1 AIR-SITE GROUP White Paper Green Equipment Room Practices

2 Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider of products and solutions for GREEN technology and know-how in reducing power consumption and maximizing the investment benefits. As an example, data-centres can save one million kilowatt hours a year by implementing 11 best practices, according to analyst Gartner. Most of the principles for saving power are the same for computer halls, Telecom shelters, rail track providers equipment sheds and ISPs (Internet Service Providers) cabins, all here shortly called equipment rooms. Gartner says that in a conventional data centre, 35% to 50% of the electricity consumed is for cooling. The figure is 15% in best-practice "GREEN" data-centres. "Virtually all data-centres waste enormous amounts of electricity using inefficient cooling designs and systems," said Paul McGuckin, an analyst at Gartner. "Even in a small data centre, this wasted electricity amounts to more than one million kilowatt hours annually, that could be saved with the implementation of some best practices." The overriding reason for the waste in conventional data centre cooling is the unconstrained mixing of cold supply air with hot exhaust air, said Gartner. "This mixing (of hot and cold air) increases the load on the cooling system and energy used to provide the cooling and reduces the efficiency of the cooling system." said Paul McGuckin. The mixing may be caused by deficiencies in the room/rack structure such as holes in the walls and floors (caused by historical changes in the structure such as hinders for correct air flow) or simply by choice of poor performance cooling systems. 2 Best practices The first 11 practices below are recommended by Gartner, accompanied by the last 3 practices based on experience from efficient green equipment rooms at Mobile Telecom Operators. 1

3 2.1 Plug holes in the raised floor Most raised-floor environments have cable holes, conduit holes and other breaches that allow cold air to escape and mix with hot air. This single low-tech retrofit can save as much as 10% of the energy used for data centre cooling. 2.2 Install blanking panels Any unused position in a rack needs to be covered with a blanking panel to manage airflow in a rack by preventing the hot air entering the cold-air intake of other equipment in the same rack. When the panels are used effectively, supply air temperatures are lowered by as much as 5.6 C, greatly reducing the electricity consumed by fans in the IT and Telecom equipment, and alleviating hot spots in the data centre. 2.3 Co-ordinate CRAC units Older equipment rooms air-conditioning units (CRACs) operate independently in cooling and dehumidifying the air. These units should be tied together so efforts are co-ordinate. Alternatively, humidification responsibilities can be removed from them altogether and place with a newer piece of technology. Please consult with Air-Site how this can be achieved in a cost efficient way. Air-Site control systems for equipment room climate control. 2

4 2.4 Improve the under-floor airflow Older equipment rooms typically have constrained space underneath the raised floor that is not only used for the distribution of cold air, but also has served as a place for data cables and power cables. Many old equipment rooms have accumulated such a tangle of these cables that airflow is restricted, so the under-floor should be cleaned out to improve airflow. 2.5 Implement hot aisles and cold aisles In traditional equipment rooms, racks were set up in what is sometimes referred to as a "classroom style," where all the intakes face in a single direction. This arrangement causes the hot air exhausted from one row to mix with the cold air being drawn into the adjacent row, thereby increasing the cold-air-supply temperature in uneven and sometimes unpredictable ways. Please note that when the temperature cannot be predicted, the overall temperature has to be lowered to give the right temperature even in the blind spots. Newer rack layout practices instituted in the past 10 years demonstrate that organizing rows into hot aisles and cold aisles is better at controlling the flow of air in the equipment room. 2.6 Analyse the temperature A small number of sensors can be placed in areas where temperature problems are suspected. Sensors store temperature data that can be transferred into a spreadsheet, where it can be further analysed. This can provide insight into possible temperature problems, as well as a method for analysing the results of improvements made to the cooling. Using Air-Site SiteManager, you can connect many sensors, log the temperature values locally and upload them to your computer automatically or on-demand, locally or remotely via wireless Telecom lines, Internet or your intranet. SiteManager provides the means of analysing the temperature data with powerful built in tools and also export to a spreadsheet or database. 3

