1 Page 1 of PURPOSE SAMPLE CASTING APPROVAL This specification documents the procedure and the requirements for the procurement of casting fixtures, gages and pattern equipment, approval of sample castings and casting process, risk sample Definition and casting production release. 2.0 SCOPE Applicable to all castings, casting pattern equipment, dies and fixtures used to produce castings for Eaton, FSD, Euclid. 3.0 TABLE OF CONTENTS 4.0 Procurement 5.0 Tooling Manufacture 6.0 Pattern Equipment or Die Requirements 7.0 Casting Qualification Fixtures 8.0 Core Stick Review 8.5 Investment Model Review 9.0 Conditions for Sample Casting Manufacture 9.3 Risk Casting Definition 10.0 Sample Inspection 10.4 First Article Inspection 10.5 Periodic Production Sample Evaluation 11.0 Destructive Testing 12.0 Evaluation and Dispositioning of Samples 13.0 Maintenance of Tooling 14.0 Foundry Process Control (Frozen Process) 15.0 Production Casting Inspection and Serialization 3.1 APPLICABLE DOCUMENTS ARG-693 Spec TAP-MS-642 SOP SOP Casting or Forging Sample Release or Rejection Part Marking Requirements For Evaluation of Castings Casting Tooling Development Control Procedure Inactive Casting Tooling Procedure Date of Issue Revision 1/20/09 - P 05/16/12 Revision complete Prepared by Approved by signature on file D. Neville signature on file G. Lallathin

2 Page 2 of PROCUREMENT 4.1 Quotations for new tooling shall include the following: A. A complete description of pattern equipment, molding process, fixtures and gages to be used for inspecting the casting. B. The quantity of castings the purchaser can expect to receive from each item of the proposed process equipment. C. The cost of blueprints and inspection of fixtures and gages, and inspection reports for each item. 4.2 The foundry shall maintain a sketch/photo defining only the critical elements of foundry in process fixtures and/or gages. 5.0 TOOLING MANUFACTURE 5.1 It is the foundry's responsibility to inform the pattern shop that the blueprint shall not be scaled for undefined features. If there is a difference between the configuration in blueprint views and blueprint dimensions, Eaton, FSD, Euclid shall be notified immediately. 5.2 Unless specifically waived in writing by Quality and Engineering, existing pattern equipment will be duplicated to produce any new equipment. Refurbishing of worn areas without changing dimensional sizes shall be made prior to duplication. 5.3 When pattern equipment is re-manufactured (not duplicated from model, plugs, dummies or existing equipment), Engineering and Quality shall determine the level of pump qualification test required prior to production release. 5.4 Casting patterns or dies that have been duplicated from old patterns shall only require First Article evaluation. 5.5 Documented accepted dimensional discrepancies duplicated from previous tooling are responsibility. Process related discrepancies and discrepancies resulting from wear or damage are the suppliers responsibility Tooling refurbishment shall be done in the most permanent manner. Carbide or metal fillers or better shall be used to repair worn areas for sand casting tooling. 5.6 New tooling shall be produced per SOP PATTERN EQUIPMENT OR DIES 6.1 Pattern equipment or dies shall be manufactured with the following considerations where possible: 6.2 Core joints, parting lines and rigging shall lie on surfaces which are machined. 6.3 Foundry rigging shall be constructed to support the shake-out vibration loads.

3 Page 3 of Cores which locate on strike-off surfaces shall have steel faces on the aluminum, plastic or wood core box frames. Strike-off fixtures or gages may be utilized in place of steel faces. 6.5 Casting datum locating points shall be produced by stable pattern equipment. Process rigging, set cores, loose pattern pieces or parting lines shall not be located on datum points without prior written approval. 6.6 Pattern equipment shall produce corner and fillet radii in all areas which will not be machined. Any exceptions shall be submitted for approval at core stick review. Sharp corners are permitted on surfaces which are to be machined. 6.7 Multi-cavity patterns shall have cast cavity identification. Dual patterns shall have vendor trademarks. This identification is to be on a surface which will not be machined. Request location for this marking through Purchasing. 6.8 Aluminum shell core boxes are NOT permitted. 6.9 Unless waived by Quality, all small cores shall have enlarged core prints to produce the exterior surface of the casting. This enlarged print area around cored passages shall be.062 minimum per side for visual inspection of core location. 7.0 CASTING QUALIFICATION FIXTURES AND GAGES shall be designed with the following considerations: 7.1 Scribe and profile features shall, as a minimum, verify that minimum material condition complies with blueprint requirements (eg. low limit for O.D. and high limit for I.D.). 7.2 Datum locators for datums on cast surfaces shall be a.250 minimum diameter sphere. 7.3 Inspection features shall be accurate within +/-.005 of casting drawing definition. 7.4 One vertical surface shall have a.062" deep recessed milled slot for the full length of the fixture, 2 gage maker set-up holes or 2 gage balls for gage inspection alignment. 8.0 SAND OR PLASTER PROCESS MODEL AND CORE STICK REVIEW 8.1 Supplier Quality will evaluate the model and core sticks. The model and core sticks shall be manufactured to the following state: 8.2 The exterior shall have all features completed except for fillets and finishing. The pattern shall not be mounted. 8.3 All interior core sticks shall be completed with core prints. 8.4 No part of the production tooling shall be completed at this point.

