1 BYXBEE PARK PALO ALTO LANDFILL CLOSURE GRADING Landscape Design Consultation JANUARY 2007

2

3 Byxbee Park Palo Alto Landfi ll Closure Grading Landscape Design Consultation January 2007 Hargreaves Associates Sean Kennedy... Palo Alto Public Works / Operations Ken Haskell... Golder Associates (Engineers) Peter Richards... Artist Michael Oppenheimer...Artist 1

4 CONTENTS 2

5 Purpose List of fi gures... 5 Intent of Study... 6 Method of Study... 7 Background Byxbee Park History... 8 Master Plan Design Principles... 9 Study Materials Master Plan Closure Permit Grading Plan Drainage Plan Current Topographical Survey Recommendations Recommendation Recommendation Recommendation Recommendation Summary Results Implementation

6 LIST OF FIGURES 4

7 Figures Figure 1: Master Plan 3D Model Figure 2: Byxbee Park Plan Figure 3: Closure Plan 3D Model Figure 4: City of Palo Alto Landfi ll Plan Figure 5: Byxbee Landfi ll-park Drainage Plan Figure 6: Current Survey 3d Model Figure 7: City of Palo Alto Landfi ll Figure 8: Master Plan and Closure Plan 3D Model Overview Figure 9: Master Plan and Closure Plan 3D Models Superimposed Figure 10: Master Plan 3D Model Closeup Figure 11: Closure Plan 3D Model Closeup Figure 12: Master Plan 3D Model Overview Figure 13: Closure Plan Model and Current Survey Models Figure 14: Master Plan Model Figure 15: Master Plan 3D Model Overview Figure 16: Master Plan 3D Model Closeup with Top of Trash Points Figure 17: Closure Plan and Survey 3D Models Overview Figure 18: Survey and Closure Plan 3D Model Superimposed Detail View Figure 19: Master Plan 3D Model Detail View Figure 20: Master Plan and Closure Plan 3D Models Overview Figure 21: Master Plan and Closure Plan 3D Models Detail Figure 22: Diagram Section of Smoothing

8 INTENT OF STUDY This report provides professional landscape consultation on the closure grading of the Palo Alto landfi ll upon which the future phases of Byxbee Park will be developed. Phase One of the park was constructed upon already completed landfi ll forms and at that time the Byxbee Park design team of landscape architects Hargreaves Associates and artists Peter Richards and Michael Oppenheimer were asked to make suggestions as to the future phases of both the landfi ll forms and the park. Those suggestions were documented and approved in the 1991 Master Plan. Since that time a large majority of the landfi ll closure has taken place. The already closed areas closely conform to the Master Plan grading while the still active areas differ from the Master Plan grading for a variety of reasons. It is the concern of the city of Palo Alto that the completed landfi ll foundation of the park be complementary to the intention of the June 1991 Master Plan update authored by Hargreaves Associates. Therefore Hargreaves Associates was asked to form a study team to review the materials available at this time to determine if the closure grading plan currently being utilized by Palo Alto s Public Works/Operations (PW/OPS) is acceptable. Included in the study team are the original artists from the design team and Ken Haskell, an engineer with Golden Associates. PURPOSE 6

9 This report is thus an assessment of the landfi ll work done since the completion of the phase one park, the modifi cations that have occurred and any impacts they may have to the future park completion, and contains recommendations both in regards to the landfi ll closure as well as to the next steps now appropriate in the design of the completion of the park. While the Master Plan does include some basic ideas as a framework for the phase two park s completion, it was always intended that at the time of fi nal closure the phase two park s design should move into full services of schematic design, design development and construction drawings. That process is still appropriate, but in addition there are now new opportunities for the park as a result of the landfi ll operations and other changes to facilities adjacent to the park. plans, currently proposed plans and the current existing site, the study team was able to arrive at a series of recommendations. The material presented in this report includes the model images developed for that study. The images illustrate the current conditions and the variables presented by the current closure plan and the Master Plan. The recommendations clarify how the grading fi ts within the goals of the Master Plan design. They also address areas of the site that should receive further attention during fi nal grading in order to fi t within the intention of the closure grading plan. Images used within the recommendations indicate these specifi c areas and clarify aesthetic grading considerations that will facilitate the transition of the landfi ll to a foundation for the completed Byxbee Park. The landscape of Byxbee Park is dependent on the forms created by the operations of the landfi ll. The current landfi ll operations and the fi nal grading of the cap and topsoil that will take place in the next several years will be the basis for Byxbee Park s fi nal development. METHOD OF STUDY Through a process of computer modeling and discussion of the distinguishable differences between previously proposed 7