5 2.7 Implement cold-aisle or hot-aisle containment Once a data-centre has been organised around hot aisles and cold aisles, dramatically improved separation of cold air supply and hot exhaust air through containment becomes an option. For most users, hot-aisle containment or cold-aisle containment will have the single largest payback of any of these energy efficiency best practices. 2.8 Raise the temperature in the data centre Many data-centres are run colder than an efficient standard. The American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) has increased the top end of allowable supply-side air temperatures from 25 C to 26.7 C. Not all equipment rooms should be run at the top end of this temperature range, but a step-by-step increase, even to the 75 F (23.9 C) to 76 F (24.4 C) range, would have a beneficial effect on equipment rooms electrical use. 2.9 Install variable speed fans and pumps Traditional CRAC units contain fans that run at a single speed. Emerging best practice suggests variable speed fans be used whenever possible. A reduction of 10% in fan speed yields a reduction in the fan's electrical use of around 27%. A 20% speed reduction yields electrical savings of around 49%. 4

6 Air-Site offers a wide range of control systems that can not only connect the cooling equipment together, but also controls each unit at its optimal point Design equipment rooms using modular cooling Traditional raised-floor-perimeter air distribution systems have long been the method used to cool equipment rooms. However, mounting evidence strongly points to the use of modular cooling (in-row or in-rack) as more energy-efficient Exploit "free cooling" "Free cooling" is the general name given to any technique that cools air without the use of chillers or refrigeration units. The two most common forms of free cooling are air-side economisation (Called Free Air Cooling) and water/gas-side economisation. Free Air Cooling is by far more energy efficient as it is works directly to cool the room and not by transfer of the heat/cold to other media. How much the free air can be used to cool the equipment room is depends on two factors: A. The local climate and can be everything between 100 hours per year to complete year around. B. The particular free cooling system efficiency Free Cooling System Efficiency By standard, the difference in temperature between 1.5 m above the floor level in the equipment room, and the colder outdoors air is called Delta T. A Free Cooling system efficiency is defined by how low Delta T it can achieve. Lower Delta T maximizes the number of usable hours through the year to utilize the outdoor temperature to cool the indoor temperature. In many climate zones (such as in UK) an efficient free cooling system with the right heat load dimensioning will suffice round the year and an active cooling system is not needed in most cases if a sufficiently efficient Free Cooling system is implemented. In warmer climate zones though, a combination of Free Air Cooling and traditional air conditioners can be used but to maximize the benefit, the two systems must be controlled by a single source of control. 5

7 Some free air cooling systems use the forced ventilation principle, that is cool air is pumped directly into the equipment room through some kind of filtering mechanism. Forced Ventilation causes the hot and cool air to mix with each other, resulting in an average indoor air temperature. The air that leaves the room is therefore not the hot air but the mixed average temperature air, which would mean a high Delta-T by definition. A Delta T of up to 12 C is not unusual when forced ventilation is used. This would mean that only outdoor temperatures of up to 13 C can be used to achieve 25 C. For example in UK, that would mean only half of the year in hours. The keep 25 degrees in the room, air conditioners have to be utilized the rest of the year. A forced ventilation system has also some other drawbacks. To push out heat from the room, large fans are required at high speed. That could result in unwanted noise levels as well as more dust particles clogging up the filter in a short time period. The efficiency of the system will gradually decrease as the filter clogs up resulting in even higher Delta-T, and hence longer usage of air conditioners and higher power consumption. Research at Air-Site Group has shown that using air pressure instead of Forced Ventilation can provide much better results in terms of Delta-T. This technology called Pressure Cooling utilizes the outside air but to slightly higher pressure in the equipment room. As by the force of nature, heat always raises upwards from the equipment. Pressure Cooling systems works ALONG the natural law of Heat Dissipation and only increases the speed of this process, pressing the hot air up to the ceiling. Adding an exhaust air vent close to the ceiling of the equipment room, will vacate only the hottest air layer. By working alongside the natural process, the technology offers tremendous additional savings in power and achieves a Delta-T of down to 1 C, that is, almost same temperatures as outside can be achieved with this technology. For a set point of 25 C, outdoor temperatures of up to 24 C can be utilized for efficient cooling indoors. For a moderate climate zone, that would be almost all around the year. Beside the uniquely low Delta T, pressure cooling obviously requires considerably less air enabling smaller fan motors which offer: - Lower power consumption. - Lower noise levels. - Less dust in the filters and thus longer time between service Air-Site filters (type F6) comprise of long (1.6 m) bag shaped socks and have in practice shown to be capable of keeping harmful particles from reaching the equipment. The mean time between is up to 5 years requiring minimum system maintenance. Air-Site's wide range of control systems allows use of a combination of free air cooling and up to two sets of air conditioning systems to work together, one as main and the second as backup. Also, many different control scenarios such as emergency cooling, fire, power outage etc is predicted and processed. 6

