidance on SEA/SA English Heritage recommends that a broad definition of the historic environment is used to establish the baseline. This will include areas, buildings, features and landscapes with statutory protection (designated heritage assets), together with those parts of the historic environment which are locally valued and important (non-designated heritage assets) and also the historic character of the landscape, townscape and seascape. The cultural heritage overview of Luton in Section 6 of the report is useful, including reference to Heritage at Risk. 12 Baseline Together with our general advice on baseline information and the historic environment, the following data sources can be particularly useful in providing locally specific information, as for example: Historic Environment Records: These can be interrogated in various ways, as for example, heritage assets located in identified Flood Risk Areas or river catchments, and or heritage assets associated with rivers and other waterdependent habitats or water-level management regimes (e.g. historic bridges, weirs, mills). Preliminary Flood Risk Assessments: These assessments may identify heritage assets as a key site at risk of flooding. The character of the historic landscape and townscape and other valued historic landscapes: Historic characterisation studies such as county based historic landscape characterisations can help to identify surviving water meadows or areas where such historic land management could be reinstated as part of wider catchment management proposals. Urban historic characterisation studies may be useful in providing up-to-date, mapped data on present day land uses and the character of places as well as their historical development, including the historical extent of river floodplains and associated land uses. Such information may be of help informing the location and sensitive design of Sustainable Drainage Systems within the existing urban fabric. Scoping Report PPP updated where necessary. Plaiter's Lea is the only Conservation Area affected by fluvial flood risk, which is limited to a short, narrow stretch of the Lea between John Street and Guildford Street. A Conservation Area Appraisal is not available. Scoping Report Noted. Scoping Report Historic environment records and related information were used at the options assessment stage. 13 Baseline English Heritage also recommends that the baseline takes account of areas of archaeological importance and the potential for unrecorded archaeology: This may include buried, waterlogged archaeological and paleo-environmental remains of significant interest and fragility that can be associated river valleys, floodplains and wetland areas. 14 Baseline English Heritage recommends that, wherever possible, data sets are mapped. This will aid the assessment process by helping to identify those heritage assets or groups of assets that may be at most risk from flooding and or potentially impacted by proposed measures to help manage flood risk or improve resilience. Scoping Report Historic environment records and related information were used at the options assessment stage. Scoping Report Noted. UE-0161 Consultation Analysis_2_ Appendix B 2 / 4

53 Analysis of Consultation Responses Strategic Environmental Assessment of the Luton Local Flood Risk Management Strategy Organisation Date Comment ID Para Comments Document Summary of reaction, if any needed 15 Baseline For both designated and non-designated heritage assets, an important consideration is the contribution of their setting Scoping Report Noted. to their heritage interest or significance. The significance of a heritage asset can be harmed or lost by development within its setting. New development within the setting of a heritage asset may also offer opportunities for enhancing or better revealing its significance, for example, removing a culvert may serve to improve the character and experience of a historic townscape or landscape (relevant to the River Lea through Luton town centre). 16 Baseline With regard to heritage assets identified as at risk in the National Heritage at Risk Register or local registers, consideration could be given to screening the records to identify if the at risk status is associated in some way with flood risk and or whether flood risk might exacerbate the problem. For example, this might include whether a conservation area at risk is within a high flood risk area, or whether the sustainable use of a listed building at risk might be hampered by its location in a flood risk area as a result of limitations put on its use or the design solution for its repair and reuse. Up-to-date information on the National Heritage at Risk Register is available via: Scoping Report Historic environment records and related information were used at the options assessment stage. 17 Key Issues Environmental problems, issues and opportunities affecting the historic environment in the context of the strategy could include the following depending on the local baseline and the nature and prevalence of flood risk: Most heritage assets are vulnerable to flooding and a range of heritage assets are likely to be at risk of flooding, which may result in harm to or loss of their significance. This may be as a result of direct flood damage as well as inappropriate remedial works. Proposed flood risk management measures and measures to improve resilience have the potential to impact on the significance of heritage assets, including the contribution made by their setting. Securing the sustainable use of heritage assets, including those identified as at risk, may be hindered by their location in high flood risk areas. Accommodating measures such as Sustainable Drainage Systems, whilst sustaining and enhancing the character of historic townscapes and landscapes and the significance of areas of archaeological interest and or potential interest. Scoping Report Key issues updated. 18 SEA Framework 19 SEA Framework English Heritage recommends the SEA assessment framework includes a specific headline objective for the SEA topic Scoping Report SEA Framework updated. on Archaeology and Cultural Heritage, for example: Conserve and enhance the historic environment, heritage assets and their settings The current draft SEA objective on page 53 of your report could be amended as above. In addition to the head-line objective, it can also be beneficial for the SEA framework to include relevant sub-objectives Scoping Report Noted. (decision-making criteria) to help ensure that all the key heritage issues are considered and potential effects (direct and indirect) appropriately assessed. We note the decision making criteria in Appendix IV which we welcome. Examples of other decision-making criteria that may be relevant for the strategy include: Will the measures reduce the number of heritage assets at risk of flooding? Will the measures harm the significance of designated and non-designated heritage assets, including their setting? Will the measures help secure the sustainable use of a heritage asset and or improve its maintenance? Will the measures lead to changes in groundwater levels or chemistry that could alter the hydrological setting of water-dependent heritage assets, including paleo-environmental deposits? Will the measures involve hydromorphological adaptations comprising the modification/removal of weirs or other inchannel structures and physical changes to rivers including de-canalisation or re-cutting old meanders? Will the measures conserve and enhance the local character and distinctiveness of historic townscapes and landscapes? Will the measures increase public awareness and understanding of appropriate responses for heritage assets affected by flooding and the design and implementation of other measures aimed at risk management or improving resilience? Will the measures provide opportunities for improved access, understanding and enjoyment of the historic environment? UE-0161 Consultation Analysis_2_ Appendix B 3 / 4

54 Analysis of Consultation Responses Strategic Environmental Assessment of the Luton Local Flood Risk Management Strategy Organisation Date Comment ID Para Comments Document Summary of reaction, if any needed 20 Monitoring The English Heritage guidance on SEA/SA recognises that a combination of different types of indicators is likely to be Scoping Report Noted. necessary as part of the assessment process. However, the priority should be the inclusion of indicators which clearly demonstrate the significant impact(s) of the plan/strategy on the historic environment, whether positive or negative. For example, recording numbers of assets may be appropriate as part of the baseline, but are not normally recommended for monitoring impacts. Appendix 4 of our SEA/SA guidance provides examples of indicators for the historic environment that can be tailored to local circumstances and suggests ways in which they can be framed to: describe the baseline or state of the historic environment; monitor the type of impact or outcome; and track wider policy responses or actions taken to conserve and improve the historic environment, and mitigate any degradation (including avoiding or rectifying adverse impacts). 21 Monitoring With respect to specific indicators for the strategy additional, topic specific indicators might include: Number of heritage assets at risk of flooding Proportion of conservation area ground at risk from flooding Number of flood risk management measures implemented that conserve and enhance heritage assets Number of designated and non-designated heritage assets harmed by flood risk management measures, including impacts on their settings Scoping Report Consider for inclusion in Environmental Report and/or Environmental Statement. LBC Ecology Officer 15/01/ Chapter 4 Oaket Wood and Winch Hill wood are partly in Luton & partly in Herts, and part of Oosey Hill CWS is in CBeds. A further DWS was added in Nov 2013 Whitehorse Vale DWS, which is the parcel of land in Luton, N of Bramingham Wood. 23 Chapter 4 NB three sites are currently being considered by Natural England as SSSIs Dallow Downs CWS, Cowslip Meadow CWS and Bradger s Hill CWS, the latter may include parts of Stopsley Common DWS too. A decision on all three is likely later this year. Scoping Report Amendments made to baseline; Scoping Report not re-issued. Scoping Report Amendments made to baseline; Scoping Report not re-issued. LBC Transportation Strategy & Regulation Manager 02/12/ General On list of figures/tables at front (and also on the relevant pages of those), need consistent approach to name of Capita Symonds work. In some places it is in full, but others say Cap Symonds Scoping Report Amended. 25 General To be consistent with the actual LFRMS, the name of main river should be Lea & not Lee. Scoping Report Amended. 26 Chapter 4 May be worth checking the list of CWS s on page 11 with that in the latest version of emerging Local Plan, because it Scoping Report See comments 22 and 23 above. looks to me as though there are a couple missing 27 Chapter 4 In relation to Para on page 13, surely the presence or not of flooding in a particular area of biodiversity interest Scoping Report Amended. could have an impact on survival of certain species. This doesn t seem to be mentioned. 28 Chapter 6 In relation to cultural heritage sites close to Luton, surprised that Sundon Historic Park + Garden doesn't get a mention Scoping Report Amended. in Para General In Table 8.1 (and also on list of figures/tables page at front) note incorrect spelling of Barnfield. Scoping Report Amended. UE-0161 Consultation Analysis_2_ Appendix B 4 / 4

55 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Appendix C: Policy, Plan & Programme Review Please see insert. E

56 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. F

57 Review of Policies, Plans and Programmes Title of PPP Biodiversity UN Convention on Biological Diversity (1992) Bern Convention on the Conservation of European Wildlife and Natural Habitats (1979) DEFRA Wildlife and Countryside Act (1981, as amended) Natural Environment and Rural Communities Act 2006 Conservation of Habitats and Species Regulations 2010 (as amended) Making Space for Nature: a review of England s wildlife sites and ecological network (2010) Main objectives and environmental / socio-economic requirements of PPP The aims of the Convention include the conservation of biological diversity (including a commitment to significantly reduce the current rate of biodiversity loss), the sustainable use of its components and the fair and equitable sharing of the benefits arising out of the utilization of genetic resources. The Convention seeks to conserve wild flora and fauna and their natural habitats, and to monitor and control endangered and vulnerable species. The principle mechanism for the legislative protection of wildlife in Great Britain. A wide ranging act, parts of which re-organised the Government s armslength bodies for countryside management. The most important part of the Act in relation to biodiversity is the section 40 duty on all public bodies to have regard to the conservation of biodiversity in England, when carrying out their normal functions. The UK transposition of EC Directive 92/43/EC on the conservation of natural habitats and of wild fauna and flora. The Regulations provide for the designation and protection of 'European sites', the protection of 'European protected species', and the adaptation of planning and other controls for the protection of European Sites. The Regulations make it an offence (subject to exceptions) to deliberately capture, kill, disturb, or trade in the animals listed in Schedule 2, or pick, collect, cut, uproot, destroy, or trade in the plants listed in Schedule 4. The Making Space for Nature report, which investigated the resilience of England s ecological network to multiple pressures, concluded that England s wildlife sites do not comprise of a coherent and resilient ecological network. The report advocates the need for a step change in conservation of England s wildlife sites to ensure they are able to adapt and become part of a strong and resilient network. The report summarises what needs to be done to improve England s wildlife sites to enhance the resilience and coherence of England s ecological network in four words; more, bigger, better, and joined. There are five key approaches which How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should include provision which enhances biological diversity (e.g. provision of woodland and greenspace) where possible in order to meet the requirements of the UN Convention, whilst at the same time avoiding biodiversity loss through careful choice of flood risk management actions. Protected species are present throughout the borough, so the LFRMS should ensure that where flood risk management actions are necessary in areas containing these species, adequate mitigation is carried out before development commences. Monitoring of such species will also be necessary. Protected species are present throughout the borough, so the LFRMS should ensure that where flood risk management actions are necessary in areas containing these species, adequate mitigation is carried out before development commences. Monitoring of such species will also be necessary. Section 41 of the Act lists habitats and species of principal importance in England. The biodiversity duty requires all public bodies to take biodiversity into account when undertaking their normal functions, including flood defence. There are no European sites in the borough, but there is a possibility that European protected species could be affected directly or indirectly by development within the borough. The LFRMS should explore opportunities to promote their conservation. The LFRMS should aim to promote flood risk management actions which support the resilience of and improves sub regional ecological networks. This includes through facilitating the provision of a high quality green infrastructure network, enhancements to habitats, promoting connections between biodiversity sites and facilitating the right conditions for native species. Policy Plan and Programme Review: Appendix C; page 1