10 BYXBEE PARK HISTORY There are two prior reports addressing the development of the Palo Alto landfi ll as Byxbee Park: the 1980 Master Plan for Byxbee Landfi ll Park and the 1991 Byxbee Park Palo Alto Baylands Update. The 1980 Master Plan by Eckbo Kay Associates et. al. provided an initial idea for creating the park. Subsequent changes in landfi ll regulations created requirements for the form and construction of the landfi ll which still have application today. Over time, additional input from the city and community mandated efforts to reduce costs and to integrate the landscape with the Baylands context. The City of Palo Alto Municipal Arts Plan also played a role in the park s development by requiring a public art element and indeed the requirement that the artists would be selected fi rst and then assist in the selection of the landscape architects. The design team was thus assembled to address these components and as led by Hargreaves Associates produced the Byxbee Park Palo Alto Baylands Update in June 1991 which in this report is referred to as the Master Plan. BACKGROUND The Master Plan contains the design documents to construct Phase I and overall plan guidelines for Phase II. Phase I was successfully constructed and has been in public service since that time, enjoying a high degree of use as well as recognition within the design and art world in the form of numerous awards and publications both nationally and internationally. 8

11 The landscape concepts and plans illustrated in the Master Plan are the starting point for examining any developments as the Phase II effort approaches. This study includes the current analysis necessary to determine if the closure grading plan is acceptable, and to determine any modifi cations necessary both to the closure plan and to the phase two park development. a rich variety of different landscape experiences for the park visitor. The summits and draws also provide varied opportunities for the designers and the artists to locate different artworks and to create habitat variations. This makes the park an exploratory experience as visitors discover art and unique terrain throughout the park all within the context of the subtle colors and textures of the land. MASTER PLAN DESIGN PRINCIPLES The design principles generated in the Master Plan emphasize the inherent qualities of the site: Prospect and Refuge. Prospect is an experience of expansive views from an elevation above the surrounding area while refuge is an experience of protection resulting from a more sheltered environment. The oversized mounding of the land as a result of the landfi ll operation creates high windswept areas with expansive views- Prospect in all directions at this location on the edge of the bay. The leeward sides and the valleys between the landfi lled hills provide Refuge from the breezes that are common to the area. These refuges provide a concentration of environmental diversity for the benefi t of habitat and the experience of park visitors. The variety of landforms created by the landfi ll operations is unique in this area of sloughs and lower elevation bay shore lands. The smaller more intricate hills of Phase I and the larger forms of Phase II provide The fundamental structure for these environmental experiences is the mounding of garbage but the park elements add to these experiences by emphasizing the inherent characteristics of the landfi ll forms for example the windgate in phase one emphasizes one of the more pronounced draws or valleys of the site, while the hillocks atop the landfi ll forms provide points of refuge places to be out of the wind at the highest points of the site. In addition the recreational and art elements of the park are designed to increase awareness of the environment, not only the natural context but the fact of the human intervention the landfi ll as well. Disposal of our refuse is a necessary operation of human society. An operation which in this case is integrated back into our occupied environment as a landscape for recreation and native vegetation and animal life. This juxtaposition of man and nature illustrates the admirable human desire to be a steward of the occupied land, to maximize its benefi ts, and to foster native habitat wherever possible. 9

12 The original 1988 Master Plan drawing on the right (fi gure 2) and the 3D model on the left (fi g- ure 1) illustrating the original intention for the landforms to be created by operations. This plan was approved by the city of Palo Alto. Figure 1: Master Plan 3d Model MASTER PLAN 10

13 Figure 2: Byxbee Park Plan, July 1988, Revised Feb. 1989, drawn by Hargreaves Associates. 11

14 The closure permit plan (fi gure 3) grafts the intended contours for closure (A) onto already completed work (B). The drawing on the right (fi gure 4) was approved by the State of California. B A Figure 3: Closure Plan 3d Model CLOSURE PERMIT GRADING PLAN 12

15 B A Figure 4: City of Palo Alto Landfi ll Plan, May 2005, drawn by HJW Geospatial Inc. 13

16 The drainage plan (fi gure 5) was developed separately from the design documents of the Master Plan. It was published in December of 1988 after the Master Plan grading design process. The drainage plan suggested a need for grading changes as areas were measured for drainage, and swales were developed that were not part of the Master Plan s grading scheme. In this drainage plan, it can be seen how the grading for the closure permit plan continued to be developed after the Master Plan. The more sinuous form of the northwest ridge (A) is thus developed in this plan. DRAINAGE PLAN 14

17 A Figure 5: Byxbee Landfi ll-park Drainage Plan, December 1988, drawn by Mark Thomas & Co. Inc. 15

18 The current topography of the site (fi gures 6 & 7) shows the windrows and other forms inherent to the landfi ll operations (A). These ares are still to be completed. The completed area (B) of phase II has already fairly closely assumed the form of the Master Plan intention. B A Figure 6: Current Survey 3d Model CURRENT TOPOGRAPHICAL SURVEY 16

