1 Appendix 9A DSM Implementation Plan

2 Table of Contents 1 Context and DSM Strategy Legal and Policy Context Definition of DSM British Columbia s Energy Objectives Future Approval Process DSM Regulation Bill 32 (Energy and Water Efficiency Act) Conservation Potential DSM Strategy DSM Plan Description Contents Energy-focused DSM Capacity-focused DSM Energy and Capacity Savings Energy-focused DSM Capacity-focused DSM Utility Costs Justification Energy-focused DSM Cost-Effectiveness Rate Impact Environmental and Economic Benefits Comprehensive and Flexible Policy Alignment Capacity-focused DSM Alignment with Clean Energy Act DSM Risk Management Risk Mitigation Codes and Standards Rate Structures Programs Portfolio Performance Management Page 9A-i

3 List of Figures Figure 1 DSM Strategic Framework... 5 List of Tables Table 1 DSM Tools and the Strategic Contexts... 6 Table 2 Energy-Focused DSM Tools and Initiatives in DSM Option Table 3 Supporting Initiatives Table 4 Capacity-focused Program Areas Table 5 Energy-focused DSM: Cumulative Energy Savings since F2012 at Customer Meter in F2021 (GWh) (mid) Table 6 Energy-focused DSM: Cumulative Associated Capacity Savings since F2012 at Customer Meter in F2021 (MW) (mid) Table 7 Capacity-focused DSM: Cumulative Capacity Savings since F2012 at Customer Meter in F2021 (MW) (mid) Table 8 Utility Costs ($ million) Page 9A-ii

4 1 Context and DSM Strategy BC Hydro s Demand-Side Measure (DSM) Implementation Plan is guided by government legislative requirements and policies including Bill 32 (Energy and Water Efficiency Act) (section 1.1), an estimate of the potential energy and capacity savings that could be achieved among BC Hydro s customers (section 1.2) and BC Hydro s strategy for attaining this DSM potential (section 1.3). The DSM Implementation Plan describes how BC Hydro will implement the DSM recommendations of the IRP (section 2). The remainder of the Plan provides a justification for proceeding with implementation and a discussion of risk management tactics. 1.1 Legal and Policy Context Definition of DSM The term demand-side measure is broadly defined in subsection 1(1) of the British Columbia (B.C.) Clean Energy Act 1 (CEA): demand-side measure means a rate, measure, action or program undertaken (a) to conserve energy or promote energy efficiency, (b) to reduce the energy demand a public utility must serve, or (c) to shift the use of energy to periods of lower demand, but does not include (d) a rate, measure, action or program the main purpose of which is to encourage a switch from the use of one kind of energy to another such that the switch would increase greenhouse gas emissions in British Columbia, or (e) any rate, measure, action or program prescribed. 1 S.B.C. 2010, c 22. Page 9A-1

5 With respect to (e), to date no rate, measure, action or program has been excluded by B.C. Minister of Energy regulation under subsection 37(b) of the CEA. BC Hydro does not consider the following to be DSM, all of which is captured in BC Hydro s Load Forecast: Closure of industrial facilities as a result of economic conditions; Rate increases from Revenue Requirement Applications (RRAs) or as set out in BC Hydro s Long Term Rate Forecast (LTRF) (as opposed to conservation rate structures described below); Natural conservation, defined as natural changes in efficiency that are expected to occur in the absence of DSM initiatives British Columbia s Energy Objectives The following British Columbia s energy objectives are relevant to BC Hydro s DSM Plan: To achieve self-sufficiency (CEA, subsection 2(a)). Subsection 6(2) of the CEA requires that BC Hydro achieve electricity self-sufficiency by 2016 and each year thereafter. To take demand-side measures and to conserve energy, including the objective of BC Hydro reducing its expected increase in demand for electricity by the year 2020 by at least 66 per cent (CEA, subsection 2(b)). To use and foster the development in B.C. of innovative technologies that support energy conservation and efficiency (CEA, subsection 2(d)). To reduce greenhouse gas emissions (CEA, subsection 2(g)) To encourage communities to reduce GHG emissions and use energy efficiently (CEA, subsection 2(i)). Page 9A-2

6 To reduce waste by encouraging the use of waste heat (CEA, subsection 2(j)). and To encourage economic development and the creation and retention of jobs (CEA, subsection 2(k)) Future Approval Process Pursuant to subsection 44.2(1)a of the UCA, BC Hydro will file an application for BCUC approval of expenditures related to the DSM Plan. It is expected that the application will include an updated DSM Plan that will reflect new information available at the time of filing on plan performance, DSM costs and energy savings opportunities DSM Regulation In its determination of DSM cost-effectiveness when considering DSM expenditure applications, the BCUC must consider and be guided by the Demand Side Measures Regulation. 2 The Total Resource Cost (TRC) test results reported in Attachment 1, Tables 5 and 6, have been calculated in accordance with this Regulation Bill 32 (Energy and Water Efficiency Act) Bill 32 (Energy and Water Efficiency Act) provides a new framework for the development, administration and enforcement of codes and standards. Together with the Pacific Coast Collaborative s 2012 West Coast Action Plan on Jobs that seeks to jointly develop energy efficiency upgrades, technologies and standards, additional and more cost effective DSM savings would be anticipated. 1.2 Conservation Potential BC Hydro s DSM strategy development is grounded in an estimate of the size of the electricity conservation and efficiency resource, being the potential to save electricity through DSM measures. The 2007 Conservation Potential Review (CPR) 2 Pursuant to section 44.2(5.1)(d) of the UCA. Page 9A-3

7 estimated the potential energy and capacity savings that could be achieved among BC Hydro s customers from 2006 to The CPR is a technical, end-use analysis of where, how and at what cost electricity demand in British Columbia could be reduced and estimates potential savings without assuming which DSM tools would be employed. The CPR identified 19,000 GWh/year of economic potential electricity savings by F2021 at a cost less than 13 cents/kwh. In addition, further savings are possible through changes that are not reflected in the CPR estimates, such as lifestyle changes, emerging technologies beyond those reflected in the CPR and step-changes in energy efficiency technologies. 1.3 DSM Strategy BC Hydro s strategic objective to Mind Our Footprint outlines the goal of fostering an energy conservation and efficiency culture. This objective is the starting point for BC Hydro s DSM strategy. The strategic framework introduced in the 2008 LTAP continues to influence BC Hydro s thinking on achieving electricity savings. 3 The framework depicts three levels through which conservation and efficiency actions can be influenced. (i) (ii) Individual refers to the context of the individual consumer who makes decisions about energy-using equipment and buildings and how to operate or use them. Market refers to the context of the marketplace where a number of market parameters, such as prices and rules, influence decisions about energy consumption and conservation by all consumers and market players. (iii) Societal refers to the context of the community or society where societal norms and patterns of living and work influence market parameters and individual choices. The figure below provides a visual representation of the three contexts. 3 The strategic framework is consistent with that developed by BC Hydro s Electricity Conservation and Efficiency Advisory Committee. Page 9A-4

8 Figure 1 DSM Strategic Framework Societal Market Individual With the strategic framework as its foundation, BC Hydro s DSM strategy is to pursue a diverse set of DSM tactics that: Transform British Columbia s economy by changing market parameters and shifting societal norms and patterns to increase energy efficiency and conservation, Collaborate with customers and partners to leverage our efforts, and Integrate with other offers and efforts, both internally and with other organizations, to increase the effectiveness of programs and support market and societal initiatives. The DSM tactics fall under the following categories: Codes and standards, designed to influence energy efficiency through regulations on equipment, buildings and industry, tax measures and municipal zoning and building permitting processes. Page 9A-5

9 Conservation rate structures aimed at conserving energy, promoting energy efficiency or reducing the demand BC Hydro must serve, such as the Residential Inclining Block (RIB) rate, the Large General Service (LGS) rate, and the Transmission Service Rate (TSR). Energy-focused programs, designed to address barriers to energy efficiency and conservation and capture additional conservation potential after codes and standards and conservation rate structures, as well as to set the stage for further changes to codes and standards; Capacity-focused programs, including industrial load curtailment and a suite of technology-focused programs, to specifically achieve capacity savings during BC Hydro s system peak by addressing barriers to peak shaving and peak shifting; Supporting initiatives, including support for the adoption of codes and standards by various levels of government; public awareness and education; community engagement; technology innovation; information technology; and indirect and portfolio-level enabling activities that provide a critical foundation for the success of the DSM tools in the DSM Plan. Table 1 DSM Tools and the Strategic Contexts Individual Market Societal Codes & Standards Rate Structures Energy-focused Programs Capacity-focused Programs Supporting Initiatives 2 DSM Plan Description As described in Chapter 9, three key recommendations are made in the area of DSM energy and capacity savings. Page 9A-6