8 Please consult with Air-Site about use of free cooling and related control and communication systems Explore racks with top mounted hot air outlet Racks, utilizing the new cooling techniques, force the hot air towards the ceiling. This, in combination with a free air cooling system that builds up a higher pressure in the room than outside, force the hot air out from an air outlet (close to the ceiling of the equipment room) at the same time that the cool air is pressed from below lifting the hot air even more Use automatic control to turn off equipment when not used Equipment rooms are used for different purposes but not all equipment is used all the time. For example, backup servers can be switched off when the backup is finished. At low traffic hours, redundant equipment can be put in to rest etc. Many new servers have this functionality as a built in property that needs to be set up. For others, an automatic switching on and off, may result in longer MTBF (Mean Time between Failures) and power savings, depending on the specifications Consider the service frequency when designing an equipment room. Some operators have a long distance between their equipment rooms making the travel more costly than performing the actual service. Using equipment that have long MTBF (Mean Time Between Failure) is not only essential for keeping a high service level, but is also essential for saving the cost of travel. An air conditioner is traditionally a service requiring equipment. Following simple practices could help extending the life time of the air conditioners: A. Minimize the number of hours air conditioners are on by using a free air cooling system. B. If there is a backup air conditioners, switch between the main and secondary air conditioners, keeping in mind how much time each system has been used. As an example, assume that a Free Air Cooling system can be used instead of the air conditioners ¾ of the year. That would prolong the life of the air conditioners with four times. If the work is then shared between the primary and secondary air conditioner system, the service period will be extended by 8 times. Using free air cooling has a number of other benefits when controlled in an intelligent way. In case of a power failure, a free air cooling system will consume considerably less power than air conditioners. That will load the backup batteries less and gives the equipment room a longer emergency life. Also in case of air conditioner failure, the equipment room can continue its function using the free air cooling system but a temporary higher temperature until the air conditioner system is functioning again. 7

9 Frequent exchange/cleaning filters for free air cooling systems may be a time demanding and costly factor which has to be calculated in the design of the equipment rooms. The longer between the filter change/cleaning, the less cost and better performance (lower Delta T.) 3 Conclusion Although most users will not be able to immediately implement all 14 best practices, all users will find at least three or four that can be immediately implemented in their current equipment rooms. Savings in electrical costs of 10 to 30% are achievable through these most available techniques. Users committed to aggressively implementing all 14 best practices can save up to 70% of the cooling cost. 8

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the

More information

Airflow Simulation Solves Data Centre Cooling Problem

Airflow Simulation Solves Data Centre Cooling Problem Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length

More information

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Technical Paper (13 December 2013) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw

More information

- White Paper - Data Centre Cooling. Best Practice

- White Paper - Data Centre Cooling. Best Practice - White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH

More information

Choosing Close-Coupled IT Cooling Solutions

Choosing Close-Coupled IT Cooling Solutions W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of

More information

DataCenter 2020: first results for energy-optimization at existing data centers

DataCenter 2020: first results for energy-optimization at existing data centers DataCenter : first results for energy-optimization at existing data centers July Powered by WHITE PAPER: DataCenter DataCenter : first results for energy-optimization at existing data centers Introduction

More information

Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems

Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems Data Center Cooling A guide from: Your partners in UPS Monitoring Systems The air in your server room, especially nearest the processors in your equipment, will rise to dangerous temperatures quickly if

More information

Data Center Technology: Physical Infrastructure

Data Center Technology: Physical Infrastructure Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider

More information

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.

