HOW TO REMOVE NONFRIABLE ASBESTOS (AC) WATER PIPE
|
|
|
- Miranda Richardson
- 9 years ago
- Views:
Transcription
1 HOW TO REMOVE NONFRIABLE ASBESTOS (AC) WATER PIPE A Guide for Meeting DEQ Rules Exposure to asbestos can result in severe health impacts and the Department of Environmental Quality (DEQ regulates the removal, handling and disposal of asbestos-containing materials (ACM) during construction, remodeling, and demolition. This document outlines handling procedures for working with water pipe that contains asbestos. The safest way to handle AC Pipe is to make sure the material stays in a nonfriable condition. Friable asbestos material will easily release fibers when crushed. Nonfriable asbestos material has a solid matrix that holds the asbestos fibers in check and will not allow asbestos fibers to release easily, unless mishandled, damaged, or in badly weathered condition. In most cases, AC Pipe is considered nonfriable. Nonfriable asbestos materials in good condition are exempt from some DEQ rules. You do not need to be a DEQ licensed asbestos contractor or DEQ certified asbestos worker to do nonfriable removal. If you follow the procedures in this guide, the AC pipe should remain in nonfriable condition. Nonfriable material must be handled, transported, and disposed of in a way that prevents it from becoming friable and releasing asbestos fibers. For more information about the asbestos rules or if you have questions contact one of the DEQ regional offices: Northwest Region in Portland at (503) , (503) , (503) , or (800) Western Region Salem at (503) , ext. 272, or (800) Western Region Medford at (541) , ext. 235 or (877) Western Region Coos Bay at (541) , ext. 22 Eastern Region Bend at (541) , ext. 226 Eastern Region Pendleton at (541) The Oregon Occupational Safety and Health Division (OR-OSHA) has rules about worker training, building surveys, and the safe handling of nonfriable asbestos. (See OAR 437, Division 3, Construction.) Contact OR-OSHA at (503) , for current rule and policy information. A. FOR AC WATER PIPE TO BE CONSIDERED NONFRIABLE IT MUST BE REMOVED IN WHOLE SECTIONS. You cannot cause the AC pipe to shatter, crumble, be pulverized, or release asbestos fibers. You cannot sand, saw, grind, chip, or use power tools on AC pipe. If you use this guide, licensing as a DEQ asbestos abatement contractor and DEQ worker certification are not needed. 1. File a DEQ nonfriable notification and pay the nonfriable fee as outlined in OAR
2 2. Keep the material wet while you remove it. You can use a water hose, garden sprayer, spray bottles, or any method that keeps the material wet. Wetting prevents fiber migration during removal. 3. Pull the pipe up out of the ground in easy to handle lengths (3 feet to 5 feet), using DEQ approved cutting procedures. 4. DEQ suggests you place the pipe in leaktight containers with a warning statement DANGER ASBESTOS-CONTAINING MATERIAL. The asbestos-containing waste material (ACWM) must remain wet until disposed of at a landfill authorized to handle asbestos waste. It is also suggested that you fill out a DEQ ASN-4 waste shipment report for transport and give it to the landfill upon arrival. DEQ advises you to contact the landfill before you start your project so you can find out what that landfill s disposal needs are. Many landfills require asbestos to be specially packaged and labeled. Nonfriable asbestos waste may not be used as clean fill and DEQ rules do not allow on-site burial of AC pipe, unless the reason for this burial meets specific exception conditions! NOTE: DEQ knows that some breakage and damage will occur during this process. However, that breakage will be minimized if you follow this guide. DEQ CAN ALLOW ALTERNATE REMOVAL AND DISPOSAL PROCEDURES: The DEQ can consider unusual conditions and allow the use of a different removal and disposal procedure on a case by case basis. Some of these exceptions may include removal procedures not listed in this guide. Options for leaving AC pipe in place instead of removal and disposal may be available through this exception. AC pipe buried under a roadway, or AC pipe that goes under a structure normally is considered an acceptable reason for on site burial. DEQ staff is willing to discuss any situation where the removal and disposal of AC pipe, instead of on site burial, may cause an extreme financial hardship. For more information about these exceptions or to see if your project qualifies for an exception, please contact the DEQ. B. USE THE FOLLOWING PROCEDURES WHEN THE REMOVAL RESULTS IN THE AC PIPE BECOMING FRIABLE. If AC PIPE is shattered, damaged, or badly weathered, it is considered to be friable and will likely release asbestos fibers. A DEQ licensed asbestos abatement contractor using DEQ certified workers must remove all friable asbestos materials. All asbestos abatement rules under OAR through must be followed, including the following: 1. File a friable asbestos abatement notification and fee as outlined in OAR Hire a DEQ licensed asbestos abatement contractor to remove the asbestos for you.
