Oakland County Department of Information Technology Project Scope and Approach

Size: px
Start display at page:

Download "Oakland County Department of Information Technology Project Scope and Approach"

Transcription

1 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Leadership Group: Information Technology Steering Committee Department: Information Technology Division: Technical Systems and Networking Project Sponsor: David Veit Date Requested: 4/28/1 PM Customer No. 186 Request Type: New Development IT Team Name: Network Services IT Team No: P Project Manager/Leader: Mahesh Parab Account Number: 173 Account Description: Technical Systems and Networking Customer Name: Information Technology Grant Funded? No Mandate? No Mandate Source: Project Goal To conduct an assessment of remote access options, including implementation of device based remote access service. Business Objective To conduct an assessment of remote access options, including device based VPN services to formulate a strategy for remote access management. Develop remote access service(s) that balance the security, functionality, licensing impact, and costs against the requirements of County departments. Major Deliverables Analysis and Recommendation Report including: Delineation of remote access needs including mobile staff, field staff, business continuity staff and occasion work-at-home staff. Assessment of remote access methods on software licensing, hardware configuration, and security configuration. Recommendation on approach(s) to provide services. Approach Project team will work with TSN networking and workstation services team to Conduct product research. Review vendor presentation. and Produce a feasibility report to outline possible deployment of remote access service, using device based VPN solution. Form Rev. 9/1/26 Page 1 Project Rev. 8/2/1

2 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Business Objective To deploy remote access service(s) using device based VPN solution, so that balance the security, functionality, licensing impact, and costs against the requirements of County departments. Major Deliverables Device based remote access service to mobile and field staff. Knowledge documents - to support the remote access service. and Standard operating procedures - for managing the remote access service. Approach Project team will work with TSN networking, workstation services and internal services team to Implementing remote access solution for current mobile and field staff, and Developing guidelines, knowledge documents and standard operating procedures to manage and support the remote access service. Benefits See Return on Investment (ROI) Analysis Document Intangible Improved Service None identified. Product/Service Accuracy Product/Service Productivity None identified. Impact Number of Users All Divisions All Leadership Groups All Form Rev. 9/1/26 Page 2 Project Rev. 8/2/1

3 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Risk Business Environment Medium project will require some changes to existing business processes. Technical Environment Medium previously implemented technologies with new aspects and/or new requirements. Assumptions Staffing IT staffing: resources will be available for the hours indicated per the attached project plan. Other Staffing: additional staffing will be available as follows: Role: Name Hours per Day Project Sponsor David Veit As needed. Facilities None identified. Technical Implementing second business objective is subject to finding of feasibility studies in the first business objective. Implementation estimates are based on assumption to rollout out service around Cisco Secure Remote Access Solution and are subject to change depending upon specific solution selected during the product research conducted in first business objective. Funding Information Technology Other Form Rev. 9/1/26 Page 3 Project Rev. 8/2/1

4 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Priority Constraints None identified. Exclusions None identified. Form Rev. 9/1/26 Page 4 Project Rev. 8/2/1

5 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA PROJECT PHASE AUTHORIZATION Phase(s): All Total Estimated Application Services Hours: Cost: Total Estimated Technical Systems Hours: 75 Cost: $35,319 Total Estimated CLEMIS Hours: Cost: Total Estimated Internal Services Hours: 3 Cost: $366 IT Application Services Division Manager Approval: IT Technical Systems Division Manager Approval: IT CLEMIS Division Manager Approval: IT Internal Services Division Manager Approval: IT Management Approval: Approved: Yes No Reason: Project Sponsor Approval: Title: PROJECT SUMMARY Authorized Development (see above) Hours: 78 Cost: $35,685 Preliminary Estimated Development for Future Phases Hours: Cost: Grand Total Estimated Development Hours: 78 Cost: $35,685 Form Rev. 9/1/26 Page 5 Project Rev. 8/2/1

6 Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Customer Acceptance of Product: PROJECT COMPLETION AUTHORIZATION Title: Project Office Review: Form Rev. 9/1/26 Page 6 Project Rev. 8/2/1