19 B A Figure 7: City of Palo Alto Landfi ll, Photography Date May 2006, drawn by HJW Geospatial Inc. 17

20 Figure 8: Master plan and closure plan 3d model overview. The most signifi cant recognizable modifi cation to the Master Plan addressed by this report is the change in form of the last phase of the landfi ll. The ridge that now has a more serpentine quality was previously intended as a simple extension of a much larger form in the phase II landscape which presented itself in plan as a simple butterfly form, with smoothed rounded flanks on all sides. Figure 9 shows a combination of the Master Plan overlaid with the permit plan. Figure 10 shows the Master Plan and fi gure 11 shows the permit plan. The essential difference of the permit plan from the Master Plan is that this more complex ridge will change its alignment from north-south to east-west and back again and in the process will create additional drainage valleys. Implementing the Master Plan design principles on this more complex landform means that there will be more opportunities for Refuge. These are places that can become more concentrated with diverse vegetation, have multiple daylight aspects, provide shelter from the wind, and become locations for design elements or artwork. Therefore the net effect of the serpentine form is an enrichment of the park experience. The study team concludes that the sinuous ridge form at the north end of phase II is acceptable. RECOMMENDATION 1 18

21 Figure 9: Master plan and closure plan 3d models superimposed. Figure 10: Master plan 3d model closeup. Figure 11: Closure plan 3d model closeup. 19

22 Figure 12: Master plan 3d model overview. Looking more closely at the southwestern corner of the site, the closure permit grading plan in fi gure 13 shows a squaring off (A) of the landform that was not intended by the Master Plan grading (fi gure 14). The red lines show how the ridge and slopes should taper down to a point. We recommend that an effort be made to smooth the form in the fi nal grading so that it resembles the more tapered shape intended by the Master Plan, the current plan, if realized as drawn, will make a more typical landfi ll shape square and abrupt and not in keeping with the context of softly undulating hills. In fi gure 13 the blue represents the current surveyed surface and the yellow shows the extent that the grading permit allows. Therefore the soils currently at (A) can be smoothed down or shifted to the ridge and flank (B) areas without exceeding the limits of the permit plan and will help create a fuller distinct tapered shape. Any additional available soil can also be placed in the (B) areas to help build the tapered shape. The study team recommends smoothing the south west corner to match the original intent of the Master Plan. RECOMMENDATION 2 20

23 B B A A Figure 13: Closure plan model and current survey model superimposed. Figure 14: Master Plan model. 21

24 Part of the effort to achieve the Master Plan s desired grading in the southwest corner of the site requires understanding how much can be accomplished in an area that has already been fi lled during landfi ll operations. Figure 15: Master plan 3d model overview. In pursuit of that intent PW/OPS was able to provide Top of Trash elevations in this area which were translated into the models. Discussion with Golder Associates indicates there is some room to achieve the Master Plan design through minor grading efforts while fi nishing this area. Minor excavation of the near surface materials can achieve some of the tapering. Additional fi ll along the ridge and flanks can also help. At locations 12 and 13 the bottom of the exposed red part of the column shows that trash has already been placed above the intent of the Master Plan. Movement of trash to some extent should be considered. The Point 00 marker shows that trash could be placed there and still fi t within the Master Plan grading. The study team recommends moving topsoil and trash to smooth the south west landform to resemble the Master Plan. RECOMMENDATION 2 continued 22

25 How to read this model view: The blue column shows the position of the surveyed points. The bottom of the column is at elevation 0. The top of the column is elevation 60. The red collar shows the layer of topsoil currently existing at each point. The bottom of the collar indicates Top of Trash. The Master Plan 3d model was then superimposed with a transparency allowing comparison between existing and desired conditions. Where the red collar is above the surface of the Master Plan model means trash has been placed higher than originally desired. Where the collar is below the Master Plan surface is an area where more trash and topsoil could be placed. Figure 16: Master plan 3d model closeup with Top of Trash points Position of surveyed points Trash below expected elevation Trash above expected elevation 23

26 Figure 17: Closure plan and Survey 3d models overview. Figure 18 shows a combination view of the current topographic survey and the closure plan. Figure 19 shows the Master Plan in the same area of the swale which occurs at the north end and entry point of the park. The swale is the seam between Phase I and Phase II (A). It was not able to be built to the fi nal Master Plan elevations during Phase I. Due to work during Phase II there has been a resultant steep slope leading into the swale. smoothing the ridge back, if top of trash elevations permit. The study team believes that this newly established valley can be a high profi le element of the park. It is within the welcoming area of the park and deserves to receive a high level of fi nish in the closure grading. Its depth and length also provide greater interest and possibility in fi nal design for access, vegetation, and art. This area represents a new opportunity that the future park design development should address. It is recommended that as work continues in the area of (B) that an effort be made to smooth the fi nal form of the north slope to resemble the Master Plan. Also the mouth of the swale could be opened at (C) by The study team recommends that this valley area be smoothly integrated into the remaining Phase II final grading. Monitor grading quality because of the prominence of this area at the park entry. RECOMMENDATION 3 24

27 A C B Figure 18: Survey and Closure plan 3d model superimposed detail view. Figure 19: Master Plan 3d model detail view. 25