4 Page 4 of This review will consist of the following: A. Pouring attitude and chilling for optimum casting properties. B. Foundry producibility (eliminate foundry problem areas). C. Core configuration (restrictions, proper fuel flow, etc.). D. Assure pattern and core models comply with blueprint E. Eliminate all possible negative draft areas. F. If possible move cast designation and foundry logo location to eliminate set cores. G. Any changes will be marked up on three (3) sets of prints or documented in a letter if changes can be described adequately. These will be signed by and distributed to representatives of Eaton, the foundry and the tool shop. Any changes to a released blueprint will require an Engineering Order (E.O.) to be initiated by Eaton personnel. It is Eaton s option to immediately change the drawing or operate with a working E.O. per SOP Any changes to an unreleased blueprint will be incorporated in the released blueprint. 8.5 Investment Model Review After manufacture of investment die and prior to producing castings, a pattern review is required. For this review a sample of each soluble core, an undressed wax pattern with soluble cores encapsulated and wax pattern with soluble cores removed are to be submitted for review Eaton will review the wax pattern for obvious non-conformances such as missing fillets, thin walls and marking requirements Eaton Quality Assurance will issue a report of this evaluation to Purchasing Eaton will advise the supplier in writing of the disposition of any findings with regards to correction prior to producing castings. 8.6 Eaton review and approval of core stick, pattern, model or other device for evaluation of methods used to produce tool will, in no way, limit suppliers responsibility to produce accurate tooling. 9.0 CONDITIONS FOR SAMPLE CASTING MANUFACTURE 9.1 Sample castings shall be ordered and evaluated in accordance with this SOP. Samples and inspection shall be as contracted by Purchasing. All samples shall be source inspected unless this requirement is waived by Quality. 9.2 The first molds or investment patterns shall be assembled under the suppliers Quality or Engineering Department control. A report shall be generated and available with the first or reworked sample castings of the core fit, adjustments made to produce a VISUAL acceptable part, and the results of the mold assembly gages.

5 Page 5 of "Definition of Risk Casting Prior to Sample Approval (PSA)"; Prior to producing risk samples, the supplier is responsible for producing initial samples for the following: A. Establish mold assembly instructions and verify rigging. B. Confirm material properties. C. Verify material integrity by radiographic and fluorescent penetrant inspection. D. Verify wall thickness. E. Inspect for obvious "visual" errors when compared to a full size blueprint. F. Layout inspect a few key dimensions and/or evaluate a part in a qualifying fixture Any discrepancies found on the risk castings after these initial samples have been evaluated are subject to Eaton review via layout report. Deviated risk castings produced without sampling are the vendor's responsibility Eaton will source inspect all risk castings A First Article shall be submitted prior to the machining of any Eaton risk casting. After dispositioning layout report, Eaton will notify the machining supplier of any special machining instructions. 9.4 The foundry is not permitted to produce additional parts after risk castings until parts are released for production on ARG-693 report or without other written authorization from Engineering, Program Office and Quality department LAYOUT INSPECTION SAMPLE(S) 10.1 When laying out sample castings, the supplier MUST use locating points (datum system) as specified on the blueprint. If castings are balanced, qualified or targeted prior to layout any adjustment to datum points shall be reported. In addition, there shall be only minimum clean-up of flash or mismatch of partings or rigging. THIS IS EXTREMELY IMPORTANT; LAYOUTS WHICH DO NOT COMPLY WITH THIS REQUIREMENT MAY BE REJECTED. Layouts are for product of the tool, sanding or filing cores is not permitted. Characteristics that require this on existing tooling are to be reported A detailed report for any dimensional inspection contracted from the supplier shall be furnished indicating: 1. The serial number of the casting inspected. 2. Dimension reference numbers. 3. Blueprint sheet and zone location. 4. Blueprint dimension. 5. The actual size and location of all characteristics inspected. 6. Mechanical property results (for complete 1 st article). 7. Drawing change letter contracted by the purchase order. 8. The name of the inspector and date 9. All items inspected during layout are to be identified on a sketch and/or full size drawing and reported by a characteristic number. Copy of E.O s shall be included with the report. 10. All items that exceed drawing requirements are to be shown as rejected. 11. The layout inspector shall sign and date the drawings used for the inspection.