7 Information Technology Strategic Plan Alignment TP186RA - Remote Access Management Provide an Enhanced Application Service Offering Increase application integration through web services Research and develop a Constituent Relationship Management (CRM) strategy Promote mobility and location integration in business applications Utilize ecommerce platform to offset costs and expand product offerings to customers Improve the quality, reliability and availability of all applications Increase the agility and responsiveness of business units by expanding customer analytics Leverage the County's Internet presence and portal as a branded consolidated point of access to all County information and services through a web browser Centralize identity and access management for all applications and content Enhance ability to provide effective and timely customer (County departments and CVTs) service Implement a centralized service center strategy to provide a single point of contact for service delivery Implement the IT Library (ITIL) best practice framework for IT Service Management Define a service and support strategy that clearly identifies the IT service provided Provide a high-quality training program to empower employees through technology Develop a formalized customer communication plan Build IT Staff expertise through professional development Expand capacity through ongoing organizational review and selective outsourcing Implement a Standardized Strategy Deliver services using a shared technology infrastructure wherever possible Implement a Microsoft infrastructure strategy Implement a consolidated security strategy Establish a standard personal computing hardware and software product suite, SLA, and replacement schedule for all County personal computers X Establish support cost model and SLA for all offerings outside Improve service availability through network design and management strategies Establish enhanced capacity planning and recovery management strategies Run Date 7/27/21 Page 1 of 1

8 Project Summary Description Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total Benefits/Savings: Tangible Benefits Subtotal: Cost Avoidance Subtotal: Costs: Development Services Subtotal: 68,792 5,824 5,824 5,824 5,824 5,824 97,912 Subtotal: 24, 5, 5, 5, 5, 5, 49, Software Subtotal: Subtotal 1,35 1,35 1,35 1,35 1,35 1,35 8,1 Training Subtotal: Other Subtotal: Annual Statistics: Annual Total Savings Annual Total Costs 94,142 12,174 12,174 12,174 12,174 12, ,12 Annual Return on Investment (94,142) (12,174) (12,174) (12,174) (12,174) (12,174) (155,12) Annual Costs/Savings Ratio.%.%.%.%.%.% Project Cumulative Statistics: Cumulative Total Savings Cumulative Total Costs 94,142 16, ,49 13, , ,12 155,12 Cumulative Return on Investment (94,142) (16,316) (118,49) (13,664) (142,838) (155,12) (155,12) Cumulative Cost/Savings Ratio.%.%.%.%.%.%.% Year Positive Payback Achieved State or Federal Mandate? Signatures: NO PAYBACK Benefits Reviewed By Project Sponsor Costs (including IT Resources) Reviewed By Information Technology Project Manager TP186RA.xls/Project Summary Page 1 REV: February 17, 29

9 Savings Detail Benefit/Savings Description Project Savings Category Budget Category/Funding Source Unit Desc Units Rate per Unit Total Savings Improved security for remote access connections on county domain. Intangible Benefit Improved management for microsoft windows cal licenses. Intangible Benefit Annual Multiplier TP186RA.xls/Savings Detail Page 2 REV: February 17, 29

10 Savings Detail Benefit/Savings Description Improved security for remote access connections on county domain. Improved management for microsoft windows cal licenses. Project Savings Category Intangible Benefit Intangible Benefit Affects Project ROI? Potential Savings Extensions Y1 Y2 Y3 Y4 Y5 Y6 Y1 Y2 Y3 Y4 Y5 Y6 TP186RA.xls/Savings Detail Page 3 REV: February 17, 29

11 Savings Summary Tangible Benefit: Benefit/Savings Description Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total Tangible Benefits Subtotal: Cost Avoidance: Cost Avoidance Subtotal: Intangible Benefit: Improved security for remote access connections on county domain. Improved management for microsoft windows cal licenses. Savings Total: TP186RA.xls/Savings Summary Page 4 REV: February 17, 29

12 Cost Detail Cost Description Project Cost Category Budget Category/Funding Source Units Rate per Unit Total Cost Annual Multiplier Affects Project ROI? Y1 Y2 Y3 Y4 Y5 Y6 IT Hours - New Development Development Svcs IT - Information Technology / ,968 x IT Hours - System Maintenance Development Svcs IT - Information Technology / ,912 x x x x x x IT Hours - Customer Support Development Svcs IT - Information Technology / ,912 x x x x x x IT Hours - Planned Maintenance Development Svcs 122 User Hours - New Development Development Svcs User Hours - PTNE/OT Development Svcs Contractor Professional Services Development Svcs Acquisition IT - Information Technology / , x Acquisition IT - Information Technology / , x x x x x Maintenance IT - Information Technology / , x x x x x x Annualized Virtual Server Service Cost IT - Information Technology / ,35 1,35 x x x x x x Notebook - Acquisition 1,223 Notebook - Maintenance 2,372 Tablet Notebook - Acquisition 2,12 Tablet Notebook - Maintenance Laserprinter - Acquisition 1,432 Laserprinter - Maintenance 1,14 Image Workstations - Acquisition Image Workstations - Maintenance 3,496 PC Maintenance User Owned 2,34 Printer Maintenance User Owned 1,72 Package Software - Acquisition Software Package Software - Maintenance Software Business Objects Access Software Term Emulation SFTW-Acquisition Software Term Emulation SFTW-Maintenance Software Server - Acquisition/Upgrade 8, Server - Maintenance 36 Server Sftwre - Acquisition/Upgrade 335 Server Sftwre - Maintenance Server Rack Mount 4 TP186RA.xls/Cost Detail Page 5 REV: February 17, 29