More information

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200

More information

OPEN RACK APPROACHES FOR MAXIMIZING THE EFFICIENCY OF EQUIPMENT IN A COLD- AISLE/HOT-AISLE DATA CENTER ENVIRONMENT By: Lars Larsen Product Manager -

OPEN RACK APPROACHES FOR MAXIMIZING THE EFFICIENCY OF EQUIPMENT IN A COLD- AISLE/HOT-AISLE DATA CENTER ENVIRONMENT By: Lars Larsen Product Manager - OPEN RACK APPROACHES FOR MAXIMIZING THE EFFICIENCY OF EQUIPMENT IN A COLD- AISLE/HOT-AISLE DATA CENTER ENVIRONMENT By: Lars Larsen Product Manager - Physical Support Ortronics/Legrand WHITE PAPER Open

More information

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room

More information

A White Paper from the Experts in Business-Critical Continuity TM. Data Center Cooling Assessments What They Can Do for You

A White Paper from the Experts in Business-Critical Continuity TM. Data Center Cooling Assessments What They Can Do for You A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly

More information

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Energy Efficiency Best Practice Guide Data Centre and IT Facilities 2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits

More information

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building

More information

Elements of Energy Efficiency in Data Centre Cooling Architecture

Elements of Energy Efficiency in Data Centre Cooling Architecture Elements of Energy Efficiency in Data Centre Cooling Architecture Energy Efficient Data Center Cooling 1 STULZ Group of Companies Turnover 2006 Plastics Technology 400 Mio A/C Technology 200 Mio Total

More information

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no

More information

Integrated Cabinets and Thermal Systems May 15, 2014 Panduit Korea Technical System Engineer Chester Ki

Integrated Cabinets and Thermal Systems May 15, 2014 Panduit Korea Technical System Engineer Chester Ki 1 Integrated Cabinets and Thermal Systems May 15, 2014 Panduit Korea Technical System Engineer Chester Ki 4/10/2014 2 Agenda Market Trends Thermal Architectures Data Centre Cabinet Systems Net-Access Cabinet

More information

Hot Aisle vs. Cold Aisle Containment

Hot Aisle vs. Cold Aisle Containment Hot Aisle vs. Cold Aisle Containment By John Niemann White Paper #135 Executive Summary Both hot and cold air containment can significantly improve the predictability and efficiency of data center cooling

More information

Re Engineering to a "Green" Data Center, with Measurable ROI

Re Engineering to a Green Data Center, with Measurable ROI Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices

More information

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency

More information

Data Center Power Consumption

Data Center Power Consumption Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling

More information

Analysis of data centre cooling energy efficiency

Analysis of data centre cooling energy efficiency Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe

More information

Benefits of. Air Flow Management. Data Center

Benefits of. Air Flow Management. Data Center Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment

More information

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Data Center 2020: Delivering high density in the Data Center; efficiently and reliably March 2011 Powered by Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Review:

More information

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

Data Centers. Datacom Airflow Patterns

Data Centers. Datacom Airflow Patterns The following article was published in ASHRAE Journal, April 2005. Copyright 2005 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe Daniele.Tordin@Panduit.com AGENDA Business Drivers Challenges

More information

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010 White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence

More information

APC APPLICATION NOTE #92

APC APPLICATION NOTE #92 #92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center

More information

National Grid Your Partner in Energy Solutions

National Grid Your Partner in Energy Solutions National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National

More information

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Agenda Review of cooling challenge and strategies Solutions to deal with wiring closet cooling Opportunity and value Power

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center

More information

Energy Efficient Server Room and Data Centre Cooling. Computer Room Evaporative Cooler. EcoCooling

Energy Efficient Server Room and Data Centre Cooling. Computer Room Evaporative Cooler. EcoCooling Energy Efficient Server Room and Data Centre Cooling Computer Room Evaporative Cooler EcoCooling EcoCooling CREC Computer Room Evaporative Cooler Reduce your cooling costs by over 90% Did you know? An

More information

EHDC. Cooling system for Data Center and server cabinets.

EHDC. Cooling system for Data Center and server cabinets. EHDC Cooling system for Data Center and server cabinets. EHDC PEN LP EHDC L is a High Density Cooling module for an pen Loop configuration. It is ideally installed with Enoc Systems cold corridor containment

More information

Data Operations Center Renovation

Data Operations Center Renovation Data Operations Center Renovation Frederick County s main Data Center is located at Winchester Hall and was originally designed to house five HP3000 computer systems and the support hardware needed for

More information

Reducing the Annual Cost of a Telecommunications Data Center

Reducing the Annual Cost of a Telecommunications Data Center Applied Math Modeling White Paper Reducing the Annual Cost of a Telecommunications Data Center By Paul Bemis and Liz Marshall, Applied Math Modeling Inc., Concord, NH March, 2011 Introduction The facilities