3 The following information was excerpted from the American Water Works Association guideline for handling AC pipe. This information is modified to make it compatible with the DEQ asbestos removal regulations. There may be other removal and handling procedures employing non-power options that are equally effective and also meet DEQ asbestos requirements. AMERICAN WATER WORKS ASSOCIATION RECOMMENDED WORK PRACTICES FOR CUTTING AND SPLICING CEMENT WATER PIPE 1. USING CARBIDE TIPPED BLADES TO CUT AC PIPE, IN SIZES FROM 3 INCH THROUGH 24 INCH. Blade cutters are frame adjustable to the circumference of the pipe and have a number of self-tracking rollers that align one or more carbide-tipped cutting blades. Because of the relatively low mechanical input and clean cutting action, hand operated blade cutters do not produce significant amounts of airborne asbestos dust. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner! 2. USING SNAP CUTTERS TO CUT AC PIPE IN SIZE RANGES 3 INCH THROUGH 24 INCH. Snap cutters ( squeeze-and-pop equipment) operate by means of cutting wheels mounted in a chain wrapper around the pipe barrel. Hydraulic pressure, applied by means of a remote, pneumatically, or manually operated pump, squeezes the cutting wheels into the pipe wall until the cut is made. This type of cutting minimizes the release of asbestos fibers. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner!
4 3. USING MANUAL FIELD LATHES TO MACHINE AC PIPE IN ALL SIZES. Manual field lathes are designed to end-trim and remachine rough pipe barrels to factory-machined end profiles. The lathe consists of an adjustable, selfaligning arbor inserted into the pipe bore (which acts as a mandrel upon which the turning handle operates), a screw-fed turning frame, carbide machining blades, and manual (hand or ratchet) turning handles. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner! 4. USING A MANUAL RASP TO MACHINE AC PIPE IN ALL SIZES. Short lengths of AC pipe, machined-end exclusively (MEE) and machined overall (MOA), can be cut to make closures and repairs and to locate fittings exactly. Field-cut ends may be rebeveled with a coarse wood rasp to form a taper approximating the profile of the factor-beveled end. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner!
5 5. WET TAPPING AC PRESSURE PIPE IN ALL SIZES. 6. DRY TAPPING AC PRESSURE PIPE IN ALL SIZES. Pressure or wet tapping for service connections is performed in the trench while the pipe is under pressure. The equipment (manual driven) is affixed to the pipe by means of a chain yoke. A combination boring-and-inserting bar drills and taps the pipe wall and inserts a corporation stop or pipe plug. The pressure chamber, which protects against water leakage, also catches the asbestos-cement chips, so this is essentially a dust-free operation. To minimize (1) the fouling of valves, regulators, meters, and other equipment with chips and (2) unnecessary addition of asbestos to drinking water, provisions should be made for downstream flushing or use of tapping equipment with positive purge or blow-off features. KEEP MATERIAL WET AT ALL TIMES. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner! Non-pressure or dry tapping for service connections may be performed in or out of the trench. The equipment is affixed to the pipe by means of a chain yoke. Separate drills and taps or a combination tool is used to drill and tap the pipe wall. Remember; always keep the pipe wet during these processes. Corporation stops or other connections may then be affixed to the pipe. To minimize (1) the fouling of valves, regulators, meters, and other equipment with chips and (2) the unnecessary addition of asbestos to drinking water, all dust and cuttings should be removed from the pipe s interior by flushing with water, wet mopping, or vacuuming with a HEPA rated vacuum cleaner. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner!