13 Cost Detail Cost Description Project Cost Category Budget Category/Funding Source Units Rate per Unit Total Cost Oracle Enterprise Per Processor - Includes Year 1 Maintenance 21,372 Oracle Enterprise Per Processor - Year 2 and Beyond 3,432 MS SQL Server Standard Per Processor - Includes Year 1 Maintenance 4,725 MS SQL Server Standard Per Processor - Year 2 and Beyond 946 MS SQL Server Enterprise Per Processor - Includes Year 1 Maintenance 19,693 MS SQL Server Enterprise Per Processor - Year 2 and Beyond 3,939 Websphere Basic Per Processor Single/Dual Core - Includes Year 1 Maintenance 3,56 Websphere Basic Per Processor Single/Dual Core - Year 2 and Beyond 71 Websphere ND Per Processor Single/Dual Core - Includes Year 1 Maintenance 13,18 Websphere ND Per Processor Single/Dual Core - Year 2 and Beyond 2,635 SSL Certificate 845 TBD TBD TBD TBD Internet Access 18 Project Staff Training Training User Training Training Annual Multiplier Affects Project ROI? Y1 Y2 Y3 Y4 Y5 Y6 TP186RA.xls/Cost Detail Page 6 REV: February 17, 29

14 Cost Detail Project Cost Cost Description Category IT Hours - New Development Development Svcs IT Hours - System Maintenance Development Svcs IT Hours - Customer Support Development Svcs IT Hours - Planned Maintenance Development Svcs User Hours - New Development Development Svcs User Hours - PTNE/OT Development Svcs Contractor Professional Services Development Svcs Acquisition Acquisition Maintenance Annualized Virtual Server Service Cost Notebook - Acquisition Notebook - Maintenance Tablet Notebook - Acquisition Tablet Notebook - Maintenance Laserprinter - Acquisition Laserprinter - Maintenance Image Workstations - Acquisition Image Workstations - Maintenance PC Maintenance User Owned Printer Maintenance User Owned Package Software - Acquisition Software Package Software - Maintenance Software Business Objects Access Software Term Emulation SFTW-Acquisition Software Term Emulation SFTW-Maintenance Software Server - Acquisition/Upgrade Server - Maintenance Server Sftwre - Acquisition/Upgrade Server Sftwre - Maintenance Server Rack Mount Potential Cost Extensions Y1 Y2 Y3 Y4 Y5 Y6 62, ,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,912. 2,. 1,. 1,. 1,. 1,. 1,. 4,. 4,. 4,. 4,. 4,. 4,. 1,35. 1,35. 1,35. 1,35. 1,35. 1,35. TP186RA.xls/Cost Detail Page 7 REV: February 17, 29

15 Cost Detail Cost Description Project Cost Category Oracle Enterprise Per Processor - Includes Year 1 Maintenance Oracle Enterprise Per Processor - Year 2 and Beyond MS SQL Server Standard Per Processor - Includes Year 1 Maintenance MS SQL Server Standard Per Processor - Year 2 and Beyond MS SQL Server Enterprise Per Processor - Includes Year 1 Maintenance MS SQL Server Enterprise Per Processor - Year 2 and Beyond Websphere Basic Per Processor Single/Dual Core - Includes Year 1 Maintenance Websphere Basic Per Processor Single/Dual Core - Year 2 and Beyond Websphere ND Per Processor Single/Dual Core - Includes Year 1 Maintenance Websphere ND Per Processor Single/Dual Core - Year 2 and Beyond SSL Certificate TBD TBD TBD TBD Internet Access Project Staff Training Training User Training Training Potential Cost Extensions Y1 Y2 Y3 Y4 Y5 Y6 TP186RA.xls/Cost Detail Page 8 REV: February 17, 29