10 (i) (ii) Pursue DSM Option 3 - Increase energy savings target to 9,800 GWh per year by F2021 (1,000 GWh more than the current plan) based upon the first two LNG loads being confirmed, through conservation and efficiency programs, incentives and regulations. 4 The utility cost of Option 3 over the four-year period of F2014 F2017 is estimated to be $1.4 billion. Advance DSM Options 4 & 5 Explore more codes, standards, and rate options for savings beyond the 9,800 GWh target. This action supports Bill 32 (Energy and Water Efficiency Act). It also supports BC Hydro s preparation for the next IRP and has an approximate cost of $7 million from F2014 F2017. (iii) Pursue DSM Capacity Options - Pursue voluntary capacity-focused conservation programs that encourage residential, commercial and industrial customers to reduce energy consumption during peak periods. The utility cost of DSM capacity options over the four-year period of F214 F2017 is estimated to be $143 million. This section summarizes the contents of the DSM Plan. 2.1 Contents The DSM Plan is made up of three DSM tools -- codes and standards, conservation rate structures and programs -- along with six supporting initiatives focused on energy and capacity savings. The Plan is flexible and will be adjusted over time as appropriate to account for new information or new opportunities. The following sections describe these tools and initiatives Energy-focused DSM Table 2 summarizes the energy-focused initiatives within each of the DSM tools. Each of these tools is described in turn. 4 DSM Option 3 targets energy savings by F2021 equivalent to approximately two Site C projects. Page 9A-7

11 Table 2 Energy-Focused DSM Tools and Initiatives in DSM Option 3 Tools Codes and Standards Rate Structures Lighting Torchieres Traffic & Pedestrian Lights Ceiling Fans Fluorescent Lamps Residential Appliances Dishwashers Portable Air Conditioners Room Air Conditioners Residential Electronics Standby Power Digital Television Adapters External Power Supplies Other Residential Equipment Furnace Blower Motors Hot Tubs Building Codes BC Building Code Commercial/Industrial Equipment Commercial Clothes Washers Ice Makers Commercial Refrigeration Dry Transformers Large Air Conditioners Residential Inclining Block Large General Service Medium General Service Small General Service Transmission Service Initiatives High Intensity Discharge Lamps and Ballasts Incandescent Reflector Lamps Fluorescent Ballasts General Service Lamps Clothes Washers Freezers Refrigerators Battery Chargers Set-Top Boxes Televisions Electric Water Heaters City of Vancouver Building By-law Liquid-filled Transformers Single Package Vertical Air-conditioners Packaged Terminal Air Conditioners Pre-rinse Spray Valves Large Motors Page 9A-8

12 Tools Initiatives Programs Residential Behaviour Lighting Refrigerator Buy-Back Low Income New Home Appliances Consumer Electronics Renovation Rebate Load Displacement Sector Enabling Activities Commercial Power Smart Partner Product Incentive New Construction Load Displacement Sector Enabling Activities Industrial Power Smart Partners, Transmission Power Smart Partners, Distribution New Plant Design Load Displacement Sector Enabling Activities Cross Sector Lead By Example Codes and Standards The term codes and standards refers to a range of government policy instruments that can influence energy efficiency, including product/equipment regulations, building codes, tax measures and municipal zoning and building permitting processes. Codes and standards are coordinated with programs to help drive the efficient technologies and practices. The DSM Plan supports and relies on government implementation of a suite of changes to codes and standards. The codes and standards included in DSM Option 3 have either been enacted, announced or are planned by government. The provincial government has introduced Bill 32 (Energy and Water Efficiency Act) and initiated development of additional codes and standards since DSM Option 3 was developed. The DSM Plan will support the development of these additional codes and standards and rely on their eventual implementation. Electricity savings from additional codes and standards will increase the prospect of achieving targeted Page 9A-9

13 electricity savings and may allow BC Hydro to reduce its DSM costs relative to those forecast in this DSM Plan. Additional details on the codes and standards projected in the DSM Plan are provided in Attachment 3. While these actions are expected to result in further codes and standards to rely upon in the future, BC Hydro will continue to pursue and rely on Option 3 until sufficient certainty has been achieved to adjust future DSM implementation plans Rate Structures Rate structures are changes to the design of electricity rates to provide more economically efficient price signals to customers which encourage conservation, while collecting the same amount of revenue as previous rate structures. BC Hydro has conservation rates in place (or with planned implementation) for 92 per cent of its domestic load. Over the past five years, BC Hydro has implemented four conservation rate structures for residential, commercial and industrial customers. A conservation rate structure for small commercial customers in the Small General Service rate class is planned for introduction in F2018. BC Hydro will continue to consider potential changes to these rate structures that could achieve additional electricity savings Programs The DSM Plan includes a suite of DSM programs that deliver a mix of information, access to efficient technology and services, technical assessment and support, and financial assistance to address barriers to cost-effective energy efficiency, conservation and load displacement. The DSM programs are designed to capture additional DSM energy savings potential that remains beyond that obtained from codes and standards and rate structures. In addition, programs are designed to complement rates structures and are critical in setting the stage for changes to codes and standards. Sector enabling activities, such as trade ally support and training, support the residential, commercial and industrial sector programs in 5 The government has initiated a review of industrial electricity policy, including industrial rates and rate design. Page 9A-10

14 achieving their savings. Programs will be adjusted as appropriate to account for new information, such as aligning incentives with promising codes and standards or changing program designs to work with new DSM financing mechanisms. 6 A description of the program strategy by sector is provided in the following sections. Residential Programs The suite of programs in the residential sector target a range of end-uses and aims to address the barriers faced by all residential customers, including low-income customers, in adopting energy efficiency and conservation measures. The residential programs are designed to complement the RIB rate by helping customers to respond to its conservation price signal and to set the stage for changes to codes and standards, as they can help to advance and prepare the market for the adoption of a regulation by government and acceptance by customers. Behaviour: Provides customers with information and motivation to reduce their consumption, including incentives to increase participation. This program will be further enhanced with the introduction of Smart Metering, through the introduction of in-home feedback. Lighting: Targets increasing the efficiency of residential lighting by providing incentives for residential customers to replace inefficient lighting technologies with energy efficient products and raising awareness of efficient lighting technologies, like specialty CFLs and light emitting diode products. In doing so, the Lighting program sets the stage for government regulations on lighting. Refrigerator Buy-Back: Encourages customers to give up their inefficient second refrigerator, reducing the number of secondary refrigerators in the marketplace. 6 In 2011, the government amended the Clean Energy Act (section 17.1) to enable the establishment of new energy efficiency financing mechanisms by public utilities. Page 9A-11

15 Low-Income: Targets the energy-efficiency of low-income households by addressing capital, awareness and education and other unique barriers that often prevent these customers from participating in other DSM programs. New Home: Encourages builders and developers to incorporate energy-efficient products and design at construction, in order to increase the market share of energy efficient new home construction and set the stage for changes to the energy efficiency requirements in the BC Building Code. Appliances: Encourages customers to consider energy efficiency when making their appliance purchases by increasing awareness and providing upstream incentives to retailers for targeted energy efficient products. Consumer Electronics: Aimed at reducing the electricity consumption of televisions and computers by residential customers through upstream incentives directed at retailers. Renovation Rebate: Encourages residential customers to undertake energy efficient upgrades to their existing homes, primarily focused on their space heating load. This program is embedded within the provincial government s LiveSmart BC offer and is managed and administered by the Ministry of Energy in conjunction with BC Hydro and Fortis BC providing a seamless, fuel-neutral and simple offer for customers. Load Displacement: Expected to start in F2015, this program will target the displacement of residential load through solar PV arrays for home use. The objective of the program will be to prepare the market to take off when these technologies become cost-effective in the future. Finally, the DSM Plan includes residential Sector Enabling activities such as home energy labelling, development of a financing initiative to provides access to loans for energy efficiency home improvements, training to tradespeople and other partners to enable them to deliver energy efficiency solutions and retailer partnerships that support the success of residential DSM initiatives. Page 9A-12