28 Also the brow of hill which is more visible in the permit plan (A) should be smoothed to match the gentler transitions of the Master Plan. In the opinion of the study team, this can be achieved without the effort of modifying the submitted closure permit grading plan. Figure 20: Master plan and Closure plan 3d models overview. The simple diagram at the bottom (fi gure 22) shows in exaggerated form the crisp transition in black and the proposed smoothing of that transition. It is not uncommon to negotiate this synthesis of engineering and landscape grading plans. The more rigid approach of engineering drafting often benefi ts from some subtle smoothing of the transitions as we are suggesting here. The study team recommends that smoothing of the slope transitions be incorporated into final grading. RECOMMENDATION 4 26

29 A A A Figure 21: Master plan and Closure plan 3d models detail. Remove topsoil to obtain smooth transition Figure 22: Diagram section of smoothing. 27

30 RESULTS The four recommendations given will help the fi nal landfi ll form meet the intent of the Master Plan. The study team offers these recommendations because the design goals of the Master Plan were twofold: one) to make the future phases of the landfi ll forms as sympathetic with the Baylands context as possible and two) to create the best possible platform for the future park phases. The recommendations will all work within the permitted closure grading plan. The drainage, trash volume, and boundaries that constrain the closure plan design are intact with the recommendations given. We believe that the operations can proceed as permitted. Monitoring of fi nal grading by PW/OPS will insure these aesthetic refi nements will smooth the transition into the fi nal design and construction phases of the park. SUMMARY The next step is then to realize the implementation of the park elements atop the fi nal landfi ll closure. It will be important to reassess the park elements based on the revisions to the landfi ll forms as there are new opportunities now possible - and the changed context in regards to the needed expansion of parking, and the changes in plans for onsite facilities for recycling and other operations. There are new opportunities because of these changes and as 28

31 well, there is now the opportunity to flesh out the Master Plan for the remaining park in a process of schematic design refi nement and detailing. This is an opportune time to recommend that for a seamless design between Phase One and Two to be realized, the process of design refi nement and detailing for Phase Two should follow that of Phase One. The future phases of the park can now be reassessed and elaborated upon, ideally by the Master Plan design team, based on these new conditions, the use patterns of phase one, any successes or failures and lessons to be learned from phase one and any new technological or environmental conditions to be addressed. The study team appreciates that this study is allowing the future of the park to be considered at this juncture of closing the landfi ll. IMPLEMENTATION The design ideas of the Master Plan can be implemented on the foundation of the closed landfi ll but need some modifi cations due to changed conditions and new opportunities as outlined above. As the time nears to revisit the park design the recommendations of this report can help prepare the foundation upon which work proceeds. Plan can be implemented as originally envisioned but the study team also believes that there are interesting opportunities in the new convolutions created by the new closure grading plan. The entrance and foreground views and access into the park can be studied and made more prominent in the fi nal design of phase II. Now that the recycling and energy facilities that were part of the original Master Plan are no longer, and there is a need for additional parking there is an opportunity to add to the landscape and features at the north end of the park. And with the success and high use of phase one it is important to add adequate access this newly defi ned north area could afford an opportunity for an additional park entrance. The recommendations in this report and the refi ned design work needed for the park elements will improve the already much appreciated public use of the park. With implementation Byxbee Park will be the amenity originally envisioned by the Master Plan and the City of Palo Alto. Several of the pieces in phase II as identifi ed in the Master 29

services NEW ZEALAND INSTITUTE OF ARCHITECTS INCORPORATED GUIDE TO ARCHITECTS SERVICES

services NEW ZEALAND INSTITUTE OF ARCHITECTS INCORPORATED GUIDE TO ARCHITECTS SERVICES 1 e services NEW ZEALAND INSTITUTE OF ARCHITECTS INCORPORATED GUIDE TO ARCHITECTS SERVICES 01 contents 02 guide to architects services 03 architecture in new zealand 04 an architect s skills 05 an architect

More information

Mobile Network Base Station Design Guide User Manual

Mobile Network Base Station Design Guide User Manual Mobile Network Base Station Design Guide User Manual Prepared for the Mobile Carriers Forum and the Design and Innovation Programme Taskforce February 2008 Consultant Contact: Nicole Halsey, Director Urban

More information

Basic Elements of Reading Plans

Basic Elements of Reading Plans Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws

More information

Visual Arts Scope and Sequence

Visual Arts Scope and Sequence ART PRODUCTION Visual Arts Scope and Sequence LINE Recognize lines and line characteristics in the environment I R R R Identify and explore tools that make lines (pencils, crayons, markers, paint brushes)

More information

Description of Simandou Archaeological Potential Model. 13A.1 Overview

Description of Simandou Archaeological Potential Model. 13A.1 Overview 13A Description of Simandou Archaeological Potential Model 13A.1 Overview The most accurate and reliable way of establishing archaeological baseline conditions in an area is by conventional methods of

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

REPORT OF WORK GUIDELINES

REPORT OF WORK GUIDELINES REPORT OF WORK GUIDELINES The following guidelines apply to a report of work submitted under section 56(1) of the Mining Act (http://laws.gnb.ca/en/showdoc/cs/m-14.1). 1 (1) A report of work shall be submitted

More information

This high level land planning and design system will replace the land

This high level land planning and design system will replace the land Performance Planning System () The following is a v1.3 feature analysis, which clarifies differences, between and American Planning Association (APA) Land Based Classification Standards (LBCS) for color

More information

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...