16 Cost Summary Cost Description Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total Development Services: IT Hours - New Development 62,968 62,968 IT Hours - System Maintenance 2,912 2,912 2,912 2,912 2,912 2,912 17,472 IT Hours - Customer Support 2,912 2,912 2,912 2,912 2,912 2,912 17,472 IT Hours - Planned Maintenance User Hours - New Development User Hours - PTNE/OT Contractor Professional Services Development Services Subtotal: 68,792 5,824 5,824 5,824 5,824 5,824 97,912 : Acquisition 2, 2, Acquisition 1, 1, 1, 1, 1, 5, Maintenance 4, 4, 4, 4, 4, 4, 24, Subtotal: 24, 5, 5, 5, 5, 5, 49, Software: Software Subtotal: : Annualized Virtual Server Service Cost 1,35 1,35 1,35 1,35 1,35 1,35 8,1 Subtotal 1,35 1,35 1,35 1,35 1,35 1,35 8,1 Training: Training Subtotal: Other: Other Subtotal: Costs Total: 94,142 12,174 12,174 12,174 12,174 12, ,12 TP186RA.xls/Cost Summary Page 9 REV: February 17, 29

17 Assumptions Date Assumption Description 27-Jul-1 Cost Detail - Line hours from the Workbench WBS includes blended rate cost of $89 for TSN and IT resources. 27-Jul-1 Cost Detail - Line 4,5 -- One hour per week for system maintenance and customer support at cost of $ Jul-1 Cost Detail - Line 1 -- Assuming CISCO SDRAM USB remote user device will be acquired for 2 users in current environment. 27-Jul-1 Cost Detail - Line Assuming 1% increase in mobile/field staff per year. 27-Jul-1 Cost Detail - Line Assuming 2% annual maintenance for devices purchased. TP186RA.xls/Assumptions Page 1 REV: February 17, 29

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Oracle Consolidation Project ID: T3186OC Leadership Group: IT Steering Committee Department: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: SQL Server Services Enhancements Project ID: T3186SE Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Microsoft Enterprise Deployment Program 211-12 Project ID: T6186ED Leadership Group: Information Technology

More information

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: IVR Platform Upgrade Project ID: D90186IV Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Devices Security Strategy Implementation Project ID: TN2186BY Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: SharePoint Document Mgmt. Proof of Concept Project ID: DE8187DP Leadership Group: IT Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Document Management Strategy Project ID: DE0187DM Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Audit Data Analytics Software Project ID: DA2112DA Leadership Group: Finance / Admin Department: County Executive

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Database Project ID: DR0181CI Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Database / Asset Management Program Project ID: DR181CI Leadership Group: IT Steering

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Project ID: D8111VC Leadership Group: Finance/Administration Department: Health and Human Services Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Project ID: D971LT Leadership Group: Land Department: Treasurer s Office Division: Tax Administration Project

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Rewrite Separate OTC from ECommerce Environment Project ID: DJ4182OE Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Print Management Project ID: TN186PM Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: TeamSite to SharePoint Assessment Project ID: DE0187TA Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Secure Email Server Project ID: TBD Leadership Group: Finance/Admin Department: Health & Human Services Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Applicant System RFP Project ID: DB3154AS Leadership Group: Finance and Administration Department: Human Resources

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Social Media Expansion Project ID: DE1187SM Leadership Group: I.T. Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Professional ecommerce Package Project ID:DE1187PP Leadership Group: IT Steering Committee Department: Information

More information

Oakland County - Information Technology Project Scope and Approach

Oakland County - Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Backup Strategy / Backup Services Replacement Project ID: T62186BK Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Load Balancer System Implementation Project ID: T64186LB Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Facilities Space Allocation Program Project ID: TBD Leadership Group: Land Department: Facilities Management

More information

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Server Systems Management Software Implementation Project ID: T60186SS Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: IT Asset Inventory Phase 2 Project ID: T6186A2 Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Device Management Project ID: TN5186MD Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Reverse Proxy Standardization Project ID: T62186RP Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Audit Management System Project ID: DB4112AS Leadership Group: Finance / Admin Department: County Executive

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Desktop Software Audit Compliance Phase 1 Project ID: TN2186SI Leadership Group: Information Technology Steering

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Disaster Recovery Redesign Project ID: T64186DR Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Server Systems Management Software Implementation Project ID: T62186SS Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Circuit Court Mobile App Project ID: DB2312MA Leadership Group: Courts Department: Circuit Court Division: Business

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: Information Technology Steering Committee Department: Information Technology Division: Technical Systems and Networking Project Sponsor: Date Requested: 6/26/6 PM Customer No. 186 Request