6 7. USING CHISEL AND RASP TO HOLE CUT AC PIPE IN ALL SIZES. Holes may be cut into AC pipe with a hammer and chisel. The edge of a plumber s wood chisel is used to cut completely around the hole outline, about ¼ in. (7 mm) from the prescribed line. The operation is repeated and the cut deepened until through. The edges of the hole are then dressed with a coarse wood rasp. When cutting holes in AC pipe products, all dust and cuttings should be removed from the pipe or duct interior after the cutting operation. Removal may be accomplished by flushing with water, wet mopping or vacuuming with a HEPA rated vacuum cleaner. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner! 8. USING HAMMER AND CHISEL TO REMOVE COUPLING FROM AC PIPE IN ALL SIZES. Replacement of damaged pipe necessitates excavation, exposure and removal. AC coupling removal may be accomplished by gradually splitting the coupling lengthwise using a chisel and hammer. After the top of the coupling has been split, a crowbar or similar tool is used as a lever to split the bottom of the coupling. DO NOT blow out with compressed air, dry sweep, or vacuum with a non-hepa rated vacuum cleaner! DEQ and Oregon OSHA have carefully evaluated the above procedures and determined that they can be used safely when handling and repairing AC pipe. REMEMBER, DEQ regulations require that all asbestos-containing materials be kept wet during removal and disposal in accordance with the asbestos disposal regulations. Exceptions to these requirements must be approved prior to starting an asbestos removal project. (Revised 12/02)
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL
SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos
San Antonio Water System Standard Specifications for Construction ITEM NO. 3000 HANDLING ASBESTOS CEMENT PIPE
ITEM NO. 3000 HANDLING ASBESTOS CEMENT PIPE 3000.1 INTRODUCTION: This item shall govern the uncovering, dislodging, handling, removing, transporting, and disposing of asbestos cement (AC) pipe and other
UI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
Asbestos Removal Procedures for Homeowners
Asbestos Removal Procedures for Homeowners How to Properly Remove Cement Asbestos-Board Siding (Single-Family, Owner-Occupied Residences Only) IMPORTANT: Read these procedures from start to finish, making
DIVISION 248 ASBESTOS REQUIREMENTS. Asbestos Emission Standards and Procedural Requirements 340-248-0250. Asbestos Abatement Project Exemptions
DIVISION 248 ASBESTOS REQUIREMENTS Asbestos Emission Standards and Procedural Requirements 340-248-0250 Asbestos Abatement Project Exemptions (1) Any person who conducts or provides for the conduct of
SECTION 16 ASBESTOS MANAGEMENT
SECTION 16 ASBESTOS MANAGEMENT 16.1 Asbestos Management Procedure 16.2 Asbestos O&M Procedure Reviewed: October 2008 Revised: February 2003 Date Accepted: April 2002 Draft Date: December 2001 16.1 ASBESTOS
Asbestos Management Procedures
Asbestos Management Procedures Introduction Asbestos is a naturally occurring mineral which has commonly been used in a variety of building materials due to its strength and unique fire and chemical resistant
Asbestos Work Permit Procedures
These procedures are to be followed by all persons required to perform the following work: Handling, installation or removal of non-friable manufactured products known to contain asbestos provided no sanding,
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS
ASBESTOS IN ROOFING SYSTEMS WORK PRACTICES AND DISPOSAL IN ASSOCIATION WITH ROOFING PROJECTS 1.0 GENERAL 1.1 SUMMARY A. The following procedures apply to the project manual and drawings for asbestos in
Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations
Procedures for Cutting and Handling of Asbestos Cement Pipe City of Richmond Public Works Operations Version 2.0 Updates to: November 1995 Procedures Prepared by: AMEC Earth & Environmental a division
ASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
ASBESTOS in state and local government
ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.