More information

Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries

Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries April 2013 - Revised January 2014 Settlement boundaries are a well utilised planning tool for guiding, controlling and identifying

More information

Watershed Delineation

Watershed Delineation ooooo Appendix D: Watershed Delineation Department of Environmental Protection Stream Survey Manual 113 Appendix D: Watershed Delineation Imagine a watershed as an enormous bowl. As water falls onto the

More information

WE OFTEN BELIEVE artists

WE OFTEN BELIEVE artists Analyzing the Residential Landscape WE OFTEN BELIEVE artists have the liberty to create anything they want. That is sometimes true, but many artists are hired to do particular types of work. Landscape

More information

VISUAL ARTS VOCABULARY

VISUAL ARTS VOCABULARY VISUAL ARTS VOCABULARY Abstract Artwork in which the subject matter is stated in a brief, simplified manner; little or no attempt is made to represent images realistically, and objects are often simplified

More information

Focusing Trade Funds on Your Best Customers: Best Practices in Foodservice Customer Segmentation

Focusing Trade Funds on Your Best Customers: Best Practices in Foodservice Customer Segmentation Blacksmith Applications The Leader in Foodservice Trade Spending Solutions Focusing Trade Funds on Your Best Customers: Best Practices in Foodservice Customer Segmentation Contents Introduction 2 What

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room

Friday, March 9, 2012 1800 Grant Street, 1st Floor conference room Office of the Vice President for Finance 1800 Grant Street, Suite 800 Denver, Colorado 80203 (303) 860-5600 Fax: (303) 860-5640 University of Colorado Design Review Board Minutes Friday, March 9, 2012

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

Price Optimization. For New Business Profit and Growth

Price Optimization. For New Business Profit and Growth Property & Casualty Insurance Price Optimization For New Business Profit and Growth By Angel Marin and Thomas Bayley Non-life companies want to maximize profits from new business. Price optimization can

More information

LEARNING THE LANDFORMS Grade Level: Third Presented by: Elizabeth Turcott, Endeavor Charter Academy, Springfield, Michigan Length of Unit: 14 lessons

LEARNING THE LANDFORMS Grade Level: Third Presented by: Elizabeth Turcott, Endeavor Charter Academy, Springfield, Michigan Length of Unit: 14 lessons LEARNING THE LANDFORMS Grade Level: Third Presented by: Elizabeth Turcott, Endeavor Charter Academy, Springfield, Michigan Length of Unit: 14 lessons I. ABSTRACT This unit develops an understanding of

More information

CHARACTER TYPE 15 RAISED FRINGE SETTLEMENT

CHARACTER TYPE 15 RAISED FRINGE SETTLEMENT CHARACTER TYPE 15 RAISED FRINGE SETTLEMENT Character Area: Grange Park (15 RFS 1) Mossbank (15 RFS 2) Derbyshire Hill / Parr (15 RFS 3) Sutton (15 RFS 4) Key Characteristics settled areas located on raised

More information

Application for Permit to Construct an Individual Sewage Treatment and Disposal System

Application for Permit to Construct an Individual Sewage Treatment and Disposal System Application for Permit to Construct an Individual Sewage Treatment and Disposal System Home Phone No.: Work Phone No.: Application No.: I, _, (Name) (Mailing Address) (City/Town) (State) (Zip Code) hereby

More information

CONTACTS: Mitchell Shire Council 57346200. M.S.C. Building Department 57346230. M.S.C. Health Department 57346238

CONTACTS: Mitchell Shire Council 57346200. M.S.C. Building Department 57346230. M.S.C. Health Department 57346238 CONTACTS: Mitchell Shire Council 57346200 M.S.C. Building Department 57346230 M.S.C. Health Department 57346238 M.S.C. Enforcement & Compliance Unit 57346274 Building Control Commission 92856458 USEFUL

More information

Overview of Land Construction Courses at Kansas State University

Overview of Land Construction Courses at Kansas State University Overview of Land Construction Courses at Kansas State University Developed by Professor Day in the mid 1960 s at KSU, continuing to present time, is a vision of a Land Construction course series that examines

More information

SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016

SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016 SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016 INTRODUCTION THE STRATEGIC PLANNING PROCESS FOR SASK SPORT ENGAGED ITS ACTIVE AND AFFILIATE MEMBERSHIP AND FIRST NATIONS AND MÉTIS COMMUNITIES FOR IDEAS AND RECOMMENDATIONS