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: CSTAR Appointment Scheduler Replacement Project ID: DB6174CS Leadership Group: Courts Department: Public Services

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Econ Dev & Comm Affairs Web Site Project ID:D10192EW Leadership Group: Land Leadership Group Department: Economic

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Change Management Integration Project ID: DR0181CM Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV Leadership Group: Courts Justice Administration Department: Circuit Court Division: Court Business Project

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: P & R Electronic File Conversion, Storage and Retrieval Project ID: Leadership Group: Land Department: Parks

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Visa PCI Audit - Assessment Project ID: DE5188PI Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Change and Release Management Integration Project ID: DH6181CM Leadership Group: Internal Services Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Enterprise Content Management Proof of Concept Project ID: DE7188CM Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Windows Backup/Recovery Improvement Project ID: T35186BR Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Reqts & RFP Project ID: DH6181CR Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: CJCC Business Intelligence Project ID: DJ6351BI Leadership Group: Courts Department: Circuit Court Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Prototype Project ID: DH6181CP Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Service Center Knowledge Base Project ID: DH6181KB Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Collaborative Asset Management System Program Project ID:D96611DC Leadership Group: Land Department: Drain Commissioner

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Active Directory Federation Services (ADFS) Upgrade Project ID: TP5186AD Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: Finance / Admin Department: Human Resources and Health & Human Services Division: Administration Project Sponsor: Malcolm Brown Date Requested: 3/7/2016 PM Customer No. 151 & 161 Request

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: CLEMIS Department: Information Technology Division: Clemis Project Sponsor: R. Daddow / J. Sullivan Date Requested: 5/30/2006 PM Customer No. 431 Request Type: New Development IT Team

More information

Oakland County Michigan Information Technology (IT) Strategic Plan

Oakland County Michigan Information Technology (IT) Strategic Plan 1.0 INTRODUCTION Oakland County Michigan Information Technology (IT) Strategic Plan The Oakland County Information Technology (IT) Strategic Plan, similar to all strategic planning, is an ongoing process.

More information

Information Technology Cost Containment / Reduction Plan

Information Technology Cost Containment / Reduction Plan Sacramento County Information Technology Cost Containment / Reduction Plan November 2008 Executive Summary The IT community worked together in November to understand our IT costs and structure. The team

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland Cunty Department f Infrmatin Technlgy Prject Scpe and Apprach Prject Name: Web-Based Permanency Database Prject ID: DB1314PD Leadership Grup: Curts Department: Circuit Curt Divisin: Family Prject

More information

Description. Need Statement

Description. Need Statement Description Brief description of the proposed project: CDVA is currently operating in a "Fat Client" environment for all office automation product applications. CDVA is committed to it's strategic goal

More information

Cisco and VMware Virtualization Planning and Design Service

Cisco and VMware Virtualization Planning and Design Service Cisco and VMware Virtualization Planning and Design Service Create an End-to-End Virtualization Strategy with Combined Services from Cisco and VMware Service Overview A Collaborative Approach to Virtualization

More information

Application Development

Application Development 1. Rate: Standard Rates Fiscal Year 2015 Applications Developer $64.25 Applications Developer/Senior $75.25 Applications Developer/Lead $87.25 Co-Located Rates Fiscal Year 2015 Applications Developer Co-Located

More information

Software Cost. Discounted STS Rate Units Total $0.00 $0.00 $0.00 $0.00 Total $0.00

Software Cost. Discounted STS Rate Units Total $0.00 $0.00 $0.00 $0.00 Total $0.00 Cost Form This cost form has been provided to assist respondents in submitting costs associated by deliverable. Remember that all costs are to be the firm, fixed price of the deliverable and project total.

More information

General Hardware Requirements... 1. Workstation Requirements... 2. Application / Database Server Requirements... 3. Storage Requirements...

General Hardware Requirements... 1. Workstation Requirements... 2. Application / Database Server Requirements... 3. Storage Requirements... General Contents General... 1 Workstation Requirements... 2 Application / Database Server Requirements... 3 Storage Requirements... 4 Thin Client Requirements... 5 HIS/RIS Interface Installation... 6 Interfacing...