6 Page 6 of A full size blueprint with each characteristic identified with an item number is required. Eaton will copy this print and return it with a copy of form ARG-693 when disposition has been completed This blueprint may be used by the inspector to document actual inspection results. When the blueprint is so used, actual dimensions shall be recorded adjacent to the blueprint requirement and the print is to be signed and dated by the inspector Coordinate Measuring Machine Inspection: Coordinate measuring machines (CMM) are authorized for inspection of Eaton castings. The Eaton Source inspector reserves the right to re-inspect any characteristic on head or surface plate. Scribe-lines are not required for features on whole casting inspection Identified scribed reference lines and datum lines are required on all the sectioned pieces. These scribed lines are required for re-inspection of a section when required First Article Inspection: Sample castings and layout inspection will be contracted by the purchase order to support evaluation of the following: A. New pattern equipment. B. Altered pattern resulting from drawing changes or corrections required per Eaton layout reports. Eaton is to be notified before any dimensional tooling changes are made. This excludes routine maintenance, as long as dimensional characteristics are not changed. It is the foundry's responsibility to inspect the repaired area(s) on a casting after any pattern repair C. Process changes as defined by the Foundry Process Control section of this SOP. D. Pattern equipment transferred to another foundry The following evaluation shall be performed completed on the sample castings when specified on the purchase order: A. The First Sample Casting shall have all external features and locations of accessible internal features dimensionally inspected. Unless otherwise specified, the following applies to layout inspection of the First Sample Casting: 1. This casting shall have scribe-lines for external features. 2. This sample may be a metallurgical reject and in the unheat treated condition. 3. On multi-cavity patterns one casting shall be layout inspected. One casting from each cavity shall be layout inspected for a few key features. Wall thickness shall be inspected and a visual comparison shall be made to the layout piece. Any questionable observations resulting from the visual comparison shall be verified by layout inspection. B. The Second Sample Casting shall be scribed with datum lines and recorded reference cut lines. This casting shall be inspected for deviations found on the first sample casting and sectioned for complete internal dimensional inspection including wall thickness. Additional castings may be required to complete this evaluation. Unless otherwise specified this sample may be a metallurgical reject and in the unheat treated condition.

7 Page 7 of 12 C. The Third Sample Casting shall be heat treated and acceptable when inspected using NDT methods prior to sectioning. The casting shall be sectioned if any surfaces of cored passages are hidden from external view and/or section thickness exceeds 3/4". Castings shall be sectioned through each passage "PARALLEL TO THE HORIZONTAL" orientation in the mold as poured when possible, thus allowing NDT evaluations of each single wall section. Any radiographic or penetrant discontinuity caused by deficiencies in the casting process shall be cause for rejection. This evaluation shall be performed for one casting from each cavity of multi-cavity molds. The following data shall be recorded: 1. Wall thickness 2. Radiographic inspection results of each individual section. 3. Fluorescent Penetrant Inspection results of each section per VQR. 4. Mechanical properties. D. The Fourth Sample Casting may be a metallurgical reject. A 1/8 inch dia. hole shall be drilled through a pressure passage by the foundry and the casting shall be painted. The foundry shall tag this casting with Cast to Machine Sectioning Piece. Send To Quality After Machining. This casting will be machined complete to component print. This part can be used as machining lead piece. Any machining discrepancies (cast datum to machine datum, mislocated machined feature, over or undersize machine configuration) must be documented by the machining source. This part will be sectioned to verify design integrity as follows: 1. Cast to machined configuration wall thickness 2. Cast to cast wall thickness 3. Fluorescent penetrant inspect each section 4. Radiographic inspect each section Eaton will negotiate with vendor the degree of compliance to basic radiographic discontinuity requirement. 5. Visual discontinuities in the internal passages. Note: This sample is required for samples off new tooling for any casting that has cored passages or hidden features that can not be evaluated without sectioning Periodic Production Sample Evaluation: When a casting is being ordered after two or more years of inactivity, a periodic evaluation will be required. Supplier Quality may waive this evaluation when conditions, such as relatively new tooling, warrant. Documentation of waivers will be maintained in casting files. It shall be the responsibility of Supplier Quality to monitor castings for dimensional issues during normal daily activities or source inspection. When dimensional problems are suspected, a periodic evaluation may be requested.

8 Page 8 of Periodic Evaluation shall include all the external features and internal features which are accessible without sectioning This inspection shall be performed by individual(s) from the suppliers organization with responsibility for dimensional and metallurgical quality of the castings and shall include: a) A review of the NCR and CAR history. All characteristics that have shown as discrepant in the past shall be verified. b) A visual examination of the sample casting for evidence of process problems such as excessive grinding, mismatches, irregular fillets and other conditions which may indicate tooling wear and which may require corrective action. c) When a casting requires inspection in a fixture, characteristics which the fixture is used to inspect shall be reviewed for evidence of core shift, tooling wear and other abnormalities. Results of this review shall be documented and used when evaluating other dimensional data and when determining when corrective action is required to prevent discrepancies. d) Characteristics which have been reviewed using an inspection fixture do not require layout inspection. A notation indicating that the feature was acceptable by fixture inspection on the inspection report is acceptable Sample Identification Unless otherwise approved by Eaton, all samples which are not fully processed or NDT acceptable and submitted as a whole casting shall have a l/8" diameter drilled hole in a pressure passage wall. This will prevent the part from passing pressure test. In addition, if the casting is not sectioned or covered with blue or red dykum, the part shall be conspicuously identified with paint Sample castings serial numbers shall be marked in the area and by the method specified on the drawing or VQR. If the location is not specified or if a question arises as to the feasibility of marking, the supplier should obtain appropriate instructions through Purchasing Shipping containers shall be clearly marked "Sample Castings" DESTRUCTIVE TESTING 11.1 The supplier shall test material for mechanical properties per the blueprint and/or VQR After supplier testing, mechanical and chemical evaluation is to be submitted to and tested by Eaton Laboratories. Eaton laboratory s test results are to become part of the first article The location of tensile specimens excised from castings shall be clearly defined on a sketch accompanying the first article report Where blueprints do not require specimens cut from a casting, Eaton may require tensile-test specimens cut from a casting for an information basis on initial samples. These results will be used to evaluate a foundry process change and monitor casting production. This requirement will be specified on the purchase order The vendor shall include, with the sample report, the destroyed casting remains, a sketch indicating the areas tested and the tensile results for each area.