Asbestos Management. 2. Introduction. Contents
Asbestos Management Contents 1. Policy 2. Introduction 3. Scope 4. Definitions 5. Asbestos Inventory and Identification 6. Inspection 7. Access Control 8. Repair and Maintenance of Asbestos-Containing
Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards
Part 2. Overview Risk management Workplace health and safety legislation How should asbestos exposure be managed? identify hazards assess risk decide on control measures implement control measures monitor
ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos
ASBESTOS AND THE HOME RENOVATOR A basic guide on what you need to know about asbestos DISCLAIMER This publication contains information regarding occupational health and safety. It includes some of your
How To Manage Asbestos From Roofing And Siding
Contents Frequently Asked Questions Asphaltic Roofing and Siding Materials.... 1 Floor Tile.... 4 Non-Traditional Asbestos Abatement Work Practice Approvals.... 6 Survey Requirements.... 7 Vermiculite
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA
ASBESTOS and LEAD-BASED PAINT INVESTIGATION TOWN OF ST. PAUL WILLIS BUILDING ST. PAUL, VIRGINIA May 22, 2013 Robert R. Jones, Ph.D., REM, AHERA Asbestos Inspector, 5/22/13 Signature Date Asbestos Virginia
ASBESTOS CONTROL PROGRAM
WESTERN UNIVERSITY OCCUPATIONAL HEALTH AND SAFETY ASBESTOS CONTROL PROGRAM Last Update: August 2012 TABLE OF CONTENTS 1.0 INTRODUCTION AND SCOPE... 3 2.0 DEFINITIONS... 4 3.0 HISTORICAL INFORMATION...
SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION 028214 ASBESTOS REMEDIATION FLOOR TILE AND MASTIC
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
ASBESTOS AWARENESS IN THE WORKPLACE This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
Asbestos Inspection Project Procedure
EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship
GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship Effective Date: June 9, 2015 Approved By: EMC Date Reviewed: Date Revised:
SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS
SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS Within the City of Mandurah many dwellings exist with asbestos cement building products. When removing the asbestos, concerns may be raised
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001).
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001). You will learn the: About the dangers of asbestos. How to identify asbestos. How to protect yourself
Miami University s Asbestos Operations & Maintenance Program Administered by
Miami University s Asbestos Operations & Maintenance Program Administered by ENVIRONMENTAL SAFETY & RISK MANAGEMENT 529-2829 Table of Contents Purpose 2 Personnel Covered Under the Asbestos Mangement Plan
Fact Sheet on Asbestos
Fact Sheet on Asbestos WHAT IS ASBESTOS? Asbestos is a naturally occurring mineral found in certain rock formations, mined from open pit mines. Most of the asbestos used in the United States today comes
North Carolina State University. Asbestos Management Plan
North Carolina State University 1.0 Introduction Purpose The purpose of this plan is to establish the polices and procedures to be used at North Carolina State University (NCSU) in the management of building
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
Vacuum chucking. MDAE Woodturning Center Course Number 95537001
Purpose of vacuum chucking Vacuum chucking MDAE Woodturning Center Course Number 95537001 Completing the foot of a vessel Re chucking a completed object Quick securing for additional steps (sanding) How
Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material
Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace
Asbestos Management Plan EC 45 Page 1
Name: Asbestos and ACBM (asbestos containing building material) Management Plan Areas Affected: All buildings that contain asbestos and ACBM on campus Effective Date: 1/1/09 Reviewed/Revised: 12/15/12
STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure
STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012 Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People
UBC Plant Operations Asbestos Work Procedures April 2004
UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other
ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions
The Language Used In This Document Does Not Create An Employment Contract Between The Employee And The Agency. This Document Does Not Create Any Contractual Rights Or Entitlements. The Agency Reserves
British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT
BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS Dust and Debris Management Procedures refers to preventive measures that shall be undertaken by the contractor to prevent exposure
LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material
LRI Hidden Valley Acceptance Criteria for Asbestos and Asbestos Contaminate Waste Material Asbestos Policy and Criteria Policy: Pierce County Recycling Composting and Disposal (LRI) has established an
EVERYONE'S RESPONSIBILITY
EVERYONE'S RESPONSIBILITY Guidelines for an Asbestos Operations and Maintenance Program February 2007 Guidelines for an Asbestos Operations and Maintenance Program Workplace Safety & Health Division 200
Asbestos. from the Home. Removing. Read this booklet for:
Removing Asbestos from the Home Read this booklet for: steps and care you should take if your home has asbestos-containing material (ACM) advice about protective gear. How to get ACM removed from your
SB 705 Asbestos Survey 2015 Rulemaking Fiscal Impact Statement
SB 705 Asbestos Survey 2015 Rulemaking Fiscal Impact Statement Oregon Department of Environmental Quality Headquarters 811 SW 6 th Ave. Portland OR 97204 Contact: Kieran O Donnell [email protected]
Asbestos in Your Home
Asbestos in Your Home The following information below is taken largely from a document developed in 1990 entitled Asbestos in Your Home. However, this information is still of value to homeowners and renters.