More information

Requirements Document for ROI Print Assessment/Print Manager

Requirements Document for ROI Print Assessment/Print Manager Requirements Document for ROI Print Assessment/Print Manager Print Manager Pre-requisites for a successful deployment Contents 1. What is - a. Print Assessment? b. Print Manager? c. ROI Analytics? 2. About

More information

DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE

DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE 1 Introduction and Instructions This sample Statement

More information

Executive Branch IT Reorganization Project Plan

Executive Branch IT Reorganization Project Plan Office of Information Resource Management Executive Branch Project Plan Work Program Funded by for IT Appropriations Reorganization 2007, 2009 and Five Small Projects Date: August 2009 Version: 1.3 Revision

More information

Scope of Work Microsoft Infrastructure Upgrade

Scope of Work Microsoft Infrastructure Upgrade Introduction Scope of Work Microsoft Infrastructure Upgrade The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in Houston, Texas, celebrating six decades of Making Cancer History, is

More information

Lenovo System x servers achieve top customer satisfaction scores in 1Q15. May 2015 TBR T EC H N O LO G Y B U S I N ES S R ES EAR C H, I N C.

Lenovo System x servers achieve top customer satisfaction scores in 1Q15. May 2015 TBR T EC H N O LO G Y B U S I N ES S R ES EAR C H, I N C. Lenovo System x servers achieve top customer satisfaction scores in 1Q15 May 2015 TBR T EC H N O LO G Y B U S I N ES S R ES EAR C H, I N C. System x customer satisfaction scores surpass those of Dell and

More information

SENIOR SYSTEMS ANALYST

SENIOR SYSTEMS ANALYST CITY OF MONTEBELLO 109 DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and

More information

Invitation To Bid By State of Connecticut Office of Policy and Management. Vendor to Host Internet Applications. Amendment #2 October 29, 2008

Invitation To Bid By State of Connecticut Office of Policy and Management. Vendor to Host Internet Applications. Amendment #2 October 29, 2008 Invitation To Bid By State of Connecticut Office of Policy and Management Vendor to Host Internet Applications Amendment #2 October 29, 2008 Responses to Questions Below please find the responses to the

More information

MS 10751A - Configuring and Deploying a Private Cloud with System Center 2012

MS 10751A - Configuring and Deploying a Private Cloud with System Center 2012 MS 10751A - Configuring and Deploying a Private Cloud with System Center 2012 Description: Days: 5 Prerequisites: This course describes private cloud configuration and deployment with Microsoft System

More information

Release Management PinkVerify v2.1. Mandatory Criteria

Release Management PinkVerify v2.1. Mandatory Criteria Mandatory Criteria *CMDB= Configuration Management Database *CI= Configuration Item *DSL= Definitive Software Library *RFC= Request for Change *SLA= Service Level Agreement 1. Does the tool facilitate

More information

A Provance White Paper

A Provance White Paper The Benefits of Combined IT Service Management and IT Asset Management A Provance White Paper Contents Introduction... 3 IT Service Management... 3 IT Asset Management... 4 People... 4 Processes... 5 Shared

More information

Information Technology Strategic Plan Final Presentation

Information Technology Strategic Plan Final Presentation City of Boise, ID Information Technology Strategic Plan Final Presentation August 28, 2012 Pacific Technologies, Inc. Practical planning. Positive change. City of Boise, ID IT Strategic Plan Final Presentation

More information

CSG UCLA Enterprise Service Bus (ESB)

CSG UCLA Enterprise Service Bus (ESB) CSG UCLA Enterprise Service Bus (ESB) May 28, 2013 Draft Information Technology Services Enterprise Service Bus (ESB) The UCLA Enterprise Service Bus (ESB) is an application middleware solution designed

More information

Virtualization In Manufacturing Industries. Copyright 2012 Rockwell Automation, Inc. All rights reserved.

Virtualization In Manufacturing Industries. Copyright 2012 Rockwell Automation, Inc. All rights reserved. Virtualization In Manufacturing Industries Rev 5058-CO900C What is Virtualization? Traditionally the OS and its applications were tightly coupled to the hardware they were installed on Virtualization breaks

More information

Addendum 03. This is the Final Extension in response and due to the above received request:

Addendum 03. This is the Final Extension in response and due to the above received request: RFP 13-44 Questions 05-29-2013: Can the due date be extended 1 week? There is very little time between posting of answers and the proposal due date. We want to be sure we have sufficient time to prepare

More information

Upper Perkiomen School District

Upper Perkiomen School District Upper Perkiomen School District Network Infrastructure Review Executive Summary Prepared by 1001 James Drive, Suite A15 Leesport, PA 19533 610 916 9400 www.jlrconsulting.com Date: March 10, 2015 Report

More information

Enterprise Governance and Planning

Enterprise Governance and Planning GEORGIA TECHNOLOGY AUTHORITY Title: Enterprise Operational Environment PSG Number: SO-10-003.02 Topical Area: Operations / Performance and Capacity Document Type: Standard Pages: 5 Issue Date: July 15,