58 Title of PPP The Natural Choice: Securing the Value of Nature. The Natural Environment White Paper. HM Government Main objectives and environmental / socio-economic requirements of PPP encompass these, which also take into account of the land around the ecological network: (i) Improve the quality of current sites by better habitat management. (ii) Increase the size of current wildlife sites. (iii) Enhance connections between, or join up, sites, either through physical corridors, or through stepping stones. (iv) Create new sites. (v) Reduce the pressures on wildlife by improving the wider environment, including through buffering wildlife sites. To establish a coherent ecological network 24 wide ranging recommendations have been made which are united under five key themes: (i) There is a need to continue the recent progress in improving the management and condition of wildlife sites, particularly our SSSIs. We also make recommendations for how these should be designated and managed in ways that enhance their resilience to climate change. (ii) There is a need to properly plan ecological networks, including restoration areas. Restoration needs to take place throughout England. However, in some areas, both the scale of what can be delivered to enhance the network, and the ensuing benefits for wildlife and people, will be very high. These large areas should be formally recognised as Ecological Restoration Zones. (iii) There are a large number of surviving patches of important wildlife habitat scattered across England outside of SSSIs, for example in Local Wildlife Sites. We need to take steps to improve the protection and management of these remaining wildlife habitats. Protection will usually be best achieved through incentive-based mechanisms, but at times may require designation. (iv) There is a need to become better at deriving multiple benefits from the ways we use and interact with our environment. (v) It will not be possible to achieve a step-change in nature conservation in England without society accepting it to be necessary, desirable, and achievable. Published in June 2011, the Natural Environment White paper sets out the Government s plans to ensure the natural environment is protected and fully integrated into society and economic growth. The White Paper sets out four key aims: (i) Protecting and improving our natural environment There is a need to improve the quality of our natural environment across England, moving to a net gain in the value of nature. It aims to arrest the decline in habitats and species and the degradation of landscapes. It will protect priority habitats and safeguard vulnerable non-renewable How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to help deliver the aspirations of the White Paper. The LFRMS should seek to support natural systems in the area and consider facilitating people and communities to access and enjoy the natural environment. Policy Plan and Programme Review: Appendix C; page 2

59 Title of PPP UK National Ecosystem Assessment (2011) Main objectives and environmental / socio-economic requirements of PPP resources for future generations. It will support natural systems to function more effectively in town, in the country and at sea. It will achieve this through joined-up action at local and national levels to create an ecological network which is resilient to changing pressures. (ii) Growing a green economy The ambition is for a green and growing economy which not only uses natural capital in a responsible and fair way but contributes to improving it. It will properly value the stocks and flows of natural capital. Growth will be green because it is intrinsically linked to the health of the country s natural resources. The economy will capture the value of nature. It will encourage businesses to use natural capital sustainably, protecting and improving it through their day-to-day operations and the management of their supply chains. (iii) Reconnecting people and nature The ambition is to strengthen the connections between people and nature. It wants more people to enjoy the benefits of nature by giving them freedom to connect with it. Everyone should have fair access to a goodquality natural environment. It wants to see every child in England given the opportunity to experience and learn about the natural environment. It wants to help people take more responsibility for their environment, putting local communities in control and making it easier for people to take positive action. (iv) International and EU leadership The global ambitions are: internationally, to achieve environmentally and socially sustainable economic growth, together with food, water, climate and energy security; and to put the EU on a path towards environmentally sustainable, low-carbon and resource-efficient growth, which is resilient to climate change, provides jobs and supports the wellbeing of citizens. The UK National Ecosystem Assessment is the first analysis of the UK s natural environment and the benefits it provides to society and economic prosperity. The assessment leads on from the Millennium Ecosystem Assessment (2005) and analyses services provided by ecosystem set against eight broad habitat types. The ecosystem services provided by these habitat types have been assessed to find their overall condition. The assessment sought to answer ten key questions: 1) What are the status and trends of the UK s ecosystems and the services they provide to society? 2) What are the drivers causing changes in the UK s ecosystems and their services? 3) How do ecosystem services affect human well-being, who and How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to reflect the emerging importance of the ecosystem service concept. It should be aware of the impacts that flood risk management actions can have on these services and recognise the services that have the potential to be performed by the natural environment in the LFRMS area. Policy Plan and Programme Review: Appendix C; page 3

60 Title of PPP Biodiversity 2020: a Strategy for England s Wildlife and Ecosystem Services (2011) National Planning Policy Framework (2012)) Main objectives and environmental / socio-economic requirements of PPP where are the beneficiaries, and how does this affect how they are valued and managed? 4) Which vital UK provisioning services are not provided by UK ecosystems? 5) What is the current public understanding of ecosystem services and the benefits they provide? 6) Why should we incorporate the economic values of ecosystem services into decision making? 7) How might ecosystems and their services change in the UK under plausible future scenarios? 8) What are the economic implications of different plausible futures? 9) How can we secure and improve the continued delivery of ecosystem services? 10) How have we advanced our understanding of the influence of ecosystem services on human well-being and what are the knowledge constraints on more informed decision making? A new England Biodiversity Strategy, which introduces a package of measures to halt the decline of our wildlife and its habitats. The Strategy includes the following priorities: - Creating 200,000 hectares of new wildlife habitats by 2020 this is equivalent to an area the size of Warwickshire - Securing 50% of SSSIs in favourable condition, while maintaining at least 95% in favourable or recovering condition - Trialling new approaches to setting fishing quotas to reduce discards - Encouraging more people to get involved in conservation by supporting wildlife gardening and outdoor learning programmes - Introducing a new designation for local green spaces to enable communities to protect places that are important to them The Strategy will help to deliver the Natural Environment White Paper. Replacing PPS9 (Biodiversity and Geological Conservation), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including - Conserving and enhancing the natural environment; The planning system should contribute and enhance the natural and local environment by; Protecting and enhancing valued landscapes, geological conservation interests and soils; How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to address the objectives of the biodiversity strategy by fully addressing biodiversity considerations through the LFRMS development process. In particular the LFRMS should support flood risk management actions which avoid sensitive areas and seek to support sub regional biodiversity networks. The LFRMS should aim to promote flood risk management action which protects and supports the resilience of and improves sub regional ecological networks. This includes through facilitating the provision of a high quality green infrastructure network, enhancements to habitats, promoting connections between biodiversity sites and facilitating the right conditions for native species. Local geodiversity assets should also be recognised by the LFRMS. Policy Plan and Programme Review: Appendix C; page 4

61 Title of PPP Bedfordshire and Luton Wildlife Working Group (2001): Bedfordshire and Luton Biodiversity Action Plan Climate Change UN Framework Convention on Climate Change (1992) IPCC Kyoto Protocol to the United Nations Framework Convention on Climate Change (1997) UK Climate Change Act 2008 (2008) Main objectives and environmental / socio-economic requirements of PPP Recognising the wider benefits of ecosystem services; Minimising impacts on biodiversity and providing net gains in biodiversity where possible, including by establishing coherent ecological networks that are more resilient to current and future pressures; Preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of soil, air, water or noise pollution or land instability; and Remediating and mitigating despoiled, degraded, derelict, contaminated and unstable land, where appropriate. Plans and decisions should encourage effective use of brownfield sites and take into account the economic benefits of agricultural land when assessing development, seeking to utilise areas of poorer quality land. Local planning strategic approach should plan positively for creation, protection, enhancement and management of networks of biodiversity and green infrastructure. Maintain character and scenic beauty of undeveloped coast and landscapes, especially; Heritage coast, National Parks, the Broads and Areas of Outstanding Natural Beauty. Planning and decision making should occur at a landscape scale across local authority boundaries and assess noise, air and light pollution, considering cumulative impacts. The framework offers guidance to protect and enhance biodiversity specifically regarding priority species/habitats, protected sites and potential/proposed/possible protected sites. Since 2001 the Bedfordshire and Luton Wildlife Working Group has been developing and maintaining the individual plans for species and habitats as part of the county's Biodiversity Action Plan, which is comprised of: Seven species action plans; and Thirteen habitat action plans. Sets an overall framework for intergovernmental efforts to tackle the challenge posed by climate change. Commits member nations to reduce their emissions of carbon dioxide and other greenhouse gases, or engage in emissions trading if they maintain or increase emissions of these gases. The 2008 Climate Change Act seeks to manage and respond to climate change in the UK, by: How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should aim to promote flood risk management action which protects and supports local biodiversity, including the habitats and species for which action plans have been prepared. Background document. Background document. The LFRMS will be a key document in seeking to increase the resilience of the borough to the effects of climate change. Policy Plan and Programme Review: Appendix C; page 5

62 Title of PPP National Planning Policy Framework (2012) National Policy Statements (NPS): Renewable Energy Infrastructure NPS (July 2011) Luton Climate Change Adaptation Action Plan (Luton Borough Council, 2010) Main objectives and environmental / socio-economic requirements of PPP Setting ambitious, legally binding targets; Taking powers to help meet those targets; Strengthening the institutional framework; Enhancing the UK s ability to adapt to the impact of climate change; and Establishing clear and regular accountability to the UK Parliament and to the devolved legislatures. Significantly, the Act sets a legally binding target of at least an 80 percent cut in greenhouse gas emissions by 2050 and at least a 34 percent cut by These targets are against a 1990 baseline. Replacing Planning and Climate Change: Supplement to PPS1, the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including - Meeting the challenge of climate change, flooding and coastal change; Adoption of proactive strategies to mitigate and adapt to climate change in line with the objectives and provisions of the Climate Change Act 2008, taking full consideration of flood risk, coastal change and water supply and demand. Support low carbon future by helping to increase the use of renewable and low carbon sources in line with the National Policy Statement for Renewable Energy Infrastructure. Seeks to ensure that all types of flood risk is taken into account,over the long term, at the planning process to avoid inappropriate development in areas at risk of flooding, and to direct development away from areas of highest risk Under the principle of promoting healthy communities local and neighbourhood plans should identify community green spaces of particular importance to them, ensuring any development of these areas is ruled out in a majority of circumstances. It sets out the Government s policy (England and Wales) for delivery of major energy infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance on generic impacts and mitigation may be helpful to local planning authorities (LPAs) in preparing their local impact reports. The Luton Climate Change Adaptation Action Plan sets out an extensive series of key actions to promote adaptation, organised under the following How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and does not increases flood risk in existing or potential (due to climate change) flood risk areas. Background document. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and does not Policy Plan and Programme Review: Appendix C; page 6

63 Title of PPP Health EC Together for Health: A Strategic Approach for the EU (2007) National Planning Policy Framework (2012) Historic Environment UNESCO World Heritage Convention (1972) Council of Europe: Convention on the Protection of the Architectural Heritage of Europe (1985) Main objectives and environmental / socio-economic requirements of PPP themes: Adapting Luton s built environment to a changing climate; Minimising flood risk in Luton; Managing and enhancing Luton s green infrastructure to improve resilience to a changing climate; Increasing the resilience of the Council s services delivery; Increasing workforce capability to adapt to climate change; Raising awareness and communicating climate change risks; and To provide leadership across the borough in increasing resilience and adapting to climate change. Building on current work, this Strategy aims to provide an overarching strategic framework spanning core issues in health as well as health in all policies and global health issues. Replacing PPG17 (Planning for Open Space, Sport and Recreation), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including Promoting healthy communities; The framework sets out open space, sport and recreation considerations for neighbourhood planning bodies These include an assessment of needs and opportunities; setting local standards; maintaining an adequate supply of open space and sports and recreational facilities; planning for new open space and sports and recreational facilities; and planning obligations. Local and neighbourhood plans should identify community green spaces of particular importance (including recreational and tranquillity) to them, ensuring any development of these areas is ruled out in a majority of circumstances. Aims of the Convention are: defining cultural and natural heritage; recognising the protection and conservation; understanding the value; and establishing 'the World Heritage fund'. Aims for signatories to protect their architectural heritage by means of identifying monuments, buildings and sites to be protected; preventing the disfigurement, dilapidation or demolition of protected properties; providing financial support by the public authorities for maintaining and How it affects, or is affected by the Luton Local Flood Risk Management Strategy increases flood risk in existing or potential (due to climate change) flood risk areas. Background document. The LFRMS should support the provision and protection of new sporting, leisure, recreational facilities, public rights of way and National trails in the borough and help facilitate enhancements to sub regional multifunctional green infrastructure networks (Local Green Spaces). The protection and enhancement of cultural heritage assets and their settings should be a key consideration for the LFRMS. The protection and enhancement of cultural heritage assets and their settings should be a key consideration for the LFRMS. Policy Plan and Programme Review: Appendix C; page 7