ASBESTOS MANAGEMENT INTRODUCTION
SECTION: II. General Hygiene/ Safety Chapter: 7. Asbestos Management Revision Date: 12/05/2013 Review Date: ASBESTOS MANAGEMENT INTRODUCTION PURPOSE This policy has been developed to ensure that hazardous
ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208
ASBESTOS AWARENESS TRAINING Title 8, GISO Section 5208 What is Asbestos? Generic term for group of minerals known for their strength, flame/heat resistance, & indestructible qualities. Miracle mineral
The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.
The Administration of Norfolk Island SAFE DISPOSAL OF ASBESTOS AT THE WASTE MANAGEMENT CENTRE The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing
CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR. License Requirements & Work Practice Standards
CERTIFIED LEAD-BASED PAINT RENOVATION CONTRACTOR License Requirements & Work Practice Standards License Required By April 22, 2010, construction contractors that perform renovation on certain older buildings
University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
Asbestos Containing Material MANAGEMENT PLAN
Asbestos Containing Material MANAGEMENT PLAN Introduction Extensive research has shown exposure to asbestos containing material (ACM) when it becomes airborne (commonly referred to as friable) poses a
FRED GRAHAM'S ASBESTOS SAFETY PROGRAM EXPERT WITNESS SUPPORT SERVICES
FRED GRAHAM'S ASBESTOS SAFETY PROGRAM EXPERT WITNESS SUPPORT SERVICES QUALIFICATIONS If your asbestos lawsuit requires the services of a asbestos safety program expert witness to determine if the property
Asbestos in Your Home
Asbestos in Your Home You may have some asbestos in your home, but may not be sure what it is, what it looks like, or what to do about it. Just because asbestos is there doesn't mean there's a problem.
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT
ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL I. INTRODUCTION BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT Asbestos Asbestos is a naturally occurring fibrous mineral that is mined from
The Richard Stockton University ASBESTOS MANAGEMENT PLAN
The Richard Stockton University ASBESTOS MANAGEMENT PLAN January 2015 Asbestos Management Plan Table of Contents I. Introduction II. III. IV. Definitions Identification of Asbestos Notification and Labeling
Building Owners Responsibilities for Asbestos
Building Owners Responsibilities for Asbestos August 2012 Minnesota Department of Labor and Industry Occupational Safety and Health Division This material can be provided to you in a different format (Braille,
SECTION 202. REMOVAL Of ROADWAYS AND BUILDINGS
SECTION 202 REMOVAL Of ROADWAYS AND BUILDINGS 202.1 Description. This work shall consist of the removal and disposal of all existing improvements from the right of way and within the limits of any construction
Asbestos frequently asked questions
Asbestos frequently asked questions Asbestos is the name given to a group of fibrous silicate minerals which were mined in Australia and overseas and used for a range of products. All forms of asbestos
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
ASBESTOS AWARENESS TRAINING. For workers and building occupants
University of Nevada, Reno ASBESTOS AWARENESS TRAINING PROGRAM For workers and building occupants John A Braun, CSP Asbestos Awareness OSHA Standards for Asbestos are: 29 CFR 1910.1001 applies to all occupational
Asbestos: Guidelines for Managing Asbestos in Buildings
Asbestos: Guidelines for Managing Asbestos in Buildings 2015 PLEASE NOTE This publication is not designed to replace the legislation. Please use the original legislation to find out exactly what requirements
Asbestos Hazards and Controls
Asbestos Hazards and Controls Environmental and Occupational Health Public Health Ontario Photo provided with the kind permission of Infrastructure Health & Safety Association 5110 Creekbank Road, Mississauga,
ASBESTOS BACKGROUND INFORMATION
ASBESTOS BACKGROUND INFORMATION Asbestos Facts What is Asbestos? Asbestos is a mineral. It is a natural rock mined from the ground. Most of the asbestos used in this country comes from Quebec in Canada.