16 Commercial Programs The Commercial programs address the diverse needs and barriers businesses face in undertaking energy conservation and efficiency measures. The suite of offers includes financial resources, tools and education to identify and implement energy saving capital projects and help to instil a conservation culture in the workplace. The programs and sector enabling activities are designed to set the stage for changes to codes and standards and to help customers respond to the conservation price signals delivered by the LGS and MGS rate structures. This is realized through a variety of program offers. The Power Smart Partners program targets larger customers to implement energy efficiency retrofits, make operational and maintenance changes, behavioural changes and to integrate energy management into their ongoing business practices and corporate culture. The Product Incentive program provides a simple mechanism to help businesses implement simple retrofits as well as operations and maintenance and behavioural actions. The New Construction program targets electricity savings of new commercial buildings through more efficient design and construction relative to standard practice and aims to transform the new commercial building industry to a higher level of energy efficiency by influencing developers, designers, architects and engineers. In the process, this program sets the stage for changes to the energy efficiency requirements in the B.C. Building Code. The commercial load displacement program (expected to start in F2015) will capture energy savings by displacing existing electrical load at the customer site through the implementation of a range of renewable distributed generation projects. The DSM Plan also includes commercial sector enabling activities, which include the Power Smart Alliance, which fosters collaborative relationships with energy efficiency contractors, consultants, architects and design teams, the ecatalog which addresses the availability barrier for energy efficiency products aimed at business customers, and activities to further develop building labelling and a financing Page 9A-13

17 initiative to provides access to loans for energy efficiency measures and to build workforce capacity in energy management. Industrial Programs The Industrial programs target opportunities among large industrial customers, such as customer-based generation, process improvements, industrial equipment upgrades and operations and maintenance improvements, as well as opportunities in small and medium-sized industrial customers, such as lighting, compressed air, process improvements and pumping. A primary strategy for the industrial sector is to motivate and support industrial customers to integrate energy management into their businesses and enable customers to undertake more energy efficiency projects. The programs do so by providing tools, education and incentives to help customers overcome barriers to implementing energy efficiency upgrades and improved energy management practices. 7 Industrial programs help customers to respond to the conservation price signals delivered by the TSR and LGS rate structures and set the stage for changes to codes and standards in the future. The Industrial programs are designed to reflect the particular needs of customers (e.g., size or sub-sector). The Power Smart Partners-Transmission program targets large industrial customers who receive electricity supply at transmission voltage to implement energy efficiency retrofits, make operational and maintenance changes, behavioural changes and to integrate energy management their ongoing practices and corporate culture. The Power Smart Partners-Distribution program is aimed at small and medium industrial customers who receive electricity supply at distribution voltage with a similar offer and objectives. The New Plant program provides a comprehensive offer to support efficient facility design for new industrial plants in British Columbia. The Load Displacement program provides support and incentives 7 The programs could also support customer compliance with industrial energy reporting requirements that are contemplated under Bill 32 (Energy and Water Efficiency Act). Page 9A-14

18 for customers to displace purchased electrical load at their site through the implementation of additional on-site generation of electricity. The DSM Plan includes industrial sector enabling activities, such as the Power Smart Alliance, which fosters collaborative relationships with energy efficiency contractors and consultants to industrial customers, education and training on new technologies and best practice information for customers and Alliance members and activities to develop industrial plant certification as a tactic to increase energy efficiency of industrial plants. Lead By Example The Lead by Example program targets electricity savings at BC Hydro s facilities through energy efficiency capital projects and working to instil conservation policies, procedures and behaviours throughout BC Hydro s organization Supporting Initiatives The DSM Plan includes six supporting initiatives, shown in Table 3, that provide a critical foundation of awareness, engagement and other conditions to support the success of the DSM Plan s tools and initiatives. Page 9A-15

19 Table 3 Supporting Initiatives Supporting Initiatives Public Awareness & Education Community Engagement Technology Innovation Codes and Standards Support Information Technology Indirect and Portfolio Enabling Description Addresses market barriers to energy conservation by increasing: awareness of actions people and companies can take, acceptance of energy conservation as being the norm, understanding of the purpose and importance of energy conservation in general and participation in DSM initiatives specifically Leverages the potential of communities and local governments to become energy efficient and embed conservation in community planning, and increase public energy conservation behaviour and interest in Power Smart programs Identifies world-leading energy efficient technologies and accelerates their commercialization and adoption in B.C. Supports government implementation of codes and standards with funding and technical assistance Design, development and deployment of IT infrastructure to support successful implementation of the Updated DSM Plan General management and infrastructure to support implementation of the DSM Plan Advancing Options 4 and 5 As outlined in Chapter 3, section 3.3.1, Options 4 and 5 would involve a shift in DSM tactics to place a greater emphasis on changes in market parameters and societal norms, including additional codes and standards, such as a building retrofit code, and rate structures tied to building or facility energy intensity. These tactics have considerable potential to deliver additional, cost-effective electricity savings but face considerable uncertainty with respect to their feasibility, cost and impacts. The IRP recommends that BC Hydro take action prior to the next IRP to begin to reduce uncertainty about the feasibility and/or savings estimates for a selection of the tactics in Options 4 and Option 5. A significant aspect of these activities will be working with the government implementing Bill 32 (Energy and Water Efficiency Act), and the Pacific Coast Collaborative s 2012 West Coast Action Plan on Jobs. These activities could target building labelling, innovative rate concepts and industrial plant certification. These activities are expected to include: Strategy development Page 9A-16

20 Market research, studies and opportunity assessments; Measure design, including modelling and cost-benefit analysis; Customer, trade ally and/or stakeholder engagement; and Pilots. BC Hydro will develop an implementation plan for these activities for inclusion in future DSM expenditure applications to the BCUC Capacity-focused DSM While the energy-focused initiatives described above generate associated capacity savings, additional capacity savings are achievable through capacity-focused DSM, which targets capacity savings specifically. These activities, namely industrial load curtailment and capacity-focused programs, will be pursued as a long-term capacity resource and could represent a short-term resource if successful. These initiatives represent BC Hydro s first major implementation of capacity-focused DSM, and as a result, experience will need to be gained to increase certainty of the expected electricity savings Industrial Load Curtailment Industrial load curtailment targets large customers who agree to curtail load on short notice in return for a financial payment when total customer load exceeds BC Hydro s capabilities Capacity-focused Programs The programs are designed to provide capacity savings that can be dispatched under utility control. Programs may involve payment for customer equipment and a financial payment for participation in the program. These program efforts will need to be designed to encourage customer participation in the absence of peak and off-peak price signals. In addition, as smart appliances are introduced with the Page 9A-17

21 capability to communicate with smart meters, new capacity-focused opportunities are expected to emerge. Table 4 Capacity-focused Program Areas Residential Commercial Industrial - Water heater control - Thermostat or switch controlled heat - Switch controlled radiant heat - Energy management system load control - Water heater load control - Thermostat or switch controlled heat - Air conditioning load control - Direct load control for distribution customers 2.2 Energy and Capacity Savings The DSM Plan will deliver an increasing volume of energy and capacity savings over a 20-year period. This section provides a snapshot of energy and capacity savings from the DSM Plan at roughly the ten-year mark, in F2021. The energy and capacity savings presented in the tables are the mid savings estimates stemming from the DSM uncertainty assessment, as described in Chapter 5, section and are at the customer meter and do not include additional savings through reduced line losses Energy-focused DSM Table 5 and Table 6 provide expected energy and capacity savings from energy-focused DSM in F2021. Attachment 1 provides more detailed information on savings. Page 9A-18

22 Table 5 Energy-focused DSM: Cumulative Energy Savings since F2012 at Customer Meter in F2021 (GWh) (mid) Codes and Standards Rate Structures Programs Total Residential 1, ,165 Commercial ,507 3,079 Industrial ,084 3,710 Total 2,301 1,438 5,216 8,954 Table 6 Energy-focused DSM: Cumulative Associated Capacity Savings since F2012 at Customer Meter in F2021 (MW) (mid) Codes and Standards Rate Structures Programs Total Residential Commercial Industrial Total , Capacity-focused DSM Table 7 provides a snapshot of expected capacity savings from capacity-focused DSM at roughly the ten-year mark in F2021. Attachment 2 provides more detailed information on savings. Table 7 Capacity-focused DSM: Cumulative Capacity Savings since F2012 at Customer Meter in F2021 (MW) (mid) Industrial Load Curtailment 286 Capacity-Focused Programs Residential 99 Commercial 31 Industrial 61 Sub-total 191 Total 477 Page 9A-19

23 2.3 Utility Costs Implementation of the DSM Plan requires investment on the part of BC Hydro to implement rate structures, programs and supporting initiatives. Table 8 summarizes these costs over a 4 and 19 year period. The costs have been risk-adjusted to align with the mid savings estimates provided above. Attachments 1 and 2 provide more details on BC Hydro costs. Table 8 Utility Costs ($ million) DSM Plan Initiatives Four Years: F2014-F Years: F2014-F2032 Energy-Focused DSM Rate Structures Programs Residential 248 1,223 Commercial 470 3,005 Industrial 498 2,183 Total Programs 1,217 6,411 Supporting Initiatives Sub Total 1,374 7,287 Capacity-Focused DSM Industrial Load Curtailment Capacity Programs Sub Total DSM Plan Total 1, ,094 9 To the extent that additional codes and standards, DSM financing mechanisms or rate structure changes deliver additional electricity savings, BC Hydro s DSM costs may be lower than indicated in the table. 3 Justification The following section provides justification for the DSM Plan, including how the plan aligns with the Clean Energy Act objectives. 8 9 Includes Codes and Standards support. Includes $7 million for activities to advance Options 4 and 5. Page 9A-20