More information

Benchmark Identify physical & human characteristics of places, regions in North America. Grade Level Indicator Describe, compare landforms, climates, population, vegetation, economic characteristics of

More information

Landforms form an integral part

Landforms form an integral part Landform classification using GIS by Karsten Drescher, Terralogix Consulting, and Willem de Frey, Ekoinfo Refining existing landform classifications using ESRI s model builder. Landforms form an integral

More information

Mud in the Water. www.agclassroom.org/ok. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities

Mud in the Water. www.agclassroom.org/ok. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities Mud in the Water Objective Students will learn about soil erosion and water pollution by building a demonstration model from pop bottles and observing the movement of pollutants from soil into water. Background

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Make Global Recruiting a Winning Strategy

Make Global Recruiting a Winning Strategy Make Global Recruiting a Winning Strategy A ManpowerGroup TM Solutions White Paper Make Global Recruiting a Winning Strategy Today s global workforce is on the move like never before. Macro-economic forces,

More information

Chapter 11 Housing Page 11-1

Chapter 11 Housing Page 11-1 Housing Page 11-1 11(1) Municipal Standards for Condominium Developments That the following minimum Municipal Standards for condominium developments be established: Minimum Municipal Standards Parking

More information

John F. Cotton College of Architecture & Environmental Design California Polytechnic State University San Luis Obispo, California JOHN F.

John F. Cotton College of Architecture & Environmental Design California Polytechnic State University San Luis Obispo, California JOHN F. SO L I DMO D E L I N GAS A TO O LFO RCO N S T RU C T I N SO G LA REN V E LO PE S by John F. Cotton College of Architecture & Environmental Design California Polytechnic State University San Luis Obispo,

More information

Weekend Cabin Retreat Project Site Plans

Weekend Cabin Retreat Project Site Plans Weekend Cabin Retreat Project Site Plans Sacramento City College EDT 300/ENGR 306 EDT 300/ENGR 306 - Site Plans 1 Cabin Project Site Plan/Bubble Diagram - Assignment 1 =10-0 Floor Plan - Assignment 1/4

More information

A permanent settlement on Mars: The architecture of the Mars Homestead Project

A permanent settlement on Mars: The architecture of the Mars Homestead Project 2005 Mars Home 1 A permanent settlement on Mars: The architecture of the Mars Homestead Project Georgi I. Petrov Project Architect Laguarda.Low Architects Bruce Mackenzie Mars Foundation Mark Homnick Mars

More information

For Historically Designated Homes & Buildings

For Historically Designated Homes & Buildings Ninth Street Historic Park Acknowledgements This project was paid for in part by a State Historical Fund grant from the Colorado Historical Society. The contents contained herein do not necessarily reflect

More information

ACO Water Management: Civils + Infrastructure

ACO Water Management: Civils + Infrastructure ACO Water Management: Civils + Infrastructure Technical data Introduction to The unit provides an aesthetically pleasing solution when linking proprietary conveyance drainage systems to vegetated infiltration

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

FRED JONES JR. MUSEUM OF ART THE STUART WING AND ADKINS GALLERY ADDITION

FRED JONES JR. MUSEUM OF ART THE STUART WING AND ADKINS GALLERY ADDITION Client: Fred Jones Jr. Museum of Art, The Stuart Wing and Adkins Gallery Completion: October 2011 Scope: Renovation of existing gallery and addition of new galleries - 54,570 SF Cost: $13 Million Awards:

More information

What Is Rehabilitation?

What Is Rehabilitation? Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated

More information

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS This section provides guidance on a variety of trail issues for planners and developers of the Ice Age NST across the state. It also provides introductory

More information

unprecedented opportunity MOFFET T TOW ERS unparalleled visibility

unprecedented opportunity MOFFET T TOW ERS unparalleled visibility unprecedented opportunity MOFFET T TOW ERS unparalleled visibility INNOVATION THRIVES HERE Moffett Towers is an extraordinary new office and R&D campus in the heart of Silicon Valley. It is unquestionably

More information

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria Memorandum TO: FROM: Michael Bergstrom and Robin Cole City of Bellevue Nancy Bird, AICP EDAW, Inc. DATE: July 23, 2008 RE: Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

data capture The Internet has fundamentally changed consumer acquisition for today s business by empowering the consumer.

data capture The Internet has fundamentally changed consumer acquisition for today s business by empowering the consumer. data capture The Internet has fundamentally changed consumer acquisition for today s business by empowering the consumer. Today s consumers are not restricted by geographical boundaries, they are internet

More information

Creating a History Day Exhibit Adapted from materials at the National History Day website

Creating a History Day Exhibit Adapted from materials at the National History Day website Creating a History Day Exhibit Adapted from materials at the National History Day website Exhibits are designed to display visual and written information on topics in an attractive and understandable manner.