More information

SMALL BUSINESS OUTSOURCING

SMALL BUSINESS OUTSOURCING SMALL BUSINESS OUTSOURCING PCs on Lease 24X7 Remote Supports Professional Fees Service Level Agreement SMALL BUSINESS OUTSOURCING (SMO) CONNECTING YOUR BUSINESS TO THE TECHNOLOGY RESOURCES YOU NEED Implement

More information

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting Addendum 1 CityWorks System Cloud Hosting This addendum is issued to answer questions submitted via email and to make the following revisions to this solicitation. All information provided herein is hereby

More information

General Information Guide

General Information Guide RL Consulting People Process Technology Organization Integration General Information Guide Data Center Relocation and Consolidation Prepared by: Rick Leopoldi July 25, 2009 INTRODUCTION DC Consolidation

More information

JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # IT Tech II AD Grid Level 5(g) #123 Network Support Technician

JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # IT Tech II AD Grid Level 5(g) #123 Network Support Technician COUNTY OF GRANDE PRAIRIE JOB DESCRIPTION JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # IT Tech II AD Grid Level 5(g) #123 Network Support Technician NOC CODE: 2281 STANDARD HOURS: 35 hours/week (non-management)

More information

Responses to questions related to RFP for IT Managed Services

Responses to questions related to RFP for IT Managed Services Responses to questions related to RFP for IT Managed Services 1. What defines a call center? Part II, paragraph B of the RFP Technical end-user support must include support of Microsoft Office as it relates

More information

IT Project Full Business Case Report

IT Project Full Business Case Report IT Project Full Business Case Report Division: Public Health Cluster: A Print Date: 09-Jun-2014 Project Information Name of Project : TPH Collaboration Sub-Project Title: Project Manager: Peter Oliver

More information

Server Virtualization Cloud Partner Training Series

Server Virtualization Cloud Partner Training Series Server Virtualization Cloud Partner Training Series August 2015 Agenda What is it? Benefits Industry Landscape Evolve is Different How we can help you $ucceed Who is a fit? Who is a challenge? Key Questions

More information

NCTA Cloud Architecture

NCTA Cloud Architecture NCTA Cloud Architecture Course Specifications Course Number: 093019 Course Length: 5 days Course Description Target Student: This course is designed for system administrators who wish to plan, design,

More information

INTRODUCTION TO THE COLUMBIAN COLLEGE PRIVATE CLOUD

INTRODUCTION TO THE COLUMBIAN COLLEGE PRIVATE CLOUD INTRODUCTION TO THE COLUMBIAN COLLEGE PRIVATE CLOUD Office of Technology Services 202-994-8096 ots@gwu.edu columbian.gwu.edu/ots WHAT IS THE COLUMBIAN COLLEGE CLOUD? Any Time Any Resource Any Place Any

More information

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814 IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9

More information

Bid/Proposal No. P15/9888 Business Intelligence Management

Bid/Proposal No. P15/9888 Business Intelligence Management Answers to Vendor Questions Questions are in black, Answers are in red 1. Who is the Executive Sponsor(s) for this project Information not available at this time 2. Will PCC provide the selected consultant

More information

How Microsoft runs IT. Ludwig Wilhelm CIO Central & Eastern Europe Microsoft IT

How Microsoft runs IT. Ludwig Wilhelm CIO Central & Eastern Europe Microsoft IT How Microsoft runs IT Ludwig Wilhelm CIO Central & Eastern Europe Microsoft IT 2 Source: Accenture Cloudrise: Rewards & Risks at the Dawn of Cloud Computing, November 2010 3 Source: Accenture Cloudrise:

More information

SESSION 108 Wednesday, March 25, 10:15 AM - 11:15 AM Track: Industry Insights

SESSION 108 Wednesday, March 25, 10:15 AM - 11:15 AM Track: Industry Insights SESSION 108 Wednesday, March 25, 10:15 AM - 11:15 AM Track: Industry Insights Control Shift: How Cloud Computing Is Changing Everything Hank Marquis Practice Director, Cloud, Global Knowledge hank.marquis@globalknowledge.com

More information

G-Cloud Managed Exchange SaaS. Service Description

G-Cloud Managed Exchange SaaS. Service Description G-Cloud Managed Exchange SaaS Service Description G-Cloud Managed Exchange SaaS Service Description 2 INDEX TO SUNGARD MANAGED EXCHANGE SAAS SUNGARD CLOUD SERVICES... 3 Managed Exchange SaaS Overview...