More information

High Density in the Data Center

High Density in the Data Center High Density in the Data Center Choosing and specifying density High density in an existing environment High density in a new environment Presented by: Christopher Eko Business Development - ASEAN All

More information

Google s Green Data Centers: Network POP Case Study

Google s Green Data Centers: Network POP Case Study Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice

More information

An Introduction to Cold Aisle Containment Systems in the Data Centre

An Introduction to Cold Aisle Containment Systems in the Data Centre An Introduction to Cold Aisle Containment Systems in the Data Centre White Paper October 2010 By Zac Potts MEng Mechanical Engineer Sudlows October 2010 An Introduction to Cold Aisle Containment Systems

More information

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com

More information

Office of the Government Chief Information Officer. Green Data Centre Practices

Office of the Government Chief Information Officer. Green Data Centre Practices Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain

More information

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational

More information

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.

More information

Improving Data Center Energy Efficiency Through Environmental Optimization

Improving Data Center Energy Efficiency Through Environmental Optimization Improving Data Center Energy Efficiency Through Environmental Optimization How Fine-Tuning Humidity, Airflows, and Temperature Dramatically Cuts Cooling Costs William Seeber Stephen Seeber Mid Atlantic

More information

Cooling Options for Rack Equipment with Side-to-Side Airflow

Cooling Options for Rack Equipment with Side-to-Side Airflow Cooling Options for Rack Equipment with Side-to-Side Airflow By Neil Rasmussen White Paper #50 Executive Summary Equipment with side-to-side airflow presents special cooling challenges in today s data

More information

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

Cooling Audit for Identifying Potential Cooling Problems in Data Centers Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous

More information

POWER USAGE EFFECTIVENESS. Developing Best Practices Manual for Indian Data Centers. Presentation by HVAC Core Group

POWER USAGE EFFECTIVENESS. Developing Best Practices Manual for Indian Data Centers. Presentation by HVAC Core Group POWER USAGE EFFECTIVENESS Developing Best Practices Manual for Indian Data Centers PUE - Power usage effectiveness is Total incoming power( IT equipment + electrical And mechanical support system ) / Presentation

More information

White Paper Rack climate control in data centres

White Paper Rack climate control in data centres White Paper Rack climate control in data centres Contents Contents...2 List of illustrations... 3 Executive summary...4 Introduction...5 Objectives and requirements...6 Room climate control with the CRAC

More information

Improving Data Center Efficiency with Rack or Row Cooling Devices:

Improving Data Center Efficiency with Rack or Row Cooling Devices: Improving Data Center Efficiency with Rack or Row Cooling Devices: Results of Chill-Off 2 Comparative Testing Introduction In new data center designs, capacity provisioning for ever-higher power densities

More information

Environmental Data Center Management and Monitoring

Environmental Data Center Management and Monitoring 2013 Raritan Inc. Table of Contents Introduction Page 3 Sensor Design Considerations Page 3 Temperature and Humidity Sensors Page 4 Airflow Sensor Page 6 Differential Air Pressure Sensor Page 6 Water Sensor

More information

Managing Data Centre Heat Issues

Managing Data Centre Heat Issues Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design

More information

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Kenneth G. Brill, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies, Inc. 505.798.0200

More information

Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling

Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling Saving energy in the Brookhaven National Laboratory Computing Center: Cold aisle containment implementation and computational fluid dynamics modeling Student Intern Earth and Environmental Engineering,

More information

Data center upgrade proposal. (phase one)

Data center upgrade proposal. (phase one) Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

Using CFD for optimal thermal management and cooling design in data centers

Using CFD for optimal thermal management and cooling design in data centers www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel

More information

AIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland

AIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland AIA Provider: Colorado Green Building Guild Provider Number: 50111120 Office Efficiency: Get Plugged In AIA Course Number: EW10.15.14 Speaker: Geoff Overland Credit(s) earned on completion of this course

More information

Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures

Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD

More information

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue

More information

Hot-Aisle vs. Cold-Aisle Containment for Data Centers

Hot-Aisle vs. Cold-Aisle Containment for Data Centers Hot-Aisle vs. Cold-Aisle Containment for Data Centers White Paper 135 Revision 1 by John Niemann, Kevin Brown, and Victor Avelar > Executive summary Both hot-air and cold-air containment can improve the

More information

Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant

Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant RESEARCH UNDERWRITER WHITE PAPER LEAN, CLEAN & GREEN Wright Line Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant Currently 60 percent of the cool air that

More information

RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful

RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful RACKMOUNT SOLUTIONS 1/7/2013 AcoustiQuiet /UCoustic User Guide The AcoustiQuiet /UCoustic User Guide provides useful hints, tips and advice to help maximize the thermal and acoustic properties of the cabinets.