24 3.1 Energy-focused DSM Cost-Effectiveness Option 3 would deliver electricity savings at an average unit net cost of less than $10 per MWh 10, compared to new electricity supply costing an average of $129 per MWh. 11 As shown in Chapter 6, the expected cost of portfolios with Options 3, 4 and 5 are quite close, with Option 4 being the lowest cost option. 12 However, going beyond Option 3 is not recommended at this time because the small cost advantage is outweighed by the additional deliverability risk associated with Options 4 and 5. Nevertheless, the upside potential of Options 4 and 5 warrants further attention, as discussed in recommended action II. All DSM tools in the DSM Plan have a Total Resource benefit-cost ratio greater than 1.0 (refer to Attachment 1, Table 6) Rate Impact Despite the fact that Option 3 is expected to result in a rate impact compared to Option 2, it is expected to result in lower overall electricity bills ($180 million relative to Option 2 over the 20-year life of the IRP). Option 3 is expected to result in a 2 per cent rate increase over Option 2 over a ten-year period by F Environmental and Economic Benefits DSM avoids the environmental impacts associated with the construction of new generation facilities. Specifically, the energy-focused DSM outlined above would avoid the environmental impacts of approximately 1,300 MW of new electricity supply. Additionally, DSM has the potential to reduce the province s greenhouse gas emissions. Customers are forecast to reduce their natural gas consumption as a Chapter 6, Figure $129/MWh is BC Hydro s current reference energy price based on levelized UEC for the Clean Power Call firm energy price (adjusted for delivery to the Lower Mainland and for transmission losses and other Clean Power Call-related adjustments). Chapter 6, Figure Page 9A-21

25 result of BC Hydro s electricity DSM activity, resulting in a 146,000 tonnes reduction in GHG emissions in F2021. Incremental DSM also provides economic development benefits through the creation and retention of jobs and increases in GDP Comprehensive and Flexible The DSM Plan provides a comprehensive portfolio of DSM measures with a broad offering to all customer groups, which work in concert to affect significant and enduring change in the way electricity is utilized in the province. DSM measures are designed to complement one another and capture synergies. They are flexible and can be changed over time in response to new information in order to optimize performance and ensure DSM savings targets are achieved. The DSM Plan is designed for learning in that it includes actions to begin to establish and reduce uncertainty with respect to the feasibility and/or potential electricity savings from selected DSM tactics that were identified as having considerable savings potential. In F2032, in high DSM scenario, Option 5 could provide 8,100 GWh more savings than Option 3. Therefore, this learning will inform future IRPs Policy Alignment Option 3 aligns with several Clean Energy Act (CEA) objectives, as discussed in section 3.3. The work undertaken to implement Option 3 will also support Bill 32 (Energy and Water Efficiency Act). Bill 32 provides a new framework for the development, administration and enforcement of codes and standards. Together with the Pacific Coast Collaborative s 2012 West Coast Action Plan on Jobs that seeks to jointly develop energy efficiency upgrades, technologies and standards, the Energy and Water Efficiency Act creates the potential for additional, cost-effective DSM savings. Page 9A-22

26 3.2 Capacity-focused DSM The load-resource balance indicates a capacity gap starting in F2017 that persists at different levels over time despite the addition of large increments of generation capacity from Mica Units 5 and 6, Revelstoke Unit 6 and Site C. At that point BC Hydro will have exhausted the supply of relatively low cost and large scale increments of generation capacity and will need to advance a number of long-term capacity options to fill the remaining gap. Two capacity-focused DSM (CF-DSM) options, Industrial Load Curtailment and Capacity-focused Programs, have the potential to deliver capacity savings over the long-term, at an estimated cost of $32/kW-year and $53/kW-year respectively. 13 These costs are lower than gas-fired generation and pumped storage, the marginal capacity resources depending on the timeframe. If successful, CF-DSM will avoid the need for 475 MW of generation and bulk transmission capacity, resulting in a lower environmental footprint. In addition, CF-DSM would support BC Hydro in meeting its self-sufficiency and 93 per cent clean requirements as part of the CEA. Section 6.10 in Chapter 6 discusses the capacity analysis. CF-DSM represents a new capacity resource to BC Hydro and is subject to uncertainty with respect to its ability to reduce the system peak over the long-term. For this reason, BC Hydro will not yet rely on capacity savings from CF-DSM for resource planning purposes. However, implementation of CF-DSM starting in F2014 is justified based on BC Hydro s need for capacity resources and the low cost of CF-DSM relative to alternatives. CF-DSM provides the capacity potential to reduce the need for bridging resources and the likelihood of new gas-fired generation being used in contingency plans. Implementation will provide BC Hydro with information on the cost and impacts of CF-DSM that will inform decisions in future IRPs on whether to rely on CF-DSM as a long-term capacity resource. 13 Includes transmission and distribution losses. Page 9A-23

27 3.3 Alignment with Clean Energy Act The DSM Plan contributes to and aligns with British Columbia s energy objectives as outlined in the Clean Energy Act. Specifically: to achieve electricity self-sufficiency: The DSM Plan s forecast energy and capacity savings will contribute to BC Hydro achieving electricity self-sufficiency. to take demand-side measures and to conserve energy, including the objective of BC Hydro reducing its expected increase in demand for electricity by the year 2020 by at least 66 per cent: The DSM Plan is forecast to reduce BC Hydro s increase in electricity demand in F2021 by approximately 58 per cent including the Initial LNG load. Without the Initial LNG load, the plan would reduce the increase in demand by 78 per cent. None of the DSM Options meet the 66 per cent objective; Option 3 goes further towards meeting the objective than the current 2008 LTAP target. to generate at least 93 per cent of the electricity in British Columbia from clean or renewable resources and to build the infrastructure necessary to transmit that electricity: The implementation of DSM lowers the demand for new resources, assisting in the achievement of this objective at lower cost. to use and foster the development in British Columbia of innovative technologies that support energy conservation and efficiency and the use of clean or renewable resources: Both the DSM programs contained within the DSM Plan and the Technology Innovation supporting initiative will promote the use of innovative technologies supporting energy conservation. to ensure BC Hydro s rates remain among the most competitive of rates charged by public utilities in North America: The DSM Plan is expected to result in a cumulative 2 per cent increase in rates over a ten year period by F2021 relative to Option 2. However, the DSM Plan is forecast to reduce Page 9A-24

28 customer s electricity bills by $180 million relative to Option 2 over the 20-year life of the IRP. to reduce BC greenhouse gas emissions: The DSM Plan is forecast to result in natural gas savings that will reduce BC greenhouse gas emissions. BC Hydro estimates that the DSM Plan will reduce greenhouse gas emissions by 146,000 tonnes in F2021. to encourage the switching from one kind of energy source or use to another that decreases greenhouse gas emissions in B.C.: The DSM Plan includes the Community Engagement supporting initiative which supports local governments and developers to consider and develop community wide energy plans that encourage energy efficiency and decrease GHG emissions. to encourage communities to reduce greenhouse gas emissions and use energy efficiently: The DSM Plan s Codes and Standards Support and Community Engagement supporting initiatives provide support for communities to incorporate electricity efficiency into community energy planning and implement energy efficiency policies and projects. to reduce waste by encouraging the use of waste heat, biogas and biomass: The DSM Plan s Commercial and Industrial Load Displacement programs encourage load displacement using waste heat or renewable fuels such as biogas and biomass. to encourage economic development and the creation and retention of jobs: BC Hydro s analysis indicates that economic development benefits and employment increase with increasing effort on DSM. Page 9A-25

29 4 DSM Risk Management BC Hydro s approach to DSM risk management begins with the identification and assessment of risk and the development of mitigation measures at various stages in the DSM process. Performance management of the DSM Plan is a key component in managing the risks related to DSM savings and costs. In addition, BC Hydro uses Contingency Resource Plans to mitigate DSM-related risks. 4.1 Risk Mitigation Codes and Standards A key aspect of codes and standards risk mitigation is that BC Hydro does not have direct control over the implementation of codes and standards and thus relies on the action of governments to deliver these savings. Thus there is uncertainty regarding the timing, coverage and efficiency level of codes and standards outlined in the DSM Plan. However, these risks are mitigated by BC Hydro using its influence to support the implementation of codes and standards through its DSM programs and codes and standards supporting initiative. In addition, BC Hydro monitors government approval of codes and standards and uses the best available information, including results from completed evaluations, to estimate codes and standards savings. If it becomes apparent that codes and standards savings might be less than planned, BC Hydro can respond in a number of ways, for example: Approach the most appropriate government (i.e., federal, provincial or local government) to expedite the enactment of regulations; and Continue DSM programs to capture some of the savings expected from a code or standard. Page 9A-26