64 Title of PPP Council of Europe: The Convention on the Protection of Archaeological Heritage (Revised) (Valetta Convention) (1992) Council of Europe: European Landscape Convention (2006) DCMS Ancient Monuments and Archaeological Areas Act (1979) National Planning Policy Framework (2012) Main objectives and environmental / socio-economic requirements of PPP restoring the architectural heritage on its territory; and supporting scientific research for identifying and analysing the harmful effects of pollution and for defining ways and means to reduce or eradicate these effects. The convention defines archaeological heritage and identifies measures for its protection. Aims include integrated conservation of the archaeological heritage, and financing of archaeological research and conservation. Aims to promote the protection, management and planning (including active design and creation of Europe's landscapes, both rural and urban, and to foster European co-operation on landscape issues. An act to consolidate and amend the law retain to ancient monuments, to make provision of matters of archaeological or historic interest, and to provide grants by secretary of state to the Architectural Heritage fund. Replacing PPS (Planning for the Historic Environment), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including Conserving and enhancing the historic environment; Local planning authorities should set out a positive strategy for the conservation and enjoyment of the historic environment, including heritage assets most at risk through neglect, decay or other threats. If any heritage asset is affected by a proposed development, planning applicants must supply relevant historical records and consult using appropriate expertise. The significance of any impact to heritage asset should be taken into account by the local authority. Deliberate neglect or damage to the asset should not be taken into account when assessing the impact of the development to the asset. Substantial harm to or loss of a grade II listed building, park or garden should be exceptional. Substantial harm to or loss of designated heritage assets of the highest significance, notably scheduled monuments, protected wreck sites, battlefields, grade I and II* listed buildings, grade I and II* registered parks and gardens, and World Heritage Sites, should be wholly exceptional. Non-designated heritage assets of archaeological interest that are demonstrably of equivalent significance to scheduled monuments, should be considered subject to the policies for designated heritage assets. Where a proposed development will lead to substantial harm to a designated heritage asset, local authorities should refuse consent unless the development meets one of the exception criteria outlined in the framework. To enhance or better reveal their significance, Local planning authorities How it affects, or is affected by the Luton Local Flood Risk Management Strategy Archaeological assets, both potential and realised should be provided with full consideration through the development of the LFRMS. The LFRMS should support flood risk management action which protects, and where possible improves the landscape character of the area. Flood risk management actions affecting areas of archaeological resource will need to have due regard to this Act. The protection and enhancement of cultural heritage assets and their settings should be a key consideration for the LFRMS. Archaeological assets, both potential and realised should be provided with consideration by the LFRMS, proportionate to their significance. Policy Plan and Programme Review: Appendix C; page 8

65 Title of PPP Planning (Listed Buildings and Conservation Areas) Act (1990) Landscape Council of Europe: European Landscape Convention (2006) The Chilterns Conservation Board: The Chilterns AONB Management Plan Material Assets Main objectives and environmental / socio-economic requirements of PPP should look for opportunities within Conservation Areas, World Heritage Sites and within the setting of heritage assets. Proposals that preserve the setting, reveal the significance of the asset or make a positive contribution should be treated favourably. An act to consolidate certain enactments relating to special controls in respect of buildings and areas of special architectural or historic interest with amendments to give effect to recommendations to give effect to recommendations of the Law Commissions. Aims to promote the protection, management and planning (including active design and creation of Europe's landscapes, both rural and urban, and to foster European co-operation on landscape issues. The Management Plan for the AONB for contains a number of broad aims for the management of the Chilterns AONB. The more detailed policies and actions in the Plan outline how these aims will be achieved by the Board and all other parties with an interest in the AONB. How it affects, or is affected by the Luton Local Flood Risk Management Strategy Flood risk management actions affecting listed buildings and conservation areas will need to have due regard to this Act. Background document. The LFRMS should seek to reflect the ambitions of the Management Plan and support the integrity of the AONB. EC Sixth Environmental Action Programme (2002) EC Directive on Electricity Production from Renewable Energy Sources (2001) EC Waste Framework Directive (1975, updated 2006) EC Landfill Directive (1999) Natural resources and waste (in particular recycling) has been identified as one of four priority areas for Europe. The EAP requires member states to achieve 22% of electricity production from renewable energies by 2010; to significantly reduce the volumes of waste generated and the quantity going to disposal; and to give preference to waste recovery and recycling. Seeking to promote renewable energy use in electricity production, the directive, which took effect in October 2001, sets national indicative targets for renewable energy production from individual member states. Whilst the overall target for the 15 original member states is for 22% of electricity to be produced from renewable sources, the target for the UK is 10%. Objective is the protection of human health and the environment against harmful effects caused by the collection, transport, treatment, storage and tipping of waste. Particular focus is placed on the re-use of recovered materials as raw materials; restricting the production of waste; promoting clean technologies; and the drawing up of waste management plans. Aims to prevent or reduce as far as possible negative effects on the environment, in particular the pollution of surface water, groundwater, soil and air, and on the global environment, including the greenhouse effect, as well as any resulting risk to human health, from the landfilling of waste, during the whole lifecycle of the landfill. Background document. Background document. Background document. Background document. National Planning Policy Framework (2012) Replacing MPS1 (Planning and Minerals), the policy sets out the The LFRMS should, if relevant recognise the potential of former Policy Plan and Programme Review: Appendix C; page 9

66 Title of PPP National Planning Policy Framework (2012) National Policy Statements : Overarching National Policy Statement (NPS) for Energy (July 2011) Main objectives and environmental / socio-economic requirements of PPP Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including Facilitating the sustainable use of minerals; The framework sets out guidance for local mineral plans including: Identifying policies for existing and new sites of national importance, definition of Mineral Safeguarding Areas so that locations of mineral sources are not sterilised by other developments, safeguarding of existing and planned mineral infrastructure (rail links, wharfage, storage, processing etc), environmental criteria to ensure there is not an unacceptable environmental impact and policies for reclaiming land and site aftercare. The framework sets out the principles and the key planning policy objectives against which plans for minerals and decisions on individual applications should be made. These cover the areas of exploration, survey, safeguarding, protection of heritage and countryside, supply, bulk transportation, environmental protection, efficient use, and restoration. Mineral planning authorities should plan for steady and adequate supply of aggregates by; preparing a Local Aggregate Assessment, participating in an Aggregate Working Party, making provision for land-won in mineral plans, take account of National and sub national guidelines, using landbanks as an indicator of supply, maintaining separate landbanks for specific qualities and making adequate provisions. Mineral planning authorities should also: clearly distinguish between the three phases of development when planning on-shore oil and gas development, encourage underground gas and carbon storage, indicate areas of acceptable coal extraction and spoil sites and encourage capture and use of methane from coal mines. Replacing PPS22 (Renewable Energy), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including - Meeting the challenge of climate change, flooding and coastal change; Support low carbon future by helping to increase the use of renewable and low carbon sources in line with the National Policy Statement for Renewable Energy Infrastructure. This Overarching National (England and Wales) Policy Statement for Energy (EN-1) is part of a suite of NPSs issued by the Secretary of State for Energy and Climate Change. It sets out the Government s policy for delivery of major energy infrastructure, enabling the planning system to be How it affects, or is affected by the Luton Local Flood Risk Management Strategy minerals sites for landscape and biodiversity/geodiversity-led restoration. It should also, where appropriate, aim to safeguard against the sterilisation of certain minerals resources and related infrastructure. Background document. Background document. Policy Plan and Programme Review: Appendix C; page 10

67 Title of PPP National Policy Statements : Fossil Fuel Electricity Generating Infrastructure NPS (July 2011) National Policy Statements : Renewable Energy Infrastructure NPS (July 2011) National Policy Statements : Gas Supply Infrastructure & Gas and Oil Pipelines NPS (July 2011) National Policy Statements : Electricity Networks Infrastructure NPS (July 2011) National Policy Statements : Nuclear Power Generation NPS (July 2011) National Policy Statements : Hazardous Waste Main objectives and environmental / socio-economic requirements of PPP rapid, predicable and accountable. A further five technology-specific NPSs for the energy sector cover different types of energy infrastructure (see below NPSs). These are used in conjunction with this NPS where relevant to an application. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England and Wales) policy for delivery of major energy Infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England and Wales) policy for delivery of major energy Infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England and Wales) policy for delivery of major energy Infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England and Wales) policy for delivery of major energy Infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England and Wales) policy for delivery of major energy Infrastructure, enabling the planning system to be rapid, predicable and accountable. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. This NPS (England only), and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. The NPS How it affects, or is affected by the Luton Local Flood Risk Management Strategy Background document. Background document. Background document. Background document. Background document. Background document. Policy Plan and Programme Review: Appendix C; page 11

68 Title of PPP Bedfordshire and Luton Minerals and Waste Local Plan Strategic Sites and Policies Plan 2014 Population UN The Aarhus Convention (1998) Securing the Future: Delivering the Sustainable Development Strategy, 2005 Equality Act 2010* Main objectives and environmental / socio-economic requirements of PPP covers; Construction of facilities in England where the main purpose of the facility is expected to be the final disposal or recovery of hazardous waste and the capacity is expected to be: o in the case of the disposal of hazardous waste by landfill or in a deep storage facility1, more than 100,000 tonnes per year; o in any other case, more than 30,000 tonnes per year. The alteration of a hazardous waste facility in England where the main purpose of the facility is the final disposal or recovery of hazardous waste and the alteration is expected to have the following effect: o in the case of the disposal of hazardous waste by landfill or in a deep storage facility, to increase by more than 100,000 tonnes per year the capacity of the facility; o in any other case, to increase by more than 30,000 tonnes per year the capacity of the facility. This plan sets out strategic policies on which future waste management and mineral extraction will be assessed. It identifies strategic sites for mineral extraction, non-hazardous waste landfill and other waste management activities. Waste recycling and recovery, including generating energy where appropriate, is an important part of the plan. The plan safeguards the existing rail served aggregates depots at Leagrave Road and Crescent Road, as well as the asphalt-making plants and concrete batching plants that provide essential materials for road construction and maintenance. Links environmental rights and human rights. It establishes that sustainable development can be achieved only through the involvement of all stakeholders and links government accountability and environmental protection. Aims to enable people to satisfy their basic needs and enjoy a better quality of life without compromising the quality of life of future generations. The Equality Act 2010 is the law which bans unfair treatment and helps achieve equal opportunities in the workplace and in wider society. The act replaced previous anti-discrimination laws with a single act to make the law simpler and to remove inconsistencies. The act protects everyone against unfair treatment, on the basis of protected characteristics: age, disability, gender reassignment, marriage How it affects, or is affected by the Luton Local Flood Risk Management Strategy Background document. Background document. Background document. Background document. Policy Plan and Programme Review: Appendix C; page 12

69 Title of PPP National Planning Policy Framework (2012) Main objectives and environmental / socio-economic requirements of PPP and civil partnership, pregnancy and maternity, race, religion or belief, sex, and sexual orientation. Replacing PPS12 (Local Spatial Planning) and PPG17 (Planning for Open Space, Sport and Recreation), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including - Promoting healthy communities, and Supporting high quality communications infrastructure; The planning system can play an important role in facilitating social interaction and creating healthy, inclusive communities. Local planning authorities should create a shared vision with communities of the residential environment and facilities they wish to see. Local policies and decisions should therefore promote: Safe and accessible environments and developments. Opportunities for members of the community to mix and meet. Plan for development and use of high quality shared public space. Guard against loss of facilities. Ensure established shops can develop in a sustainable way Ensure integrated approach to housing and community facilities and services. Local and neighbourhood plans should identify community green spaces of particular importance (including recreational and tranquillity) to them, ensuring any development of these areas is ruled out in a majority of circumstances. The framework sets out open space, sport and recreation considerations for neighbourhood planning bodies These include an assessment of needs and opportunities; setting local standards; maintaining an adequate supply of open space and sports and recreational facilities; planning for new open space and sports and recreational facilities; and planning obligations. Advanced, high quality communications infrastructure is essential for sustainable economic growth. The development of high speed broadband technology and other communications networks also plays a vital role in enhancing the provision of local community facilities and services. The NPPF states on page 17 that to deliver the social, recreational and cultural facilities and services that the community needs, planning policies and decisions should plan for the use of shared space and guard against unnecessary loss of valued facilities. Also to ensure that established facilities and services are retained and able to develop for the benefit of the community. How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should have due regard to the NPPF promoting healthy community and Supporting high quality communications infrastructure principles. Policy Plan and Programme Review: Appendix C; page 13

70 Title of PPP English Nature: Accessible Natural Green Space Standards in Towns and Cities: A Review and Toolkit for their Implementation (2003) The Greensand Trust: Luton Green Space Strategy Review (2014) Soil DEFRA: Safeguarding our Soils: A Strategy for England (2009) National Planning Policy Framework (2012) Main objectives and environmental / socio-economic requirements of PPP Aims to help Local Authorities develop policies which acknowledge, protect and enhance the contribution natural spaces make to local sustainability. Three aspects of natural space in cities and towns are discussed: their biodiversity; their ability to cope with urban pollution; ensuring natural spaces are accessible to everyone. The report aims to show how size and distance criteria can be used to identify the natural spaces which contribute most to local sustainability. This Strategy reviews and updates the earlier Draft Green Space Strategy for Luton and South Bedfordshire, which was consulted upon but never updated and adopted. The elements making up the Review therefore include: Assessment of consultation responses to the Draft Strategy; Assessing the draft typology and proposed standards (distance thresholds, quantitative and qualitative standards); Assessing other existing qualitative data (e.g. site surveys); Recommendations for green space standards within the Luton Local Plan ; Considering the impact upon green space provision of an additional 50,000 residents by 2031; and Considering how green space in adjoining areas contributes to meeting local needs. The Soil Strategy for England outlines the Government s approach to safeguarding soils for the long term. It provides a vision to guide future policy development across a range of areas and sets out the practical steps that are needed to take to prevent further degradation of our soils, enhance, restore and ensure their resilience, and improve understanding of the threats to soil and best practice in responding to them. Key objectives of the strategy include: Better protection for agricultural soils; Protecting and enhancing stores of soil carbon; Building the resilience of soils to a changing climate; Preventing soil pollution; Effective soil protection during construction and development; and Dealing with the legacy of contaminated land Replacing PPS7 (Sustainable development in rural areas), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to support the expansion of Accessible Natural Green Space and improve the quality of existing areas. The LFRMS should seek to support the expansion of Green Space and improve the quality of existing areas. The LFRMS should seek to limit the loss of the highest quality agricultural land, support a reduction of soil loss and erosion, promote an improvement of soil quality, including a reduction of land contamination, and promote soil protection during the construction activities linked with flood risk management actions. The LFRMS should seek to limit the loss of higher quality agricultural land and valued geology. Policy Plan and Programme Review: Appendix C; page 14