9 Page 9 of The vendor shall be advised of previously established mechanical properties and locations on castings when applicable. The new supplier will evaluate the same areas and report results. Results must be similar or superior to previously established mechanical properties Pratt & Whitney Casting Sectioning: When required by the VQR the Foundry control inspection shall include the sectioning of castings. The sectioning plan shall be approved by Eaton. When Pratt & Whitney Casting Sectioning is specified one casting shall be sectioned every 2 years except for a part number which is procured in quantities of less than 100 per year which will require sectioning every (36) thirty-six months or 200 pieces which ever comes first. A damaged part that is otherwise dimensionally and NDT acceptable and representative of the current production lot should be used for this requirement. The evaluation shall be the same as performed on the Third First Article Sample. (Mechanical testing is not required). The results of this evaluation shall be recorded and forwarded to Eaton Quality. The sectioned part shall be retained at the foundry until the next casting is sectioned General Casting Sectioning: When required by the VQR the Foundry control inspection shall include the sectioning of castings. The sectioning plan shall be approved by Eaton. When General Casting Sectioning is specified one casting shall be sectioned every 2 years except for a part number which is procured in quantities of less than 100 per year which will require sectioning every (36) thirty-six months or 200 pieces which ever comes first. A damaged part that is otherwise dimensionally and NDT acceptable and representative of the current production lot should be used for this requirement. The evaluation shall be the same as performed on the Third First Article Sample. (Mechanical testing is not required). The results of this evaluation shall be recorded and forwarded to Eaton. The sectioned part shall be retained until the next casting is sectioned Paragraphs 11.5 and 11.6, while having the same requirements are both listed to retain integrity of VQRs Sectioning is required from the first lot after anniversary date of the last sectioned part EVALUATION AND DISPOSITIONING OF SAMPLES 12.1 Materials Cell Quality Assurance shall document sample evaluation on form ARG-693 "Casting or Forging Sample Release or Rejection" The form ARG-693 shall list the date initiated, part name, part number, purchase order number, sample serial number(s), supplier name, latest blueprint change letter, material and heat treatment, purpose of the inspection, results of the inspection and disposition of samples When applicable, the form ARG-693 shall also list the Master Receiving Record Number, manufacturing lot number, heat number, casting weight and the quantity inspected Supplier Quality Assurance shall review inspection results for accuracy and completeness.

10 Page 10 of When there are no discrepancies listed, Supplier Quality will disposition the sample as acceptable. Dimensions that are near tolerance limits may require correction to prevent discrepancies due to casting process variation Any discrepancies which may effect tooling or finish stock will be reviewed by Supplier Quality and Process Engineering. Disposition shall be documented in section 2 of form ARG All discrepancies shall be reviewed by Supplier Quality Assurance and Product Engineering. One of the following dispositions shall be made for each discrepant characteristic and the disposition shall be documented in section 4 of form ARG-693: A. Acceptable, blueprint will not be changed: Discrepancy is acceptable for the life of the casting tooling. This discrepancy does not effect the design intent. B. Acceptable, blueprint will be changed: Discrepancy is acceptable and will become a permanent part of the design. C. Tooling Correction is required, parts currently in process or a limited quantity of parts having this discrepancy are acceptable. This disposition is used when parts in process can only be used conditionally such as for engineering development or the discrepancy would effect design intent if severity increases. Limitation shall be specified in the appropriate blocks in section 4 of form ARG D. Correction is required; parts exhibiting this discrepancy cannot be used. This disposition is used when Supplier Quality Assurance and/or Product Engineering determine that a discrepant characteristic would affect the design intent. φ 12.6 There shall be a final review of the first article by the Supplier Quality Manager or Casting Team Leader The supplier shall be notified by Purchasing of the final disposition with one copy of form ARG When casting weight control is a requirement on the blueprint the weight shall be determined from the first 100 castings. The established weight will be negotiated with supplier. Gates, risers and other positive metal surface irregularities on machined surfaces will be snagged to.010 maximum silhouette for weight determination. Any overweight casting will be unacceptable. The supplier shall determine the cause of the excessive weight. A. If excessive material on the machine surfaces is the cause of discrepancy, the sample shall be approved. B. Castings with excessive weight may have stock removed by an approved method within the blueprint tolerance from surfaces which "REMAIN CAST" on final configuration After completion of the required tests and inspection, the dimensional inspected samples shall be retained by Eaton. The First Article Sample shall be permanently identified by date and symbol circle f, stored in the layout retention area for life of tooling. Subsequent inspection samples may be stored until the next sample is placed in storage If the sample lot included more castings than required, the additional castings shall be transferred to production stock if dispositioned acceptable.