30 4.1.2 Rate Structures BC Hydro has implemented or is in the process of implementing four conservation rate structures that have been approved by the BCUC. 14 Together these rate structures will deliver an efficient price signal to customer classes that consume 92 per cent of BC Hydro s domestic load. The principal risk for rate structures is that the customer response from the rate structures is lower than planned. BC Hydro mitigates this risk in several ways during design and implementation - by applying rigorous rate design that includes customer consultations, forecasting rates using the best information available and educating customers on rate structure and how they can respond to it and achieve bill savings. If rate structure savings are lower than planned, BC Hydro can take the following actions: Redesign rate structures; Increase customer communication and support effort related to rate structures; and Expand DSM programs to achieve additional savings Programs To minimize the risk of lower participation than planned, DSM programs are designed to address barriers to energy efficiency and elicit customer participation using information from BC Hydro customers, trade allies and other jurisdictions. BC Hydro also undertakes comprehensive market and technical research into current and future DSM opportunities to develop the most effective Program and Initiative designs. In addition, conservation rate structures complement programs by motivating customers to participate. 14 The Transmission Service Rate, Large General Service Rate, Medium General Service Rate and Residential Inclining Block Rate. Page 9A-27

31 Programs also face a risk of delivering lower savings per participant than planned. This risk is mitigated by using a variety of sources on unit savings to forecast overall program savings, including market research, technical reviews of projects, measurement and verification results and program evaluations. If DSM program electricity savings fall below plan, BC Hydro can modify the program to respond and increase participation, for example by: Increasing or modifying program advertising; Modifying the program application process or eligibility criteria; Increasing or modifying program incentives; and Revising the list of qualifying products Portfolio At the portfolio or plan level, relying upon the flexibility of DSM is a key risk mitigation strategy. If DSM savings fall below plan or costs rise above plan, BC Hydro can shift costs or resources between initiatives or sectors. For example, through the diversity of the DSM plan, if one program is more successful than planned, resources may be shifted from another program to take advantage of that success. In doing so, these adjustments allow for the improvement of the DSM Plan as it is implemented and the mitigation of both cost and deliverability risk. 4.2 Performance Management BC Hydro manages the performance of the DSM Plan in a comprehensive manner than includes tracking a number of performance metrics, regular management reporting and oversight and electricity savings confirmation. The primary performance metrics for the DSM Plan are energy savings and costs, which are tracked monthly by initiative in addition to a number of supplemental leading and lagging indicators. Variances from plan are identified and discussed by management with a view to take corrective measures if needed. Page 9A-28

32 To further gauge performance, BC Hydro is continuously collecting feedback from manufacturers, retailers and other trade allies and partners on its initiatives. Management judgement, industry input and stakeholder feedback are then combined with these key performance indicators, when assessing changes to programs and initiatives. During the implementation of a program or initiative, risks are monitored through the tracking of indicators as described above. If the program is not performing as expected or if there is new information that could impact the program, program management will work to identify and analyze the issue and understand its potential impact on program performance. Issue identification and analysis could involve gathering feedback from customers and trade allies and additional market research. Once the issue is identified and understood, solutions would be explored and if a specific change has a good prospect of mitigating the issue, adjustments would be made to the program. Finally, reliably estimating DSM savings is also an important strategy to mitigate DSM deliverability risk. To accomplish this, BC Hydro undertakes a comprehensive approach to DSM evaluation, measurement and verification. Page 9A-29

33 Appendix 9A - Attachment 1 Energy-Focused DSM Table 1. Cumulative Acquired Energy Savings from F2012 at Customer Meter (GWh) F2014 F2015 F2016 F2017 F2018 F2019 F2020 F2021 F2022 F2023 F2024 Codes and Standards Residential ,013 1,154 1,274 1,379 1,465 1,540 1,608 1,670 1,727 Commercial Industrial Sub-total 807 1,286 1,535 1,741 1,911 2,061 2,188 2,301 2,402 2,495 2,583 Rate Structures Residential Commercial 645 1,119 1,066 1,031 1, Industrial Sub-total 1,039 1,684 1,627 1,595 1,598 1,565 1,533 1,438 1,421 1,410 1,413 DSM Programs Residential Commercial ,026 1,208 1,364 1,507 1,645 1,781 1,910 Industrial ,144 1,477 1,827 2,256 2,660 3,084 3,372 3,569 3,689 Sub-total 1,363 1,866 2,356 2,925 3,445 4,033 4,615 5,216 5,676 6,040 6,317 TOTAL 3,208 4,835 5,518 6,261 6,954 7,660 8,337 8,955 9,500 9,946 10,313 DRAFT Note: F2012 and F2013 are not shown as detailed and updated information for these years is included in BC Hydro's F F2014 Revenue Requirements Application. Page 1 of 10

34 Codes and Standards Residential Commercial Industrial Sub-total Rate Structures Residential Commercial Industrial Sub-total DSM Programs Residential Commercial Industrial Sub-total TOTAL Energy-Focused DSM Table 1. Cumulative Acquired Energy Savings from F2012 at Customer Meter (GWh) F2025 F2026 F2027 F2028 F2029 F2030 F Integrated Resource Plan Appendix 9A - Attachment 1 21 Year Total: F2032 1,776 1,820 1,862 1,907 1,951 1,995 2,044 2, ,661 2,733 2,803 2,873 2,943 3,011 3,083 3, ,029 1,079 1, ,456 1,508 1,562 1,616 1,690 1,760 1,838 1, ,063 1,146 1,223 2,022 2,104 2,171 2,232 2,256 2,271 2,289 2,305 3,757 3,809 3,877 3,916 3,820 3,727 3,600 3,589 6,530 6,705 6,888 7,047 7,054 7,060 7,035 7,117 DRAFT 10,646 10,946 11,253 11,537 11,686 11,831 11,956 12,147 Page 2 of 10

2014/15-2016/17 ELECTRICITY EFFICIENCY PLAN

2014/15-2016/17 ELECTRICITY EFFICIENCY PLAN 2014/15-2016/17 ELECTRICITY EFFICIENCY PLAN PLAN OVERVIEW Prepared for the New Brunswick Department of Energy and Mines with the assistance of Dunsky Energy Consulting July 2014 This page intentionally

More information

Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan

Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan April 2014 Contents Summary...1 Introduction...2 Objectives of the Plan...3 Plan of Action...5 The Benefits of Energy Efficiency...

More information

Massachusetts Saving Electricity:

Massachusetts Saving Electricity: Commonwealth of Massachusetts Massachusetts Saving Electricity: A Summary of the Performance of Electric Efficiency Programs Funded by Ratepayers Between 2003 and 2005 Executive Office of Energy and Environmental

More information

FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS. 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13)

FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS. 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13) FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13) 11-13 September 2013 Coimbra, Portugal Introduction Citizens and

More information

May 27, 2010 MEMORANDUM. Power Committee. Tom Eckman and Charlie Grist. Update on Federal Standards Activities

May 27, 2010 MEMORANDUM. Power Committee. Tom Eckman and Charlie Grist. Update on Federal Standards Activities Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon May 27,

More information

Clean State Energy Actions 2011 Update. connecticut

Clean State Energy Actions 2011 Update. connecticut Energy Efficiency Appliance/Equipment Efficiency Standards Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards Public

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

Nova Scotia s Energy (Efficiency) Resource

Nova Scotia s Energy (Efficiency) Resource Nova Scotia s Energy (Efficiency) Resource What is Energy Efficiency? Refers to products or systems using less energy to do the same or better job than conventional products or systems. (US Environmental

More information

Clean State Energy Actions 2011 Update. colorado

Clean State Energy Actions 2011 Update. colorado Energy Efficiency Building Energy Codes Utility Demand-Side-Management Energy Savings Targets/Energy Efficiency Resource Standards Residential: 2003 IECC, required in jurisdictions with a building code

More information

SITE C CLEAN ENERGY PROJECT: BUSINESS CASE SUMMARY

SITE C CLEAN ENERGY PROJECT: BUSINESS CASE SUMMARY SITE C CLEAN ENERGY PROJECT: BUSINESS CASE SUMMARY UPDATED MAY 2014 A HERITAGE BUILT FOR GENERATIONS Clean, abundant electricity has been key to British Columbia s economic prosperity and quality of life