71 Title of PPP Soils Lead Coordination Network: Soils and the Natural Heritage: a Vision by the Soils LCN for the Protection of the UK Soil Resource and Sustainable Use of Soils (2007) Main objectives and environmental / socio-economic requirements of PPP resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including conserving and enhancing the natural environment; The planning system should contribute and enhance the natural and local environment by; Protecting and enhancing valued landscapes, geological conservation interests and soils; Recognising the wider benefits of ecosystem services; Preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of soil, air, water or noise pollution or land instability; and Remediating and mitigating despoiled, degraded, derelict, contaminated and unstable land, where appropriate. Planning policies and decisions should also ensure that: The site is suitable for its new use taking account of ground conditions and land instability, including from natural hazards or former activities such as mining, pollution arising from previous uses and any proposals for mitigation including land remediation or impacts on the natural environment arising from that remediation; after remediation, as a minimum, land should not be capable of being determined as contaminated land under Part IIA of the Environmental Protection Act 1990; and adequate site investigation information, prepared by a competent person, is presented. Plans and decisions should encourage effective use of brownfield sites and take into account the economic benefits of agricultural land when assessing development. The presence of best and most versatile agricultural land (defined as land in grades 1, 2 and 3a of the Agricultural Land Classification), should be taken into account alongside other sustainability considerations. Where significant development of agricultural land is unavoidable, local planning authorities should seek to use areas of poorer quality land (grades 3b, 4 and 5) in preference to that of a higher quality, except where this would be inconsistent with other sustainability considerations. This document sets out the Soils Lead Coordination Network s vision for soil conservation. The desired outcomes of the vision are as follows: (i) (ii) Maintaining the diversity and biodiversity of UK soils; Controlling and when appropriate reversing loss of soil carbon and water-holding capacity; How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to reflect the vision presented in the document by seeking to support a reduction of soil loss and erosion, promote an improvement of soil quality, including a reduction of land contamination, and promote soil protection during development. Policy Plan and Programme Review: Appendix C; page 15

72 Title of PPP Water EC Water Framework Directive 2000/60/EC EC Floods Directive 2007/60/EC The Water Environment (Water Framework Directive) (England and Wales) Regulations (2003) National Planning Policy Framework (2012) Main objectives and environmental / socio-economic requirements of PPP (iii) (iv) Reducing accelerated soil erosion and sediment transport into watercourses; and Ensuring appropriate status of soils in mitigation and remediation scenarios to control the impact of climate change. This provides an overarching strategy, including a requirement for EU Member States to ensure that they achieve 'good ecological status' by River Basin Management Plans were defined as the key means of achieving this. Requires Member States to assess if all water courses and coast lines are at risk from flooding, to map the flood extent and assets and humans at risk, and to take measures to reduce this flood risk. Also reinforces the rights of the public to access this information. Requires all inland and coastal waters to reach good status by This is being done by establishing a river basin structure within which demanding environmental objectives are being set, including ecological targets for surface waters. Replacing PPS23 (Planning and Pollution Control), the policy sets out the Government s planning policies for England and is a framework for local policies and how they should be applied. In response to the UN resolution 24/187, the framework performs a sustainable development role (economic, social and environmental) in the planning system, outlining 12 core planning principles for plan and decision making, including - Conserving and enhancing the natural environment, and Meeting the challenge of climate change, flooding and coastal change; The planning system should contribute to and enhance the natural and local environment by: preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of soil, air, water or noise pollution or land instability. In preparing plans to meet development needs, the aim should be to minimise pollution and other adverse effects on the local and natural environment. Local planning authorities should adopt proactive strategies to mitigate and adapt to climate change, taking full account of flood risk, coastal change and water supply and demand considerations. Inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at highest risk, but where development is necessary, making it safe without increasing flood risk How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to ensure that water quality is not negatively affected by planned flood risk management actions, including regarding surface run-off during and after construction which could lead to a deterioration in quality of local watercourses. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and does not increases flood risk in existing or potential (due to climate change) flood risk areas. The LFRMS should support development which reduces the frequency and severity of pollution events, limits the risk of flooding, improves water quality and facilitates water conservation and reuse. The LFRMS should treat potential pollution from flood risk management actions as a material consideration, help realise opportunities for the remediation of contaminated The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and does not increases flood risk in existing or potential (due to climate change) flood risk areas. Policy Plan and Programme Review: Appendix C; page 16

73 Title of PPP The Water Supply (Water Quality) Regulations, 2010 / Water Act, 2003 / Water Resources Act, 1991 / Water Industry Act, 1991,1999 / Groundwater Regulations, 1998 / Bathing Waters Regulations, 2008 / Urban Wastewater Treatment Regulations, 1994 / Land Drainage Act, 1991, 1994 / Drainage EIA Regulations, 1999 / Flood Risk Regulations, 2009 Flood and Water Management Act, 2010 Main objectives and environmental / socio-economic requirements of PPP elsewhere. Local Plans should be supported by Strategic Flood Risk Assessment and develop policies to manage flood risk from all sources, taking account of advice from the Environment Agency and other relevant flood risk management bodies, such as lead local flood authorities and internal drainage boards. Local Plans should apply a sequential, risk-based approach to the location of development to avoid where possible flood risk to people and property and manage any residual risk, taking account of the impacts of climate change, by: applying the Sequential Test; if necessary, applying the Exception Test; safeguarding land from development that is required for current and future flood management; using opportunities offered by new development to reduce the causes and impacts of flooding; and where climate change is expected to increase flood risk so that some existing development may not be sustainable in the longterm, seeking opportunities to facilitate the relocation of development, including housing, to more sustainable locations. These legislative and regulatory instruments set out objectives and provide direction for the protection, improvement, sustainable management and use of the water environment (surface, ground, estuarine and coastal waters) in terms of quantity and quality, for the benefit of the human and natural environment. The Flood and Water Management Act (2010) states that a LFRMS must address: How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and helping to alleviate flood risks and hazards where they occur. The LFRMS will be the primary means of meeting these requirements in Luton. authorities in relation to the area; ose objectives; & how they are to be paid for; Environment Agency: Water Resources for the Future: A Strategy for England and Wales (2001, reviewed 2005) is to be reviewed, and how the strategy contributes to the achievement of wider environmental objectives. Looks at the steps needed to manage water resources to the 2020s and beyond, with the overall aim of improving the environment while allowing enough water for human uses. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and helping to alleviate flood risks and hazards where they occur. Policy Plan and Programme Review: Appendix C; page 17

74 Title of PPP Environment Agency: Groundwater Protection: Policy and Practice (2007) National Policy Statements : Water Supply NPS National Policy Statements : Waste Water NPS Main objectives and environmental / socio-economic requirements of PPP The Environment Agency is the statutory body responsible for the protection and management of groundwater resources in England & Wales. The Environment Agency have set out a framework for the regulation and management of groundwater in a set of documents, collectively known as Groundwater Protection: Policy and Practice (GP3). In these documents the Environment Agency describe their aims and objectives for groundwater, their technical approach to its management and protection, the tools to be used and the policies and approach to the application of legislation. The documents also provide a route map to other policies, strategies, procedures and technical resources related to groundwater. It sets out the Government s policy for delivery of major infrastructure, relating to the mitigation of, and adaptation to, climate change. This NPS, and in particular the policy and guidance section on generic environmental impacts and mitigation, may be helpful to local planning authorities (LPAs) in preparing their local impact reports. It sets out the Government s (England only, including national project in England) policy for the provision of major waste water infrastructure, enabling the planning system to be rapid, predicable and accountable. Major waste water infrastructure is defined as; construction of waste water treatment plants which are expected to have a capacity exceeding a population equivalent4 of 500,000 when constructed; or alterations to waste water treatment plants where the effect of the alteration is expected to increase by more than a population equivalent of 500,000 the capacity of the plant. Waste water (generally a mixture of domestic waste water from baths, sinks, washing machines and toilets, and waste water from industry. It will often also contain rainwater run-off from roofs and other impermeable surfaces). This NPS, includes a policy and guidance section on generic environmental impacts and mitigation. How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to protect the quality and quantity of groundwater in the wider area through promoting development which reduces the frequency and severity of pollution events, limits the risk of flooding, improves water quality and facilitates water conservation and reuse. The presence of the Source Protection Zones in the borough will require close management of surface water runoff to protect groundwater. Background document. Background document. Policy Plan and Programme Review: Appendix C; page 18

75 Title of PPP National Flood and Coastal Erosion Risk Management Strategy, 2011 Environment Agency, River Basin Management Plan: River Thames Basin District (2009); And: Environment Agency (October 2014): Water for life and livelihoods: A consultation on the draft update to the river basin management plan for the Thames River Basin District. Environment Agency: Thames Catchment Flood Management Plan (2009); And: Environment Agency (October 2014): Thames River Basin District: Consultation on the Draft Flood Risk Management Plan. Main objectives and environmental / socio-economic requirements of PPP The strategy encourages more effective risk management by enabling people, communities, business, infrastructure operators and the public sector to work together to: ensure a clear understanding of the risks of flooding and coastal erosion, nationally and locally, so that investment in risk management can be prioritised more effectively; set out clear and consistent plans for risk management so that communities and businesses can make informed decisions about the management of the remaining risk; manage flood and coastal erosion risks in an appropriate way, taking account of the needs of communities and the environment; ensure that emergency plans and responses to flood incidents are effective and that communities are able to respond effectively to flood forecasts, warnings and advice; help communities to recover more quickly and effectively after incidents. The River Basin Management plan focuses on the protection, improvement and sustainable use of the water environment. This plan has been prepared under the Water Framework Directive, which requires all countries throughout the European Union to manage the water environment to consistent standards. The plan describes the river basin district, and the pressures that the water environment faces. It highlights what this means for the current state of the water environment, and what actions will be taken to address the pressures. It sets out what improvements are possible by 2015 and how the actions will make a difference to the local environment the catchments, estuaries, the coast and groundwater. The CFMP gives an overview of the flood risk in the Thames catchment area and sets out the preferred plan for sustainable flood risk management over the next 50 to 100yrs. How it affects, or is affected by the Luton Local Flood Risk Management Strategy The Strategy defines how responsibility for flood and coastal erosion risk management issues are shared between public bodies, establishes duties to be met by each body, and sets priorities for strategy, funding and reporting. The LFRMS should seek to support improvements to the area s water environment. In this context it should support flood risk management actions which reduce the frequency and severity of pollution events, improve water quality and facilitate water conservation and reuse. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and helping to alleviate flood risks and hazards where they occur. Policy Plan and Programme Review: Appendix C; page 19

76 Title of PPP Environment Agency: Upper Lee Abstraction Licensing Strategy (2013) Capita Symonds (February 2013): Luton Strategic Flood Risk Assessment Level 1 (Update) Capita Symonds (2012): Luton Surface Water Management Plan Final Draft [Updated September 2013]. Main objectives and environmental / socio-economic requirements of PPP This Licensing Strategy sets out how water resources are managed in the Upper Lee CAMS area. It provides information about where water is available for further abstraction and an indication of how reliable a new abstraction licence may be. The strategy was produced in February 2013 using evidence and information gathered during the Catchment Abstraction Management Strategy (CAMS) process which it supersedes. Through this process the Environment Agency considers the impact of abstraction at all flows. This helps to manage future abstraction more sustainably. The document provides information on the geology and hydrology within the Upper Lee CAMS area and resource availability in terms of surface and groundwater and reliability of abstraction within the CAMS area. It also details how abstractions are managed within the CAMS area, including the principles that guide licence application assessment; the abstraction licence application process; opportunities for license trading; new authorisations and restoring sustainable abstractions. A Level 1 SFRA presents sufficient information to enable the LPA to apply the Sequential Test to potential development sites and assists in identifying if application of the Exception Test will be necessary. The Level 1 SFRA also provides background information, a review of local policies, and guidance for site specific flood risk assessment and the potential for application of Sustainable Drainage Systems (SuDS). The review of policies is allied to guidance on the requirements for site- specific Flood Risk Assessments (FRAs) throughout the study area. The outcomes from the Level 1 SFRA should be used by the LPA to identify the most suitable locations for development in line with NPPF and other planning drivers. Where sites cannot be located in line with the principles of NPPF further investigation may be required through a Level 2 SFRA. The draft SWMP defines 17 Critical Drainage Areas (CDA) which are discrete geographic areas (usually a hydrological catchment) where multiple and interlinked sources of flood risk (surface water, groundwater, sewer and/or river) often cause flooding during severe weather thereby affecting people, property or local infrastructure. It goes on to identify options for reducing flood risks and hazards, prioritisation thereof, a proposed surface water drainage policy, and an action plan. How it affects, or is affected by the Luton Local Flood Risk Management Strategy The LFRMS should seek to support sustainable water management and promote the sustainable use of water resources. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and helping to alleviate flood risks and hazards where they occur. The LFRMS will be a key document in seeking to ensure development does not take place in flood risk areas, and helping to alleviate flood risks and hazards where they occur. Policy Plan and Programme Review: Appendix C; page 20