More information

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich

More information

Great Lakes Data Room Case Study

Great Lakes Data Room Case Study Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment

More information

IBM Twin Data Center Complex Ehningen Peter John IBM BS peter.john@de.ibm.com. 2011 IBM Corporation

IBM Twin Data Center Complex Ehningen Peter John IBM BS peter.john@de.ibm.com. 2011 IBM Corporation IBM Twin Data Center Complex Ehningen Peter John IBM BS peter.john@de.ibm.com Overview Profile IBM owned facility 6447 m² IT-Space Infrastructure concurrent maintainable (Tier Level 3) Feed-ins of Power

More information

Greening Commercial Data Centres

Greening Commercial Data Centres Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling

More information

Top 5 Trends in Data Center Energy Efficiency

Top 5 Trends in Data Center Energy Efficiency Top 5 Trends in Data Center Energy Efficiency By Todd Boucher, Principal Leading Edge Design Group 603.632.4507 @ledesigngroup Copyright 2012 Leading Edge Design Group www.ledesigngroup.com 1 In 2007,

More information

Reducing Data Center Energy Consumption

Reducing Data Center Energy Consumption Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate

More information

Ductless Heat Pump Homeowner Guide & FAQs

Ductless Heat Pump Homeowner Guide & FAQs Ductless Heat Pump Homeowner Guide & FAQs No matter what temperature the outdoor thermometer reads, Dead River Company provides year-round comfort in any weather. A ductless heat pump requires no ductwork,

More information

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building rsed Energy Efficiency & Renewable Energy FEDERAL ENERGY MANAGEMENT PROGRAM Reducing Data Center Loads for a Large-Scale, Net Zero Office Building Energy Efficiency & Renewable Energy Executive summary

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

The Benefits of Supply Air Temperature Control in the Data Centre

The Benefits of Supply Air Temperature Control in the Data Centre Executive Summary: Controlling the temperature in a data centre is critical to achieving maximum uptime and efficiency, but is it being controlled in the correct place? Whilst data centre layouts have

More information

QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS

QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS WHITE PAPER #30 QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS EDITOR: Bob Blough, Emerson Network Power CONTRIBUTORS: John Bean, APC by Schneider Electric Robb Jones, Chatsworth Products

More information

Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan

Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan Please read this owner s Manual carefully before operating the unit. - Cooling - Heating - Dehumidifying - Fan TABLE OF CONTENTS INTRODUCTION 2 IMPORTANT SAFEGUARDS...2 PACKAGE CONTAINS..2 NAMES OF PARTS.3

More information

Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency

Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency Impact of Hot and Cold Aisle Containment on Data Center Temperature and Efficiency White Paper 135 Revision 4 by John Niemann, Kevin Brown, and Victor Avelar Executive summary Both hot-air and cold-air

More information

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs WHITE PAPER Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs By Lars Strong, P.E., Upsite Technologies, Inc. 505.798.000 upsite.com Reducing Room-Level

More information

Virtualization and Consolidation

Virtualization and Consolidation Virtualization and Consolidation Choosing a density strategy Implementing a high density environment Maximizing the efficiency benefit The 7 Design Principles of InfrastruXure Presented by: Jeffrey N.