More information

ELECTRIC ENERGY EFFICIENCY POTENTIAL FOR PENNSYLVANIA

ELECTRIC ENERGY EFFICIENCY POTENTIAL FOR PENNSYLVANIA GDS Associates, Inc. Engineers and Consultants ELECTRIC ENERGY EFFICIENCY POTENTIAL FOR PENNSYLVANIA Final Report Prepared for: PENNSYLVANIA PUBLIC UTILITY COMMISSION May 10, 2012 Prepared by GDS Associates

More information

Saving energy, growing jobs

Saving energy, growing jobs Saving energy, growing jobs Victoria s energy efficiency and productivity statement June 2015 Contents Minister s foreword 1 Why energy efficiency matters for Victorians 2 Our plan for energy efficiency

More information

Integrated Resource Plan. Appendix 7K

Integrated Resource Plan. Appendix 7K Integrated Resource Plan Appendix 7K Technical Advisory Committee Written Submissions on Consultation Topics 2013 INTEGRATED RESOURCE PLAN Integrated Resource Plan Appendix 7K TECHNICAL ADVISORY COMMITTEE

More information

FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act

FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act F L O R I D A P U B L I C S E R V I C E C O M M I S S I O N FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act As Required by Sections 366.82(10), and 377.703(2)(f),

More information

Clean Energy Jobs Plan

Clean Energy Jobs Plan Clean Energy Jobs Plan Introduction When I was governor, California was the world leader in renewable energy and it led the nation in efficiency standards. Our programs saved California consumers billions

More information

NECAQ Sustainability Program The Business Case

NECAQ Sustainability Program The Business Case NECAQ Sustainability Program The Business Case Key messages Energy efficiency is a fundamental element in the progression towards a future low-carbon economy. Actions to increase energy efficiency can

More information

Achievable Demand Side Management Potential Study

Achievable Demand Side Management Potential Study Entergy New Orleans, Inc. Achievable Demand Side Management Potential Study Final Report October 30, 2012 Prepared for Entergy Services, Inc. Prepared by ICF International 9300 Lee Highway Fairfax, VA

More information

Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209

Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209 Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209 by the Vermont Public Service Board April 14, 2014 In accordance with 30 V.S.A. 209, the Public Service

More information

EarthCents (DSM) Program Summary

EarthCents (DSM) Program Summary EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.

More information

Energy Efficiency Finance in Pennsylvania

Energy Efficiency Finance in Pennsylvania Energy Efficiency Finance in Pennsylvania Summary: Propel increases in non-utility delivered demand-side energy efficiency by providing education, access and funding for innovative energy efficiency finance

More information

California Energy Commission 2015 Accomplishments

California Energy Commission 2015 Accomplishments California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new

More information

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary

More information

Newfoundland and Labrador Energy Efficiency Program Study P a r t

Newfoundland and Labrador Energy Efficiency Program Study P a r t Newfoundland and Labrador Energy Efficiency Program Study P a r t A This page is blank in original document. Newfoundland and Labrador Energy Efficiency Program Study Part A Enhancing energy efficiency

More information

Alternatives to the Site C Hydroelectric Project

Alternatives to the Site C Hydroelectric Project www.centrehelios.org Alternatives to the Site C Hydroelectric Project Presentation to the Joint Review Panel on the Site C Hydroelectric Project Philip Raphals for Treaty 8 First Nations December 10, 2013

More information

Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes

Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments Hong Kong, China (1) Building Energy Codes The Electrical and Mechanical Services Department of the Hong Kong Government

More information

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. TITLE XIII--SMART GRID SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. It is the policy of the United States to support the modernization of the Nation's electricity transmission and

More information

EXAMPLES OF SUCCESSFUL POLICY TOOLS FOR EMISSION REDUCTION

EXAMPLES OF SUCCESSFUL POLICY TOOLS FOR EMISSION REDUCTION Submission of the United Nations Environment Programme (UNEP) Sustainable Building Initiative (SBCI) to the Ad Hoc Working Group on Long-Term Cooperative Action under the Convention (AWG-LCA) 24 April

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period December 2013 through February 2014 Program Year 5, Quarter 3 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

MARKET EFFECTS AND MARKET TRANSFORMATION: THEIR ROLE IN ENERGY EFFICIENCY PROGRAM DESIGN AND EVALUATION

MARKET EFFECTS AND MARKET TRANSFORMATION: THEIR ROLE IN ENERGY EFFICIENCY PROGRAM DESIGN AND EVALUATION MARKET EFFECTS AND MARKET TRANSFORMATION: THEIR ROLE IN ENERGY EFFICIENCY PROGRAM DESIGN AND EVALUATION Prepared by Mitchell Rosenberg KEMA, Inc. Lynn Hoefgen Nexus Market Research Prepared for CIEE Market

More information

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS

CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS Ontario Energy Board Commission de l énergie de l Ontario CONSERVATION AND DEMAND MANAGEMENT REQUIREMENT GUIDELINES FOR ELECTRICITY DISTRIBUTORS December 19, 2014 TABLE OF CONTENTS 1. BACKGROUND AND OVERVIEW...

More information

Connecticut Department of Environmental Protection. chris.nelson@po.state.ct.us and chris.james@po.state.ct.us

Connecticut Department of Environmental Protection. chris.nelson@po.state.ct.us and chris.james@po.state.ct.us An Energy Agenda for the 21 st Century March 9, 2007 To: Regarding: Submitted Via Email: Connecticut Department of Environmental Protection BCSE Recommendations for CT RGGI Pre-Proposal chris.nelson@po.state.ct.us

More information

Business Plan: Energy Conservation

Business Plan: Energy Conservation Business Plan: Energy Conservation How does this service contribute to the results identified in the City of London Strategic Plan? A Green and Growing City A Strong Economy This business area s key focus

More information

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

NEW COMMERCIAL Rates. Understanding the. Commercial Customers Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount

More information

Customer Energy Solutions

Customer Energy Solutions Customer Energy Solutions Program Progress Report 2013-2014 1 Customer Energy Solutions The Customer Energy Solutions team is committed to providing the best service to our customers and our community.

More information

Electric Load Forecast

Electric Load Forecast Electric Load Forecast Fiscal 2013 to Fiscal 2033 Load and Market Forecasting Energy Planning and Economic Development BC Hydro 2012 Forecast December 2012 PAGE 1 Tables of Contents Executive Summary...

More information

Economic Analysis of Ohio s Renewable and Energy Efficiency Standards

Economic Analysis of Ohio s Renewable and Energy Efficiency Standards Economic Analysis of Ohio s Renewable and Energy Efficiency Standards Ohio State Researchers Find Ohio s Renewable and Energy Efficiency Standards Have Saved Ratepayers 1.4% Since Inception, and Weakening

More information

Utility Energy Efficiency Developments in the States and DC. Laura Furrey, JD, PE ACEEE March 2010

Utility Energy Efficiency Developments in the States and DC. Laura Furrey, JD, PE ACEEE March 2010 Utility Energy Efficiency Developments in the States and DC Laura Furrey, JD, PE ACEEE March 2010 1 The American Council for an Energy Efficient Economy (ACEEE) Non-governmental organization (NGO) dedicated

More information

British Columbia s Clean Energy Vision

British Columbia s Clean Energy Vision British Columbia s Clean Energy Vision Innovative Technologies and Green Energy Solutions National Environmental Conference Brunei Darussalam July 1, 2010 Profile of British Columbia Overview British

More information

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE DEWAN PERWAKILAN RAKYAT REPUBLIK INDONESIA INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE As part of the international community, Indonesia shares its concern on the environment and development

More information

Review of the Energy Savings Scheme. Position Paper

Review of the Energy Savings Scheme. Position Paper Review of the Energy Savings Scheme Position Paper October 2015 Contents Executive summary... 3 Energy Savings Scheme Review Report package... 3 Expanding to gas... 3 Target, penalties and duration...