77 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ Appendix D: Baseline Data & Key Issues Please see insert. G

78 SEA for the Luton Local Flood Risk Management Strategy: Environmental Report August 2015 UE-0161 SEA- Luton LFRMS ER_3_ This page is intentionally blank. H

79 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Contents 1 Biodiversity, Flora and Fauna Designated Sites Priority Habitats Bedfordshire and Luton Biodiversity Action Plan Key Issues for Biodiversity Likely Evolution of the Baseline in the Absence of the LFRMS 5 2 Climatic Factors Effects of Climate Change Climate Change Adaptation Key Issues for Climate Change Likely Evolution of the Baseline in the Absence of the LFRMS 10 3 Cultural Heritage Designated Sites Key Issues for Cultural Heritage Likely Evolution of the Baseline in the Absence of the LFRMS 13 4 Landscape Designated Sites Key Issues for Landscape Likely Evolution of the Baseline in the Absence of the LFRMS 16 5 Material Assets Properties and Infrastructure at Risk of Flooding Key Issues for Materials Assets Likely Evolution of the Baseline in the Absence of the LFRMS 28 6 Population and Human Health Demographics Key Issues for Population and Human Health Likely Evolution of the Baseline in the Absence of the LFRMS 31

80 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Soil Agricultural Land Minerals and Waste Sites Previously Developed and/or Derelict Land Key Issues for Soil Likely Evolution of the Baseline in the Absence of the LFRMS 36 8 Water Water Resources Water Quality Flood Risk Key Issues for Water Likely Evolution of the Baseline in the Absence of the LFRMS 44

81 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ List of Tables and Figures Table 1.1: County and District Wildlife Sites 3 Table 1.2: Type and extent of priority habitats in Luton 4 Table 1.3: Bedfordshire & Luton Species and Habitat Action Plans 4 Table 4.1: Luton Green Belt 14 Table 5.1: Barnfield College / Barnfield Avenue CDA (Adapted from Capita Symonds, 2013) 17 Table 5.2: Barton Road / Great Bramingham CDA (Adapted from Capita Symonds, 2013) 19 Table 5.3: Barnfield West Academy/Poynters Road CDA (Adapted from Capita Symonds, 2013) 19 Table 5.4: Beechwood Primary School / Railway Line CDA (Adapted from Capita Symonds, 2013) 20 Table 5.5: Chapel Street, Stuart Street CDA (Adapted from Capita Symonds, 2013) 20 Table 5.6: Dalroad Enterprise Estate CDA (Adapted from Capita Symonds, 2013) 21 Table 5.7: Dunstable Road / Luton Town FC Ground CDA (Adapted from Capita Symonds, 2013) 21 Table 5.8: Farley Hill CDA (Adapted from Capita Symonds, 2013) 22 Table 5.9: Junction 11 M1 CDA (Adapted from Capita Symonds, 2013) 22 Table 5.10: Luton Sixth Form College CDA (Adapted from Capita Symonds, 2013) 23 Table 5.11: Luton High Town CDA (Adapted from Capita Symonds, 2013) 23 Table 5.12: Sundon Park / Railway Line CDA (Adapted from Capita Symonds, 2013) 24 Table 5.13: Vauxhall Road CDA (Adapted from Capita Symonds, 2013) 25 Table 5.14: Wigmore Lane / Eaton Green Road CDA (Adapted from Capita Symonds, 2013) 25 Table 5.15: Summary of Risk Outside CDAs (Adapted from Capita Symonds, 2013) 26 Table 5.16: Summary of Risks in CDAs Outside the Borough Boundary * (Adapted from Capita Symonds, 2013) 27 Table 8.1: Luton waterbodies, status and objectives 2014/ Figure 1.1: Designated nature conservation sites in and around the borough 2 Figure 1.2: Priority habitats in and around the borough 6 Figure 2.1: Extent and possible impacts of changes in summer temperature and precipitation in the East of England (Source: LBC, 2010) 8 Figure 2.2: Extent and possible impacts of changes in winter precipitation in the East of England (Source: LBC, 2010) 9

82 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 3.1: Designated heritage sites in and around the borough 12 Figure 4.1: Designated landscapes in and around the borough 15 Figure 5.1: Luton Critical Drainage Areas (Source: Capita Symonds, September 2013) 18 Figure 6.1: Age profile of Luton (June 2012), with regional and England comparators 29 Figure 6.2: Population projections, 2012, 2027, Figure 6.3: Health profile (March 2011) 31 Figure 7.1: Agricultural Land Classification in and around the borough 33 Figure 7.2: Policies Inset Map 9 (Source: Bedfordshire and Luton Minerals and Waste Local Plan) 34 Figure 8.1: Upper Lee abstraction licensing area (Source: Upper Lee ALS 2013) 37 Figure 8.2: Source Protection Zones in Luton 39 Figure 8.3: Fluvial flood risk in Luton 41 Figure 8.4: River catchments and watercourses (Source: Capita Symonds, 2012) 42 Figure 8.5: Susceptibility to groundwater flooding (Source: Capita Symonds, 2012) 42 Figure 8.6: Sewer flooding probability areas (Source: Capita Symonds, 2012) 45 Figure 8.7: Surface water depths during a 100yr rainfall event (Source: Capita Symonds, 2012) 45

83 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Biodiversity, Flora and Fauna 1.1 Designated Sites There are no internationally important nature conservation sites within or adjacent to the Luton borough boundary, such as Special Areas of Conservation (SAC), Special Protection Areas (SPA) or Ramsar sites. The closest such site to the borough is Chilterns Beechwoods SAC, approximately 8.8km to the south-west and designated for Asperulo-Fagetum beech forests, semi-natural dry grasslands and scrubland facies on calcareous substrates (Festuco-Brometalia) and stag beetle Lucanus cervus. Although water levels are likely to play an important role in the ecological status of these features they are unlikely to be affected by the LFRMS. There are no other European sites within 20km of the borough The only other European sites which could theoretically be affected by the LFRMS are the Lea Valley SPA/Ramsar which are hydrologically connected to the borough via the River Lea. However, these are located c.25km south-east of the borough boundary at their nearest extent and would be unlikely to be affected except under an extreme pollution incident. Assessment of the LFRMS policies and actions will need to take account of the risk of such an event There are no nationally designated sites for nature conservation within Luton, however, the following are adjacent to the borough s northern boundary: Galley and Warden Hills Site of Special Scientific Interest (SSSI); and Galley and Warden Hills Local Nature Reserve (LNR) Located on the northern edge of Luton, and situated on the Middle Chalk with an overlying cap of clay-with-flints, Galley and Warden Hills SSSI supports areas of unimproved neutral and calcareous grassland with structural variety provided by scattered and dense scrub. It supports a characteristic downland flora, including many locally uncommon species and nationally rare plants. First notified in 1951, and covering an area of 47.5ha, 76.7% of the site is in unfavourable, recovering condition, with the remaining 23.3% in favourable condition. The site was further declared an LNR in There are 27 County Wildlife Sites (CWS) and 16 District Wildlife Sites (DWS) within or adjacent to the borough boundary, see Table 1.1 and Figure 1.1. County Wildlife Sites are recognised as important for wildlife when assessed against a set of criteria including: Size, Diversity, Rarity, Fragility, Typicality and Recorded History. Bradgers Hill CWS, Dallow Downs CWS and part of Hay Wood and Stopsley Common DWS are being considered for designation as SSSI but no decisions have yet been and the precise extent of the land to be designated is not known. 1

84 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 1.1: Designated nature conservation sites in and around the borough 2

85 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ District Wildlife Sites are recognised as having value for wildlife when assessed against a set of criteria, and are one tier below CWS status, i.e. their biodiversity interest is not great enough for recognition as CWS but is still worthy of recognition and protection if possible. With appropriate management a DWS may attain CWS quality and status. District Wildlife Sites are a new category of site, initiated in 2012 and currently only being recognised within the area of Luton Borough Council 1. Table 1.1: County and District Wildlife Sites County and District Wildlife Sites County Wildlife Sites Within Luton Biscot Churchyard CWS Bradger's Hill CWS (currently being considered for SSSI designation) Bramingham Wood CWS Castle Croft and Bluebell Wood CWS Church Cemetery, Luton CWS Cowslip Meadow CWS (currently being considered for SSSI designation) Croda Colloids CWS Dallow Downs CWS (currently being considered for SSSI designation) Fallowfield CWS Honeygate and Crick Hills CWS Icknield School CWS Adjacent to Luton Dunstable to Luton disused railway CWS Leagrave Common CWS Oaket Wood CWS (partly in Hertfordshire) Oosey Hill CWS (partly in Central Bedfordshire) People's Park CWS River Lea CWS Riverside Walk CWS Slaughter's Wood and Green Lane CWS Stockwood Park CWS Sunshine Riding Stables CWS The Chase CWS Wandon End Park CWS Wigmore Park CWS Winch Hill Wood CWS (partly in Hertfordshire) Galley and Warden Hills CWS Kidney and Bull Woods CWS District Wildlife Sites Within Luton Dairyborn Scarp DWS Dallow Lane DWS Foxdell DWS Great Bramingham Park DWS Great Hayes Wood DWS Hatters Way DWS Hay Wood and Stopsley Common DWS (part of which is currently being considered for SSSI designation) Hitchin Road Spinney DWS Lewsey Park DWS Luton Parkway Verges DWS Mixes Hill DWS River Lea DWS Stockingstone Hill DWS Stockwood Park DWS Turnpike Lane DWS Whitehorse Vale DWS 1 Bedfordshire and Luton Biodiversity Recording and Monitoring Centre accessed online at [October 2014]: 3

86 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Priority Habitats Luton is a heavily urbanised borough but nonetheless supports over 225ha of priority habitats according to nationally mapped datasets 2. These are depicted on Figure 1.2 with a summary of the extent of each priority habitat type given in Table 1.2. Table 1.2: Type and extent of priority habitats in Luton Priority Habitat Type Area (ha) Deciduous woodland Good quality semi-improved grassland 1.03 Lowland calcareous grassland Lowland fen 0.02 Lowland meadow Bedfordshire and Luton Biodiversity Action Plan Since 2001 the Bedfordshire and Luton Wildlife Working Group has been developing and maintaining the plans for species and habitats as part of the county's Biodiversity Action Plan; see Table 1.3. Table 1.3: Bedfordshire & Luton Species and Habitat Action Plans Habitat Action Plans Arable field margins Floodplain grazing marsh Hedgerows Lowland grasslands (dry acid & calcareous) Lowland heathland Lowland meadows Ponds Species Action Plans Adder Arable plants Depressed river mussel Otter Great crested newt Hazel dormouse Water vole Reedbed - Traditional orchards - Wet woodland - Wood-pasture and parkland - Woodland - 2 Natural England Priory Habitats Layer (June 2013), accessed online at [February 2014]: 4

87 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Key Issues for Biodiversity Luton is a heavily urbanised borough with comparatively little remaining in the way of seminatural habitats. It has a growing population and a high level of new housing needs over the next 20 years or so, which will place additional pressures on the remaining biodiversity resources in the borough. The LFRMS should, wherever possible, seek to promote and facilitate the conservation and enhancement of semi-natural habitats, both in their own right and for flora and fauna they support. This could be achieved, for example, by promoting multifunctional (i.e. biodiverse) flood storage areas, removal of watercourse culverts, and ensuring that flood defences and their management do not significantly affect biodiversity. 1.5 Likely Evolution of the Baseline in the Absence of the LFRMS Baseline conditions for biodiversity, flora and fauna are unlikely to significantly alter in the absence of an LFRMS, except perhaps to the extent that they could be negatively affected by other flood risk management strategies and defences. However, as the River Lea is both a key source of flood risk in Luton and one of the borough s most extensive wildlife sites, measures to alleviate flood risk (whether promoted by the LFRMS or other flood risk management plan) should seek to avoid significant ecological impacts. Flooding incidents may result in impacts to remaining areas of semi-natural and/or priority habitats and the species they support, but equally are likely to play a role in the dynamic conditions of riparian ecosystems. Flood defences could negatively affect populations of riparian species such as water vole or kingfisher by changing the extent or structure of riparian habitat. 5