11 Page 11 of MAINTANANCE OF TOOLING 13.1 After samples have been accepted by Eaton, a certified tool list shall be furnished by the vendor. This shall include a basic description of each item, (core box, iron shell box, die etc.), number of same cavities, if different cavities identify component cavity in each box, and list the number of loose pieces which are not permanently fastened to basic item. This tool list shall be submitted on a vendor's letter head, or on form that is acceptable to Eaton Supplier Quality Eaton tooling at supplier facilities shall be maintained such as to produce acceptable castings. Proof of condition of patterns or die shall be provided upon request of Product Assurance, or at any point in the order where Eaton or the vendor detects a non-conforming or deteriorating condition. Additional tooling examination shall not interfere with product flow and should be made any time problems are suspected The supplier shall maintain fixtures to prevent damage and maintain accuracy. In lieu of annual fixture inspection, the vendor is permitted to scribe the target feature sizes and datum lines on a casting. This casting shall be kept with fixture. Prior to each use, the casting is evaluated in the fixture to assure fixture compliance to specification. Actual fixture inspection should be made only to resolve suspected problems Eaton property shall be stored to prevent deterioration, physical damage or corrosion Inactive casting tooling that the foundry does not want to store shall be processed per SOP FOUNDRY PROCESS CONTROL To control the "Frozen" casting process, as stated in applicable material specifications, QCP 5.8 and all casting VQR's, the foundry shall prepare a master control document. This document shall be type written or hand written in ink with no errors. An Eaton representative will sign the master control document at the foundry after metallurgical approval has been issued. Any changes or strike outs shall be initialed by Eaton. The procedure shall contain all the applicable characteristics listed below. These characteristics require process re-evaluation by Eaton prior to permanent change to the process and/or tooling. Specific elements and parameters not listed below that are critical to the process shall also be specified on the master control document and shall not be altered without prior Eaton approval. When different mold or core materials are introduced, Eaton shall be notified prior to production release. Any castings produced using an unapproved procedure, this includes samples from experimental process revisions, shall not be shipped without prior approval. On an audit visit the procedures on the floor will be compared to this master control document for compliance. NOTE: NONE OF THIS INFORMATION WILL LEAVE THE FOUNDRY. Critical elements where applicable shall include:

12 Page 12 of Tooling. Changes to tooling such as core register, core print, parting lines or replacement of lost or damaged pieces. Any dimensional corrections must be verified by inspecting sample castings prior to production release. The foundry shall maintain records of this verification Rigging. Any changes, additions or deletions in size, shape or location of runners, gates, risers, sprue, or integral specimen. Location includes contact area, shape and size. Verification of replacement of damaged rigging is foundry responsibility Chills. (Mold) Any change in size, contact area, location or chill material. Cast chills require a pattern or description. If machined, a sketch is required Investment Pattern. Type of wax, size and number of chills (inlays), number of patterns on clusters or tree, attitude of pattern to cluster and wax removal procedures Molds. (Molds include cores, body cores (stacks), green sand and investment molds.) A) Sand: Changes in binders, sand type (grain size or shape) or material, core making process (hand packed-vs-machine blown), core racking, core or mold coating, riser stack size or carbon blacking. The foundry shall be responsible for core box venting rework. B) Investment process: change from solid mold to shell, shell to solid or number of coats of shell or mold materials Mold Assembly. Any changes to fixtures, gages, procedures, mold venting and mold coating. For the gages or fixtures used in the manufacture of casting, the vendor shall have on file a sketch defining as a minimum the critical features of this equipment. Eaton reserves the right to review these fixtures and gages Pouring. Any change affecting pouring cycle time, pour temperature, mold temperature, vacuum assist and when vacuum is applied, length of time mold is held on vacuum, grain modification or refining, chemistry, degassing, sequence of metal preparation, and hot topping Mold Removal. Any changes to shake out, burn out or knock out procedures Heat Treat. Any changes in time, temp., atmosphere, quench procedures and media, racking procedures, and heat treat source Targeting/Qualifying. Any changes to methods or tooling PRODUCTION CASTINGS INSPECTION AND SERIALIZATION 15.1 Unless otherwise specified on the blueprint or VQR, inspection of production castings shall comply with TAP-MS Serialization shall marked in accordance with Eaton spec at the location and using the method specified on the blueprint and/or VQR.