More information

INTRODUCTION OF DSM PROGRAMS. Ankara, November 2007. EVA MICHALENA Regulatory Authority for Energy, Greece Sorbonne University, France

INTRODUCTION OF DSM PROGRAMS. Ankara, November 2007. EVA MICHALENA Regulatory Authority for Energy, Greece Sorbonne University, France INTRODUCTION OF DSM PROGRAMS Ankara, November 2007 EVA MICHALENA Regulatory Authority for Energy, Greece Sorbonne University, France World State-Of Of-The-Art and the need for Energy Efficiency Rio Convention

More information

NATIONAL ENERGY EFFICIENCY ACTION PLAN

NATIONAL ENERGY EFFICIENCY ACTION PLAN NATIONAL ENERGY EFFICIENCY ACTION PLAN Draft Final Report January 2014 FINAL DRAFT Table of Contents 1. Executive Summary... 4 2. Background... 8 2.1 The Institutional Setup and Regulatory Framework on

More information

Greenhouse gas abatement potential in Israel

Greenhouse gas abatement potential in Israel Greenhouse gas abatement potential in Israel Israel s GHG abatement cost curve Translated executive summary, November 2009 1 Executive Summary Background At the December 2009 UNFCCC Conference in Copenhagen,

More information

Quick Guide to Energy Efficiency Incentives

Quick Guide to Energy Efficiency Incentives Quick Guide to Energy Efficiency Incentives Commercial and Industrial PREPARED BY: ClearLead Consulting Ltd. #108-245 Fell Ave North Vancouver, BC www.clearlead.ca 604-229-6159 September 2015 Hi, we re

More information

BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development

BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development Ruth C. Kiselewich, Director Demand Side Management Programs

More information

Innovative Funding Options for Energy Efficiency Initiatives

Innovative Funding Options for Energy Efficiency Initiatives Innovative Funding Options for Energy Efficiency Initiatives A Constellation Whitepaper January 2013 Innovative Funding Options For Energy Efficiency Initiatives Greg Fox, Director of Business Development

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES. 25.181. Energy Efficiency Goal. (a) (b) (c) Purpose. The purpose of this section is to ensure that: (1) electric utilities administer energy efficiency incentive programs in a market-neutral, nondiscriminatory

More information

Implications of Carbon Cap-and-Trade for Electricity Rate Design, with Examples from Florida. Hethie Parmesano and Theodore J.

Implications of Carbon Cap-and-Trade for Electricity Rate Design, with Examples from Florida. Hethie Parmesano and Theodore J. Implications of Carbon Cap-and-Trade for Electricity Rate Design, with Examples from Florida Hethie Parmesano and Theodore J. Kury Hethie Parmesano is a Special Consultant with NERA Economic Consulting

More information

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY PARTNERING in Energy Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY Partnering in Energy Solutions Business Customers 3 Austin Utilities An Energy PARTNER for our Customers How can you be more

More information

FINANCIAL SUPPORT PROGRAMS

FINANCIAL SUPPORT PROGRAMS 9 FINANCIAL SUPPORT PROGRAMS 108 9 FINANCIAL SUPPORT PROGRAMS 9 FINANCIAL SUPPORT PROGRAMS There are a number of Government support mechanisms to help reduce the barriers to undertaking action on energy

More information

Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan

Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan INTRODUCTION The Austin City Council adopted the Austin Climate Protection Plan (ACPP) in 2007 to build

More information

POLICY ACTIONS INVESTING IN INNOVATION

POLICY ACTIONS INVESTING IN INNOVATION The BC Energy Plan ALTERNATIVE ENERGY Government will work with other agencies to maximize opportunities to develop, deploy and export British Columbia clean and alternative energy technologies. POLICY

More information

Regulatory Impact Statement

Regulatory Impact Statement Regulatory Impact Statement Revision to Minimum Performance Standards and labelling for air conditioners and revisions to energy rating labelling for domestic refrigerator and freezer appliances EXECUTIVE

More information

ENERGY STAR OVERVIEW OF 2005 ACHIEVEMENTS

ENERGY STAR OVERVIEW OF 2005 ACHIEVEMENTS ENERGY STAR OVERVIEW OF 2005 ACHIEVEMENTS HOME PERFORMANCE WITH ENERGY STAR A COST-EFFECTIVE STRATEGY FOR IMPROVING EFFICIENCY IN EXISTING HOMES BRINGING ENERGY EFFICIENCY TO HOMES AND BUSINESS State Energy

More information

National Energy Benchmarking Framework: Report on Preliminary Working Group Findings

National Energy Benchmarking Framework: Report on Preliminary Working Group Findings National Energy Benchmarking Framework: Report on Preliminary Working Group Findings January 2016 Prepared by: Contact: Sundeep Virdi, MES, SBA Manager, Advocacy & Policy Canada Green Building Council

More information

Energy Optimization 2014 Annual Report

Energy Optimization 2014 Annual Report Energy Optimization Annual Report Energy Optimization Annual Report s CONTENTS Legislative Requirements 8 II Energy Optimization Annual Report EXECUTIVE SUMMARY The purpose of this annual report is to

More information

Study of Potential for Energy Savings in Delaware

Study of Potential for Energy Savings in Delaware Study of Potential for Energy Savings in Delaware September 4, 2014 Prepared for by with Optimal Energy, Inc. 10600 Route 116, Suite 3 802-482-5600 www.optenergy.com Hinesburg, VT 05461 Study of Potential

More information

Before the Department of Energy Washington, D.C. 20585. Smart Grid RFI: Addressing Policy and Logistical Challenges

Before the Department of Energy Washington, D.C. 20585. Smart Grid RFI: Addressing Policy and Logistical Challenges Before the Department of Energy Washington, D.C. 20585 In the Matter of Addressing Policy and Logistical Challenges to Smart Grid Implementation I. Introduction Smart Grid RFI: Addressing Policy and Logistical

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps

Earth Hour 2013. City Hall, City of London CITY OF LONDON. Culture of Conservation The Next Steps Earth Hour 2013. City Hall, City of London CITY OF LONDON Culture of Conservation The Next Steps September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 CULTURE OF CONSERVATION PROGRAM

More information

Switching Energy Providers and PECO Smart Ideas. March 23, 2011

Switching Energy Providers and PECO Smart Ideas. March 23, 2011 Switching Energy Providers and PECO Smart Ideas March 23, 2011 Agenda Market Changes Taking Advantage of Competition PECO Smart Ideas for your home Questions Market Changes Utility Functions Before deregulation,

More information

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY

PARTNERING. in Energy. Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY PARTNERING in Energy Solutions A PROGRAM TO PROMOTE BUSINESS ENERGY EFFICIENCY Partnering in Energy Solutions Business Customers 3 Owatonna Public Utilities An Energy PARTNER for our Customers How can

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

SMUD CUSTOMER PROGRAMS AND SERVICES. Ed Hamzawi Implementation Supervisor Energy Efficiency Programs May, 2010

SMUD CUSTOMER PROGRAMS AND SERVICES. Ed Hamzawi Implementation Supervisor Energy Efficiency Programs May, 2010 SMUD CUSTOMER PROGRAMS AND SERVICES Ed Hamzawi Implementation Supervisor Energy Efficiency Programs May, 2010 1 Customer Programs & Services 1. Vision and Background 2. Energy Efficiency Programs 3. Solar/PV

More information

Comments of the Business Council for Sustainable Energy Regarding the American Clean Energy and Security Act of 2009. May 6, 2009.

Comments of the Business Council for Sustainable Energy Regarding the American Clean Energy and Security Act of 2009. May 6, 2009. Comments of the Business Council for Sustainable Energy Regarding the American Clean Energy and Security Act of 2009 Executive Summary The Business Council for Sustainable Energy commends the release of

More information

Community Energy and Efficiency Development Fund

Community Energy and Efficiency Development Fund Community Energy and Efficiency Development Fund 2013 Draft Annual Report Submitted by Green Mountain Power November 14, 2014 1 Community Energy and Efficiency Development Fund 2013 Draft Annual Report

More information

Solar systems provide a range of flexible heating

Solar systems provide a range of flexible heating f a c t s h e e t 7 Solar Power Production photo by Alex Nikada Why solar? Solar systems provide a range of flexible heating and electricity options and are particularly wellsuited to remote or off-grid

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

Rules of Thumb Energy Efficiency in Buildings

Rules of Thumb Energy Efficiency in Buildings Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split

More information

How To Plan For A New Power Plant In Manitoba

How To Plan For A New Power Plant In Manitoba Meeting Manitobans Electricity Manitoba is growing and is expected to continue doing so. Over the last years the province has enjoyed an expanding population and economy. These increases have led to many

More information

A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers

A Virtual Power Plant to balance wind energy - A Canadian Smart Grid Project. Number of customers PowerShift Atlantic will demonstrate one of the world s first virtual power plants designed to allow for more effective integration and balancing of wind power onto the power grid. The project is a collaborative

More information

Page 1 of 11. F u t u r e M e l b o u r n e C o m m i t t e e Agenda Item 7.1. Notice of Motion: Cr Wood, Renewable Energy Target 9 September 2014

Page 1 of 11. F u t u r e M e l b o u r n e C o m m i t t e e Agenda Item 7.1. Notice of Motion: Cr Wood, Renewable Energy Target 9 September 2014 Page 1 of 11 F u t u r e M e l b o u r n e C o m m i t t e e Agenda Item 7.1 Notice of Motion: Cr Wood, Renewable Energy Target 9 September 2014 Motion 1. That Council resolves that the Chair of the Environment