88 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 1.2: Priority habitats in and around the borough 6

89 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Climatic Factors 2.1 Effects of Climate Change The outcome of research on the probable effects of climate change in the UK has been released by the UK Climate Projections (UKCP09) team. UKCP09 gives climate information for the UK up to the end of this century and projections of future changes to the climate are provided, based on simulations from climate models. Projections are broken down to a regional level across the UK and are shown in probabilistic form, which illustrate the potential range of changes over three time periods (2020s, 2050s and 2080s) and the level of confidence in each prediction. The effects of climate change for the East of England climate in the 2050s for a medium emissions scenario are likely to be as follows 3 : The central estimate of increase in winter mean temperature is 2.2ºC; it is very unlikely to be less than 1.1ºC and is very unlikely to be more than 3.4ºC. A wider range of uncertainty is from 0.9ºC to 3.8ºC. The central estimate of increase in summer mean temperature is 2.5ºC; it is very unlikely to be less than 1.2ºC and is very unlikely to be more than 4.3ºC. A wider range of uncertainty is from 1ºC to 4.8ºC. The central estimate of increase in summer mean daily maximum temperature is 3.4ºC; it is very unlikely to be less than 1.3ºC and is very unlikely to be more than 6ºC. A wider range of uncertainty is from 1.1ºC to 6.8ºC. The central estimate of increase in summer mean daily minimum temperature is 2.7ºC; it is very unlikely to be less than 1.2ºC and is very unlikely to be more than 4.7ºC. A wider range of uncertainty is from 1.1ºC to 5.3ºC. The central estimate of change in annual mean precipitation is 0%; it is very unlikely to be less than 5% and is very unlikely to be more than 5%. A wider range of uncertainty is from 5% to 6%. The central estimate of change in winter mean precipitation is 14%; it is very unlikely to be less than 3% and is very unlikely to be more than 31%. A wider range of uncertainty is from 1% to 35%. The central estimate of change in summer mean precipitation is 17%; it is very unlikely to be less than 38% and is very unlikely to be more than 6%. A wider range of uncertainty is from 40% to 14% Figure 2.1 and Figure 2.2 illustrate the extent and possible impacts of changes in summer temperature, and summer and winter precipitation in the East of England over three time periods (2020, 2040 and 2080). 3 UK Climate Projections, UKCP09 Key Findings, accessed online at [October 2014]: 7

90 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 2.1: Extent and possible impacts of changes in summer temperature and precipitation in the East of England (Source: LBC, 2010) 8

91 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 2.2: Extent and possible impacts of changes in winter precipitation in the East of England (Source: LBC, 2010) 2.2 Climate Change Adaptation The Luton Climate Change Adaptation Action Plan (LBC, 2010) sets out an extensive series of key actions to promote adaptation, organised under the following themes: Adapting Luton s built environment to a changing climate; Minimising flood risk in Luton; Managing and enhancing Luton s green infrastructure to improve resilience to a changing climate; Increasing the resilience of the Council s services delivery; Increasing workforce capability to adapt to climate change; Raising awareness and communicating climate change risks; and To provide leadership across the borough in increasing resilience and adapting to climate change. 9

92 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Key Issues for Climate Change Large areas of Luton are already subject to flood risks resulting from a combination of topography, geology and inadequate infrastructure (including the constrained capacity in drainage and culverted watercourses). Although levels of summer precipitation may decline in future, climate change is likely to exacerbate this situation through greater volumes of rainfall during the winter, and increased storminess and intensity of rain showers. 2.4 Likely Evolution of the Baseline in the Absence of the LFRMS The effects of climate change in Luton are likely to continue with accelerating pace in future, with or without an LFRMS, due to past and present carbon emissions. The borough already benefits from an extensive Climate Change Adaptation Strategy, however, the LFRMS and related documents (e.g. the Surface Water Management Plan) will form an important part of the policy response to managing these impacts. Without an LFRMS, adaptation to climate change is unlikely to be as successful, meaning that its impacts would be greater. 10

93 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Cultural Heritage 3.1 Designated Sites There are no World Heritage Sites, Registered Battlefields or Protected Wrecks in Luton, but there are four Scheduled Monuments within or adjacent to the borough; see Figure 3.1: Neolithic enclosure known as Waulud s Bank in the north-west of the borough; Dray s Ditches, an Iron Age linear earthwork overlaying Bronze Age occupation at the northern borough boundary; Two bowl barrows on Galley Hill, just north of Dray s Ditches; and The upstanding and buried remains of the late medieval magnate's residence known as Someries Castle and the adjacent garden earthworks, just outside the borough boundary south of London Luton Airpoort A fifth Scheduled Monument, the site of a Medieval village near Zouches Farm, is outside of the borough around 700m south-west Additionally there are three Registered Parks and Gardens in the borough, Wardown Park (in the centre of the borough), Putteridge Bury (on its north-eastern flank) and Luton Hoo (to the south). A further (unregistered) historic park and garden can be found south of Manor Farm, Lower Sundon just outside of the borough to the north. This area, commonly known as Sundon Park, formed part of the home park of the manor of Sundon during the medieval (when it was joined to a much larger deer park) and post-medieval periods, before the house was demolished in the early 19th century. On demolition of the house, the landscape garden reverted back to farmland Furthermore there is one Grade I (Parish Church of St Mary) and 81 Grade II nationally Listed Buildings 4, and five locally designated Conservation Areas in the borough including: High Town Conservation Area, noted by English Heritage as in very bad condition and listed on the Heritage at Risk Register ; Luton South Conservation Area; Plaiters Lea Conservation Area, noted by English Heritage as in very bad condition and listed on the Heritage at Risk Register 2014; Rothesay Conservation Area; and Town Centre Conservation Area. 4 English Heritage National Monuments Record (Feb/Mar 2014), accessed online at [March 2014]: 5 English Heritage, Heritage at Risk Register 2014, accessed online at [October 2014]: 11

94 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 3.1: Designated heritage sites in and around the borough 12

95 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ There is also undesignated archaeology, including some that may be of national importance, which is recorded on the Historic Environment Record (HER); buried archaeology can be affected by changes in hydrology, e.g. de watering. 3.2 Key Issues for Cultural Heritage The majority of the borough s historic assets are at risk of flooding, whether from fluvial, ground water or surface water sources, which may result in harm to or loss of their significance as a result of direct flood damage and/or inappropriate remedial works. This is especially so in the town centre which is noted as having a high risk of fluvial and pluvial flooding and very high susceptibility to groundwater flooding (see also Chapter 8). The following key issues are relevant: Proposed flood risk management measures and measures to improve resilience have the potential to impact on the significance of heritage assets, including the contribution made by their setting. Securing the sustainable use of heritage assets, including those identified as at risk, may be hindered by their location in high flood risk areas. Measures such as Sustainable Drainage Systems should be promoted whilst sustaining and enhancing the character of historic townscapes and landscapes and the significance of areas of archaeological interest and/or potential interest. 3.3 Likely Evolution of the Baseline in the Absence of the LFRMS The borough s historic environment is unlikely to change dramatically with or without an LFRMS, however, the number of heritage features at risk of flooding is likely to progressively increase with climate change unless suitable adaptation and flood protection measures are implemented. 13

96 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Landscape 4.1 Designated Sites Luton is bordered to the north and south-west by the Chilterns Area of Outstanding Natural Beauty (AONB) and small sections of the north-east of the borough fall within this designation; see Figure 4.1. The Chilterns AONB covers 839km 2 of countryside, stretching from the River Thames in southern Oxfordshire up through Buckinghamshire and Bedfordshire to Hitchin in Hertfordshire. Farmland covers nearly two-thirds of the AONB and over one-fifth of the area is wooded. Attractive villages with brick and flint cottages nestle in quiet valleys. The chalk rock underlying the Chilterns gives rise to hillsides of velvety chalk downland. Water stored in the rock emerges from springs to feed clear, sparkling chalk streams like the Chess and Misbourne Luton is surrounded on virtually all sides by the southern Bedfordshire Green Belt, apart from to the east and south-east of Luton where the North Hertfordshire Green Belt completes the ring (an extension of the Metropolitan Green Belt). Luton itself currently has only six small areas of Green Belt remaining, totalling 138.2ha as listed in Table 4.1, which are protected through the Luton Local Plan. Table 4.1: Luton Green Belt Name Area (ha) Dane Street 6.58 Oaket Wood 0.75 Putteridge 5.77 Someries Stopsley Common Warden Hill Additionally, the Luton Local Plan seeks to protect locally designated Areas of Great Landscape Value (AGLV) and Areas of Local Landscape Importance (ALLI) in the following locations: Bradgers Hill AGLV; Dallow Downs AGLV; Dane Street AGLV; Someries AGLV; Hart Hill ALL; and Stockwood Park ALLI. 6 The Chilterns Area of Outstanding Natural Beauty, accessed online at [October 2014]: 14

97 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 4.1: Designated landscapes in and around the borough 15

98 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Key Issues for Landscape Areas of significant landscape value are not likely to be significantly affected by the LFRMS. 4.3 Likely Evolution of the Baseline in the Absence of the LFRMS As with the historic environment, the borough s landscape and townscape are unlikely to change dramatically with or without an LFRMS, however, the number of heritage features (which are an essential component of landscape and townscape character) at risk of flooding is likely to progressively increase with climate change unless suitable adaptation and flood protection measures are implemented. 16

99 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Material Assets 5.1 Properties and Infrastructure at Risk of Flooding The Draft Luton Surface Water Management Plan 7 defines 17 Critical Drainage Areas (CDA) which are discrete geographic areas (usually a hydrological catchment) where multiple and interlinked sources of flood risk (surface water, groundwater, sewer and/or river) often cause flooding during severe weather thereby affecting people, property or local infrastructure (p.47). More information on the various types of flood risk is given at Chapter Table 5.1 to Table 5.16 provide a summary of the locations, sources and consequences of flooding for properties and infrastructure, for each CDA within the borough, based on the 1in100yr rainfall event. Figure 5.1 illustrates the location of CDAs within Luton. Table 5.1: Barnfield College / Barnfield Avenue CDA (Adapted from Capita Symonds, 2013) CDA ID: BCBR Barnfield College / Barnfiled Avenue Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Numerous households are predicted to be affected by flooding during this rainfall event. Barnfield College grounds are affected, but not the buildings themselves. 7 Capita Symonds (2012): Luton Surface Water Management Plan Final Draft [Updated September 2013]. Accessed online at [October 2014]: %20V1%207.pdf

100 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 5.1: Luton Critical Drainage Areas (Source: Capita Symonds, September 2013) 18

101 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Table 5.2: Barton Road / Great Bramingham CDA (Adapted from Capita Symonds, 2013) CDA ID: BRGB Barton Road / Great Bramingham Local Other Flood Source Surface water Sewer Ord. watercourse Main river Groundwater Reservoir Approx. Depth Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: The flood level reaches between m during the 100 year event around Icknield Way and is predicted to flood a substantial number of properties. Many residential properties along A6 near Statham Close roundabout, Chard Drive, Sacombe Green and the Whitehorse Vale are observed to have a significant hazard rating. The highly vulnerable infrastructure identified is the church / community hall at the corner of Catsbrook Road and Icknield Way. More vulnerable items are schools throughout the CDA. Table 5.3: Barnfield West Academy/Poynters Road CDA (Adapted from Capita Symonds, 2013) CDA ID: BWPR Barnfield West Academy/Poynters Road Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m

102 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: BWPR Barnfield West Academy/Poynters Road Flood impacts: The properties between Poynters Road and Amhurst Road are flooded with observed flood depths between 0.4m and 0.75m, this is due to the area of ground which is lower than the surrounding area. Similarly a group of properties along Pastures Way is also identified to be flooded by approximately 0.2m. Minor flooding is predicted at two schools within the CDA (more vulnerable infrastructure). Table 5.4: Beechwood Primary School / Railway Line CDA (Adapted from Capita Symonds, 2013) CDA ID: BWSRL Beechwood Primary School / Railway Line Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: The majority of flooded households are centred on Morgan Close, Linden Road and Mostyn Road typical depths are between 0.7m and 1.0m for the 1% AEP event. Table 5.5: Chapel Street, Stuart Street CDA (Adapted from Capita Symonds, 2013) CDA ID: CHAST Chapel Street, Stuart Street Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other 20