More information

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com

More information

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack

More information

Data Center Energy Profiler Questions Checklist

Data Center Energy Profiler Questions Checklist Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space

More information

Increase Rack Cooling Efficiency and Solve Heat-Related Problems

Increase Rack Cooling Efficiency and Solve Heat-Related Problems W H I T E P A P E R Increase Rack Cooling Efficiency and Solve Heat-Related Problems Low-Cost and No-Cost Cooling Best Practices Provide Exceptional ROI for Small to Mid-Size Data Centers Executive Summary

More information

Implementing Energy Efficient Data Centers

Implementing Energy Efficient Data Centers Implementing Energy Efficient Data Centers By Neil Rasmussen White Paper #114 Executive Summary Electricity usage costs have become an increasing fraction of the total cost of ownership (TCO) for data

More information

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National

More information

Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation

Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation Version 1.0 - November, 2011 Incorporating Data Center-Specific Sustainability Measures into

More information

SiteManager. Air-Site s advanced facility management system

SiteManager. Air-Site s advanced facility management system Air-Site s advanced facility management system Brochure ENG Page 2 of 6, facility management, communication, Table of Contents What is?... 3 Saving power in an equipment room... 4 Outsourcing... 5 Solutions

More information

Lesson 36 Selection Of Air Conditioning Systems

Lesson 36 Selection Of Air Conditioning Systems Lesson 36 Selection Of Air Conditioning Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this chapter are to: 1. Introduction to thermal distribution systems and their functions (Section

More information

Rittal White Paper 509: Inner-Rack Airflow Patterns & Data Center Efficiency By: Daniel Kennedy

Rittal White Paper 509: Inner-Rack Airflow Patterns & Data Center Efficiency By: Daniel Kennedy Rittal White Paper 509: Inner-Rack Airflow Patterns & Data Center Efficiency By: Daniel Kennedy Executive Summary Understanding airflow patterns in the data center environment requires knowledge of several

More information

In Row Cooling Options for High Density IT Applications

In Row Cooling Options for High Density IT Applications In Row Cooling Options for High Density IT Applications By Ramzi Y. Namek, PE, LEED AP, BD+C; Director of Engineering 1 Users wishing to deploy high density IT racks have several In Row Cooling solutions

More information

Thermal Optimisation in the Data Centre

Thermal Optimisation in the Data Centre Thermal Optimisation in the Data Centre Best Practices for achieving optimal cooling performance and significant energy savings in your data centre 1. Thermal analysis 2. Cold-Aisle-Containment 3. Seal

More information

HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE

HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation AIRFLOW MANAGEMENT COLD AND HOT AISLE CONTAINMENT DC ASSESSMENT SERVICES Achieving true 24/7/365

More information

Data Centre Cooling Air Performance Metrics

Data Centre Cooling Air Performance Metrics Data Centre Cooling Air Performance Metrics Sophia Flucker CEng MIMechE Ing Dr Robert Tozer MSc MBA PhD CEng MCIBSE MASHRAE Operational Intelligence Ltd. info@dc-oi.com Abstract Data centre energy consumption

More information

Fact Sheet (Web Content): Improving Energy Efficiency for Server Rooms and Closets

Fact Sheet (Web Content): Improving Energy Efficiency for Server Rooms and Closets Fact Sheet (Web Content): Improving Energy Efficiency for Server Rooms and Closets September 2012 Table of Contents A) Simplest, No-Cost, or Very-Low-Cost Measures 1. Determine computational functions

More information

Economizer Fundamentals: Smart Approaches to Energy-Efficient Free-Cooling for Data Centers

Economizer Fundamentals: Smart Approaches to Energy-Efficient Free-Cooling for Data Centers A White Paper from the Experts in Business-Critical Continuity TM Economizer Fundamentals: Smart Approaches to Energy-Efficient Free-Cooling for Data Centers Executive Summary The strategic business importance

More information

News in Data Center Cooling

News in Data Center Cooling News in Data Center Cooling Wednesday, 8th May 2013, 16:00h Benjamin Petschke, Director Export - Products Stulz GmbH News in Data Center Cooling Almost any News in Data Center Cooling is about increase

More information

Data Center Airflow Management Retrofit

Data Center Airflow Management Retrofit FEDERAL ENERGY MANAGEMENT PROGRAM Data Center Airflow Management Retrofit Technology Case Study Bulletin: September 2010 Figure 1 Figure 2 Figure 1: Data center CFD model of return airflow short circuit

More information

heating 3 & cooling heating and cooling 2010 PulteGroup, Inc. All Rights Reserved.

heating 3 & cooling heating and cooling 2010 PulteGroup, Inc. All Rights Reserved. 3 & cooling 17 heating 2010 PulteGroup, Inc. All Rights Reserved. condensation The line that drains condensed moisture away from your heating and/or cooling unit needs periodic maintenance. Air conditioning

More information