More information

Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS

Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS Energy Efficiency Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards 2009 North Carolina Energy Conservation Code

More information

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY i P a g e www.energym adeclean.com CONTENTS

More information

Ontario Hydro. September 28, 1995

Ontario Hydro. September 28, 1995 Ontario Hydro Ontario Hydro 700 University Avenue Toronto, Ontario M5G 1X6 O. Allan Kupcis, President & CEO September 28, 1995 Honourable Anne McLellan Minister of Natural Resources Canada Sir William

More information

Funding Opportunities for Energy Efficiency: Utility Programs and Tax Incentives

Funding Opportunities for Energy Efficiency: Utility Programs and Tax Incentives Funding Opportunities for Energy Efficiency: Utility Programs and Tax Incentives 1 Indiana Energy Efficiency 2015 & Beyond What Has Changed In Energy Efficiency From A Commercial Customer & Utility Perspective

More information

From: Carl Nolen Energy Resource Analyst Approved by: /s/ Ronald V. Stassi Interim General Manager

From: Carl Nolen Energy Resource Analyst Approved by: /s/ Ronald V. Stassi Interim General Manager AGENDA ITEM NO: 5.B.1 ADMINISTRATIVE REPORT NO.: 2014-66 To: Honorable Public Utilities Board Submitted by: /s/ Don Rushton Interim AGM Energy Resource Planning From: Carl Nolen Energy Resource Analyst

More information

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019

Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Corporate Energy Conservation & Demand Management Plan (CECDMP) 2014-2019 Table of Contents Our Commitment to Energy Conservation...1 1.0 Introduction...2 2.0 Energy Supply in Ontario...3 2.1 Energy Supply

More information

The Smart Grid: Utility Master Energy & Sustainability Planning

The Smart Grid: Utility Master Energy & Sustainability Planning The Smart Grid: Utility Master Energy & Sustainability Planning Gene Rodrigues Director, Customer Energy Efficiency & Solar Southern California Edison CMAA Long Beach, CA May 5, 2011 About Southern California

More information

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session Demand Response Programs In Ontario IESO Demand Response Working Group Public Session April 3, 2014 Outline of Presentation DR Program intent Evolution of DR programs in Ontario Program highlights Key

More information

Renewable Energy Credit (REC) Price Forecast (Preliminary Results)

Renewable Energy Credit (REC) Price Forecast (Preliminary Results) Renewable Energy Credit (REC) Price Forecast (Preliminary Results) OVERVIEW What is a REC price forecast and why is it needed? Interest in renewable energy has increased worldwide in response to concerns

More information

Achieving Balance. Ontario s Long-Term Energy Plan

Achieving Balance. Ontario s Long-Term Energy Plan Achieving Balance Ontario s Long-Term Energy Plan Table of Contents Minister s Message... 2 Executive Summary... 4 1 Where We Are Now... 8 2 Putting Conservation First... 20 3 A Reliable and Clean Supply...28

More information

Illinois Electric and Gas 3 Year Planning. Policy Issues and Perspectives

Illinois Electric and Gas 3 Year Planning. Policy Issues and Perspectives Illinois Electric and Gas 3 Year Planning Policy Issues and Perspectives February 5, 2013 Phil Mosenthal, AG Chris Neme, NRDC Geoff Crandall, ELPC Optimal Energy 14 School Street Bristol, VT 05443 (V)

More information

Energy Efficiency and Automated Demand Response Program Integration: Time for a Paradigm Shift

Energy Efficiency and Automated Demand Response Program Integration: Time for a Paradigm Shift Energy Efficiency and Automated Demand Response Program Integration: Time for a Paradigm Shift Christine Riker and Kitty Wang, Energy Solutions Fred Yoo, Pacific Gas and Electric Company ABSTRACT The practice

More information

The Smart Energy Pricing Evolution at BGE

The Smart Energy Pricing Evolution at BGE The Smart Energy Pricing Evolution at BGE for The 2011 National Town Meeting on Demand Response and Smart Grid 2011 National Town Meeting on Demand Response and Smart Grid Wayne Harbaugh VP Pricing & Regulatory

More information

ENERGY EFFICIENT BUILDINGS STRATEGY: MORE ACTION, LESS ENERGY

ENERGY EFFICIENT BUILDINGS STRATEGY: MORE ACTION, LESS ENERGY ENERGY EFFICIENT BUILDINGS STRATEGY: MORE ACTION, LESS ENERGY 1 TABLE OF CONTENTS INTRODUCTION HIGHLIGHTS 1 LIVESMART BC: EFFICIENCY INCENTIVE PROGRAM 2 HOMES 3 COMMUNITIES 4 COMMERCIAL & INSTITUTIONAL

More information

Energy Update Report Summary 2014

Energy Update Report Summary 2014 Energy Update Report Summary 2014 City Energy Use Overview 2014 Cost of energy in 2014 for the City of Richmond buildings, lighting, water and wastewater services = $6.1 million dollars or 80.4 GWh (this

More information

MEMORANDUM. Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023

MEMORANDUM. Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023 MEMORANDUM TO: FROM: UTILITIES ADVISORY COMMISSION UTILITIES DEPARTMENT DATE: JUNE 6, 2012 SUBJECT: Framework for developing the City s Ten-Year Energy Efficiency Targets for the period 2014 to 2023 This

More information

OPPORTUNITY STATEMENT:

OPPORTUNITY STATEMENT: 3.3.3 Utility Program Administrator Business Model The following sections focus on the five core components of a utility s business model, highlighting the critical elements of how utilities function within

More information

Energy Efficiency Program Overview

Energy Efficiency Program Overview Energy Efficiency Program Overview Clean Air Through Energy Efficiency CATEE Conference November 18-20, 2014 Dallas, TX General Overview State of Texas enacted legislation requiring Transmission and Distribution

More information

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions Home Energy Efficiency and Conservation: Call to Action July 23, 2015 Dave Blake and David Wood REEP Green Solutions Today s Agenda Background Understanding where you are: Energy Usage EnerGuide Home Energy

More information

Procurement Call for Energy Efficiency Research. Invitation to Tender

Procurement Call for Energy Efficiency Research. Invitation to Tender Procurement Call for Energy Efficiency Research Invitation to Tender 17 September 2015 1. Background Ireland, like all countries in Europe, is required to meet a 20% savings target in relation to energy

More information

NSW Energy Efficiency Action Plan

NSW Energy Efficiency Action Plan NSW Energy Efficiency Action Plan State of NSW and Office of Environment and Heritage. The Office of Environment and Heritage and State of NSW are pleased to allow this material to be reproduced for educational

More information

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation

Energy Conservation and Demand Management Plan. Township of Wellesley: 2014-2019. Developed by Wendy Smith, Administrative Assistant Fire/Recreation Energy Conservation and Demand Management Plan Township of Wellesley: 2014-2019 The Township of Wellesley will strive to continually reduce our total energy consumption and associated greenhouse gases

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines

More information

126th MAINE LEGISLATURE

126th MAINE LEGISLATURE th MAINE LEGISLATURE FIRST REGULAR SESSION-01 Legislative Document No. 1 H.P. 1 House of Representatives, April, 01 An Act To Create Affordable Heating Options for Maine Residents and Reduce Business Energy

More information

Effective Marketing and Outreach Strategies for Multifamily Energy Efficiency Programs May 2014

Effective Marketing and Outreach Strategies for Multifamily Energy Efficiency Programs May 2014 Effective Marketing and Outreach Strategies for Multifamily Energy Efficiency Programs May 2014 Marketing and Outreach Challenges for Multifamily Housing As with any customer energy efficiency program,

More information

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division

Corporate Energy Conservation and Demand Management Plan 2014. Engineering Department. Public Works Division Engineering Department Public Works Division August 14 th, 2014 Table of Contents 1.0 Current State of Corporate Energy Management... 3 1.1 Energy Data Management... 3 1.2 Energy Supply Management... 3

More information

Energy efficiency is a priority for the Russian Federation in its energy policy

Energy efficiency is a priority for the Russian Federation in its energy policy Energy efficiency is a priority for the Russian Federation in its energy policy Mikhail Soloviev Geneva, 7-9 October 2009 Purpose and Principles of Government Energy Policy Purpose: most efficient use

More information

Building Energy Efficiency. Minimum Performance Standards and Labeling to Improve Energy Efficiency

Building Energy Efficiency. Minimum Performance Standards and Labeling to Improve Energy Efficiency Building Energy Efficiency Minimum Performance Standards and Labeling to Improve Energy Efficiency Leading the region Education, labeling help lower energy demand and emissions in Brazil To improve energy

More information