103 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: CHAST Chapel Street, Stuart Street >0.1m >0.5m Flood impacts: The majority of household flooding is predicted along the Russell Street / Elizabeth Street overland flow path. Predicted commercial property flooding is generally centred within and around The Mall. Of most concern is the predicted 0.4m to 0.6m deep overland flow through The Mall. Table 5.6: Dalroad Enterprise Estate CDA (Adapted from Capita Symonds, 2013) CDA ID: DREE Dalroad Enterprise Estate Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Most of the predicted flooded properties are along Kingsway or within the Bilton Way Industrial Estate or Dalroad Estate. Table 5.7: Dunstable Road / Luton Town FC Ground CDA (Adapted from Capita Symonds, 2013) CDA ID: DURD Dunstable Road / Luton Town FC Ground Local Other Flood Source Surface water Sewer Ord. watercourse Main river Groundwater - Approx. Depth Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m

104 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: DURD Dunstable Road / Luton Town FC Ground Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Residential property flooding is generally associated with the predicted flooding at Leagrave Road underpass and at Waldeck Road. Commercial property flooding is concentrated in the rail depot on Leagrave Road and Wingate Road. Flooding of A6 at New Bedford Road underpass and B579 at Leagrave Road underpass (both are main east-west routes through Luton). Table 5.8: Farley Hill CDA (Adapted from Capita Symonds, 2013) CDA ID: FHILL Farley Hill Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: All of the household flooding predicted in this CDA is located in the Farley Hill area. Deeper flooding is associated with the predicted overland flow path through The Grove, Farley Farm Road and Leyhill Drive. Table 5.9: Junction 11 M1 CDA (Adapted from Capita Symonds, 2013) CDA ID: J11M1 Junction 11 M1 Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use 22

105 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: J11M1 Junction 11 M1 >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Predicted household flooding is adjacent to the M1 motorway. One other property listed here as flooded is one of the outbuildings at Challney High School. The second other property no longer exists and is now part of the north bound M1 off-slip (OS mapping still shows this as a large warehouse and hence is included in the overall flooded property count). While the M1 itself is not predicted to be flooded the Junction 11 access point may be affected. Table 5.10: Luton Sixth Form College CDA (Adapted from Capita Symonds, 2013) CDA ID: L6FC Luton Sixth Form College Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Residential properties along Avebury Avenue, Marston Gardens, Old Bedford Road and Foxhill Road are flooded as a result of overland flow. More significant flooding is predicted for the properties between the Luton College playing field and Marston Gardens, with modelled flooding of between 0.4m and 0.5m near the houses. Table 5.11: Luton High Town CDA (Adapted from Capita Symonds, 2013) CDA ID: LUHT Luton High Town Flood Source Local Other Surface water Sewer 23

106 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: LUHT Luton High Town Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: A large number of flooded households are centred around the low point on Frederick Street. The more vulnerable infrastructure identified as being at risk of minor flooding is a drugs clinic on Clarendon Road. Table 5.12: Sundon Park / Railway Line CDA (Adapted from Capita Symonds, 2013) CDA ID: SPRL Sundon Park / Railway Line Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: The residential properties within the modelled flood extent are generally along both sides of Sundon Park Road while the commercial properties are located around Dencora Way. The infrastructure predicted to be affected by flooding is Lealand High School on Sundon Park Road (two buildings). 24

107 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Table 5.13: Vauxhall Road CDA (Adapted from Capita Symonds, 2013) CDA ID: VAUX Vauxhall Road Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Predicted commercial property flooding is primarily within the General Motors area along Vauxhall Way and Vauxhall Road. Modelled residential property flooding is generally related to smaller overland flows contributing to the main flow path along Vauxhall Way. In addition to the infrastructure noted above, Parkway Road is also predicted to experience significant flooding. This is currently the only access road to Luton Airport Parkway Station. Similarly, significant overland flow is predicted along Vauxhall Way (A505). Table 5.14: Wigmore Lane / Eaton Green Road CDA (Adapted from Capita Symonds, 2013) CDA ID: WIGP Wigmore Lane / Eaton Green Road Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Depths of water along majority of Wigmore Lane are in the range of 0.3m to 0.7m 25

108 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ CDA ID: WIGP Wigmore Lane / Eaton Green Road during the 1%AEP event. Under these conditions, the road is likely to be impassable to vehicles - especially at the southern end where ponding reaches 1m deep. The majority of predicted residential property flooding is located adjacent to Wigmore Lane. Flooding is likely to make the Wigmore Lane / Eaton Green Road intersection impassable. Predicted flooding of infrastructure includes the Thames Water foul water pumping station at the Wigmore Lane / Eaton Green Road intersection. Table 5.15: Summary of Risk Outside CDAs (Adapted from Capita Symonds, 2013) CDA ID: n/a Summary of Risk Outside CDAs Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts: Key items of infrastructure predicted as being affected by surface water flooding deeper than 0.5m are summarised below: - Highly vulnerable: Fire Station (Corner of New Bedford Road and Studley Road) mainly influenced by Main River flooding from the River Lea - More vulnerable: Health Care Centre (Mill Street) Mainly influenced by Main River flooding from the River Lea through the Luton Town Centre - More vulnerable: Health Care Centre (Bridge Street) - Mainly influenced by Main River flooding from the River Lea through the Luton Town Centre - More vulnerable: Educational Building Driver Training (Corner Telford Road and New Bedford Road) - Mainly influenced by Main River flooding from the River Lea through the Luton Town Centre - Other: Electricity Substation (Corner of Mill Street and New Bedford Road) - Mainly influenced by Main River flooding from the River Lea through the Luton Town Centre 26

109 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Table 5.16: Summary of Risks in CDAs Outside the Borough Boundary * (Adapted from Capita Symonds, 2013) CDA ID: n/a Summary of Risks in CDAs Outside the Borough Local Other Flood Source Surface water Sewer Ord. watercourse Main river Approx. Depth Groundwater - Households Commercial / Non-deprived Deprived industrial Unclassified land use >0.1m >0.5m Approx. Depth Infrastructure Essential Highly vulnerable More vulnerable Other >0.1m >0.5m Flood impacts Nimbus Park / The Herculean CDA: Commercial property flooding is generally located in the three business parks Townsend Estate, Apex Business Centre and The Herculean. Most of the residential flooding is located on the Townsend Industrial Estate flow path on Dunstable Road and Cemetery Road. Flood impacts Upstream of Houghton Park CDA: Minor flooding is predicted for properties between Kent Road and Sundon Road with several more affected along the western side of Houghton Park Road. Although part of the overland flow is predicted to be through Hillcrest School, the depths are not predicted to significantly affect buildings. Flood impacts Windsor Drive CDA: Minor surface flooding is predicted to affect the residential properties and local roads in this area. * Three CDAs described in the draft SWMP are outside of the borough boundary. LBC is not therefore responsible for managing flood risk to properties in these areas, however, the overland flows that are generated can impact on infrastructure and properties within the borough, especially in the Houghton Brook floodplain. The relevant CDAs are: Nimbus Park / The Herculean; Upstream of Houghton Park; and Windsor Drive. 5.2 Key Issues for Materials Assets In total, 5,500 properties and infrastructure assets are at risk of surface water flooding in excess of 0.1m in Luton, including: Non-deprived households: 3,140; Deprived households: 1,429; Commercial/industrial premises: 331; Unclassified land uses: 568; and 27

110 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Infrastructure: Likely Evolution of the Baseline in the Absence of the LFRMS As stated in the draft Surface Water Management Plan, many of the borough s drainage and flood protection assets have an effective life of 30 years or less. Furthermore, the frequency and intensity of extreme rainfall events is likely to increase with climate change. In this context, the baseline risk of flooding to material assets in the borough is likely to increase in future in the absence of an LFRMS. 28

111 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Population and Human Health 6.1 Demographics The population of Luton has grown from 185,900 in 2001 to 205,800 in 2012, an increase of 10.7% in 11 years 8. Over the same period, the East of England population has grown from 5,400,500 to 5,907,300 or 9.4%. However, the borough has a relatively young population when compared to the East of England and England averages 9 ; see Figure 6.1. Figure 6.1: Age profile of Luton (June 2012), with regional and England comparators Male life expectancy (for males born in ) in Luton is 77.2, slightly less than the regional (79.3) and England (78.3) figures. For females (born in ) life expectancy is slightly longer at 80.6 but still less than the regional (83.0) and England (82.3) figures. The borough has seen a continual improvement in life expectancy which in was 75.0 for males and 79.1 for females, mirroring but slightly behind regional and national trends. 8 Neighbourhood Statistics: Resident Population Estimates. Accessed online at [October 2014]: = &i=1001x1003x1004x1005&l=1818&o=391&m=0&r=1&s= &enc=1&adminCompId=34025&variableFamilyId s=6766&xw=1293&xw= Neighbourhood Statistics: Key Figures for People and Society: Population and Migration. Accessed online at [October 2014]: &i=1001x1003x1004&m=0&r=1&s= &enc=1 29

112 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ The population in Luton is expected to grow from 205,800 in 2012, to 241,100 in 2027, to259,600 in 2037, a growth rate of 26.1% over 25yrs. During the same period, Bedford s population will grow from 159,200 to 198,700 or 24.8%, while Central Bedfordshire will grow from 260,000 to 332,900 or 28.0% 10 ; see Figure The borough has an excellent record of taking account of Environment Agency advice regarding development in flood risk areas, with zero permissions having been granted contrary to agency advice between and The health profile of Luton s population is broadly comparable with the regional and England averages, with slightly more people reporting good health or very bad health, and slightly fewer people reporting very good health, fair health or bad health 12 ; see Figure 6.3. Figure 6.2: Population projections, 2012, 2027, Office for National Statistics: Subnational Population Projections, 2012-based projections. Accessed online at [October 2014]: 11 Luton Borough Council (March 2013): Scoping Report for the Sustainability Appraisal of the Luton Local Plan : Appendix 2: Baseline Information. Access online at [October 2014]: 12 Office for National Statistics: Key Figures for Health and Care. Accessed online at [October 2014]: &i=1001x1003x1004&m=0&r=1&s= &enc=1 30

113 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 6.3: Health profile (March 2011) 6.2 Key Issues for Population and Human Health Luton is an already densely populated borough, with projections indicating that the population could grow by more than a quarter over the next 25 years, to almost 260,000 residents, increasing the pressure for development in areas at risk of flooding. Many of these people will be elderly people (despite the borough s generally younger ager profile) and children who are more vulnerable to the impacts of flooding. 6.3 Likely Evolution of the Baseline in the Absence of the LFRMS Demographic characteristics and trends in Luton are unlikely to dramatically change with or without an LFRMS. However, in the absence of an LFRMS, the number of people at risk from the impacts of flooding is likely to increase. 31

114 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Soil 7.1 Agricultural Land As highlighted by the Soil Strategy for England 13, soil is a vital natural resource, with a range of key functions. These include: Nutrient cycling; Water regulation; Carbon storage; Support for biodiversity and wildlife; and Providing a platform for food and fibre production and infrastructure Soil quality has a strong influence on the quality of agricultural land. The Agricultural Land Classification system provides a method for assessing the quality of farmland to enable informed choices to be made about its future use within the planning system. A number of consistent criteria used for assessment include; climate (temperature, rainfall, aspect, exposure, frost risk), site (gradient, micro-relief, flood risk) and soil (depth, texture, stoniness) The Agricultural Land Classification (ALC) system classifies land into five grades, with Grade 3 subdivided into Subgrades 3a and 3b. The best and most versatile (BMV) land is defined as Grades 1, 2 and 3a, which is deemed to be the land which is most flexible, productive and efficient in response to inputs and which can best deliver future crops for food and non-food uses such as biomass, fibres and pharmaceuticals Agricultural Land Classification maps were produced for England and Wales in the 1970s to provide general strategic guidance on land quality to planners, and are supplied by Natural England. They show only five grades because their preparation preceded the subdivision of Grade 3 and the refinement of criteria, which occurred after Figure 7.1 illustrates mapped ALC data in and around Luton and indicates that the majority of the borough was classified as urban or non-agricultural land. Segments of Grade 2 agricultural land are shown at the northern and western fringes of the town, with areas of Grade 3 land at the east, south and south-western fringes, however, the majority of these have been built over since the 1970s. 7.2 Minerals and Waste Sites The Bedfordshire and Luton Minerals and Waste Local Plan Strategic Sites and Policies document was adopted in early It sets out strategic policies on which future waste management and mineral extraction will be assessed. It identifies strategic sites for mineral extraction, non-hazardous waste landfill and other waste management activities. 13 Defra (2011) Soil Strategy for England: 32

115 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Figure 7.1: Agricultural Land Classification in and around the borough 33

116 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Waste recycling and recovery, including generating energy where appropriate, is an important part of the plan. The nearest strategic site to Luton will be at Thorn Turn, on the A5 near Houghton Regis. The plan safeguards the existing rail served aggregates depots at Leagrave Road and Crescent Road, which are shown on Figure 7.2, as well as the following asphaltmaking plants and concrete batching plants that provide essential materials for road construction and maintenance 14 : Concrete Batching Plants Asphalt Plants Selbourne Road, Luton Cosgrove Way, Luton Cosgrove Way, Luton Limbury Sidings, Leagrave Rd, Luton Kingsway Luton No sites in the borough are identified for mineral extraction or for large scale waste management because no sites have been previously proposed and Luton is a heavily built up area. Figure 7.2: Policies Inset Map 9 (Source: Bedfordshire and Luton Minerals and Waste Local Plan) 14 Bedfordshire and Luton Minerals and Waste Local Plan Strategic Site and Policies Plan Adopted 2014, accessed online at [October 2014]: 34