Quality Control Procedures QCP 5.4 Page 1 of 5

Quality Control Procedures QCP 5.4 Page 1 of 5 Quality Control Procedures QCP 5.4 Page 1 of 5 1.0 PURPOSE 2.0 SCOPE SOURCE INSPECTION To establish a system for Source Inspection of material supplied to Eaton Corporation, FSD, Euclid. This procedure

More information

LOST FOAM PROTOTYPING METHODS

LOST FOAM PROTOTYPING METHODS LOST FOAM PROTOTYPING METHODS A Comparison of Methods and Processes Copyright 2002 Austin Group, LLC. All rights reserved. INTRODUCTION TERRY AUSTIN PRESIDENT AUSTIN GROUP, LLC QUINCY, ILLINOIS INTRODUCTION

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

Casting. Training Objective

Casting. Training Objective Training Objective After watching the program and reviewing this printed material, the viewer will learn the essentials of the various metal casting processes used in industry today. The basic principles

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

ARMSTRONG MOLD GRAPHITE DIE CASTING DIVISION

ARMSTRONG MOLD GRAPHITE DIE CASTING DIVISION ARMSTRONG MOLD CORPORATION GRAPHITE DIE CASTING DIVISION Getting Started The Evolution of GDC The GDC technology was developed as a hybrid of traditional permanent mold, graphite mold and the die casting

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

NetShape - MIM. Metal Injection Molding Design Guide. NetShape Technologies - MIM Phone: 440-248-5456 31005 Solon Road FAX: 440-248-5807

NetShape - MIM. Metal Injection Molding Design Guide. NetShape Technologies - MIM Phone: 440-248-5456 31005 Solon Road FAX: 440-248-5807 Metal Injection Molding Design Guide NetShape Technologies - MIM Phone: 440-248-5456 31005 Solon Road FAX: 440-248-5807 Solon, OH 44139 solutions@netshapetech.com 1 Frequently Asked Questions Page What

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

ALUMINUM CASTING PROCESS COMPARISON CHARTS. Copyright 2002 Austin Group, LLC. All rights reserved.

ALUMINUM CASTING PROCESS COMPARISON CHARTS. Copyright 2002 Austin Group, LLC. All rights reserved. ALUMINUM CASTING COMPARISON CHARTS A Qualitative Comparison of Several Competing Processes for the Production of Aluminum Castings The following charts are intended to provide a relative guide to compare

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

CHAPTER 13 LOAD HOOKS

CHAPTER 13 LOAD HOOKS CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

Quality Systems Manual

Quality Systems Manual Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

MIT 2.810 Manufacturing Processes and Systems. Homework 6 Solutions. Casting. October 15, 2015. Figure 1: Casting defects

MIT 2.810 Manufacturing Processes and Systems. Homework 6 Solutions. Casting. October 15, 2015. Figure 1: Casting defects MIT 2.810 Manufacturing Processes and Systems Casting October 15, 2015 Problem 1. Casting defects. (a) Figure 1 shows various defects and discontinuities in cast products. Review each one and offer solutions

More information

APPLYING RAPID TOOLING FOR INJECTION MOLDING & DIE CASTING From a RT users perspective

APPLYING RAPID TOOLING FOR INJECTION MOLDING & DIE CASTING From a RT users perspective APPLYING RAPID TOOLING FOR INJECTION MOLDING & DIE CASTING From a RT users perspective Glenn Anderson Senior Engineer, Research and Development Southco, Inc. RPA/SME Technical Forum on Rapid Tooling 20

More information

3D Printed Injection Molding Tool ("PIMT") Guide. Objet Ltd.

3D Printed Injection Molding Tool (PIMT) Guide. Objet Ltd. 3D Printed Injection Molding Tool ("PIMT") Guide Objet Ltd. 2 Injection molding is a high speed, automated and versatile process that can produce high precision complex three dimensional parts from a fraction

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

Quality Control Procedures QCP 13.0 Page 1 of 6

Quality Control Procedures QCP 13.0 Page 1 of 6 Quality Control Procedures QCP 13.0 Page 1 of 6 1.0 PURPOSE CONTROL OF QUALITY RECORDS To define the method for the identification, collection, indexing, filing, access, storage, maintenance and disposition

More information

DIESEL EFFECT PROBLEM SOLVING DURING INJECTION MOULDING

DIESEL EFFECT PROBLEM SOLVING DURING INJECTION MOULDING RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA 2014 Volume 22, Special Number DIESEL EFFECT PROBLEM SOLVING DURING INJECTION MOULDING

More information

Quality Assurance Manual. QAM-2013-Rev2

Quality Assurance Manual. QAM-2013-Rev2 QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality

More information

LiftAlloy Chain Slings

LiftAlloy Chain Slings CHAIN SLING BASICS Slings Lift-All chain slings meet or exceed all OSHA, ASME B30.9 and NACM standards and regulations. chain slings, available in 80 for 7/32" and 7/8"- /4" and 00 for 9/32"-3/4", are

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

Production Part Approval Process 4 th Edition

Production Part Approval Process 4 th Edition Production Part Approval Process 4 th Edition 13.01.2007 Seite 1 It s the goal of this lecture to to show you the basic content and the rules of the Production Part Approval Process and to explain the

More information

DIE CASTING. This process if for high volume, high detail, and value added economically priced cast parts. HOW IT WORKS

DIE CASTING. This process if for high volume, high detail, and value added economically priced cast parts. HOW IT WORKS DIE CASTING PROCESS This process if for high volume, high detail, and value added economically priced cast parts. HOW IT WORKS A metal tool is built and attached to a furnace of molten metal Then molten

More information

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * PRODUCT: Polymer (Foam-Filled) Fuel Cells 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards

More information

A Guide to Thermoform Processing of Polypropylene. Introduction

A Guide to Thermoform Processing of Polypropylene. Introduction A Guide to Thermoform Processing of Polypropylene Introduction Thermoforming is the process of heating plastic sheet to a pliable state and forming it into shape. Thermoforming offers processing advantages

More information

TITANIUM FABRICATION CORP.