More information

Choosing Colors for Data Visualization Maureen Stone January 17, 2006

Choosing Colors for Data Visualization Maureen Stone January 17, 2006 Choosing Colors for Data Visualization Maureen Stone January 17, 2006 The problem of choosing colors for data visualization is expressed by this quote from information visualization guru Edward Tufte:

More information

Appendix To Operational Review and Recommendations For Juniper Golf Course

Appendix To Operational Review and Recommendations For Juniper Golf Course Appendix To Operational Review and Recommendations For Juniper Golf Course Prepared For: City of Redmond Attn: David Brandt 716 SW Evergreen Street Redmond, OR 97756 Prepared By: 1150 South U.S. Highway

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

2 Wind Erosion and Deposition

2 Wind Erosion and Deposition CHAPTER 3 2 Wind Erosion and Deposition SECTION Agents of Erosion and Deposition BEFORE YOU READ After you read this section, you should be able to answer these questions: How can wind erosion shape the

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Expert Color Choices for Presenting Data

Expert Color Choices for Presenting Data Expert Color Choices for Presenting Data Maureen Stone, StoneSoup Consulting The problem of choosing colors for data visualization is expressed by this quote from information visualization guru Edward

More information

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

APPLICATION PROCESS FOR LAND DISTURBING PERMIT PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT. Final Report. Michael Lackner, B.A. Geography, 2003

2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT. Final Report. Michael Lackner, B.A. Geography, 2003 2002 URBAN FOREST CANOPY & LAND USE IN PORTLAND S HOLLYWOOD DISTRICT Final Report by Michael Lackner, B.A. Geography, 2003 February 2004 - page 1 of 17 - TABLE OF CONTENTS Abstract 3 Introduction 4 Study

More information

Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey

Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Introduction The following data entry guidelines are to be followed for new Data Sharing System (DSS) entries. When updating previously

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.

C. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters. SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers

More information

A Strategy for Teaching Finite Element Analysis to Undergraduate Students

A Strategy for Teaching Finite Element Analysis to Undergraduate Students A Strategy for Teaching Finite Element Analysis to Undergraduate Students Gordon Smyrell, School of Computing and Mathematics, University of Teesside The analytical power and design flexibility offered

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

EcoInformatics International Inc.

EcoInformatics International Inc. 1 von 10 03.08.2010 14:25 EcoInformatics International Inc. Home Services - solutions Projects Concepts Tools Links Contact EXPLORING BEAVER HABITAT AND DISTRIBUTION WITH GOOGLE EARTH: THE LONGEST BEAVER

More information

Earth Coordinates & Grid Coordinate Systems

Earth Coordinates & Grid Coordinate Systems Earth Coordinates & Grid Coordinate Systems How do we model the earth? Datums Datums mathematically describe the surface of the Earth. Accounts for mean sea level, topography, and gravity models. Projections

More information

john jay college of criminal justice

john jay college of criminal justice AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the

More information

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps GEOLOGIC MAPS PURPOSE: To be able to understand, visualize, and analyze geologic maps Geologic maps show the distribution of the various igneous, sedimentary, and metamorphic rocks at Earth s surface in

More information

part 9 waste management

part 9 waste management part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE

More information

[2011] Digital. Photography Lesson Plan 2. The Subject

[2011] Digital. Photography Lesson Plan 2. The Subject Digital [2011] Photography Lesson Plan 2 [This lesson is intended to engage the students with the concepts of art in photography. We will be discussing the use of compositions, background, foreground and

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Graphic Design. Background: The part of an artwork that appears to be farthest from the viewer, or in the distance of the scene.

Graphic Design. Background: The part of an artwork that appears to be farthest from the viewer, or in the distance of the scene. Graphic Design Active Layer- When you create multi layers for your images the active layer, or the only one that will be affected by your actions, is the one with a blue background in your layers palette.

More information

STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION

STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION CITY COUNCIL PROPOSED NEW RESIDENCE AT LOT XX, DP:55555 XXX Anon Drive, Somewhere FOR X. & Y Anonymous STATEMENT OF ENVIRONMENTAL EFFECTS AND NOTES IN SUPPORT OF DEVELOPMENT APPLICATION Angela Elliss Design

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Created by Elizabeth Rossi, Valley View Middle School Art Teacher

Created by Elizabeth Rossi, Valley View Middle School Art Teacher Odili Donald Odita, Flow Abstracted Architecture Multimedia Drawings Created by Elizabeth Rossi, Valley View Middle School Art Teacher Age Adaptable Visual Arts 2-3 Lessons On-Site Lesson Plan About the

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Copyright 2008 Stephen Few, Perceptual Edge Page of 11

Copyright 2008 Stephen Few, Perceptual Edge Page of 11 Copyright 2008 Stephen Few, Perceptual Edge Page of 11 Dashboards can keep people well informed of what s going on, but most barely scratch the surface of their potential. Most dashboards communicate too

More information

Composition and Layout Techniques

Composition and Layout Techniques Composition and Layout Techniques Composition Techniques Composition Composition is the placement or arrangement of visual elements or ingredients in a work of art, as distinct from the subject of a work.