117 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Previously Developed and/or Derelict Land There are no sites currently on the Council s register of contaminated land. However, in May 2009 the Council determined the land at 2-10 Guildford Street, Luton, as land within the Council s area which was contaminated land for the purposes of section 78A(2) of the Environmental Protection Act 1990, in particular: the contaminated land was causing pollution of controlled waters; and the contaminant (hydrocarbons) is listed in Schedule 1 to the regulations; and the waters being polluted were contained within a strata (upper cretaceous chalk) listed in Schedule 1 to the regulations Remediation works were completed between January 2010 and February 2011 followed by post-remediation groundwater monitoring. The advice of the Environment Agency was sought, which considered that there is no longer significant pollution of controlled waters being caused or a significant possibility of such pollution being caused, while the site and those sites immediately down-gradient remain in their current condition. It added that the source has not been completely removed and contamination remains in controlled waters within the putty chalk layer of the principal aquifer and the pathway has not been permanently broken The Council has concluded (in November 2012) that, having regard to the current use of the land and the advice provided by the Environment Agency, the land no longer meets the definition of contaminated land as defined by section 78A(2) of the Environmental Protection Act It should be noted that this statement is subject to the reservations set out above as to the use of the site and those down-gradient, and as to the remaining contamination Between 2001 and 2011 more than 95% of new dwellings in Luton were built on previously developed land. This figure reduced significantly in 2011/12 to 20112/13 due to the New Homes for Luton programme which delivers high levels of affordable housing on open space, a trend which is set to continue in the short-term. Despite this a high proportion of sites in the housing trajectory for Luton are considered to be previously developed Key Issues for Soil Luton has very limited soil and mineral resources, however, given the heavily developed nature of the borough and past industrial land uses, there are likely to be unidentified areas where land contamination could pose a threat to the water environment. 15 Luton Borough Council (April 2014): Strategic Housing Land Availability Assessment. Accessed online at [November 2014]: ility%20assessment%20april% pdf 35

118 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Likely Evolution of the Baseline in the Absence of the LFRMS The few remaining areas of agricultural land within the borough are likely to come under increasing development in future to meet housing needs, a situation which is unlikely to change with or without an LFRMS. However, the LFRMS will provide an important mechanism for developing and prioritising flood risk management actions, and will need to be mindful of the potential presence contamination sources and their effects on the aquatic environment. 36

119 SEA for the Luton Local Flood Risk Management Strategy: Scoping Report July 2015 UE-0161 SEA- Luton LFRMS Scoping_4_ Water 8.1 Water Resources Luton lies within the Upper Lee Abstraction Licensing Strategy (ALS) area, as indicated on Figure The Upper Lee ALS covers an area that drains into the River Lea from its source near Luton downstream to Feildes Weir to north east of Hoddesdon where the River Stort meets the Lea. Below this point the River Lea is assessed in the London ALS. The Upper Lee catchment covers an area of approximately 1,033 km², includes the Rivers Upper Lee, Mimram, Beane, Rib, Ash, and Stort, and incorporates parts of Hertfordshire, Essex and Bedfordshire, including the urban areas of Luton, Stevenage, Harlow, Hertford, Welwyn Garden City and Bishops Stortford. Figure 8.1: Upper Lee abstraction licensing area (Source: Upper Lee ALS 2013) Outside of the urban areas the catchment is characterised by open farmland, predominately for arable use. The catchment contains a number of Sites of Special Scientific interest (SSSIs) and 16 Environment Agency (February 2013): Upper Lee Abstraction Licensing Strategy. Accessed online at [October 2014]: 37

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities The Strategic Environmental Assessment Directive: Guidance for Planning Authorities Practical guidance on applying European Directive 2001/42/EC on the assessment of the effects of certain plans and programmes

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY

THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY 50600596 THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY STRATEGIC ENVIRONMENTAL ASSESSMENT OCTOBER, 2015 THE BLACK COUNTRY LOCAL FLOOD RISK MANAGEMENT STRATEGY THE BLACK COUNTRY LOCAL FLOOD RISK

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services

2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

A Practical Guide to the Strategic Environmental Assessment Directive

A Practical Guide to the Strategic Environmental Assessment Directive A Practical Guide to the Strategic Environmental Assessment Directive A Practical Guide to the Strategic Environmental Assessment Directive Practical guidance on applying European Directive 2001/42/EC

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

Sustainability appraisal of the Norwich development management policies local plan:

Sustainability appraisal of the Norwich development management policies local plan: Norwich Local Plan Sustainability appraisal of the Norwich development management policies local plan: Environmental adoption statement (December 2014) DM policies plan Environmental adoption statement

More information

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Isle of Wight Biodiversity Partnership August 2010 1. Introduction 1.1 This document

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

SA Report to accompany the Local Plan

SA Report to accompany the Local Plan SA Report to accompany the Local Plan July 2015 Rev No Comments Prepared by Checked by Approved by Date 3 Draft for client comment Nick Chisholm-Batten Principal Consultant Steve Smith Technical Director

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

December 2004 Paper 2004/21

December 2004 Paper 2004/21 The Scottish Environment Protection Agency (SEPA) and Sustainable Development Statutory Guidance to SEPA made under Section 31 of the Environment Act 1995 December 2004 Paper 2004/21 Crown copyright 2005

More information

Environmental impact assessment (EIA)

Environmental impact assessment (EIA) October 2005 Environmental impact assessment (EIA) a campaigner's guide What is this guide for? Environmental Impact Assessment (EIA) is a key aspect of many large scale planning applications. It is a

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

Response by Friends of the Earth Cymru. November 2005

Response by Friends of the Earth Cymru. November 2005 Consultation Relating to the Proposed New Local Development Plan System; on: The Local Development Plan Manual Response by inspires solutions to environmental problems which make life better for people.

More information

Policy Background Reports

Policy Background Reports Supporting Document for Proposed Local Development Plan 2015 East Dunbartonshire Policy Background Reports Strategic Environmental Assessment: Environment Report Action Programme Habitats Regulations Appraisal

More information

What do we already know about Bradford-on-Avon community area?

What do we already know about Bradford-on-Avon community area? What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist

More information

Green Infrastructure Case Study Template

Green Infrastructure Case Study Template Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template

Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template Strategic Environmental Assessment of Local Implementation Plans: Scoping Report Template by C Treleven 4 UNPUBLISHED PROJECT REPORT Centre for Sustainability at UNPUBLISHED PROJECT REPORT STRATEGIC ENVIRONMENTAL

More information

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that

More information

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It

More information

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS

5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS 5.0 ENVIRONMENTAL IMPACT ASSESSMENT METHODS The methods that are used to conduct the environmental impact assessment (EIA) of the Project are described in this section. The EIA uses a methodological framework

More information

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.1 This chapter outlines how the need for this proposed development has been established, where planning policy supports it, the alternative

More information

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Appendix 1 Denbighshire County Council PLANNING STRATEGY DEVELOPER GUIDANCE NOTE November 2015 SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Context

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

How To Write A New Bill On Flood Management In Scotland

How To Write A New Bill On Flood Management In Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally

More information

Newbiggin House Farm,

Newbiggin House Farm, Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Charging for Pre-application Advice. WSCC Guidance Note

Charging for Pre-application Advice. WSCC Guidance Note Charging for Pre-application Advice WSCC Guidance Note Content 1. Introduction 1.1 Our Objectives 1.2 Development Team Approach 1.3 Areas of Advice 1.4 What We Expect of You 1.5 Benefits of Pre-application

More information

Thames Water is pleased to comment on the proposed changes to the London Plan 2014.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014. Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

London Underground Environment Strategy

London Underground Environment Strategy London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment

More information

The future development of air transport in the UK Make your views known

The future development of air transport in the UK Make your views known The future development of air transport in the UK Make your views known Contents Introduction 1 Introduction..................................................... 2 How much airport capacity should be provided

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems

Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems Biological Diversity and Tourism: Development of Guidelines for Sustainable Tourism in Vulnerable Ecosystems Secretariat of the Convention on Biological Diversity Foreword The rapid and often uncontrolled

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

The River Ribble is one of the longest rivers in the North West of England

The River Ribble is one of the longest rivers in the North West of England River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety

More information

Water Resources Management Plan

Water Resources Management Plan Yorkshire Water Water Resources Management Plan 2014 1 Water Resources Management Plan Yorkshire Water Services Ltd August 2014 Yorkshire Water Water Resources Management Plan 2014 2 Yorkshire Water Water

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environmental Impact Assessment of National Road Schemes A Practical Guide

Environmental Impact Assessment of National Road Schemes A Practical Guide Environmental Impact Assessment of National Road Schemes A Practical Guide Revision 1, 20 November, 2008 CONTENTS LIST OF BOXES...iii LIST OF TABLES...iv LIST OF FIGURES...iv 1.0 INTRODUCTION 1.1 Introduction...2

More information

Shepway Core Strategy Development Plan Document Examination in Public

Shepway Core Strategy Development Plan Document Examination in Public Shepway Core Strategy Development Plan Document Examination in Public Public Hearing Statement on behalf of Taylor Wimpey (Respondent References 900 and 921) Wednesday 2 May 2012 Matter 1 Spatial Strategy,

More information

A14 April 2014. Cambridge to Huntingdon improvement scheme Preliminary environmental information report

A14 April 2014. Cambridge to Huntingdon improvement scheme Preliminary environmental information report Safe roads, reliable journeys, informed travellers Cambridge to Huntingdon improvement scheme Preliminary environmental information report A14 April 2014 An executive agency of the Department for Transport

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Policy & Management Applications of Blue Carbon. fact SHEET

Policy & Management Applications of Blue Carbon. fact SHEET Policy & Management Applications of Blue Carbon fact SHEET Policy & Management Applications of Blue Carbon Coastal Blue Carbon - An Important Wetland Ecosystem Service Coastal Blue Carbon refers to the

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

A Strategic Approach to Housing Asset Management

A Strategic Approach to Housing Asset Management Housing A Strategic Approach to Housing Asset Management www.milton-keynes.gov.uk/housing-mkc 0 A Strategic Approach to Housing Asset Management Contents Page 1. Introduction 1 2. Developing a New Set

More information

Guildford borough Local Plan Local Development Scheme 2015

Guildford borough Local Plan Local Development Scheme 2015 Guildford borough Local Plan Local Development Scheme 2015 Summary The Local Development Scheme (LDS) is the timetable and project plan for the new Guildford borough Local Plan. The LDS explains what documents

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

Making the polluter pay Environmental Damage Regulations March 2009

Making the polluter pay Environmental Damage Regulations March 2009 Making the polluter pay Environmental Damage Regulations March 2009 Introduction... 1 When do the Regulations apply?... 2 Type of damage... 2 Cause of damage... 3 When did the incident or damage occur?...

More information

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions 5. THAILAND 5.1 Water Resources Management Policies and Actions In Thailand, the Office of Natural Resources and Environmental Policy and Planning issued the State of Environment Report 2004, which has

More information

SEA PRE SCREENING REPORT (COVER NOTE ) PART 1. An SEA Pre Screening Report is attached for the plan, programme or strategy (PPS) entitled:

SEA PRE SCREENING REPORT (COVER NOTE ) PART 1. An SEA Pre Screening Report is attached for the plan, programme or strategy (PPS) entitled: SEA PRE SCREENING REPORT (COVER NOTE ) PART 1 To: SEA.gateway@scotland.gsi.gov.uk or SEA Gateway Scottish Eecutive Area 1 H (Bridge) Victoria Quay Edinburgh EH6 6QQ PART 2 An SEA Pre Screening Report is

More information

Place Scrutiny Briefing AGENDA ITEM 13

Place Scrutiny Briefing AGENDA ITEM 13 Place Scrutiny Briefing AGENDA ITEM 13 Meeting date: 13.7.15 Heading: Joint Spatial Plan and Joint Transport Study - Update Ward: All Bristol wards Author: Sarah O Driscoll Ext. No: 36722 Officer presenting

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

Appendix A. Wiltshire Core Strategy DPD SA/SEA Plans, Policies and Programmes Atkins

Appendix A. Wiltshire Core Strategy DPD SA/SEA Plans, Policies and Programmes Atkins Wiltshire County Council: Wiltshire Site Allocations DPD and Chippenham Site Allocations DPD: Sustainability Appraisal/ Strategic Environmental Assessment Appendix A. Wiltshire Core Strategy DPD SA/SEA

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:

More information