TITANIUM FABRICATION CORP. TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,

More information

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2

PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2 PRODUCTION PART APPROVAL PROCESS (PPAP) Section 2 PRODUCTION SUBMISSION REQUIREMENTS (PPAP) Refer to the AIAG s Production Part Approval Process (PPAP) manual, (latest edition). The default submission

More information

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS

INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

Application Example: Quality Control of Injection-Molded Parts

Application Example: Quality Control of Injection-Molded Parts Application Example: Quality Control of Injection-Molded Parts Measuring Systems: ATOS Keywords: Optical 3D measuring technology, mold try-out, first article inspection, form and dimension inspection of

More information

CLASSIFICATIONS OF INJECTION MOLDS

CLASSIFICATIONS OF INJECTION MOLDS CLASSIFICATIONS OF INJECTION MOLDS General Notes The following classifications are guidelines to be used in obtaining quotations and placing orders for uniform types of molds. It is our desire, through

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS 1. SCOPE 1.1 This specification covers the type, physical properties and dimensions of Expanded Polystyrene Insulation Board intended for use

More information

CITY OF BEAUFORT SOLICITING SEALED PROPOSALS FOR MOBILE REFUSE CARTS

CITY OF BEAUFORT SOLICITING SEALED PROPOSALS FOR MOBILE REFUSE CARTS CITY OF BEAUFORT SOLICITING SEALED PROPOSALS FOR MOBILE REFUSE CARTS The City of Beaufort is requesting sealed, competitive, proposals for interested Vendors to provide the City of Beaufort fifty-five

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH

DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH Applied Manufacturing Technologies 219 Kay Industrial Drive, Orion, MI 48359 (248) 409-2100 www.appliedmfg.com 2 Die Casting Automation: An Integrated

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

SHIMS STAMPINGS MACHINED COMPONENTS

SHIMS STAMPINGS MACHINED COMPONENTS SHIMS STAMPINGS MACHINED COMPONENTS The Spirol Concept WE ARE SHORT-RUN PRODUCTION SPECIALISTS Our objective is to provide our customers with the highest quality, short run stamped and machined components,

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared

More information

Die casting Figure M2.3.1

Die casting Figure M2.3.1 Die casting Die casting is a moulding process in which the molten metal is injected under high pressure and velocity into a split mould die. It is also called pressure die casting. The split mould used

More information

North Carolina FFA Association Agricultural Mechanics Career Development Event

North Carolina FFA Association Agricultural Mechanics Career Development Event North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance

More information

Tolerance Charts. Dr. Pulak M. Pandey. http://paniit.iitd.ac.in/~pmpandey

Tolerance Charts. Dr. Pulak M. Pandey. http://paniit.iitd.ac.in/~pmpandey Tolerance Charts Dr. Pulak M. Pandey http://paniit.iitd.ac.in/~pmpandey Introduction A tolerance chart is a graphical method for presenting the manufacturing dimensions of a workpiece or assembly at all

More information

4 FAH-2 H-210 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS

4 FAH-2 H-210 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS 4 FAH-2 H-200 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS 4 FAH-2 H-210 REQUISITIONING, RECEIVING, AND CONTROLLING CHECK STOCK, AND SIGNATURE DIE (Office of Origin: CGFS/FPRA/FP)

More information

Lamination Production. by: John Roberts / Sko Die, Inc

Lamination Production. by: John Roberts / Sko Die, Inc Lamination Production by: John Roberts / Sko Die, Inc Presentation Mission Understand the construction for magnetic cores Chose the best methods for producing Magnetic cores are constructed From soft magnetic

More information

A Systematic Approach to Diagnosing Mold Filling and Part Quality Variations

A Systematic Approach to Diagnosing Mold Filling and Part Quality Variations VOL. 3 NO. 2 A Systematic Approach to Diagnosing Mold Filling and Part Quality Variations www.beaumontinc.com A Systematic Approach to Diagnosing Mold Filling and Part Quality Variations Applying Fundamental

More information

Quality Control Procedures QCP 5.5 Page 1 of 5

Quality Control Procedures QCP 5.5 Page 1 of 5 Quality Control Procedures QCP 5.5 Page 1 of 5 1.0 PURPOSE CERTIFIED SUPPLIER PROGRAM To establish quality requirements for the selection, implementation and maintenance of the Certified Supplier Program.

More information

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE

More information

Electrical Wiring Technical Bulletin

Electrical Wiring Technical Bulletin Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions Y Parts Included: Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions Tools Required: Power Driver Drill Bit (Determined by fastener) Driver Bit (Determined by fastener)

More information

FRICTION MATERIALS & BONDING SERVICES

FRICTION MATERIALS & BONDING SERVICES FRICTION MATERIALS & BONDING SERVICES World Class Friction Materials & Bonding Services The Industry Leader Midwest Brake has been a leading supplier of non asbestos industrial friction material and bonding

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Gulfstream Production Certificate Operations

Gulfstream Production Certificate Operations SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.