More information

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA Brendan J. Holden SOPAC Technical Secretariat July 1992 SOPAC Technical Report 148 Prepared for: South Pacific Applied Geoscience

More information

Topographic Survey. Topographic Survey. Topographic Survey. Topographic Survey. CIVL 1101 Surveying - Introduction to Topographic Modeling 1/8

Topographic Survey. Topographic Survey. Topographic Survey. Topographic Survey. CIVL 1101 Surveying - Introduction to Topographic Modeling 1/8 IVL 1 Surveying - Introduction to Topographic Modeling 1/8 Introduction Topography - defined as the shape or configuration or relief or three dimensional quality of a surface Topography maps are very useful

More information

LANDSCAPE ARCHITECTURE SERIES, GS-0807

LANDSCAPE ARCHITECTURE SERIES, GS-0807 TS-44 February 1963 General Schedule Position Classification Standards POSITION CLASSIFICATION STANDARD FOR LANDSCAPE ARCHITECTURE SERIES, GS-0807 Theodore Roosevelt Building 1900 E Street, NW Washington,

More information

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent. 11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

It was my assignment to physically inspect the 8 trees on site near the proposed construction, July 11, 2013 Tariton Properties 2555 Park Blvd Palo Alto, CA 94306 Re: Tree Survey To Whom It May Concern: Assignment It was my assignment to physically inspect the 8 trees on site near the proposed construction,

More information

Inspired Stitch: A Creative Journey

Inspired Stitch: A Creative Journey Inspired Stitch: A Creative Journey Design and Stitch from Photographs Gwen Hedley For many years I have been inspired by the shores of Dungeness in Kent. My creative journeys have always begun by spending

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

How To Teach Geology

How To Teach Geology A HANDS-ON APPROACH TO UNDERSTANDING TOPOGRAPHIC MAPS AND THEIR CONSTRUCTION Department of Geology and Environmental Science La Salle University Philadelphia, Pennsylvania This article originally appeared

More information

Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland

Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland Development of an Impervious-Surface Database for the Little Blackwater River Watershed, Dorchester County, Maryland By Lesley E. Milheim, John W. Jones, and Roger A. Barlow Open-File Report 2007 1308

More information

Art Masterpiece: Poppy, 1927-Georgia O Keeffe

Art Masterpiece: Poppy, 1927-Georgia O Keeffe Art Masterpiece: Poppy, 1927-Georgia O Keeffe Keywords: Vantage Point, Blending, Water-color Grade: 4 th 5th Lesson: Close-Up Flower-Water Color Art Print: A variety of O Keefe art prints can be used in

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8

More information

Architect-Led Architect-Led Design-Build Design-Build A Client s Guide A Client s Guide

Architect-Led Architect-Led Design-Build Design-Build A Client s Guide A Client s Guide 10 Advantages of Architect-Led Design-Build A Client s Guide 10d Welcome! We prepared this guide after seeing so many people struggle with understanding the differences between the Design-Build (DB) method

More information

ARTS & CRAFTS PRIMARY

ARTS & CRAFTS PRIMARY ARTS & CRAFTS PRIMARY 2013 CONTENTS ByME 2 Arts and Crafts ByME 3 Contents Levels 1 to 6 4 Student s Book 10 Teacher s Material 34 Online Resources 40 ByME THE BEST IS YET TO COME ARTS AND CRAFTS ByME

More information

Create a folder on your network drive called DEM. This is where data for the first part of this lesson will be stored.

Create a folder on your network drive called DEM. This is where data for the first part of this lesson will be stored. In this lesson you will create a Digital Elevation Model (DEM). A DEM is a gridded array of elevations. In its raw form it is an ASCII, or text, file. First, you will interpolate elevations on a topographic

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Waste and Recycling Station Design Guidelines

Waste and Recycling Station Design Guidelines The Pennsylvania State University Offi ce of Physical Plant PURPOSE Waste and Recycling Station Design Guidelines To advance the progress of Penn State s Sustainability Strategic Plan. To facilitate the

More information

How To Test A Safe Harbor Plan

How To Test A Safe Harbor Plan Profit Sharing Allocation Methods - The Better Part of Discretion A White Paper by Manning & Napier www.manning-napier.com Unless otherwise noted, all figures are based in USD. 1 Most Profit Sharing/401(k)

More information

DRAFT Proposed Revisions Texas Essential Knowledge and Skills (TEKS) Fine Arts, High School Art

DRAFT Proposed Revisions Texas Essential Knowledge and Skills (TEKS) Fine Arts, High School Art Proposed Revisions Texas Essential Knowledge and Skills (TEKS) Fine Arts, High School Art Prepared by the State Board of Education (SBOE) TEKS Review Committees First Draft, These draft proposed revisions

More information

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced

More information

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.

HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. HOMEOWNER S GUIDE to LANDSLIDES RECOGNITION, PREVENTION, CONTROL, and MITIGATION Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. Andrew Federal Emergency Management Agency Region 10 If you are

More information