Demolition Practices Under the Asbestos NESHAP
Demolition Practices Under the Asbestos NESHAP SECTION 1 DEMOLITION PRACTICES AND NONFRIABLE MATERIALS INTRODUCTION EPA revised the asbestos NESHAP regulations on November 20, 1990 (see 40 CFR Part 61
Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%)
Syracuse University s Guidelines for Work Involving Materials Containing Trace Asbestos (Asbestos at a Concentration Less than 1%) I. Asbestos Survey Requirements Prior to performing any construction,
100 North Senate Avenue, Indianapolis, IN 46204 Phone: (317) 308-3103 Toll Free: (800) 451-6027
GUIDANCE OLQ GENERAL ID #003-02-SW INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF LAND QUALITY ASBESTOS HANDLING AND DISPOSAL REQUIREMENTS www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly
ASBESTOS IN THE HOME
J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What
EVERYONE'S RESPONSIBILITY
EVERYONE'S RESPONSIBILITY Guideline for Working with Asbestos March 2008 Guidelines For Working With Asbestos Workplace Safety & Health Division 200 401 York Avenue Winnipeg, Manitoba R3C 0P8 March 2008
Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
Asbestos Abatement Work Plan for the Carter Carburetor Superfund Site
for the Prepared for: ACF Industries LLC 101 Clark Street St. Charles, Missouri 63301 Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, Missouri 63011 Project
BLR s Safety Training Presentations
BLR s Safety Training Presentations Asbestos Safety 29 CFR 1910.1001 I. Background for the Trainer: The OSHA Asbestos Standard for general industry, found in 29 CFR 1910.1001, requires information and
Asbestos NESHAP ISSUES AND QUESTIONS
Asbestos NESHAP ISSUES AND QUESTIONS FIRE-DAMAGED BUILDINGS HOW DOES THE NESHAP APPLY? After the Fire Is Out Building condition can vary widely from smoke damage to complete destruction with variations
ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015
ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD
Septic Tank to Cistern Conversions. Saving Water & Saving Money
Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System
AFLOAT ASBESTOS CONTROL
SAFETY TRAINING GOUGE #7 AFLOAT ASBESTOS CONTROL April 2012 Published by the Naval Safety and Environmental Training Center www.public.navy.mil/navsafecen/navsafenvtracen/ About Safety Training Gouge If
Tech Shop Safety Level 2 - FN000425. Tech Shop / Tool Safety Operations. (Fermilab machines not covered in course FN000258)
Tech Shop Safety Level 2 - FN000425 Tech Shop / Tool Safety Operations (Fermilab machines not covered in course FN000258) Table of Contents Tech Shop / Tool Safety Operations 3 General Rules of Safety
Asbestos in the Home MISAWA AB, JAPAN
Asbestos in the Home MISAWA AB, JAPAN Asbestos Awareness OCCUPANT ACKNOWLEDGEMENT OF INFORMATION SIGNATURE UNIT NUMBER DATE Prepared by: 35 CES/CEV If you have further question about location of asbestos
TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-1
Part #: HT-1 1965-82 CORVETTE O-RING CONVERSION front CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette
Final Amendments of 310 CMR 7.15: Asbestos
Final Amendments of 310 CMR 7.15: Asbestos Published in the Massachusetts Register on June 20, 2014, Typographical Corrections Published on November 21, 2014 7.00 AIR POLLUTION CONTROL Definitions Revised
TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-2
Part #: HT-2 1965-82 CORVETTE O-RING CONVERSION REAR CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette
LEGAL REVIEW & UPDATE
LEGAL REVIEW & UPDATE There are lots of laws and regulations designed to protect workers, the general public, and the environment. However, not everyone follows the laws. Many people deliberately break
INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
Recommended Work Practices for Removal of Resilient Floor Coverings. Warning
Recommended Work Practices for Removal of Resilient Floor Coverings Warning Do not sand, dry sweep, dry scrape, drill, saw, beadblast, or mechanically chip or pulverize existing resilient flooring, backing,
ENVIRONMENTAL QUALITY
Chapter 51. Title 33 ENVIRONMENTAL QUALITY Part III. Air Comprehensive Toxic Air Pollutant Emission Control Program Subchapter M. Asbestos 5151. Emission Standard for Asbestos A. Applicability. The provisions
Approved by: UBC ACT Committee
The University of British Columbia Asbestos Safety Policy Prepared by: Russell R. English Policy Approved by: UBC ACT Committee Issue Date: April 1, 2004 Replaces: March, 1989 I-B-05 1.0 Policy: This policy