More information

Current Environment Assessment Specification. Single Sign On Customer Relation Management Workstation Support

Current Environment Assessment Specification. Single Sign On Customer Relation Management Workstation Support Current Environment Assessment Specification Single Sign On Customer Relation Management Workstation Support Georgia State University By: Team #2 Members: Igor Wolbers Tony Yuan Saeed Nadjariun Team2 Version

More information

Kaseya IT Automation Framework

Kaseya IT Automation Framework Kaseya Kaseya IT Automation Framework An Integrated solution designed for reducing complexity while increasing productivity for IT Professionals and Managed Service Providers. The powerful, web-based automation

More information

Information and Communication Technology. Patch Management Policy

Information and Communication Technology. Patch Management Policy BELA-BELA LOCAL MUNICIPALITY - - Chris Hani Drive, Bela- Bela, Limpopo. Private Bag x 1609 - BELA-BELA 0480 - Tel: 014 736 8000 Fax: 014 736 3288 - Website: www.belabela.gov.za - - OFFICE OF THE MUNICIPAL

More information

Achieve Economic Synergies by Managing Your Human Capital In The Cloud

Achieve Economic Synergies by Managing Your Human Capital In The Cloud Achieve Economic Synergies by Managing Your Human Capital In The Cloud By Orblogic, March 12, 2014 KEY POINTS TO CONSIDER C LOUD S OLUTIONS A RE P RACTICAL AND E ASY TO I MPLEMENT Time to market and rapid

More information

CAMAvision v18.5.x System Specification Guide 7/23/2014

CAMAvision v18.5.x System Specification Guide 7/23/2014 The computer industry is very fast moving, with larger and faster technologies supplanting previous hardware releases within six to nine months. Some of the specifications listed may no longer be available,

More information

Microsoft Dynamics SL for Government Contractors

Microsoft Dynamics SL for Government Contractors Microsoft Dynamics SL for Government Contractors Government Contracting Microsoft Dynamics SL is a project focused enterprise resource planning (ERP) solution with a wide variety of uses from government

More information

Logicalis Managed Service Strategy & Support. Geraldine Moatti Proposition Manager, Services

Logicalis Managed Service Strategy & Support. Geraldine Moatti Proposition Manager, Services Logicalis Managed Service Strategy & Support Geraldine Moatti Proposition Manager, Services 1 I don t want to be a Technology Operator Or how do I deliver business differentiation? Support business growth

More information

PROMAPP TECHNICAL INFORMATION

PROMAPP TECHNICAL INFORMATION Promapp Software Architecture Promapp is designed in accordance with Microsoft best practices, developed with the Microsoft.net framework and uses a Microsoft SQL database. The software architecture is

More information

Town of Andover. Strategic Information Technology Plan Findings and Recommendations. Version 3.0 March 2010

Town of Andover. Strategic Information Technology Plan Findings and Recommendations. Version 3.0 March 2010 Town of Andover Strategic Information Technology Plan Findings and Recommendations Version 3.0 March 2010 Andover Strategic Information Technology Plan Table of Contents I Project Overview II Executive

More information

G-Cloud Managed Exchange SaaS. Service Description

G-Cloud Managed Exchange SaaS. Service Description G-Cloud Managed Exchange SaaS Service Description Version No: 5.0g Date: 08/04/2014 Table of Contents FEATURES... 3 OPTIONAL FEATURES... 4 BENEFITS... 4 CONNECTED SERVICES... 4 SERVICE REQUIREMENTS...

More information

Where is Your Print Strategy? An IDC interactive document, sponsored by HP

Where is Your Print Strategy? An IDC interactive document, sponsored by HP Where is Your Print Strategy? An IDC interactive document, sponsored by HP Where is Your Print Strategy? Organizations have the opportunity to reduce costs, increase productivity, increase security and

More information

Project Charter Updated

Project Charter Updated Enterprise IT Service Management Pilot Proof of Concept Project Charter Updated Prepared By: M. Riley & J. Foster Date of Publication: March 13, 2006 Date Last Revised: April 25, 2007 PMO CH1, 8/01 Document

More information

Innovation through Outsourcing

Innovation through Outsourcing Innovation through Outsourcing Timothy Gehrig timothy.gehrig@cedarcrestone.com David Moore david.moore@cedarcrestone.com Agenda Expectations CedarCrestone Introduction Market Direction Outsourcing Solutions

More information