More information

Determining the Right Molding Process for Part Design

Determining the Right Molding Process for Part Design Determining the Right Molding Process for Part Design How RIM Molding Advantages Compare with Traditional Production Technologies Page 2 Introduction This White Paper details the part production processes

More information

GUARDRAIL POST STEEL

GUARDRAIL POST STEEL GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating

More information

COMPETENCE IN ALUMINIUM AND MAGNESIUM HIGH PRESSURE DIE CASTING

COMPETENCE IN ALUMINIUM AND MAGNESIUM HIGH PRESSURE DIE CASTING COMPETENCE IN ALUMINIUM AND MAGNESIUM HIGH PRESSURE DIE CASTING 2014 Make use of our experience. For your advantage. Foundry experts worldwide in the field. Source of pic: //blog.mercedes-benz-passion.com/2010/02

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0

More information

Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998)

Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) 1 Scope This part of EN 10228 describes the method and acceptance criteria to be used for the penetrant testing

More information

Essentials Welding QA/QC Plan Sample

Essentials Welding QA/QC Plan Sample Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the

More information

Engineering & Design: Coordinate Dimensioning

Engineering & Design: Coordinate Dimensioning s e c t i o n Section Contents NADCA No. Format Page Frequently Asked Questions (FAQ) -2 1 Introduction -2 2 Section Objectives -3 3 Standard and Precision Tolerances -3 4 Production Part Technologies

More information

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Supplier Requirements for Beckwith Electric Co., Inc. Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality

More information

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).

More information

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history. Revision History COPY The top row of this table shows the most recent changes to this controlled document. For previous revision history information, archived versions of this document are maintained by

More information

Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid

Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid 1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies

More information

Free Examples of plant layout drawing

Free Examples of plant layout drawing Free layout examples; a wide variety of industrial layouts, within different facility types. Principles of plant layout and design will apply widely. Free Examples of plant layout drawing Principles of

More information

Part and tooling design. Eastman Tritan copolyester

Part and tooling design. Eastman Tritan copolyester Part and tooling design Eastman Tritan copolyester Part and tooling design Process Part design Tooling design High cavitation considerations Process Process Project development flow chart Concept OEM generates

More information

Material and Components Used for UL/C-UL/ULC Mark Follow-Up Services

Material and Components Used for UL/C-UL/ULC Mark Follow-Up Services MARK INTEGRITY PROGRAM UL Traceability Requirements Material and Components Used for UL/C-UL/ULC Mark Follow-Up Services UL defines minimum requirements for material and components used in UL certified

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing 1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado

More information

Philosophy of Troubleshooting Injection Molding Problems

Philosophy of Troubleshooting Injection Molding Problems PLASTICS ENGINEERING COMPANY SHEBOYGAN, WISCONSIN 53082-0758 U.S.A 3518 LAKESHORE ROAD POST OFFICE BOX 758 PHONE 920-458 - 2121 F A X 920-458 - 1923 Philosophy of Troubleshooting Injection Molding Problems

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

How To Manage A Plant

How To Manage A Plant MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal

More information

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion

TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion B. J. Sanders Consultant 307 Meyer Street Alvin, Texas 77511 TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT After a decision has been made to use zirconium as the material of construction for a shell

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

CHAPTER 1. Introduction to CAD/CAM/CAE Systems

CHAPTER 1. Introduction to CAD/CAM/CAE Systems CHAPTER 1 1.1 OVERVIEW Introduction to CAD/CAM/CAE Systems Today s industries cannot survive worldwide competition unless they introduce new products with better quality (quality, Q), at lower cost (cost,

More information

Field Welding Inspection Guide

Field Welding Inspection Guide Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding

More information

Automotive Applications of 3D Laser Scanning Introduction

Automotive Applications of 3D Laser Scanning Introduction Automotive Applications of 3D Laser Scanning Kyle Johnston, Ph.D., Metron Systems, Inc. 34935 SE Douglas Street, Suite 110, Snoqualmie, WA 98065 425-396-5577, www.metronsys.com 2002 Metron Systems, Inc

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

Camar Aircraft Parts Co. Procedures Manual

Camar Aircraft Parts Co. Procedures Manual QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign

More information

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend

More information

Section i POLICY AND AUTHORITY STATEMENT

Section i POLICY AND AUTHORITY STATEMENT Section i POLICY AND AUTHORITY STATEMENT It is the policy of Laboratory Testing, Incorporated (LTI)*, as a Material Organization, to furnish and perform testing services in nondestructive, mechanical,

More information

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

SUPPLIER QUALITY ASSURANCE REQUIREMENTS SUPPLIER QUALITY ASSURANCE REQUIREMENTS The following supplier quality assurance requirements, referenced by number on the Purchase Order, are an integral part of each order placed by Continental Disc

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

SOLUTIONS FOR MOLD DESIGNERS

SOLUTIONS FOR MOLD DESIGNERS SOLUTIONS FOR MOLD DESIGNERS White Paper Abstract For CAE analysis tools to be truly useful, they must provide practical information that drives design decisions. Moldflow Plastics Advisers (MPA ) solutions

More information